7 Programma Quadro Call del 10 Luglio 2012 · Topic ICT-2013.6.6 Integrated personal mobility for...
Transcript of 7 Programma Quadro Call del 10 Luglio 2012 · Topic ICT-2013.6.6 Integrated personal mobility for...
7° Programma Quadro Call del 10 Luglio 2012
TTS Italia
18 Luglio 2012
2
Call pubblicate: invito del 10 luglio 2012
La Commissione Europea ha lanciato lo scorso 10 luglio uninvito a presentare proposte per il 7°PQ, l’ultimo invito rilevantedella programmazione finanziaria 2007/2013
Il valore complessivo è di 8,1 miliardi di euro, di cui 1,2 miliardidi euro per le PMI.
Questi ultimi bandi costituiscono una passerella verso Horizon2020, il nuovo programma di finanziamento per la ricerca UE belperiodo 2014-2020
3
Call pubblicate: invito del 10 luglio 2012
FP7- Infrastructures-2013 -1 (Infrastrutture di ricerca)
FP7–Energy-2013 -1 (energia)
FP7–Energy–2013 -2 (energia)
FP7-Energy—2013-IRP (energia)
FP7-2013-NMP-ICT-FoF (tecnologie dell’informazione e dellacomunicazione)
FP7-SEC-2013-1 (sicurezza)
FP7-INCO-2013-1 (cooperazione internazionale)
FP7-INCO-2013-2 (cooperazione internazionale)
4
Call pubblicate: invito del 10 luglio 2012
FP7-INCO-2013-3 (cooperazione internazionale)
FP7 -INCO-2013-4 (cooperazione internazionale)
FP7-INCO-2013-9 (cooperazione internazionale)
FP7-NMP-2013-CSA-7 (nanoscienze, nanotecnologie, materialie nuove tecnologie di produzione)
FP7-SPACE-2013-1 (spazio)
FP7-SME–2013 (ricerca per piccole e medie imprese)
FP7-ENV-2013: one stage (ambiente)
FP7-ENV-2013: two stage (ambiente)
5
Call pubblicate: invito del 10 luglio 2012
FP7-ICT-2013-FET-F (Future and Emerging Technologies -tecnologie dell’informazione e della comunicazione)
FP7-2013-ICT-GC (Green Cars - tecnologie dell’informazione edella comunicazione)
FP7-Transport–2013-MOVE-1
FP7-Sustainable Surface Transport (SST)–2013-RTD-1
FP7-ICT–2013-10
FP7-Smartcities–2013
6
FP7-Transport–2013-MOVE-1
Scadenza: 14 Novembre 2012
Indicative budget: 25 M€
Challenge 2. Safe and Seamless MobilityActivity 7.2.3. Ensuring sustainable urban MobilityTopic SST.2013.3-3. Capitalising CIVITAS knowledge and experience.
Obiettivo: The aims are to capitalise knowledge gained in previousCIVITAS ('City-Vitality-Sustainability' or 'Cleaner and BetterTransport in Cities' initiative) phases, strengthen the role ofpublic authorities in stimulating transport innovation, and providea bridge to the Union’s next research and innovation programme
Funding Scheme: CSA-CA. Contributo UE < 4M€
7
FP7-Transport–2013-MOVE-1
Cross-Cutting activities for implementing the sub-themeprogrammeTopic SST.2013.6-2. Towards a competitive and resource efficient port transport system.
Obiettivo: The objectives of the action are to facilitate ports (maritime orinland waterway) to efficiently handle the increasing freight volumes; toenable seamless logistics chains; to review the restrictions on provisionsfor port services; to enhance the transparency on ports’ financing,highlighting the destination of public funding to the different port activitieswith a view to avoid any distortion of competition; and to “establish amutually recognisable framework on the training of port workers indifferent fields of port activities
Funding scheme: CP / CSA-CAContributo per il CP project < 3M€ e durata < di 48 mesiContributo per il CSA-CA project < a 1,5M€ e durata < a 30 mesi1 CP project e 1 CSA-CA project saranno finanziati
8
FP7-Transport–2013-MOVE-1
The “European Green Cars Initiative”Topic GC.SST.2013-4. Demonstration of electric buses as urban public transport
Obiettivo: The White Paper calls for a transition from a car based personalmobility to a public transport based mobility. Public transport plays alsoan important role in mitigating the negative effects of transport in urbanareas such as congestion, greenhouse gases and pollutants emissions.Clean, energy efficient and silent buses will contribute to meet theseobjectives. A large demonstration project will facilitate the market take upof electric buses in Europe. The fleets of urban buses will include themain types of electrification technologies dealing with different scenariosof interaction with the electricity grid. The proposal time frame should bedesigned to take on board latest development in EU or nationalprograms and latest available innovative industrial technologies for allvehicle categories considered. Existing local or regional
Funding scheme: CP; Contributo UE < 13,5M€1 CP project sarà finanziato
9
FP7-Sustainable Surface Transport (SST)–2013-RTD-1
Scadenza: 14 Novembre 2012
Indicative budget: 110,95 M€
Challenge 2. Safe and Seamless MobilityActivity 7.2.3. Ensuring sustainable Urban MobilityTopic SST.2013.3-1 Managing integrated multimodal urban transport network
Obiettivo: Research will aim at developing, demonstrating and validatingstrategies and tools (technological and methodological), which contributeto integrated multimodal network management for cities and theirhinterland. Strategies can address the movements of goods and peopleon the network as well as the improvement of the accessibility.Funding Scheme: CPContributo UE < 9M€1 Progetto sarà finanziato
10
FP7-Sustainable Surface Transport (SST)–2013-RTD-1
Topics SST.2013.3-2 Implementing innovative and green urban transport solutions in Europe and beyond
Obiettivo: The active take up and transfer of experiencebetween European cities and cities across the world canaccelerate the deployment of innovative and green urbantransport solutions.
Funding Scheme: CSA-CAContributo UE < 2M€.
11
FP7-Sustainable Surface Transport (SST)–2013-RTD-1
The European Green Car InitiativeTopic GC.SST.2013-1. Feasibility analysis and technologicaldevelopment of on-road charging for long term electricvehicle range extension
Obiettivo: Wide-scale adoption of pure Electric Vehicles (EVs)requires advanced charging solutions which provide a userexperience similar to today's cars, particularly in terms of range
Funding Scheme: CPContributo UE < 10M€1 Progetto sarà finanziato
12
FP7-Sustainable Surface Transport (SST)–2013-RTD-1
The European Green Car InitiativeTopic GC.SST.2013-7. Technical and operational connectivity in intermodal freight transport
Obiettivo: The objective of this topic is to increase the individualand co-operative performance quality and throughput of portsand terminals through the development of innovativetechnologies, infrastructures and e-freight solutions
Funding Scheme: CP-FPContributo UE < 3M€
13
FP7-Sustainable Surface Transport (SST)–2013-RTD-1
Horizontal activities for implementing the transport programmeTopic TPT.2013-1. Technology transfer in the area of Transport
Obiettivo: The aim of this topic is to develop and implementconcepts of technology transfer or cross fertilisation of technicalsolutions between transport modes or sectors in areas such assustainable and light materials and their processing, humanfactors, lean manufacturing, passenger comfort and safety,energy efficient components, etc.
Funding Scheme: CP-FPContributo UE < 3M€
14
FP7-ICT–2013-10
Scadenza: 15 Gennaio 2013
Indicative budget: 705,5 M€
Challenge 1: Pervasive and Trusted network and service InfrastructuresTopic ICT-2013.1.3 Digital EnterpriseObiettivo: The work addresses new forms of enterprises withad-hoc extensive connectivity of digital assets and enhancedbusiness processes through integration of sensing capabilities.
Funding Scheme: Strep, CSAIndicative budget distribution:- STREP: 15.30 M€- CSA: 0.70 M€
15
FP7-ICT–2013-10
Challenge 1: Pervasive and Trusted network and service InfrastructuresTopic ICT-2013.1.7 Future Internet Research Experimentation (FIRE)
Obiettivo: The overall goal of Future Internet ResearchExperimentation (FIRE) is combining technological and socialinnovation by investigating and experimenting new paradigmsrelated to the Internet, both for future Internet architectures and aholistic and multidisciplinary understanding of Internetdevelopments.
Funding Scheme: IP, Strep, CSA
16
FP7-ICT–2013-10
Challenge 6: ICT per a Low Carbon EconomyTopic ICT-2013.6.5 Co-operative mobility
Obiettivo: The objective is to make use of co-operative mobilitytechnologies to develop supervised automated driving which isexpected to be the most viable long-term option for improvingboth the energy efficiency and safety of individual, public andfreight transport by smoother, better informed driving andbehavioural change.
Funding Scheme: IP/Strep, CSAIndicative budget distribution:a) 23 M€ per IP/Strepb) 3 M€ per CSA
17
FP7-ICT–2013-10
International CooperationTopic ICT-2013.10.3 International partnership building and support to dialogues – Horizontal International Cooperation Actions
Obiettivo: The target is to support dialogues between the EuropeanCommission/the EU and strategic partner countries and regions,and to foster cooperation with strategic third countryorganisations in collaborative ICT R&D both within the EU'sFramework Programmes (FP7, Horizon 2020) and under relevantthird country programmes
Funding Scheme: CSAIndicative budget distribution:8 M€ (maximum EU grant of 800 K€ per proposal)
18
FP7-ICT–2013-10
International CooperationTopics ICT-2013.11.1 Ensuring more efficient, higher qualitypublic services through Pre-Commercial Procurement of ICTsolutions across sectors of public interest
Obiettivi: The aim of this action is to bring radical improvements tothe quality and efficiency of public services by supporting thedevelopment and validation of breakthrough solutions throughPre-Commercial Procurement (PCP). It is open to proposals in allareas of public sector interest, (e.g. for new ICT solutions inhealthcare, inclusion, e-government, transport, energy,environment), in complementarity with actions foreseen underother objectives
Funding Scheme: CP-CSAIndicative budget distribution: 4 M€, of which maximum 30% for the
CSA part of the CP-CSA
19
FP7-Smartcities–2013
Scadenza: 4 Dicembre 2012
Indicative budget: 209 M€, di cui 95 M€ per ICT e 114 M€ per Energy
Information and Communication TechnologiesTopic ICT-2013.1.4 A reliable, smart and secure Internet ofThings for Smart Cities
Obiettivo: The goal is to facilitate wider uptake of IoT-basedsystems with an emphasis on sustainable smart cityapplications. The technological focus is on built-in privacy andsecurity, and on scalable data management capabilitiesapplicable to heterogeneous device platforms.
Funding Scheme: CP (STREP only), CSAIndicative budget distribution: 20 M€, dei quali 19.25 M€ per
STREP e 0,25M€ per un solo CSA
20
FP7-Smartcities–2013
Information and Communication TechnologiesTopic ICT-2013.6.2 Data Centres in an energy-efficient andenvironmentally friendly Internet
Obiettivo: The action will address system level technologies andassociated services that will improve the energy andenvironmental performance of data centres. Given that datacentres are a core element of today's Internet and among thefacilities with the highest rate of increase energy consumptionand related environmental impact, the action will contribute to amore energy efficient and environmentally friendly Internet.
Funding Scheme: CP (STREP only)Indicative budget distribution: 20 M€
21
FP7-Smartcities–2013
Information and Communication TechnologiesTopics ICT-2013.6.4 Optimising Energy Systems in SmartCities
Obiettivi: Cities are increasingly recognized for their ability to play acatalytic role in addressing climate and energy challenges usingtechnologically innovative approaches. This can be achieved bycreating new partnerships connecting city leaders andstakeholders to secure practical commitments for implementinggreen digital agendas.
Funding Scheme: CP (STREP only )/CSAIndicative budget distribution: 40 M€, di cui 39 M€ per STREPs,
1 M€ per CSA
22
FP7-Smartcities–2013
Information and Communication TechnologiesTopic ICT-2013.6.6 Integrated personal mobility for smartcities
Obiettivo: Proposals shall demonstrate the value of new servicesand business models through pilots involving end-users, payingattention to aspects of data privacy and security of the digitalcitizen.
Funding Scheme: CP (STREP only)Indicative budget distribution: 15 M€
23
FP7-Smartcities–2013
EnergyTopic Energy.2013.7.3.1: Planning rules for linkingelectric vehicles (EV) to distributed energy resourcesObiettivo: The aim is to develop network planning rules andtools to enable electric vehicles in a large scale roll out and tomaximise their potential for linking with and balancing ofdistributed energy resourcesFunding Scheme: CPAdditional information: Up to one project may be funded.
24
FP7-Smartcities–2013
EnergyTopic Energy.2013.7.3.2: Enhanced interoperability andconformance testing methods and tools for interactionbetween grid infrastructure and electric vehiclesObiettivo: The aim is to develop enhanced conformancetesting methods and tools for the interaction between gridinfrastructure and EVs.Funding Scheme: CPAdditional information: Up to one project may be funded.
Grazie per lʼattenzione!