E-DOC-004 -RELAZIONE DEI CALCOLI ESECUTIVI STRUTTURE · 2012-10-26 · − Foglio 557 n. 140...

174
PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture Pag. 1 a 174 Provincia di Cagliari Comune di Cagliari ENTE PARCO NATURALE REGIONALE MOLENTARGIUS - SALINE RELAZIONE DEI CALCOLI ESECUTIVI DELLE STRUTTURE PROGETTO ESECUTIVO PONTE CICLABILE - PEDONALE Progetto Esecutivo Strutture

Transcript of E-DOC-004 -RELAZIONE DEI CALCOLI ESECUTIVI STRUTTURE · 2012-10-26 · − Foglio 557 n. 140...

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 1 a 174

Provincia di Cagliari Comune di Cagliari

ENTE PARCO NATURALE REGIONALE MOLENTARGIUS - SALINE

RELAZIONE DEI CALCOLI ESECUTIVI DELLE STRUTTURE

PROGETTO ESECUTIVO PONTE CICLABILE - PEDONALE

Progetto Esecutivo Strutture

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 2 a 174

01. PREMESSE E GENERALITÀ SUL PROGETTO STRUTTUALE

La presente relazione riguarda il progetto esecutiva di un ponte ciclabile – pedonale alla fine di Via La Palma in

prossimità dell’esistente Ponte Secchi, nel territorio dell’Ente Parco Naturale Regionale Molentargius - Saline.

01.01. Caratteristiche del sito

Il sito interessato dal ponte ciclabile è ubicato in comune di Cagliari, nella porzione sud occidentale del territorio del

Parco e risulta contenuto nella seguente cartografia:

− Foglio 557 Cagliari della carta geologica nazionale in scala 1:50.000,

− Foglio 557 Sez. III "Cagliari" in scala 1:25.000,

− Foglio 557 n. 140 “Cagliari” della Carta Tecnica Regionale numerica della Regione Autonoma Sardegna in scala

1:10.000.

Il nuovo ponte ciclabile – pedonale verrà realizzato alla fine di via Palma in prossimità dell’esistente Ponte Secchi, unico

ingresso al Parco dal lato della Città di Cagliari.

Figura 1: Inquadramento geografico

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 3 a 174

Figura 2: inquadramento geografico su ortofoto 2006

Figura 3: inquadramento geografico su CTR

Il Ponte Secchi, avente una larghezza di appena 4,00 metri, in cui coesiste di traffico veicolare con il transito di biciclette

e pedoni. Si ritiene opportuno con il presente progetto creare un’infrastruttura che consenta il passaggio in sicurezza

esclusivo di pedoni e ciclisti. Per cui il progetto prevede la realizzazione di un ponte ciclopedonale affiancato a quello

esistente che sarà perciò dedicato al solo traffico veicolare.

La realizzazione del ponte dedicato esclusivamente alla mobilità ciclo-pedonale, ben si sposa con la finalità generale del

progetto che prevede di ripristinare e rafforzare la mobilità sostenibile all’interno del Parco.

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 4 a 174

01.02. Caratteristiche geologiche geotecniche del sito

Le caratteristiche geotecniche del terreno di sedime che ospiterà l’opera in progetto, sono state desunte della relazioni

specialistiche poste a corredo del presente progetto dall’Ente appaltante e di seguito specificate:

- Relazione Geologica, redatta dalla Dott.ssa Geol. Alba Gamba;

- Indagini geognostiche, eseguite dalla Dott. Geol. Antonello Angius;

Il sito ha quota circa 1 metro sul l.m.m. ed è stato originato durante le ultime fasi di regressione marina Quaternaria, che

hanno visto l’accumulo dei sedimenti, sabbioso-ciottolosi con legante carbonatico, originati dall’erosione dei rilievi

calcarei (Sella del Diavolo– Monte Urpinu) in ambiente di mare poco profondo o di linea di spiaggia. I terreni, al di sotto

di una coltre di terreno di riporto potente circa 1 metro, sono sabbiosi, talora con ciottoli e più o meno legati da carbonati

ed argilla, moderatamente addensati. Appena al di sotto di 1.50 m i terreni sono saturi per la presenza del Canale La

Palma. Al di sotto dei -4.50 metri e sino a circa -10 metri dal p.c. i terreni, prevalentemente sabbiosi sono saturi e sotto-

consolidati, prevalentemente sciolti; risultato di una fase di rapido accumulo e sedimentazione in ambiente marino.

Oltre tale quota le sabbie sfumano da termini poco addensati a termini molto addensati. Il sondaggio non ha riscontrato

la presenza della Panchina Tirreniana che normalmente caratterizza l’area. Si riporta di seguito la parametrizzazione

geotecnica assunta alla base del calcolo e desunta delle relazioni specialistiche:

La superficie piezometrica si stabilizza in entrambi i fori a - 1.60 metri dall’attuale p.c. La successione stratigrafica può

essere geotecnica mente accorpata in tre strati, a partire dall’alto verso il basso, come segue:

A) dal p.c. a -0.80 (max -1.00 metri) Terreno di riporto: clasti di calcare e sabbia

rimaneggiata, biancastra, asciutta, moderatamente addensata. Questo livello sarà superato dal piano di posa delle

strutture di fondazione. Si assume un valore NSPT=15-20 colpi/30 cm al quale vengono associati i seguenti parametri

geotecnici:

γ = 18.5-19.7 kN/mc; γsat = 19.1-23.6 kN/mc; DR = 90.00 % (Gibbs-Holtz, 1957)

Cu = ≥ 0; γmedio = 31°-33°; EYoung = 17000 kN/mq

B) da -0.80 (max -1.00 metri) a -10.20 (max -11.20 metri) Sabbia da sciolta a poco addensata (sotto-consolidata):

complesso di sedimenti di ambiente di transizione (antica linea di costa) costituiti da sabbia equigranulare, qualche

clasto di calcare e legante carbonatico, da biancastra a beige. Sempre satura a partire da – 1.60 metri dal p.c.

Si attribuisce a tale livello un valore NSPT= 5-12 colpi/30 cm e si associano i seguenti parametri geotecnici:

γ = 15.0-19.0 kN/mc γsat = 18.5-19 kN/m3 DR =40-70 %

Cu = ≥ 0; γmedio = 29-32° EYoung = 5.000-11.000 kN/m2

C) da -10.20 (max -11.20 metri) a 11.60 e oltre Sabbia molto addensata: sabbia con granulometria assortita,

consolidata, addensata, satura. Si assume un valore NSPT=50 colpi/30 cm al quale sono associati i seguenti parametri

geotecnici:

γ = 21.7 kN/m3 γsat = 24.5 kN/m3 DR = 95%

Cu = ≥ 0 γmedio = 38°-40°; EYoung = 30.000-45.000 kN/mq

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 5 a 174

02. DESCRIZIONE DELLE OPERE

02.01. Fondazioni spalle n. 1 e 2

In considerazione delle caratteristiche geotecniche del sito su descritte e degli esigui carichi tramessi dal manufatto si è

optato per la realizzazione di fondazioni superficiali posate a quota -1.85 m dal piano di campagna (strato B) previa

esecuzione di bonifica del piano di posa con misto arido di cava pulito e compattato adeguatamente per un’altezza di

almeno 50 cm, prima di eseguire il magrone di sottofondazione in calcestruzzo tipo C 10/15.

Tutto ciò premesso le spalle n.1 e 2 e i relativi muri d’ala verranno fondati su una platea in cemento armato ordinario

avente dimensioni pari a 4.50x3.30x0.60 h, dimensionate adottando un carico limite ammissibile di 1.50 daN/cmq. I

manufatti di fondazione dovranno essere confezionati con calcestruzzo tipo C 30/37 e acciaio tipo B450C.

02.02. Spalle n. 1 e 2

I manufatti di sostegno previsti in progetto su ciascun lato dell’opera d’arte sono costituiti due paramenti sub-verticali

avventi altezza totale rispettivamente pari a 4.00 m spalla n. 1 e 4.44 m spalla n. 2, di cui 1.85 m risultano interrati. Il

paramento murario presenta larghezza pari a 3.10 m e spessore variabile da 60 cm alla base a 40 cm in sommità, nella

sezione di attacco del muro paraghiaia posto a protezione della sede di appoggio del ponte. Su ciascun lato del

paramento, ortogonalmente a questo sono previsti muri d’ala avventi spessore pari a 30 cm sagomati con una parte a

sbalzo per contenere il rilevato a tergo del opera, per una lunghezza totale di circa 6.10 m e altezza variabile dalla

sommità della spalla alla quota di progetto della rampa..

L’impalcato è collegato alle spalle mediante l’interposizione di uno strato di neoprene spesso 5 cm su ciascuna spalla in

modo da ricreare la condizione di appoggio semplice preesistente. Le spalle dovranno essere confezionati con

calcestruzzo tipo C 30/37 e acciaio tipo B450C.

02.03. Impalcato

L’opera in oggetto essendo una passerella destinata al transito pedonale-ciclabile è stata dimensionata come ponte di

III° categoria, ovvero per il transito dei soli carichi associati allo Schema 5 (passerelle pedonali) indicato nella NTC 2008

p. 5.1.3.3.3 Schemi di Carico, costituito dalla folla compatta agente con intensità nominale comprendente gli effetti

dinamici di 5.0 KN/mq.

Il ponte costituito ad un’unica campate avente luce di calcolo tra gli assi degli appoggi pari a 21.00 m e larghezza pari a

2.50 m, attraversa il canale La Palma trasversalmente al suo corso garantendo gli adeguati franchi richiesti dal

committente per la navigazione con i battelli di proprietà dell’Ente, 2.80 m dal pelo libero dell’acqua all’intradosso

dell’impalcato; da cui conseguine le altezze e le quote di progetto previste in progetto per rispettare tale vincolo

progettuale. L’asse principale del ponte presenta un andamento planimetrico rettilineo e una pendenza longitudinale

pari a zero, mentre le rampe si ricollegano alla viabilità ciclabile esistente con pendenze longitudinali rispettivamente del

6.85 % (spalla n.1) e del 6.37 % (spalla n.2)

Il ponte, progettato con schema statico di semplice appoggio, presenta struttura portante in carpenteria metallica

costituita da due travi principali HEA 280 mm rinforzate con un sistema di puntoni e tiranti Φ120 mm sp. 10 mm,

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 6 a 174

accoppiate trasversalmente da profili IPE 120 mm posti ad interasse 1.00 m e deputati ad sostenere la lamiera grecata

collaborante da completare in opera con getto in calcestruzzo alleggerito strutturale C20/25 di spessore pari a 10 cm

armata con rette elettrosaldata. Il getto di completamento collega la sommità dei profili principali e le aste della struttura

secondaria realizzando un impalcato rigido in grado di conferire all’opera la necessaria rigidezza torsionale. In fase di

varo è montaggio della struttura al fine di garantire la necessaria rigidezza dell’impalcato nel suo piano prima del getto

della soletta collaborante in calcestruzzo, è prevista una specifica controventatura di piano con diagonali tipo L35x4 mm.

Figura 4 – Pianta e sezione di progetto del ponte I collegamenti tra gli elementi costituenti la struttura principale, ovvero travi, puntoni e tiranti dovranno essere realizzati

con saldature, mentre i collegamenti delle travi trasversali sulle principali e dei diagonali deve essere eseguito con

flange bullonate. La lamiera grecata collaborante dovrà essere fissata su questi ultimi mediante opportuni punti di

saldatura. La carpenteria metallica costituente la struttura dovrà essere di acciaio laminato tipo CorTen, i collegamenti

saldati devono essere di I° categoria nel rispetto della UNI ISO EN 15614-1 per la qualifica dei procedimenti di saldatura

e dei saldatori.

02.04. Descrizione delle metodologia costruttiva

La realizzazione dell’opera prevede diverse fasi costruttive articolate secondo l’ordine indicato nell’elenco puntato di

seguito riportato.

1. Realizzazione degli scavi di fondazione e delle bonifiche con materiale d’apporto proveniente da cava;

2. Realizzazione delle platee in c.a. di fondazione delle spalle n. 1 e n.2 e dei muri d’ala;

3. Realizzazione dei paramenti murari delle spalle n. 1 e n. 2 e dei muri d’ala;

4. Realizzazione dei muretti di sostegno a tergo del rilevato;

5. Posizionamento degli apparecchi d’appoggio in neoprene sulle spalle n. 1 e n. 2;

6. Trasporto dall’officina e varo della passerella pre-assemblata;

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 7 a 174

7. Posa della rette di armatura e getto della soletta in c.a. collaborante con la lamiera grecata;

8. Realizzazione pavimentazione rampe e passerella;

9. Completamenti e finiture.

03. NORMATIVA TECNICA DI RIFERIMENTO

La progettazione delle opere in epigrafe è stata eseguita in ottemperanza alle vigenti norme e prescrizioni in materia

strutturale.

• Decreto del Ministero delle Infrastrutture 14.01.2008 - Approvazione delle nuove norme tecniche per le costruzioni [G.U. 04.02.2008 n. 29, S.O. n. 30] • Consiglio Superiore dei Lavori Pubblici - Istruzioni per l’applicazione delle “Norme tecniche per le costruzioni” di cui al D.M. 14 gennaio 2008 (bozza del 07.03.2008). e, per quanto di competenza e vigente, ma anche per costituire un utile panorama di riferimento: • Legge dello Stato 05.11.1971 n.1086 - Norme per la disciplina delle opere di conglomerato cementizio armato, normale e precompresso ed a struttura metallica [G.U. 21.12.1971 n.321] • Circolare Ministero dei Lavori Pubblici 14.02.1974 n. 11951 - Applicazione delle norme sul cemento armato. • Circolare Ministero dei Lavori Pubblici 25.01.1975 n. 13229 - L’impiego di materiali con elevatecaratteristiche di resistenza per cemento armato normale e precompresso. • Decreto Ministero dei Lavori Pubblici 27.07.1985 - Norme tecniche per l’esecuzione delle opere in cemento armato normale e precompresso e per le strutture metalliche. • Raccomandazioni CNR 10024/86 - Analisi di strutture mediante elaboratore: impostazione e redazione delle relazioni di calcolo. • Circolare Ministero dei Lavori Pubblici 01.09.1987 n. 29010 - Legge 5 novembre 1971 n. 1086 - D.M. 27/7/1985 Controllo dei materiali in genere e degli acciai per cemento armato normale in particolare. • Decreto Ministero dei Lavori Pubblici 20.11.1987 - Norme tecniche per la progettazione, esecuzione e collaudo degli edifici in muratura e per il loro consolidamento [S.O. alla G.U.05.12.1987 n. 285] • Decreto Ministero dei Lavori Pubblici 03.12.1987 - Norme tecniche per la progettazione, esecuzione e collaudo delle costruzioni prefabbricate. • Decreto Ministero dei Lavori Pubblici 11.03.1988 - Norme tecniche riguardanti le indagini sui terreni e sulle rocce, la stabilità dei pendii naturali e delle scarpate, i criteri generali e le prescrizioni per la progettazione, l’esecuzione ed il collaudo delle opere di sostegno delle terre e delle opere di fondazione • Circolare Ministero dei Lavori Pubblici 24.09.1988 n. 30483 - Legge 2 febbraio 1974 n. 64, art. 1 - D.M. 11.03.1988. Norme tecniche riguardanti le indagini sui terreni e sulle rocce, la stabilità dei pendii naturali e delle scarpate, i criteri generali e le prescrizioni per la progettazione, l’esecuzione ed il collaudo delle opere di sostegno delle terre e delle opere di fondazione. Istruzioni per l’applicazione. • CNR-UNI 10011:1988 - Costruzioni di acciaio – Istruzioni per il calcolo, l’esecuzione, il collaudo e la manutenzione. • Decreto Ministero dei Lavori Pubblici 14.02.1992 - Norme tecniche per l’esecuzione delle opere in cemento armato normale e precompresso e per le strutture metalliche [S.O. alla G.U.18.03.1992 n. 65] • Circolare Ministero dei Lavori Pubblici 16.07.1992 n.36105 - Legge 5-11-1971, n. 1086, D.M. 14-2-1992. Acciai per cemento armato e da carpenteria. • Decreto Presidente della Repubblica 21.04.1993 n. 246 – Regolamento di attuazione della direttiva 89/106/CEE relativa ai prodotti da costruzione [G.U. 22.07.1993 n. 170]

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 8 a 174

• Circolare Ministero dei Lavori Pubblici 24.06.1993 n. 37406/STC - Pres. Cons. Superiore - Servizio Tecnico Centrale - Legge 5 novembre 1971, n. 1086. Istruzioni relative alle norme tecniche per l’esecuzione delle opere in c.a.a normale e precompresso e per le strutture metalliche, di cui al D.M. 14-2-1992 • Decreto Ministero dei Lavori Pubblici 09.01.1996 - Norme tecniche per il calcolo, l’esecuzione ed il collaudo delle strutture in cemento armato, normale e precompresso e per le strutture metalliche [G.U. 05.02.1996 n. 29] • Decreto Ministero dei Lavori Pubblici 16.01.1996 - Norme tecniche relative ai «Criteri generali per la verifica di sicurezza delle costruzioni e dei carichi e sovraccarichi» [G.U. 05.02.1996 n. 29] • Circolare Ministero dei Lavori Pubblici 15.10.1996 n. 252 AA.GG./S.T.C. - Istruzioni per l’applicazione delle «Norme tecniche per il calcolo, l’esecuzione ed il collaudo delle opere in cemento armato normale e precompresso e per le strutture metalliche» di cui al D.M. 9 gennaio 1996. (n. 252 AA.GG./S.T.C) [S.O. alla G.U. 26.11.1996 n. 277] • Circolare Ministero dei Lavori Pubblici 24.09.1998 n. 30483 – Istruzioni per l’applicazione delle norme sui terreni e sulle fondazioni. • Decreto Ministero dei Lavori Pubblici 05.08.1999 - Modificazioni al decreto ministeriale 9 gennaio 1996 contenente norme tecniche per il calcolo, l’esecuzione ed il collaudo delle strutture in cemento armato normale e precompresso e per le strutture metalliche. • Circolare Ministero dei Lavori Pubblici 14.12.1999 n.346/STC - Legge 5 novembre 1971, n. 1086, art. 20 - Concessione ai laboratori per prove sui materiali da costruzione. • Circolare Ministero delle Attività Produttive 05.08.2004 – Norme armonizzate in applicazione della direttiva 89/106/CE sui materiali da costruzione – Appendice ZA [G.U. 14.09.2004 n.216 – S.O. n. 152]. • UNI EN 206-1:2006 - Calcestruzzo - Specificazione, prestazione, produzione e conformità. • Decreto Ministero delle Infrastrutture e dei Trasporti 11.04.2007 – Applicazione della direttiva n° 89/106/CEE sui prodotti da costruzione recepita con D.P.R. 21/04/1993, n° 246, relativa alla individuazione dei prodotti e dei relativi metodi di controllo della conformità di aggregati [G.U. 19.04.2007 n. 91] • Decreto Presidente del Consiglio dei Ministri 23.11.2007 - Dichiarazione di "grande evento" nel territorio nazionale in occasione delle celebrazioni per il 150° Anniversario dell’Unità d’Italia [G.U. 03.12.2007 n. 281] • Linee Guida 20.03.2008 - Linee guida per il coordinamento della sicurezza nella realizzazione delle Grandi Opere • Linee guida sul calcestruzzo strutturale - Presidenza del Consiglio Superiore dei Lavori Pubblici - Servizio Tecnico Centrale, dicembre 1996. • Linee guida per la produzione, il trasporto ed il controllo del calcestruzzo preconfezionato - Presidenza del Consiglio Superiore dei Lavori Pubblici - Servizio Tecnico Centrale, marzo 2003. • Linee guida su calcestruzzi strutturali ad alta resistenza (75 N/mm2 < Rck ≤ 115 N/mm2) - Presidenza del Consiglio Superiore dei Lavori Pubblici – Servizio Tecnico Centrale, luglio 2001. • UNI EN 206-1:2006 - Calcestruzzo - Specificazione, prestazione, produzione e conformità. • Legge dello Stato 02.02.1974 n. 64 - Provvedimenti per le costruzioni con particolari prescrizioni per le zone sismiche [G.U. 21.03.1974 n. 76]. • Decreto Ministero dei Lavori Pubblici 24.01.1986 - Norme tecniche relative alle costruzioni antisismiche [G.U. 12.05.1986 n. 108] • Circolare Ministero dei Lavori Pubblici 19.07.1986 n. 27690 - D.M. 24-1-1986. Istruzioni relative alla normativa tecnica per le costruzioni in zona sismica. • Decreto Ministero dei Lavori Pubblici 16.01.1996 - Norme tecniche per le costruzioni in zone sismiche [G.U. 05.02.1996 n. 29] • Nota del Dipartimento Protezione Civile 04.06.2003 – Ufficio Servizio Sismico Nazionale - Nota esplicativa dell’Ordinanza del Presidente del Consiglio dei Ministri n. 3274 del 20 marzo 2003 recante «Primi elementi in materia di criteri generali per la classificazione sismica del territorio nazionale e di normative tecniche per le costruzioni in zona sismica» [G.U. 08.05.2003 n. 105] • Decreto Presidenza del Consiglio dei Ministri 21.10.2003 – Disposizioni attuative dell’art. 2, commi 2, 3 e 4, dell’Ordinanza del Presidente del Consiglio dei Ministri 20 Marzo 2003, n. 3274, recante «Primi elementi in materia di

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 9 a 174

criteri generali per la classificazione sismica del territorio nazionale e di normative tecniche per le costruzioni in zona sismica». • Ordinanza Presidente del Consiglio dei Ministri 28.04.2006 n. 3519 – Criteri generali per l’individuazione delle zone sismiche e per la formazione e l’aggiornamento degli elenchi delle medesime [G.U. 11.05.2006 n. 108] • Ordinanza Presidente del Consiglio dei Ministri 03.05.2005 n. 3431 - Ulteriori modifiche ed integrazioni all'ordinanza del Presidente del Consiglio dei Ministri n. 3274 del 20 marzo 2003, recante «Primi elementi in materia di criteri generali per la classificazione sismica del territorio nazionale e di normative tecniche per le costruzioni in zona sismica». [G.U.10.05.2005 n. 107 – S.O. n. 85] • Ordinanza Presidente del Consiglio dei Ministri 02.10.2003 n. 3316 – Modifiche ed integrazioni all’Ordinanza del Presidente del consiglio dei Ministri n. 3274 del 20 marzo 2003, recante «Primi elementi in materia di criteri generali per la classificazione sismica del territorio nazionale e di normative tecniche per le costruzioni in zona sismica» [G.U. 10.10.2003 n. 236] • Ordinanza Presidente del Consiglio dei Ministri 20.03.2003 n. 3274 - Primi elementi in materia di criteri generali per la classificazione sismica del territorio nazionale e di normative tecniche per le costruzioni in zona sismica [G.U. 08.05.2003 n. 105]. • Decreto Ministero delle Infrastrutture e dei Trasporti 14.09.2005 - Norme Tecniche per le Costruzioni (ex "Testo unico" delle Norme Tecniche per le Costruzioni) [G.U. 23.09.2005 n. 222 – S.O. n. 159] • Ordinanza Presidente del Consiglio dei Ministri 28.04.2006 n.3519 - Criteri generali per l'individuazione delle zone sismiche e per la formazione e l'aggiornamento degli elenchi delle medesime zone [G.U. 11.05.2006 n.108] • Linee Guida 10.05.2006 - Dipartimento della Protezione Civile di concerto con il Ministero per i Beni e le Attività Culturali - Linee Guida per la valutazione e riduzione del rischio sismico del patrimonio culturale con riferimento alle norme tecniche per le costruzioni • Direttiva Presidente del Consiglio dei Ministri 12.10.2007 - Direttiva del Presidente del Consiglio dei Ministri per la valutazione e la riduzione del rischio sismico del patrimonio culturale con riferimento alle norme tecniche per le costruzioni [G.U. 29.01.2008 n. 24].

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 10 a 174

04. MATERIALI STRUTTURALI

I materiali ed i prodotti per uso strutturale devono essere identificati univocamente a cura del produttore, qualificati sotto

la responsabilità del produttore ed accettati dal Direttore dei Lavori mediante acquisizione e verifica della

documentazione di qualificazione, nonché mediante eventuali prove sperimentali di accettazione.

04.01. Calcestruzzo

04.01.1. Caratteristiche adottate in fase di progettazione

In fase di progettazione, le caratteristiche meccaniche del calcestruzzo sono definite, in funzione della sua resistenza

caratteristica cubica Rck, dalle seguenti relazioni.

In particolare, le caratteristiche meccaniche del calcestruzzo sono definite, in funzione della sua resistenza caratteristica

cubica Rck, dalle seguenti relazioni. Nel caso di elementi

piani (solette, pareti, …) gettati in opera con calcestruzzi

ordinari e con spessori minori di 50 mm, la resistenza di

calcolo a compressione e trazione vanno ridotte a 0,80

fcd. e 0,80 fctd. Per sollecitazioni che provocano tensioni

normali, è possibile adottare uno dei modelli mostrati in

Figura, definiti in base alla resistenza di calcolo fcd ed alla deformazione ultima εcu.

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 11 a 174

04.01.2. Calcestruzzo per cemento armato ordinario – fondazioni spalle

Le condizioni ambientali, ai fini della protezione contro la corrosione delle armature metalliche, risultano suddivise in

ordinarie, aggressive e molto aggressive in relazione a quanto indicato nella Tab. 4.1.III della vigente normativa tecnica

(riportata di seguito), con riferimento alle classi di esposizione definite nelle Linee Guida per il calcestruzzo strutturale

emesse dal Servizio Tecnico Centrale del Consiglio Superiore del Lavori Pubblici.

Nella fattispecie, viste le caratteristiche ambientali, ovvero opera esposta ad atmosfera esterna salina, si ricade in classe

di esposizione XS1.

Pertanto per la realizzazione delle piastre di fondazione, delle spalle e delle pile si prevede l’impiego di calcestruzzo

avente le seguenti caratteristiche:

- classe di resistenza: C30/37

- classe di esposizione ambientale: XS1

- dimensione nominale massima dell’inerte: 25-75 mm

- classe di abbassamento al cono (slump): S4-S5

- copriferro: 35 mm

Le caratteristiche meccaniche assunte in fase di progettazione sono riportate nella tabella seguente.

Rck fck Ec fctm fcd εc1 εcu αc νc

[Mpa] [Mpa] [Mpa] [Mpa] [Mpa] % % [°C-1x10-6] -

37 30 33000 2.90 19.19 0.002 0.0035 10 0.20

04.01.3. Calcestruzzo alleggerito strutturale - impalcato

Le condizioni ambientali, ai fini della protezione contro la corrosione delle armature metalliche, risultano suddivise in

ordinarie, aggressive e molto aggressive in relazione a quanto indicato nella Tab. 4.1.III della vigente normativa tecnica

(riportata di seguito), con riferimento alle classi di esposizione definite nelle Linee Guida per il calcestruzzo strutturale

emesse dal Servizio Tecnico Centrale del Consiglio Superiore del Lavori Pubblici.

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 12 a 174

Nella fattispecie, viste le caratteristiche ambientali, opera esterna protetta dalla pioggia, si ricade in classe di

esposizione XC1.

Pertanto per la realizzazione dell’impalcato della passerella si prevede l’impiego di calcestruzzo avente le seguenti

caratteristiche:

- classe di resistenza: C20/25

- classe di esposizione ambientale: XC1

- dimensione nominale massima dell’inerte: 25-75 mm

- classe di abbassamento al cono (slump): S4-S5

- copriferro: 25 mm

Le caratteristiche meccaniche assunte in fase di progettazione sono riportate nella tabella seguente, in sede di calcolo

sono state ridotte opportunamente secondo quanto prescritto dalla normativa vigente per i calcestruzzi strutturali

alleggeriti. Peso specifico 17.50 KN/mc.

Rck fck Ec fctm fcd εc1 εcu αc νc

[Mpa] [Mpa] [Mpa] [Mpa] [Mpa] % % [°C-1x10-6] -

25 20 30000 2.2 12.97 0.002 0.0035 10 0.20

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 13 a 174

04.02. Acciaio

04.02.1. Prescrizioni comuni agli acciai

Tutti gli acciai, siano essi destinati ad utilizzo come armature per cemento armato ordinario o precompresso o ad utilizzo

diretto come carpenterie in strutture metalliche devono essere prodotti con un sistema permanente di controllo interno

della produzione in stabilimento che deve assicurare il mantenimento dello stesso livello di affidabilità nella conformità

del prodotto finito, indipendentemente dal processo di produzione. Ciascun prodotto qualificato deve costantemente

essere riconoscibile per quanto concerne le caratteristiche qualitative e riconducibile allo stabilimento di produzione

tramite marchiatura indelebile depositata presso il Servizio Tecnico Centrale, dalla quale risulti, in modo inequivocabile, il

riferimento all’Azienda produttrice, allo Stabilimento, al tipo di acciaio ed alla sua eventuale saldabilità.

04.02.2. Acciaio per armature da cemento armato

È ammesso esclusivamente l’impiego di acciai saldabili fabbricati in regime di qualità secondo la norma UNI EN ISO

9001:2000 ed accertati secondo la norma UNI EN ISO 15630-1:2004. Si possono utilizzare barre ad aderenza migliorata

in acciaio tipo B450C laminato a caldo (§11.3.2.1) oppure di tipo B450A nel rispetto dei requisiti indicati nella seguente

tabella.

In entrambi i casi, al fine dell’analisi strutturale si adottano le seguenti:

- tensione caratteristica nominale di snervamento: fy,nom=450 MPa

- tensione caratteristica nominale di rottura: ft,nom=540 MPa

Per costruzioni in zona sismica, si deve utilizzare l’acciaio B450C; è consentito l’uso di acciai tipo B450A con diametro

5mm ≤ Ф≤ 10 mm per:

- reti e tralicci

- armatura trasversale solo se si verifica almeno una delle seguenti condizioni:

- elementi in cui è impedita la plasticizzazione nel rispetto del criterio di gerarchia delle resistenze;

- elementi secondari di cui al § 7.2.3 della normativa tecnica vigente;

- strutture poco dissipative con fattore di struttura q≤1,5.

Per realizzare le armature da cemento armato si prevede l’impiego di barre in acciaio tipo B450C.

Caratteristiche adottate in fase di progettazione

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 14 a 174

Per le verifiche agli stati limite ultimi, si definisce la seguente resistenza di calcolo.

Resistenza di snervamento di calcolo: fyd =fyk γs

dove:

fyk per armatura ordinaria è la tensione caratteristica di snervamento dell’acciaio

γs =1,15 coefficiente parziale di sicurezza comprensivo delle incertezze del modello e della geometria.

Per le barre di armatura da cemento lente si prevede l’impiego di acciaio di grado B450C. Le caratteristiche assunte in

fase di progettazione sono riportate nelle tabelle seguenti.

fyk ftk Ec fyd ftd εyd εud k

[Mpa] [Mpa] [Mpa] [Mpa] [Mpa] % % [-]

450 540 210000 391 469 0.0186 0.225 1.2

04.02.3. Acciaio tipo Cor Ten per carpenteria metallica

È importante ricordare che la norma EN 10025-5 definisce le caratteristiche meccaniche e chimiche degli acciai Cor-Ten

e che la fornitura deve essere correttamente certificata.

Alcuni accorgimenti vanno però considerati nella messa in opera degli elementi posti all’esterno: va evitato il ristagno

d’acqua, vanno predisposte delle canaline per la raccolta dell’acqua meteorica di dilavamento al fine di evitare di

macchiare le parti circostanti all’acciaio, vanno impiegati esclusivamente fissaggi meccanici in acciaio patinabile o in

inox. L'acciaio Cor-Ten può essere saldato in tutti gli spessori e con tutti i più comuni metodi di saldatura, ma se

utilizzato allo stato "nudo" per impieghi architettonici è necessario che la saldatura sia effettuata in più di due passate, ed

è consigliabile che, per le ultime due, vengano utilizzati elettrodi al 2% o al 3% di Ni in modo da ottenere cordoni di

saldatura con una colorazione simile a quella dell'acciaio. Va prestata attenzione inoltre alla corrosione galvanica

generata dall'accoppiamento con materiali nobili come lo zinco e l'alluminio. Le caratteristiche meccaniche assunte in

fase di progettazione sono riportate nelle tabelle seguenti.

fyk ftk Ec

[Mpa] [Mpa] [Mpa]

350 490 210000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 15 a 174

05. VITA NOMINALE DELLA COSTRUZIONE

La vita nominale VN della struttura (ossia il numero di anni in cui la struttura, soggetta a manutenzione ordinaria, può

essere usata per lo scopo al quale è destinata) è definita come indicato nella Tabella 2.4.I del D.M. 14.02.2008, qui

riportata di seguito.

L’opera in esame rientra nel tipo di costruzione 2 per cui la vita nominale è pari a:

VN≥50 anni Il periodo di ritorno per la definizione dei carichi accidentali, dell’azione della neve e dell’azione del vento nonché

dell’azione sismica sono definiti nei rispettivi paragrafi, assumendo un terreno di classe E, sulla base degli studi

geologici eseguiti dalla committenza.

06. AZIONI SULLA COSTRUZIONE

Le azioni elementari agenti sulla costruzione sono di seguito descritte distinguendo tra pesi propri, carichi permanenti,

carichi variabili, azione sismica ed azione del vento. L’intensità di tali azioni è stata valutata in conformità con quanto

indicato nel capitolo 3 “Azioni sulle Costruzioni” del D.M. 14.01.2008.

Carichi permanenti

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 16 a 174

06.01. Analisi dei carichi permanenti sull’impalcato g1 e g2

Si riporta di seguito l’analisi del peso proprio e dei carichi permanenti portati dall’impalcato sia nelle fasi costruttive che in

esercizio:

Peso Proprio dell’impalcato – g1

Travi principali, puntoni tiranti, traversi e diagonali 2,30 KN/m

Carichi permanenti portati dall’impalcato – g2 Fase 1 Costruzione

Getto soletta collaborante in lamiera - cls alleggerito 1,40 KN/mq

1,40 KN/mq

Carichi permanenti portati dall’impalcato – g2 Fase 2 Esercizio

Soletta collaborante in lamiera cls alleggerito 1,00 KN/mq

Pavimentazione 0,40 KN/mq

Parapetti bordo passerella 1,00 KN/mq

2,40 KN/mq

06.02. Spinta delle terre g3

Il calcolo della spinta delle terra sulle spalle è stato effettuato direttamente nel paragrafo relativo al dimensionamento

statico delle stesse e riportato di seguito nella presente relazione. Le elaborazioni numeriche sono state eseguite

assumendo i seguenti paramenti geotecnici per il terreno sistemato a tergo delle opere di sostegno delle terre: angolo di

attrito interno �= 35°, γ = 18.00 KN/mc, avendo cura in fase esecutiva di sistemare i rilevati a tergo delle spalle con gli

accorgimenti atti a garantire tali caratteristiche.

06.03. Analisi dei carichi mobili sull’impalcato - qik e Qik

Si riporta di seguito lo schema di carico mobile adottato per il calcolo del presente ponticello classificato quale opera

d’arte di III° categoria. Seguendo le indicazioni fornite dalla Normativa Tecnica ai punti: p. 5.1.3.3.2 “Definizione delle

corsie convenzionali”, p. 5.1.3.3.3 “Schemi di carico”, p. 5.1.3.3.4 “Categorie stradali”, p. 5.1.3.3.5 “Disposizione dei

carichi mobili per realizzare le condizioni di carico più gravose”; e in funzione delle caratteristiche geometriche della

carreggiata stradale è stato individuato lo schema di carico di seguito indicato.

___________________________________________________________ _Carico mobile – Qik e qik

Qik it il qik wl dw

Corsia n. 1 - - - 5.00 KN/mq 2.50 m -

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 17 a 174

Ovvero la passerella in progetto prevede il transito dei soli carichi associati allo Schema 5 (passerelle pedonali) indicato

nella NTC 2008 p. 5.1.3.3.3 Schemi di Carico, costituito dalla folla compatta agente con intensità nominale

comprendente gli effetti dinamici di 5.0 KN/mq.

06.04. Carico di costruzione – q

Nella fase di costruzione Fase 1, la passerella è stata calcolata per resistere a un carico accidentale di costruzione pari

a 1.5 KN/mq, uniformante distribuito su tutta la lunghezza dell’impalcato e su tutta la larghezza in aggiunta ai carichi

permanenti portati, secondo quanto indicato dalla normativa vigente e dall’eurocodice 4 per le strutture miste acciaio-cls.

06.05. Azione del Vento – q5

L’azione del vento può essere convenzionalmente assimilata ad un carico orizzontale statico, diretto ortogonalmente

all’asse del ponte e/o diretto nelle direzioni più sfavorevoli per alcuni dei suoi elementi. Tale azione si considera agente

sulla proiezione nel piano verticale delle superfici direttamente investite. La superficie dei carichi transitanti sul ponte

esposta al vento si assimila ad una parete rettangolare continua dell’altezza di 3 m a partire dal piano stradale.

La pressione del vento è definita dalla seguente relazione:

p=qbcecpcd

dove:

q : pressione cinetica di riferimento;

ce : coefficiente di esposizione;

cp : coefficiente di forma (o coefficiente aerodinamico), funzione della tipologia e della geometria della costruzione e del

suo orientamento rispetto alla direzione del vento;

cd : coefficiente dinamico con cui si tiene conto degli effetti riduttivi associati alla non contemporaneità delle massime

pressioni locali e degli effetti amplificativi dovuti alle vibrazioni strutturali.

Per l’opera in esame, i parametri indicati dalla NTI per la definizione dell’azione del vento sono riportati in Tabella,

calcolati per la zona 5 di apparenza.

Nella fattispecie

Zona di riferimento: 5

Altitudine di riferimento: as = 100 m

Classe di rugosità: D

Distanza dalla costa: d = 30 Km

Altezza dell’opera da terra: h = 5 m

Coefficiente di topografia Ct = 1

Velocità di riferimento del vento Vref = 28 m/s

Pressione del vento sulla superficie verticale q(z)=0.945 KN/mq

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 18 a 174

Azione del vento – q5

q5

0.945x21x3.00 = 59.5 KN

06.06. Carico della neve – q6

L’azione del vento può essere convenzionalmente assimilata ad un carico orizzontale statico, diretto ortogonalmente

all’asse del ponte e/o diretto nelle direzioni più sfavorevoli per alcuni dei suoi elementi (ad es. le pile). Tale azione si

Il carico della neve qs riferito alla proiezione orizzontale della superficie della copertura e riferito ad un generico periodo

di ritorno TR è dato, nel campo compreso tra 10 e 500 anni, dalla seguente espressione:

Sulla base dei parametri sopra riportati, il valore del sovraccarico accidentale della neve valutato è riportato nella tabella

di seguito riportata per la Zona 3 del territorio nazionale.

Altitudine del sito: as = 0 m

Valore caratt. di riferimento del carico della neve al suolo: qsk = 1.590 KN/mq

Periodo di ritorno: TR = 500 anni

Coef. amplificativo relativo a : αR = 1.12

Valore caratt. di riferimento del carico della neve al suolo per TR: qsk = 0.60 KN/mq

06.07. Resistenze passive dei vincoli – q7

Si assume per il loro calcolo un coefficiente di attrito del PTFE vergine pari a 0,03. La parte strisciante trasversale

(sollecitata dalle forze trasversali quale quella del vento) è costituita da neoprene per i quali il valore del coefficiente di

attrito è pari a 0,10.

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 19 a 174

07. METODI DI ANALISI STRUTTUALE

07.01. Metodi di analisi

La risposta strutturale in termini di sollecitazioni e deformazioni è stata valutata eseguendo una analisi statica lineare per

gli effetti dei carichi verticali fissi e mobili e dell’azione del vento.

07.02. Metodi di verifica

La risposta strutturale in termini di sollecitazioni e deformazioni è stata valutata eseguendo una analisi statica lineare, la

sicurezza e le prestazioni dell’opera e delle sue parti sono state valutate con riferimento agli stati limite previsti durante

la sua vita nominale. La durabilità dell’opera è garantita dalla scelta dei materiali e tramite un opportuno

dimensionamento delle membrature.

In particolare le verifiche strutturali hanno riguardato:

• gli stati limite ultimi conseguenti alle diverse combinazioni delle azioni;

• gli stati limite di esercizio definiti in relazione alle prestazioni attese.

Nelle verifiche si è tenuto conto delle fasi intermedie che si possono presentare durante il processo costruttivo. Le

verifiche sono state condotte nell’ottica di un approccio semiprobabilistico gli stati limite (metodo di primo livello). Per le

verifiche di sicurezza degli stati limite ultimi di resistenza si è seguito il metodo dei coefficienti parziali di sicurezza,

formalmente espresso dalla seguente relazione:

Rd > Ed

dove Rd=resistenza di progetto valutata in base alla resistenza di progetto dei materiali ed ai valori nominali delle

grandezze geometriche interessate; Ed=effetto delle azioni di progetto Fdj=FkjγFj.

Per le verifiche degli stati limite di esercizio si sono controllati aspetti di funzionalità e stati tensionali. Nelle verifiche agli

stati limite ultimi si è considerato lo stato limite di resistenza della struttura compresi gli elementi di fondazione.

In merito alla progettazione per azioni sismiche, la NTI stabilisce che, in assenza di espresse indicazioni in merito, il

rispetto dei vari stati limite si considera conseguito:

- nei confronti di tutti gli stati limite di esercizio, se sono rispettate le verifiche relative al solo SLD; fanno eccezione le

costruzioni di classe d’uso III e IV per le quali è richiesto il rispetto anche delle verifiche di sicurezza relative allo SLO per

gli elementi non strutturali e gli impianti;

- nei confronti di tutti gli stati limite ultimi, se sono rispettate le indicazioni progettuali e costruttive riportate nel capitolo 7

delle NTI e se sono soddisfatte le verifiche relative al solo SLV.

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 20 a 174

07.03. Combinazioni delle azioni

Le azioni “elementari” agenti sulla struttura sono state determinate in accordo con la Normativa vigente e consistono del

peso proprio degli elementi componenti, dei sovraccarichi accidentali funzione della destinazione d’uso degli ambienti,

del carico da neve, dell’evento sismico rappresentato con il relativo spettro di risposta, dell’azione del vento agente in

direzione ortogonale e radente sulle superfici che delimitano il corpo. Le condizioni di carico “elementari” contemplate

sono quindi le seguenti:

- peso proprio degli elementi strutturali;

- carichi permanenti portati;

- carichi permanenti portati in fase di costruzione;

- distorsioni di progetto;

- Carico accidentale

- carichi mobili della folla compatta;

- carico da neve;

- azione del vento (componente ortogonale e radente);

Tali condizioni di carico “elementari” sono state combinate, nell’ottica di un approccio agli stati limite, secondo quanto

prescritto dalla Normativa vigente, per soddisfare le condizioni che si vengono a creare sia nelle fasi di costruzione Fase

1 che in esercizio ad opera ultimata Fase 2.

Ai fini statici le citate condizioni elementari di carico sono state combinate in modo da determinare condizioni di carico

globali tali da risultare più gravose ai fini delle singole verifiche, tenendo conto della probabilità ridotta di intervento

simultaneo di tutte le azioni con i rispettivi valori più sfavorevoli, come consentito dalle normative vigenti.

Si sono adottate le seguenti combinazioni delle azioni.

Combinazione fondamentale per gli stati limite ultimi:

Combinazione caratteristica (rara) per gli stati limite di esercizio irreversibili (da utilizzarsi nelle verifiche alle tensioni

ammissibili):

Combinazione frequente per gli stati limite di esercizio reversibili:

Combinazione quasi permanente per gli stati limite di esercizio connessi agli effetti a lungo termine:

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 21 a 174

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 22 a 174

08. ANALISI STRUTTURALE

08.01. Programma di calcolo

Il modello strutturale dell’edificio è stato assemblato ed analizzato con il programma di calcolo SAP 2000 v.14 della

Computers and Structures, Inc 1995 University Avenue, Suite 540 Berkeley, CA 94704 USA, impiegando nella

fattispecie il modulo di calcolo BRIM dedicato allo studio dei ponti.

08.02. Modello strutturale

08.02.1. Modello geometrico

Il modello matematico riproduce fedelmente le caratteristiche geometrico-meccaniche e la distribuzione spaziale di

massa della struttura reale. Si tratta di un modello elastico lineare, tridimensionale, composto essenzialmente da due

tipologie di elementi finiti:

• elementi tipo beams monodimensionali con funzionamento a “trave” adottati per le l’impalcato in acciaio;

• elementi tipo shell bidimensionali a comportamento piastra con una meshatura interna;

• elementi link per simulare il comportamento degli elementi di sostegni, dei vincoli in fondazione e degli apparecchi di

appoggio;

Gli elementi finiti sono collocati in corrispondenza della linea d’asse baricentrica nel caso di elementi a sviluppo

prevalentemente lineare ed in corrispondenza della superficie baricentrica nel caso di elementi bidimensionali. Eventuali

situazioni di disallineamento tra elementi consecutivi o di porzioni di raccordo indeformabili sono state risolte

introducendo opportuni elementi finiti infinitamente rigidi. Le sezioni trasversali assegnate ai vari elementi rispettano le

indicazioni dei disegni progettuali. Le caratteristiche dei materiali assegnati agli elementi sono definite nei paragrafi

precedenti. Si riportano di seguito le immaggini del modello di calcolo fisici matematico del viadotto in oggetto, dalle

quali si può evincere come sia stata eseguita una schematizzazione della struttura fedele alla realtà.

08.02.2. Condizioni di vincolo

Il modello matematico riproduce fedelmente le caratteristiche geometrico-meccaniche e la distribuzione spaziale di

massa della struttura reale. Si tratta di un modello elastico lineare, tridimensionale, composto essenzialmente da tre

tipologie di elementi finiti:

Il grado di vincolo assunto nei pilastri a livello della fondazione è pari all’incastro. Per valutare lo stato tenso-deformativo

al contatto tra struttura e terreno si assume l’ipotesi di incastro alla base di tutti gli elementi di sostegno verticale del

viadotto. Gli orizzontamenti sono stati considerati infinitamente rigidi nel loro piano.

08.02.3. Modello delle azioni

Le caratteristiche meccaniche dei materiali, essenziali ai fini della sola determinazione della risposta strutturale,

assegnati ai vari elementi finiti del modello matematico sono riassunte nella Tabella di seguito riportata:

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 23 a 174

Pesi propri degli elementi strutturali

Il peso proprio degli elementi strutturali viene assegnato automaticamente dal programma di calcolo in funzione della

relativa geometria e del peso specifico del materiale definito, in particolare il peso proprio lineare di ogni elemento

strutturale è dato dal prodotto della sua sezione per il peso specifico del materiale costitutivo.

Carichi permanenti e accidentali

I carichi verticali applicati agli elementi strutturali vengono attribuiti attraverso la definizione di condizioni elementari di

carico e di coefficienti moltiplicativi, detti coefficienti di influenza, uno per ogni elemento e condizione elementare di

carico. Il prodotto dei coefficienti di influenza per il valore attribuito alla corrispondente condizione elementare di carico

definiscono i carichi elementari su ogni asta; la somma di tutti i carichi elementari agenti su un’asta costituisce il carico

totale ad essa applicato. I carichi assegnati nelle condizioni elementari di carico sono definiti nel paragrafo seguente.

Carichi mobili

I carichi mobili definiti secondo la condizione di carico individuata nei paragrafi precedenti vengono applicati alla struttura

definendo un caso di carico mobile, che viene applicato automaticamente dal software all’implacato generando le linee

di influenza che consentono di individuare la risposta della struttura in seguito al movimento del carico su ogni punto

della struttura.

08.03. Risultati delle analisi strutturali

I risultati delle analisi condotte sono riportate nei successivi paragrafi della presente relazione anche in forma grafica,

con riferimento ad alcuni dei principali risultati.

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 24 a 174

09. RISULTATI DELL’ANALISI STRUTTURALE E VERIFICHE

Figura 5 – Modello di calcolo del ponte in Fase 1 – Costruzione

Figura 6 - Modello di calcolo del ponte in Fase 2 – Esercizio

09.01. Verifica Implacato nella Fase 1 - Costruzione

Si riportano di seguito le verifiche agli stati limite ultimi e di esercizio della sezione dell’impalcato in corrispondenza delle

sezioni maggiormente sollecitate, individuabili dai diagrammi di seguito riportati e relativi ai casi di carico elementari

analizzati e alla combinazione fra gli stessi casi.

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 25 a 174

Caso di Carico g1 – Peso proprio

Figura 7 – Diagramma del momento flettente [KN m ] – peso proprio g1

Figura 8 - Diagramma del taglio [KN ] – peso proprio g1

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 26 a 174

Figura 9 - Diagramma azione normale [KN ] – peso proprio g1

Caso di Carico g2 – Carico permanente

Figura 10 - Diagramma del momento flettente [KN m ] – carichi permanenti g2

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 27 a 174

Figura 11 - Diagramma del taglio [KN ] – peso proprio g2

Figura 12 - Diagramma azione normale [KN ] – peso proprio g2

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 28 a 174

Caso di Carico q – carico accidentale di costruzione

Figura 13 - Diagramma del momento flettente [KN m ] – carichi accidentali di costruzione q

Figura 14 - Diagramma del taglio [KN] – carichi accidentali di costruzione q

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 29 a 174

Figura 15 - Diagramma azione normale [KN ] – carichi accidentali di costruzione q

Combinazione di Carico SLU - A1 STR [1.35 (g1 + g2) + 1.50 (Qik + qik)] – Fase 1

Figura 16 - Diagramma del momento flettente [KN m] – SLU

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 30 a 174

Figura 17 - Diagramma del taglio [KN] – SLU

Figura 18 - Diagramma azione normale [KN ] – SLU

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 31 a 174

Figura 19 – Progetto delle sezioni – Diagramma dei rapporti di resistenza SLU

Output Forze e Verifica aste

combinazione di Carico SLU - A1 STR [1.35 (g1 + g2) + 1.50 (Qik + qik)] – Fase 1

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

11 0,00000 DSTL2 Combination -144,207 9,913 0,011 0,0062 0,0073

11 0,51478 DSTL2 Combination -144,045 10,003 0,011 0,0062 0,0017

11 1,02956 DSTL2 Combination -143,883 10,092 0,011 0,0062 -0,0040

12 0,00000 DSTL2 Combination 83,583 -3,811 9,531E-03 0,0021 0,0083

12 0,51478 DSTL2 Combination 83,745 -3,721 9,531E-03 0,0021 0,0034

12 1,02956 DSTL2 Combination 83,907 -3,631 9,531E-03 0,0021 -0,0015

13 0,00000 DSTL2 Combination -144,167 9,913 0,010 0,0065 0,0067

13 0,51478 DSTL2 Combination -144,005 10,003 0,010 0,0065 0,0013

13 1,02956 DSTL2 Combination -143,844 10,092 0,010 0,0065 -0,0041

14 0,00000 DSTL2 Combination 83,532 -3,812 8,489E-03 0,0016 0,0076

14 0,51478 DSTL2 Combination 83,693 -3,722 8,489E-03 0,0016 0,0032

14 1,02956 DSTL2 Combination 83,855 -3,632 8,489E-03 0,0016 -0,0011

15 0,00000 DSTL2 Combination 83,532 -3,812 8,523E-03 0,0016 0,0076

15 0,51478 DSTL2 Combination 83,693 -3,722 8,523E-03 0,0016 0,0032

15 1,02956 DSTL2 Combination 83,855 -3,632 8,523E-03 0,0016 -0,0012

16 0,00000 DSTL2 Combination -203,443 -7,246 0,477 6,582E-05 0,0253

16 0,50000 DSTL2 Combination -203,443 -6,795 0,477 6,582E-05 -0,2131

17 0,00000 DSTL2 Combination -203,494 -1,351 -0,462 6,582E-05 -0,2131

17 0,50000 DSTL2 Combination -203,494 -0,900 -0,462 6,582E-05 0,0177

18 0,00000 DSTL2 Combination -203,494 -0,900 -0,462 6,582E-05 0,0177

18 0,50000 DSTL2 Combination -203,494 -0,449 -0,462 6,582E-05 0,2486

19 0,00000 DSTL2 Combination -247,417 76,444 0,572 3,932E-04 0,2460

19 0,50000 DSTL2 Combination -247,417 76,895 0,572 3,932E-04 -0,0401

20 0,00000 DSTL2 Combination -247,417 76,895 0,572 3,932E-04 -0,0401

20 0,50000 DSTL2 Combination -247,417 77,346 0,572 3,932E-04 -0,3262

21 0,00000 DSTL2 Combination -326,004 -38,087 -0,704 -3,553E-05 -0,3336

21 0,50000 DSTL2 Combination -326,004 -37,636 -0,704 -3,553E-05 0,0182

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 32 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

22 0,00000 DSTL2 Combination -326,004 -37,636 -0,704 -3,553E-05 0,0182

22 0,50000 DSTL2 Combination -326,004 -37,185 -0,704 -3,553E-05 0,3701

23 0,00000 DSTL2 Combination -326,041 37,249 -0,712 -3,553E-05 -0,3855

23 0,50000 DSTL2 Combination -326,041 37,700 -0,712 -3,553E-05 -0,0297

24 0,00000 DSTL2 Combination -326,041 37,700 -0,712 -3,553E-05 -0,0297

24 0,50000 DSTL2 Combination -326,041 38,151 -0,712 -3,553E-05 0,3262

25 0,00000 DSTL2 Combination -247,362 -77,381 0,543 3,691E-04 0,3185

25 0,50000 DSTL2 Combination -247,362 -76,930 0,543 3,691E-04 0,0469

26 0,00000 DSTL2 Combination -247,362 -76,930 0,543 3,691E-04 0,0469

26 0,50000 DSTL2 Combination -247,362 -76,479 0,543 3,691E-04 -0,2246

27 0,00000 DSTL2 Combination -203,562 0,502 -0,432 1,167E-04 -0,2265

27 0,50000 DSTL2 Combination -203,562 0,953 -0,432 1,167E-04 -0,0104

28 0,00000 DSTL2 Combination -203,562 0,953 -0,432 1,167E-04 -0,0104

28 0,50000 DSTL2 Combination -203,562 1,404 -0,432 1,167E-04 0,2057

29 0,00000 DSTL2 Combination -203,562 6,713 0,531 1,167E-04 0,2057

29 0,50000 DSTL2 Combination -203,562 7,164 0,531 1,167E-04 -0,0600

30 0,00000 DSTL2 Combination -326,004 -31,876 0,733 -3,553E-05 0,3701

30 0,50000 DSTL2 Combination -326,004 -31,425 0,733 -3,553E-05 0,0035

31 0,00000 DSTL2 Combination -326,004 -31,425 0,733 -3,553E-05 0,0035

31 0,50000 DSTL2 Combination -326,004 -30,974 0,733 -3,553E-05 -0,3630

32 0,00000 DSTL2 Combination -326,016 30,904 0,746 -3,553E-05 0,3603

32 0,50000 DSTL2 Combination -326,016 31,355 0,746 -3,553E-05 -0,0126

33 0,00000 DSTL2 Combination -326,016 31,355 0,746 -3,553E-05 -0,0126

33 0,50000 DSTL2 Combination -326,016 31,806 0,746 -3,553E-05 -0,3855

34 0,00000 DSTL2 Combination -326,014 -25,531 -0,729 -3,553E-05 -0,3630

34 0,50000 DSTL2 Combination -326,014 -25,080 -0,729 -3,553E-05 0,0013

35 0,00000 DSTL2 Combination -326,014 -25,080 -0,729 -3,553E-05 0,0013

35 0,50000 DSTL2 Combination -326,014 -24,629 -0,729 -3,553E-05 0,3656

36 0,00000 DSTL2 Combination -326,014 -19,320 0,730 -3,553E-05 0,3656

36 0,50000 DSTL2 Combination -326,014 -18,869 0,730 -3,553E-05 5,553E-04

37 0,00000 DSTL2 Combination -326,014 -18,869 0,730 -3,553E-05 5,553E-04

37 0,50000 DSTL2 Combination -326,014 -18,418 0,730 -3,553E-05 -0,3644

38 0,00000 DSTL2 Combination -326,014 -12,975 -0,729 -3,553E-05 -0,3644

38 0,50000 DSTL2 Combination -326,014 -12,524 -0,729 -3,553E-05 -9,343E-06

39 0,00000 DSTL2 Combination -326,014 -12,524 -0,729 -3,553E-05 -9,343E-06

39 0,50000 DSTL2 Combination -326,014 -12,073 -0,729 -3,553E-05 0,3644

40 0,00000 DSTL2 Combination -326,014 -6,764 0,729 -3,553E-05 0,3644

40 0,50000 DSTL2 Combination -326,014 -6,313 0,729 -3,553E-05 6,863E-07

41 0,00000 DSTL2 Combination -326,014 -6,313 0,729 -3,553E-05 6,863E-07

41 0,50000 DSTL2 Combination -326,014 -5,862 0,729 -3,553E-05 -0,3644

42 0,00000 DSTL2 Combination -326,014 -0,419 -0,729 -3,553E-05 -0,3644

42 0,50000 DSTL2 Combination -326,014 0,032 -0,729 -3,553E-05 3,036E-06

43 0,00000 DSTL2 Combination -326,014 0,032 -0,729 -3,553E-05 3,036E-06

43 0,50000 DSTL2 Combination -326,014 0,483 -0,729 -3,553E-05 0,3644

44 0,00000 DSTL2 Combination -326,014 5,792 0,729 -3,553E-05 0,3644

44 0,50000 DSTL2 Combination -326,014 6,243 0,729 -3,553E-05 -3,379E-05

45 0,00000 DSTL2 Combination -326,014 6,243 0,729 -3,553E-05 -3,379E-05

45 0,50000 DSTL2 Combination -326,014 6,694 0,729 -3,553E-05 -0,3645

46 0,00000 DSTL2 Combination -326,014 12,137 -0,729 -3,553E-05 -0,3645

46 0,50000 DSTL2 Combination -326,014 12,588 -0,729 -3,553E-05 -6,421E-05

47 0,00000 DSTL2 Combination -326,014 12,588 -0,729 -3,553E-05 -6,421E-05

47 0,50000 DSTL2 Combination -326,014 13,039 -0,729 -3,553E-05 0,3644

48 0,00000 DSTL2 Combination -326,014 18,348 0,728 -3,553E-05 0,3644

48 0,50000 DSTL2 Combination -326,014 18,799 0,728 -3,553E-05 3,170E-04

49 0,00000 DSTL2 Combination -326,014 18,799 0,728 -3,553E-05 3,170E-04

49 0,50000 DSTL2 Combination -326,014 19,250 0,728 -3,553E-05 -0,3637

50 0,00000 DSTL2 Combination -326,016 24,693 -0,724 -3,553E-05 -0,3637

50 0,50000 DSTL2 Combination -326,016 25,144 -0,724 -3,553E-05 -0,0017

51 0,00000 DSTL2 Combination -326,016 25,144 -0,724 -3,553E-05 -0,0017

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 33 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

51 0,50000 DSTL2 Combination -326,016 25,595 -0,724 -3,553E-05 0,3603

52 0,00000 DSTL2 Combination -144,167 9,913 0,010 0,0065 0,0067

52 0,51478 DSTL2 Combination -144,005 10,003 0,010 0,0065 0,0013

52 1,02956 DSTL2 Combination -143,844 10,092 0,010 0,0065 -0,0041

53 0,00000 DSTL2 Combination 83,583 -3,811 9,507E-03 0,0021 0,0083

53 0,51478 DSTL2 Combination 83,745 -3,721 9,507E-03 0,0021 0,0034

53 1,02956 DSTL2 Combination 83,907 -3,631 9,507E-03 0,0021 -0,0015

54 0,00000 DSTL2 Combination -144,207 9,913 0,011 0,0063 0,0073

54 0,51478 DSTL2 Combination -144,045 10,003 0,011 0,0063 0,0016

54 1,02956 DSTL2 Combination -143,883 10,092 0,011 0,0063 -0,0040

56 0,00000 DSTL2 Combination 326,306 -2,228 -5,363E-05 -1,274E-05 -4,313E-04

56 0,50000 DSTL2 Combination 326,306 -2,069 -5,363E-05 -1,274E-05 -4,045E-04

56 1,00000 DSTL2 Combination 326,306 -1,910 -5,363E-05 -1,274E-05 -3,777E-04

56 1,50000 DSTL2 Combination 326,306 -1,751 -5,363E-05 -1,274E-05 -3,509E-04

56 2,00000 DSTL2 Combination 326,306 -1,591 -5,363E-05 -1,274E-05 -3,240E-04

56 2,50000 DSTL2 Combination 326,306 -1,432 -5,363E-05 -1,274E-05 -2,972E-04

56 3,00000 DSTL2 Combination 326,306 -1,273 -5,363E-05 -1,274E-05 -2,704E-04

56 3,50000 DSTL2 Combination 326,306 -1,114 -5,363E-05 -1,274E-05 -2,436E-04

56 4,00000 DSTL2 Combination 326,306 -0,955 -5,363E-05 -1,274E-05 -2,168E-04

56 4,50000 DSTL2 Combination 326,306 -0,796 -5,363E-05 -1,274E-05 -1,900E-04

56 5,00000 DSTL2 Combination 326,306 -0,637 -5,363E-05 -1,274E-05 -1,631E-04

56 5,50000 DSTL2 Combination 326,306 -0,477 -5,363E-05 -1,274E-05 -1,363E-04

56 6,00000 DSTL2 Combination 326,306 -0,318 -5,363E-05 -1,274E-05 -1,095E-04

56 6,50000 DSTL2 Combination 326,306 -0,159 -5,363E-05 -1,274E-05 -8,270E-05

56 7,00000 DSTL2 Combination 326,306 -1,599E-05 -5,363E-05 -1,274E-05 -5,588E-05

56 7,50000 DSTL2 Combination 326,306 0,159 -5,363E-05 -1,274E-05 -2,907E-05

56 8,00000 DSTL2 Combination 326,306 0,318 -5,363E-05 -1,274E-05 -2,251E-06

56 8,50000 DSTL2 Combination 326,306 0,477 -5,363E-05 -1,274E-05 2,457E-05

56 9,00000 DSTL2 Combination 326,306 0,637 -5,363E-05 -1,274E-05 5,138E-05

56 9,50000 DSTL2 Combination 326,306 0,796 -5,363E-05 -1,274E-05 7,820E-05

56 10,00000 DSTL2 Combination 326,306 0,955 -5,363E-05 -1,274E-05 1,050E-04

56 10,50000 DSTL2 Combination 326,306 1,114 -5,363E-05 -1,274E-05 1,318E-04

56 11,00000 DSTL2 Combination 326,306 1,273 -5,363E-05 -1,274E-05 1,586E-04

56 11,50000 DSTL2 Combination 326,306 1,432 -5,363E-05 -1,274E-05 1,855E-04

56 12,00000 DSTL2 Combination 326,306 1,591 -5,363E-05 -1,274E-05 2,123E-04

56 12,50000 DSTL2 Combination 326,306 1,751 -5,363E-05 -1,274E-05 2,391E-04

56 13,00000 DSTL2 Combination 326,306 1,910 -5,363E-05 -1,274E-05 2,659E-04

56 13,50000 DSTL2 Combination 326,306 2,069 -5,363E-05 -1,274E-05 2,927E-04

56 14,00000 DSTL2 Combination 326,306 2,228 -5,363E-05 -1,274E-05 3,195E-04

57 0,00000 DSTL2 Combination 326,306 -2,228 -5,377E-05 -1,282E-05 -3,203E-04

57 0,50000 DSTL2 Combination 326,306 -2,069 -5,377E-05 -1,282E-05 -2,934E-04

57 1,00000 DSTL2 Combination 326,306 -1,910 -5,377E-05 -1,282E-05 -2,665E-04

57 1,50000 DSTL2 Combination 326,306 -1,751 -5,377E-05 -1,282E-05 -2,396E-04

57 2,00000 DSTL2 Combination 326,306 -1,591 -5,377E-05 -1,282E-05 -2,127E-04

57 2,50000 DSTL2 Combination 326,306 -1,432 -5,377E-05 -1,282E-05 -1,859E-04

57 3,00000 DSTL2 Combination 326,306 -1,273 -5,377E-05 -1,282E-05 -1,590E-04

57 3,50000 DSTL2 Combination 326,306 -1,114 -5,377E-05 -1,282E-05 -1,321E-04

57 4,00000 DSTL2 Combination 326,306 -0,955 -5,377E-05 -1,282E-05 -1,052E-04

57 4,50000 DSTL2 Combination 326,306 -0,796 -5,377E-05 -1,282E-05 -7,832E-05

57 5,00000 DSTL2 Combination 326,306 -0,637 -5,377E-05 -1,282E-05 -5,143E-05

57 5,50000 DSTL2 Combination 326,306 -0,477 -5,377E-05 -1,282E-05 -2,455E-05

57 6,00000 DSTL2 Combination 326,306 -0,318 -5,377E-05 -1,282E-05 2,335E-06

57 6,50000 DSTL2 Combination 326,306 -0,159 -5,377E-05 -1,282E-05 2,922E-05

57 7,00000 DSTL2 Combination 326,306 1,599E-05 -5,377E-05 -1,282E-05 5,610E-05

57 7,50000 DSTL2 Combination 326,306 0,159 -5,377E-05 -1,282E-05 8,299E-05

57 8,00000 DSTL2 Combination 326,306 0,318 -5,377E-05 -1,282E-05 1,099E-04

57 8,50000 DSTL2 Combination 326,306 0,477 -5,377E-05 -1,282E-05 1,368E-04

57 9,00000 DSTL2 Combination 326,306 0,637 -5,377E-05 -1,282E-05 1,636E-04

57 9,50000 DSTL2 Combination 326,306 0,796 -5,377E-05 -1,282E-05 1,905E-04

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 34 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

57 10,00000 DSTL2 Combination 326,306 0,955 -5,377E-05 -1,282E-05 2,174E-04

57 10,50000 DSTL2 Combination 326,306 1,114 -5,377E-05 -1,282E-05 2,443E-04

57 11,00000 DSTL2 Combination 326,306 1,273 -5,377E-05 -1,282E-05 2,712E-04

57 11,50000 DSTL2 Combination 326,306 1,432 -5,377E-05 -1,282E-05 2,981E-04

57 12,00000 DSTL2 Combination 326,306 1,591 -5,377E-05 -1,282E-05 3,249E-04

57 12,50000 DSTL2 Combination 326,306 1,751 -5,377E-05 -1,282E-05 3,518E-04

57 13,00000 DSTL2 Combination 326,306 1,910 -5,377E-05 -1,282E-05 3,787E-04

57 13,50000 DSTL2 Combination 326,306 2,069 -5,377E-05 -1,282E-05 4,056E-04

57 14,00000 DSTL2 Combination 326,306 2,228 -5,377E-05 -1,282E-05 4,325E-04

59 0,00000 DSTL2 Combination -203,728 -13,509 -0,348 1,216E-04 0,1591

59 0,50000 DSTL2 Combination -203,728 -13,058 -0,348 1,216E-04 0,3333

60 0,00000 DSTL2 Combination -203,562 -7,615 0,538 1,216E-04 0,3333

60 0,50000 DSTL2 Combination -203,562 -7,164 0,538 1,216E-04 0,0642

61 0,00000 DSTL2 Combination -203,443 -13,456 -0,275 6,582E-05 0,1261

61 0,50000 DSTL2 Combination -203,443 -13,005 -0,275 6,582E-05 0,2636

62 0,00000 DSTL2 Combination -203,443 -7,697 0,477 6,582E-05 0,2636

62 0,50000 DSTL2 Combination -203,443 -7,246 0,477 6,582E-05 0,0253

64 0,00000 DSTL2 Combination -203,445 7,246 0,480 6,742E-05 -0,0260

64 0,50000 DSTL2 Combination -203,445 7,697 0,480 6,742E-05 -0,2658

65 0,00000 DSTL2 Combination -203,445 13,005 -0,277 6,742E-05 -0,2658

65 0,50000 DSTL2 Combination -203,445 13,456 -0,277 6,742E-05 -0,1272

66 0,00000 DSTL2 Combination -203,562 7,164 0,531 1,167E-04 -0,0600

66 0,50000 DSTL2 Combination -203,562 7,615 0,531 1,167E-04 -0,3257

67 0,00000 DSTL2 Combination -203,728 13,058 -0,340 1,167E-04 -0,3257

67 0,50000 DSTL2 Combination -203,728 13,509 -0,340 1,167E-04 -0,1556

69 0,00000 DSTL2 Combination -203,728 13,509 -0,348 1,216E-04 -0,1591

69 0,47500 DSTL2 Combination -203,728 13,938 -0,348 1,216E-04 0,0063

70 0,00000 DSTL2 Combination -203,443 13,456 -0,275 6,582E-05 -0,1261

70 0,47500 DSTL2 Combination -203,443 13,885 -0,275 6,582E-05 0,0045

71 0,00000 DSTL2 Combination -203,445 13,456 -0,277 6,742E-05 -0,1272

71 0,47500 DSTL2 Combination -203,445 13,885 -0,277 6,742E-05 0,0045

72 0,00000 DSTL2 Combination -203,728 13,509 -0,340 1,167E-04 -0,1556

72 0,47500 DSTL2 Combination -203,728 13,938 -0,340 1,167E-04 0,0061

75 0,00000 DSTL2 Combination 0,752 -5,309 0,000 0,0000 0,0000

75 0,50000 DSTL2 Combination 0,752 -3,185 0,000 0,0000 0,0000

75 1,00000 DSTL2 Combination 0,752 -1,062 0,000 0,0000 0,0000

75 1,50000 DSTL2 Combination 0,752 1,062 0,000 0,0000 0,0000

75 2,00000 DSTL2 Combination 0,752 3,185 0,000 0,0000 0,0000

75 2,50000 DSTL2 Combination 0,752 5,309 0,000 0,0000 0,0000

76 0,00000 DSTL2 Combination 0,969 -5,309 0,000 0,0000 0,0000

76 0,50000 DSTL2 Combination 0,969 -3,185 0,000 0,0000 0,0000

76 1,00000 DSTL2 Combination 0,969 -1,062 0,000 0,0000 0,0000

76 1,50000 DSTL2 Combination 0,969 1,062 0,000 0,0000 0,0000

76 2,00000 DSTL2 Combination 0,969 3,185 0,000 0,0000 0,0000

76 2,50000 DSTL2 Combination 0,969 5,309 0,000 0,0000 0,0000

77 0,00000 DSTL2 Combination 1,043 -5,309 0,000 0,0000 0,0000

77 0,50000 DSTL2 Combination 1,043 -3,185 0,000 0,0000 0,0000

77 1,00000 DSTL2 Combination 1,043 -1,062 0,000 0,0000 0,0000

77 1,50000 DSTL2 Combination 1,043 1,062 0,000 0,0000 0,0000

77 2,00000 DSTL2 Combination 1,043 3,185 0,000 0,0000 0,0000

77 2,50000 DSTL2 Combination 1,043 5,309 0,000 0,0000 0,0000

78 0,00000 DSTL2 Combination 1,265 -5,309 0,000 0,0000 0,0000

78 0,50000 DSTL2 Combination 1,265 -3,185 0,000 0,0000 0,0000

78 1,00000 DSTL2 Combination 1,265 -1,062 0,000 0,0000 0,0000

78 1,50000 DSTL2 Combination 1,265 1,062 0,000 0,0000 0,0000

78 2,00000 DSTL2 Combination 1,265 3,185 0,000 0,0000 0,0000

78 2,50000 DSTL2 Combination 1,265 5,309 0,000 0,0000 0,0000

79 0,00000 DSTL2 Combination 1,437 -5,309 0,000 0,0000 0,0000

79 0,50000 DSTL2 Combination 1,437 -3,185 0,000 0,0000 0,0000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 35 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

79 1,00000 DSTL2 Combination 1,437 -1,062 0,000 0,0000 0,0000

79 1,50000 DSTL2 Combination 1,437 1,062 0,000 0,0000 0,0000

79 2,00000 DSTL2 Combination 1,437 3,185 0,000 0,0000 0,0000

79 2,50000 DSTL2 Combination 1,437 5,309 0,000 0,0000 0,0000

80 0,00000 DSTL2 Combination 1,470 -5,309 0,000 0,0000 0,0000

80 0,50000 DSTL2 Combination 1,470 -3,185 0,000 0,0000 0,0000

80 1,00000 DSTL2 Combination 1,470 -1,062 0,000 0,0000 0,0000

80 1,50000 DSTL2 Combination 1,470 1,062 0,000 0,0000 0,0000

80 2,00000 DSTL2 Combination 1,470 3,185 0,000 0,0000 0,0000

80 2,50000 DSTL2 Combination 1,470 5,309 0,000 0,0000 0,0000

81 0,00000 DSTL2 Combination 1,459 -5,309 0,000 0,0000 0,0000

81 0,50000 DSTL2 Combination 1,459 -3,185 0,000 0,0000 0,0000

81 1,00000 DSTL2 Combination 1,459 -1,062 0,000 0,0000 0,0000

81 1,50000 DSTL2 Combination 1,459 1,062 0,000 0,0000 0,0000

81 2,00000 DSTL2 Combination 1,459 3,185 0,000 0,0000 0,0000

81 2,50000 DSTL2 Combination 1,459 5,309 0,000 0,0000 0,0000

82 0,00000 DSTL2 Combination 1,457 -5,309 0,000 0,0000 0,0000

82 0,50000 DSTL2 Combination 1,457 -3,185 0,000 0,0000 0,0000

82 1,00000 DSTL2 Combination 1,457 -1,062 0,000 0,0000 0,0000

82 1,50000 DSTL2 Combination 1,457 1,062 0,000 0,0000 0,0000

82 2,00000 DSTL2 Combination 1,457 3,185 0,000 0,0000 0,0000

82 2,50000 DSTL2 Combination 1,457 5,309 0,000 0,0000 0,0000

83 0,00000 DSTL2 Combination 1,458 -5,309 0,000 0,0000 0,0000

83 0,50000 DSTL2 Combination 1,458 -3,185 0,000 0,0000 0,0000

83 1,00000 DSTL2 Combination 1,458 -1,062 0,000 0,0000 0,0000

83 1,50000 DSTL2 Combination 1,458 1,062 0,000 0,0000 0,0000

83 2,00000 DSTL2 Combination 1,458 3,185 0,000 0,0000 0,0000

83 2,50000 DSTL2 Combination 1,458 5,309 0,000 0,0000 0,0000

84 0,00000 DSTL2 Combination 1,458 -5,309 0,000 0,0000 0,0000

84 0,50000 DSTL2 Combination 1,458 -3,185 0,000 0,0000 0,0000

84 1,00000 DSTL2 Combination 1,458 -1,062 0,000 0,0000 0,0000

84 1,50000 DSTL2 Combination 1,458 1,062 0,000 0,0000 0,0000

84 2,00000 DSTL2 Combination 1,458 3,185 0,000 0,0000 0,0000

84 2,50000 DSTL2 Combination 1,458 5,309 0,000 0,0000 0,0000

85 0,00000 DSTL2 Combination 1,458 -5,309 0,000 0,0000 0,0000

85 0,50000 DSTL2 Combination 1,458 -3,185 0,000 0,0000 0,0000

85 1,00000 DSTL2 Combination 1,458 -1,062 0,000 0,0000 0,0000

85 1,50000 DSTL2 Combination 1,458 1,062 0,000 0,0000 0,0000

85 2,00000 DSTL2 Combination 1,458 3,185 0,000 0,0000 0,0000

85 2,50000 DSTL2 Combination 1,458 5,309 0,000 0,0000 0,0000

86 0,00000 DSTL2 Combination 1,458 -5,309 0,000 0,0000 0,0000

86 0,50000 DSTL2 Combination 1,458 -3,185 0,000 0,0000 0,0000

86 1,00000 DSTL2 Combination 1,458 -1,062 0,000 0,0000 0,0000

86 1,50000 DSTL2 Combination 1,458 1,062 0,000 0,0000 0,0000

86 2,00000 DSTL2 Combination 1,458 3,185 0,000 0,0000 0,0000

86 2,50000 DSTL2 Combination 1,458 5,309 0,000 0,0000 0,0000

87 0,00000 DSTL2 Combination 1,457 -5,309 0,000 0,0000 0,0000

87 0,50000 DSTL2 Combination 1,457 -3,185 0,000 0,0000 0,0000

87 1,00000 DSTL2 Combination 1,457 -1,062 0,000 0,0000 0,0000

87 1,50000 DSTL2 Combination 1,457 1,062 0,000 0,0000 0,0000

87 2,00000 DSTL2 Combination 1,457 3,185 0,000 0,0000 0,0000

87 2,50000 DSTL2 Combination 1,457 5,309 0,000 0,0000 0,0000

88 0,00000 DSTL2 Combination 1,459 -5,309 0,000 0,0000 0,0000

88 0,50000 DSTL2 Combination 1,459 -3,185 0,000 0,0000 0,0000

88 1,00000 DSTL2 Combination 1,459 -1,062 0,000 0,0000 0,0000

88 1,50000 DSTL2 Combination 1,459 1,062 0,000 0,0000 0,0000

88 2,00000 DSTL2 Combination 1,459 3,185 0,000 0,0000 0,0000

88 2,50000 DSTL2 Combination 1,459 5,309 0,000 0,0000 0,0000

89 0,00000 DSTL2 Combination 1,470 -5,309 0,000 0,0000 0,0000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 36 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

89 0,50000 DSTL2 Combination 1,470 -3,185 0,000 0,0000 0,0000

89 1,00000 DSTL2 Combination 1,470 -1,062 0,000 0,0000 0,0000

89 1,50000 DSTL2 Combination 1,470 1,062 0,000 0,0000 0,0000

89 2,00000 DSTL2 Combination 1,470 3,185 0,000 0,0000 0,0000

89 2,50000 DSTL2 Combination 1,470 5,309 0,000 0,0000 0,0000

90 0,00000 DSTL2 Combination 1,437 -5,309 0,000 0,0000 0,0000

90 0,50000 DSTL2 Combination 1,437 -3,185 0,000 0,0000 0,0000

90 1,00000 DSTL2 Combination 1,437 -1,062 0,000 0,0000 0,0000

90 1,50000 DSTL2 Combination 1,437 1,062 0,000 0,0000 0,0000

90 2,00000 DSTL2 Combination 1,437 3,185 0,000 0,0000 0,0000

90 2,50000 DSTL2 Combination 1,437 5,309 0,000 0,0000 0,0000

91 0,00000 DSTL2 Combination 1,265 -5,309 0,000 0,0000 0,0000

91 0,50000 DSTL2 Combination 1,265 -3,185 0,000 0,0000 0,0000

91 1,00000 DSTL2 Combination 1,265 -1,062 0,000 0,0000 0,0000

91 1,50000 DSTL2 Combination 1,265 1,062 0,000 0,0000 0,0000

91 2,00000 DSTL2 Combination 1,265 3,185 0,000 0,0000 0,0000

91 2,50000 DSTL2 Combination 1,265 5,309 0,000 0,0000 0,0000

92 0,00000 DSTL2 Combination 1,043 -5,309 0,000 0,0000 0,0000

92 0,50000 DSTL2 Combination 1,043 -3,185 0,000 0,0000 0,0000

92 1,00000 DSTL2 Combination 1,043 -1,062 0,000 0,0000 0,0000

92 1,50000 DSTL2 Combination 1,043 1,062 0,000 0,0000 0,0000

92 2,00000 DSTL2 Combination 1,043 3,185 0,000 0,0000 0,0000

92 2,50000 DSTL2 Combination 1,043 5,309 0,000 0,0000 0,0000

93 0,00000 DSTL2 Combination 0,964 -5,309 0,000 0,0000 0,0000

93 0,50000 DSTL2 Combination 0,964 -3,185 0,000 0,0000 0,0000

93 1,00000 DSTL2 Combination 0,964 -1,062 0,000 0,0000 0,0000

93 1,50000 DSTL2 Combination 0,964 1,062 0,000 0,0000 0,0000

93 2,00000 DSTL2 Combination 0,964 3,185 0,000 0,0000 0,0000

93 2,50000 DSTL2 Combination 0,964 5,309 0,000 0,0000 0,0000

94 0,00000 DSTL2 Combination 0,757 -5,309 0,000 0,0000 0,0000

94 0,50000 DSTL2 Combination 0,757 -3,185 0,000 0,0000 0,0000

94 1,00000 DSTL2 Combination 0,757 -1,062 0,000 0,0000 0,0000

94 1,50000 DSTL2 Combination 0,757 1,062 0,000 0,0000 0,0000

94 2,00000 DSTL2 Combination 0,757 3,185 0,000 0,0000 0,0000

94 2,50000 DSTL2 Combination 0,757 5,309 0,000 0,0000 0,0000

96 0,00000 DSTL2 Combination 0,000 -5,683 0,000 0,0000 0,0000

96 0,50000 DSTL2 Combination 0,000 -3,410 0,000 0,0000 0,0000

96 1,00000 DSTL2 Combination 0,000 -1,137 0,000 0,0000 0,0000

96 1,50000 DSTL2 Combination 0,000 1,137 0,000 0,0000 0,0000

96 2,00000 DSTL2 Combination 0,000 3,410 0,000 0,0000 0,0000

96 2,50000 DSTL2 Combination 0,000 5,683 0,000 0,0000 0,0000

97 0,00000 DSTL2 Combination 0,338 -5,683 0,000 0,0000 0,0000

97 0,50000 DSTL2 Combination 0,338 -3,410 0,000 0,0000 0,0000

97 1,00000 DSTL2 Combination 0,338 -1,137 0,000 0,0000 0,0000

97 1,50000 DSTL2 Combination 0,338 1,137 0,000 0,0000 0,0000

97 2,00000 DSTL2 Combination 0,338 3,410 0,000 0,0000 0,0000

97 2,50000 DSTL2 Combination 0,338 5,683 0,000 0,0000 0,0000

98 0,00000 DSTL2 Combination 210,612 -0,628 1,939E-03 0,0015 0,0061

98 1,79483 DSTL2 Combination 210,469 -0,075 1,939E-03 0,0015 0,0027

98 3,58966 DSTL2 Combination 210,326 0,479 1,939E-03 0,0015 -8,239E-04

99 0,00000 DSTL2 Combination 210,568 -0,628 1,330E-03 0,0011 0,0044

99 1,79483 DSTL2 Combination 210,424 -0,075 1,330E-03 0,0011 0,0020

99 3,58966 DSTL2 Combination 210,281 0,478 1,330E-03 0,0011 -4,152E-04

100 0,00000 DSTL2 Combination 210,281 -0,478 1,349E-03 0,0011 4,352E-04

100 1,79483 DSTL2 Combination 210,424 0,075 1,349E-03 0,0011 -0,0020

100 3,58966 DSTL2 Combination 210,567 0,628 1,349E-03 0,0011 -0,0044

101 0,00000 DSTL2 Combination 210,326 -0,479 1,885E-03 0,0014 8,173E-04

101 1,79483 DSTL2 Combination 210,469 0,075 1,885E-03 0,0014 -0,0026

101 3,58966 DSTL2 Combination 210,612 0,628 1,885E-03 0,0014 -0,0059

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 37 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

102 0,00000 DSTL2 Combination -203,562 -7,164 0,538 1,216E-04 0,0642

102 0,50000 DSTL2 Combination -203,562 -6,713 0,538 1,216E-04 -0,2050

103 0,00000 DSTL2 Combination -203,562 -1,404 -0,431 1,216E-04 -0,2050

103 0,50000 DSTL2 Combination -203,562 -0,953 -0,431 1,216E-04 0,0106

104 0,00000 DSTL2 Combination -203,562 -0,953 -0,431 1,216E-04 0,0106

104 0,50000 DSTL2 Combination -203,562 -0,502 -0,431 1,216E-04 0,2262

105 0,00000 DSTL2 Combination -247,362 76,479 0,543 3,690E-04 0,2243

105 0,50000 DSTL2 Combination -247,362 76,930 0,543 3,690E-04 -0,0471

106 0,00000 DSTL2 Combination -247,362 76,930 0,543 3,690E-04 -0,0471

106 0,50000 DSTL2 Combination -247,362 77,381 0,543 3,690E-04 -0,3185

107 0,00000 DSTL2 Combination -326,041 -38,151 -0,712 -3,557E-05 -0,3262

107 0,50000 DSTL2 Combination -326,041 -37,700 -0,712 -3,557E-05 0,0297

108 0,00000 DSTL2 Combination -326,041 -37,700 -0,712 -3,557E-05 0,0297

108 0,50000 DSTL2 Combination -326,041 -37,249 -0,712 -3,557E-05 0,3855

109 0,00000 DSTL2 Combination -326,004 37,185 -0,704 -3,557E-05 -0,3701

109 0,50000 DSTL2 Combination -326,004 37,636 -0,704 -3,557E-05 -0,0182

110 0,00000 DSTL2 Combination -326,004 37,636 -0,704 -3,557E-05 -0,0182

110 0,50000 DSTL2 Combination -326,004 38,087 -0,704 -3,557E-05 0,3336

111 0,00000 DSTL2 Combination -247,417 -77,346 0,572 3,928E-04 0,3262

111 0,50000 DSTL2 Combination -247,417 -76,895 0,572 3,928E-04 0,0403

112 0,00000 DSTL2 Combination -247,417 -76,895 0,572 3,928E-04 0,0403

112 0,50000 DSTL2 Combination -247,417 -76,444 0,572 3,928E-04 -0,2457

113 0,00000 DSTL2 Combination -203,494 0,449 -0,462 6,742E-05 -0,2482

113 0,50000 DSTL2 Combination -203,494 0,900 -0,462 6,742E-05 -0,0172

114 0,00000 DSTL2 Combination -203,494 0,900 -0,462 6,742E-05 -0,0172

114 0,50000 DSTL2 Combination -203,494 1,351 -0,462 6,742E-05 0,2138

115 0,00000 DSTL2 Combination -203,445 6,795 0,480 6,742E-05 0,2138

115 0,50000 DSTL2 Combination -203,445 7,246 0,480 6,742E-05 -0,0260

116 0,00000 DSTL2 Combination -326,016 -31,806 0,746 -3,557E-05 0,3855

116 0,50000 DSTL2 Combination -326,016 -31,355 0,746 -3,557E-05 0,0126

117 0,00000 DSTL2 Combination -326,016 -31,355 0,746 -3,557E-05 0,0126

117 0,50000 DSTL2 Combination -326,016 -30,904 0,746 -3,557E-05 -0,3603

118 0,00000 DSTL2 Combination -326,004 30,974 0,733 -3,557E-05 0,3630

118 0,50000 DSTL2 Combination -326,004 31,425 0,733 -3,557E-05 -0,0035

119 0,00000 DSTL2 Combination -326,004 31,425 0,733 -3,557E-05 -0,0035

119 0,50000 DSTL2 Combination -326,004 31,876 0,733 -3,557E-05 -0,3701

120 0,00000 DSTL2 Combination -326,016 -25,595 -0,724 -3,557E-05 -0,3603

120 0,50000 DSTL2 Combination -326,016 -25,144 -0,724 -3,557E-05 0,0017

121 0,00000 DSTL2 Combination -326,016 -25,144 -0,724 -3,557E-05 0,0017

121 0,50000 DSTL2 Combination -326,016 -24,693 -0,724 -3,557E-05 0,3637

122 0,00000 DSTL2 Combination -326,014 -19,250 0,728 -3,557E-05 0,3637

122 0,50000 DSTL2 Combination -326,014 -18,799 0,728 -3,557E-05 -3,175E-04

123 0,00000 DSTL2 Combination -326,014 -18,799 0,728 -3,557E-05 -3,175E-04

123 0,50000 DSTL2 Combination -326,014 -18,348 0,728 -3,557E-05 -0,3644

124 0,00000 DSTL2 Combination -326,014 -13,039 -0,729 -3,557E-05 -0,3644

124 0,50000 DSTL2 Combination -326,014 -12,588 -0,729 -3,557E-05 6,427E-05

125 0,00000 DSTL2 Combination -326,014 -12,588 -0,729 -3,557E-05 6,427E-05

125 0,50000 DSTL2 Combination -326,014 -12,137 -0,729 -3,557E-05 0,3645

126 0,00000 DSTL2 Combination -326,014 -6,694 0,729 -3,557E-05 0,3645

126 0,50000 DSTL2 Combination -326,014 -6,243 0,729 -3,557E-05 3,382E-05

127 0,00000 DSTL2 Combination -326,014 -6,243 0,729 -3,557E-05 3,382E-05

127 0,50000 DSTL2 Combination -326,014 -5,792 0,729 -3,557E-05 -0,3644

128 0,00000 DSTL2 Combination -326,014 -0,483 -0,729 -3,557E-05 -0,3644

128 0,50000 DSTL2 Combination -326,014 -0,032 -0,729 -3,557E-05 -3,028E-06

129 0,00000 DSTL2 Combination -326,014 -0,032 -0,729 -3,557E-05 -3,028E-06

129 0,50000 DSTL2 Combination -326,014 0,419 -0,729 -3,557E-05 0,3644

130 0,00000 DSTL2 Combination -326,014 5,862 0,729 -3,557E-05 0,3644

130 0,50000 DSTL2 Combination -326,014 6,313 0,729 -3,557E-05 -7,014E-07

131 0,00000 DSTL2 Combination -326,014 6,313 0,729 -3,557E-05 -7,014E-07

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 38 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

131 0,50000 DSTL2 Combination -326,014 6,764 0,729 -3,557E-05 -0,3644

132 0,00000 DSTL2 Combination -326,014 12,073 -0,729 -3,557E-05 -0,3644

132 0,50000 DSTL2 Combination -326,014 12,524 -0,729 -3,557E-05 9,219E-06

133 0,00000 DSTL2 Combination -326,014 12,524 -0,729 -3,557E-05 9,219E-06

133 0,50000 DSTL2 Combination -326,014 12,975 -0,729 -3,557E-05 0,3644

134 0,00000 DSTL2 Combination -326,014 18,418 0,730 -3,557E-05 0,3644

134 0,50000 DSTL2 Combination -326,014 18,869 0,730 -3,557E-05 -5,548E-04

135 0,00000 DSTL2 Combination -326,014 18,869 0,730 -3,557E-05 -5,548E-04

135 0,50000 DSTL2 Combination -326,014 19,320 0,730 -3,557E-05 -0,3656

136 0,00000 DSTL2 Combination -326,014 24,629 -0,729 -3,557E-05 -0,3656

136 0,50000 DSTL2 Combination -326,014 25,080 -0,729 -3,557E-05 -0,0013

137 0,00000 DSTL2 Combination -326,014 25,080 -0,729 -3,557E-05 -0,0013

137 0,50000 DSTL2 Combination -326,014 25,531 -0,729 -3,557E-05 0,3630

181 0,00000 DSTL2 Combination -0,666 -0,067 0,000 0,0000 0,0000

181 0,44723 DSTL2 Combination -0,666 -0,045 0,000 0,0000 0,0000

181 0,89447 DSTL2 Combination -0,666 -0,022 0,000 0,0000 0,0000

181 1,34170 DSTL2 Combination -0,666 -1,405E-17 0,000 0,0000 0,0000

181 1,78893 DSTL2 Combination -0,666 0,022 0,000 0,0000 0,0000

181 2,23617 DSTL2 Combination -0,666 0,045 0,000 0,0000 0,0000

181 2,68340 DSTL2 Combination -0,666 0,067 0,000 0,0000 0,0000

182 0,00000 DSTL2 Combination -1,097 -0,067 0,000 0,0000 0,0000

182 0,44876 DSTL2 Combination -1,097 -0,045 0,000 0,0000 0,0000

182 0,89753 DSTL2 Combination -1,097 -0,022 0,000 0,0000 0,0000

182 1,34629 DSTL2 Combination -1,097 4,684E-18 0,000 0,0000 0,0000

182 1,79505 DSTL2 Combination -1,097 0,022 0,000 0,0000 0,0000

182 2,24382 DSTL2 Combination -1,097 0,045 0,000 0,0000 0,0000

182 2,69258 DSTL2 Combination -1,097 0,067 0,000 0,0000 0,0000

183 0,00000 DSTL2 Combination -0,958 -0,067 0,000 0,0000 0,0000

183 0,44876 DSTL2 Combination -0,958 -0,045 0,000 0,0000 0,0000

183 0,89753 DSTL2 Combination -0,958 -0,022 0,000 0,0000 0,0000

183 1,34629 DSTL2 Combination -0,958 -1,405E-17 0,000 0,0000 0,0000

183 1,79505 DSTL2 Combination -0,958 0,022 0,000 0,0000 0,0000

183 2,24382 DSTL2 Combination -0,958 0,045 0,000 0,0000 0,0000

183 2,69258 DSTL2 Combination -0,958 0,067 0,000 0,0000 0,0000

184 0,00000 DSTL2 Combination -1,224 -0,067 0,000 0,0000 0,0000

184 0,44876 DSTL2 Combination -1,224 -0,045 0,000 0,0000 0,0000

184 0,89753 DSTL2 Combination -1,224 -0,022 0,000 0,0000 0,0000

184 1,34629 DSTL2 Combination -1,224 -1,405E-17 0,000 0,0000 0,0000

184 1,79505 DSTL2 Combination -1,224 0,022 0,000 0,0000 0,0000

184 2,24382 DSTL2 Combination -1,224 0,045 0,000 0,0000 0,0000

184 2,69258 DSTL2 Combination -1,224 0,067 0,000 0,0000 0,0000

185 0,00000 DSTL2 Combination -1,525 -0,067 0,000 0,0000 0,0000

185 0,44876 DSTL2 Combination -1,525 -0,045 0,000 0,0000 0,0000

185 0,89753 DSTL2 Combination -1,525 -0,022 0,000 0,0000 0,0000

185 1,34629 DSTL2 Combination -1,525 -1,405E-17 0,000 0,0000 0,0000

185 1,79505 DSTL2 Combination -1,525 0,022 0,000 0,0000 0,0000

185 2,24382 DSTL2 Combination -1,525 0,045 0,000 0,0000 0,0000

185 2,69258 DSTL2 Combination -1,525 0,067 0,000 0,0000 0,0000

186 0,00000 DSTL2 Combination -1,593 -0,067 0,000 0,0000 0,0000

186 0,44876 DSTL2 Combination -1,593 -0,045 0,000 0,0000 0,0000

186 0,89753 DSTL2 Combination -1,593 -0,022 0,000 0,0000 0,0000

186 1,34629 DSTL2 Combination -1,593 -1,405E-17 0,000 0,0000 0,0000

186 1,79505 DSTL2 Combination -1,593 0,022 0,000 0,0000 0,0000

186 2,24382 DSTL2 Combination -1,593 0,045 0,000 0,0000 0,0000

186 2,69258 DSTL2 Combination -1,593 0,067 0,000 0,0000 0,0000

187 0,00000 DSTL2 Combination -1,565 -0,067 0,000 0,0000 0,0000

187 0,44876 DSTL2 Combination -1,565 -0,045 0,000 0,0000 0,0000

187 0,89753 DSTL2 Combination -1,565 -0,022 0,000 0,0000 0,0000

187 1,34629 DSTL2 Combination -1,565 -1,405E-17 0,000 0,0000 0,0000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 39 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

187 1,79505 DSTL2 Combination -1,565 0,022 0,000 0,0000 0,0000

187 2,24382 DSTL2 Combination -1,565 0,045 0,000 0,0000 0,0000

187 2,69258 DSTL2 Combination -1,565 0,067 0,000 0,0000 0,0000

188 0,00000 DSTL2 Combination -1,570 -0,067 0,000 0,0000 0,0000

188 0,44876 DSTL2 Combination -1,570 -0,045 0,000 0,0000 0,0000

188 0,89753 DSTL2 Combination -1,570 -0,022 0,000 0,0000 0,0000

188 1,34629 DSTL2 Combination -1,570 -1,405E-17 0,000 0,0000 0,0000

188 1,79505 DSTL2 Combination -1,570 0,022 0,000 0,0000 0,0000

188 2,24382 DSTL2 Combination -1,570 0,045 0,000 0,0000 0,0000

188 2,69258 DSTL2 Combination -1,570 0,067 0,000 0,0000 0,0000

189 0,00000 DSTL2 Combination -1,570 -0,067 0,000 0,0000 0,0000

189 0,44876 DSTL2 Combination -1,570 -0,045 0,000 0,0000 0,0000

189 0,89753 DSTL2 Combination -1,570 -0,022 0,000 0,0000 0,0000

189 1,34629 DSTL2 Combination -1,570 9,368E-18 0,000 0,0000 0,0000

189 1,79505 DSTL2 Combination -1,570 0,022 0,000 0,0000 0,0000

189 2,24382 DSTL2 Combination -1,570 0,045 0,000 0,0000 0,0000

189 2,69258 DSTL2 Combination -1,570 0,067 0,000 0,0000 0,0000

190 0,00000 DSTL2 Combination -1,570 -0,067 0,000 0,0000 0,0000

190 0,44876 DSTL2 Combination -1,570 -0,045 0,000 0,0000 0,0000

190 0,89753 DSTL2 Combination -1,570 -0,022 0,000 0,0000 0,0000

190 1,34629 DSTL2 Combination -1,570 9,368E-18 0,000 0,0000 0,0000

190 1,79505 DSTL2 Combination -1,570 0,022 0,000 0,0000 0,0000

190 2,24382 DSTL2 Combination -1,570 0,045 0,000 0,0000 0,0000

190 2,69258 DSTL2 Combination -1,570 0,067 0,000 0,0000 0,0000

191 0,00000 DSTL2 Combination -1,570 -0,067 0,000 0,0000 0,0000

191 0,44876 DSTL2 Combination -1,570 -0,045 0,000 0,0000 0,0000

191 0,89753 DSTL2 Combination -1,570 -0,022 0,000 0,0000 0,0000

191 1,34629 DSTL2 Combination -1,570 9,368E-18 0,000 0,0000 0,0000

191 1,79505 DSTL2 Combination -1,570 0,022 0,000 0,0000 0,0000

191 2,24382 DSTL2 Combination -1,570 0,045 0,000 0,0000 0,0000

191 2,69258 DSTL2 Combination -1,570 0,067 0,000 0,0000 0,0000

192 0,00000 DSTL2 Combination -1,570 -0,067 0,000 0,0000 0,0000

192 0,44876 DSTL2 Combination -1,570 -0,045 0,000 0,0000 0,0000

192 0,89753 DSTL2 Combination -1,570 -0,022 0,000 0,0000 0,0000

192 1,34629 DSTL2 Combination -1,570 9,368E-18 0,000 0,0000 0,0000

192 1,79505 DSTL2 Combination -1,570 0,022 0,000 0,0000 0,0000

192 2,24382 DSTL2 Combination -1,570 0,045 0,000 0,0000 0,0000

192 2,69258 DSTL2 Combination -1,570 0,067 0,000 0,0000 0,0000

193 0,00000 DSTL2 Combination -1,570 -0,067 0,000 0,0000 0,0000

193 0,44876 DSTL2 Combination -1,570 -0,045 0,000 0,0000 0,0000

193 0,89753 DSTL2 Combination -1,570 -0,022 0,000 0,0000 0,0000

193 1,34629 DSTL2 Combination -1,570 9,368E-18 0,000 0,0000 0,0000

193 1,79505 DSTL2 Combination -1,570 0,022 0,000 0,0000 0,0000

193 2,24382 DSTL2 Combination -1,570 0,045 0,000 0,0000 0,0000

193 2,69258 DSTL2 Combination -1,570 0,067 0,000 0,0000 0,0000

194 0,00000 DSTL2 Combination -1,570 -0,067 0,000 0,0000 0,0000

194 0,44876 DSTL2 Combination -1,570 -0,045 0,000 0,0000 0,0000

194 0,89753 DSTL2 Combination -1,570 -0,022 0,000 0,0000 0,0000

194 1,34629 DSTL2 Combination -1,570 9,368E-18 0,000 0,0000 0,0000

194 1,79505 DSTL2 Combination -1,570 0,022 0,000 0,0000 0,0000

194 2,24382 DSTL2 Combination -1,570 0,045 0,000 0,0000 0,0000

194 2,69258 DSTL2 Combination -1,570 0,067 0,000 0,0000 0,0000

195 0,00000 DSTL2 Combination -1,565 -0,067 0,000 0,0000 0,0000

195 0,44876 DSTL2 Combination -1,565 -0,045 0,000 0,0000 0,0000

195 0,89753 DSTL2 Combination -1,565 -0,022 0,000 0,0000 0,0000

195 1,34629 DSTL2 Combination -1,565 2,810E-17 0,000 0,0000 0,0000

195 1,79505 DSTL2 Combination -1,565 0,022 0,000 0,0000 0,0000

195 2,24382 DSTL2 Combination -1,565 0,045 0,000 0,0000 0,0000

195 2,69258 DSTL2 Combination -1,565 0,067 0,000 0,0000 0,0000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 40 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

196 0,00000 DSTL2 Combination -1,593 -0,067 0,000 0,0000 0,0000

196 0,44876 DSTL2 Combination -1,593 -0,045 0,000 0,0000 0,0000

196 0,89753 DSTL2 Combination -1,593 -0,022 0,000 0,0000 0,0000

196 1,34629 DSTL2 Combination -1,593 -1,405E-17 0,000 0,0000 0,0000

196 1,79505 DSTL2 Combination -1,593 0,022 0,000 0,0000 0,0000

196 2,24382 DSTL2 Combination -1,593 0,045 0,000 0,0000 0,0000

196 2,69258 DSTL2 Combination -1,593 0,067 0,000 0,0000 0,0000

197 0,00000 DSTL2 Combination -1,524 -0,067 0,000 0,0000 0,0000

197 0,44876 DSTL2 Combination -1,524 -0,045 0,000 0,0000 0,0000

197 0,89753 DSTL2 Combination -1,524 -0,022 0,000 0,0000 0,0000

197 1,34629 DSTL2 Combination -1,524 -1,405E-17 0,000 0,0000 0,0000

197 1,79505 DSTL2 Combination -1,524 0,022 0,000 0,0000 0,0000

197 2,24382 DSTL2 Combination -1,524 0,045 0,000 0,0000 0,0000

197 2,69258 DSTL2 Combination -1,524 0,067 0,000 0,0000 0,0000

198 0,00000 DSTL2 Combination -1,224 -0,067 0,000 0,0000 0,0000

198 0,44876 DSTL2 Combination -1,224 -0,045 0,000 0,0000 0,0000

198 0,89753 DSTL2 Combination -1,224 -0,022 0,000 0,0000 0,0000

198 1,34629 DSTL2 Combination -1,224 -1,405E-17 0,000 0,0000 0,0000

198 1,79505 DSTL2 Combination -1,224 0,022 0,000 0,0000 0,0000

198 2,24382 DSTL2 Combination -1,224 0,045 0,000 0,0000 0,0000

198 2,69258 DSTL2 Combination -1,224 0,067 0,000 0,0000 0,0000

199 0,00000 DSTL2 Combination -0,960 -0,067 0,000 0,0000 0,0000

199 0,44876 DSTL2 Combination -0,960 -0,045 0,000 0,0000 0,0000

199 0,89753 DSTL2 Combination -0,960 -0,022 0,000 0,0000 0,0000

199 1,34629 DSTL2 Combination -0,960 -1,405E-17 0,000 0,0000 0,0000

199 1,79505 DSTL2 Combination -0,960 0,022 0,000 0,0000 0,0000

199 2,24382 DSTL2 Combination -0,960 0,045 0,000 0,0000 0,0000

199 2,69258 DSTL2 Combination -0,960 0,067 0,000 0,0000 0,0000

200 0,00000 DSTL2 Combination -1,092 -0,067 0,000 0,0000 0,0000

200 0,44876 DSTL2 Combination -1,092 -0,045 0,000 0,0000 0,0000

200 0,89753 DSTL2 Combination -1,092 -0,022 0,000 0,0000 0,0000

200 1,34629 DSTL2 Combination -1,092 -1,405E-17 0,000 0,0000 0,0000

200 1,79505 DSTL2 Combination -1,092 0,022 0,000 0,0000 0,0000

200 2,24382 DSTL2 Combination -1,092 0,045 0,000 0,0000 0,0000

200 2,69258 DSTL2 Combination -1,092 0,067 0,000 0,0000 0,0000

201 0,00000 DSTL2 Combination -0,659 -0,067 0,000 0,0000 0,0000

201 0,44723 DSTL2 Combination -0,659 -0,045 0,000 0,0000 0,0000

201 0,89447 DSTL2 Combination -0,659 -0,022 0,000 0,0000 0,0000

201 1,34170 DSTL2 Combination -0,659 2,810E-17 0,000 0,0000 0,0000

201 1,78893 DSTL2 Combination -0,659 0,022 0,000 0,0000 0,0000

201 2,23617 DSTL2 Combination -0,659 0,045 0,000 0,0000 0,0000

201 2,68340 DSTL2 Combination -0,659 0,067 0,000 0,0000 0,0000

Table: Element Forces - Frames, Part 2 of 2

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

11 0,00000 DSTL2 3,6151 11-1 0,00000

11 0,51478 DSTL2 -1,5110 11-1 0,51478

11 1,02956 DSTL2 -6,6833 11-1 1,02956

12 0,00000 DSTL2 -1,3613 12-1 0,00000

12 0,51478 DSTL2 0,5772 12-1 0,51478

12 1,02956 DSTL2 2,4695 12-1 1,02956

13 0,00000 DSTL2 3,6147 13-1 0,00000

13 0,51478 DSTL2 -1,5113 13-1 0,51478

13 1,02956 DSTL2 -6,6836 13-1 1,02956

14 0,00000 DSTL2 -1,3615 14-1 0,00000

14 0,51478 DSTL2 0,5777 14-1 0,51478

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 41 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

14 1,02956 DSTL2 2,4707 14-1 1,02956

15 0,00000 DSTL2 -1,3615 15-1 0,00000

15 0,51478 DSTL2 0,5777 15-1 0,51478

15 1,02956 DSTL2 2,4707 15-1 1,02956

16 0,00000 DSTL2 17,0530 16-1 0,00000

16 0,50000 DSTL2 20,5630 16-1 0,50000

17 0,00000 DSTL2 20,5630 17-1 0,00000

17 0,50000 DSTL2 21,1259 17-1 0,50000

18 0,00000 DSTL2 21,1259 18-1 0,00000

18 0,50000 DSTL2 21,4634 18-1 0,50000

19 0,00000 DSTL2 18,9939 19-1 0,00000

19 0,50000 DSTL2 -19,3406 19-1 0,50000

20 0,00000 DSTL2 -19,3406 20-1 0,00000

20 0,50000 DSTL2 -57,9007 20-1 0,50000

21 0,00000 DSTL2 -64,5840 21-1 0,00000

21 0,50000 DSTL2 -45,6534 21-1 0,50000

22 0,00000 DSTL2 -45,6534 22-1 0,00000

22 0,50000 DSTL2 -26,9484 22-1 0,50000

23 0,00000 DSTL2 -26,8983 23-1 0,00000

23 0,50000 DSTL2 -45,6355 23-1 0,50000

24 0,00000 DSTL2 -45,6355 24-1 0,00000

24 0,50000 DSTL2 -64,5981 24-1 0,50000

25 0,00000 DSTL2 -57,9145 25-1 0,00000

25 0,50000 DSTL2 -19,3367 25-1 0,50000

26 0,00000 DSTL2 -19,3367 26-1 0,00000

26 0,50000 DSTL2 19,0156 26-1 0,50000

27 0,00000 DSTL2 21,4863 27-1 0,00000

27 0,50000 DSTL2 21,1223 27-1 0,50000

28 0,00000 DSTL2 21,1223 28-1 0,00000

28 0,50000 DSTL2 20,5329 28-1 0,50000

29 0,00000 DSTL2 20,5329 29-1 0,00000

29 0,50000 DSTL2 17,0635 29-1 0,50000

30 0,00000 DSTL2 -26,9484 30-1 0,00000

30 0,50000 DSTL2 -11,1232 30-1 0,50000

31 0,00000 DSTL2 -11,1232 31-1 0,00000

31 0,50000 DSTL2 4,4765 31-1 0,50000

32 0,00000 DSTL2 4,4563 32-1 0,00000

32 0,50000 DSTL2 -11,1083 32-1 0,50000

33 0,00000 DSTL2 -11,1083 33-1 0,00000

33 0,50000 DSTL2 -26,8983 33-1 0,50000

34 0,00000 DSTL2 4,4765 34-1 0,00000

34 0,50000 DSTL2 17,1290 34-1 0,50000

35 0,00000 DSTL2 17,1290 35-1 0,00000

35 0,50000 DSTL2 29,5561 35-1 0,50000

36 0,00000 DSTL2 29,5561 36-1 0,00000

36 0,50000 DSTL2 39,1034 36-1 0,50000

37 0,00000 DSTL2 39,1034 37-1 0,00000

37 0,50000 DSTL2 48,4251 37-1 0,50000

38 0,00000 DSTL2 48,4251 38-1 0,00000

38 0,50000 DSTL2 54,7997 38-1 0,50000

39 0,00000 DSTL2 54,7997 39-1 0,00000

39 0,50000 DSTL2 60,9489 39-1 0,50000

40 0,00000 DSTL2 60,9489 40-1 0,00000

40 0,50000 DSTL2 64,2182 40-1 0,50000

41 0,00000 DSTL2 64,2182 41-1 0,00000

41 0,50000 DSTL2 67,2619 41-1 0,50000

42 0,00000 DSTL2 67,2619 42-1 0,00000

42 0,50000 DSTL2 67,3586 42-1 0,50000

43 0,00000 DSTL2 67,3586 43-1 0,00000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 42 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

43 0,50000 DSTL2 67,2298 43-1 0,50000

44 0,00000 DSTL2 67,2298 44-1 0,00000

44 0,50000 DSTL2 64,2212 44-1 0,50000

45 0,00000 DSTL2 64,2212 45-1 0,00000

45 0,50000 DSTL2 60,9870 45-1 0,50000

46 0,00000 DSTL2 60,9870 46-1 0,00000

46 0,50000 DSTL2 54,8057 46-1 0,50000

47 0,00000 DSTL2 54,8057 47-1 0,00000

47 0,50000 DSTL2 48,3990 47-1 0,50000

48 0,00000 DSTL2 48,3990 48-1 0,00000

48 0,50000 DSTL2 39,1123 48-1 0,50000

49 0,00000 DSTL2 39,1123 49-1 0,00000

49 0,50000 DSTL2 29,6002 49-1 0,50000

50 0,00000 DSTL2 29,6002 50-1 0,00000

50 0,50000 DSTL2 17,1410 50-1 0,50000

51 0,00000 DSTL2 17,1410 51-1 0,00000

51 0,50000 DSTL2 4,4563 51-1 0,50000

52 0,00000 DSTL2 3,6147 52-1 0,00000

52 0,51478 DSTL2 -1,5113 52-1 0,51478

52 1,02956 DSTL2 -6,6836 52-1 1,02956

53 0,00000 DSTL2 -1,3613 53-1 0,00000

53 0,51478 DSTL2 0,5772 53-1 0,51478

53 1,02956 DSTL2 2,4695 53-1 1,02956

54 0,00000 DSTL2 3,6151 54-1 0,00000

54 0,51478 DSTL2 -1,5110 54-1 0,51478

54 1,02956 DSTL2 -6,6833 54-1 1,02956

56 0,00000 DSTL2 -4,9172 56-1 0,00000

56 0,50000 DSTL2 -3,8430 56-1 0,50000

56 1,00000 DSTL2 -2,8483 56-1 1,00000

56 1,50000 DSTL2 -1,9332 56-1 1,50000

56 2,00000 DSTL2 -1,0977 56-1 2,00000

56 2,50000 DSTL2 -0,3417 56-1 2,50000

56 3,00000 DSTL2 0,3347 56-1 3,00000

56 3,50000 DSTL2 0,9315 56-1 3,50000

56 4,00000 DSTL2 1,4487 56-1 4,00000

56 4,50000 DSTL2 1,8864 56-1 4,50000

56 5,00000 DSTL2 2,2444 56-1 5,00000

56 5,50000 DSTL2 2,5230 56-1 5,50000

56 6,00000 DSTL2 2,7219 56-1 6,00000

56 6,50000 DSTL2 2,8413 56-1 6,50000

56 7,00000 DSTL2 2,8811 56-1 7,00000

56 7,50000 DSTL2 2,8413 56-1 7,50000

56 8,00000 DSTL2 2,7219 56-1 8,00000

56 8,50000 DSTL2 2,5230 56-1 8,50000

56 9,00000 DSTL2 2,2445 56-1 9,00000

56 9,50000 DSTL2 1,8864 56-1 9,50000

56 10,00000 DSTL2 1,4488 56-1 10,00000

56 10,50000 DSTL2 0,9316 56-1 10,50000

56 11,00000 DSTL2 0,3348 56-1 11,00000

56 11,50000 DSTL2 -0,3416 56-1 11,50000

56 12,00000 DSTL2 -1,0975 56-1 12,00000

56 12,50000 DSTL2 -1,9330 56-1 12,50000

56 13,00000 DSTL2 -2,8481 56-1 13,00000

56 13,50000 DSTL2 -3,8428 56-1 13,50000

56 14,00000 DSTL2 -4,9170 56-1 14,00000

57 0,00000 DSTL2 -4,9170 57-1 0,00000

57 0,50000 DSTL2 -3,8428 57-1 0,50000

57 1,00000 DSTL2 -2,8481 57-1 1,00000

57 1,50000 DSTL2 -1,9330 57-1 1,50000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 43 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

57 2,00000 DSTL2 -1,0975 57-1 2,00000

57 2,50000 DSTL2 -0,3416 57-1 2,50000

57 3,00000 DSTL2 0,3348 57-1 3,00000

57 3,50000 DSTL2 0,9316 57-1 3,50000

57 4,00000 DSTL2 1,4488 57-1 4,00000

57 4,50000 DSTL2 1,8864 57-1 4,50000

57 5,00000 DSTL2 2,2445 57-1 5,00000

57 5,50000 DSTL2 2,5230 57-1 5,50000

57 6,00000 DSTL2 2,7219 57-1 6,00000

57 6,50000 DSTL2 2,8413 57-1 6,50000

57 7,00000 DSTL2 2,8811 57-1 7,00000

57 7,50000 DSTL2 2,8413 57-1 7,50000

57 8,00000 DSTL2 2,7219 57-1 8,00000

57 8,50000 DSTL2 2,5230 57-1 8,50000

57 9,00000 DSTL2 2,2444 57-1 9,00000

57 9,50000 DSTL2 1,8864 57-1 9,50000

57 10,00000 DSTL2 1,4487 57-1 10,00000

57 10,50000 DSTL2 0,9315 57-1 10,50000

57 11,00000 DSTL2 0,3347 57-1 11,00000

57 11,50000 DSTL2 -0,3417 57-1 11,50000

57 12,00000 DSTL2 -1,0977 57-1 12,00000

57 12,50000 DSTL2 -1,9332 57-1 12,50000

57 13,00000 DSTL2 -2,8483 57-1 13,00000

57 13,50000 DSTL2 -3,8430 57-1 13,50000

57 14,00000 DSTL2 -4,9172 57-1 14,00000

59 0,00000 DSTL2 6,7269 59-1 0,00000

59 0,50000 DSTL2 13,3687 59-1 0,50000

60 0,00000 DSTL2 13,3687 60-1 0,00000

60 0,50000 DSTL2 17,0635 60-1 0,50000

61 0,00000 DSTL2 6,7021 61-1 0,00000

61 0,50000 DSTL2 13,3175 61-1 0,50000

62 0,00000 DSTL2 13,3175 62-1 0,00000

62 0,50000 DSTL2 17,0530 62-1 0,50000

64 0,00000 DSTL2 17,0530 64-1 0,00000

64 0,50000 DSTL2 13,3175 64-1 0,50000

65 0,00000 DSTL2 13,3175 65-1 0,00000

65 0,50000 DSTL2 6,7021 65-1 0,50000

66 0,00000 DSTL2 17,0635 66-1 0,00000

66 0,50000 DSTL2 13,3687 66-1 0,50000

67 0,00000 DSTL2 13,3687 67-1 0,00000

67 0,50000 DSTL2 6,7269 67-1 0,50000

69 0,00000 DSTL2 6,7269 69-1 0,00000

69 0,47500 DSTL2 0,2083 69-1 0,47500

70 0,00000 DSTL2 6,7021 70-1 0,00000

70 0,47500 DSTL2 0,2086 70-1 0,47500

71 0,00000 DSTL2 6,7021 71-1 0,00000

71 0,47500 DSTL2 0,2086 71-1 0,47500

72 0,00000 DSTL2 6,7269 72-1 0,00000

72 0,47500 DSTL2 0,2083 72-1 0,47500

75 0,00000 DSTL2 0,0000 75-1 0,00000

75 0,50000 DSTL2 2,1235 75-1 0,50000

75 1,00000 DSTL2 3,1853 75-1 1,00000

75 1,50000 DSTL2 3,1853 75-1 1,50000

75 2,00000 DSTL2 2,1235 75-1 2,00000

75 2,50000 DSTL2 3,227E-17 75-1 2,50000

76 0,00000 DSTL2 0,0000 76-1 0,00000

76 0,50000 DSTL2 2,1235 76-1 0,50000

76 1,00000 DSTL2 3,1853 76-1 1,00000

76 1,50000 DSTL2 3,1853 76-1 1,50000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 44 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

76 2,00000 DSTL2 2,1235 76-1 2,00000

76 2,50000 DSTL2 -3,903E-15 76-1 2,50000

77 0,00000 DSTL2 0,0000 77-1 0,00000

77 0,50000 DSTL2 2,1235 77-1 0,50000

77 1,00000 DSTL2 3,1853 77-1 1,00000

77 1,50000 DSTL2 3,1853 77-1 1,50000

77 2,00000 DSTL2 2,1235 77-1 2,00000

77 2,50000 DSTL2 -3,903E-15 77-1 2,50000

78 0,00000 DSTL2 0,0000 78-1 0,00000

78 0,50000 DSTL2 2,1235 78-1 0,50000

78 1,00000 DSTL2 3,1853 78-1 1,00000

78 1,50000 DSTL2 3,1853 78-1 1,50000

78 2,00000 DSTL2 2,1235 78-1 2,00000

78 2,50000 DSTL2 -3,903E-15 78-1 2,50000

79 0,00000 DSTL2 0,0000 79-1 0,00000

79 0,50000 DSTL2 2,1235 79-1 0,50000

79 1,00000 DSTL2 3,1853 79-1 1,00000

79 1,50000 DSTL2 3,1853 79-1 1,50000

79 2,00000 DSTL2 2,1235 79-1 2,00000

79 2,50000 DSTL2 -3,903E-15 79-1 2,50000

80 0,00000 DSTL2 0,0000 80-1 0,00000

80 0,50000 DSTL2 2,1235 80-1 0,50000

80 1,00000 DSTL2 3,1853 80-1 1,00000

80 1,50000 DSTL2 3,1853 80-1 1,50000

80 2,00000 DSTL2 2,1235 80-1 2,00000

80 2,50000 DSTL2 -3,903E-15 80-1 2,50000

81 0,00000 DSTL2 0,0000 81-1 0,00000

81 0,50000 DSTL2 2,1235 81-1 0,50000

81 1,00000 DSTL2 3,1853 81-1 1,00000

81 1,50000 DSTL2 3,1853 81-1 1,50000

81 2,00000 DSTL2 2,1235 81-1 2,00000

81 2,50000 DSTL2 -3,903E-15 81-1 2,50000

82 0,00000 DSTL2 0,0000 82-1 0,00000

82 0,50000 DSTL2 2,1235 82-1 0,50000

82 1,00000 DSTL2 3,1853 82-1 1,00000

82 1,50000 DSTL2 3,1853 82-1 1,50000

82 2,00000 DSTL2 2,1235 82-1 2,00000

82 2,50000 DSTL2 -3,903E-15 82-1 2,50000

83 0,00000 DSTL2 0,0000 83-1 0,00000

83 0,50000 DSTL2 2,1235 83-1 0,50000

83 1,00000 DSTL2 3,1853 83-1 1,00000

83 1,50000 DSTL2 3,1853 83-1 1,50000

83 2,00000 DSTL2 2,1235 83-1 2,00000

83 2,50000 DSTL2 -3,903E-15 83-1 2,50000

84 0,00000 DSTL2 0,0000 84-1 0,00000

84 0,50000 DSTL2 2,1235 84-1 0,50000

84 1,00000 DSTL2 3,1853 84-1 1,00000

84 1,50000 DSTL2 3,1853 84-1 1,50000

84 2,00000 DSTL2 2,1235 84-1 2,00000

84 2,50000 DSTL2 -3,903E-15 84-1 2,50000

85 0,00000 DSTL2 0,0000 85-1 0,00000

85 0,50000 DSTL2 2,1235 85-1 0,50000

85 1,00000 DSTL2 3,1853 85-1 1,00000

85 1,50000 DSTL2 3,1853 85-1 1,50000

85 2,00000 DSTL2 2,1235 85-1 2,00000

85 2,50000 DSTL2 -3,903E-15 85-1 2,50000

86 0,00000 DSTL2 0,0000 86-1 0,00000

86 0,50000 DSTL2 2,1235 86-1 0,50000

86 1,00000 DSTL2 3,1853 86-1 1,00000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 45 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

86 1,50000 DSTL2 3,1853 86-1 1,50000

86 2,00000 DSTL2 2,1235 86-1 2,00000

86 2,50000 DSTL2 -3,903E-15 86-1 2,50000

87 0,00000 DSTL2 0,0000 87-1 0,00000

87 0,50000 DSTL2 2,1235 87-1 0,50000

87 1,00000 DSTL2 3,1853 87-1 1,00000

87 1,50000 DSTL2 3,1853 87-1 1,50000

87 2,00000 DSTL2 2,1235 87-1 2,00000

87 2,50000 DSTL2 -3,903E-15 87-1 2,50000

88 0,00000 DSTL2 0,0000 88-1 0,00000

88 0,50000 DSTL2 2,1235 88-1 0,50000

88 1,00000 DSTL2 3,1853 88-1 1,00000

88 1,50000 DSTL2 3,1853 88-1 1,50000

88 2,00000 DSTL2 2,1235 88-1 2,00000

88 2,50000 DSTL2 -3,903E-15 88-1 2,50000

89 0,00000 DSTL2 0,0000 89-1 0,00000

89 0,50000 DSTL2 2,1235 89-1 0,50000

89 1,00000 DSTL2 3,1853 89-1 1,00000

89 1,50000 DSTL2 3,1853 89-1 1,50000

89 2,00000 DSTL2 2,1235 89-1 2,00000

89 2,50000 DSTL2 -3,903E-15 89-1 2,50000

90 0,00000 DSTL2 0,0000 90-1 0,00000

90 0,50000 DSTL2 2,1235 90-1 0,50000

90 1,00000 DSTL2 3,1853 90-1 1,00000

90 1,50000 DSTL2 3,1853 90-1 1,50000

90 2,00000 DSTL2 2,1235 90-1 2,00000

90 2,50000 DSTL2 -3,903E-15 90-1 2,50000

91 0,00000 DSTL2 0,0000 91-1 0,00000

91 0,50000 DSTL2 2,1235 91-1 0,50000

91 1,00000 DSTL2 3,1853 91-1 1,00000

91 1,50000 DSTL2 3,1853 91-1 1,50000

91 2,00000 DSTL2 2,1235 91-1 2,00000

91 2,50000 DSTL2 -3,903E-15 91-1 2,50000

92 0,00000 DSTL2 0,0000 92-1 0,00000

92 0,50000 DSTL2 2,1235 92-1 0,50000

92 1,00000 DSTL2 3,1853 92-1 1,00000

92 1,50000 DSTL2 3,1853 92-1 1,50000

92 2,00000 DSTL2 2,1235 92-1 2,00000

92 2,50000 DSTL2 -3,903E-15 92-1 2,50000

93 0,00000 DSTL2 0,0000 93-1 0,00000

93 0,50000 DSTL2 2,1235 93-1 0,50000

93 1,00000 DSTL2 3,1853 93-1 1,00000

93 1,50000 DSTL2 3,1853 93-1 1,50000

93 2,00000 DSTL2 2,1235 93-1 2,00000

93 2,50000 DSTL2 -3,903E-15 93-1 2,50000

94 0,00000 DSTL2 0,0000 94-1 0,00000

94 0,50000 DSTL2 2,1235 94-1 0,50000

94 1,00000 DSTL2 3,1853 94-1 1,00000

94 1,50000 DSTL2 3,1853 94-1 1,50000

94 2,00000 DSTL2 2,1235 94-1 2,00000

94 2,50000 DSTL2 -1,997E-15 94-1 2,50000

96 0,00000 DSTL2 0,0000 96-1 0,00000

96 0,50000 DSTL2 2,2732 96-1 0,50000

96 1,00000 DSTL2 3,4097 96-1 1,00000

96 1,50000 DSTL2 3,4097 96-1 1,50000

96 2,00000 DSTL2 2,2732 96-1 2,00000

96 2,50000 DSTL2 -4,989E-15 96-1 2,50000

97 0,00000 DSTL2 0,0000 97-1 0,00000

97 0,50000 DSTL2 2,2732 97-1 0,50000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 46 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

97 1,00000 DSTL2 3,4097 97-1 1,00000

97 1,50000 DSTL2 3,4097 97-1 1,50000

97 2,00000 DSTL2 2,2732 97-1 2,00000

97 2,50000 DSTL2 1,173E-15 97-1 2,50000

98 0,00000 DSTL2 -0,2083 98-1 0,00000

98 1,79483 DSTL2 0,4218 98-1 1,79483

98 3,58966 DSTL2 0,0592 98-1 3,58966

99 0,00000 DSTL2 -0,2086 99-1 0,00000

99 1,79483 DSTL2 0,4216 99-1 1,79483

99 3,58966 DSTL2 0,0592 99-1 3,58966

100 0,00000 DSTL2 0,0592 100-1 0,00000

100 1,79483 DSTL2 0,4216 100-1 1,79483

100 3,58966 DSTL2 -0,2086 100-1 3,58966

101 0,00000 DSTL2 0,0592 101-1 0,00000

101 1,79483 DSTL2 0,4218 101-1 1,79483

101 3,58966 DSTL2 -0,2083 101-1 3,58966

102 0,00000 DSTL2 17,0635 102-1 0,00000

102 0,50000 DSTL2 20,5329 102-1 0,50000

103 0,00000 DSTL2 20,5329 103-1 0,00000

103 0,50000 DSTL2 21,1223 103-1 0,50000

104 0,00000 DSTL2 21,1223 104-1 0,00000

104 0,50000 DSTL2 21,4863 104-1 0,50000

105 0,00000 DSTL2 19,0156 105-1 0,00000

105 0,50000 DSTL2 -19,3367 105-1 0,50000

106 0,00000 DSTL2 -19,3367 106-1 0,00000

106 0,50000 DSTL2 -57,9145 106-1 0,50000

107 0,00000 DSTL2 -64,5981 107-1 0,00000

107 0,50000 DSTL2 -45,6355 107-1 0,50000

108 0,00000 DSTL2 -45,6355 108-1 0,00000

108 0,50000 DSTL2 -26,8983 108-1 0,50000

109 0,00000 DSTL2 -26,9484 109-1 0,00000

109 0,50000 DSTL2 -45,6534 109-1 0,50000

110 0,00000 DSTL2 -45,6534 110-1 0,00000

110 0,50000 DSTL2 -64,5840 110-1 0,50000

111 0,00000 DSTL2 -57,9007 111-1 0,00000

111 0,50000 DSTL2 -19,3406 111-1 0,50000

112 0,00000 DSTL2 -19,3406 112-1 0,00000

112 0,50000 DSTL2 18,9939 112-1 0,50000

113 0,00000 DSTL2 21,4634 113-1 0,00000

113 0,50000 DSTL2 21,1260 113-1 0,50000

114 0,00000 DSTL2 21,1260 114-1 0,00000

114 0,50000 DSTL2 20,5630 114-1 0,50000

115 0,00000 DSTL2 20,5630 115-1 0,00000

115 0,50000 DSTL2 17,0530 115-1 0,50000

116 0,00000 DSTL2 -26,8983 116-1 0,00000

116 0,50000 DSTL2 -11,1083 116-1 0,50000

117 0,00000 DSTL2 -11,1083 117-1 0,00000

117 0,50000 DSTL2 4,4563 117-1 0,50000

118 0,00000 DSTL2 4,4765 118-1 0,00000

118 0,50000 DSTL2 -11,1232 118-1 0,50000

119 0,00000 DSTL2 -11,1232 119-1 0,00000

119 0,50000 DSTL2 -26,9484 119-1 0,50000

120 0,00000 DSTL2 4,4563 120-1 0,00000

120 0,50000 DSTL2 17,1410 120-1 0,50000

121 0,00000 DSTL2 17,1410 121-1 0,00000

121 0,50000 DSTL2 29,6002 121-1 0,50000

122 0,00000 DSTL2 29,6002 122-1 0,00000

122 0,50000 DSTL2 39,1123 122-1 0,50000

123 0,00000 DSTL2 39,1123 123-1 0,00000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 47 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

123 0,50000 DSTL2 48,3990 123-1 0,50000

124 0,00000 DSTL2 48,3990 124-1 0,00000

124 0,50000 DSTL2 54,8057 124-1 0,50000

125 0,00000 DSTL2 54,8057 125-1 0,00000

125 0,50000 DSTL2 60,9870 125-1 0,50000

126 0,00000 DSTL2 60,9870 126-1 0,00000

126 0,50000 DSTL2 64,2212 126-1 0,50000

127 0,00000 DSTL2 64,2212 127-1 0,00000

127 0,50000 DSTL2 67,2298 127-1 0,50000

128 0,00000 DSTL2 67,2298 128-1 0,00000

128 0,50000 DSTL2 67,3586 128-1 0,50000

129 0,00000 DSTL2 67,3586 129-1 0,00000

129 0,50000 DSTL2 67,2619 129-1 0,50000

130 0,00000 DSTL2 67,2619 130-1 0,00000

130 0,50000 DSTL2 64,2182 130-1 0,50000

131 0,00000 DSTL2 64,2182 131-1 0,00000

131 0,50000 DSTL2 60,9489 131-1 0,50000

132 0,00000 DSTL2 60,9489 132-1 0,00000

132 0,50000 DSTL2 54,7997 132-1 0,50000

133 0,00000 DSTL2 54,7997 133-1 0,00000

133 0,50000 DSTL2 48,4251 133-1 0,50000

134 0,00000 DSTL2 48,4251 134-1 0,00000

134 0,50000 DSTL2 39,1034 134-1 0,50000

135 0,00000 DSTL2 39,1034 135-1 0,00000

135 0,50000 DSTL2 29,5561 135-1 0,50000

136 0,00000 DSTL2 29,5561 136-1 0,00000

136 0,50000 DSTL2 17,1290 136-1 0,50000

137 0,00000 DSTL2 17,1290 137-1 0,00000

137 0,50000 DSTL2 4,4765 137-1 0,50000

181 0,00000 DSTL2 0,0000 181-1 0,00000

181 0,44723 DSTL2 0,0250 181-1 0,44723

181 0,89447 DSTL2 0,0399 181-1 0,89447

181 1,34170 DSTL2 0,0449 181-1 1,34170

181 1,78893 DSTL2 0,0399 181-1 1,78893

181 2,23617 DSTL2 0,0250 181-1 2,23617

181 2,68340 DSTL2 4,391E-17 181-1 2,68340

182 0,00000 DSTL2 0,0000 182-1 0,00000

182 0,44876 DSTL2 0,0251 182-1 0,44876

182 0,89753 DSTL2 0,0402 182-1 0,89753

182 1,34629 DSTL2 0,0452 182-1 1,34629

182 1,79505 DSTL2 0,0402 182-1 1,79505

182 2,24382 DSTL2 0,0251 182-1 2,24382

182 2,69258 DSTL2 -2,342E-18 182-1 2,69258

183 0,00000 DSTL2 0,0000 183-1 0,00000

183 0,44876 DSTL2 0,0251 183-1 0,44876

183 0,89753 DSTL2 0,0402 183-1 0,89753

183 1,34629 DSTL2 0,0452 183-1 1,34629

183 1,79505 DSTL2 0,0402 183-1 1,79505

183 2,24382 DSTL2 0,0251 183-1 2,24382

183 2,69258 DSTL2 3,044E-17 183-1 2,69258

184 0,00000 DSTL2 0,0000 184-1 0,00000

184 0,44876 DSTL2 0,0251 184-1 0,44876

184 0,89753 DSTL2 0,0402 184-1 0,89753

184 1,34629 DSTL2 0,0452 184-1 1,34629

184 1,79505 DSTL2 0,0402 184-1 1,79505

184 2,24382 DSTL2 0,0251 184-1 2,24382

184 2,69258 DSTL2 3,044E-17 184-1 2,69258

185 0,00000 DSTL2 0,0000 185-1 0,00000

185 0,44876 DSTL2 0,0251 185-1 0,44876

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 48 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

185 0,89753 DSTL2 0,0402 185-1 0,89753

185 1,34629 DSTL2 0,0452 185-1 1,34629

185 1,79505 DSTL2 0,0402 185-1 1,79505

185 2,24382 DSTL2 0,0251 185-1 2,24382

185 2,69258 DSTL2 3,044E-17 185-1 2,69258

186 0,00000 DSTL2 0,0000 186-1 0,00000

186 0,44876 DSTL2 0,0251 186-1 0,44876

186 0,89753 DSTL2 0,0402 186-1 0,89753

186 1,34629 DSTL2 0,0452 186-1 1,34629

186 1,79505 DSTL2 0,0402 186-1 1,79505

186 2,24382 DSTL2 0,0251 186-1 2,24382

186 2,69258 DSTL2 3,044E-17 186-1 2,69258

187 0,00000 DSTL2 0,0000 187-1 0,00000

187 0,44876 DSTL2 0,0251 187-1 0,44876

187 0,89753 DSTL2 0,0402 187-1 0,89753

187 1,34629 DSTL2 0,0452 187-1 1,34629

187 1,79505 DSTL2 0,0402 187-1 1,79505

187 2,24382 DSTL2 0,0251 187-1 2,24382

187 2,69258 DSTL2 3,044E-17 187-1 2,69258

188 0,00000 DSTL2 0,0000 188-1 0,00000

188 0,44876 DSTL2 0,0251 188-1 0,44876

188 0,89753 DSTL2 0,0402 188-1 0,89753

188 1,34629 DSTL2 0,0452 188-1 1,34629

188 1,79505 DSTL2 0,0402 188-1 1,79505

188 2,24382 DSTL2 0,0251 188-1 2,24382

188 2,69258 DSTL2 3,044E-17 188-1 2,69258

189 0,00000 DSTL2 0,0000 189-1 0,00000

189 0,44876 DSTL2 0,0251 189-1 0,44876

189 0,89753 DSTL2 0,0402 189-1 0,89753

189 1,34629 DSTL2 0,0452 189-1 1,34629

189 1,79505 DSTL2 0,0402 189-1 1,79505

189 2,24382 DSTL2 0,0251 189-1 2,24382

189 2,69258 DSTL2 -1,405E-17 189-1 2,69258

190 0,00000 DSTL2 0,0000 190-1 0,00000

190 0,44876 DSTL2 0,0251 190-1 0,44876

190 0,89753 DSTL2 0,0402 190-1 0,89753

190 1,34629 DSTL2 0,0452 190-1 1,34629

190 1,79505 DSTL2 0,0402 190-1 1,79505

190 2,24382 DSTL2 0,0251 190-1 2,24382

190 2,69258 DSTL2 -1,405E-17 190-1 2,69258

191 0,00000 DSTL2 0,0000 191-1 0,00000

191 0,44876 DSTL2 0,0251 191-1 0,44876

191 0,89753 DSTL2 0,0402 191-1 0,89753

191 1,34629 DSTL2 0,0452 191-1 1,34629

191 1,79505 DSTL2 0,0402 191-1 1,79505

191 2,24382 DSTL2 0,0251 191-1 2,24382

191 2,69258 DSTL2 -1,405E-17 191-1 2,69258

192 0,00000 DSTL2 0,0000 192-1 0,00000

192 0,44876 DSTL2 0,0251 192-1 0,44876

192 0,89753 DSTL2 0,0402 192-1 0,89753

192 1,34629 DSTL2 0,0452 192-1 1,34629

192 1,79505 DSTL2 0,0402 192-1 1,79505

192 2,24382 DSTL2 0,0251 192-1 2,24382

192 2,69258 DSTL2 -1,405E-17 192-1 2,69258

193 0,00000 DSTL2 0,0000 193-1 0,00000

193 0,44876 DSTL2 0,0251 193-1 0,44876

193 0,89753 DSTL2 0,0402 193-1 0,89753

193 1,34629 DSTL2 0,0452 193-1 1,34629

193 1,79505 DSTL2 0,0402 193-1 1,79505

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 49 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

193 2,24382 DSTL2 0,0251 193-1 2,24382

193 2,69258 DSTL2 -1,405E-17 193-1 2,69258

194 0,00000 DSTL2 0,0000 194-1 0,00000

194 0,44876 DSTL2 0,0251 194-1 0,44876

194 0,89753 DSTL2 0,0402 194-1 0,89753

194 1,34629 DSTL2 0,0452 194-1 1,34629

194 1,79505 DSTL2 0,0402 194-1 1,79505

194 2,24382 DSTL2 0,0251 194-1 2,24382

194 2,69258 DSTL2 -1,405E-17 194-1 2,69258

195 0,00000 DSTL2 0,0000 195-1 0,00000

195 0,44876 DSTL2 0,0251 195-1 0,44876

195 0,89753 DSTL2 0,0402 195-1 0,89753

195 1,34629 DSTL2 0,0452 195-1 1,34629

195 1,79505 DSTL2 0,0402 195-1 1,79505

195 2,24382 DSTL2 0,0251 195-1 2,24382

195 2,69258 DSTL2 -6,323E-17 195-1 2,69258

196 0,00000 DSTL2 0,0000 196-1 0,00000

196 0,44876 DSTL2 0,0251 196-1 0,44876

196 0,89753 DSTL2 0,0402 196-1 0,89753

196 1,34629 DSTL2 0,0452 196-1 1,34629

196 1,79505 DSTL2 0,0402 196-1 1,79505

196 2,24382 DSTL2 0,0251 196-1 2,24382

196 2,69258 DSTL2 3,044E-17 196-1 2,69258

197 0,00000 DSTL2 0,0000 197-1 0,00000

197 0,44876 DSTL2 0,0251 197-1 0,44876

197 0,89753 DSTL2 0,0402 197-1 0,89753

197 1,34629 DSTL2 0,0452 197-1 1,34629

197 1,79505 DSTL2 0,0402 197-1 1,79505

197 2,24382 DSTL2 0,0251 197-1 2,24382

197 2,69258 DSTL2 3,044E-17 197-1 2,69258

198 0,00000 DSTL2 0,0000 198-1 0,00000

198 0,44876 DSTL2 0,0251 198-1 0,44876

198 0,89753 DSTL2 0,0402 198-1 0,89753

198 1,34629 DSTL2 0,0452 198-1 1,34629

198 1,79505 DSTL2 0,0402 198-1 1,79505

198 2,24382 DSTL2 0,0251 198-1 2,24382

198 2,69258 DSTL2 3,044E-17 198-1 2,69258

199 0,00000 DSTL2 0,0000 199-1 0,00000

199 0,44876 DSTL2 0,0251 199-1 0,44876

199 0,89753 DSTL2 0,0402 199-1 0,89753

199 1,34629 DSTL2 0,0452 199-1 1,34629

199 1,79505 DSTL2 0,0402 199-1 1,79505

199 2,24382 DSTL2 0,0251 199-1 2,24382

199 2,69258 DSTL2 3,044E-17 199-1 2,69258

200 0,00000 DSTL2 0,0000 200-1 0,00000

200 0,44876 DSTL2 0,0251 200-1 0,44876

200 0,89753 DSTL2 0,0402 200-1 0,89753

200 1,34629 DSTL2 0,0452 200-1 1,34629

200 1,79505 DSTL2 0,0402 200-1 1,79505

200 2,24382 DSTL2 0,0251 200-1 2,24382

200 2,69258 DSTL2 3,044E-17 200-1 2,69258

201 0,00000 DSTL2 0,0000 201-1 0,00000

201 0,44723 DSTL2 0,0250 201-1 0,44723

201 0,89447 DSTL2 0,0399 201-1 0,89447

201 1,34170 DSTL2 0,0449 201-1 1,34170

201 1,78893 DSTL2 0,0399 201-1 1,78893

201 2,23617 DSTL2 0,0250 201-1 2,23617

201 2,68340 DSTL2 -7,728E-17 201-1 2,68340

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 50 a 174

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 1 of 2

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 1 of 2

Frame DesignSect DesignType Status Ratio RatioType

16 HE260A Beam No Messages 0,132242 PMM

17 HE260A Beam No Messages 0,132709 PMM

18 HE260A Beam No Messages 0,135291 PMM

19 HE260A Beam No Messages 0,142063 PMM

20 HE260A Beam No Messages 0,263424 PMM

21 HE260A Beam No Messages 0,597082 PMM

22 HE260A Beam No Messages 0,521042 PMM

23 HE260A Beam No Messages 0,521060 PMM

24 HE260A Beam No Messages 0,597154 PMM

25 HE260A Beam No Messages 0,263398 PMM

26 HE260A Beam No Messages 0,141970 PMM

27 HE260A Beam No Messages 0,139573 PMM

28 HE260A Beam No Messages 0,137579 PMM

29 HE260A Beam No Messages 0,136496 PMM

30 HE260A Beam No Messages 0,448499 PMM

31 HE260A Beam No Messages 0,384531 PMM

32 HE260A Beam No Messages 0,384521 PMM

33 HE260A Beam No Messages 0,448375 PMM

34 HE260A Beam No Messages 0,408267 PMM

35 HE260A Beam No Messages 0,458798 PMM

36 HE260A Beam No Messages 0,495101 PMM

37 HE260A Beam No Messages 0,533359 PMM

38 HE260A Beam No Messages 0,557127 PMM

39 HE260A Beam No Messages 0,582850 PMM

40 HE260A Beam No Messages 0,594346 PMM

41 HE260A Beam No Messages 0,607797 PMM

42 HE260A Beam No Messages 0,607797 PMM

43 HE260A Beam No Messages 0,607670 PMM

44 HE260A Beam No Messages 0,607670 PMM

45 HE260A Beam No Messages 0,594358 PMM

46 HE260A Beam No Messages 0,583000 PMM

47 HE260A Beam No Messages 0,557150 PMM

48 HE260A Beam No Messages 0,533255 PMM

49 HE260A Beam No Messages 0,495135 PMM

50 HE260A Beam No Messages 0,458968 PMM

51 HE260A Beam No Messages 0,408318 PMM

102 HE260A Beam No Messages 0,132134 PMM

103 HE260A Beam No Messages 0,132673 PMM

104 HE260A Beam No Messages 0,135236 PMM

105 HE260A Beam No Messages 0,141967 PMM

106 HE260A Beam No Messages 0,263398 PMM

107 HE260A Beam No Messages 0,597154 PMM

108 HE260A Beam No Messages 0,521060 PMM

109 HE260A Beam No Messages 0,521042 PMM

110 HE260A Beam No Messages 0,597081 PMM

111 HE260A Beam No Messages 0,263424 PMM

112 HE260A Beam No Messages 0,142061 PMM

113 HE260A Beam No Messages 0,139562 PMM

114 HE260A Beam No Messages 0,137593 PMM

115 HE260A Beam No Messages 0,136581 PMM

116 HE260A Beam No Messages 0,448375 PMM

117 HE260A Beam No Messages 0,384521 PMM

118 HE260A Beam No Messages 0,384531 PMM

119 HE260A Beam No Messages 0,448499 PMM

120 HE260A Beam No Messages 0,408318 PMM

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 51 a 174

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 1 of 2

Frame DesignSect DesignType Status Ratio RatioType

121 HE260A Beam No Messages 0,458968 PMM

122 HE260A Beam No Messages 0,495135 PMM

123 HE260A Beam No Messages 0,533255 PMM

124 HE260A Beam No Messages 0,557150 PMM

125 HE260A Beam No Messages 0,583000 PMM

126 HE260A Beam No Messages 0,594358 PMM

127 HE260A Beam No Messages 0,607670 PMM

128 HE260A Beam No Messages 0,607670 PMM

129 HE260A Beam No Messages 0,607797 PMM

130 HE260A Beam No Messages 0,607797 PMM

131 HE260A Beam No Messages 0,594346 PMM

132 HE260A Beam No Messages 0,582850 PMM

133 HE260A Beam No Messages 0,557127 PMM

134 HE260A Beam No Messages 0,533359 PMM

135 HE260A Beam No Messages 0,495101 PMM

136 HE260A Beam No Messages 0,458798 PMM

137 HE260A Beam No Messages 0,408267 PMM

11 F12 Brace No Messages 0,276338 PMM

12 F12 Brace No Messages 0,127523 PMM

13 F12 Brace No Messages 0,276312 PMM

14 F12 Brace No Messages 0,127510 PMM

15 F12 Brace No Messages 0,127510 PMM

52 F12 Brace No Messages 0,276312 PMM

53 F12 Brace No Messages 0,127523 PMM

54 F12 Brace No Messages 0,276338 PMM

56 FI8 Beam No Messages 0,522187 PMM

57 FI8 Beam No Messages 0,522187 PMM

59 HE260A Beam No Messages 0,110792 PMM

60 HE260A Beam No Messages 0,120424 PMM

61 HE260A Beam No Messages 0,110076 PMM

62 HE260A Beam No Messages 0,120093 PMM

64 HE260A Beam No Messages 0,124817 PMM

65 HE260A Beam No Messages 0,114026 PMM

66 HE260A Beam No Messages 0,125025 PMM

67 HE260A Beam No Messages 0,114522 PMM

69 HE260A Beam No Messages 0,089008 PMM

70 HE260A Beam No Messages 0,088618 PMM

71 HE260A Beam No Messages 0,092700 PMM

72 HE260A Beam No Messages 0,092989 PMM

75 IPE100 Beam No Messages 0,550814 PMM

76 IPE100 Beam No Messages 0,551418 PMM

77 IPE100 Beam No Messages 0,551623 PMM

78 IPE100 Beam No Messages 0,552237 PMM

79 IPE100 Beam No Messages 0,552714 PMM

80 IPE100 Beam No Messages 0,552806 PMM

81 IPE100 Beam No Messages 0,552775 PMM

82 IPE100 Beam No Messages 0,552770 PMM

83 IPE100 Beam No Messages 0,552772 PMM

84 IPE100 Beam No Messages 0,552772 PMM

85 IPE100 Beam No Messages 0,552772 PMM

86 IPE100 Beam No Messages 0,552772 PMM

87 IPE100 Beam No Messages 0,552770 PMM

88 IPE100 Beam No Messages 0,552775 PMM

89 IPE100 Beam No Messages 0,552806 PMM

90 IPE100 Beam No Messages 0,552714 PMM

91 IPE100 Beam No Messages 0,552238 PMM

92 IPE100 Beam No Messages 0,551623 PMM

93 IPE100 Beam No Messages 0,551402 PMM

94 IPE100 Beam No Messages 0,550828 PMM

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 52 a 174

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 1 of 2

Frame DesignSect DesignType Status Ratio RatioType

96 IPE240 Beam No Messages 0,038193 PMM

97 IPE240 Beam No Messages 0,038440 PMM

98 FI8 Brace No Messages 0,215004 PMM

99 FI8 Brace No Messages 0,214954 PMM

100 FI8 Brace No Messages 0,214954 PMM

101 FI8 Brace No Messages 0,215004 PMM

181 L50X5 Beam See ErrMsg

182 L50X5 Beam See ErrMsg

183 L50X5 Beam See ErrMsg

184 L50X5 Beam See ErrMsg

185 L50X5 Beam See ErrMsg

186 L50X5 Beam See ErrMsg

187 L50X5 Beam See ErrMsg

188 L50X5 Beam See ErrMsg

189 L50X5 Beam See ErrMsg

190 L50X5 Beam See ErrMsg

191 L50X5 Beam See ErrMsg

192 L50X5 Beam See ErrMsg

193 L50X5 Beam See ErrMsg

194 L50X5 Beam See ErrMsg

195 L50X5 Beam See ErrMsg

196 L50X5 Beam See ErrMsg

197 L50X5 Beam See ErrMsg

198 L50X5 Beam See ErrMsg

199 L50X5 Beam See ErrMsg

200 L50X5 Beam See ErrMsg

201 L50X5 Beam See ErrMsg

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 2 of 2

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 2 of 2

Frame Combo Location ErrMsg WarnMsg

m

16 DSTL2 0,50000 No Messages No Messages

17 DSTL2 0,50000 No Messages No Messages

18 DSTL2 0,50000 No Messages No Messages

19 DSTL2 0,00000 No Messages No Messages

20 DSTL2 0,50000 No Messages No Messages

21 DSTL2 0,00000 No Messages No Messages

22 DSTL2 0,00000 No Messages No Messages

23 DSTL2 0,50000 No Messages No Messages

24 DSTL2 0,50000 No Messages No Messages

25 DSTL2 0,00000 No Messages No Messages

26 DSTL2 0,50000 No Messages No Messages

27 DSTL2 0,00000 No Messages No Messages

28 DSTL2 0,00000 No Messages No Messages

29 DSTL2 0,00000 No Messages No Messages

30 DSTL2 0,00000 No Messages No Messages

31 DSTL2 0,00000 No Messages No Messages

32 DSTL2 0,50000 No Messages No Messages

33 DSTL2 0,50000 No Messages No Messages

34 DSTL2 0,50000 No Messages No Messages

35 DSTL2 0,50000 No Messages No Messages

36 DSTL2 0,50000 No Messages No Messages

37 DSTL2 0,50000 No Messages No Messages

38 DSTL2 0,50000 No Messages No Messages

39 DSTL2 0,50000 No Messages No Messages

40 DSTL2 0,50000 No Messages No Messages

41 DSTL2 0,50000 No Messages No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 53 a 174

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 2 of 2

Frame Combo Location ErrMsg WarnMsg

m

42 DSTL2 0,00000 No Messages No Messages

43 DSTL2 0,50000 No Messages No Messages

44 DSTL2 0,00000 No Messages No Messages

45 DSTL2 0,00000 No Messages No Messages

46 DSTL2 0,00000 No Messages No Messages

47 DSTL2 0,00000 No Messages No Messages

48 DSTL2 0,00000 No Messages No Messages

49 DSTL2 0,00000 No Messages No Messages

50 DSTL2 0,00000 No Messages No Messages

51 DSTL2 0,00000 No Messages No Messages

102 DSTL2 0,50000 No Messages No Messages

103 DSTL2 0,50000 No Messages No Messages

104 DSTL2 0,50000 No Messages No Messages

105 DSTL2 0,00000 No Messages No Messages

106 DSTL2 0,50000 No Messages No Messages

107 DSTL2 0,00000 No Messages No Messages

108 DSTL2 0,00000 No Messages No Messages

109 DSTL2 0,50000 No Messages No Messages

110 DSTL2 0,50000 No Messages No Messages

111 DSTL2 0,00000 No Messages No Messages

112 DSTL2 0,50000 No Messages No Messages

113 DSTL2 0,00000 No Messages No Messages

114 DSTL2 0,00000 No Messages No Messages

115 DSTL2 0,00000 No Messages No Messages

116 DSTL2 0,00000 No Messages No Messages

117 DSTL2 0,00000 No Messages No Messages

118 DSTL2 0,50000 No Messages No Messages

119 DSTL2 0,50000 No Messages No Messages

120 DSTL2 0,50000 No Messages No Messages

121 DSTL2 0,50000 No Messages No Messages

122 DSTL2 0,50000 No Messages No Messages

123 DSTL2 0,50000 No Messages No Messages

124 DSTL2 0,50000 No Messages No Messages

125 DSTL2 0,50000 No Messages No Messages

126 DSTL2 0,50000 No Messages No Messages

127 DSTL2 0,50000 No Messages No Messages

128 DSTL2 0,00000 No Messages No Messages

129 DSTL2 0,50000 No Messages No Messages

130 DSTL2 0,00000 No Messages No Messages

131 DSTL2 0,00000 No Messages No Messages

132 DSTL2 0,00000 No Messages No Messages

133 DSTL2 0,00000 No Messages No Messages

134 DSTL2 0,00000 No Messages No Messages

135 DSTL2 0,00000 No Messages No Messages

136 DSTL2 0,00000 No Messages No Messages

137 DSTL2 0,00000 No Messages No Messages

11 DSTL2 1,02956 No Messages No Messages

12 DSTL2 1,02956 No Messages No Messages

13 DSTL2 1,02956 No Messages No Messages

14 DSTL2 1,02956 No Messages No Messages

15 DSTL2 1,02956 No Messages No Messages

52 DSTL2 1,02956 No Messages No Messages

53 DSTL2 1,02956 No Messages No Messages

54 DSTL2 1,02956 No Messages No Messages

56 DSTL2 0,00000 No Messages No Messages

57 DSTL2 14,00000 No Messages No Messages

59 DSTL2 0,50000 No Messages No Messages

60 DSTL2 0,50000 No Messages No Messages

61 DSTL2 0,50000 No Messages No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 54 a 174

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 2 of 2

Frame Combo Location ErrMsg WarnMsg

m

62 DSTL2 0,50000 No Messages No Messages

64 DSTL2 0,00000 No Messages No Messages

65 DSTL2 0,00000 No Messages No Messages

66 DSTL2 0,00000 No Messages No Messages

67 DSTL2 0,00000 No Messages No Messages

69 DSTL2 0,00000 No Messages No Messages

70 DSTL2 0,00000 No Messages No Messages

71 DSTL2 0,00000 No Messages No Messages

72 DSTL2 0,00000 No Messages No Messages

75 DSTL2 1,00000 No Messages No Messages

76 DSTL2 1,00000 No Messages No Messages

77 DSTL2 1,00000 No Messages No Messages

78 DSTL2 1,00000 No Messages No Messages

79 DSTL2 1,00000 No Messages No Messages

80 DSTL2 1,00000 No Messages No Messages

81 DSTL2 1,00000 No Messages No Messages

82 DSTL2 1,00000 No Messages No Messages

83 DSTL2 1,00000 No Messages No Messages

84 DSTL2 1,00000 No Messages No Messages

85 DSTL2 1,00000 No Messages No Messages

86 DSTL2 1,00000 No Messages No Messages

87 DSTL2 1,00000 No Messages No Messages

88 DSTL2 1,00000 No Messages No Messages

89 DSTL2 1,00000 No Messages No Messages

90 DSTL2 1,00000 No Messages No Messages

91 DSTL2 1,00000 No Messages No Messages

92 DSTL2 1,00000 No Messages No Messages

93 DSTL2 1,00000 No Messages No Messages

94 DSTL2 1,00000 No Messages No Messages

96 DSTL2 1,00000 No Messages No Messages

97 DSTL2 1,00000 No Messages No Messages

98 DSTL2 1,79483 No Messages No Messages

99 DSTL2 1,79483 No Messages No Messages

100 DSTL2 1,79483 No Messages No Messages

101 DSTL2 1,79483 No Messages No Messages

181 DSTL2 1,34170 Section is Class 4 No Messages

182 DSTL2 1,34629 Section is Class 4 No Messages

183 DSTL2 1,34629 Section is Class 4 No Messages

184 DSTL2 1,34629 Section is Class 4 No Messages

185 DSTL2 1,34629 Section is Class 4 No Messages

186 DSTL2 1,34629 Section is Class 4 No Messages

187 DSTL2 1,34629 Section is Class 4 No Messages

188 DSTL2 1,34629 Section is Class 4 No Messages

189 DSTL2 1,34629 Section is Class 4 No Messages

190 DSTL2 1,34629 Section is Class 4 No Messages

191 DSTL2 1,34629 Section is Class 4 No Messages

192 DSTL2 1,34629 Section is Class 4 No Messages

193 DSTL2 1,34629 Section is Class 4 No Messages

194 DSTL2 1,34629 Section is Class 4 No Messages

195 DSTL2 1,34629 Section is Class 4 No Messages

196 DSTL2 1,34629 Section is Class 4 No Messages

197 DSTL2 1,34629 Section is Class 4 No Messages

198 DSTL2 1,34629 Section is Class 4 No Messages

199 DSTL2 1,34629 Section is Class 4 No Messages

200 DSTL2 1,34629 Section is Class 4 No Messages

201 DSTL2 1,34170 Section is Class 4 No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 55 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 1 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 1 of 8

Frame DesignSect DesignType Status Combo Location Pu

m KN

16 HE260A Beam No Messages DSTL2 0,50000 -203,443

17 HE260A Beam No Messages DSTL2 0,50000 -203,494

18 HE260A Beam No Messages DSTL2 0,50000 -203,494

19 HE260A Beam No Messages DSTL2 0,00000 -247,417

20 HE260A Beam No Messages DSTL2 0,50000 -247,417

21 HE260A Beam No Messages DSTL2 0,00000 -326,004

22 HE260A Beam No Messages DSTL2 0,00000 -326,004

23 HE260A Beam No Messages DSTL2 0,50000 -326,041

24 HE260A Beam No Messages DSTL2 0,50000 -326,041

25 HE260A Beam No Messages DSTL2 0,00000 -247,362

26 HE260A Beam No Messages DSTL2 0,50000 -247,362

27 HE260A Beam No Messages DSTL2 0,00000 -203,562

28 HE260A Beam No Messages DSTL2 0,00000 -203,562

29 HE260A Beam No Messages DSTL2 0,00000 -203,562

30 HE260A Beam No Messages DSTL2 0,00000 -326,004

31 HE260A Beam No Messages DSTL2 0,00000 -326,004

32 HE260A Beam No Messages DSTL2 0,50000 -326,016

33 HE260A Beam No Messages DSTL2 0,50000 -326,016

34 HE260A Beam No Messages DSTL2 0,50000 -326,014

35 HE260A Beam No Messages DSTL2 0,50000 -326,014

36 HE260A Beam No Messages DSTL2 0,50000 -326,014

37 HE260A Beam No Messages DSTL2 0,50000 -326,014

38 HE260A Beam No Messages DSTL2 0,50000 -326,014

39 HE260A Beam No Messages DSTL2 0,50000 -326,014

40 HE260A Beam No Messages DSTL2 0,50000 -326,014

41 HE260A Beam No Messages DSTL2 0,50000 -326,014

42 HE260A Beam No Messages DSTL2 0,00000 -326,014

43 HE260A Beam No Messages DSTL2 0,50000 -326,014

44 HE260A Beam No Messages DSTL2 0,00000 -326,014

45 HE260A Beam No Messages DSTL2 0,00000 -326,014

46 HE260A Beam No Messages DSTL2 0,00000 -326,014

47 HE260A Beam No Messages DSTL2 0,00000 -326,014

48 HE260A Beam No Messages DSTL2 0,00000 -326,014

49 HE260A Beam No Messages DSTL2 0,00000 -326,014

50 HE260A Beam No Messages DSTL2 0,00000 -326,016

51 HE260A Beam No Messages DSTL2 0,00000 -326,016

102 HE260A Beam No Messages DSTL2 0,50000 -203,562

103 HE260A Beam No Messages DSTL2 0,50000 -203,562

104 HE260A Beam No Messages DSTL2 0,50000 -203,562

105 HE260A Beam No Messages DSTL2 0,00000 -247,362

106 HE260A Beam No Messages DSTL2 0,50000 -247,362

107 HE260A Beam No Messages DSTL2 0,00000 -326,041

108 HE260A Beam No Messages DSTL2 0,00000 -326,041

109 HE260A Beam No Messages DSTL2 0,50000 -326,004

110 HE260A Beam No Messages DSTL2 0,50000 -326,004

111 HE260A Beam No Messages DSTL2 0,00000 -247,417

112 HE260A Beam No Messages DSTL2 0,50000 -247,417

113 HE260A Beam No Messages DSTL2 0,00000 -203,494

114 HE260A Beam No Messages DSTL2 0,00000 -203,494

115 HE260A Beam No Messages DSTL2 0,00000 -203,445

116 HE260A Beam No Messages DSTL2 0,00000 -326,016

117 HE260A Beam No Messages DSTL2 0,00000 -326,016

118 HE260A Beam No Messages DSTL2 0,50000 -326,004

119 HE260A Beam No Messages DSTL2 0,50000 -326,004

120 HE260A Beam No Messages DSTL2 0,50000 -326,016

121 HE260A Beam No Messages DSTL2 0,50000 -326,016

122 HE260A Beam No Messages DSTL2 0,50000 -326,014

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 56 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 1 of 8

Frame DesignSect DesignType Status Combo Location Pu

m KN

123 HE260A Beam No Messages DSTL2 0,50000 -326,014

124 HE260A Beam No Messages DSTL2 0,50000 -326,014

125 HE260A Beam No Messages DSTL2 0,50000 -326,014

126 HE260A Beam No Messages DSTL2 0,50000 -326,014

127 HE260A Beam No Messages DSTL2 0,50000 -326,014

128 HE260A Beam No Messages DSTL2 0,00000 -326,014

129 HE260A Beam No Messages DSTL2 0,50000 -326,014

130 HE260A Beam No Messages DSTL2 0,00000 -326,014

131 HE260A Beam No Messages DSTL2 0,00000 -326,014

132 HE260A Beam No Messages DSTL2 0,00000 -326,014

133 HE260A Beam No Messages DSTL2 0,00000 -326,014

134 HE260A Beam No Messages DSTL2 0,00000 -326,014

135 HE260A Beam No Messages DSTL2 0,00000 -326,014

136 HE260A Beam No Messages DSTL2 0,00000 -326,014

137 HE260A Beam No Messages DSTL2 0,00000 -326,014

11 F12 Brace No Messages DSTL2 1,02956 -143,883

12 F12 Brace No Messages DSTL2 1,02956 83,907

13 F12 Brace No Messages DSTL2 1,02956 -143,844

14 F12 Brace No Messages DSTL2 1,02956 83,855

15 F12 Brace No Messages DSTL2 1,02956 83,855

52 F12 Brace No Messages DSTL2 1,02956 -143,844

53 F12 Brace No Messages DSTL2 1,02956 83,907

54 F12 Brace No Messages DSTL2 1,02956 -143,883

56 FI8 Beam No Messages DSTL2 0,00000 326,306

57 FI8 Beam No Messages DSTL2 14,00000 326,306

59 HE260A Beam No Messages DSTL2 0,50000 -203,728

60 HE260A Beam No Messages DSTL2 0,50000 -203,562

61 HE260A Beam No Messages DSTL2 0,50000 -203,443

62 HE260A Beam No Messages DSTL2 0,50000 -203,443

64 HE260A Beam No Messages DSTL2 0,00000 -203,445

65 HE260A Beam No Messages DSTL2 0,00000 -203,445

66 HE260A Beam No Messages DSTL2 0,00000 -203,562

67 HE260A Beam No Messages DSTL2 0,00000 -203,728

69 HE260A Beam No Messages DSTL2 0,00000 -203,728

70 HE260A Beam No Messages DSTL2 0,00000 -203,443

71 HE260A Beam No Messages DSTL2 0,00000 -203,445

72 HE260A Beam No Messages DSTL2 0,00000 -203,728

75 IPE100 Beam No Messages DSTL2 1,00000 0,752

76 IPE100 Beam No Messages DSTL2 1,00000 0,969

77 IPE100 Beam No Messages DSTL2 1,00000 1,043

78 IPE100 Beam No Messages DSTL2 1,00000 1,265

79 IPE100 Beam No Messages DSTL2 1,00000 1,437

80 IPE100 Beam No Messages DSTL2 1,00000 1,470

81 IPE100 Beam No Messages DSTL2 1,00000 1,459

82 IPE100 Beam No Messages DSTL2 1,00000 1,457

83 IPE100 Beam No Messages DSTL2 1,00000 1,458

84 IPE100 Beam No Messages DSTL2 1,00000 1,458

85 IPE100 Beam No Messages DSTL2 1,00000 1,458

86 IPE100 Beam No Messages DSTL2 1,00000 1,458

87 IPE100 Beam No Messages DSTL2 1,00000 1,457

88 IPE100 Beam No Messages DSTL2 1,00000 1,459

89 IPE100 Beam No Messages DSTL2 1,00000 1,470

90 IPE100 Beam No Messages DSTL2 1,00000 1,437

91 IPE100 Beam No Messages DSTL2 1,00000 1,265

92 IPE100 Beam No Messages DSTL2 1,00000 1,043

93 IPE100 Beam No Messages DSTL2 1,00000 0,964

94 IPE100 Beam No Messages DSTL2 1,00000 0,757

96 IPE240 Beam No Messages DSTL2 1,00000 0,000

97 IPE240 Beam No Messages DSTL2 1,00000 0,338

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 57 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 1 of 8

Frame DesignSect DesignType Status Combo Location Pu

m KN

98 FI8 Brace No Messages DSTL2 1,79483 210,469

99 FI8 Brace No Messages DSTL2 1,79483 210,424

100 FI8 Brace No Messages DSTL2 1,79483 210,424

101 FI8 Brace No Messages DSTL2 1,79483 210,469

181 L50X5 Beam See ErrMsg DSTL2 1,34170 -0,666

182 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,097

183 L50X5 Beam See ErrMsg DSTL2 1,34629 -0,958

184 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,224

185 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,525

186 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,593

187 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,565

188 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,570

189 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,570

190 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,570

191 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,570

192 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,570

193 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,570

194 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,570

195 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,565

196 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,593

197 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,524

198 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,224

199 L50X5 Beam See ErrMsg DSTL2 1,34629 -0,960

200 L50X5 Beam See ErrMsg DSTL2 1,34629 -1,092

201 L50X5 Beam See ErrMsg DSTL2 1,34170 -0,659

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 2 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 2 of 8

Frame MuMajor MuMinor VuMajor VuMinor Tu Equation TotalRatio

KN-m KN-m KN KN KN-m

16 20,5630 -0,2131 -6,795 0,477 6,582E-05 (6.2) 0,132242

17 21,1259 0,0177 -0,900 -0,462 6,582E-05 (6.2) 0,132709

18 21,4634 0,2486 -0,449 -0,462 6,582E-05 (6.2) 0,135291

19 18,9939 0,2460 76,444 0,572 3,932E-04 (6.2) 0,142063

20 -57,9007 -0,3262 77,346 0,572 3,932E-04 (6.2) 0,263424

21 -64,5840 -0,3336 -38,087 -0,704 -3,553E-05 (6.61) 0,597082

22 -45,6534 0,0182 -37,636 -0,704 -3,553E-05 (6.61) 0,521042

23 -45,6355 -0,0297 37,700 -0,712 -3,553E-05 (6.61) 0,521060

24 -64,5981 0,3262 38,151 -0,712 -3,553E-05 (6.61) 0,597154

25 -57,9145 0,3185 -77,381 0,543 3,691E-04 (6.2) 0,263398

26 19,0156 -0,2246 -76,479 0,543 3,691E-04 (6.2) 0,141970

27 21,4863 -0,2265 0,502 -0,432 1,167E-04 (6.61) 0,139573

28 21,1223 -0,0104 0,953 -0,432 1,167E-04 (6.61) 0,137579

29 20,5329 0,2057 6,713 0,531 1,167E-04 (6.61) 0,136496

30 -26,9484 0,3701 -31,876 0,733 -3,553E-05 (6.61) 0,448499

31 -11,1232 0,0035 -31,425 0,733 -3,553E-05 (6.61) 0,384531

32 -11,1083 -0,0126 31,355 0,746 -3,553E-05 (6.61) 0,384521

33 -26,8983 -0,3855 31,806 0,746 -3,553E-05 (6.61) 0,448375

34 17,1290 0,0013 -25,080 -0,729 -3,553E-05 (6.61) 0,408267

35 29,5561 0,3656 -24,629 -0,729 -3,553E-05 (6.61) 0,458798

36 39,1034 5,553E-04 -18,869 0,730 -3,553E-05 (6.61) 0,495101

37 48,4251 -0,3644 -18,418 0,730 -3,553E-05 (6.61) 0,533359

38 54,7997 -9,343E-06 -12,524 -0,729 -3,553E-05 (6.61) 0,557127

39 60,9489 0,3644 -12,073 -0,729 -3,553E-05 (6.61) 0,582850

40 64,2182 6,863E-07 -6,313 0,729 -3,553E-05 (6.61) 0,594346

41 67,2619 -0,3644 -5,862 0,729 -3,553E-05 (6.61) 0,607797

42 67,2619 -0,3644 -0,419 -0,729 -3,553E-05 (6.61) 0,607797

43 67,2298 0,3644 0,483 -0,729 -3,553E-05 (6.61) 0,607670

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 58 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 2 of 8

Frame MuMajor MuMinor VuMajor VuMinor Tu Equation TotalRatio

KN-m KN-m KN KN KN-m

44 67,2298 0,3644 5,792 0,729 -3,553E-05 (6.61) 0,607670

45 64,2212 -3,379E-05 6,243 0,729 -3,553E-05 (6.61) 0,594358

46 60,9870 -0,3645 12,137 -0,729 -3,553E-05 (6.61) 0,583000

47 54,8057 -6,421E-05 12,588 -0,729 -3,553E-05 (6.61) 0,557150

48 48,3990 0,3644 18,348 0,728 -3,553E-05 (6.61) 0,533255

49 39,1123 3,170E-04 18,799 0,728 -3,553E-05 (6.61) 0,495135

50 29,6002 -0,3637 24,693 -0,724 -3,553E-05 (6.61) 0,458968

51 17,1410 -0,0017 25,144 -0,724 -3,553E-05 (6.61) 0,408318

102 20,5329 -0,2050 -6,713 0,538 1,216E-04 (6.2) 0,132134

103 21,1223 0,0106 -0,953 -0,431 1,216E-04 (6.2) 0,132673

104 21,4863 0,2262 -0,502 -0,431 1,216E-04 (6.2) 0,135236

105 19,0156 0,2243 76,479 0,543 3,690E-04 (6.2) 0,141967

106 -57,9145 -0,3185 77,381 0,543 3,690E-04 (6.2) 0,263398

107 -64,5981 -0,3262 -38,151 -0,712 -3,557E-05 (6.61) 0,597154

108 -45,6355 0,0297 -37,700 -0,712 -3,557E-05 (6.61) 0,521060

109 -45,6534 -0,0182 37,636 -0,704 -3,557E-05 (6.61) 0,521042

110 -64,5840 0,3336 38,087 -0,704 -3,557E-05 (6.61) 0,597081

111 -57,9007 0,3262 -77,346 0,572 3,928E-04 (6.2) 0,263424

112 18,9939 -0,2457 -76,444 0,572 3,928E-04 (6.2) 0,142061

113 21,4634 -0,2482 0,449 -0,462 6,742E-05 (6.61) 0,139562

114 21,1260 -0,0172 0,900 -0,462 6,742E-05 (6.61) 0,137593

115 20,5630 0,2138 6,795 0,480 6,742E-05 (6.61) 0,136581

116 -26,8983 0,3855 -31,806 0,746 -3,557E-05 (6.61) 0,448375

117 -11,1083 0,0126 -31,355 0,746 -3,557E-05 (6.61) 0,384521

118 -11,1232 -0,0035 31,425 0,733 -3,557E-05 (6.61) 0,384531

119 -26,9484 -0,3701 31,876 0,733 -3,557E-05 (6.61) 0,448499

120 17,1410 0,0017 -25,144 -0,724 -3,557E-05 (6.61) 0,408318

121 29,6002 0,3637 -24,693 -0,724 -3,557E-05 (6.61) 0,458968

122 39,1123 -3,175E-04 -18,799 0,728 -3,557E-05 (6.61) 0,495135

123 48,3990 -0,3644 -18,348 0,728 -3,557E-05 (6.61) 0,533255

124 54,8057 6,427E-05 -12,588 -0,729 -3,557E-05 (6.61) 0,557150

125 60,9870 0,3645 -12,137 -0,729 -3,557E-05 (6.61) 0,583000

126 64,2212 3,382E-05 -6,243 0,729 -3,557E-05 (6.61) 0,594358

127 67,2298 -0,3644 -5,792 0,729 -3,557E-05 (6.61) 0,607670

128 67,2298 -0,3644 -0,483 -0,729 -3,557E-05 (6.61) 0,607670

129 67,2619 0,3644 0,419 -0,729 -3,557E-05 (6.61) 0,607797

130 67,2619 0,3644 5,862 0,729 -3,557E-05 (6.61) 0,607797

131 64,2182 -7,014E-07 6,313 0,729 -3,557E-05 (6.61) 0,594346

132 60,9489 -0,3644 12,073 -0,729 -3,557E-05 (6.61) 0,582850

133 54,7997 9,219E-06 12,524 -0,729 -3,557E-05 (6.61) 0,557127

134 48,4251 0,3644 18,418 0,730 -3,557E-05 (6.61) 0,533359

135 39,1034 -5,548E-04 18,869 0,730 -3,557E-05 (6.61) 0,495101

136 29,5561 -0,3656 24,629 -0,729 -3,557E-05 (6.61) 0,458798

137 17,1290 -0,0013 25,080 -0,729 -3,557E-05 (6.61) 0,408267

11 -6,6833 -0,0040 10,092 0,011 0,0062 (6.2) 0,276338

12 2,4695 -0,0015 -3,631 9,531E-03 0,0021 (6.2.1) 0,127523

13 -6,6836 -0,0041 10,092 0,010 0,0065 (6.2) 0,276312

14 2,4707 -0,0011 -3,632 8,489E-03 0,0016 (6.2.1) 0,127510

15 2,4707 -0,0012 -3,632 8,523E-03 0,0016 (6.2.1) 0,127510

52 -6,6836 -0,0041 10,092 0,010 0,0065 (6.2) 0,276312

53 2,4695 -0,0015 -3,631 9,507E-03 0,0021 (6.2.1) 0,127523

54 -6,6833 -0,0040 10,092 0,011 0,0063 (6.2) 0,276338

56 -4,9172 -4,313E-04 -2,228 -5,363E-05 -1,274E-05 (6.2.1) 0,522187

57 -4,9172 4,325E-04 2,228 -5,377E-05 -1,282E-05 (6.2.1) 0,522187

59 13,3687 0,3333 -13,058 -0,348 1,216E-04 (6.2) 0,110792

60 17,0635 0,0642 -7,164 0,538 1,216E-04 (6.2) 0,120424

61 13,3175 0,2636 -13,005 -0,275 6,582E-05 (6.2) 0,110076

62 17,0530 0,0253 -7,246 0,477 6,582E-05 (6.2) 0,120093

64 17,0530 -0,0260 7,246 0,480 6,742E-05 (6.61) 0,124817

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 59 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 2 of 8

Frame MuMajor MuMinor VuMajor VuMinor Tu Equation TotalRatio

KN-m KN-m KN KN KN-m

65 13,3175 -0,2658 13,005 -0,277 6,742E-05 (6.61) 0,114026

66 17,0635 -0,0600 7,164 0,531 1,167E-04 (6.61) 0,125025

67 13,3687 -0,3257 13,058 -0,340 1,167E-04 (6.61) 0,114522

69 6,7269 -0,1591 13,509 -0,348 1,216E-04 (6.2) 0,089008

70 6,7021 -0,1261 13,456 -0,275 6,582E-05 (6.2) 0,088618

71 6,7021 -0,1272 13,456 -0,277 6,742E-05 (6.61) 0,092700

72 6,7269 -0,1556 13,509 -0,340 1,167E-04 (6.61) 0,092989

75 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,550814

76 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,551418

77 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,551623

78 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552237

79 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552714

80 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552806

81 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552775

82 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552770

83 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552772

84 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552772

85 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552772

86 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552772

87 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552770

88 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552775

89 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552806

90 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552714

91 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,552238

92 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,551623

93 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,551402

94 3,1853 0,0000 -1,062 0,000 0,0000 (6.2.1) 0,550828

96 3,4097 0,0000 -1,137 0,000 0,0000 (6.62) 0,038193

97 3,4097 0,0000 -1,137 0,000 0,0000 (6.2.1) 0,038440

98 0,4218 0,0027 -0,075 1,939E-03 0,0015 (6.2.1) 0,215004

99 0,4216 0,0020 -0,075 1,330E-03 0,0011 (6.2.1) 0,214954

100 0,4216 -0,0020 0,075 1,349E-03 0,0011 (6.2.1) 0,214954

101 0,4218 -0,0026 0,075 1,885E-03 0,0014 (6.2.1) 0,215004

181 0,0449 0,0000 -1,405E-17 0,000 0,0000 (6.62)

182 0,0452 0,0000 4,684E-18 0,000 0,0000 (6.62)

183 0,0452 0,0000 -1,405E-17 0,000 0,0000 (6.62)

184 0,0452 0,0000 -1,405E-17 0,000 0,0000 (6.62)

185 0,0452 0,0000 -1,405E-17 0,000 0,0000 (6.62)

186 0,0452 0,0000 -1,405E-17 0,000 0,0000 (6.62)

187 0,0452 0,0000 -1,405E-17 0,000 0,0000 (6.62)

188 0,0452 0,0000 -1,405E-17 0,000 0,0000 (6.62)

189 0,0452 0,0000 9,368E-18 0,000 0,0000 (6.62)

190 0,0452 0,0000 9,368E-18 0,000 0,0000 (6.62)

191 0,0452 0,0000 9,368E-18 0,000 0,0000 (6.62)

192 0,0452 0,0000 9,368E-18 0,000 0,0000 (6.62)

193 0,0452 0,0000 9,368E-18 0,000 0,0000 (6.62)

194 0,0452 0,0000 9,368E-18 0,000 0,0000 (6.62)

195 0,0452 0,0000 2,810E-17 0,000 0,0000 (6.62)

196 0,0452 0,0000 -1,405E-17 0,000 0,0000 (6.62)

197 0,0452 0,0000 -1,405E-17 0,000 0,0000 (6.62)

198 0,0452 0,0000 -1,405E-17 0,000 0,0000 (6.62)

199 0,0452 0,0000 -1,405E-17 0,000 0,0000 (6.62)

200 0,0452 0,0000 -1,405E-17 0,000 0,0000 (6.62)

201 0,0449 0,0000 2,810E-17 0,000 0,0000 (6.62)

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 60 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 3 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 3 of 8

Frame PRatio MMajRatio MMinRatio SRLimit NsdDsgn Ncrd Ntrd

KN KN KN

16 0,066966 0,063860 0,001416 0,950000 -203,443 3030,458 3038,000

17 0,066983 0,065608 0,000118 0,950000 -203,494 3030,458 3038,000

18 0,066983 0,066656 0,001651 0,950000 -203,494 3030,458 3038,000

19 0,081441 0,058987 0,001635 0,950000 -247,417 3030,458 3038,000

20 0,081441 0,179816 0,002168 0,950000 -247,417 3030,458 3038,000

21 0,340562 0,255217 0,001303 0,950000 -326,004 957,253 3038,000

22 0,340562 0,180409 0,000000 0,950000 -326,004 957,253 3038,000

23 0,340601 0,180342 0,000116 0,950000 -326,041 957,253 3038,000

24 0,340601 0,255279 0,001274 0,950000 -326,041 957,253 3038,000

25 0,081423 0,179859 0,002116 0,950000 -247,362 3030,458 3038,000

26 0,081423 0,059055 0,001492 0,950000 -247,362 3030,458 3038,000

27 0,071188 0,067493 0,000892 0,950000 -203,562 2859,477 3038,000

28 0,071188 0,066350 0,000000 0,950000 -203,562 2859,477 3038,000

29 0,071188 0,064498 0,000810 0,950000 -203,562 2859,477 3038,000

30 0,340562 0,106492 0,001445 0,950000 -326,004 957,253 3038,000

31 0,340562 0,043956 0,000000 0,950000 -326,004 957,253 3038,000

32 0,340575 0,043897 0,000000 0,950000 -326,016 957,253 3038,000

33 0,340575 0,106295 0,001505 0,950000 -326,016 957,253 3038,000

34 0,340573 0,067689 0,000000 0,950000 -326,014 957,253 3038,000

35 0,340573 0,116798 0,001428 0,950000 -326,014 957,253 3038,000

36 0,340573 0,154526 0,000000 0,950000 -326,014 957,253 3038,000

37 0,340573 0,191363 0,001423 0,950000 -326,014 957,253 3038,000

38 0,340573 0,216554 0,000000 0,950000 -326,014 957,253 3038,000

39 0,340573 0,240854 0,001423 0,950000 -326,014 957,253 3038,000

40 0,340573 0,253773 0,000000 0,950000 -326,014 957,253 3038,000

41 0,340573 0,265801 0,001423 0,950000 -326,014 957,253 3038,000

42 0,340573 0,265801 0,001423 0,950000 -326,014 957,253 3038,000

43 0,340573 0,265674 0,001423 0,950000 -326,014 957,253 3038,000

44 0,340573 0,265674 0,001423 0,950000 -326,014 957,253 3038,000

45 0,340573 0,253785 0,000000 0,950000 -326,014 957,253 3038,000

46 0,340573 0,241004 0,001423 0,950000 -326,014 957,253 3038,000

47 0,340573 0,216578 0,000000 0,950000 -326,014 957,253 3038,000

48 0,340573 0,191260 0,001423 0,950000 -326,014 957,253 3038,000

49 0,340573 0,154562 0,000000 0,950000 -326,014 957,253 3038,000

50 0,340575 0,116972 0,001420 0,950000 -326,016 957,253 3038,000

51 0,340575 0,067737 0,000000 0,950000 -326,016 957,253 3038,000

102 0,067005 0,063767 0,001362 0,950000 -203,562 3030,458 3038,000

103 0,067005 0,065597 0,000000 0,950000 -203,562 3030,458 3038,000

104 0,067005 0,066728 0,001503 0,950000 -203,562 3030,458 3038,000

105 0,081423 0,059055 0,001490 0,950000 -247,362 3030,458 3038,000

106 0,081423 0,179859 0,002116 0,950000 -247,362 3030,458 3038,000

107 0,340601 0,255279 0,001274 0,950000 -326,041 957,253 3038,000

108 0,340601 0,180342 0,000116 0,950000 -326,041 957,253 3038,000

109 0,340562 0,180409 0,000000 0,950000 -326,004 957,253 3038,000

110 0,340562 0,255217 0,001303 0,950000 -326,004 957,253 3038,000

111 0,081441 0,179816 0,002168 0,950000 -247,417 3030,458 3038,000

112 0,081441 0,058987 0,001632 0,950000 -247,417 3030,458 3038,000

113 0,071165 0,067421 0,000977 0,950000 -203,494 2859,477 3038,000

114 0,071165 0,066361 0,000000 0,950000 -203,494 2859,477 3038,000

115 0,071148 0,064592 0,000841 0,950000 -203,445 2859,477 3038,000

116 0,340575 0,106295 0,001505 0,950000 -326,016 957,253 3038,000

117 0,340575 0,043897 0,000000 0,950000 -326,016 957,253 3038,000

118 0,340562 0,043956 0,000000 0,950000 -326,004 957,253 3038,000

119 0,340562 0,106492 0,001445 0,950000 -326,004 957,253 3038,000

120 0,340575 0,067737 0,000000 0,950000 -326,016 957,253 3038,000

121 0,340575 0,116972 0,001420 0,950000 -326,016 957,253 3038,000

122 0,340573 0,154562 0,000000 0,950000 -326,014 957,253 3038,000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 61 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 3 of 8

Frame PRatio MMajRatio MMinRatio SRLimit NsdDsgn Ncrd Ntrd

KN KN KN

123 0,340573 0,191260 0,001423 0,950000 -326,014 957,253 3038,000

124 0,340573 0,216578 0,000000 0,950000 -326,014 957,253 3038,000

125 0,340573 0,241004 0,001423 0,950000 -326,014 957,253 3038,000

126 0,340573 0,253785 0,000000 0,950000 -326,014 957,253 3038,000

127 0,340573 0,265674 0,001423 0,950000 -326,014 957,253 3038,000

128 0,340573 0,265674 0,001423 0,950000 -326,014 957,253 3038,000

129 0,340573 0,265801 0,001423 0,950000 -326,014 957,253 3038,000

130 0,340573 0,265801 0,001423 0,950000 -326,014 957,253 3038,000

131 0,340573 0,253773 0,000000 0,950000 -326,014 957,253 3038,000

132 0,340573 0,240854 0,001423 0,950000 -326,014 957,253 3038,000

133 0,340573 0,216554 0,000000 0,950000 -326,014 957,253 3038,000

134 0,340573 0,191363 0,001423 0,950000 -326,014 957,253 3038,000

135 0,340573 0,154526 0,000000 0,950000 -326,014 957,253 3038,000

136 0,340573 0,116798 0,001428 0,950000 -326,014 957,253 3038,000

137 0,340573 0,067689 0,000000 0,950000 -326,014 957,253 3038,000

11 0,118960 0,157378 0,000000 0,950000 -143,883 1116,251 1209,513

12 0,069372 0,058151 0,000000 0,950000 83,907 1116,251 1209,513

13 0,118927 0,157385 0,000000 0,950000 -143,844 1116,251 1209,513

14 0,069330 0,058180 0,000000 0,950000 83,855 1116,251 1209,513

15 0,069330 0,058180 0,000000 0,950000 83,855 1116,251 1209,513

52 0,118927 0,157385 0,000000 0,950000 -143,844 1116,251 1209,513

53 0,069372 0,058151 0,000000 0,950000 83,907 1116,251 1209,513

54 0,118960 0,157378 0,000000 0,950000 -143,883 1116,251 1209,513

56 0,304370 0,217816 0,000000 0,950000 326,306 16,163 1072,068

57 0,304370 0,217816 0,000000 0,950000 326,306 16,163 1072,068

59 0,067060 0,041518 0,002214 0,950000 -203,728 3038,000 3038,000

60 0,067005 0,052992 0,000426 0,950000 -203,562 3030,458 3038,000

61 0,066966 0,041359 0,001752 0,950000 -203,443 3038,000 3038,000

62 0,066966 0,052960 0,000168 0,950000 -203,443 3030,458 3038,000

64 0,071148 0,053567 0,000102 0,950000 -203,445 2859,477 3038,000

65 0,071148 0,041833 0,001046 0,950000 -203,445 2859,477 3038,000

66 0,071188 0,053600 0,000236 0,950000 -203,562 2859,477 3038,000

67 0,071247 0,041994 0,001281 0,950000 -203,728 2859,477 3038,000

69 0,067060 0,020891 0,001057 0,950000 -203,728 3038,000 3038,000

70 0,066966 0,020814 0,000838 0,950000 -203,443 3038,000 3038,000

71 0,071148 0,021053 0,000500 0,950000 -203,445 2859,477 3038,000

72 0,071247 0,021131 0,000612 0,950000 -203,728 2859,477 3038,000

75 0,002085 0,548729 0,000000 0,950000 0,752 44,277 360,500

76 0,002689 0,548729 0,000000 0,950000 0,969 44,277 360,500

77 0,002895 0,548729 0,000000 0,950000 1,043 44,277 360,500

78 0,003509 0,548729 0,000000 0,950000 1,265 44,277 360,500

79 0,003986 0,548729 0,000000 0,950000 1,437 44,277 360,500

80 0,004077 0,548729 0,000000 0,950000 1,470 44,277 360,500

81 0,004046 0,548729 0,000000 0,950000 1,459 44,277 360,500

82 0,004042 0,548729 0,000000 0,950000 1,457 44,277 360,500

83 0,004044 0,548729 0,000000 0,950000 1,458 44,277 360,500

84 0,004044 0,548729 0,000000 0,950000 1,458 44,277 360,500

85 0,004044 0,548729 0,000000 0,950000 1,458 44,277 360,500

86 0,004044 0,548729 0,000000 0,950000 1,458 44,277 360,500

87 0,004042 0,548729 0,000000 0,950000 1,457 44,277 360,500

88 0,004046 0,548729 0,000000 0,950000 1,459 44,277 360,500

89 0,004077 0,548729 0,000000 0,950000 1,470 44,277 360,500

90 0,003986 0,548729 0,000000 0,950000 1,437 44,277 360,500

91 0,003510 0,548729 0,000000 0,950000 1,265 44,277 360,500

92 0,002894 0,548729 0,000000 0,950000 1,043 44,277 360,500

93 0,002673 0,548729 0,000000 0,950000 0,964 44,277 360,500

94 0,002100 0,548729 0,000000 0,950000 0,757 44,277 360,500

96 0,000000 0,038193 0,000000 0,950000 0,000 628,564 1368,500

97 0,000247 0,038193 0,000000 0,950000 0,338 628,564 1368,500

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 62 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 3 of 8

Frame PRatio MMajRatio MMinRatio SRLimit NsdDsgn Ncrd Ntrd

KN KN KN

98 0,196320 0,018683 0,000118 0,950000 210,469 205,532 1072,068

99 0,196279 0,018675 0,000000 0,950000 210,424 205,532 1072,068

100 0,196279 0,018675 0,000000 0,950000 210,424 205,532 1072,068

101 0,196320 0,018683 0,000114 0,950000 210,469 205,532 1072,068

181 0,950000 -0,666 10,801 168,105

182 0,950000 -1,097 10,730 168,105

183 0,950000 -0,958 10,730 168,105

184 0,950000 -1,224 10,730 168,105

185 0,950000 -1,525 10,730 168,105

186 0,950000 -1,593 10,730 168,105

187 0,950000 -1,565 10,730 168,105

188 0,950000 -1,570 10,730 168,105

189 0,950000 -1,570 10,730 168,105

190 0,950000 -1,570 10,730 168,105

191 0,950000 -1,570 10,730 168,105

192 0,950000 -1,570 10,730 168,105

193 0,950000 -1,570 10,730 168,105

194 0,950000 -1,570 10,730 168,105

195 0,950000 -1,565 10,730 168,105

196 0,950000 -1,593 10,730 168,105

197 0,950000 -1,524 10,730 168,105

198 0,950000 -1,224 10,730 168,105

199 0,950000 -0,960 10,730 168,105

200 0,950000 -1,092 10,730 168,105

201 0,950000 -0,659 10,801 168,105

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 4 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 4 of 8

Frame NbrdMajor NbrdMinor MsdMajDsgn McrdMajor MvrdMajor MbrdMajor XKMajor

KN KN KN-m KN-m KN-m KN-m

16 3038,000 3030,458 20,5630 322,0000 322,0000 322,0000 1,000000

17 3038,000 3030,458 21,1259 322,0000 322,0000 322,0000 1,000000

18 3038,000 3030,458 21,4634 322,0000 322,0000 322,0000 1,000000

19 3038,000 3030,458 18,9939 322,0000 322,0000 322,0000 1,000000

20 3038,000 3030,458 -57,9007 322,0000 322,0000 322,0000 1,000000

21 957,253 3030,458 -64,5840 322,0000 322,0000 322,0000 1,000000

22 957,253 3030,458 -45,6534 322,0000 322,0000 322,0000 1,000000

23 957,253 3030,458 -45,6355 322,0000 322,0000 322,0000 1,000000

24 957,253 3030,458 -64,5981 322,0000 322,0000 322,0000 1,000000

25 3038,000 3030,458 -57,9145 322,0000 322,0000 322,0000 1,000000

26 3038,000 3030,458 19,0156 322,0000 322,0000 322,0000 1,000000

27 2859,477 3030,458 21,4863 322,0000 322,0000 322,0000 1,000000

28 2859,477 3030,458 21,1223 322,0000 322,0000 322,0000 1,000000

29 2859,477 3030,458 20,5329 322,0000 322,0000 322,0000 1,000000

30 957,253 3030,458 -26,9484 322,0000 322,0000 322,0000 1,000000

31 957,253 3030,458 -11,1232 322,0000 322,0000 322,0000 1,000000

32 957,253 3030,458 -11,1083 322,0000 322,0000 322,0000 1,000000

33 957,253 3030,458 -26,8983 322,0000 322,0000 322,0000 1,000000

34 957,253 3030,458 17,1290 322,0000 322,0000 322,0000 1,000000

35 957,253 3030,458 29,5561 322,0000 322,0000 322,0000 1,000000

36 957,253 3030,458 39,1034 322,0000 322,0000 322,0000 1,000000

37 957,253 3030,458 48,4251 322,0000 322,0000 322,0000 1,000000

38 957,253 3030,458 54,7997 322,0000 322,0000 322,0000 1,000000

39 957,253 3030,458 60,9489 322,0000 322,0000 322,0000 1,000000

40 957,253 3030,458 64,2182 322,0000 322,0000 322,0000 1,000000

41 957,253 3030,458 67,2619 322,0000 322,0000 322,0000 1,000000

42 957,253 3030,458 67,2619 322,0000 322,0000 322,0000 1,000000

43 957,253 3030,458 67,2298 322,0000 322,0000 322,0000 1,000000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 63 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 4 of 8

Frame NbrdMajor NbrdMinor MsdMajDsgn McrdMajor MvrdMajor MbrdMajor XKMajor

KN KN KN-m KN-m KN-m KN-m

44 957,253 3030,458 67,2298 322,0000 322,0000 322,0000 1,000000

45 957,253 3030,458 64,2212 322,0000 322,0000 322,0000 1,000000

46 957,253 3030,458 60,9870 322,0000 322,0000 322,0000 1,000000

47 957,253 3030,458 54,8057 322,0000 322,0000 322,0000 1,000000

48 957,253 3030,458 48,3990 322,0000 322,0000 322,0000 1,000000

49 957,253 3030,458 39,1123 322,0000 322,0000 322,0000 1,000000

50 957,253 3030,458 29,6002 322,0000 322,0000 322,0000 1,000000

51 957,253 3030,458 17,1410 322,0000 322,0000 322,0000 1,000000

102 3038,000 3030,458 20,5329 322,0000 322,0000 322,0000 1,000000

103 3038,000 3030,458 21,1223 322,0000 322,0000 322,0000 1,000000

104 3038,000 3030,458 21,4863 322,0000 322,0000 322,0000 1,000000

105 3038,000 3030,458 19,0156 322,0000 322,0000 322,0000 1,000000

106 3038,000 3030,458 -57,9145 322,0000 322,0000 322,0000 1,000000

107 957,253 3030,458 -64,5981 322,0000 322,0000 322,0000 1,000000

108 957,253 3030,458 -45,6355 322,0000 322,0000 322,0000 1,000000

109 957,253 3030,458 -45,6534 322,0000 322,0000 322,0000 1,000000

110 957,253 3030,458 -64,5840 322,0000 322,0000 322,0000 1,000000

111 3038,000 3030,458 -57,9007 322,0000 322,0000 322,0000 1,000000

112 3038,000 3030,458 18,9939 322,0000 322,0000 322,0000 1,000000

113 2859,477 3030,458 21,4634 322,0000 322,0000 322,0000 1,000000

114 2859,477 3030,458 21,1260 322,0000 322,0000 322,0000 1,000000

115 2859,477 3030,458 20,5630 322,0000 322,0000 322,0000 1,000000

116 957,253 3030,458 -26,8983 322,0000 322,0000 322,0000 1,000000

117 957,253 3030,458 -11,1083 322,0000 322,0000 322,0000 1,000000

118 957,253 3030,458 -11,1232 322,0000 322,0000 322,0000 1,000000

119 957,253 3030,458 -26,9484 322,0000 322,0000 322,0000 1,000000

120 957,253 3030,458 17,1410 322,0000 322,0000 322,0000 1,000000

121 957,253 3030,458 29,6002 322,0000 322,0000 322,0000 1,000000

122 957,253 3030,458 39,1123 322,0000 322,0000 322,0000 1,000000

123 957,253 3030,458 48,3990 322,0000 322,0000 322,0000 1,000000

124 957,253 3030,458 54,8057 322,0000 322,0000 322,0000 1,000000

125 957,253 3030,458 60,9870 322,0000 322,0000 322,0000 1,000000

126 957,253 3030,458 64,2212 322,0000 322,0000 322,0000 1,000000

127 957,253 3030,458 67,2298 322,0000 322,0000 322,0000 1,000000

128 957,253 3030,458 67,2298 322,0000 322,0000 322,0000 1,000000

129 957,253 3030,458 67,2619 322,0000 322,0000 322,0000 1,000000

130 957,253 3030,458 67,2619 322,0000 322,0000 322,0000 1,000000

131 957,253 3030,458 64,2182 322,0000 322,0000 322,0000 1,000000

132 957,253 3030,458 60,9489 322,0000 322,0000 322,0000 1,000000

133 957,253 3030,458 54,7997 322,0000 322,0000 322,0000 1,000000

134 957,253 3030,458 48,4251 322,0000 322,0000 322,0000 1,000000

135 957,253 3030,458 39,1034 322,0000 322,0000 322,0000 1,000000

136 957,253 3030,458 29,5561 322,0000 322,0000 322,0000 1,000000

137 957,253 3030,458 17,1290 322,0000 322,0000 322,0000 1,000000

11 1116,251 1116,251 -6,6833 42,4667 42,4667 42,4667 1,000000

12 1116,251 1116,251 2,4695 42,4667 42,4667 42,4667 1,000000

13 1116,251 1116,251 -6,6836 42,4667 42,4667 42,4667 1,000000

14 1116,251 1116,251 2,4707 42,4667 42,4667 42,4667 1,000000

15 1116,251 1116,251 2,4707 42,4667 42,4667 42,4667 1,000000

52 1116,251 1116,251 -6,6836 42,4667 42,4667 42,4667 1,000000

53 1116,251 1116,251 2,4695 42,4667 42,4667 42,4667 1,000000

54 1116,251 1116,251 -6,6833 42,4667 42,4667 42,4667 1,000000

56 16,163 16,163 -4,9172 22,5750 22,5750 22,5750 1,000000

57 16,163 16,163 -4,9172 22,5750 22,5750 22,5750 1,000000

59 3038,000 3038,000 13,3687 322,0000 322,0000 322,0000 1,000000

60 3038,000 3030,458 17,0635 322,0000 322,0000 322,0000 1,000000

61 3038,000 3038,000 13,3175 322,0000 322,0000 322,0000 1,000000

62 3038,000 3030,458 17,0530 322,0000 322,0000 322,0000 1,000000

64 2859,477 3030,458 17,0530 322,0000 322,0000 322,0000 1,000000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 64 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 4 of 8

Frame NbrdMajor NbrdMinor MsdMajDsgn McrdMajor MvrdMajor MbrdMajor XKMajor

KN KN KN-m KN-m KN-m KN-m

65 2859,477 3038,000 13,3175 322,0000 322,0000 322,0000 1,000000

66 2859,477 3030,458 17,0635 322,0000 322,0000 322,0000 1,000000

67 2859,477 3038,000 13,3687 322,0000 322,0000 322,0000 1,000000

69 3038,000 3038,000 6,7269 322,0000 322,0000 322,0000 1,000000

70 3038,000 3038,000 6,7021 322,0000 322,0000 322,0000 1,000000

71 2859,477 3038,000 6,7021 322,0000 322,0000 322,0000 1,000000

72 2859,477 3038,000 6,7269 322,0000 322,0000 322,0000 1,000000

75 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

76 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

77 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

78 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

79 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

80 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

81 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

82 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

83 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

84 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

85 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

86 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

87 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

88 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

89 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

90 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

91 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

92 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

93 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

94 283,271 44,277 3,1853 13,7900 13,7900 5,8048 1,000000

96 1326,738 628,564 3,4097 128,4500 128,4500 89,2762 1,000000

97 1326,738 628,564 3,4097 128,4500 128,4500 89,2762 1,000000

98 205,532 205,532 0,4218 22,5750 22,5750 22,5750 1,000000

99 205,532 205,532 0,4216 22,5750 22,5750 22,5750 1,000000

100 205,532 205,532 0,4216 22,5750 22,5750 22,5750 1,000000

101 205,532 205,532 0,4218 22,5750 22,5750 22,5750 1,000000

181 25,992 10,801 0,0449 1,0667 1,0667 0,7618 1,000000

182 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

183 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

184 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

185 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

186 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

187 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

188 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

189 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

190 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

191 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

192 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

193 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

194 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

195 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

196 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

197 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

198 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

199 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

200 25,830 10,730 0,0452 1,0667 1,0667 0,7611 1,000000

201 25,992 10,801 0,0449 1,0667 1,0667 0,7618 1,000000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 65 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 5 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 5 of 8

Frame XLMajor kMajor kzy C1 MsdMinDsgn McrdMinor MvrdMinor

KN-m KN-m KN-m

16 1,000000 0,923030 0,804866 1,000000 -0,2131 150,5000 150,5000

17 1,000000 0,980109 0,804866 1,000000 0,0177 150,5000 150,5000

18 1,000000 0,984438 0,804866 1,000000 0,2486 150,5000 150,5000

19 2,000000 0,993597 0,804866 1,000000 0,2460 150,5000 150,5000

20 2,000000 0,993597 0,804866 1,000000 -0,3262 150,5000 150,5000

21 26,000000 1,272449 0,804866 1,000000 -0,3336 150,5000 150,5000

22 26,000000 1,272449 0,804866 1,000000 0,0182 150,5000 150,5000

23 26,000000 1,272481 0,804866 1,000000 -0,0297 150,5000 150,5000

24 26,000000 1,272481 0,804866 1,000000 0,3262 150,5000 150,5000

25 2,000000 0,993598 0,804866 1,000000 0,3185 150,5000 150,5000

26 2,000000 0,993598 0,804866 1,000000 -0,2246 150,5000 150,5000

27 5,950000 1,011468 0,804866 1,000000 -0,2265 150,5000 150,5000

28 5,950000 1,011468 0,804866 1,000000 -0,0104 150,5000 150,5000

29 5,950000 1,011468 0,804866 1,000000 0,2057 150,5000 150,5000

30 26,000000 1,272449 0,804866 1,000000 0,3701 150,5000 150,5000

31 26,000000 1,272449 0,804866 1,000000 0,0035 150,5000 150,5000

32 26,000000 1,272460 0,804866 1,000000 -0,0126 150,5000 150,5000

33 26,000000 1,272460 0,804866 1,000000 -0,3855 150,5000 150,5000

34 26,000000 1,272458 0,804866 1,000000 0,0013 150,5000 150,5000

35 26,000000 1,272458 0,804866 1,000000 0,3656 150,5000 150,5000

36 26,000000 1,272458 0,804866 1,000000 5,553E-04 150,5000 150,5000

37 26,000000 1,272458 0,804866 1,000000 -0,3644 150,5000 150,5000

38 26,000000 1,272458 0,804866 1,000000 -9,343E-06 150,5000 150,5000

39 26,000000 1,272458 0,804866 1,000000 0,3644 150,5000 150,5000

40 26,000000 1,272458 0,804866 1,000000 6,863E-07 150,5000 150,5000

41 26,000000 1,272458 0,804866 1,000000 -0,3644 150,5000 150,5000

42 26,000000 1,272458 0,804866 1,000000 -0,3644 150,5000 150,5000

43 26,000000 1,272458 0,804866 1,000000 0,3644 150,5000 150,5000

44 26,000000 1,272458 0,804866 1,000000 0,3644 150,5000 150,5000

45 26,000000 1,272458 0,804866 1,000000 -3,379E-05 150,5000 150,5000

46 26,000000 1,272458 0,804866 1,000000 -0,3645 150,5000 150,5000

47 26,000000 1,272458 0,804866 1,000000 -6,421E-05 150,5000 150,5000

48 26,000000 1,272458 0,804866 1,000000 0,3644 150,5000 150,5000

49 26,000000 1,272458 0,804866 1,000000 3,170E-04 150,5000 150,5000

50 26,000000 1,272460 0,804866 1,000000 -0,3637 150,5000 150,5000

51 26,000000 1,272460 0,804866 1,000000 -0,0017 150,5000 150,5000

102 1,000000 0,923710 0,804866 1,000000 -0,2050 150,5000 150,5000

103 1,000000 0,979607 0,804866 1,000000 0,0106 150,5000 150,5000

104 1,000000 0,983953 0,804866 1,000000 0,2262 150,5000 150,5000

105 2,000000 0,993598 0,804866 1,000000 0,2243 150,5000 150,5000

106 2,000000 0,993598 0,804866 1,000000 -0,3185 150,5000 150,5000

107 26,000000 1,272481 0,804866 1,000000 -0,3262 150,5000 150,5000

108 26,000000 1,272481 0,804866 1,000000 0,0297 150,5000 150,5000

109 26,000000 1,272449 0,804866 1,000000 -0,0182 150,5000 150,5000

110 26,000000 1,272449 0,804866 1,000000 0,3336 150,5000 150,5000

111 2,000000 0,993597 0,804866 1,000000 0,3262 150,5000 150,5000

112 2,000000 0,993597 0,804866 1,000000 -0,2457 150,5000 150,5000

113 5,950000 1,011464 0,804866 1,000000 -0,2482 150,5000 150,5000

114 5,950000 1,011464 0,804866 1,000000 -0,0172 150,5000 150,5000

115 5,950000 1,011461 0,804866 1,000000 0,2138 150,5000 150,5000

116 26,000000 1,272460 0,804866 1,000000 0,3855 150,5000 150,5000

117 26,000000 1,272460 0,804866 1,000000 0,0126 150,5000 150,5000

118 26,000000 1,272449 0,804866 1,000000 -0,0035 150,5000 150,5000

119 26,000000 1,272449 0,804866 1,000000 -0,3701 150,5000 150,5000

120 26,000000 1,272460 0,804866 1,000000 0,0017 150,5000 150,5000

121 26,000000 1,272460 0,804866 1,000000 0,3637 150,5000 150,5000

122 26,000000 1,272458 0,804866 1,000000 -3,175E-04 150,5000 150,5000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 66 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 5 of 8

Frame XLMajor kMajor kzy C1 MsdMinDsgn McrdMinor MvrdMinor

KN-m KN-m KN-m

123 26,000000 1,272458 0,804866 1,000000 -0,3644 150,5000 150,5000

124 26,000000 1,272458 0,804866 1,000000 6,427E-05 150,5000 150,5000

125 26,000000 1,272458 0,804866 1,000000 0,3645 150,5000 150,5000

126 26,000000 1,272458 0,804866 1,000000 3,382E-05 150,5000 150,5000

127 26,000000 1,272458 0,804866 1,000000 -0,3644 150,5000 150,5000

128 26,000000 1,272458 0,804866 1,000000 -0,3644 150,5000 150,5000

129 26,000000 1,272458 0,804866 1,000000 0,3644 150,5000 150,5000

130 26,000000 1,272458 0,804866 1,000000 0,3644 150,5000 150,5000

131 26,000000 1,272458 0,804866 1,000000 -7,014E-07 150,5000 150,5000

132 26,000000 1,272458 0,804866 1,000000 -0,3644 150,5000 150,5000

133 26,000000 1,272458 0,804866 1,000000 9,219E-06 150,5000 150,5000

134 26,000000 1,272458 0,804866 1,000000 0,3644 150,5000 150,5000

135 26,000000 1,272458 0,804866 1,000000 -5,548E-04 150,5000 150,5000

136 26,000000 1,272458 0,804866 1,000000 -0,3656 150,5000 150,5000

137 26,000000 1,272458 0,804866 1,000000 -0,0013 150,5000 150,5000

11 1,000000 0,407791 0,244675 2,700000 -0,0040 42,4667 42,4667

12 1,000000 0,400000 0,240000 2,700000 -0,0015 42,4667 42,4667

13 1,000000 0,407789 0,244673 2,700000 -0,0041 42,4667 42,4667

14 1,000000 0,400000 0,240000 2,700000 -0,0011 42,4667 42,4667

15 1,000000 0,400000 0,240000 2,700000 -0,0012 42,4667 42,4667

52 1,000000 0,407789 0,244673 2,700000 -0,0041 42,4667 42,4667

53 1,000000 0,400000 0,240000 2,700000 -0,0015 42,4667 42,4667

54 1,000000 0,407791 0,244675 2,700000 -0,0040 42,4667 42,4667

56 1,000000 0,568732 0,341239 1,000016 -4,313E-04 22,5750 22,5750

57 1,000000 0,568732 0,341239 1,000016 4,325E-04 22,5750 22,5750

59 1,000000 0,793786 0,702433 1,307206 0,3333 150,5000 150,5000

60 1,000000 0,904860 0,804866 1,000000 0,0642 150,5000 150,5000

61 1,000000 0,793827 0,702433 1,307141 0,2636 150,5000 150,5000

62 1,000000 0,903867 0,804866 1,000000 0,0253 150,5000 150,5000

64 5,950000 1,011461 0,804866 1,000000 -0,0260 150,5000 150,5000

65 5,950000 1,011461 0,799745 1,000000 -0,2658 150,5000 150,5000

66 5,950000 1,011468 0,804866 1,000000 -0,0600 150,5000 150,5000

67 5,950000 1,011477 0,799745 1,000000 -0,3257 150,5000 150,5000

69 1,000000 0,606538 0,697312 1,837154 -0,1591 150,5000 150,5000

70 1,000000 0,606612 0,697312 1,836927 -0,1261 150,5000 150,5000

71 6,263158 1,011461 0,799745 1,000000 -0,1272 150,5000 150,5000

72 6,263158 1,011477 0,799745 1,000000 -0,1556 150,5000 150,5000

75 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

76 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

77 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

78 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

79 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

80 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

81 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

82 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

83 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

84 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

85 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

86 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

87 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

88 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

89 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

90 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

91 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

92 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

93 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

94 1,000000 1,000000 1,000000 1,000000 0,0000 3,2025 3,2025

96 1,000000 1,000000 1,000000 1,000000 0,0000 25,8650 25,8650

97 1,000000 1,000000 1,000000 1,000000 0,0000 25,8650 25,8650

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 67 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 5 of 8

Frame XLMajor kMajor kzy C1 MsdMinDsgn McrdMinor MvrdMinor

KN-m KN-m KN-m

98 1,000000 0,939350 0,563610 1,000000 0,0027 22,5750 22,5750

99 1,000000 0,939294 0,563577 1,000000 0,0020 22,5750 22,5750

100 1,000000 0,939295 0,563577 1,000000 -0,0020 22,5750 22,5750

101 1,000000 0,939350 0,563610 1,000000 -0,0026 22,5750 22,5750

181 1,000000 1,015363 0,995892 1,000000 0,0000 1,0667 1,0667

182 1,000000 1,025477 0,993186 1,000000 0,0000 1,0667 1,0667

183 1,000000 1,022256 0,994047 1,000000 0,0000 1,0667 1,0667

184 1,000000 1,028428 0,992397 1,000000 0,0000 1,0667 1,0667

185 1,000000 1,035414 0,990528 1,000000 0,0000 1,0667 1,0667

186 1,000000 1,036997 0,990105 1,000000 0,0000 1,0667 1,0667

187 1,000000 1,036344 0,990279 1,000000 0,0000 1,0667 1,0667

188 1,000000 1,036477 0,990244 1,000000 0,0000 1,0667 1,0667

189 1,000000 1,036473 0,990245 1,000000 0,0000 1,0667 1,0667

190 1,000000 1,036469 0,990246 1,000000 0,0000 1,0667 1,0667

191 1,000000 1,036473 0,990245 1,000000 0,0000 1,0667 1,0667

192 1,000000 1,036469 0,990246 1,000000 0,0000 1,0667 1,0667

193 1,000000 1,036473 0,990245 1,000000 0,0000 1,0667 1,0667

194 1,000000 1,036477 0,990244 1,000000 0,0000 1,0667 1,0667

195 1,000000 1,036344 0,990279 1,000000 0,0000 1,0667 1,0667

196 1,000000 1,036997 0,990105 1,000000 0,0000 1,0667 1,0667

197 1,000000 1,035413 0,990528 1,000000 0,0000 1,0667 1,0667

198 1,000000 1,028427 0,992397 1,000000 0,0000 1,0667 1,0667

199 1,000000 1,022292 0,994038 1,000000 0,0000 1,0667 1,0667

200 1,000000 1,025376 0,993213 1,000000 0,0000 1,0667 1,0667

201 1,000000 1,015224 0,995929 1,000000 0,0000 1,0667 1,0667

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 6 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 6 of 8

Frame XKMinor XLMinor kMinor kyz Fy E Length

KN/m2 KN/m2 m

16 1,000000 2,000000 0,987227 0,592336 350000,00 199947978,8 0,50000

17 1,000000 2,000000 0,987224 0,592334 350000,00 199947978,8 0,50000

18 1,000000 2,000000 0,987224 0,592334 350000,00 199947978,8 0,50000

19 1,000000 2,000000 0,984466 0,590680 350000,00 199947978,8 0,50000

20 1,000000 2,000000 0,984466 0,590680 350000,00 199947978,8 0,50000

21 1,000000 2,000000 0,979532 0,587719 350000,00 199947978,8 0,50000

22 1,000000 2,000000 0,979532 0,587719 350000,00 199947978,8 0,50000

23 1,000000 2,000000 0,979530 0,587718 350000,00 199947978,8 0,50000

24 1,000000 2,000000 0,979530 0,587718 350000,00 199947978,8 0,50000

25 1,000000 2,000000 0,984469 0,590682 350000,00 199947978,8 0,50000

26 1,000000 2,000000 0,984469 0,590682 350000,00 199947978,8 0,50000

27 1,000000 2,000000 0,987219 0,592332 350000,00 199947978,8 0,50000

28 1,000000 2,000000 0,987219 0,592332 350000,00 199947978,8 0,50000

29 1,000000 2,000000 0,987219 0,592332 350000,00 199947978,8 0,50000

30 1,000000 2,000000 0,979532 0,587719 350000,00 199947978,8 0,50000

31 1,000000 2,000000 0,979532 0,587719 350000,00 199947978,8 0,50000

32 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

33 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

34 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

35 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

36 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

37 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

38 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

39 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

40 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

41 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

42 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

43 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 68 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 6 of 8

Frame XKMinor XLMinor kMinor kyz Fy E Length

KN/m2 KN/m2 m

44 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

45 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

46 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

47 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

48 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

49 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

50 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

51 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

102 1,000000 2,000000 0,987219 0,592332 350000,00 199947978,8 0,50000

103 1,000000 2,000000 0,987219 0,592332 350000,00 199947978,8 0,50000

104 1,000000 2,000000 0,987219 0,592332 350000,00 199947978,8 0,50000

105 1,000000 2,000000 0,984469 0,590682 350000,00 199947978,8 0,50000

106 1,000000 2,000000 0,984469 0,590682 350000,00 199947978,8 0,50000

107 1,000000 2,000000 0,979530 0,587718 350000,00 199947978,8 0,50000

108 1,000000 2,000000 0,979530 0,587718 350000,00 199947978,8 0,50000

109 1,000000 2,000000 0,979532 0,587719 350000,00 199947978,8 0,50000

110 1,000000 2,000000 0,979532 0,587719 350000,00 199947978,8 0,50000

111 1,000000 2,000000 0,984466 0,590680 350000,00 199947978,8 0,50000

112 1,000000 2,000000 0,984466 0,590680 350000,00 199947978,8 0,50000

113 1,000000 2,000000 0,987224 0,592334 350000,00 199947978,8 0,50000

114 1,000000 2,000000 0,987224 0,592334 350000,00 199947978,8 0,50000

115 1,000000 2,000000 0,987227 0,592336 350000,00 199947978,8 0,50000

116 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

117 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

118 1,000000 2,000000 0,979532 0,587719 350000,00 199947978,8 0,50000

119 1,000000 2,000000 0,979532 0,587719 350000,00 199947978,8 0,50000

120 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

121 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

122 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

123 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

124 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

125 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

126 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

127 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

128 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

129 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

130 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

131 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

132 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

133 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

134 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

135 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

136 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

137 1,000000 2,000000 0,979531 0,587719 350000,00 199947978,8 0,50000

11 1,000000 1,000000 0,407791 0,244675 350000,00 199947978,8 1,02956

12 1,000000 1,000000 0,526686 0,316012 350000,00 199947978,8 1,02956

13 1,000000 1,000000 0,407789 0,244673 350000,00 199947978,8 1,02956

14 1,000000 1,000000 0,539685 0,323811 350000,00 199947978,8 1,02956

15 1,000000 1,000000 0,539077 0,323446 350000,00 199947978,8 1,02956

52 1,000000 1,000000 0,407789 0,244673 350000,00 199947978,8 1,02956

53 1,000000 1,000000 0,526840 0,316104 350000,00 199947978,8 1,02956

54 1,000000 1,000000 0,407791 0,244675 350000,00 199947978,8 1,02956

56 1,000000 1,000000 0,400000 0,240000 350000,00 199947978,8 14,00000

57 1,000000 1,000000 0,400000 0,240000 350000,00 199947978,8 14,00000

59 1,000000 1,000000 0,770031 0,462018 350000,00 199947978,8 0,50000

60 1,000000 2,000000 0,987219 0,592332 350000,00 199947978,8 0,50000

61 1,000000 1,000000 0,770440 0,462264 350000,00 199947978,8 0,50000

62 1,000000 2,000000 0,987227 0,592336 350000,00 199947978,8 0,50000

64 1,000000 2,000000 0,987227 0,592336 350000,00 199947978,8 0,50000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 69 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 6 of 8

Frame XKMinor XLMinor kMinor kyz Fy E Length

KN/m2 KN/m2 m

65 1,000000 1,950000 0,986572 0,591943 350000,00 199947978,8 0,50000

66 1,000000 2,000000 0,987219 0,592332 350000,00 199947978,8 0,50000

67 1,000000 1,950000 0,986554 0,591932 350000,00 199947978,8 0,50000

69 1,000000 1,000000 0,568267 0,340960 350000,00 199947978,8 0,47500

70 1,000000 1,000000 0,569870 0,341922 350000,00 199947978,8 0,47500

71 1,000000 2,052632 0,986572 0,591943 350000,00 199947978,8 0,47500

72 1,000000 2,052632 0,986554 0,591932 350000,00 199947978,8 0,47500

75 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

76 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

77 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

78 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

79 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

80 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

81 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

82 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

83 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

84 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

85 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

86 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

87 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

88 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

89 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

90 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

91 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

92 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

93 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

94 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

96 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

97 1,000000 1,000000 1,000000 0,600000 350000,00 199947978,8 2,50000

98 1,000000 1,000000 0,546289 0,327773 350000,00 199947978,8 3,58966

99 1,000000 1,000000 0,561913 0,337148 350000,00 199947978,8 3,58966

100 1,000000 1,000000 0,560508 0,336305 350000,00 199947978,8 3,58966

101 1,000000 1,000000 0,545052 0,327031 350000,00 199947978,8 3,58966

181 1,000000 1,000000 1,036971 1,036971 350000,00 199947978,8 2,68340

182 1,000000 1,000000 1,061326 1,061326 350000,00 199947978,8 2,69258

183 1,000000 1,000000 1,053573 1,053573 350000,00 199947978,8 2,69258

184 1,000000 1,000000 1,068431 1,068431 350000,00 199947978,8 2,69258

185 1,000000 1,000000 1,085246 1,085246 350000,00 199947978,8 2,69258

186 1,000000 1,000000 1,089057 1,089057 350000,00 199947978,8 2,69258

187 1,000000 1,000000 1,087486 1,087486 350000,00 199947978,8 2,69258

188 1,000000 1,000000 1,087806 1,087806 350000,00 199947978,8 2,69258

189 1,000000 1,000000 1,087797 1,087797 350000,00 199947978,8 2,69258

190 1,000000 1,000000 1,087786 1,087786 350000,00 199947978,8 2,69258

191 1,000000 1,000000 1,087795 1,087795 350000,00 199947978,8 2,69258

192 1,000000 1,000000 1,087786 1,087786 350000,00 199947978,8 2,69258

193 1,000000 1,000000 1,087797 1,087797 350000,00 199947978,8 2,69258

194 1,000000 1,000000 1,087806 1,087806 350000,00 199947978,8 2,69258

195 1,000000 1,000000 1,087486 1,087486 350000,00 199947978,8 2,69258

196 1,000000 1,000000 1,089056 1,089056 350000,00 199947978,8 2,69258

197 1,000000 1,000000 1,085244 1,085244 350000,00 199947978,8 2,69258

198 1,000000 1,000000 1,068429 1,068429 350000,00 199947978,8 2,69258

199 1,000000 1,000000 1,053661 1,053661 350000,00 199947978,8 2,69258

200 1,000000 1,000000 1,061085 1,061085 350000,00 199947978,8 2,69258

201 1,000000 1,000000 1,036636 1,036636 350000,00 199947978,8 2,68340

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 70 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 7 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 7 of 8

Frame MajAxisAng RLLF SectClass FramingType ErrMsg

Degrees

16 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

17 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

18 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

19 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

20 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

21 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

22 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

23 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

24 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

25 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

26 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

27 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

28 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

29 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

30 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

31 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

32 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

33 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

34 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

35 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

36 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

37 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

38 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

39 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

40 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

41 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

42 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

43 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

44 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

45 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

46 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

47 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

48 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

49 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

50 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

51 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

102 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

103 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

104 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

105 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

106 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

107 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

108 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

109 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

110 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

111 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

112 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

113 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

114 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

115 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

116 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

117 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

118 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

119 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

120 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

121 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

122 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 71 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 7 of 8

Frame MajAxisAng RLLF SectClass FramingType ErrMsg

Degrees

123 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

124 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

125 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

126 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

127 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

128 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

129 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

130 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

131 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

132 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

133 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

134 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

135 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

136 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

137 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

11 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

12 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

13 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

14 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

15 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

52 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

53 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

54 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

56 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

57 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

59 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

60 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

61 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

62 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

64 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

65 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

66 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

67 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

69 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

70 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

71 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

72 1,000000 Class 2 Ductility Class High Moment Resisting Frame No Messages

75 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

76 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

77 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

78 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

79 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

80 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

81 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

82 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

83 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

84 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

85 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

86 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

87 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

88 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

89 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

90 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

91 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

92 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

93 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

94 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

96 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

97 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 72 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 7 of 8

Frame MajAxisAng RLLF SectClass FramingType ErrMsg

Degrees

98 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

99 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

100 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

101 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

181 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

182 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

183 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

184 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

185 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

186 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

187 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

188 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

189 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

190 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

191 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

192 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

193 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

194 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

195 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

196 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

197 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

198 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

199 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

200 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

201 1,000000 Class 4 Ductility Class High Moment Resisting Frame Section is Class 4

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 8 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 8 of 8

Frame WarnMsg

16 No Messages

17 No Messages

18 No Messages

19 No Messages

20 No Messages

21 No Messages

22 No Messages

23 No Messages

24 No Messages

25 No Messages

26 No Messages

27 No Messages

28 No Messages

29 No Messages

30 No Messages

31 No Messages

32 No Messages

33 No Messages

34 No Messages

35 No Messages

36 No Messages

37 No Messages

38 No Messages

39 No Messages

40 No Messages

41 No Messages

42 No Messages

43 No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 73 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 8 of 8

Frame WarnMsg

44 No Messages

45 No Messages

46 No Messages

47 No Messages

48 No Messages

49 No Messages

50 No Messages

51 No Messages

102 No Messages

103 No Messages

104 No Messages

105 No Messages

106 No Messages

107 No Messages

108 No Messages

109 No Messages

110 No Messages

111 No Messages

112 No Messages

113 No Messages

114 No Messages

115 No Messages

116 No Messages

117 No Messages

118 No Messages

119 No Messages

120 No Messages

121 No Messages

122 No Messages

123 No Messages

124 No Messages

125 No Messages

126 No Messages

127 No Messages

128 No Messages

129 No Messages

130 No Messages

131 No Messages

132 No Messages

133 No Messages

134 No Messages

135 No Messages

136 No Messages

137 No Messages

11 No Messages

12 No Messages

13 No Messages

14 No Messages

15 No Messages

52 No Messages

53 No Messages

54 No Messages

56 No Messages

57 No Messages

59 No Messages

60 No Messages

61 No Messages

62 No Messages

64 No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 74 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 8 of 8

Frame WarnMsg

65 No Messages

66 No Messages

67 No Messages

69 No Messages

70 No Messages

71 No Messages

72 No Messages

75 No Messages

76 No Messages

77 No Messages

78 No Messages

79 No Messages

80 No Messages

81 No Messages

82 No Messages

83 No Messages

84 No Messages

85 No Messages

86 No Messages

87 No Messages

88 No Messages

89 No Messages

90 No Messages

91 No Messages

92 No Messages

93 No Messages

94 No Messages

96 No Messages

97 No Messages

98 No Messages

99 No Messages

100 No Messages

101 No Messages

181 No Messages

182 No Messages

183 No Messages

184 No Messages

185 No Messages

186 No Messages

187 No Messages

188 No Messages

189 No Messages

190 No Messages

191 No Messages

192 No Messages

193 No Messages

194 No Messages

195 No Messages

196 No Messages

197 No Messages

198 No Messages

199 No Messages

200 No Messages

201 No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 75 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 1 of 4

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 1 of 4

Frame DesignSect DesignType Status VMajorCombo VMajorLoc VMajorRatio

m

16 HE260A Beam No Messages DSTL2 0,00000 0,012477

17 HE260A Beam No Messages DSTL2 0,00000 0,002327

18 HE260A Beam No Messages DSTL2 0,00000 0,001550

19 HE260A Beam No Messages DSTL2 0,50000 0,132416

20 HE260A Beam No Messages DSTL2 0,50000 0,133192

21 HE260A Beam No Messages DSTL2 0,00000 0,065587

22 HE260A Beam No Messages DSTL2 0,00000 0,064810

23 HE260A Beam No Messages DSTL2 0,50000 0,064921

24 HE260A Beam No Messages DSTL2 0,50000 0,065697

25 HE260A Beam No Messages DSTL2 0,00000 0,133253

26 HE260A Beam No Messages DSTL2 0,00000 0,132477

27 HE260A Beam No Messages DSTL2 0,50000 0,001642

28 HE260A Beam No Messages DSTL2 0,50000 0,002418

29 HE260A Beam No Messages DSTL2 0,50000 0,012337

30 HE260A Beam No Messages DSTL2 0,00000 0,054892

31 HE260A Beam No Messages DSTL2 0,00000 0,054115

32 HE260A Beam No Messages DSTL2 0,50000 0,053994

33 HE260A Beam No Messages DSTL2 0,50000 0,054771

34 HE260A Beam No Messages DSTL2 0,00000 0,043965

35 HE260A Beam No Messages DSTL2 0,00000 0,043188

36 HE260A Beam No Messages DSTL2 0,00000 0,033270

37 HE260A Beam No Messages DSTL2 0,00000 0,032493

38 HE260A Beam No Messages DSTL2 0,00000 0,022343

39 HE260A Beam No Messages DSTL2 0,00000 0,021567

40 HE260A Beam No Messages DSTL2 0,00000 0,011648

41 HE260A Beam No Messages DSTL2 0,00000 0,010871

42 HE260A Beam No Messages DSTL2 0,00000 0,000721

43 HE260A Beam No Messages DSTL1 0,50000 0,000832

44 HE260A Beam No Messages DSTL2 0,50000 0,010750

45 HE260A Beam No Messages DSTL2 0,50000 0,011527

46 HE260A Beam No Messages DSTL2 0,50000 0,021677

47 HE260A Beam No Messages DSTL2 0,50000 0,022454

48 HE260A Beam No Messages DSTL2 0,50000 0,032372

49 HE260A Beam No Messages DSTL2 0,50000 0,033149

50 HE260A Beam No Messages DSTL2 0,50000 0,043299

51 HE260A Beam No Messages DSTL2 0,50000 0,044075

102 HE260A Beam No Messages DSTL2 0,00000 0,012337

103 HE260A Beam No Messages DSTL2 0,00000 0,002418

104 HE260A Beam No Messages DSTL2 0,00000 0,001642

105 HE260A Beam No Messages DSTL2 0,50000 0,132477

106 HE260A Beam No Messages DSTL2 0,50000 0,133254

107 HE260A Beam No Messages DSTL2 0,00000 0,065697

108 HE260A Beam No Messages DSTL2 0,00000 0,064921

109 HE260A Beam No Messages DSTL2 0,50000 0,064810

110 HE260A Beam No Messages DSTL2 0,50000 0,065587

111 HE260A Beam No Messages DSTL2 0,00000 0,133192

112 HE260A Beam No Messages DSTL2 0,00000 0,132416

113 HE260A Beam No Messages DSTL2 0,50000 0,001551

114 HE260A Beam No Messages DSTL2 0,50000 0,002327

115 HE260A Beam No Messages DSTL2 0,50000 0,012477

116 HE260A Beam No Messages DSTL2 0,00000 0,054771

117 HE260A Beam No Messages DSTL2 0,00000 0,053994

118 HE260A Beam No Messages DSTL2 0,50000 0,054115

119 HE260A Beam No Messages DSTL2 0,50000 0,054892

120 HE260A Beam No Messages DSTL2 0,00000 0,044075

121 HE260A Beam No Messages DSTL2 0,00000 0,043299

122 HE260A Beam No Messages DSTL2 0,00000 0,033149

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 76 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 1 of 4

Frame DesignSect DesignType Status VMajorCombo VMajorLoc VMajorRatio

m

123 HE260A Beam No Messages DSTL2 0,00000 0,032372

124 HE260A Beam No Messages DSTL2 0,00000 0,022454

125 HE260A Beam No Messages DSTL2 0,00000 0,021677

126 HE260A Beam No Messages DSTL2 0,00000 0,011527

127 HE260A Beam No Messages DSTL2 0,00000 0,010750

128 HE260A Beam No Messages DSTL1 0,00000 0,000832

129 HE260A Beam No Messages DSTL2 0,50000 0,000721

130 HE260A Beam No Messages DSTL2 0,50000 0,010871

131 HE260A Beam No Messages DSTL2 0,50000 0,011648

132 HE260A Beam No Messages DSTL2 0,50000 0,021567

133 HE260A Beam No Messages DSTL2 0,50000 0,022343

134 HE260A Beam No Messages DSTL2 0,50000 0,032493

135 HE260A Beam No Messages DSTL2 0,50000 0,033270

136 HE260A Beam No Messages DSTL2 0,50000 0,043188

137 HE260A Beam No Messages DSTL2 0,50000 0,043965

11 F12 Brace No Messages DSTL2 1,02956 0,022702

12 F12 Brace No Messages DSTL2 0,00000 0,008571

13 F12 Brace No Messages DSTL2 1,02956 0,022702

14 F12 Brace No Messages DSTL2 0,00000 0,008575

15 F12 Brace No Messages DSTL2 0,00000 0,008575

52 F12 Brace No Messages DSTL2 1,02956 0,022702

53 F12 Brace No Messages DSTL2 0,00000 0,008571

54 F12 Brace No Messages DSTL2 1,02956 0,022702

56 FI8 Beam No Messages DSTL1 0,00000 0,005654

57 FI8 Beam No Messages DSTL1 14,00000 0,005654

59 HE260A Beam No Messages DSTL2 0,00000 0,023263

60 HE260A Beam No Messages DSTL2 0,00000 0,013114

61 HE260A Beam No Messages DSTL2 0,00000 0,023172

62 HE260A Beam No Messages DSTL2 0,00000 0,013254

64 HE260A Beam No Messages DSTL2 0,50000 0,013254

65 HE260A Beam No Messages DSTL2 0,50000 0,023172

66 HE260A Beam No Messages DSTL2 0,50000 0,013114

67 HE260A Beam No Messages DSTL2 0,50000 0,023263

69 HE260A Beam No Messages DSTL2 0,47500 0,024001

70 HE260A Beam No Messages DSTL2 0,47500 0,023910

71 HE260A Beam No Messages DSTL2 0,47500 0,023910

72 HE260A Beam No Messages DSTL2 0,47500 0,024001

75 IPE100 Beam No Messages DSTL2 0,00000 0,051903

76 IPE100 Beam No Messages DSTL2 2,50000 0,051903

77 IPE100 Beam No Messages DSTL2 2,50000 0,051903

78 IPE100 Beam No Messages DSTL2 2,50000 0,051903

79 IPE100 Beam No Messages DSTL2 2,50000 0,051903

80 IPE100 Beam No Messages DSTL2 2,50000 0,051903

81 IPE100 Beam No Messages DSTL2 2,50000 0,051903

82 IPE100 Beam No Messages DSTL2 2,50000 0,051903

83 IPE100 Beam No Messages DSTL2 2,50000 0,051903

84 IPE100 Beam No Messages DSTL2 2,50000 0,051903

85 IPE100 Beam No Messages DSTL2 2,50000 0,051903

86 IPE100 Beam No Messages DSTL2 2,50000 0,051903

87 IPE100 Beam No Messages DSTL2 2,50000 0,051903

88 IPE100 Beam No Messages DSTL2 2,50000 0,051903

89 IPE100 Beam No Messages DSTL2 2,50000 0,051903

90 IPE100 Beam No Messages DSTL2 2,50000 0,051903

91 IPE100 Beam No Messages DSTL2 2,50000 0,051903

92 IPE100 Beam No Messages DSTL2 2,50000 0,051903

93 IPE100 Beam No Messages DSTL2 2,50000 0,051903

94 IPE100 Beam No Messages DSTL2 2,50000 0,051903

96 IPE240 Beam No Messages DSTL2 2,50000 0,014703

97 IPE240 Beam No Messages DSTL2 0,00000 0,014703

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 77 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 1 of 4

Frame DesignSect DesignType Status VMajorCombo VMajorLoc VMajorRatio

m

98 FI8 Brace No Messages DSTL2 0,00000 0,001593

99 FI8 Brace No Messages DSTL2 0,00000 0,001593

100 FI8 Brace No Messages DSTL2 3,58966 0,001593

101 FI8 Brace No Messages DSTL2 3,58966 0,001593

181 L50X5 Beam No Messages DSTL1 0,00000 0,001326

182 L50X5 Beam No Messages DSTL1 0,00000 0,001330

183 L50X5 Beam No Messages DSTL1 0,00000 0,001330

184 L50X5 Beam No Messages DSTL1 0,00000 0,001330

185 L50X5 Beam No Messages DSTL1 0,00000 0,001330

186 L50X5 Beam No Messages DSTL1 0,00000 0,001330

187 L50X5 Beam No Messages DSTL1 0,00000 0,001330

188 L50X5 Beam No Messages DSTL1 0,00000 0,001330

189 L50X5 Beam No Messages DSTL1 2,69258 0,001330

190 L50X5 Beam No Messages DSTL1 2,69258 0,001330

191 L50X5 Beam No Messages DSTL1 2,69258 0,001330

192 L50X5 Beam No Messages DSTL1 2,69258 0,001330

193 L50X5 Beam No Messages DSTL1 2,69258 0,001330

194 L50X5 Beam No Messages DSTL1 2,69258 0,001330

195 L50X5 Beam No Messages DSTL1 2,69258 0,001330

196 L50X5 Beam No Messages DSTL1 0,00000 0,001330

197 L50X5 Beam No Messages DSTL1 0,00000 0,001330

198 L50X5 Beam No Messages DSTL1 0,00000 0,001330

199 L50X5 Beam No Messages DSTL1 0,00000 0,001330

200 L50X5 Beam No Messages DSTL1 0,00000 0,001330

201 L50X5 Beam No Messages DSTL1 2,68340 0,001326

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 2 of 4

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 2 of 4

Frame VsdMajDsgn VrdMajor TuMajor VMinorCombo VMinorLoc VMinorRatio VsdMinDsgn

KN KN KN-m m KN

16 7,246 580,706 6,582E-05 DSTL2 0,00000 0,000337 7,246

17 1,351 580,706 6,582E-05 DSTL2 0,00000 0,000327 1,351

18 0,900 580,706 6,582E-05 DSTL2 0,00000 0,000327 0,900

19 76,895 580,706 3,932E-04 DSTL2 0,00000 0,000405 76,895

20 77,346 580,706 3,932E-04 DSTL2 0,00000 0,000405 77,346

21 38,087 580,706 3,553E-05 DSTL2 0,00000 0,000498 38,087

22 37,636 580,706 3,553E-05 DSTL2 0,00000 0,000498 37,636

23 37,700 580,706 3,553E-05 DSTL2 0,00000 0,000504 37,700

24 38,151 580,706 3,553E-05 DSTL2 0,00000 0,000504 38,151

25 77,381 580,706 3,691E-04 DSTL2 0,00000 0,000384 77,381

26 76,930 580,706 3,691E-04 DSTL2 0,00000 0,000384 76,930

27 0,953 580,706 1,167E-04 DSTL2 0,00000 0,000306 0,953

28 1,404 580,706 1,167E-04 DSTL2 0,00000 0,000306 1,404

29 7,164 580,706 1,167E-04 DSTL2 0,00000 0,000376 7,164

30 31,876 580,706 3,553E-05 DSTL2 0,00000 0,000519 31,876

31 31,425 580,706 3,553E-05 DSTL2 0,00000 0,000519 31,425

32 31,355 580,706 3,553E-05 DSTL2 0,00000 0,000528 31,355

33 31,806 580,706 3,553E-05 DSTL2 0,00000 0,000528 31,806

34 25,531 580,706 3,553E-05 DSTL2 0,00000 0,000516 25,531

35 25,080 580,706 3,553E-05 DSTL2 0,00000 0,000516 25,080

36 19,320 580,706 3,553E-05 DSTL2 0,00000 0,000517 19,320

37 18,869 580,706 3,553E-05 DSTL2 0,00000 0,000517 18,869

38 12,975 580,706 3,553E-05 DSTL2 0,00000 0,000516 12,975

39 12,524 580,706 3,553E-05 DSTL2 0,00000 0,000516 12,524

40 6,764 580,706 3,553E-05 DSTL2 0,00000 0,000516 6,764

41 6,313 580,706 3,553E-05 DSTL2 0,00000 0,000516 6,313

42 0,419 580,706 3,553E-05 DSTL2 0,00000 0,000516 0,419

43 0,483 580,706 2,067E-05 DSTL2 0,00000 0,000516 0,483

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 78 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 2 of 4

Frame VsdMajDsgn VrdMajor TuMajor VMinorCombo VMinorLoc VMinorRatio VsdMinDsgn

KN KN KN-m m KN

44 6,243 580,706 3,553E-05 DSTL2 0,00000 0,000516 6,243

45 6,694 580,706 3,553E-05 DSTL2 0,00000 0,000516 6,694

46 12,588 580,706 3,553E-05 DSTL2 0,00000 0,000516 12,588

47 13,039 580,706 3,553E-05 DSTL2 0,00000 0,000516 13,039

48 18,799 580,706 3,553E-05 DSTL2 0,00000 0,000515 18,799

49 19,250 580,706 3,553E-05 DSTL2 0,00000 0,000515 19,250

50 25,144 580,706 3,553E-05 DSTL2 0,00000 0,000512 25,144

51 25,595 580,706 3,553E-05 DSTL2 0,00000 0,000512 25,595

102 7,164 580,706 1,216E-04 DSTL2 0,00000 0,000381 7,164

103 1,404 580,706 1,216E-04 DSTL2 0,00000 0,000305 1,404

104 0,953 580,706 1,216E-04 DSTL2 0,00000 0,000305 0,953

105 76,930 580,706 3,690E-04 DSTL2 0,00000 0,000384 76,930

106 77,381 580,706 3,690E-04 DSTL2 0,00000 0,000384 77,381

107 38,151 580,706 3,557E-05 DSTL2 0,00000 0,000504 38,151

108 37,700 580,706 3,557E-05 DSTL2 0,00000 0,000504 37,700

109 37,636 580,706 3,557E-05 DSTL2 0,00000 0,000498 37,636

110 38,087 580,706 3,557E-05 DSTL2 0,00000 0,000498 38,087

111 77,346 580,706 3,928E-04 DSTL2 0,00000 0,000405 77,346

112 76,895 580,706 3,928E-04 DSTL2 0,00000 0,000405 76,895

113 0,900 580,706 6,742E-05 DSTL2 0,00000 0,000327 0,900

114 1,351 580,706 6,742E-05 DSTL2 0,00000 0,000327 1,351

115 7,246 580,706 6,742E-05 DSTL2 0,00000 0,000339 7,246

116 31,806 580,706 3,557E-05 DSTL2 0,00000 0,000528 31,806

117 31,355 580,706 3,557E-05 DSTL2 0,00000 0,000528 31,355

118 31,425 580,706 3,557E-05 DSTL2 0,00000 0,000519 31,425

119 31,876 580,706 3,557E-05 DSTL2 0,00000 0,000519 31,876

120 25,595 580,706 3,557E-05 DSTL2 0,00000 0,000512 25,595

121 25,144 580,706 3,557E-05 DSTL2 0,00000 0,000512 25,144

122 19,250 580,706 3,557E-05 DSTL2 0,00000 0,000515 19,250

123 18,799 580,706 3,557E-05 DSTL2 0,00000 0,000515 18,799

124 13,039 580,706 3,557E-05 DSTL2 0,00000 0,000516 13,039

125 12,588 580,706 3,557E-05 DSTL2 0,00000 0,000516 12,588

126 6,694 580,706 3,557E-05 DSTL2 0,00000 0,000516 6,694

127 6,243 580,706 3,557E-05 DSTL2 0,00000 0,000516 6,243

128 0,483 580,706 2,069E-05 DSTL2 0,00000 0,000516 0,483

129 0,419 580,706 3,557E-05 DSTL2 0,00000 0,000516 0,419

130 6,313 580,706 3,557E-05 DSTL2 0,00000 0,000516 6,313

131 6,764 580,706 3,557E-05 DSTL2 0,00000 0,000516 6,764

132 12,524 580,706 3,557E-05 DSTL2 0,00000 0,000516 12,524

133 12,975 580,706 3,557E-05 DSTL2 0,00000 0,000516 12,975

134 18,869 580,706 3,557E-05 DSTL2 0,00000 0,000517 18,869

135 19,320 580,706 3,557E-05 DSTL2 0,00000 0,000517 19,320

136 25,080 580,706 3,557E-05 DSTL2 0,00000 0,000516 25,080

137 25,531 580,706 3,557E-05 DSTL2 0,00000 0,000516 25,531

11 10,092 444,560 0,0062 DSTL2 0,00000 0,000000 10,092

12 3,811 444,560 0,0021 DSTL2 0,00000 0,000000 3,811

13 10,092 444,560 0,0065 DSTL2 0,00000 0,000000 10,092

14 3,812 444,560 0,0016 DSTL2 0,00000 0,000000 3,812

15 3,812 444,560 0,0016 DSTL2 0,00000 0,000000 3,812

52 10,092 444,560 0,0065 DSTL2 0,00000 0,000000 10,092

53 3,811 444,560 0,0021 DSTL2 0,00000 0,000000 3,811

54 10,092 444,560 0,0063 DSTL2 0,00000 0,000000 10,092

56 2,228 394,041 7,909E-06 DSTL1 0,00000 0,000000 2,228

57 2,228 394,041 7,955E-06 DSTL1 0,00000 0,000000 2,228

59 13,509 580,706 1,216E-04 DSTL2 0,00000 0,000246 13,509

60 7,615 580,706 1,216E-04 DSTL2 0,00000 0,000381 7,615

61 13,456 580,706 6,582E-05 DSTL2 0,00000 0,000195 13,456

62 7,697 580,706 6,582E-05 DSTL2 0,00000 0,000337 7,697

64 7,697 580,706 6,742E-05 DSTL2 0,00000 0,000339 7,697

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 79 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 2 of 4

Frame VsdMajDsgn VrdMajor TuMajor VMinorCombo VMinorLoc VMinorRatio VsdMinDsgn

KN KN KN-m m KN

65 13,456 580,706 6,742E-05 DSTL2 0,00000 0,000196 13,456

66 7,615 580,706 1,167E-04 DSTL2 0,00000 0,000376 7,615

67 13,509 580,706 1,167E-04 DSTL2 0,00000 0,000241 13,509

69 13,938 580,706 1,216E-04 DSTL2 0,00000 0,000246 13,938

70 13,885 580,706 6,582E-05 DSTL2 0,00000 0,000195 13,885

71 13,885 580,706 6,742E-05 DSTL2 0,00000 0,000196 13,885

72 13,938 580,706 1,167E-04 DSTL2 0,00000 0,000241 13,938

75 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

76 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

77 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

78 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

79 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

80 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

81 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

82 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

83 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

84 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

85 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

86 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

87 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

88 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

89 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

90 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

91 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

92 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

93 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

94 5,309 102,283 0,0000 DSTL1 0,00000 0,000000 5,309

96 5,683 386,516 0,0000 DSTL1 0,00000 0,000000 5,683

97 5,683 386,516 0,0000 DSTL1 0,00000 0,000000 5,683

98 0,628 394,041 0,0015 DSTL2 0,00000 0,000000 0,628

99 0,628 394,041 0,0011 DSTL2 0,00000 0,000000 0,628

100 0,628 394,041 0,0011 DSTL2 0,00000 0,000000 0,628

101 0,628 394,041 0,0014 DSTL2 0,00000 0,000000 0,628

181 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

182 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

183 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

184 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

185 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

186 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

187 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

188 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

189 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

190 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

191 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

192 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

193 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

194 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

195 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

196 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

197 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

198 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

199 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

200 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

201 0,067 50,518 0,0000 DSTL1 0,00000 0,000000 0,067

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 80 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 3 of 4

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 3 of 4

Frame VrdMinor TuMinor SRLimit RLLF FramingType

KN KN-m

16 1412,992 6,582E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

17 1412,992 6,582E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

18 1412,992 6,582E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

19 1412,992 3,932E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

20 1412,992 3,932E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

21 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

22 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

23 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

24 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

25 1412,992 3,691E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

26 1412,992 3,691E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

27 1412,992 1,167E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

28 1412,992 1,167E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

29 1412,992 1,167E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

30 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

31 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

32 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

33 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

34 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

35 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

36 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

37 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

38 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

39 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

40 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

41 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

42 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

43 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

44 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

45 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

46 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

47 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

48 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

49 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

50 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

51 1412,992 3,553E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

102 1412,992 1,216E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

103 1412,992 1,216E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

104 1412,992 1,216E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

105 1412,992 3,690E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

106 1412,992 3,690E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

107 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

108 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

109 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

110 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

111 1412,992 3,928E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

112 1412,992 3,928E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

113 1412,992 6,742E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

114 1412,992 6,742E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

115 1412,992 6,742E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

116 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

117 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

118 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

119 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

120 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

121 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

122 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 81 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 3 of 4

Frame VrdMinor TuMinor SRLimit RLLF FramingType

KN KN-m

123 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

124 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

125 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

126 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

127 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

128 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

129 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

130 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

131 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

132 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

133 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

134 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

135 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

136 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

137 1412,992 3,557E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

11 444,560 0,0062 0,950000 1,000000 Ductility Class High Moment Resisting Frame

12 444,560 0,0021 0,950000 1,000000 Ductility Class High Moment Resisting Frame

13 444,560 0,0065 0,950000 1,000000 Ductility Class High Moment Resisting Frame

14 444,560 0,0016 0,950000 1,000000 Ductility Class High Moment Resisting Frame

15 444,560 0,0016 0,950000 1,000000 Ductility Class High Moment Resisting Frame

52 444,560 0,0065 0,950000 1,000000 Ductility Class High Moment Resisting Frame

53 444,560 0,0021 0,950000 1,000000 Ductility Class High Moment Resisting Frame

54 444,560 0,0063 0,950000 1,000000 Ductility Class High Moment Resisting Frame

56 394,041 7,909E-06 0,950000 1,000000 Ductility Class High Moment Resisting Frame

57 394,041 7,955E-06 0,950000 1,000000 Ductility Class High Moment Resisting Frame

59 1412,992 1,216E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

60 1412,992 1,216E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

61 1412,992 6,582E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

62 1412,992 6,582E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

64 1412,992 6,742E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

65 1412,992 6,742E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

66 1412,992 1,167E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

67 1412,992 1,167E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

69 1412,992 1,216E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

70 1412,992 6,582E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

71 1412,992 6,742E-05 0,950000 1,000000 Ductility Class High Moment Resisting Frame

72 1412,992 1,167E-04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

75 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

76 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

77 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

78 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

79 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

80 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

81 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

82 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

83 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

84 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

85 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

86 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

87 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

88 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

89 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

90 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

91 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

92 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

93 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

94 134,730 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

96 513,975 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

97 513,975 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 82 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 3 of 4

Frame VrdMinor TuMinor SRLimit RLLF FramingType

KN KN-m

98 394,041 0,0015 0,950000 1,000000 Ductility Class High Moment Resisting Frame

99 394,041 0,0011 0,950000 1,000000 Ductility Class High Moment Resisting Frame

100 394,041 0,0011 0,950000 1,000000 Ductility Class High Moment Resisting Frame

101 394,041 0,0014 0,950000 1,000000 Ductility Class High Moment Resisting Frame

181 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

182 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

183 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

184 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

185 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

186 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

187 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

188 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

189 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

190 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

191 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

192 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

193 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

194 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

195 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

196 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

197 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

198 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

199 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

200 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

201 50,518 0,0000 0,950000 1,000000 Ductility Class High Moment Resisting Frame

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 4 of 4

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 4 of 4

Frame ErrMsg WarnMsg

16 No Messages No Messages

17 No Messages No Messages

18 No Messages No Messages

19 No Messages No Messages

20 No Messages No Messages

21 No Messages No Messages

22 No Messages No Messages

23 No Messages No Messages

24 No Messages No Messages

25 No Messages No Messages

26 No Messages No Messages

27 No Messages No Messages

28 No Messages No Messages

29 No Messages No Messages

30 No Messages No Messages

31 No Messages No Messages

32 No Messages No Messages

33 No Messages No Messages

34 No Messages No Messages

35 No Messages No Messages

36 No Messages No Messages

37 No Messages No Messages

38 No Messages No Messages

39 No Messages No Messages

40 No Messages No Messages

41 No Messages No Messages

42 No Messages No Messages

43 No Messages No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 83 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 4 of 4

Frame ErrMsg WarnMsg

44 No Messages No Messages

45 No Messages No Messages

46 No Messages No Messages

47 No Messages No Messages

48 No Messages No Messages

49 No Messages No Messages

50 No Messages No Messages

51 No Messages No Messages

102 No Messages No Messages

103 No Messages No Messages

104 No Messages No Messages

105 No Messages No Messages

106 No Messages No Messages

107 No Messages No Messages

108 No Messages No Messages

109 No Messages No Messages

110 No Messages No Messages

111 No Messages No Messages

112 No Messages No Messages

113 No Messages No Messages

114 No Messages No Messages

115 No Messages No Messages

116 No Messages No Messages

117 No Messages No Messages

118 No Messages No Messages

119 No Messages No Messages

120 No Messages No Messages

121 No Messages No Messages

122 No Messages No Messages

123 No Messages No Messages

124 No Messages No Messages

125 No Messages No Messages

126 No Messages No Messages

127 No Messages No Messages

128 No Messages No Messages

129 No Messages No Messages

130 No Messages No Messages

131 No Messages No Messages

132 No Messages No Messages

133 No Messages No Messages

134 No Messages No Messages

135 No Messages No Messages

136 No Messages No Messages

137 No Messages No Messages

11 No Messages No Messages

12 No Messages No Messages

13 No Messages No Messages

14 No Messages No Messages

15 No Messages No Messages

52 No Messages No Messages

53 No Messages No Messages

54 No Messages No Messages

56 No Messages No Messages

57 No Messages No Messages

59 No Messages No Messages

60 No Messages No Messages

61 No Messages No Messages

62 No Messages No Messages

64 No Messages No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 84 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 4 of 4

Frame ErrMsg WarnMsg

65 No Messages No Messages

66 No Messages No Messages

67 No Messages No Messages

69 No Messages No Messages

70 No Messages No Messages

71 No Messages No Messages

72 No Messages No Messages

75 No Messages No Messages

76 No Messages No Messages

77 No Messages No Messages

78 No Messages No Messages

79 No Messages No Messages

80 No Messages No Messages

81 No Messages No Messages

82 No Messages No Messages

83 No Messages No Messages

84 No Messages No Messages

85 No Messages No Messages

86 No Messages No Messages

87 No Messages No Messages

88 No Messages No Messages

89 No Messages No Messages

90 No Messages No Messages

91 No Messages No Messages

92 No Messages No Messages

93 No Messages No Messages

94 No Messages No Messages

96 No Messages No Messages

97 No Messages No Messages

98 No Messages No Messages

99 No Messages No Messages

100 No Messages No Messages

101 No Messages No Messages

181 No Messages No Messages

182 No Messages No Messages

183 No Messages No Messages

184 No Messages No Messages

185 No Messages No Messages

186 No Messages No Messages

187 No Messages No Messages

188 No Messages No Messages

189 No Messages No Messages

190 No Messages No Messages

191 No Messages No Messages

192 No Messages No Messages

193 No Messages No Messages

194 No Messages No Messages

195 No Messages No Messages

196 No Messages No Messages

197 No Messages No Messages

198 No Messages No Messages

199 No Messages No Messages

200 No Messages No Messages

201 No Messages No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 85 a 174

Table: Steel Design 7 - Beam Shear Forces - Eurocode 3-2005

Table: Steel Design 7 - Beam Shear Forces - Eurocode 3-2005

Frame DesignSect ComboLeft VMajorLeft ComboRight VMajorRight

KN KN

16 HE260A DSTL2 7,246 DSTL2 6,795

17 HE260A DSTL2 1,351 DSTL2 0,900

18 HE260A DSTL2 0,900 DSTL2 0,449

19 HE260A DSTL2 76,444 DSTL2 76,895

20 HE260A DSTL2 76,895 DSTL2 77,346

21 HE260A DSTL2 38,087 DSTL2 37,636

22 HE260A DSTL2 37,636 DSTL2 37,185

23 HE260A DSTL2 37,249 DSTL2 37,700

24 HE260A DSTL2 37,700 DSTL2 38,151

25 HE260A DSTL2 77,381 DSTL2 76,930

26 HE260A DSTL2 76,930 DSTL2 76,479

27 HE260A DSTL2 0,502 DSTL2 0,953

28 HE260A DSTL2 0,953 DSTL2 1,404

29 HE260A DSTL2 6,713 DSTL2 7,164

30 HE260A DSTL2 31,876 DSTL2 31,425

31 HE260A DSTL2 31,425 DSTL2 30,974

32 HE260A DSTL2 30,904 DSTL2 31,355

33 HE260A DSTL2 31,355 DSTL2 31,806

34 HE260A DSTL2 25,531 DSTL2 25,080

35 HE260A DSTL2 25,080 DSTL2 24,629

36 HE260A DSTL2 19,320 DSTL2 18,869

37 HE260A DSTL2 18,869 DSTL2 18,418

38 HE260A DSTL2 12,975 DSTL2 12,524

39 HE260A DSTL2 12,524 DSTL2 12,073

40 HE260A DSTL2 6,764 DSTL2 6,313

41 HE260A DSTL2 6,313 DSTL2 5,862

42 HE260A DSTL2 0,419 DSTL1 0,032

43 HE260A DSTL1 0,032 DSTL1 0,483

44 HE260A DSTL2 5,792 DSTL2 6,243

45 HE260A DSTL2 6,243 DSTL2 6,694

46 HE260A DSTL2 12,137 DSTL2 12,588

47 HE260A DSTL2 12,588 DSTL2 13,039

48 HE260A DSTL2 18,348 DSTL2 18,799

49 HE260A DSTL2 18,799 DSTL2 19,250

50 HE260A DSTL2 24,693 DSTL2 25,144

51 HE260A DSTL2 25,144 DSTL2 25,595

102 HE260A DSTL2 7,164 DSTL2 6,713

103 HE260A DSTL2 1,404 DSTL2 0,953

104 HE260A DSTL2 0,953 DSTL2 0,502

105 HE260A DSTL2 76,479 DSTL2 76,930

106 HE260A DSTL2 76,930 DSTL2 77,381

107 HE260A DSTL2 38,151 DSTL2 37,700

108 HE260A DSTL2 37,700 DSTL2 37,249

109 HE260A DSTL2 37,185 DSTL2 37,636

110 HE260A DSTL2 37,636 DSTL2 38,087

111 HE260A DSTL2 77,346 DSTL2 76,895

112 HE260A DSTL2 76,895 DSTL2 76,444

113 HE260A DSTL2 0,449 DSTL2 0,900

114 HE260A DSTL2 0,900 DSTL2 1,351

115 HE260A DSTL2 6,795 DSTL2 7,246

116 HE260A DSTL2 31,806 DSTL2 31,355

117 HE260A DSTL2 31,355 DSTL2 30,904

118 HE260A DSTL2 30,974 DSTL2 31,425

119 HE260A DSTL2 31,425 DSTL2 31,876

120 HE260A DSTL2 25,595 DSTL2 25,144

121 HE260A DSTL2 25,144 DSTL2 24,693

122 HE260A DSTL2 19,250 DSTL2 18,799

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 86 a 174

Table: Steel Design 7 - Beam Shear Forces - Eurocode 3-2005

Frame DesignSect ComboLeft VMajorLeft ComboRight VMajorRight

KN KN

123 HE260A DSTL2 18,799 DSTL2 18,348

124 HE260A DSTL2 13,039 DSTL2 12,588

125 HE260A DSTL2 12,588 DSTL2 12,137

126 HE260A DSTL2 6,694 DSTL2 6,243

127 HE260A DSTL2 6,243 DSTL2 5,792

128 HE260A DSTL1 0,483 DSTL1 0,032

129 HE260A DSTL1 0,032 DSTL2 0,419

130 HE260A DSTL2 5,862 DSTL2 6,313

131 HE260A DSTL2 6,313 DSTL2 6,764

132 HE260A DSTL2 12,073 DSTL2 12,524

133 HE260A DSTL2 12,524 DSTL2 12,975

134 HE260A DSTL2 18,418 DSTL2 18,869

135 HE260A DSTL2 18,869 DSTL2 19,320

136 HE260A DSTL2 24,629 DSTL2 25,080

137 HE260A DSTL2 25,080 DSTL2 25,531

56 FI8 DSTL1 2,228 DSTL2 2,228

57 FI8 DSTL2 2,228 DSTL1 2,228

59 HE260A DSTL2 13,509 DSTL2 13,058

60 HE260A DSTL2 7,615 DSTL2 7,164

61 HE260A DSTL2 13,456 DSTL2 13,005

62 HE260A DSTL2 7,697 DSTL2 7,246

64 HE260A DSTL2 7,246 DSTL2 7,697

65 HE260A DSTL2 13,005 DSTL2 13,456

66 HE260A DSTL2 7,164 DSTL2 7,615

67 HE260A DSTL2 13,058 DSTL2 13,509

69 HE260A DSTL2 13,509 DSTL2 13,938

70 HE260A DSTL2 13,456 DSTL2 13,885

71 HE260A DSTL2 13,456 DSTL2 13,885

72 HE260A DSTL2 13,509 DSTL2 13,938

75 IPE100 DSTL2 5,309 DSTL2 5,309

76 IPE100 DSTL2 5,309 DSTL2 5,309

77 IPE100 DSTL2 5,309 DSTL2 5,309

78 IPE100 DSTL2 5,309 DSTL2 5,309

79 IPE100 DSTL2 5,309 DSTL2 5,309

80 IPE100 DSTL2 5,309 DSTL2 5,309

81 IPE100 DSTL2 5,309 DSTL2 5,309

82 IPE100 DSTL2 5,309 DSTL2 5,309

83 IPE100 DSTL2 5,309 DSTL2 5,309

84 IPE100 DSTL2 5,309 DSTL2 5,309

85 IPE100 DSTL2 5,309 DSTL2 5,309

86 IPE100 DSTL2 5,309 DSTL2 5,309

87 IPE100 DSTL2 5,309 DSTL2 5,309

88 IPE100 DSTL2 5,309 DSTL2 5,309

89 IPE100 DSTL2 5,309 DSTL2 5,309

90 IPE100 DSTL2 5,309 DSTL2 5,309

91 IPE100 DSTL2 5,309 DSTL2 5,309

92 IPE100 DSTL2 5,309 DSTL2 5,309

93 IPE100 DSTL2 5,309 DSTL2 5,309

94 IPE100 DSTL2 5,309 DSTL2 5,309

96 IPE240 DSTL2 5,683 DSTL2 5,683

97 IPE240 DSTL2 5,683 DSTL2 5,683

181 L50X5 DSTL1 0,067 DSTL1 0,067

182 L50X5 DSTL1 0,067 DSTL1 0,067

183 L50X5 DSTL1 0,067 DSTL1 0,067

184 L50X5 DSTL1 0,067 DSTL1 0,067

185 L50X5 DSTL1 0,067 DSTL1 0,067

186 L50X5 DSTL1 0,067 DSTL1 0,067

187 L50X5 DSTL1 0,067 DSTL1 0,067

188 L50X5 DSTL1 0,067 DSTL1 0,067

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 87 a 174

Table: Steel Design 7 - Beam Shear Forces - Eurocode 3-2005

Frame DesignSect ComboLeft VMajorLeft ComboRight VMajorRight

KN KN

189 L50X5 DSTL1 0,067 DSTL1 0,067

190 L50X5 DSTL1 0,067 DSTL1 0,067

191 L50X5 DSTL1 0,067 DSTL1 0,067

192 L50X5 DSTL1 0,067 DSTL1 0,067

193 L50X5 DSTL1 0,067 DSTL1 0,067

194 L50X5 DSTL1 0,067 DSTL1 0,067

195 L50X5 DSTL1 0,067 DSTL1 0,067

196 L50X5 DSTL1 0,067 DSTL1 0,067

197 L50X5 DSTL1 0,067 DSTL1 0,067

198 L50X5 DSTL1 0,067 DSTL1 0,067

199 L50X5 DSTL1 0,067 DSTL1 0,067

200 L50X5 DSTL1 0,067 DSTL1 0,067

201 L50X5 DSTL1 0,067 DSTL1 0,067

Table: Steel Design 8 - Brace Max Axial Load - Eurocode 3-2005

Table: Steel Design 8 - Brace Max Axial Load - Eurocode 3-2005

Frame DesignSect ComboComp PMaxComp ComboTens PMaxTens

KN KN

11 F12 DSTL2 -144,207 DSTL2 -143,883

12 F12 DSTL2 83,583 DSTL2 83,907

13 F12 DSTL2 -144,167 DSTL2 -143,844

14 F12 DSTL2 83,532 DSTL2 83,855

15 F12 DSTL2 83,532 DSTL2 83,855

52 F12 DSTL2 -144,167 DSTL2 -143,844

53 F12 DSTL2 83,583 DSTL2 83,907

54 F12 DSTL2 -144,207 DSTL2 -143,883

98 FI8 DSTL2 210,612 DSTL2 210,326

99 FI8 DSTL2 210,568 DSTL2 210,281

100 FI8 DSTL2 210,281 DSTL2 210,567

101 FI8 DSTL2 210,326 DSTL2 210,612

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 88 a 174

09.02. Verifica Implacato nella Fase 2 - Esercizio

Si riportano di seguito le verifiche agli stati limite ultimi e di esercizio della sezione dell’impalcato in corrispondenza delle

sezioni maggiormente sollecitate, individuabili dai diagrammi di seguito riportati e relativi ai casi di carico elementari

analizzati e alla combinazione fra gli stessi casi. Nella fattispecie si riportano di seguito i risultati della combinazione di

calcolo allo stato limite ultimo nella fase di esercizio del ponte, della stessa verranno riportate le tabelle con le forze nelle

aste e le relative verifiche statiche. La struttura nella presente fase ha la soletta di impalcato collaborante con

l’intelaiatura a differenza della fase iniziale dove questa era solamente un carico portato, fase di getto e maturazione.

Figura 18 – Deformata del ponte [cm] – SLE

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 89 a 174

Combinazione di Carico SLU - A1 STR [1.35 (g1 + g2) + 1.50 (Qik + qik + q5)] – Fase 1

Figura 19 - Diagramma del momento flettente [KN m] – SLU

Figura 20 - Diagramma del taglio [KN] – SLU

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 90 a 174

Figura 21 - Diagramma azione normale [KN ] – SLU

Figura 22 – Progetto delle sezioni – Diagramma rapporti di resistenza

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 91 a 174

Output Forze e Verifica aste

combinazione di Carico SLU - A1 STR [1.35 (g1 + g2) + 1.50 (Qik + qik+q5)] – Fase 1

Table: Element Forces - Frames, Part 1 of 2

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

11 0,00000 DSTL2 Combination -291,489 12,976 0,283 -0,0124 0,0590

11 0,51478 DSTL2 Combination -291,328 13,065 0,283 -0,0124 -0,0868

11 1,02956 DSTL2 Combination -291,166 13,155 0,283 -0,0124 -0,2325

12 0,00000 DSTL2 Combination 167,110 -5,414 0,300 -0,0366 0,0584

12 0,51478 DSTL2 Combination 167,271 -5,324 0,300 -0,0366 -0,0958

12 1,02956 DSTL2 Combination 167,433 -5,234 0,300 -0,0366 -0,2501

13 0,00000 DSTL2 Combination -307,347 11,579 5,123 -0,0153 1,5242

13 0,53348 DSTL2 Combination -307,185 11,682 5,123 -0,0153 -1,2087

13 1,06696 DSTL2 Combination -307,024 11,785 5,123 -0,0153 -3,9415

14 0,00000 DSTL2 Combination 177,004 -4,867 2,004 0,1435 0,2271

14 0,53348 DSTL2 Combination 177,166 -4,764 2,004 0,1435 -0,8420

14 1,06696 DSTL2 Combination 177,328 -4,661 2,004 0,1435 -1,9112

15 0,00000 DSTL2 Combination 181,885 -5,721 -0,543 0,0368 -0,0397

15 0,51478 DSTL2 Combination 182,046 -5,632 -0,543 0,0368 0,2400

15 1,02956 DSTL2 Combination 182,208 -5,542 -0,543 0,0368 0,5196

16 0,00000 DSTL2 Combination 36,494 -6,529 0,537 0,0030 0,1659

16 0,50000 DSTL2 Combination 36,494 -6,023 0,537 0,0030 -0,1024

17 0,00000 DSTL2 Combination 39,116 -1,847 0,486 0,0077 0,4958

17 0,50000 DSTL2 Combination 39,116 -1,341 0,486 0,0077 0,2528

18 0,00000 DSTL2 Combination 40,629 2,836 2,709 -0,0138 0,1070

18 0,50000 DSTL2 Combination 40,629 3,342 2,709 -0,0138 -1,2475

19 0,00000 DSTL2 Combination 8,765 110,016 1,348 -0,0038 -0,7839

19 0,50000 DSTL2 Combination 8,765 110,522 1,348 -0,0038 -1,4577

20 0,00000 DSTL2 Combination 22,214 114,645 -0,048 -0,0144 0,6790

20 0,50000 DSTL2 Combination 22,214 115,151 -0,048 -0,0144 0,7030

21 0,00000 DSTL2 Combination -44,165 -58,134 2,297 0,0028 0,9330

21 0,50000 DSTL2 Combination -44,165 -57,628 2,297 0,0028 -0,2153

22 0,00000 DSTL2 Combination -50,485 -53,587 -1,480 0,0131 -1,3838

22 0,50000 DSTL2 Combination -50,485 -53,081 -1,480 0,0131 -0,6436

23 0,00000 DSTL2 Combination -230,441 53,345 -2,216 -0,0068 -0,7433

23 0,50000 DSTL2 Combination -230,441 53,850 -2,216 -0,0068 0,3648

24 0,00000 DSTL2 Combination -239,860 57,917 -5,835 0,0061 -0,2839

24 0,50000 DSTL2 Combination -239,860 58,422 -5,835 0,0061 2,6335

25 0,00000 DSTL2 Combination -184,163 -123,060 -3,572 0,0262 0,6733

25 0,50000 DSTL2 Combination -184,163 -122,555 -3,572 0,0262 2,4593

26 0,00000 DSTL2 Combination -212,484 -118,488 -4,946 -9,794E-04 -1,3583

26 0,50000 DSTL2 Combination -212,484 -117,982 -4,946 -9,794E-04 1,1146

27 0,00000 DSTL2 Combination -190,647 -0,523 -6,227 0,0247 -1,0391

27 0,50000 DSTL2 Combination -190,647 -0,017 -6,227 0,0247 2,0743

28 0,00000 DSTL2 Combination -208,206 4,024 -4,224 -0,0181 0,3525

28 0,50000 DSTL2 Combination -208,206 4,530 -4,224 -0,0181 2,4646

29 0,00000 DSTL2 Combination -226,680 8,551 -4,239 -0,0147 0,0533

29 0,50000 DSTL2 Combination -226,680 9,056 -4,239 -0,0147 2,1727

30 0,00000 DSTL2 Combination -55,923 -48,936 -1,417 0,0192 -0,7870

30 0,50000 DSTL2 Combination -55,923 -48,430 -1,417 0,0192 -0,0784

31 0,00000 DSTL2 Combination -60,079 -44,350 -1,227 0,0199 -0,4048

31 0,50000 DSTL2 Combination -60,079 -43,845 -1,227 0,0199 0,2087

32 0,00000 DSTL2 Combination -208,694 44,058 -2,462 -0,0148 -0,0618

32 0,50000 DSTL2 Combination -208,694 44,564 -2,462 -0,0148 1,1692

33 0,00000 DSTL2 Combination -220,171 48,666 -2,298 -0,0132 -0,2702

33 0,50000 DSTL2 Combination -220,171 49,172 -2,298 -0,0132 0,8787

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 92 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

34 0,00000 DSTL2 Combination -64,709 -39,685 -0,939 0,0229 -0,3637

34 0,50000 DSTL2 Combination -64,709 -39,179 -0,939 0,0229 0,1060

35 0,00000 DSTL2 Combination -69,830 -35,055 -1,410 0,0114 -0,4935

35 0,50000 DSTL2 Combination -69,830 -34,550 -1,410 0,0114 0,2113

36 0,00000 DSTL2 Combination -75,300 -30,414 -1,162 0,0230 -0,4072

36 0,50000 DSTL2 Combination -75,300 -29,908 -1,162 0,0230 0,1738

37 0,00000 DSTL2 Combination -81,089 -25,754 -1,576 0,0031 -0,4803

37 0,50000 DSTL2 Combination -81,089 -25,248 -1,576 0,0031 0,3079

38 0,00000 DSTL2 Combination -87,216 -21,132 -1,314 0,0218 -0,3879

38 0,50000 DSTL2 Combination -87,216 -20,626 -1,314 0,0218 0,2692

39 0,00000 DSTL2 Combination -93,682 -16,450 -1,735 -0,0038 -0,4645

39 0,50000 DSTL2 Combination -93,682 -15,945 -1,735 -0,0038 0,4028

40 0,00000 DSTL2 Combination -100,489 -11,841 -1,475 0,0196 -0,3702

40 0,50000 DSTL2 Combination -100,489 -11,335 -1,475 0,0196 0,3673

41 0,00000 DSTL2 Combination -107,632 -7,146 -1,895 -0,0095 -0,4430

41 0,50000 DSTL2 Combination -107,632 -6,640 -1,895 -0,0095 0,5043

42 0,00000 DSTL2 Combination -115,116 -2,542 -1,635 0,0163 -0,3455

42 0,50000 DSTL2 Combination -115,116 -2,036 -1,635 0,0163 0,4717

43 0,00000 DSTL2 Combination -122,938 2,159 -2,054 -0,0138 -0,4154

43 0,50000 DSTL2 Combination -122,938 2,665 -2,054 -0,0138 0,6118

44 0,00000 DSTL2 Combination -131,099 6,765 -1,794 0,0120 -0,3150

44 0,50000 DSTL2 Combination -131,099 7,270 -1,794 0,0120 0,5821

45 0,00000 DSTL2 Combination -139,598 11,463 -2,214 -0,0169 -0,3819

45 0,50000 DSTL2 Combination -139,598 11,969 -2,214 -0,0169 0,7252

46 0,00000 DSTL2 Combination -148,437 16,078 -1,954 0,0066 -0,2786

46 0,50000 DSTL2 Combination -148,437 16,584 -1,954 0,0066 0,6986

47 0,00000 DSTL2 Combination -157,614 20,767 -2,375 -0,0187 -0,3420

47 0,50000 DSTL2 Combination -157,614 21,273 -2,375 -0,0187 0,8453

48 0,00000 DSTL2 Combination -167,133 25,399 -2,113 1,355E-04 -0,2355

48 0,50000 DSTL2 Combination -167,133 25,905 -2,113 1,355E-04 0,8208

49 0,00000 DSTL2 Combination -176,986 30,071 -2,527 -0,0192 -0,2993

49 0,50000 DSTL2 Combination -176,986 30,576 -2,527 -0,0192 0,9644

50 0,00000 DSTL2 Combination -187,162 34,727 -2,279 -0,0073 -0,1939

50 0,50000 DSTL2 Combination -187,162 35,232 -2,279 -0,0073 0,9456

51 0,00000 DSTL2 Combination -197,684 39,373 -2,747 -0,0182 -0,2301

51 0,50000 DSTL2 Combination -197,684 39,878 -2,747 -0,0182 1,1435

52 0,00000 DSTL2 Combination -302,693 13,930 -0,464 0,0134 -0,2134

52 0,51478 DSTL2 Combination -302,531 14,020 -0,464 0,0134 0,0256

52 1,02956 DSTL2 Combination -302,370 14,109 -0,464 0,0134 0,2645

53 0,00000 DSTL2 Combination 160,318 -4,436 -2,123 -0,1477 -0,2722

53 0,53348 DSTL2 Combination 160,480 -4,333 -2,123 -0,1477 0,8603

53 1,06696 DSTL2 Combination 160,641 -4,230 -2,123 -0,1477 1,9927

54 0,00000 DSTL2 Combination -294,731 10,657 -4,785 0,0400 -1,4452

54 0,53348 DSTL2 Combination -294,569 10,760 -4,785 0,0400 1,1078

54 1,06696 DSTL2 Combination -294,408 10,863 -4,785 0,0400 3,6607

56 0,00000 DSTL2 Combination 655,331 -2,510 -9,825E-03 0,0299 -0,0607

56 0,50000 DSTL2 Combination 655,331 -2,330 -9,825E-03 0,0299 -0,0558

56 1,00000 DSTL2 Combination 655,331 -2,151 -9,825E-03 0,0299 -0,0509

56 1,50000 DSTL2 Combination 655,331 -1,971 -9,825E-03 0,0299 -0,0460

56 2,00000 DSTL2 Combination 655,331 -1,792 -9,825E-03 0,0299 -0,0411

56 2,50000 DSTL2 Combination 655,331 -1,612 -9,825E-03 0,0299 -0,0361

56 3,00000 DSTL2 Combination 655,331 -1,433 -9,825E-03 0,0299 -0,0312

56 3,50000 DSTL2 Combination 655,331 -1,253 -9,825E-03 0,0299 -0,0263

56 4,00000 DSTL2 Combination 655,331 -1,074 -9,825E-03 0,0299 -0,0214

56 4,50000 DSTL2 Combination 655,331 -0,894 -9,825E-03 0,0299 -0,0165

56 5,00000 DSTL2 Combination 655,331 -0,715 -9,825E-03 0,0299 -0,0116

56 5,50000 DSTL2 Combination 655,331 -0,535 -9,825E-03 0,0299 -0,0067

56 6,00000 DSTL2 Combination 655,331 -0,355 -9,825E-03 0,0299 -0,0018

56 6,50000 DSTL2 Combination 655,331 -0,176 -9,825E-03 0,0299 0,0032

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 93 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

56 7,00000 DSTL2 Combination 655,331 3,652E-03 -9,825E-03 0,0299 0,0081

56 7,50000 DSTL2 Combination 655,331 0,183 -9,825E-03 0,0299 0,0130

56 8,00000 DSTL2 Combination 655,331 0,363 -9,825E-03 0,0299 0,0179

56 8,50000 DSTL2 Combination 655,331 0,542 -9,825E-03 0,0299 0,0228

56 9,00000 DSTL2 Combination 655,331 0,722 -9,825E-03 0,0299 0,0277

56 9,50000 DSTL2 Combination 655,331 0,901 -9,825E-03 0,0299 0,0326

56 10,00000 DSTL2 Combination 655,331 1,081 -9,825E-03 0,0299 0,0375

56 10,50000 DSTL2 Combination 655,331 1,260 -9,825E-03 0,0299 0,0425

56 11,00000 DSTL2 Combination 655,331 1,440 -9,825E-03 0,0299 0,0474

56 11,50000 DSTL2 Combination 655,331 1,620 -9,825E-03 0,0299 0,0523

56 12,00000 DSTL2 Combination 655,331 1,799 -9,825E-03 0,0299 0,0572

56 12,50000 DSTL2 Combination 655,331 1,979 -9,825E-03 0,0299 0,0621

56 13,00000 DSTL2 Combination 655,331 2,158 -9,825E-03 0,0299 0,0670

56 13,50000 DSTL2 Combination 655,331 2,338 -9,825E-03 0,0299 0,0719

56 14,00000 DSTL2 Combination 655,331 2,517 -9,825E-03 0,0299 0,0768

57 0,00000 DSTL2 Combination 664,256 -2,516 -0,012 0,0295 -0,1619

57 0,50000 DSTL2 Combination 664,256 -2,337 -0,012 0,0295 -0,1562

57 1,00000 DSTL2 Combination 664,256 -2,157 -0,012 0,0295 -0,1504

57 1,50000 DSTL2 Combination 664,256 -1,978 -0,012 0,0295 -0,1447

57 2,00000 DSTL2 Combination 664,256 -1,798 -0,012 0,0295 -0,1389

57 2,50000 DSTL2 Combination 664,256 -1,619 -0,012 0,0295 -0,1331

57 3,00000 DSTL2 Combination 664,256 -1,439 -0,012 0,0295 -0,1274

57 3,50000 DSTL2 Combination 664,256 -1,259 -0,012 0,0295 -0,1216

57 4,00000 DSTL2 Combination 664,256 -1,080 -0,012 0,0295 -0,1159

57 4,50000 DSTL2 Combination 664,256 -0,900 -0,012 0,0295 -0,1101

57 5,00000 DSTL2 Combination 664,256 -0,721 -0,012 0,0295 -0,1043

57 5,50000 DSTL2 Combination 664,256 -0,541 -0,012 0,0295 -0,0986

57 6,00000 DSTL2 Combination 664,256 -0,362 -0,012 0,0295 -0,0928

57 6,50000 DSTL2 Combination 664,256 -0,182 -0,012 0,0295 -0,0871

57 7,00000 DSTL2 Combination 664,256 -2,628E-03 -0,012 0,0295 -0,0813

57 7,50000 DSTL2 Combination 664,256 0,177 -0,012 0,0295 -0,0756

57 8,00000 DSTL2 Combination 664,256 0,356 -0,012 0,0295 -0,0698

57 8,50000 DSTL2 Combination 664,256 0,536 -0,012 0,0295 -0,0640

57 9,00000 DSTL2 Combination 664,256 0,716 -0,012 0,0295 -0,0583

57 9,50000 DSTL2 Combination 664,256 0,895 -0,012 0,0295 -0,0525

57 10,00000 DSTL2 Combination 664,256 1,075 -0,012 0,0295 -0,0468

57 10,50000 DSTL2 Combination 664,256 1,254 -0,012 0,0295 -0,0410

57 11,00000 DSTL2 Combination 664,256 1,434 -0,012 0,0295 -0,0352

57 11,50000 DSTL2 Combination 664,256 1,613 -0,012 0,0295 -0,0295

57 12,00000 DSTL2 Combination 664,256 1,793 -0,012 0,0295 -0,0237

57 12,50000 DSTL2 Combination 664,256 1,972 -0,012 0,0295 -0,0180

57 13,00000 DSTL2 Combination 664,256 2,152 -0,012 0,0295 -0,0122

57 13,50000 DSTL2 Combination 664,256 2,332 -0,012 0,0295 -0,0064

57 14,00000 DSTL2 Combination 664,256 2,511 -0,012 0,0295 -6,881E-04

59 0,00000 DSTL2 Combination 1,747 -16,031 1,841 0,0035 0,1424

59 0,50000 DSTL2 Combination 1,747 -15,525 -0,259 0,0035 -0,2532

60 0,00000 DSTL2 Combination -2,281 -11,360 2,023 -0,0023 0,2823

60 0,50000 DSTL2 Combination -2,281 -10,854 -0,077 -0,0023 -0,2043

61 0,00000 DSTL2 Combination 28,231 -15,851 1,111 0,0085 0,2264

61 0,50000 DSTL2 Combination 28,231 -15,345 1,111 0,0085 -0,3290

62 0,00000 DSTL2 Combination 32,555 -11,176 0,945 0,0142 0,1078

62 0,50000 DSTL2 Combination 32,555 -10,670 0,945 0,0142 -0,3648

64 0,00000 DSTL2 Combination 276,569 8,242 -3,373 -0,0137 0,1157

64 0,50000 DSTL2 Combination 276,569 8,748 -5,473 -0,0137 2,3269

65 0,00000 DSTL2 Combination 295,964 12,986 -2,709 -0,0210 -0,3535

65 0,50000 DSTL2 Combination 295,964 13,491 -4,809 -0,0210 1,5259

66 0,00000 DSTL2 Combination -246,213 13,094 -4,901 -0,0302 -0,1047

66 0,50000 DSTL2 Combination -246,213 13,599 -4,901 -0,0302 2,3455

67 0,00000 DSTL2 Combination -266,695 17,697 -5,956 -0,0259 0,5453

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 94 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

67 0,50000 DSTL2 Combination -266,695 18,202 -5,956 -0,0259 3,5234

69 0,00000 DSTL2 Combination 5,688 19,510 0,692 -0,0028 0,2641

69 0,47500 DSTL2 Combination 5,688 19,990 2,687 -0,0028 -0,5384

70 0,00000 DSTL2 Combination 23,780 19,332 1,195 0,0143 0,2136

70 0,47500 DSTL2 Combination 23,780 19,813 1,195 0,0143 -0,3543

71 0,00000 DSTL2 Combination 312,932 17,034 -5,121 -0,0157 -0,7447

71 0,47500 DSTL2 Combination 312,932 17,514 -7,116 -0,0157 2,1618

72 0,00000 DSTL2 Combination -290,093 21,625 -2,163 -0,0327 0,9023

72 0,47500 DSTL2 Combination -290,093 22,106 -2,163 -0,0327 1,9297

75 0,00000 DSTL2 Combination -0,498 -0,119 -6,914E-04 -1,095E-04 -7,889E-04

75 0,44400 DSTL2 Combination -0,498 -0,071 -6,914E-04 -1,095E-04 -4,819E-04

75 0,88800 DSTL2 Combination -0,498 -0,024 -6,914E-04 -1,095E-04 -1,749E-04

75 1,33200 DSTL2 Combination -0,498 0,024 -6,914E-04 -1,095E-04 1,320E-04

75 1,77600 DSTL2 Combination -0,498 0,071 -6,914E-04 -1,095E-04 4,390E-04

75 2,22000 DSTL2 Combination -0,498 0,119 -6,914E-04 -1,095E-04 7,459E-04

76 0,00000 DSTL2 Combination -0,739 -0,119 -6,376E-04 -1,133E-04 -5,984E-04

76 0,44400 DSTL2 Combination -0,739 -0,072 -6,376E-04 -1,133E-04 -3,153E-04

76 0,88800 DSTL2 Combination -0,739 -0,024 -6,376E-04 -1,133E-04 -3,222E-05

76 1,33200 DSTL2 Combination -0,739 0,023 -6,376E-04 -1,133E-04 2,509E-04

76 1,77600 DSTL2 Combination -0,739 0,071 -6,376E-04 -1,133E-04 5,340E-04

76 2,22000 DSTL2 Combination -0,739 0,119 -6,376E-04 -1,133E-04 8,171E-04

77 0,00000 DSTL2 Combination 3,237 -0,129 -1,411E-03 -1,203E-04 -0,0017

77 0,44400 DSTL2 Combination 3,237 -0,081 -1,411E-03 -1,203E-04 -0,0011

77 0,88800 DSTL2 Combination 3,237 -0,034 -1,411E-03 -1,203E-04 -4,356E-04

77 1,33200 DSTL2 Combination 3,237 0,014 -1,411E-03 -1,203E-04 1,910E-04

77 1,77600 DSTL2 Combination 3,237 0,061 -1,411E-03 -1,203E-04 8,176E-04

77 2,22000 DSTL2 Combination 3,237 0,109 -1,411E-03 -1,203E-04 0,0014

78 0,00000 DSTL2 Combination -4,379 -0,324 -1,089E-03 -1,098E-04 -0,0013

78 0,44400 DSTL2 Combination -4,379 -0,276 -1,089E-03 -1,098E-04 -8,400E-04

78 0,88800 DSTL2 Combination -4,379 -0,229 -1,089E-03 -1,098E-04 -3,567E-04

78 1,33200 DSTL2 Combination -4,379 -0,181 -1,089E-03 -1,098E-04 1,266E-04

78 1,77600 DSTL2 Combination -4,379 -0,134 -1,089E-03 -1,098E-04 6,099E-04

78 2,22000 DSTL2 Combination -4,379 -0,086 -1,089E-03 -1,098E-04 0,0011

79 0,00000 DSTL2 Combination 2,103 -0,120 6,159E-04 -8,484E-05 8,484E-04

79 0,44400 DSTL2 Combination 2,103 -0,072 6,159E-04 -8,484E-05 5,750E-04

79 0,88800 DSTL2 Combination 2,103 -0,025 6,159E-04 -8,484E-05 3,015E-04

79 1,33200 DSTL2 Combination 2,103 0,023 6,159E-04 -8,484E-05 2,804E-05

79 1,77600 DSTL2 Combination 2,103 0,070 6,159E-04 -8,484E-05 -2,454E-04

79 2,22000 DSTL2 Combination 2,103 0,118 6,159E-04 -8,484E-05 -5,189E-04

80 0,00000 DSTL2 Combination 1,634 -0,118 8,110E-04 -6,535E-05 8,663E-04

80 0,44400 DSTL2 Combination 1,634 -0,071 8,110E-04 -6,535E-05 5,062E-04

80 0,88800 DSTL2 Combination 1,634 -0,023 8,110E-04 -6,535E-05 1,462E-04

80 1,33200 DSTL2 Combination 1,634 0,024 8,110E-04 -6,535E-05 -2,139E-04

80 1,77600 DSTL2 Combination 1,634 0,072 8,110E-04 -6,535E-05 -5,740E-04

80 2,22000 DSTL2 Combination 1,634 0,119 8,110E-04 -6,535E-05 -9,341E-04

81 0,00000 DSTL2 Combination 1,656 -0,118 9,307E-04 -5,038E-05 0,0010

81 0,44400 DSTL2 Combination 1,656 -0,071 9,307E-04 -5,038E-05 6,251E-04

81 0,88800 DSTL2 Combination 1,656 -0,023 9,307E-04 -5,038E-05 2,119E-04

81 1,33200 DSTL2 Combination 1,656 0,024 9,307E-04 -5,038E-05 -2,013E-04

81 1,77600 DSTL2 Combination 1,656 0,072 9,307E-04 -5,038E-05 -6,146E-04

81 2,22000 DSTL2 Combination 1,656 0,119 9,307E-04 -5,038E-05 -0,0010

82 0,00000 DSTL2 Combination 1,657 -0,118 1,047E-03 -3,906E-05 0,0012

82 0,44400 DSTL2 Combination 1,657 -0,071 1,047E-03 -3,906E-05 6,963E-04

82 0,88800 DSTL2 Combination 1,657 -0,023 1,047E-03 -3,906E-05 2,316E-04

82 1,33200 DSTL2 Combination 1,657 0,024 1,047E-03 -3,906E-05 -2,331E-04

82 1,77600 DSTL2 Combination 1,657 0,072 1,047E-03 -3,906E-05 -6,977E-04

82 2,22000 DSTL2 Combination 1,657 0,119 1,047E-03 -3,906E-05 -0,0012

83 0,00000 DSTL2 Combination 1,657 -0,119 1,162E-03 -3,074E-05 0,0013

83 0,44400 DSTL2 Combination 1,657 -0,071 1,162E-03 -3,074E-05 7,742E-04

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 95 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

83 0,88800 DSTL2 Combination 1,657 -0,024 1,162E-03 -3,074E-05 2,581E-04

83 1,33200 DSTL2 Combination 1,657 0,024 1,162E-03 -3,074E-05 -2,579E-04

83 1,77600 DSTL2 Combination 1,657 0,072 1,162E-03 -3,074E-05 -7,740E-04

83 2,22000 DSTL2 Combination 1,657 0,119 1,162E-03 -3,074E-05 -0,0013

84 0,00000 DSTL2 Combination 1,657 -0,119 1,278E-03 -2,491E-05 0,0014

84 0,44400 DSTL2 Combination 1,657 -0,071 1,278E-03 -2,491E-05 8,511E-04

84 0,88800 DSTL2 Combination 1,657 -0,024 1,278E-03 -2,491E-05 2,837E-04

84 1,33200 DSTL2 Combination 1,657 0,024 1,278E-03 -2,491E-05 -2,837E-04

84 1,77600 DSTL2 Combination 1,657 0,071 1,278E-03 -2,491E-05 -8,512E-04

84 2,22000 DSTL2 Combination 1,657 0,119 1,278E-03 -2,491E-05 -0,0014

85 0,00000 DSTL2 Combination 1,657 -0,119 1,394E-03 -2,125E-05 0,0015

85 0,44400 DSTL2 Combination 1,657 -0,071 1,394E-03 -2,125E-05 9,282E-04

85 0,88800 DSTL2 Combination 1,657 -0,024 1,394E-03 -2,125E-05 3,094E-04

85 1,33200 DSTL2 Combination 1,657 0,024 1,394E-03 -2,125E-05 -3,094E-04

85 1,77600 DSTL2 Combination 1,657 0,071 1,394E-03 -2,125E-05 -9,282E-04

85 2,22000 DSTL2 Combination 1,657 0,119 1,394E-03 -2,125E-05 -0,0015

86 0,00000 DSTL2 Combination 1,657 -0,119 1,509E-03 -1,952E-05 0,0017

86 0,44400 DSTL2 Combination 1,657 -0,071 1,509E-03 -1,952E-05 0,0010

86 0,88800 DSTL2 Combination 1,657 -0,024 1,509E-03 -1,952E-05 3,350E-04

86 1,33200 DSTL2 Combination 1,657 0,024 1,509E-03 -1,952E-05 -3,352E-04

86 1,77600 DSTL2 Combination 1,657 0,071 1,509E-03 -1,952E-05 -0,0010

86 2,22000 DSTL2 Combination 1,657 0,119 1,509E-03 -1,952E-05 -0,0017

87 0,00000 DSTL2 Combination 1,657 -0,119 1,625E-03 -1,964E-05 0,0018

87 0,44400 DSTL2 Combination 1,657 -0,071 1,625E-03 -1,964E-05 0,0011

87 0,88800 DSTL2 Combination 1,657 -0,024 1,625E-03 -1,964E-05 3,615E-04

87 1,33200 DSTL2 Combination 1,657 0,024 1,625E-03 -1,964E-05 -3,601E-04

87 1,77600 DSTL2 Combination 1,657 0,071 1,625E-03 -1,964E-05 -0,0011

87 2,22000 DSTL2 Combination 1,657 0,119 1,625E-03 -1,964E-05 -0,0018

88 0,00000 DSTL2 Combination 1,656 -0,119 1,741E-03 -2,161E-05 0,0019

88 0,44400 DSTL2 Combination 1,656 -0,071 1,741E-03 -2,161E-05 0,0012

88 0,88800 DSTL2 Combination 1,656 -0,024 1,741E-03 -2,161E-05 3,815E-04

88 1,33200 DSTL2 Combination 1,656 0,024 1,741E-03 -2,161E-05 -3,915E-04

88 1,77600 DSTL2 Combination 1,656 0,071 1,741E-03 -2,161E-05 -0,0012

88 2,22000 DSTL2 Combination 1,656 0,119 1,741E-03 -2,161E-05 -0,0019

89 0,00000 DSTL2 Combination 1,634 -0,119 1,861E-03 -2,554E-05 0,0021

89 0,44400 DSTL2 Combination 1,634 -0,071 1,861E-03 -2,554E-05 0,0013

89 0,88800 DSTL2 Combination 1,634 -0,024 1,861E-03 -2,554E-05 4,451E-04

89 1,33200 DSTL2 Combination 1,634 0,024 1,861E-03 -2,554E-05 -3,810E-04

89 1,77600 DSTL2 Combination 1,634 0,071 1,861E-03 -2,554E-05 -0,0012

89 2,22000 DSTL2 Combination 1,634 0,119 1,861E-03 -2,554E-05 -0,0020

90 0,00000 DSTL2 Combination 2,088 -0,121 2,053E-03 -3,167E-05 0,0021

90 0,44400 DSTL2 Combination 2,088 -0,073 2,053E-03 -3,167E-05 0,0012

90 0,88800 DSTL2 Combination 2,088 -0,026 2,053E-03 -3,167E-05 3,013E-04

90 1,33200 DSTL2 Combination 2,088 0,022 2,053E-03 -3,167E-05 -6,100E-04

90 1,77600 DSTL2 Combination 2,088 0,069 2,053E-03 -3,167E-05 -0,0015

90 2,22000 DSTL2 Combination 2,088 0,117 2,053E-03 -3,167E-05 -0,0024

91 0,00000 DSTL2 Combination -4,152 -0,316 3,697E-03 -4,058E-05 0,0042

91 0,44400 DSTL2 Combination -4,152 -0,268 3,697E-03 -4,058E-05 0,0025

91 0,88800 DSTL2 Combination -4,152 -0,221 3,697E-03 -4,058E-05 9,012E-04

91 1,33200 DSTL2 Combination -4,152 -0,173 3,697E-03 -4,058E-05 -7,404E-04

91 1,77600 DSTL2 Combination -4,152 -0,125 3,697E-03 -4,058E-05 -0,0024

91 2,22000 DSTL2 Combination -4,152 -0,078 3,697E-03 -4,058E-05 -0,0040

92 0,00000 DSTL2 Combination 2,940 -0,216 4,125E-03 8,145E-05 0,0047

92 0,44400 DSTL2 Combination 2,940 -0,168 4,125E-03 8,145E-05 0,0029

92 0,88800 DSTL2 Combination 2,940 -0,120 4,125E-03 8,145E-05 0,0010

92 1,33200 DSTL2 Combination 2,940 -0,073 4,125E-03 8,145E-05 -8,057E-04

92 1,77600 DSTL2 Combination 2,940 -0,025 4,125E-03 8,145E-05 -0,0026

92 2,22000 DSTL2 Combination 2,940 0,022 4,125E-03 8,145E-05 -0,0045

93 0,00000 DSTL2 Combination -0,671 -0,115 3,349E-03 2,837E-04 0,0036

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 96 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

93 0,44400 DSTL2 Combination -0,671 -0,067 3,349E-03 2,837E-04 0,0021

93 0,88800 DSTL2 Combination -0,671 -0,020 3,349E-03 2,837E-04 6,401E-04

93 1,33200 DSTL2 Combination -0,671 0,028 3,349E-03 2,837E-04 -8,467E-04

93 1,77600 DSTL2 Combination -0,671 0,075 3,349E-03 2,837E-04 -0,0023

93 2,22000 DSTL2 Combination -0,671 0,123 3,349E-03 2,837E-04 -0,0038

94 0,00000 DSTL2 Combination -0,986 -0,116 3,448E-03 4,005E-04 0,0038

94 0,44400 DSTL2 Combination -0,986 -0,069 3,448E-03 4,005E-04 0,0023

94 0,88800 DSTL2 Combination -0,986 -0,021 3,448E-03 4,005E-04 7,211E-04

94 1,33200 DSTL2 Combination -0,986 0,026 3,448E-03 4,005E-04 -8,097E-04

94 1,77600 DSTL2 Combination -0,986 0,074 3,448E-03 4,005E-04 -0,0023

94 2,22000 DSTL2 Combination -0,986 0,121 3,448E-03 4,005E-04 -0,0039

96 0,00000 DSTL2 Combination 0,000 -1,043 -0,128 -0,0060 -0,1715

96 0,44400 DSTL2 Combination 0,000 -0,594 -0,128 -0,0060 -0,1148

96 0,88800 DSTL2 Combination 0,000 -0,145 -0,128 -0,0060 -0,0580

96 1,33200 DSTL2 Combination 0,000 0,304 -0,128 -0,0060 -0,0013

96 1,77600 DSTL2 Combination 0,000 0,753 -0,128 -0,0060 0,0554

96 2,22000 DSTL2 Combination 0,000 1,202 -0,128 -0,0060 0,1121

97 0,00000 DSTL2 Combination 50,045 -0,904 1,294 0,0240 1,9372

97 0,44400 DSTL2 Combination 50,045 -0,455 1,294 0,0240 1,3627

97 0,88800 DSTL2 Combination 50,045 -6,212E-03 1,294 0,0240 0,7881

97 1,33200 DSTL2 Combination 50,045 0,443 1,294 0,0240 0,2136

97 1,77600 DSTL2 Combination 50,045 0,892 1,294 0,0240 -0,3609

97 2,22000 DSTL2 Combination 50,045 1,341 1,294 0,0240 -0,9355

98 0,00000 DSTL2 Combination 437,185 -0,900 -0,283 0,0023 -0,3280

98 1,80028 DSTL2 Combination 437,024 -0,274 -0,283 0,0023 0,1819

98 3,60056 DSTL2 Combination 436,862 0,352 -0,283 0,0023 0,6919

99 0,00000 DSTL2 Combination 430,528 -0,942 -0,026 0,0506 -0,0674

99 1,79483 DSTL2 Combination 430,366 -0,318 -0,026 0,0506 -0,0200

99 3,58966 DSTL2 Combination 430,205 0,306 -0,026 0,0506 0,0274

100 0,00000 DSTL2 Combination 452,198 -0,498 0,328 -0,1415 0,8215

100 1,80028 DSTL2 Combination 452,359 0,128 0,328 -0,1415 0,2302

100 3,60056 DSTL2 Combination 452,521 0,754 0,328 -0,1415 -0,3612

101 0,00000 DSTL2 Combination 416,064 -0,185 0,069 -0,1901 0,2024

101 1,79483 DSTL2 Combination 416,226 0,439 0,069 -0,1901 0,0782

101 3,58966 DSTL2 Combination 416,387 1,063 0,069 -0,1901 -0,0461

102 0,00000 DSTL2 Combination -5,974 -6,719 2,149 0,0092 0,1400

102 0,50000 DSTL2 Combination -5,974 -6,214 0,049 0,0092 -0,4094

103 0,00000 DSTL2 Combination -10,098 -2,046 2,443 0,0051 -0,3094

103 0,50000 DSTL2 Combination -10,098 -1,540 0,343 0,0051 -1,0060

104 0,00000 DSTL2 Combination -15,680 2,616 -1,711 0,0242 0,2547

104 0,50000 DSTL2 Combination -15,680 3,121 -3,811 0,0242 1,6350

105 0,00000 DSTL2 Combination -62,199 112,699 4,773 0,0269 2,0614

105 0,50000 DSTL2 Combination -62,199 113,205 2,673 0,0269 0,2001

106 0,00000 DSTL2 Combination -67,852 117,140 6,421 -0,0284 -0,0525

106 0,50000 DSTL2 Combination -67,852 117,645 4,321 -0,0284 -2,7379

107 0,00000 DSTL2 Combination -142,589 -58,364 -5,523 0,0646 -3,3864

107 0,50000 DSTL2 Combination -142,589 -57,859 -7,623 0,0646 -0,0998

108 0,00000 DSTL2 Combination -142,903 -53,973 1,257 -0,0104 0,9426

108 0,50000 DSTL2 Combination -142,903 -53,468 -0,843 -0,0104 0,8393

109 0,00000 DSTL2 Combination 36,967 53,203 -2,816 0,0169 0,6770

109 0,50000 DSTL2 Combination 36,967 53,709 -4,916 0,0169 2,6102

110 0,00000 DSTL2 Combination 52,772 57,570 3,686 -0,0553 -0,1363

110 0,50000 DSTL2 Combination 52,772 58,076 1,586 -0,0553 -1,4542

111 0,00000 DSTL2 Combination 138,109 -109,156 -7,810 0,0392 -2,6323

111 0,50000 DSTL2 Combination 138,109 -108,651 -9,910 0,0392 1,7978

112 0,00000 DSTL2 Combination 159,172 -104,662 -5,975 -0,0334 0,2408

112 0,50000 DSTL2 Combination 159,172 -104,156 -8,075 -0,0334 3,7536

113 0,00000 DSTL2 Combination 215,477 -6,123 -0,143 -0,0117 1,6002

113 0,50000 DSTL2 Combination 215,477 -5,618 -2,243 -0,0117 2,1969

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 97 a 174

Table: Element Forces - Frames, Part 1 of 2

Frame Station OutputCase CaseType P V2 V3 T M2

m KN KN KN KN-m KN-m

114 0,00000 DSTL2 Combination 236,732 -1,329 -4,082 -0,0151 -0,7966

114 0,50000 DSTL2 Combination 236,732 -0,824 -6,182 -0,0151 1,7693

115 0,00000 DSTL2 Combination 256,714 3,499 -3,842 -0,0208 -0,1143

115 0,50000 DSTL2 Combination 256,714 4,004 -5,942 -0,0208 2,3315

116 0,00000 DSTL2 Combination -139,813 -49,259 0,327 -0,0099 -0,1099

116 0,50000 DSTL2 Combination -139,813 -48,753 -1,773 -0,0099 0,2518

117 0,00000 DSTL2 Combination -135,177 -44,641 0,135 -0,0126 -0,3913

117 0,50000 DSTL2 Combination -135,177 -44,136 -1,965 -0,0126 0,0663

118 0,00000 DSTL2 Combination 13,450 43,921 -1,722 0,0177 -0,1982

118 0,50000 DSTL2 Combination 13,450 44,426 -3,822 0,0177 1,1880

119 0,00000 DSTL2 Combination 24,462 48,516 -1,895 0,0159 0,0498

119 0,50000 DSTL2 Combination 24,462 49,022 -3,995 0,0159 1,5221

120 0,00000 DSTL2 Combination -130,242 -39,944 -0,348 -0,0162 -0,4536

120 0,50000 DSTL2 Combination -130,242 -39,439 -2,448 -0,0162 0,2454

121 0,00000 DSTL2 Combination -125,144 -35,289 -0,030 -0,0057 -0,3128

121 0,50000 DSTL2 Combination -125,144 -34,783 -2,130 -0,0057 0,2270

122 0,00000 DSTL2 Combination -119,711 -30,624 -0,439 -0,0178 -0,3930

122 0,50000 DSTL2 Combination -119,711 -30,118 -2,539 -0,0178 0,3514

123 0,00000 DSTL2 Combination -113,923 -25,944 -0,184 0,0013 -0,3076

123 0,50000 DSTL2 Combination -113,923 -25,439 -2,284 0,0013 0,3093

124 0,00000 DSTL2 Combination -107,792 -21,304 -0,606 -0,0177 -0,3868

124 0,50000 DSTL2 Combination -107,792 -20,799 -2,706 -0,0177 0,4410

125 0,00000 DSTL2 Combination -101,325 -16,608 -0,345 0,0073 -0,2922

125 0,50000 DSTL2 Combination -101,325 -16,103 -2,445 0,0073 0,4054

126 0,00000 DSTL2 Combination -94,519 -11,986 -0,765 -0,0164 -0,3675

126 0,50000 DSTL2 Combination -94,519 -11,481 -2,865 -0,0164 0,5398

127 0,00000 DSTL2 Combination -87,375 -7,281 -0,505 0,0123 -0,2705

127 0,50000 DSTL2 Combination -87,375 -6,775 -2,605 0,0123 0,5069

128 0,00000 DSTL2 Combination -79,891 -2,668 -0,924 -0,0137 -0,3430

128 0,50000 DSTL2 Combination -79,891 -2,163 -3,024 -0,0137 0,6442

129 0,00000 DSTL2 Combination -72,070 2,039 -0,664 0,0162 -0,2429

129 0,50000 DSTL2 Combination -72,070 2,544 -2,764 0,0162 0,6143

130 0,00000 DSTL2 Combination -63,908 6,649 -1,084 -0,0097 -0,3125

130 0,50000 DSTL2 Combination -63,908 7,155 -3,184 -0,0097 0,7546

131 0,00000 DSTL2 Combination -55,409 11,351 -0,824 0,0190 -0,2093

131 0,50000 DSTL2 Combination -55,409 11,856 -2,924 0,0190 0,7278

132 0,00000 DSTL2 Combination -46,570 15,967 -1,244 -0,0045 -0,2760

132 0,50000 DSTL2 Combination -46,570 16,473 -3,344 -0,0045 0,8709

133 0,00000 DSTL2 Combination -37,394 20,656 -0,983 0,0208 -0,1702

133 0,50000 DSTL2 Combination -37,394 21,162 -3,083 0,0208 0,8465

134 0,00000 DSTL2 Combination -27,879 25,286 -1,405 0,0020 -0,2341

134 0,50000 DSTL2 Combination -27,879 25,792 -3,505 0,0020 0,9935

135 0,00000 DSTL2 Combination -18,025 29,954 -1,150 0,0215 -0,1219

135 0,50000 DSTL2 Combination -18,025 30,460 -3,250 0,0215 0,9781

136 0,00000 DSTL2 Combination -7,813 34,605 -1,560 0,0097 -0,1786

136 0,50000 DSTL2 Combination -7,813 35,110 -3,660 0,0097 1,1261

137 0,00000 DSTL2 Combination 2,731 39,244 -1,244 0,0209 -0,0889

137 0,50000 DSTL2 Combination 2,731 39,750 -3,344 0,0209 1,0580

Table: Element Forces - Frames, Part 2 of 2

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

11 0,00000 DSTL2 4,1017 11-1 0,00000

11 0,51478 DSTL2 -2,6010 11-1 0,51478

11 1,02956 DSTL2 -9,3500 11-1 1,02956

12 0,00000 DSTL2 -1,8167 12-1 0,00000

12 0,51478 DSTL2 0,9472 12-1 0,51478

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 98 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

12 1,02956 DSTL2 3,6648 12-1 1,02956

13 0,00000 DSTL2 3,9448 13-1 0,00000

13 0,53348 DSTL2 -2,2597 13-1 0,53348

13 1,06696 DSTL2 -8,5191 13-1 1,06696

14 0,00000 DSTL2 -1,9313 14-1 0,00000

14 0,53348 DSTL2 0,6377 14-1 0,53348

14 1,06696 DSTL2 3,1518 14-1 1,06696

15 0,00000 DSTL2 -1,8048 15-1 0,00000

15 0,51478 DSTL2 1,1174 15-1 0,51478

15 1,02956 DSTL2 3,9933 15-1 1,02956

16 0,00000 DSTL2 30,9656 16-1 0,00000

16 0,50000 DSTL2 34,1036 16-1 0,50000

17 0,00000 DSTL2 34,7815 17-1 0,00000

17 0,50000 DSTL2 35,5785 17-1 0,50000

18 0,00000 DSTL2 35,4634 18-1 0,00000

18 0,50000 DSTL2 33,9188 18-1 0,50000

19 0,00000 DSTL2 20,7299 19-1 0,00000

19 0,50000 DSTL2 -34,4047 19-1 0,50000

20 0,00000 DSTL2 -53,6385 20-1 0,00000

20 0,50000 DSTL2 -111,0875 20-1 0,50000

21 0,00000 DSTL2 -124,9371 21-1 0,00000

21 0,50000 DSTL2 -95,9966 21-1 0,50000

22 0,00000 DSTL2 -86,5507 22-1 0,00000

22 0,50000 DSTL2 -59,8837 22-1 0,50000

23 0,00000 DSTL2 -60,8865 23-1 0,00000

23 0,50000 DSTL2 -87,6852 23-1 0,50000

24 0,00000 DSTL2 -97,1471 24-1 0,00000

24 0,50000 DSTL2 -126,2318 24-1 0,50000

25 0,00000 DSTL2 -111,6588 25-1 0,00000

25 0,50000 DSTL2 -50,2551 25-1 0,50000

26 0,00000 DSTL2 -30,5929 26-1 0,00000

26 0,50000 DSTL2 28,5246 26-1 0,50000

27 0,00000 DSTL2 42,1756 27-1 0,00000

27 0,50000 DSTL2 42,3105 27-1 0,50000

28 0,00000 DSTL2 42,2762 28-1 0,00000

28 0,50000 DSTL2 40,1377 28-1 0,50000

29 0,00000 DSTL2 39,3192 29-1 0,00000

29 0,50000 DSTL2 34,9175 29-1 0,50000

30 0,00000 DSTL2 -51,2151 30-1 0,00000

30 0,50000 DSTL2 -26,8736 30-1 0,50000

31 0,00000 DSTL2 -18,9906 31-1 0,00000

31 0,50000 DSTL2 3,0582 31-1 0,50000

32 0,00000 DSTL2 2,3076 32-1 0,00000

32 0,50000 DSTL2 -19,8480 32-1 0,50000

33 0,00000 DSTL2 -27,7440 33-1 0,00000

33 0,50000 DSTL2 -52,2033 33-1 0,50000

34 0,00000 DSTL2 10,1551 34-1 0,00000

34 0,50000 DSTL2 29,8712 34-1 0,50000

35 0,00000 DSTL2 36,1785 35-1 0,00000

35 0,50000 DSTL2 53,5797 35-1 0,50000

36 0,00000 DSTL2 59,0996 36-1 0,00000

36 0,50000 DSTL2 74,1801 36-1 0,50000

37 0,00000 DSTL2 78,9102 37-1 0,00000

37 0,50000 DSTL2 91,6607 37-1 0,50000

38 0,00000 DSTL2 95,6028 38-1 0,00000

38 0,50000 DSTL2 106,0422 38-1 0,50000

39 0,00000 DSTL2 109,1948 39-1 0,00000

39 0,50000 DSTL2 117,2934 39-1 0,50000

40 0,00000 DSTL2 119,6575 40-1 0,00000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 99 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

40 0,50000 DSTL2 125,4515 40-1 0,50000

41 0,00000 DSTL2 127,0261 41-1 0,00000

41 0,50000 DSTL2 130,4725 41-1 0,50000

42 0,00000 DSTL2 131,2582 42-1 0,00000

42 0,50000 DSTL2 132,4027 42-1 0,50000

43 0,00000 DSTL2 132,3992 43-1 0,00000

43 0,50000 DSTL2 131,1933 43-1 0,50000

44 0,00000 DSTL2 130,4004 44-1 0,00000

44 0,50000 DSTL2 126,8916 44-1 0,50000

45 0,00000 DSTL2 125,3098 45-1 0,00000

45 0,50000 DSTL2 119,4517 45-1 0,50000

46 0,00000 DSTL2 117,0800 46-1 0,00000

46 0,50000 DSTL2 108,9144 46-1 0,50000

47 0,00000 DSTL2 105,7540 47-1 0,00000

47 0,50000 DSTL2 95,2440 47-1 0,50000

48 0,00000 DSTL2 91,2934 48-1 0,00000

48 0,50000 DSTL2 78,4674 48-1 0,50000

49 0,00000 DSTL2 73,7282 49-1 0,00000

49 0,50000 DSTL2 58,5665 49-1 0,50000

50 0,00000 DSTL2 53,0368 50-1 0,00000

50 0,50000 DSTL2 35,5470 50-1 0,50000

51 0,00000 DSTL2 29,2291 51-1 0,00000

51 0,50000 DSTL2 9,4163 51-1 0,50000

52 0,00000 DSTL2 4,5577 52-1 0,00000

52 0,51478 DSTL2 -2,6362 52-1 0,51478

52 1,02956 DSTL2 -9,8764 52-1 1,02956

53 0,00000 DSTL2 -1,9005 53-1 0,00000

53 0,53348 DSTL2 0,4387 53-1 0,53348

53 1,06696 DSTL2 2,7229 53-1 1,06696

54 0,00000 DSTL2 3,4422 54-1 0,00000

54 0,53348 DSTL2 -2,2706 54-1 0,53348

54 1,06696 DSTL2 -8,0383 54-1 1,06696

56 0,00000 DSTL2 -4,6287 56-1 0,00000

56 0,50000 DSTL2 -3,4186 56-1 0,50000

56 1,00000 DSTL2 -2,2982 56-1 1,00000

56 1,50000 DSTL2 -1,2676 56-1 1,50000

56 2,00000 DSTL2 -0,3268 56-1 2,00000

56 2,50000 DSTL2 0,5242 56-1 2,50000

56 3,00000 DSTL2 1,2855 56-1 3,00000

56 3,50000 DSTL2 1,9570 56-1 3,50000

56 4,00000 DSTL2 2,5387 56-1 4,00000

56 4,50000 DSTL2 3,0306 56-1 4,50000

56 5,00000 DSTL2 3,4328 56-1 5,00000

56 5,50000 DSTL2 3,7452 56-1 5,50000

56 6,00000 DSTL2 3,9678 56-1 6,00000

56 6,50000 DSTL2 4,1006 56-1 6,50000

56 7,00000 DSTL2 4,1437 56-1 7,00000

56 7,50000 DSTL2 4,0969 56-1 7,50000

56 8,00000 DSTL2 3,9605 56-1 8,00000

56 8,50000 DSTL2 3,7342 56-1 8,50000

56 9,00000 DSTL2 3,4182 56-1 9,00000

56 9,50000 DSTL2 3,0123 56-1 9,50000

56 10,00000 DSTL2 2,5168 56-1 10,00000

56 10,50000 DSTL2 1,9314 56-1 10,50000

56 11,00000 DSTL2 1,2563 56-1 11,00000

56 11,50000 DSTL2 0,4913 56-1 11,50000

56 12,00000 DSTL2 -0,3633 56-1 12,00000

56 12,50000 DSTL2 -1,3078 56-1 12,50000

56 13,00000 DSTL2 -2,3420 56-1 13,00000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 100 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

56 13,50000 DSTL2 -3,4660 56-1 13,50000

56 14,00000 DSTL2 -4,6798 56-1 14,00000

57 0,00000 DSTL2 -4,6760 57-1 0,00000

57 0,50000 DSTL2 -3,4627 57-1 0,50000

57 1,00000 DSTL2 -2,3392 57-1 1,00000

57 1,50000 DSTL2 -1,3055 57-1 1,50000

57 2,00000 DSTL2 -0,3616 57-1 2,00000

57 2,50000 DSTL2 0,4926 57-1 2,50000

57 3,00000 DSTL2 1,2570 57-1 3,00000

57 3,50000 DSTL2 1,9316 57-1 3,50000

57 4,00000 DSTL2 2,5165 57-1 4,00000

57 4,50000 DSTL2 3,0116 57-1 4,50000

57 5,00000 DSTL2 3,4169 57-1 5,00000

57 5,50000 DSTL2 3,7324 57-1 5,50000

57 6,00000 DSTL2 3,9581 57-1 6,00000

57 6,50000 DSTL2 4,0941 57-1 6,50000

57 7,00000 DSTL2 4,1403 57-1 7,00000

57 7,50000 DSTL2 4,0967 57-1 7,50000

57 8,00000 DSTL2 3,9634 57-1 8,00000

57 8,50000 DSTL2 3,7403 57-1 8,50000

57 9,00000 DSTL2 3,4274 57-1 9,00000

57 9,50000 DSTL2 3,0247 57-1 9,50000

57 10,00000 DSTL2 2,5323 57-1 10,00000

57 10,50000 DSTL2 1,9500 57-1 10,50000

57 11,00000 DSTL2 1,2780 57-1 11,00000

57 11,50000 DSTL2 0,5163 57-1 11,50000

57 12,00000 DSTL2 -0,3353 57-1 12,00000

57 12,50000 DSTL2 -1,2766 57-1 12,50000

57 13,00000 DSTL2 -2,3077 57-1 13,00000

57 13,50000 DSTL2 -3,4286 57-1 13,50000

57 14,00000 DSTL2 -4,6392 57-1 14,00000

59 0,00000 DSTL2 14,0349 59-1 0,00000

59 0,50000 DSTL2 21,9238 59-1 0,50000

60 0,00000 DSTL2 24,1931 60-1 0,00000

60 0,50000 DSTL2 29,7465 60-1 0,50000

61 0,00000 DSTL2 13,9782 61-1 0,00000

61 0,50000 DSTL2 21,7773 61-1 0,50000

62 0,00000 DSTL2 24,0357 62-1 0,00000

62 0,50000 DSTL2 29,4971 62-1 0,50000

64 0,00000 DSTL2 25,5389 64-1 0,00000

64 0,50000 DSTL2 21,2915 64-1 0,50000

65 0,00000 DSTL2 19,1819 65-1 0,00000

65 0,50000 DSTL2 12,5627 65-1 0,50000

66 0,00000 DSTL2 33,3158 66-1 0,00000

66 0,50000 DSTL2 26,6425 66-1 0,50000

67 0,00000 DSTL2 24,2563 67-1 0,00000

67 0,50000 DSTL2 15,2815 67-1 0,50000

69 0,00000 DSTL2 10,9450 69-1 0,00000

69 0,47500 DSTL2 1,5637 69-1 0,47500

70 0,00000 DSTL2 10,8990 70-1 0,00000

70 0,47500 DSTL2 1,6021 70-1 0,47500

71 0,00000 DSTL2 9,6328 71-1 0,00000

71 0,47500 DSTL2 1,4275 71-1 0,47500

72 0,00000 DSTL2 12,0746 72-1 0,00000

72 0,47500 DSTL2 1,6885 72-1 0,47500

75 0,00000 DSTL2 -0,0722 75-1 0,00000

75 0,44400 DSTL2 -0,0300 75-1 0,44400

75 0,88800 DSTL2 -0,0089 75-1 0,88800

75 1,33200 DSTL2 -0,0089 75-1 1,33200

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 101 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

75 1,77600 DSTL2 -0,0299 75-1 1,77600

75 2,22000 DSTL2 -0,0721 75-1 2,22000

76 0,00000 DSTL2 -0,0886 76-1 0,00000

76 0,44400 DSTL2 -0,0463 76-1 0,44400

76 0,88800 DSTL2 -0,0251 76-1 0,88800

76 1,33200 DSTL2 -0,0250 76-1 1,33200

76 1,77600 DSTL2 -0,0460 76-1 1,77600

76 2,22000 DSTL2 -0,0881 76-1 2,22000

77 0,00000 DSTL2 -0,0435 77-1 0,00000

77 0,44400 DSTL2 0,0031 77-1 0,44400

77 0,88800 DSTL2 0,0286 77-1 0,88800

77 1,33200 DSTL2 0,0330 77-1 1,33200

77 1,77600 DSTL2 0,0163 77-1 1,77600

77 2,22000 DSTL2 -0,0215 77-1 2,22000

78 0,00000 DSTL2 -0,2340 78-1 0,00000

78 0,44400 DSTL2 -0,1007 78-1 0,44400

78 0,88800 DSTL2 0,0115 78-1 0,88800

78 1,33200 DSTL2 0,1026 78-1 1,33200

78 1,77600 DSTL2 0,1726 78-1 1,77600

78 2,22000 DSTL2 0,2215 78-1 2,22000

79 0,00000 DSTL2 0,0530 79-1 0,00000

79 0,44400 DSTL2 0,0957 79-1 0,44400

79 0,88800 DSTL2 0,1173 79-1 0,88800

79 1,33200 DSTL2 0,1179 79-1 1,33200

79 1,77600 DSTL2 0,0973 79-1 1,77600

79 2,22000 DSTL2 0,0557 79-1 2,22000

80 0,00000 DSTL2 -0,0421 80-1 0,00000

80 0,44400 DSTL2 -1,408E-04 80-1 0,44400

80 0,88800 DSTL2 0,0207 80-1 0,88800

80 1,33200 DSTL2 0,0205 80-1 1,33200

80 1,77600 DSTL2 -8,613E-04 80-1 1,77600

80 2,22000 DSTL2 -0,0433 80-1 2,22000

81 0,00000 DSTL2 -0,1307 81-1 0,00000

81 0,44400 DSTL2 -0,0887 81-1 0,44400

81 0,88800 DSTL2 -0,0678 81-1 0,88800

81 1,33200 DSTL2 -0,0680 81-1 1,33200

81 1,77600 DSTL2 -0,0893 81-1 1,77600

81 2,22000 DSTL2 -0,1316 81-1 2,22000

82 0,00000 DSTL2 -0,1979 82-1 0,00000

82 0,44400 DSTL2 -0,1559 82-1 0,44400

82 0,88800 DSTL2 -0,1349 82-1 0,88800

82 1,33200 DSTL2 -0,1351 82-1 1,33200

82 1,77600 DSTL2 -0,1563 82-1 1,77600

82 2,22000 DSTL2 -0,1987 82-1 2,22000

83 0,00000 DSTL2 -0,2429 83-1 0,00000

83 0,44400 DSTL2 -0,2008 83-1 0,44400

83 0,88800 DSTL2 -0,1798 83-1 0,88800

83 1,33200 DSTL2 -0,1799 83-1 1,33200

83 1,77600 DSTL2 -0,2011 83-1 1,77600

83 2,22000 DSTL2 -0,2434 83-1 2,22000

84 0,00000 DSTL2 -0,2653 84-1 0,00000

84 0,44400 DSTL2 -0,2232 84-1 0,44400

84 0,88800 DSTL2 -0,2022 84-1 0,88800

84 1,33200 DSTL2 -0,2023 84-1 1,33200

84 1,77600 DSTL2 -0,2234 84-1 1,77600

84 2,22000 DSTL2 -0,2657 84-1 2,22000

85 0,00000 DSTL2 -0,2654 85-1 0,00000

85 0,44400 DSTL2 -0,2233 85-1 0,44400

85 0,88800 DSTL2 -0,2022 85-1 0,88800

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 102 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

85 1,33200 DSTL2 -0,2022 85-1 1,33200

85 1,77600 DSTL2 -0,2234 85-1 1,77600

85 2,22000 DSTL2 -0,2656 85-1 2,22000

86 0,00000 DSTL2 -0,2431 86-1 0,00000

86 0,44400 DSTL2 -0,2009 86-1 0,44400

86 0,88800 DSTL2 -0,1798 86-1 0,88800

86 1,33200 DSTL2 -0,1798 86-1 1,33200

86 1,77600 DSTL2 -0,2009 86-1 1,77600

86 2,22000 DSTL2 -0,2431 86-1 2,22000

87 0,00000 DSTL2 -0,1983 87-1 0,00000

87 0,44400 DSTL2 -0,1561 87-1 0,44400

87 0,88800 DSTL2 -0,1350 87-1 0,88800

87 1,33200 DSTL2 -0,1350 87-1 1,33200

87 1,77600 DSTL2 -0,1561 87-1 1,77600

87 2,22000 DSTL2 -0,1983 87-1 2,22000

88 0,00000 DSTL2 -0,1313 88-1 0,00000

88 0,44400 DSTL2 -0,0890 88-1 0,44400

88 0,88800 DSTL2 -0,0679 88-1 0,88800

88 1,33200 DSTL2 -0,0679 88-1 1,33200

88 1,77600 DSTL2 -0,0889 88-1 1,77600

88 2,22000 DSTL2 -0,1311 88-1 2,22000

89 0,00000 DSTL2 -0,0429 89-1 0,00000

89 0,44400 DSTL2 -6,225E-04 89-1 0,44400

89 0,88800 DSTL2 0,0206 89-1 0,88800

89 1,33200 DSTL2 0,0206 89-1 1,33200

89 1,77600 DSTL2 -3,822E-04 89-1 1,77600

89 2,22000 DSTL2 -0,0425 89-1 2,22000

90 0,00000 DSTL2 0,0521 90-1 0,00000

90 0,44400 DSTL2 0,0952 90-1 0,44400

90 0,88800 DSTL2 0,1172 90-1 0,88800

90 1,33200 DSTL2 0,1181 90-1 1,33200

90 1,77600 DSTL2 0,0980 90-1 1,77600

90 2,22000 DSTL2 0,0567 90-1 2,22000

91 0,00000 DSTL2 -0,2235 91-1 0,00000

91 0,44400 DSTL2 -0,0940 91-1 0,44400

91 0,88800 DSTL2 0,0145 91-1 0,88800

91 1,33200 DSTL2 0,1018 91-1 1,33200

91 1,77600 DSTL2 0,1681 91-1 1,77600

91 2,22000 DSTL2 0,2133 91-1 2,22000

92 0,00000 DSTL2 -0,1430 92-1 0,00000

92 0,44400 DSTL2 -0,0578 92-1 0,44400

92 0,88800 DSTL2 0,0062 92-1 0,88800

92 1,33200 DSTL2 0,0491 92-1 1,33200

92 1,77600 DSTL2 0,0710 92-1 1,77600

92 2,22000 DSTL2 0,0717 92-1 2,22000

93 0,00000 DSTL2 -0,0835 93-1 0,00000

93 0,44400 DSTL2 -0,0432 93-1 0,44400

93 0,88800 DSTL2 -0,0239 93-1 0,88800

93 1,33200 DSTL2 -0,0258 93-1 1,33200

93 1,77600 DSTL2 -0,0488 93-1 1,77600

93 2,22000 DSTL2 -0,0928 93-1 2,22000

94 0,00000 DSTL2 -0,0691 94-1 0,00000

94 0,44400 DSTL2 -0,0281 94-1 0,44400

94 0,88800 DSTL2 -0,0081 94-1 0,88800

94 1,33200 DSTL2 -0,0092 94-1 1,33200

94 1,77600 DSTL2 -0,0314 94-1 1,77600

94 2,22000 DSTL2 -0,0748 94-1 2,22000

96 0,00000 DSTL2 0,0885 96-1 0,00000

96 0,44400 DSTL2 0,4517 96-1 0,44400

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 103 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

96 0,88800 DSTL2 0,6157 96-1 0,88800

96 1,33200 DSTL2 0,5803 96-1 1,33200

96 1,77600 DSTL2 0,3456 96-1 1,77600

96 2,22000 DSTL2 -0,0885 96-1 2,22000

97 0,00000 DSTL2 0,2521 97-1 0,00000

97 0,44400 DSTL2 0,5538 97-1 0,44400

97 0,88800 DSTL2 0,6563 97-1 0,88800

97 1,33200 DSTL2 0,5594 97-1 1,33200

97 1,77600 DSTL2 0,2631 97-1 1,77600

97 2,22000 DSTL2 -0,2324 97-1 2,22000

98 0,00000 DSTL2 0,2101 98-1 0,00000

98 1,80028 DSTL2 1,2668 98-1 1,80028

98 3,60056 DSTL2 1,1966 98-1 3,60056

99 0,00000 DSTL2 0,1470 99-1 0,00000

99 1,79483 DSTL2 1,2783 99-1 1,79483

99 3,58966 DSTL2 1,2897 99-1 3,58966

100 0,00000 DSTL2 0,7553 100-1 0,00000

100 1,80028 DSTL2 1,0889 100-1 1,80028

100 3,60056 DSTL2 0,2957 100-1 3,60056

101 0,00000 DSTL2 1,6827 101-1 0,00000

101 1,79483 DSTL2 1,4552 101-1 1,79483

101 3,58966 DSTL2 0,1080 101-1 3,58966

102 0,00000 DSTL2 31,2259 102-1 0,00000

102 0,50000 DSTL2 34,4591 102-1 0,50000

103 0,00000 DSTL2 35,1485 103-1 0,00000

103 0,50000 DSTL2 36,0451 103-1 0,50000

104 0,00000 DSTL2 35,9422 104-1 0,00000

104 0,50000 DSTL2 34,5079 104-1 0,50000

105 0,00000 DSTL2 21,4101 105-1 0,00000

105 0,50000 DSTL2 -35,0658 105-1 0,50000

106 0,00000 DSTL2 -54,4498 106-1 0,00000

106 0,50000 DSTL2 -113,1460 106-1 0,50000

107 0,00000 DSTL2 -126,7769 107-1 0,00000

107 0,50000 DSTL2 -97,7211 107-1 0,50000

108 0,00000 DSTL2 -88,2573 108-1 0,00000

108 0,50000 DSTL2 -61,3970 108-1 0,50000

109 0,00000 DSTL2 -60,3835 109-1 0,00000

109 0,50000 DSTL2 -87,1116 109-1 0,50000

110 0,00000 DSTL2 -96,5594 110-1 0,00000

110 0,50000 DSTL2 -125,4710 110-1 0,50000

111 0,00000 DSTL2 -112,6147 111-1 0,00000

111 0,50000 DSTL2 -58,1629 111-1 0,50000

112 0,00000 DSTL2 -39,3052 112-1 0,00000

112 0,50000 DSTL2 12,8995 112-1 0,50000

113 0,00000 DSTL2 25,4892 113-1 0,00000

113 0,50000 DSTL2 28,4245 113-1 0,50000

114 0,00000 DSTL2 28,7080 114-1 0,00000

114 0,50000 DSTL2 29,2462 114-1 0,50000

115 0,00000 DSTL2 28,7290 115-1 0,00000

115 0,50000 DSTL2 26,8533 115-1 0,50000

116 0,00000 DSTL2 -52,7077 116-1 0,00000

116 0,50000 DSTL2 -28,2047 116-1 0,50000

117 0,00000 DSTL2 -20,3040 117-1 0,00000

117 0,50000 DSTL2 1,8903 117-1 0,50000

118 0,00000 DSTL2 2,6499 118-1 0,00000

118 0,50000 DSTL2 -19,4369 118-1 0,50000

119 0,00000 DSTL2 -27,3245 119-1 0,00000

119 0,50000 DSTL2 -51,7089 119-1 0,50000

120 0,00000 DSTL2 9,0033 120-1 0,00000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 104 a 174

Table: Element Forces - Frames, Part 2 of 2

Frame Station OutputCase M3 FrameElem ElemStation

m KN-m m

120 0,50000 DSTL2 28,8491 120-1 0,50000

121 0,00000 DSTL2 35,1708 121-1 0,00000

121 0,50000 DSTL2 52,6889 121-1 0,50000

122 0,00000 DSTL2 58,2217 122-1 0,00000

122 0,50000 DSTL2 73,4071 122-1 0,50000

123 0,00000 DSTL2 78,1488 123-1 0,00000

123 0,50000 DSTL2 90,9945 123-1 0,50000

124 0,00000 DSTL2 94,9472 124-1 0,00000

124 0,50000 DSTL2 105,4730 124-1 0,50000

125 0,00000 DSTL2 108,6351 125-1 0,00000

125 0,50000 DSTL2 116,8128 125-1 0,50000

126 0,00000 DSTL2 119,1858 126-1 0,00000

126 0,50000 DSTL2 125,0524 126-1 0,50000

127 0,00000 DSTL2 126,6352 127-1 0,00000

127 0,50000 DSTL2 130,1493 127-1 0,50000

128 0,00000 DSTL2 130,9426 128-1 0,00000

128 0,50000 DSTL2 132,1505 128-1 0,50000

129 0,00000 DSTL2 132,1541 129-1 0,00000

129 0,50000 DSTL2 131,0084 129-1 0,50000

130 0,00000 DSTL2 130,2225 130-1 0,00000

130 0,50000 DSTL2 126,7715 130-1 0,50000

131 0,00000 DSTL2 125,1962 131-1 0,00000

131 0,50000 DSTL2 119,3944 131-1 0,50000

132 0,00000 DSTL2 117,0293 132-1 0,00000

132 0,50000 DSTL2 108,9192 132-1 0,50000

133 0,00000 DSTL2 105,7652 133-1 0,00000

133 0,50000 DSTL2 95,3108 133-1 0,50000

134 0,00000 DSTL2 91,3668 134-1 0,00000

134 0,50000 DSTL2 78,5974 134-1 0,50000

135 0,00000 DSTL2 73,8649 135-1 0,00000

135 0,50000 DSTL2 58,7615 135-1 0,50000

136 0,00000 DSTL2 53,2388 136-1 0,00000

136 0,50000 DSTL2 35,8099 136-1 0,50000

137 0,00000 DSTL2 29,4992 137-1 0,00000

137 0,50000 DSTL2 9,7508 137-1 0,50000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 105 a 174

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 1 of 2

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 1 of 2

Frame DesignSect DesignType Status Ratio RatioType

16 HE280A Beam No Messages 0,107803 PMM

17 HE280A Beam No Messages 0,113998 PMM

18 HE280A Beam No Messages 0,118113 PMM

19 HE280A Beam No Messages 0,172102 Major Shear

20 HE280A Beam No Messages 0,325872 PMM

21 HE280A Beam No Messages 0,400501 PMM

22 HE280A Beam No Messages 0,300949 PMM

23 HE280A Beam No Messages 0,466262 PMM

24 HE280A Beam No Messages 0,607915 PMM

25 HE280A Beam No Messages 0,374790 PMM

26 HE280A Beam No Messages 0,184507 Major Shear

27 HE280A Beam No Messages 0,192786 PMM

28 HE280A Beam No Messages 0,195089 PMM

29 HE280A Beam No Messages 0,183333 PMM

30 HE280A Beam No Messages 0,198712 PMM

31 HE280A Beam No Messages 0,105934 PMM

32 HE280A Beam No Messages 0,239071 PMM

33 HE280A Beam No Messages 0,347865 PMM

34 HE280A Beam No Messages 0,140613 PMM

35 HE280A Beam No Messages 0,214568 PMM

36 HE280A Beam No Messages 0,279625 PMM

37 HE280A Beam No Messages 0,336688 PMM

38 HE280A Beam No Messages 0,384703 PMM

39 HE280A Beam No Messages 0,424637 PMM

40 HE280A Beam No Messages 0,455386 PMM

41 HE280A Beam No Messages 0,477889 PMM

42 HE280A Beam No Messages 0,491048 PMM

43 HE280A Beam No Messages 0,498720 PMM

44 HE280A Beam No Messages 0,500593 PMM

45 HE280A Beam No Messages 0,493996 PMM

46 HE280A Beam No Messages 0,477632 PMM

47 HE280A Beam No Messages 0,452459 PMM

48 HE280A Beam No Messages 0,417221 PMM

49 HE280A Beam No Messages 0,372923 PMM

50 HE280A Beam No Messages 0,318207 PMM

51 HE280A Beam No Messages 0,254069 PMM

102 HE280A Beam No Messages 0,102422 PMM

103 HE280A Beam No Messages 0,113119 PMM

104 HE280A Beam No Messages 0,115703 PMM

105 HE280A Beam No Messages 0,176280 Major Shear

106 HE280A Beam No Messages 0,362171 PMM

107 HE280A Beam No Messages 0,517562 PMM

108 HE280A Beam No Messages 0,391674 PMM

109 HE280A Beam No Messages 0,278571 PMM

110 HE280A Beam No Messages 0,381739 PMM

111 HE280A Beam No Messages 0,380416 PMM

112 HE280A Beam No Messages 0,162978 Major Shear

113 HE280A Beam No Messages 0,161926 PMM

114 HE280A Beam No Messages 0,166895 PMM

115 HE280A Beam No Messages 0,170732 PMM

116 HE280A Beam No Messages 0,274333 PMM

117 HE280A Beam No Messages 0,174012 PMM

118 HE280A Beam No Messages 0,069180 Major Shear

119 HE280A Beam No Messages 0,165868 PMM

120 HE280A Beam No Messages 0,194549 PMM

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 106 a 174

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 1 of 2

Frame DesignSect DesignType Status Ratio RatioType

121 HE280A Beam No Messages 0,261510 PMM

122 HE280A Beam No Messages 0,318974 PMM

123 HE280A Beam No Messages 0,365895 PMM

124 HE280A Beam No Messages 0,403545 PMM

125 HE280A Beam No Messages 0,430755 PMM

126 HE280A Beam No Messages 0,448837 PMM

127 HE280A Beam No Messages 0,456610 PMM

128 HE280A Beam No Messages 0,455431 PMM

129 HE280A Beam No Messages 0,446308 PMM

130 HE280A Beam No Messages 0,432712 PMM

131 HE280A Beam No Messages 0,409325 PMM

132 HE280A Beam No Messages 0,377188 PMM

133 HE280A Beam No Messages 0,335424 PMM

134 HE280A Beam No Messages 0,285266 PMM

135 HE280A Beam No Messages 0,225656 PMM

136 HE280A Beam No Messages 0,158028 PMM

137 HE280A Beam No Messages 0,084784 PMM

11 F12 Brace No Messages 0,460970 PMM

12 F12 Brace No Messages 0,224928 PMM

13 F12 Brace No Messages 0,474878 PMM

14 F12 Brace No Messages 0,233407 PMM

15 F12 Brace No Messages 0,245472 PMM

52 F12 Brace No Messages 0,482644 PMM

53 F12 Brace No Messages 0,212269 PMM

54 F12 Brace No Messages 0,451400 PMM

56 F12 Beam No Messages 0,652029 PMM

57 F12 Beam No Messages 0,659369 PMM

59 HE280A Beam No Messages 0,064500 PMM

60 HE280A Beam No Messages 0,086319 PMM

61 HE280A Beam No Messages 0,072499 PMM

62 HE280A Beam No Messages 0,095853 PMM

64 HE280A Beam No Messages 0,160831 PMM

65 HE280A Beam No Messages 0,144000 PMM

66 HE280A Beam No Messages 0,171943 PMM

67 HE280A Beam No Messages 0,154930 PMM

69 HE280A Beam No Messages 0,034771 PMM

70 HE280A Beam No Messages 0,039529 PMM

71 HE280A Beam No Messages 0,125324 PMM

72 HE280A Beam No Messages 0,130208 PMM

75 IPE100 Beam No Messages 0,020300 PMM

76 IPE100 Beam No Messages 0,027148 PMM

77 IPE100 Beam No Messages 0,015031 PMM

78 IPE100 Beam No Messages 0,099693 PMM

79 IPE100 Beam No Messages 0,024102 PMM

80 IPE100 Beam No Messages 0,011476 PMM

81 IPE100 Beam No Messages 0,025263 PMM

82 IPE100 Beam No Messages 0,035697 PMM

83 IPE100 Beam No Messages 0,042669 PMM

84 IPE100 Beam No Messages 0,046174 PMM

85 IPE100 Beam No Messages 0,046209 PMM

86 IPE100 Beam No Messages 0,042774 PMM

87 IPE100 Beam No Messages 0,035876 PMM

88 IPE100 Beam No Messages 0,025520 PMM

89 IPE100 Beam No Messages 0,011815 PMM

90 IPE100 Beam No Messages 0,024282 PMM

91 IPE100 Beam No Messages 0,095128 PMM

92 IPE100 Beam No Messages 0,022588 PMM

93 IPE100 Beam No Messages 0,026564 PMM

94 IPE100 Beam No Messages 0,029659 PMM

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 107 a 174

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 1 of 2

Frame DesignSect DesignType Status Ratio RatioType

96 HE280A Beam No Messages 0,002294 PMM

97 HE280A Beam No Messages 0,031704 PMM

98 F12 Brace No Messages 0,393736 PMM

99 F12 Brace No Messages 0,386061 PMM

100 F12 Brace No Messages 0,400210 PMM

101 F12 Brace No Messages 0,383902 PMM

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 2 of 2

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 2 of 2

Frame Combo Location ErrMsg WarnMsg

cm

16 DSTL2 50,000 No Messages No Messages

17 DSTL2 50,000 No Messages No Messages

18 DSTL2 50,000 No Messages No Messages

19 DSTL2 50,000 No Messages No Messages

20 DSTL2 50,000 No Messages No Messages

21 DSTL2 0,000 No Messages No Messages

22 DSTL2 0,000 No Messages No Messages

23 DSTL2 50,000 No Messages No Messages

24 DSTL2 50,000 No Messages No Messages

25 DSTL2 0,000 No Messages No Messages

26 DSTL2 0,000 No Messages No Messages

27 DSTL2 50,000 No Messages No Messages

28 DSTL2 50,000 No Messages No Messages

29 DSTL2 50,000 No Messages No Messages

30 DSTL2 0,000 No Messages No Messages

31 DSTL2 0,000 No Messages No Messages

32 DSTL2 50,000 No Messages No Messages

33 DSTL2 50,000 No Messages No Messages

34 DSTL2 50,000 No Messages No Messages

35 DSTL2 50,000 No Messages No Messages

36 DSTL2 50,000 No Messages No Messages

37 DSTL2 50,000 No Messages No Messages

38 DSTL2 50,000 No Messages No Messages

39 DSTL2 50,000 No Messages No Messages

40 DSTL2 50,000 No Messages No Messages

41 DSTL2 50,000 No Messages No Messages

42 DSTL2 50,000 No Messages No Messages

43 DSTL2 0,000 No Messages No Messages

44 DSTL2 0,000 No Messages No Messages

45 DSTL2 0,000 No Messages No Messages

46 DSTL2 0,000 No Messages No Messages

47 DSTL2 0,000 No Messages No Messages

48 DSTL2 0,000 No Messages No Messages

49 DSTL2 0,000 No Messages No Messages

50 DSTL2 0,000 No Messages No Messages

51 DSTL2 0,000 No Messages No Messages

102 DSTL2 50,000 No Messages No Messages

103 DSTL2 50,000 No Messages No Messages

104 DSTL2 50,000 No Messages No Messages

105 DSTL2 50,000 No Messages No Messages

106 DSTL2 50,000 No Messages No Messages

107 DSTL2 0,000 No Messages No Messages

108 DSTL2 0,000 No Messages No Messages

109 DSTL2 50,000 No Messages No Messages

110 DSTL2 50,000 No Messages No Messages

111 DSTL2 0,000 No Messages No Messages

112 DSTL2 0,000 No Messages No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 108 a 174

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 2 of 2

Frame Combo Location ErrMsg WarnMsg

cm

113 DSTL2 50,000 No Messages No Messages

114 DSTL2 50,000 No Messages No Messages

115 DSTL2 50,000 No Messages No Messages

116 DSTL2 0,000 No Messages No Messages

117 DSTL2 0,000 No Messages No Messages

118 DSTL2 50,000 No Messages No Messages

119 DSTL2 50,000 No Messages No Messages

120 DSTL2 50,000 No Messages No Messages

121 DSTL2 50,000 No Messages No Messages

122 DSTL2 50,000 No Messages No Messages

123 DSTL2 50,000 No Messages No Messages

124 DSTL2 50,000 No Messages No Messages

125 DSTL2 50,000 No Messages No Messages

126 DSTL2 50,000 No Messages No Messages

127 DSTL2 50,000 No Messages No Messages

128 DSTL2 50,000 No Messages No Messages

129 DSTL2 0,000 No Messages No Messages

130 DSTL2 0,000 No Messages No Messages

131 DSTL2 0,000 No Messages No Messages

132 DSTL2 0,000 No Messages No Messages

133 DSTL2 0,000 No Messages No Messages

134 DSTL2 0,000 No Messages No Messages

135 DSTL2 0,000 No Messages No Messages

136 DSTL2 0,000 No Messages No Messages

137 DSTL2 0,000 No Messages No Messages

11 DSTL2 102,956 No Messages No Messages

12 DSTL2 102,956 No Messages No Messages

13 DSTL2 106,696 No Messages No Messages

14 DSTL2 106,696 No Messages No Messages

15 DSTL2 102,956 No Messages No Messages

52 DSTL2 102,956 No Messages No Messages

53 DSTL2 106,696 No Messages No Messages

54 DSTL2 106,696 No Messages No Messages

56 DSTL2 1400,000 No Messages No Messages

57 DSTL2 0,000 No Messages No Messages

59 DSTL2 50,000 No Messages No Messages

60 DSTL2 50,000 No Messages No Messages

61 DSTL2 50,000 No Messages No Messages

62 DSTL2 50,000 No Messages No Messages

64 DSTL2 50,000 No Messages No Messages

65 DSTL2 0,000 No Messages No Messages

66 DSTL2 0,000 No Messages No Messages

67 DSTL2 0,000 No Messages No Messages

69 DSTL2 0,000 No Messages No Messages

70 DSTL2 0,000 No Messages No Messages

71 DSTL2 0,000 No Messages No Messages

72 DSTL2 0,000 No Messages No Messages

75 DSTL2 0,000 No Messages No Messages

76 DSTL2 0,000 No Messages No Messages

77 DSTL2 0,000 No Messages No Messages

78 DSTL2 0,000 No Messages No Messages

79 DSTL2 88,800 No Messages No Messages

80 DSTL2 222,000 No Messages No Messages

81 DSTL2 222,000 No Messages No Messages

82 DSTL2 222,000 No Messages No Messages

83 DSTL2 222,000 No Messages No Messages

84 DSTL2 222,000 No Messages No Messages

85 DSTL2 222,000 No Messages No Messages

86 DSTL2 222,000 No Messages No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 109 a 174

Table: Steel Design 1 - Summary Data - Eurocode 3-2005, Part 2 of 2

Frame Combo Location ErrMsg WarnMsg

cm

87 DSTL2 0,000 No Messages No Messages

88 DSTL2 0,000 No Messages No Messages

89 DSTL2 0,000 No Messages No Messages

90 DSTL2 133,200 No Messages No Messages

91 DSTL2 0,000 No Messages No Messages

92 DSTL2 0,000 No Messages No Messages

93 DSTL2 222,000 No Messages No Messages

94 DSTL2 222,000 No Messages No Messages

96 DSTL2 88,800 No Messages No Messages

97 DSTL2 0,000 No Messages No Messages

98 DSTL2 360,056 No Messages No Messages

99 DSTL2 358,966 No Messages No Messages

100 DSTL2 180,028 No Messages No Messages

101 DSTL2 0,000 No Messages No Messages

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 1 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 1 of 8

Frame DesignSect DesignType Status Combo Location Pu

cm KN

16 HE280A Beam No Messages DSTL2 50,000 36,494

17 HE280A Beam No Messages DSTL2 50,000 39,116

18 HE280A Beam No Messages DSTL2 50,000 40,629

19 HE280A Beam No Messages DSTL2 50,000 8,765

20 HE280A Beam No Messages DSTL2 50,000 22,214

21 HE280A Beam No Messages DSTL2 0,000 -44,165

22 HE280A Beam No Messages DSTL2 0,000 -50,485

23 HE280A Beam No Messages DSTL2 50,000 -230,441

24 HE280A Beam No Messages DSTL2 50,000 -239,860

25 HE280A Beam No Messages DSTL2 0,000 -184,163

26 HE280A Beam No Messages DSTL2 0,000 -212,484

27 HE280A Beam No Messages DSTL2 50,000 -190,647

28 HE280A Beam No Messages DSTL2 50,000 -208,206

29 HE280A Beam No Messages DSTL2 50,000 -226,680

30 HE280A Beam No Messages DSTL2 0,000 -55,923

31 HE280A Beam No Messages DSTL2 0,000 -60,079

32 HE280A Beam No Messages DSTL2 50,000 -208,694

33 HE280A Beam No Messages DSTL2 50,000 -220,171

34 HE280A Beam No Messages DSTL2 50,000 -64,709

35 HE280A Beam No Messages DSTL2 50,000 -69,830

36 HE280A Beam No Messages DSTL2 50,000 -75,300

37 HE280A Beam No Messages DSTL2 50,000 -81,089

38 HE280A Beam No Messages DSTL2 50,000 -87,216

39 HE280A Beam No Messages DSTL2 50,000 -93,682

40 HE280A Beam No Messages DSTL2 50,000 -100,489

41 HE280A Beam No Messages DSTL2 50,000 -107,632

42 HE280A Beam No Messages DSTL2 50,000 -115,116

43 HE280A Beam No Messages DSTL2 0,000 -122,938

44 HE280A Beam No Messages DSTL2 0,000 -131,099

45 HE280A Beam No Messages DSTL2 0,000 -139,598

46 HE280A Beam No Messages DSTL2 0,000 -148,437

47 HE280A Beam No Messages DSTL2 0,000 -157,614

48 HE280A Beam No Messages DSTL2 0,000 -167,133

49 HE280A Beam No Messages DSTL2 0,000 -176,986

50 HE280A Beam No Messages DSTL2 0,000 -187,162

51 HE280A Beam No Messages DSTL2 0,000 -197,684

102 HE280A Beam No Messages DSTL2 50,000 -5,974

103 HE280A Beam No Messages DSTL2 50,000 -10,098

104 HE280A Beam No Messages DSTL2 50,000 -15,680

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 110 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 1 of 8

Frame DesignSect DesignType Status Combo Location Pu

cm KN

105 HE280A Beam No Messages DSTL2 50,000 -62,199

106 HE280A Beam No Messages DSTL2 50,000 -67,852

107 HE280A Beam No Messages DSTL2 0,000 -142,589

108 HE280A Beam No Messages DSTL2 0,000 -142,903

109 HE280A Beam No Messages DSTL2 50,000 36,967

110 HE280A Beam No Messages DSTL2 50,000 52,772

111 HE280A Beam No Messages DSTL2 0,000 138,109

112 HE280A Beam No Messages DSTL2 0,000 159,172

113 HE280A Beam No Messages DSTL2 50,000 215,477

114 HE280A Beam No Messages DSTL2 50,000 236,732

115 HE280A Beam No Messages DSTL2 50,000 256,714

116 HE280A Beam No Messages DSTL2 0,000 -139,813

117 HE280A Beam No Messages DSTL2 0,000 -135,177

118 HE280A Beam No Messages DSTL2 50,000 13,450

119 HE280A Beam No Messages DSTL2 50,000 24,462

120 HE280A Beam No Messages DSTL2 50,000 -130,242

121 HE280A Beam No Messages DSTL2 50,000 -125,144

122 HE280A Beam No Messages DSTL2 50,000 -119,711

123 HE280A Beam No Messages DSTL2 50,000 -113,923

124 HE280A Beam No Messages DSTL2 50,000 -107,792

125 HE280A Beam No Messages DSTL2 50,000 -101,325

126 HE280A Beam No Messages DSTL2 50,000 -94,519

127 HE280A Beam No Messages DSTL2 50,000 -87,375

128 HE280A Beam No Messages DSTL2 50,000 -79,891

129 HE280A Beam No Messages DSTL2 0,000 -72,070

130 HE280A Beam No Messages DSTL2 0,000 -63,908

131 HE280A Beam No Messages DSTL2 0,000 -55,409

132 HE280A Beam No Messages DSTL2 0,000 -46,570

133 HE280A Beam No Messages DSTL2 0,000 -37,394

134 HE280A Beam No Messages DSTL2 0,000 -27,879

135 HE280A Beam No Messages DSTL2 0,000 -18,025

136 HE280A Beam No Messages DSTL2 0,000 -7,813

137 HE280A Beam No Messages DSTL2 0,000 2,731

11 F12 Brace No Messages DSTL2 102,956 -291,166

12 F12 Brace No Messages DSTL2 102,956 167,433

13 F12 Brace No Messages DSTL2 106,696 -307,024

14 F12 Brace No Messages DSTL2 106,696 177,328

15 F12 Brace No Messages DSTL2 102,956 182,208

52 F12 Brace No Messages DSTL2 102,956 -302,370

53 F12 Brace No Messages DSTL2 106,696 160,641

54 F12 Brace No Messages DSTL2 106,696 -294,408

56 F12 Beam No Messages DSTL2 1400,000 655,331

57 F12 Beam No Messages DSTL2 0,000 664,256

59 HE280A Beam No Messages DSTL2 50,000 1,747

60 HE280A Beam No Messages DSTL2 50,000 -2,281

61 HE280A Beam No Messages DSTL2 50,000 28,231

62 HE280A Beam No Messages DSTL2 50,000 32,555

64 HE280A Beam No Messages DSTL2 50,000 276,569

65 HE280A Beam No Messages DSTL2 0,000 295,964

66 HE280A Beam No Messages DSTL2 0,000 -246,213

67 HE280A Beam No Messages DSTL2 0,000 -266,695

69 HE280A Beam No Messages DSTL2 0,000 5,688

70 HE280A Beam No Messages DSTL2 0,000 23,780

71 HE280A Beam No Messages DSTL2 0,000 312,932

72 HE280A Beam No Messages DSTL2 0,000 -290,093

75 IPE100 Beam No Messages DSTL2 0,000 -0,498

76 IPE100 Beam No Messages DSTL2 0,000 -0,739

77 IPE100 Beam No Messages DSTL2 0,000 3,237

78 IPE100 Beam No Messages DSTL2 0,000 -4,379

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 111 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 1 of 8

Frame DesignSect DesignType Status Combo Location Pu

cm KN

79 IPE100 Beam No Messages DSTL2 88,800 2,103

80 IPE100 Beam No Messages DSTL2 222,000 1,634

81 IPE100 Beam No Messages DSTL2 222,000 1,656

82 IPE100 Beam No Messages DSTL2 222,000 1,657

83 IPE100 Beam No Messages DSTL2 222,000 1,657

84 IPE100 Beam No Messages DSTL2 222,000 1,657

85 IPE100 Beam No Messages DSTL2 222,000 1,657

86 IPE100 Beam No Messages DSTL2 222,000 1,657

87 IPE100 Beam No Messages DSTL2 0,000 1,657

88 IPE100 Beam No Messages DSTL2 0,000 1,656

89 IPE100 Beam No Messages DSTL2 0,000 1,634

90 IPE100 Beam No Messages DSTL2 133,200 2,088

91 IPE100 Beam No Messages DSTL2 0,000 -4,152

92 IPE100 Beam No Messages DSTL2 0,000 2,940

93 IPE100 Beam No Messages DSTL2 222,000 -0,671

94 IPE100 Beam No Messages DSTL2 222,000 -0,986

96 HE280A Beam No Messages DSTL2 88,800 0,000

97 HE280A Beam No Messages DSTL2 0,000 50,045

98 F12 Brace No Messages DSTL2 360,056 436,862

99 F12 Brace No Messages DSTL2 358,966 430,205

100 F12 Brace No Messages DSTL2 180,028 452,359

101 F12 Brace No Messages DSTL2 0,000 416,064

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 2 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 2 of 8

Frame MuMajor MuMinor VuMajor VuMinor Tu Equation TotalRatio

KN-cm KN-cm KN KN KN-cm

16 3410,36 -10,24 -6,023 0,537 0,30 (6.2.1) 0,107803

17 3557,85 25,28 -1,341 0,486 0,77 (6.2.1) 0,113998

18 3391,88 -124,75 3,342 2,709 -1,38 (6.2.1) 0,118113

19 -3440,47 -145,77 110,522 1,348 -0,38 (6.2.1) 0,111893

20 -11108,75 70,30 115,151 -0,048 -1,44 (6.2.1) 0,325872

21 -12493,71 93,30 -58,134 2,297 0,28 (6.61) 0,400501

22 -8655,07 -138,38 -53,587 -1,480 1,31 (6.61) 0,300949

23 -8768,52 36,48 53,850 -2,216 -0,68 (6.61) 0,466262

24 -12623,18 263,35 58,422 -5,835 0,61 (6.61) 0,607915

25 -11165,88 67,33 -123,060 -3,572 2,62 (6.2) 0,374790

26 -3059,29 -135,83 -118,488 -4,946 -9,794E-02 (6.2) 0,160123

27 4231,05 207,43 -0,017 -6,227 2,47 (6.2) 0,192786

28 4013,77 246,46 4,530 -4,224 -1,81 (6.2) 0,195089

29 3491,75 217,27 9,056 -4,239 -1,47 (6.2) 0,183333

30 -5121,51 -78,70 -48,936 -1,417 1,92 (6.61) 0,198712

31 -1899,06 -40,48 -44,350 -1,227 1,99 (6.61) 0,105934

32 -1984,80 116,92 44,564 -2,462 -1,48 (6.61) 0,239071

33 -5220,33 87,87 49,172 -2,298 -1,32 (6.61) 0,347865

34 2987,12 10,60 -39,179 -0,939 2,29 (6.61) 0,140613

35 5357,97 21,13 -34,550 -1,410 1,14 (6.61) 0,214568

36 7418,01 17,38 -29,908 -1,162 2,30 (6.61) 0,279625

37 9166,07 30,79 -25,248 -1,576 0,31 (6.61) 0,336688

38 10604,22 26,92 -20,626 -1,314 2,18 (6.61) 0,384703

39 11729,34 40,28 -15,945 -1,735 -0,38 (6.61) 0,424637

40 12545,15 36,73 -11,335 -1,475 1,96 (6.61) 0,455386

41 13047,25 50,43 -6,640 -1,895 -0,95 (6.61) 0,477889

42 13240,27 47,17 -2,036 -1,635 1,63 (6.61) 0,491048

43 13239,92 -41,54 2,159 -2,054 -1,38 (6.61) 0,498720

44 13040,04 -31,50 6,765 -1,794 1,20 (6.61) 0,500593

45 12530,98 -38,19 11,463 -2,214 -1,69 (6.61) 0,493996

46 11708,00 -27,86 16,078 -1,954 0,66 (6.61) 0,477632

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 112 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 2 of 8

Frame MuMajor MuMinor VuMajor VuMinor Tu Equation TotalRatio

KN-cm KN-cm KN KN KN-cm

47 10575,40 -34,20 20,767 -2,375 -1,87 (6.61) 0,452459

48 9129,34 -23,55 25,399 -2,113 1,355E-02 (6.61) 0,417221

49 7372,82 -29,93 30,071 -2,527 -1,92 (6.61) 0,372923

50 5303,68 -19,39 34,727 -2,279 -0,73 (6.61) 0,318207

51 2922,91 -23,01 39,373 -2,747 -1,82 (6.61) 0,254069

102 3445,91 -40,94 -6,214 0,049 0,92 (6.2) 0,102422

103 3604,51 -100,60 -1,540 0,343 0,51 (6.2) 0,113119

104 3450,79 163,50 3,121 -3,811 2,42 (6.2) 0,115703

105 -3506,58 20,01 113,205 2,673 2,69 (6.2) 0,118887

106 -11314,60 -273,79 117,645 4,321 -2,84 (6.2) 0,362171

107 -12677,69 -338,64 -58,364 -5,523 6,46 (6.61) 0,517562

108 -8825,73 94,26 -53,973 1,257 -1,04 (6.61) 0,391674

109 -8711,16 261,02 53,709 -4,916 1,69 (6.2.1) 0,278571

110 -12547,10 -145,42 58,076 1,586 -5,53 (6.2.1) 0,381739

111 -11261,47 -263,23 -109,156 -7,810 3,92 (6.2.1) 0,380416

112 -3930,52 24,08 -104,662 -5,975 -3,34 (6.2.1) 0,159666

113 2842,45 219,69 -5,618 -2,243 -1,17 (6.2.1) 0,161926

114 2924,62 176,93 -0,824 -6,182 -1,51 (6.2.1) 0,166895

115 2685,33 233,15 4,004 -5,942 -2,08 (6.2.1) 0,170732

116 -5270,77 -10,99 -49,259 0,327 -0,99 (6.61) 0,274333

117 -2030,40 -39,13 -44,641 0,135 -1,26 (6.61) 0,174012

118 -1943,69 118,80 44,426 -3,822 1,77 (6.2.1) 0,068770

119 -5170,89 152,21 49,022 -3,995 1,59 (6.2.1) 0,165868

120 2884,91 24,54 -39,439 -2,448 -1,62 (6.61) 0,194549

121 5268,89 22,70 -34,783 -2,130 -0,57 (6.61) 0,261510

122 7340,71 35,14 -30,118 -2,539 -1,78 (6.61) 0,318974

123 9099,45 30,93 -25,439 -2,284 0,13 (6.61) 0,365895

124 10547,30 44,10 -20,799 -2,706 -1,77 (6.61) 0,403545

125 11681,28 40,54 -16,103 -2,445 0,73 (6.61) 0,430755

126 12505,24 53,98 -11,481 -2,865 -1,64 (6.61) 0,448837

127 13014,93 50,69 -6,775 -2,605 1,23 (6.61) 0,456610

128 13215,05 64,42 -2,163 -3,024 -1,37 (6.61) 0,455431

129 13215,41 -24,29 2,039 -0,664 1,62 (6.61) 0,446308

130 13022,25 -31,25 6,649 -1,084 -0,97 (6.61) 0,432712

131 12519,62 -20,93 11,351 -0,824 1,90 (6.61) 0,409325

132 11702,93 -27,60 15,967 -1,244 -0,45 (6.61) 0,377188

133 10576,52 -17,02 20,656 -0,983 2,08 (6.61) 0,335424

134 9136,68 -23,41 25,286 -1,405 0,20 (6.61) 0,285266

135 7386,49 -12,19 29,954 -1,150 2,15 (6.61) 0,225656

136 5323,88 -17,86 34,605 -1,560 0,97 (6.61) 0,158028

137 2949,92 -8,89 39,244 -1,244 2,09 (6.2.1) 0,084784

11 -935,00 -23,25 13,155 0,283 -1,24 (6.2) 0,460970

12 366,48 -25,01 -5,234 0,300 -3,66 (6.2.1) 0,224928

13 -851,91 -394,15 11,785 5,123 -1,53 (6.2) 0,474878

14 315,18 -191,12 -4,661 2,004 14,35 (6.2.1) 0,233407

15 399,33 51,96 -5,542 -0,543 3,68 (6.2.1) 0,245472

52 -987,64 26,45 14,109 -0,464 1,34 (6.2) 0,482644

53 272,29 199,27 -4,230 -2,123 -14,77 (6.2.1) 0,212269

54 -803,83 366,07 10,863 -4,785 4,00 (6.2) 0,451400

56 -467,98 7,68 2,517 -9,825E-03 2,99 (6.2.1) 0,652029

57 -467,60 -16,19 -2,516 -0,012 2,95 (6.2.1) 0,659369

59 2192,38 -25,32 -15,525 -0,259 0,35 (6.2.1) 0,064500

60 2974,65 -20,43 -10,854 -0,077 -0,23 (6.2) 0,086319

61 2177,73 -32,90 -15,345 1,111 0,85 (6.2.1) 0,072499

62 2949,71 -36,48 -10,670 0,945 1,42 (6.2.1) 0,095853

64 2129,15 232,69 8,748 -5,473 -1,37 (6.2.1) 0,160831

65 1918,19 -35,35 12,986 -2,709 -2,10 (6.2.1) 0,144000

66 3331,58 -10,47 13,094 -4,901 -3,02 (6.61) 0,171943

67 2425,63 54,53 17,697 -5,956 -2,59 (6.61) 0,154930

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 113 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 2 of 8

Frame MuMajor MuMinor VuMajor VuMinor Tu Equation TotalRatio

KN-cm KN-cm KN KN KN-cm

69 1094,50 26,41 19,510 0,692 -0,28 (6.2.1) 0,034771

70 1089,90 21,36 19,332 1,195 1,43 (6.2.1) 0,039529

71 963,28 -74,47 17,034 -5,121 -1,57 (6.2.1) 0,125324

72 1207,46 90,23 21,625 -2,163 -3,27 (6.61) 0,130208

75 -7,22 -7,889E-02 -0,119 -6,914E-04 -1,095E-02 (6.62) 0,020300

76 -8,86 -5,984E-02 -0,119 -6,376E-04 -1,133E-02 (6.62) 0,027148

77 -4,35 -0,17 -0,129 -1,411E-03 -1,203E-02 (6.2.1) 0,015031

78 -23,40 -0,13 -0,324 -1,089E-03 -1,098E-02 (6.62) 0,099693

79 11,73 3,015E-02 -0,025 6,159E-04 -8,484E-03 (6.2.1) 0,024102

80 -4,33 -9,341E-02 0,119 8,110E-04 -6,535E-03 (6.2.1) 0,011476

81 -13,16 -0,10 0,119 9,307E-04 -5,038E-03 (6.2.1) 0,025263

82 -19,87 -0,12 0,119 1,047E-03 -3,906E-03 (6.2.1) 0,035697

83 -24,34 -0,13 0,119 1,162E-03 -3,074E-03 (6.2.1) 0,042669

84 -26,57 -0,14 0,119 1,278E-03 -2,491E-03 (6.2.1) 0,046174

85 -26,56 -0,15 0,119 1,394E-03 -2,125E-03 (6.2.1) 0,046209

86 -24,31 -0,17 0,119 1,509E-03 -1,952E-03 (6.2.1) 0,042774

87 -19,83 0,18 -0,119 1,625E-03 -1,964E-03 (6.2.1) 0,035876

88 -13,13 0,19 -0,119 1,741E-03 -2,161E-03 (6.2.1) 0,025520

89 -4,29 0,21 -0,119 1,861E-03 -2,554E-03 (6.2.1) 0,011815

90 11,81 -6,100E-02 0,022 2,053E-03 -3,167E-03 (6.2.1) 0,024282

91 -22,35 0,42 -0,316 3,697E-03 -4,058E-03 (6.62) 0,095128

92 -14,30 0,47 -0,216 4,125E-03 8,145E-03 (6.2.1) 0,022588

93 -9,28 -0,38 0,123 3,349E-03 2,837E-02 (6.62) 0,026564

94 -7,48 -0,39 0,121 3,448E-03 4,005E-02 (6.62) 0,029659

96 61,57 -5,80 -0,145 -0,128 -0,60 (6.2) 0,002294

97 25,21 193,72 -0,904 1,294 2,40 (6.2.1) 0,031704

98 119,66 69,19 0,352 -0,283 0,23 (6.2.1) 0,393736

99 128,97 2,74 0,306 -0,026 5,06 (6.2.1) 0,386061

100 108,89 23,02 0,128 0,328 -14,15 (6.2.1) 0,400210

101 168,27 20,24 -0,185 0,069 -19,01 (6.2.1) 0,383902

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 3 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 3 of 8

Frame PRatio MMajRatio MMinRatio SRLimit NsdDsgn Ncrd Ntrd

KN KN KN

16 0,010716 0,096227 0,000860 0,950000 36,494 3405,500 3405,500

17 0,011486 0,100389 0,002123 0,950000 39,116 3405,500 3405,500

18 0,011931 0,095706 0,010477 0,950000 40,629 3405,500 3405,500

19 0,002574 0,097077 0,012242 0,950000 8,765 3405,500 3405,500

20 0,006523 0,313446 0,005904 0,950000 22,214 3405,500 3405,500

21 0,036315 0,360205 0,003981 0,950000 -44,165 1216,179 3405,500

22 0,041511 0,250295 0,009143 0,950000 -50,485 1216,179 3405,500

23 0,189480 0,275541 0,001241 0,950000 -230,441 1216,179 3405,500

24 0,197224 0,398325 0,012366 0,950000 -239,860 1216,179 3405,500

25 0,054078 0,315058 0,005654 0,950000 -184,163 3405,500 3405,500

26 0,062394 0,086321 0,011407 0,950000 -212,484 3405,500 3405,500

27 0,055982 0,119384 0,017420 0,950000 -190,647 3240,007 3405,500

28 0,061138 0,113253 0,020698 0,950000 -208,206 3240,007 3405,500

29 0,066563 0,098524 0,018246 0,950000 -226,680 3240,007 3405,500

30 0,045983 0,148496 0,004233 0,950000 -55,923 1216,179 3405,500

31 0,049400 0,055172 0,001361 0,950000 -60,079 1216,179 3405,500

32 0,171598 0,061769 0,005704 0,950000 -208,694 1216,179 3405,500

33 0,181035 0,163297 0,003533 0,950000 -220,171 1216,179 3405,500

34 0,053207 0,086976 0,000431 0,950000 -64,709 1216,179 3405,500

35 0,057417 0,156389 0,000762 0,950000 -69,830 1216,179 3405,500

36 0,061915 0,217083 0,000627 0,950000 -75,300 1216,179 3405,500

37 0,066675 0,268977 0,001036 0,950000 -81,089 1216,179 3405,500

38 0,071713 0,312084 0,000906 0,950000 -87,216 1216,179 3405,500

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 114 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 3 of 8

Frame PRatio MMajRatio MMinRatio SRLimit NsdDsgn Ncrd Ntrd

KN KN KN

39 0,077030 0,346253 0,001355 0,950000 -93,682 1216,179 3405,500

40 0,082626 0,371524 0,001236 0,950000 -100,489 1216,179 3405,500

41 0,088500 0,387691 0,001697 0,950000 -107,632 1216,179 3405,500

42 0,094654 0,394806 0,001588 0,950000 -115,116 1216,179 3405,500

43 0,101085 0,396237 0,001398 0,950000 -122,938 1216,179 3405,500

44 0,107796 0,391737 0,001061 0,950000 -131,099 1216,179 3405,500

45 0,114784 0,377926 0,001286 0,950000 -139,598 1216,179 3405,500

46 0,122052 0,354547 0,001033 0,950000 -148,437 1216,179 3405,500

47 0,129597 0,321600 0,001262 0,950000 -157,614 1216,179 3405,500

48 0,137424 0,278834 0,000962 0,950000 -167,133 1216,179 3405,500

49 0,145526 0,226197 0,001200 0,950000 -176,986 1216,179 3405,500

50 0,153894 0,163467 0,000846 0,950000 -187,162 1216,179 3405,500

51 0,162545 0,090516 0,001007 0,950000 -197,684 1216,179 3405,500

102 0,001754 0,097230 0,003438 0,950000 -5,974 3405,500 3405,500

103 0,002965 0,101705 0,008449 0,950000 -10,098 3405,500 3405,500

104 0,004604 0,097368 0,013731 0,950000 -15,680 3405,500 3405,500

105 0,018264 0,098942 0,001680 0,950000 -62,199 3405,500 3405,500

106 0,019924 0,319254 0,022993 0,950000 -67,852 3405,500 3405,500

107 0,117243 0,382879 0,017440 0,950000 -142,589 1216,179 3405,500

108 0,117502 0,266585 0,007587 0,950000 -142,903 1216,179 3405,500

109 0,010855 0,245795 0,021921 0,950000 36,967 1216,179 3405,500

110 0,015496 0,354030 0,012213 0,950000 52,772 1216,179 3405,500

111 0,040555 0,317755 0,022107 0,950000 138,109 3405,500 3405,500

112 0,046740 0,110904 0,002023 0,950000 159,172 3405,500 3405,500

113 0,063273 0,080203 0,018450 0,950000 215,477 3240,007 3405,500

114 0,069515 0,082521 0,014859 0,950000 236,732 3240,007 3405,500

115 0,075382 0,075770 0,019580 0,950000 256,714 3240,007 3405,500

116 0,114961 0,158979 0,000394 0,950000 -139,813 1216,179 3405,500

117 0,111149 0,061110 0,001753 0,950000 -135,177 1216,179 3405,500

118 0,003949 0,054843 0,009977 0,950000 13,450 1216,179 3405,500

119 0,007183 0,145902 0,012783 0,950000 24,462 1216,179 3405,500

120 0,107091 0,086631 0,000826 0,950000 -130,242 1216,179 3405,500

121 0,102899 0,157846 0,000764 0,950000 -125,144 1216,179 3405,500

122 0,098432 0,219359 0,001183 0,950000 -119,711 1216,179 3405,500

123 0,093673 0,271181 0,001041 0,950000 -113,923 1216,179 3405,500

124 0,088631 0,313430 0,001484 0,950000 -107,792 1216,179 3405,500

125 0,083314 0,346077 0,001364 0,950000 -101,325 1216,179 3405,500

126 0,077718 0,369303 0,001816 0,950000 -94,519 1216,179 3405,500

127 0,071844 0,383061 0,001705 0,950000 -87,375 1216,179 3405,500

128 0,065690 0,387574 0,002167 0,950000 -79,891 1216,179 3405,500

129 0,059259 0,386146 0,000902 0,950000 -72,070 1216,179 3405,500

130 0,052548 0,379022 0,001141 0,950000 -63,908 1216,179 3405,500

131 0,045560 0,362912 0,000853 0,950000 -55,409 1216,179 3405,500

132 0,038292 0,337798 0,001098 0,950000 -46,570 1216,179 3405,500

133 0,030747 0,303934 0,000743 0,950000 -37,394 1216,179 3405,500

134 0,022923 0,261347 0,000995 0,950000 -27,879 1216,179 3405,500

135 0,014821 0,210272 0,000563 0,950000 -18,025 1216,179 3405,500

136 0,006424 0,150798 0,000805 0,950000 -7,813 1216,179 3405,500

137 0,000802 0,083235 0,000747 0,950000 2,731 1216,179 3405,500

11 0,240730 0,220172 0,005474 0,950000 -291,166 1116,251 1209,513

12 0,138430 0,086298 0,005889 0,950000 167,433 1116,251 1209,513

13 0,253841 0,200606 0,092815 0,950000 -307,024 1108,244 1209,513

14 0,146611 0,074217 0,045004 0,950000 177,328 1108,244 1209,513

15 0,150646 0,094034 0,012235 0,950000 182,208 1116,251 1209,513

52 0,249993 0,232568 0,006228 0,950000 -302,370 1116,251 1209,513

53 0,132815 0,064118 0,046924 0,950000 160,641 1108,244 1209,513

54 0,243410 0,189286 0,086202 0,950000 -294,408 1108,244 1209,513

56 0,541814 0,110200 0,001810 0,950000 655,331 48,132 1209,513

57 0,549193 0,110110 0,003813 0,950000 664,256 48,132 1209,513

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 115 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 3 of 8

Frame PRatio MMajRatio MMinRatio SRLimit NsdDsgn Ncrd Ntrd

KN KN KN

59 0,000513 0,061861 0,002127 0,950000 1,747 3405,500 3405,500

60 0,000670 0,083933 0,001716 0,950000 -2,281 3405,500 3405,500

61 0,008290 0,061447 0,002763 0,950000 28,231 3405,500 3405,500

62 0,009559 0,083229 0,003064 0,950000 32,555 3405,500 3405,500

64 0,081213 0,060076 0,019542 0,950000 276,569 3240,007 3405,500

65 0,086908 0,054124 0,002969 0,950000 295,964 3240,007 3405,500

66 0,075992 0,095437 0,000514 0,950000 -246,213 3240,007 3405,500

67 0,082313 0,069572 0,003045 0,950000 -266,695 3240,007 3405,500

69 0,001670 0,030883 0,002218 0,950000 5,688 3405,500 3405,500

70 0,006983 0,030753 0,001794 0,950000 23,780 3405,500 3405,500

71 0,091890 0,027180 0,006254 0,950000 312,932 3240,007 3405,500

72 0,089535 0,034682 0,005992 0,950000 -290,093 3240,007 3405,500

75 0,009030 0,011170 0,000000 0,950000 -0,498 55,146 360,500

76 0,013392 0,013680 0,000000 0,950000 -0,739 55,146 360,500

77 0,008980 0,005523 0,000527 0,950000 3,237 55,146 360,500

78 0,079410 0,020099 0,000184 0,950000 -4,379 55,146 360,500

79 0,005834 0,018173 0,000000 0,950000 2,103 55,146 360,500

80 0,004531 0,006653 0,000292 0,950000 1,634 55,146 360,500

81 0,004594 0,020348 0,000321 0,950000 1,656 55,146 360,500

82 0,004596 0,030737 0,000363 0,950000 1,657 55,146 360,500

83 0,004595 0,037671 0,000403 0,950000 1,657 55,146 360,500

84 0,004595 0,041135 0,000443 0,950000 1,657 55,146 360,500

85 0,004595 0,041130 0,000483 0,950000 1,657 55,146 360,500

86 0,004595 0,037656 0,000523 0,950000 1,657 55,146 360,500

87 0,004596 0,030717 0,000564 0,950000 1,657 55,146 360,500

88 0,004595 0,020324 0,000602 0,950000 1,656 55,146 360,500

89 0,004533 0,006627 0,000655 0,950000 1,634 55,146 360,500

90 0,005793 0,018298 0,000190 0,950000 2,088 55,146 360,500

91 0,075292 0,019259 0,000578 0,950000 -4,152 55,146 360,500

92 0,008156 0,012968 0,001464 0,950000 2,940 55,146 360,500

93 0,012167 0,013912 0,000485 0,950000 -0,671 55,146 360,500

94 0,017874 0,011289 0,000496 0,950000 -0,986 55,146 360,500

96 0,000000 0,001807 0,000487 0,950000 0,000 3014,958 3405,500

97 0,014695 0,000740 0,016269 0,950000 50,045 3014,958 3405,500

98 0,361188 0,028176 0,016292 0,950000 436,862 508,813 1209,513

99 0,355684 0,030370 0,000645 0,950000 430,205 510,894 1209,513

100 0,374001 0,025642 0,005420 0,950000 452,359 508,813 1209,513

101 0,343993 0,039623 0,004766 0,950000 416,064 510,894 1209,513

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 4 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 4 of 8

Frame NbrdMajor NbrdMinor MsdMajDsgn McrdMajor MvrdMajor MbrdMajor XKMajor

KN KN KN-cm KN-cm KN-cm KN-cm

16 3405,500 3405,500 3410,36 35440,74 35440,74 35440,74 1,000000

17 3405,500 3405,500 3557,85 35440,74 35440,74 35440,74 1,000000

18 3405,500 3405,500 3391,88 35440,74 35440,74 35440,74 1,000000

19 3405,500 3405,500 -3440,47 35440,74 35440,74 35440,74 1,000000

20 3405,500 3405,500 -11108,75 35440,74 35440,74 35440,74 1,000000

21 1216,179 3405,500 -12493,71 35440,74 35440,74 35440,74 1,000000

22 1216,179 3405,500 -8655,07 35440,74 35440,74 35440,74 1,000000

23 1216,179 3405,500 -8768,52 35440,74 35440,74 35440,74 1,000000

24 1216,179 3405,500 -12623,18 35440,74 35440,74 35440,74 1,000000

25 3405,500 3405,500 -11165,88 35440,74 35440,74 35440,74 1,000000

26 3405,500 3405,500 -3059,29 35440,74 35440,74 35440,74 1,000000

27 3240,007 3405,500 4231,05 35440,74 35440,74 35440,74 1,000000

28 3240,007 3405,500 4013,77 35440,74 35440,74 35440,74 1,000000

29 3240,007 3405,500 3491,75 35440,74 35440,74 35440,74 1,000000

30 1216,179 3405,500 -5121,51 35440,74 35440,74 35440,74 1,000000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 116 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 4 of 8

Frame NbrdMajor NbrdMinor MsdMajDsgn McrdMajor MvrdMajor MbrdMajor XKMajor

KN KN KN-cm KN-cm KN-cm KN-cm

31 1216,179 3405,500 -1899,06 35440,74 35440,74 35440,74 1,000000

32 1216,179 3405,500 -1984,80 35440,74 35440,74 35440,74 1,000000

33 1216,179 3405,500 -5220,33 35440,74 35440,74 35440,74 1,000000

34 1216,179 3405,500 2987,12 35440,74 35440,74 35440,74 1,000000

35 1216,179 3405,500 5357,97 35440,74 35440,74 35440,74 1,000000

36 1216,179 3405,500 7418,01 35440,74 35440,74 35440,74 1,000000

37 1216,179 3405,500 9166,07 35440,74 35440,74 35440,74 1,000000

38 1216,179 3405,500 10604,22 35440,74 35440,74 35440,74 1,000000

39 1216,179 3405,500 11729,34 35440,74 35440,74 35440,74 1,000000

40 1216,179 3405,500 12545,15 35440,74 35440,74 35440,74 1,000000

41 1216,179 3405,500 13047,25 35440,74 35440,74 35440,74 1,000000

42 1216,179 3405,500 13240,27 35440,74 35440,74 35440,74 1,000000

43 1216,179 3405,500 13239,92 35440,74 35440,74 35440,74 1,000000

44 1216,179 3405,500 13040,04 35440,74 35440,74 35440,74 1,000000

45 1216,179 3405,500 12530,98 35440,74 35440,74 35440,74 1,000000

46 1216,179 3405,500 11708,00 35440,74 35440,74 35440,74 1,000000

47 1216,179 3405,500 10575,40 35440,74 35440,74 35440,74 1,000000

48 1216,179 3405,500 9129,34 35440,74 35440,74 35440,74 1,000000

49 1216,179 3405,500 7372,82 35440,74 35440,74 35440,74 1,000000

50 1216,179 3405,500 5303,68 35440,74 35440,74 35440,74 1,000000

51 1216,179 3405,500 2922,91 35440,74 35440,74 35440,74 1,000000

102 3405,500 3405,500 3445,91 35440,74 35440,74 35440,74 1,000000

103 3405,500 3405,500 3604,51 35440,74 35440,74 35440,74 1,000000

104 3405,500 3405,500 3450,79 35440,74 35440,74 35440,74 1,000000

105 3405,500 3405,500 -3506,58 35440,74 35440,74 35440,74 1,000000

106 3405,500 3405,500 -11314,60 35440,74 35440,74 35440,74 1,000000

107 1216,179 3405,500 -12677,69 35440,74 35440,74 35440,74 1,000000

108 1216,179 3405,500 -8825,73 35440,74 35440,74 35440,74 1,000000

109 1216,179 3405,500 -8711,16 35440,74 35440,74 35440,74 1,000000

110 1216,179 3405,500 -12547,10 35440,74 35440,74 35440,74 1,000000

111 3405,500 3405,500 -11261,47 35440,74 35440,74 35440,74 1,000000

112 3405,500 3405,500 -3930,52 35440,74 35440,74 35440,74 1,000000

113 3240,007 3405,500 2842,45 35440,74 35440,74 35440,74 1,000000

114 3240,007 3405,500 2924,62 35440,74 35440,74 35440,74 1,000000

115 3240,007 3405,500 2685,33 35440,74 35440,74 35440,74 1,000000

116 1216,179 3405,500 -5270,77 35440,74 35440,74 35440,74 1,000000

117 1216,179 3405,500 -2030,40 35440,74 35440,74 35440,74 1,000000

118 1216,179 3405,500 -1943,69 35440,74 35440,74 35440,74 1,000000

119 1216,179 3405,500 -5170,89 35440,74 35440,74 35440,74 1,000000

120 1216,179 3405,500 2884,91 35440,74 35440,74 35440,74 1,000000

121 1216,179 3405,500 5268,89 35440,74 35440,74 35440,74 1,000000

122 1216,179 3405,500 7340,71 35440,74 35440,74 35440,74 1,000000

123 1216,179 3405,500 9099,45 35440,74 35440,74 35440,74 1,000000

124 1216,179 3405,500 10547,30 35440,74 35440,74 35440,74 1,000000

125 1216,179 3405,500 11681,28 35440,74 35440,74 35440,74 1,000000

126 1216,179 3405,500 12505,24 35440,74 35440,74 35440,74 1,000000

127 1216,179 3405,500 13014,93 35440,74 35440,74 35440,74 1,000000

128 1216,179 3405,500 13215,05 35440,74 35440,74 35440,74 1,000000

129 1216,179 3405,500 13215,41 35440,74 35440,74 35440,74 1,000000

130 1216,179 3405,500 13022,25 35440,74 35440,74 35440,74 1,000000

131 1216,179 3405,500 12519,62 35440,74 35440,74 35440,74 1,000000

132 1216,179 3405,500 11702,93 35440,74 35440,74 35440,74 1,000000

133 1216,179 3405,500 10576,52 35440,74 35440,74 35440,74 1,000000

134 1216,179 3405,500 9136,68 35440,74 35440,74 35440,74 1,000000

135 1216,179 3405,500 7386,49 35440,74 35440,74 35440,74 1,000000

136 1216,179 3405,500 5323,88 35440,74 35440,74 35440,74 1,000000

137 1216,179 3405,500 2949,92 35440,74 35440,74 35440,74 1,000000

11 1116,251 1116,251 -935,00 4246,67 4246,67 4246,67 1,000000

12 1116,251 1116,251 366,48 4246,67 4246,67 4246,67 1,000000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 117 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 4 of 8

Frame NbrdMajor NbrdMinor MsdMajDsgn McrdMajor MvrdMajor MbrdMajor XKMajor

KN KN KN-cm KN-cm KN-cm KN-cm

13 1108,244 1108,244 -851,91 4246,67 4246,67 4246,67 1,000000

14 1108,244 1108,244 315,18 4246,67 4246,67 4246,67 1,000000

15 1116,251 1116,251 399,33 4246,67 4246,67 4246,67 1,000000

52 1116,251 1116,251 -987,64 4246,67 4246,67 4246,67 1,000000

53 1108,244 1108,244 272,29 4246,67 4246,67 4246,67 1,000000

54 1108,244 1108,244 -803,83 4246,67 4246,67 4246,67 1,000000

56 48,132 48,132 -467,98 4246,67 4246,67 4246,67 1,000000

57 48,132 48,132 -467,60 4246,67 4246,67 4246,67 1,000000

59 3405,500 3405,500 2192,38 35440,74 35440,74 35440,74 1,000000

60 3405,500 3405,500 2974,65 35440,74 35440,74 35440,74 1,000000

61 3405,500 3405,500 2177,73 35440,74 35440,74 35440,74 1,000000

62 3405,500 3405,500 2949,71 35440,74 35440,74 35440,74 1,000000

64 3240,007 3405,500 2129,15 35440,74 35440,74 35440,74 1,000000

65 3240,007 3405,500 1918,19 35440,74 35440,74 35440,74 1,000000

66 3240,007 3405,500 3331,58 35440,74 35440,74 35440,74 1,000000

67 3240,007 3405,500 2425,63 35440,74 35440,74 35440,74 1,000000

69 3405,500 3405,500 1094,50 35440,74 35440,74 35440,74 1,000000

70 3405,500 3405,500 1089,90 35440,74 35440,74 35440,74 1,000000

71 3240,007 3405,500 963,28 35440,74 35440,74 35440,74 1,000000

72 3240,007 3405,500 1207,46 35440,74 35440,74 35440,74 1,000000

75 301,159 55,146 -7,22 1379,00 1379,00 646,00 1,000000

76 301,159 55,146 -8,86 1379,00 1379,00 646,86 1,000000

77 301,159 55,146 -4,35 1379,00 1379,00 786,91 1,000000

78 301,159 55,146 -23,40 1379,00 1379,00 1102,39 1,000000

79 301,159 55,146 11,73 1379,00 1379,00 645,66 1,000000

80 301,159 55,146 -4,33 1379,00 1379,00 650,85 1,000000

81 301,159 55,146 -13,16 1379,00 1379,00 646,97 1,000000

82 301,159 55,146 -19,87 1379,00 1379,00 646,30 1,000000

83 301,159 55,146 -24,34 1379,00 1379,00 646,03 1,000000

84 301,159 55,146 -26,57 1379,00 1379,00 645,89 1,000000

85 301,159 55,146 -26,56 1379,00 1379,00 645,79 1,000000

86 301,159 55,146 -24,31 1379,00 1379,00 645,70 1,000000

87 301,159 55,146 -19,83 1379,00 1379,00 645,72 1,000000

88 301,159 55,146 -13,13 1379,00 1379,00 645,95 1,000000

89 301,159 55,146 -4,29 1379,00 1379,00 647,36 1,000000

90 301,159 55,146 11,81 1379,00 1379,00 645,66 1,000000

91 301,159 55,146 -22,35 1379,00 1379,00 1102,39 1,000000

92 301,159 55,146 -14,30 1379,00 1379,00 1102,39 1,000000

93 301,159 55,146 -9,28 1379,00 1379,00 666,11 1,000000

94 301,159 55,146 -7,48 1379,00 1379,00 660,58 1,000000

96 3345,611 3014,958 61,57 35440,74 35440,74 34069,88 1,000000

97 3345,611 3014,958 25,21 35440,74 35440,74 34069,88 1,000000

98 508,813 508,813 119,66 4246,67 4246,67 4246,67 1,000000

99 510,894 510,894 128,97 4246,67 4246,67 4246,67 1,000000

100 508,813 508,813 108,89 4246,67 4246,67 4246,67 1,000000

101 510,894 510,894 168,27 4246,67 4246,67 4246,67 1,000000

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 5 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 5 of 8

Frame XLMajor kMajor kzy C1 MsdMinDsgn McrdMinor MvrdMinor

KN-cm KN-cm KN-cm

16 1,000000 0,963195 1,000000 1,037526 -10,24 11907,50 11907,50

17 1,000000 0,991040 1,000000 1,008325 25,28 11907,50 11907,50

18 1,000000 0,982578 1,000000 1,016666 -124,75 11907,50 11907,50

19 2,000000 1,000000 1,000000 2,700000 -145,77 11907,50 11907,50

20 2,000000 1,000000 1,000000 1,325246 70,30 11907,50 11907,50

21 26,000000 1,021789 0,999906 1,111292 93,30 11907,50 11907,50

22 26,000000 1,024907 0,999887 1,160283 -138,38 11907,50 11907,50

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 118 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 5 of 8

Frame XLMajor kMajor kzy C1 MsdMinDsgn McrdMinor MvrdMinor

KN-cm KN-cm KN-cm

23 26,000000 1,113688 0,999487 1,158596 36,48 11907,50 11907,50

24 26,000000 1,118334 0,999491 1,110552 263,35 11907,50 11907,50

25 2,000000 1,003646 0,999514 1,355228 67,33 11907,50 11907,50

26 2,000000 1,004206 0,998021 2,700000 -135,83 11907,50 11907,50

27 5,950000 1,011801 0,999644 1,001153 207,43 11907,50 11907,50

28 5,950000 1,012888 0,999601 1,019541 246,46 11907,50 11907,50

29 5,950000 1,014031 0,999551 1,046818 217,27 11907,50 11907,50

30 26,000000 1,027590 0,999860 1,288565 -78,70 11907,50 11907,50

31 26,000000 1,029640 0,999706 2,118938 -40,48 11907,50 11907,50

32 26,000000 1,102959 0,999039 2,049796 116,92 11907,50 11907,50

33 26,000000 1,108621 0,999453 1,282830 87,87 11907,50 11907,50

34 26,000000 1,031924 0,999814 1,464151 10,60 11907,50 11907,50

35 26,000000 1,034450 0,999843 1,171767 21,13 11907,50 11907,50

36 26,000000 1,037149 0,999843 1,094677 17,38 11907,50 11907,50

37 26,000000 1,040005 0,999837 1,060140 30,79 11907,50 11907,50

38 26,000000 1,043028 0,999829 1,040480 26,92 11907,50 11907,50

39 26,000000 1,046218 0,999819 1,027336 40,28 11907,50 11907,50

40 26,000000 1,049576 0,999808 1,017736 36,73 11907,50 11907,50

41 26,000000 1,053100 0,999797 1,009872 50,43 11907,50 11907,50

42 26,000000 1,056792 0,999785 1,003151 47,17 11907,50 11907,50

43 26,000000 1,060651 0,999770 1,003322 -41,54 11907,50 11907,50

44 26,000000 1,064678 0,999752 1,010063 -31,50 11907,50 11907,50

45 26,000000 1,068870 0,999733 1,017966 -38,19 11907,50 11907,50

46 26,000000 1,073231 0,999713 1,027637 -27,86 11907,50 11907,50

47 26,000000 1,077758 0,999690 1,040913 -34,20 11907,50 11907,50

48 26,000000 1,082455 0,999663 1,060841 -23,55 11907,50 11907,50

49 26,000000 1,087316 0,999630 1,096022 -29,93 11907,50 11907,50

50 26,000000 1,092336 0,999577 1,175264 -19,39 11907,50 11907,50

51 26,000000 1,097527 0,999423 1,482951 -23,01 11907,50 11907,50

102 1,000000 0,962526 0,999988 1,038356 -40,94 11907,50 11907,50

103 1,000000 0,990149 0,999981 1,009276 -100,60 11907,50 11907,50

104 1,000000 0,984190 0,999970 1,015195 163,50 11907,50 11907,50

105 2,000000 1,001231 0,999421 2,700000 20,01 11907,50 11907,50

106 2,000000 1,001343 0,999825 1,326696 -273,79 11907,50 11907,50

107 26,000000 1,070346 0,999697 1,109822 -338,64 11907,50 11907,50

108 26,000000 1,070501 0,999682 1,157727 94,26 11907,50 11907,50

109 26,000000 1,000000 1,000000 1,159411 261,02 11907,50 11907,50

110 26,000000 1,000000 1,000000 1,110562 -145,42 11907,50 11907,50

111 2,000000 1,000000 1,000000 1,295641 -263,23 11907,50 11907,50

112 2,000000 1,000000 1,000000 2,395470 24,08 11907,50 11907,50

113 5,950000 1,000000 1,000000 1,042722 219,69 11907,50 11907,50

114 5,950000 1,000000 1,000000 1,006801 176,93 11907,50 11907,50

115 5,950000 1,000000 1,000000 1,025720 233,15 11907,50 11907,50

116 26,000000 1,068977 0,999654 1,279739 -10,99 11907,50 11907,50

117 26,000000 1,066689 0,999396 2,014849 -39,13 11907,50 11907,50

118 26,000000 1,000000 1,000000 2,080532 118,80 11907,50 11907,50

119 26,000000 1,000000 1,000000 1,285403 152,21 11907,50 11907,50

120 26,000000 1,064255 0,999617 1,493731 24,54 11907,50 11907,50

121 26,000000 1,061740 0,999717 1,177177 22,70 11907,50 11907,50

122 26,000000 1,059059 0,999749 1,096724 35,14 11907,50 11907,50

123 26,000000 1,056204 0,999770 1,061184 30,93 11907,50 11907,50

124 26,000000 1,053179 0,999788 1,041105 44,10 11907,50 11907,50

125 26,000000 1,049989 0,999804 1,027751 40,54 11907,50 11907,50

126 26,000000 1,046631 0,999819 1,018033 53,98 11907,50 11907,50

127 26,000000 1,043106 0,999835 1,010099 50,69 11907,50 11907,50

128 26,000000 1,039414 0,999850 1,003334 64,42 11907,50 11907,50

129 26,000000 1,035556 0,999865 1,003160 -24,29 11907,50 11907,50

130 26,000000 1,031529 0,999879 1,009906 -31,25 11907,50 11907,50

131 26,000000 1,027336 0,999894 1,017800 -20,93 11907,50 11907,50

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 119 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 5 of 8

Frame XLMajor kMajor kzy C1 MsdMinDsgn McrdMinor MvrdMinor

KN-cm KN-cm KN-cm

132 26,000000 1,022975 0,999910 1,027445 -27,60 11907,50 11907,50

133 26,000000 1,018448 0,999926 1,040665 -17,02 11907,50 11907,50

134 26,000000 1,013754 0,999944 1,060471 -23,41 11907,50 11907,50

135 26,000000 1,008893 0,999962 1,095351 -12,19 11907,50 11907,50

136 26,000000 1,003855 0,999982 1,173583 -17,86 11907,50 11907,50

137 26,000000 1,000000 1,000000 1,474053 -8,89 11907,50 11907,50

11 1,000000 0,441257 0,264754 2,594239 -23,25 4246,67 4246,67

12 1,000000 0,401715 0,241029 2,700000 -25,01 4246,67 4246,67

13 1,000000 0,433608 0,260165 2,639771 -394,15 4246,67 4246,67

14 1,000000 0,400000 0,240000 2,700000 -191,12 4246,67 4246,67

15 1,000000 0,419218 0,251531 2,618955 51,96 4246,67 4246,67

52 1,000000 0,432414 0,259449 2,636802 26,45 4246,67 4246,67

53 1,000000 0,400000 0,240000 2,700000 199,27 4246,67 4246,67

54 1,000000 0,447374 0,268424 2,574863 366,07 4246,67 4246,67

56 1,000000 0,808344 0,485006 1,003995 7,68 4246,67 4246,67

57 1,000000 0,808354 0,485012 1,002864 -16,19 4246,67 4246,67

59 1,000000 0,856066 1,000000 1,196870 -25,32 11907,50 11907,50

60 1,000000 0,925344 0,999995 1,085333 -20,43 11907,50 11907,50

61 1,000000 0,856749 1,000000 1,195619 -32,90 11907,50 11907,50

62 1,000000 0,925940 1,000000 1,084480 -36,48 11907,50 11907,50

64 5,950000 1,000000 1,000000 1,074256 232,69 11907,50 11907,50

65 5,950000 1,000000 1,000000 1,186145 -35,35 11907,50 11907,50

66 5,950000 1,015241 0,999486 1,092972 -10,47 11907,50 11907,50

67 5,950000 1,016508 0,999381 1,204389 54,53 11907,50 11907,50

69 1,000000 0,657146 1,000000 1,690602 26,41 11907,50 11907,50

70 1,000000 0,658798 1,000000 1,685442 21,36 11907,50 11907,50

71 6,263158 1,000000 1,000000 1,683945 -74,47 11907,50 11907,50

72 6,263158 1,017957 0,999051 1,694398 90,23 11907,50 11907,50

75 1,000000 1,000097 0,998795 1,000697 -7,889E-02 320,25 320,25

76 1,000000 0,998640 0,998208 1,002403 -5,984E-02 320,25 320,25

77 1,000000 0,707216 1,000000 1,313812 -0,17 320,25 320,25

78 1,000000 0,403057 0,947060 2,700000 -0,13 320,25 320,25

79 1,000000 0,973606 1,000000 1,000000 3,015E-02 320,25 320,25

80 1,000000 0,482787 1,000000 1,010383 -9,341E-02 320,25 320,25

81 1,000000 0,997126 1,000000 1,002614 -0,10 320,25 320,25

82 1,000000 0,998576 1,000000 1,001288 -0,12 320,25 320,25

83 1,000000 0,999163 1,000000 1,000756 -0,13 320,25 320,25

84 1,000000 0,999485 1,000000 1,000464 -0,14 320,25 320,25

85 1,000000 0,999708 1,000000 1,000263 -0,15 320,25 320,25

86 1,000000 0,999905 1,000000 1,000086 -0,17 320,25 320,25

87 1,000000 0,999849 1,000000 1,000136 0,18 320,25 320,25

88 1,000000 0,999352 1,000000 1,000585 0,19 320,25 320,25

89 1,000000 0,484829 1,000000 1,003407 0,21 320,25 320,25

90 1,000000 0,973995 1,000000 1,000000 -6,100E-02 320,25 320,25

91 1,000000 0,402899 0,949806 2,700000 0,42 320,25 320,25

92 1,000000 0,400000 1,000000 2,700000 0,47 320,25 320,25

93 1,000000 0,961011 0,998286 1,041331 -0,38 320,25 320,25

94 1,000000 0,971556 0,997517 1,030048 -0,39 320,25 320,25

96 1,000000 0,957187 1,000000 1,000000 -5,80 11907,50 11907,50

97 1,000000 0,969207 1,000000 1,000000 193,72 11907,50 11907,50

98 1,000000 0,997228 0,598337 1,000000 69,19 4246,67 4246,67

99 1,000000 0,645587 0,387352 1,727199 2,74 4246,67 4246,67

100 1,000000 0,984681 0,590809 1,000000 23,02 4246,67 4246,67

101 1,000000 0,625670 0,375402 1,792297 20,24 4246,67 4246,67

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 120 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 6 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 6 of 8

Frame XKMinor XLMinor kMinor kyz Fy E Length

KN/cm2 KN/cm2 cm

16 1,000000 1,000000 0,400000 0,400000 35,000 19994,798 50,000

17 1,000000 1,000000 0,803997 0,803997 35,000 19994,798 50,000

18 1,000000 1,000000 0,565698 0,565698 35,000 19994,798 50,000

19 1,000000 1,000000 0,815104 0,815104 35,000 19994,798 50,000

20 1,000000 1,000000 0,986347 0,986347 35,000 19994,798 50,000

21 1,000000 1,000000 0,508052 0,508052 35,000 19994,798 50,000

22 1,000000 1,000000 0,786706 0,786706 35,000 19994,798 50,000

23 1,000000 1,000000 0,405255 0,405255 35,000 19994,798 50,000

24 1,000000 1,000000 0,559125 0,559125 35,000 19994,798 50,000

25 1,000000 1,000000 0,711698 0,711698 35,000 19994,798 50,000

26 1,000000 1,000000 0,401425 0,401425 35,000 19994,798 50,000

27 1,000000 1,000000 0,401279 0,401279 35,000 19994,798 50,000

28 1,000000 1,000000 0,659506 0,659506 35,000 19994,798 50,000

29 1,000000 1,000000 0,612129 0,612129 35,000 19994,798 50,000

30 1,000000 1,000000 0,640445 0,640445 35,000 19994,798 50,000

31 1,000000 1,000000 0,400403 0,400403 35,000 19994,798 50,000

32 1,000000 1,000000 0,580878 0,580878 35,000 19994,798 50,000

33 1,000000 1,000000 0,478744 0,478744 35,000 19994,798 50,000

34 1,000000 1,000000 0,483960 0,483960 35,000 19994,798 50,000

35 1,000000 1,000000 0,429241 0,429241 35,000 19994,798 50,000

36 1,000000 1,000000 0,429825 0,429825 35,000 19994,798 50,000

37 1,000000 1,000000 0,400544 0,400544 35,000 19994,798 50,000

38 1,000000 1,000000 0,400585 0,400585 35,000 19994,798 50,000

39 1,000000 1,000000 0,400628 0,400628 35,000 19994,798 50,000

40 1,000000 1,000000 0,400674 0,400674 35,000 19994,798 50,000

41 1,000000 1,000000 0,400722 0,400722 35,000 19994,798 50,000

42 1,000000 1,000000 0,400772 0,400772 35,000 19994,798 50,000

43 1,000000 1,000000 0,400825 0,400825 35,000 19994,798 50,000

44 1,000000 1,000000 0,400879 0,400879 35,000 19994,798 50,000

45 1,000000 1,000000 0,400936 0,400936 35,000 19994,798 50,000

46 1,000000 1,000000 0,441597 0,441597 35,000 19994,798 50,000

47 1,000000 1,000000 0,439341 0,439341 35,000 19994,798 50,000

48 1,000000 1,000000 0,486587 0,486587 35,000 19994,798 50,000

49 1,000000 1,000000 0,477279 0,477279 35,000 19994,798 50,000

50 1,000000 1,000000 0,519621 0,519621 35,000 19994,798 50,000

51 1,000000 1,000000 0,521229 0,521229 35,000 19994,798 50,000

102 1,000000 1,000000 0,463248 0,463248 35,000 19994,798 50,000

103 1,000000 1,000000 0,723140 0,723140 35,000 19994,798 50,000

104 1,000000 1,000000 0,662485 0,662485 35,000 19994,798 50,000

105 1,000000 1,000000 0,639492 0,639492 35,000 19994,798 50,000

106 1,000000 1,000000 0,608367 0,608367 35,000 19994,798 50,000

107 1,000000 1,000000 0,613246 0,613246 35,000 19994,798 50,000

108 1,000000 1,000000 0,958433 0,958433 35,000 19994,798 50,000

109 1,000000 1,000000 0,703750 0,703750 35,000 19994,798 50,000

110 1,000000 1,000000 0,637483 0,637483 35,000 19994,798 50,000

111 1,000000 1,000000 0,400000 0,400000 35,000 19994,798 50,000

112 1,000000 1,000000 0,625666 0,625666 35,000 19994,798 50,000

113 1,000000 1,000000 0,891364 0,891364 35,000 19994,798 50,000

114 1,000000 1,000000 0,419906 0,419906 35,000 19994,798 50,000

115 1,000000 1,000000 0,580385 0,580385 35,000 19994,798 50,000

116 1,000000 1,000000 0,426406 0,426406 35,000 19994,798 50,000

117 1,000000 1,000000 0,533412 0,533412 35,000 19994,798 50,000

118 1,000000 1,000000 0,533263 0,533263 35,000 19994,798 50,000

119 1,000000 1,000000 0,613097 0,613097 35,000 19994,798 50,000

120 1,000000 1,000000 0,400874 0,400874 35,000 19994,798 50,000

121 1,000000 1,000000 0,400839 0,400839 35,000 19994,798 50,000

122 1,000000 1,000000 0,400803 0,400803 35,000 19994,798 50,000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 121 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 6 of 8

Frame XKMinor XLMinor kMinor kyz Fy E Length

KN/cm2 KN/cm2 cm

123 1,000000 1,000000 0,400764 0,400764 35,000 19994,798 50,000

124 1,000000 1,000000 0,400723 0,400723 35,000 19994,798 50,000

125 1,000000 1,000000 0,400680 0,400680 35,000 19994,798 50,000

126 1,000000 1,000000 0,400634 0,400634 35,000 19994,798 50,000

127 1,000000 1,000000 0,400586 0,400586 35,000 19994,798 50,000

128 1,000000 1,000000 0,400536 0,400536 35,000 19994,798 50,000

129 1,000000 1,000000 0,442360 0,442360 35,000 19994,798 50,000

130 1,000000 1,000000 0,434822 0,434822 35,000 19994,798 50,000

131 1,000000 1,000000 0,485418 0,485418 35,000 19994,798 50,000

132 1,000000 1,000000 0,473623 0,473623 35,000 19994,798 50,000

133 1,000000 1,000000 0,519919 0,519919 35,000 19994,798 50,000

134 1,000000 1,000000 0,505994 0,505994 35,000 19994,798 50,000

135 1,000000 1,000000 0,550322 0,550322 35,000 19994,798 50,000

136 1,000000 1,000000 0,536616 0,536616 35,000 19994,798 50,000

137 1,000000 1,000000 0,566388 0,566388 35,000 19994,798 50,000

11 1,000000 1,000000 0,518188 0,310913 35,000 19994,798 102,956

12 1,000000 1,000000 0,506512 0,303907 35,000 19994,798 102,956

13 1,000000 1,000000 0,465539 0,279323 35,000 19994,798 106,696

14 1,000000 1,000000 0,552468 0,331481 35,000 19994,798 106,696

15 1,000000 1,000000 0,569461 0,341676 35,000 19994,798 102,956

52 1,000000 1,000000 0,416373 0,249824 35,000 19994,798 102,956

53 1,000000 1,000000 0,545364 0,327219 35,000 19994,798 106,696

54 1,000000 1,000000 0,461335 0,276801 35,000 19994,798 106,696

56 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 1400,000

57 1,000000 1,000000 0,601700 0,361020 35,000 19994,798 1400,000

59 1,000000 1,000000 0,400000 0,400000 35,000 19994,798 50,000

60 1,000000 1,000000 0,400015 0,400015 35,000 19994,798 50,000

61 1,000000 1,000000 0,400000 0,400000 35,000 19994,798 50,000

62 1,000000 1,000000 0,481790 0,481790 35,000 19994,798 50,000

64 1,000000 1,000000 0,619887 0,619887 35,000 19994,798 50,000

65 1,000000 1,000000 0,507334 0,507334 35,000 19994,798 50,000

66 1,000000 1,000000 0,584543 0,584543 35,000 19994,798 50,000

67 1,000000 1,000000 0,664869 0,664869 35,000 19994,798 50,000

69 1,000000 1,000000 0,403802 0,403802 35,000 19994,798 47,500

70 1,000000 1,000000 0,400000 0,400000 35,000 19994,798 47,500

71 1,000000 1,000000 0,462212 0,462212 35,000 19994,798 47,500

72 1,000000 1,000000 0,790683 0,790683 35,000 19994,798 47,500

75 1,000000 1,000000 0,405057 0,243034 35,000 19994,798 222,000

76 1,000000 1,000000 0,407500 0,244500 35,000 19994,798 222,000

77 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

78 1,000000 1,000000 0,444470 0,266682 35,000 19994,798 222,000

79 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

80 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

81 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

82 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

83 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

84 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

85 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

86 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

87 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

88 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

89 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

90 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

91 1,000000 1,000000 0,442163 0,265298 35,000 19994,798 222,000

92 1,000000 1,000000 0,400000 0,240000 35,000 19994,798 222,000

93 1,000000 1,000000 0,406813 0,244088 35,000 19994,798 222,000

94 1,000000 1,000000 0,410010 0,246006 35,000 19994,798 222,000

96 1,000000 1,000000 0,400000 0,400000 35,000 19994,798 222,000

97 1,000000 1,000000 0,406839 0,406839 35,000 19994,798 222,000

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 122 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 6 of 8

Frame XKMinor XLMinor kMinor kyz Fy E Length

KN/cm2 KN/cm2 cm

98 1,000000 1,000000 0,410340 0,246204 35,000 19994,798 360,056

99 1,000000 1,000000 0,437391 0,262435 35,000 19994,798 358,966

100 1,000000 1,000000 0,424137 0,254482 35,000 19994,798 360,056

101 1,000000 1,000000 0,508987 0,305392 35,000 19994,798 358,966

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 7 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 7 of 8

Frame MajAxisAng RLLF SectClass FramingType ErrMsg

Degrees

16 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

17 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

18 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

19 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

20 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

21 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

22 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

23 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

24 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

25 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

26 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

27 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

28 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

29 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

30 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

31 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

32 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

33 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

34 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

35 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

36 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

37 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

38 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

39 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

40 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

41 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

42 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

43 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

44 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

45 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

46 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

47 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

48 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

49 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

50 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

51 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

102 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

103 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

104 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

105 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

106 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

107 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

108 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

109 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

110 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

111 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

112 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

113 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

114 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 123 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 7 of 8

Frame MajAxisAng RLLF SectClass FramingType ErrMsg

Degrees

115 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

116 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

117 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

118 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

119 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

120 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

121 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

122 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

123 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

124 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

125 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

126 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

127 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

128 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

129 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

130 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

131 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

132 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

133 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

134 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

135 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

136 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

137 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

11 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

12 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

13 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

14 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

15 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

52 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

53 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

54 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

56 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

57 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

59 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

60 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

61 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

62 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

64 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

65 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

66 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

67 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

69 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

70 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

71 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

72 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

75 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

76 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

77 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

78 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

79 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

80 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

81 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

82 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

83 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

84 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

85 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

86 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

87 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

88 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 124 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 7 of 8

Frame MajAxisAng RLLF SectClass FramingType ErrMsg

Degrees

89 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

90 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

91 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

92 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

93 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

94 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

96 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

97 1,000000 Class 3 Ductility Class High Moment Resisting Frame No Messages

98 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

99 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

100 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

101 1,000000 Class 1 Ductility Class High Moment Resisting Frame No Messages

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 8 of 8

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 8 of 8

Frame WarnMsg

16 No Messages

17 No Messages

18 No Messages

19 No Messages

20 No Messages

21 No Messages

22 No Messages

23 No Messages

24 No Messages

25 No Messages

26 No Messages

27 No Messages

28 No Messages

29 No Messages

30 No Messages

31 No Messages

32 No Messages

33 No Messages

34 No Messages

35 No Messages

36 No Messages

37 No Messages

38 No Messages

39 No Messages

40 No Messages

41 No Messages

42 No Messages

43 No Messages

44 No Messages

45 No Messages

46 No Messages

47 No Messages

48 No Messages

49 No Messages

50 No Messages

51 No Messages

102 No Messages

103 No Messages

104 No Messages

105 No Messages

106 No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 125 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 8 of 8

Frame WarnMsg

107 No Messages

108 No Messages

109 No Messages

110 No Messages

111 No Messages

112 No Messages

113 No Messages

114 No Messages

115 No Messages

116 No Messages

117 No Messages

118 No Messages

119 No Messages

120 No Messages

121 No Messages

122 No Messages

123 No Messages

124 No Messages

125 No Messages

126 No Messages

127 No Messages

128 No Messages

129 No Messages

130 No Messages

131 No Messages

132 No Messages

133 No Messages

134 No Messages

135 No Messages

136 No Messages

137 No Messages

11 No Messages

12 No Messages

13 No Messages

14 No Messages

15 No Messages

52 No Messages

53 No Messages

54 No Messages

56 No Messages

57 No Messages

59 No Messages

60 No Messages

61 No Messages

62 No Messages

64 No Messages

65 No Messages

66 No Messages

67 No Messages

69 No Messages

70 No Messages

71 No Messages

72 No Messages

75 No Messages

76 No Messages

77 No Messages

78 No Messages

79 No Messages

80 No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 126 a 174

Table: Steel Design 2 - PMM Details - Eurocode 3-2005, Part 8 of 8

Frame WarnMsg

81 No Messages

82 No Messages

83 No Messages

84 No Messages

85 No Messages

86 No Messages

87 No Messages

88 No Messages

89 No Messages

90 No Messages

91 No Messages

92 No Messages

93 No Messages

94 No Messages

96 No Messages

97 No Messages

98 No Messages

99 No Messages

100 No Messages

101 No Messages

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 1 of 4

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 1 of 4

Frame DesignSect DesignType Status VMajorCombo VMajorLoc VMajorRatio

cm

16 HE280A Beam No Messages DSTL2 0,000 0,010166

17 HE280A Beam No Messages DSTL2 0,000 0,002876

18 HE280A Beam No Messages DSTL2 50,000 0,005204

19 HE280A Beam No Messages DSTL2 50,000 0,172102

20 HE280A Beam No Messages DSTL2 50,000 0,179310

21 HE280A Beam No Messages DSTL2 0,000 0,090525

22 HE280A Beam No Messages DSTL2 0,000 0,083444

23 HE280A Beam No Messages DSTL2 50,000 0,083854

24 HE280A Beam No Messages DSTL2 50,000 0,090974

25 HE280A Beam No Messages DSTL2 0,000 0,191627

26 HE280A Beam No Messages DSTL2 0,000 0,184507

27 HE280A Beam No Messages DSTL1 50,000 0,000833

28 HE280A Beam No Messages DSTL2 50,000 0,007054

29 HE280A Beam No Messages DSTL2 50,000 0,014102

30 HE280A Beam No Messages DSTL2 0,000 0,076202

31 HE280A Beam No Messages DSTL2 0,000 0,069062

32 HE280A Beam No Messages DSTL2 50,000 0,069394

33 HE280A Beam No Messages DSTL2 50,000 0,076569

34 HE280A Beam No Messages DSTL2 0,000 0,061797

35 HE280A Beam No Messages DSTL2 0,000 0,054587

36 HE280A Beam No Messages DSTL2 0,000 0,047360

37 HE280A Beam No Messages DSTL2 0,000 0,040103

38 HE280A Beam No Messages DSTL2 0,000 0,032906

39 HE280A Beam No Messages DSTL2 0,000 0,025616

40 HE280A Beam No Messages DSTL2 0,000 0,018438

41 HE280A Beam No Messages DSTL2 0,000 0,011127

42 HE280A Beam No Messages DSTL2 0,000 0,003958

43 HE280A Beam No Messages DSTL2 50,000 0,004149

44 HE280A Beam No Messages DSTL2 50,000 0,011321

45 HE280A Beam No Messages DSTL2 50,000 0,018638

46 HE280A Beam No Messages DSTL2 50,000 0,025824

47 HE280A Beam No Messages DSTL2 50,000 0,033126

48 HE280A Beam No Messages DSTL2 50,000 0,040338

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 127 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 1 of 4

Frame DesignSect DesignType Status VMajorCombo VMajorLoc VMajorRatio

cm

49 HE280A Beam No Messages DSTL2 50,000 0,047613

50 HE280A Beam No Messages DSTL2 50,000 0,054863

51 HE280A Beam No Messages DSTL2 50,000 0,062098

102 HE280A Beam No Messages DSTL2 0,000 0,010463

103 HE280A Beam No Messages DSTL2 0,000 0,003186

104 HE280A Beam No Messages DSTL2 50,000 0,004861

105 HE280A Beam No Messages DSTL2 50,000 0,176280

106 HE280A Beam No Messages DSTL2 50,000 0,183195

107 HE280A Beam No Messages DSTL2 0,000 0,090884

108 HE280A Beam No Messages DSTL2 0,000 0,084046

109 HE280A Beam No Messages DSTL2 50,000 0,083635

110 HE280A Beam No Messages DSTL2 50,000 0,090435

111 HE280A Beam No Messages DSTL2 0,000 0,169976

112 HE280A Beam No Messages DSTL2 0,000 0,162978

113 HE280A Beam No Messages DSTL2 0,000 0,009535

114 HE280A Beam No Messages DSTL2 0,000 0,002070

115 HE280A Beam No Messages DSTL2 50,000 0,006235

116 HE280A Beam No Messages DSTL2 0,000 0,076705

117 HE280A Beam No Messages DSTL2 0,000 0,069515

118 HE280A Beam No Messages DSTL2 50,000 0,069180

119 HE280A Beam No Messages DSTL2 50,000 0,076335

120 HE280A Beam No Messages DSTL2 0,000 0,062201

121 HE280A Beam No Messages DSTL2 0,000 0,054951

122 HE280A Beam No Messages DSTL2 0,000 0,047686

123 HE280A Beam No Messages DSTL2 0,000 0,040400

124 HE280A Beam No Messages DSTL2 0,000 0,033175

125 HE280A Beam No Messages DSTL2 0,000 0,025862

126 HE280A Beam No Messages DSTL2 0,000 0,018665

127 HE280A Beam No Messages DSTL2 0,000 0,011338

128 HE280A Beam No Messages DSTL2 0,000 0,004155

129 HE280A Beam No Messages DSTL2 50,000 0,003962

130 HE280A Beam No Messages DSTL2 50,000 0,011141

131 HE280A Beam No Messages DSTL2 50,000 0,018463

132 HE280A Beam No Messages DSTL2 50,000 0,025651

133 HE280A Beam No Messages DSTL2 50,000 0,032952

134 HE280A Beam No Messages DSTL2 50,000 0,040162

135 HE280A Beam No Messages DSTL2 50,000 0,047431

136 HE280A Beam No Messages DSTL2 50,000 0,054673

137 HE280A Beam No Messages DSTL2 50,000 0,061897

11 F12 Brace No Messages DSTL2 102,956 0,029592

12 F12 Brace No Messages DSTL2 0,000 0,012178

13 F12 Brace No Messages DSTL2 106,696 0,026508

14 F12 Brace No Messages DSTL2 0,000 0,010948

15 F12 Brace No Messages DSTL2 0,000 0,012870

52 F12 Brace No Messages DSTL2 102,956 0,031738

53 F12 Brace No Messages DSTL2 0,000 0,009979

54 F12 Brace No Messages DSTL2 106,696 0,024435

56 F12 Beam No Messages DSTL2 1400,000 0,005663

57 F12 Beam No Messages DSTL2 0,000 0,005660

59 HE280A Beam No Messages DSTL2 0,000 0,024963

60 HE280A Beam No Messages DSTL2 0,000 0,017689

61 HE280A Beam No Messages DSTL2 0,000 0,024683

62 HE280A Beam No Messages DSTL2 0,000 0,017402

64 HE280A Beam No Messages DSTL2 50,000 0,013622

65 HE280A Beam No Messages DSTL2 50,000 0,021008

66 HE280A Beam No Messages DSTL2 50,000 0,021177

67 HE280A Beam No Messages DSTL2 50,000 0,028345

69 HE280A Beam No Messages DSTL2 47,500 0,031129

70 HE280A Beam No Messages DSTL2 47,500 0,030852

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 128 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 1 of 4

Frame DesignSect DesignType Status VMajorCombo VMajorLoc VMajorRatio

cm

71 HE280A Beam No Messages DSTL2 47,500 0,027273

72 HE280A Beam No Messages DSTL2 47,500 0,034423

75 IPE100 Beam No Messages DSTL1 0,000 0,001163

76 IPE100 Beam No Messages DSTL1 0,000 0,001169

77 IPE100 Beam No Messages DSTL1 0,000 0,001478

78 IPE100 Beam No Messages DSTL2 0,000 0,003167

79 IPE100 Beam No Messages DSTL2 0,000 0,001173

80 IPE100 Beam No Messages DSTL2 222,000 0,001167

81 IPE100 Beam No Messages DSTL2 222,000 0,001166

82 IPE100 Beam No Messages DSTL2 222,000 0,001165

83 IPE100 Beam No Messages DSTL2 222,000 0,001164

84 IPE100 Beam No Messages DSTL2 222,000 0,001163

85 IPE100 Beam No Messages DSTL2 222,000 0,001162

86 IPE100 Beam No Messages DSTL1 222,000 0,001162

87 IPE100 Beam No Messages DSTL1 222,000 0,001162

88 IPE100 Beam No Messages DSTL2 0,000 0,001162

89 IPE100 Beam No Messages DSTL2 0,000 0,001163

90 IPE100 Beam No Messages DSTL2 0,000 0,001182

91 IPE100 Beam No Messages DSTL2 0,000 0,003085

92 IPE100 Beam No Messages DSTL2 0,000 0,002107

93 IPE100 Beam No Messages DSTL2 222,000 0,001203

94 IPE100 Beam No Messages DSTL2 222,000 0,001186

96 HE280A Beam No Messages DSTL2 222,000 0,001872

97 HE280A Beam No Messages DSTL2 222,000 0,002087

98 F12 Brace No Messages DSTL2 0,000 0,002024

99 F12 Brace No Messages DSTL2 0,000 0,002120

100 F12 Brace No Messages DSTL1 0,000 0,001764

101 F12 Brace No Messages DSTL2 358,966 0,002390

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 2 of 4

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 2 of 4

Frame VsdMajDsgn VrdMajor TuMajor VMinorCombo VMinorLoc VMinorRatio VsdMinDsgn

KN KN KN-cm cm KN

16 6,529 642,186 0,30 DSTL2 0,000 0,000341 6,529

17 1,847 642,186 0,77 DSTL2 0,000 0,000309 1,847

18 3,342 642,186 1,38 DSTL2 0,000 0,001724 3,342

19 110,522 642,186 0,38 DSTL2 0,000 0,000857 110,522

20 115,151 642,186 1,44 DSTL1 0,000 0,000323 115,151

21 58,134 642,186 0,28 DSTL2 0,000 0,001461 58,134

22 53,587 642,186 1,31 DSTL2 0,000 0,000942 53,587

23 53,850 642,186 0,68 DSTL2 0,000 0,001410 53,850

24 58,422 642,186 0,61 DSTL2 0,000 0,003712 58,422

25 123,060 642,186 2,62 DSTL2 0,000 0,002273 123,060

26 118,488 642,186 9,794E-02 DSTL2 0,000 0,003147 118,488

27 0,535 642,186 0,84 DSTL2 0,000 0,003962 0,535

28 4,530 642,186 1,81 DSTL2 0,000 0,002688 4,530

29 9,056 642,186 1,47 DSTL2 0,000 0,002697 9,056

30 48,936 642,186 1,92 DSTL2 0,000 0,000902 48,936

31 44,350 642,186 1,99 DSTL2 0,000 0,000781 44,350

32 44,564 642,186 1,48 DSTL2 0,000 0,001566 44,564

33 49,172 642,186 1,32 DSTL2 0,000 0,001462 49,172

34 39,685 642,186 2,29 DSTL2 0,000 0,000598 39,685

35 35,055 642,186 1,14 DSTL2 0,000 0,000897 35,055

36 30,414 642,186 2,30 DSTL2 0,000 0,000739 30,414

37 25,754 642,186 0,31 DSTL2 0,000 0,001003 25,754

38 21,132 642,186 2,18 DSTL2 0,000 0,000836 21,132

39 16,450 642,186 0,38 DSTL2 0,000 0,001104 16,450

40 11,841 642,186 1,96 DSTL2 0,000 0,000938 11,841

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 129 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 2 of 4

Frame VsdMajDsgn VrdMajor TuMajor VMinorCombo VMinorLoc VMinorRatio VsdMinDsgn

KN KN KN-cm cm KN

41 7,146 642,186 0,95 DSTL2 0,000 0,001205 7,146

42 2,542 642,186 1,63 DSTL2 0,000 0,001040 2,542

43 2,665 642,186 1,38 DSTL2 0,000 0,001307 2,665

44 7,270 642,186 1,20 DSTL2 0,000 0,001142 7,270

45 11,969 642,186 1,69 DSTL2 0,000 0,001409 11,969

46 16,584 642,186 0,66 DSTL2 0,000 0,001243 16,584

47 21,273 642,186 1,87 DSTL2 0,000 0,001511 21,273

48 25,905 642,186 1,355E-02 DSTL2 0,000 0,001344 25,905

49 30,576 642,186 1,92 DSTL2 0,000 0,001608 30,576

50 35,232 642,186 0,73 DSTL2 0,000 0,001450 35,232

51 39,878 642,186 1,82 DSTL2 0,000 0,001748 39,878

102 6,719 642,186 0,92 DSTL2 0,000 0,001367 6,719

103 2,046 642,186 0,51 DSTL2 0,000 0,001555 2,046

104 3,121 642,186 2,42 DSTL2 50,000 0,002424 3,121

105 113,205 642,186 2,69 DSTL2 0,000 0,003037 113,205

106 117,645 642,186 2,84 DSTL2 0,000 0,004085 117,645

107 58,364 642,186 6,46 DSTL2 50,000 0,004850 58,364

108 53,973 642,186 1,04 DSTL2 0,000 0,000800 53,973

109 53,709 642,186 1,69 DSTL2 50,000 0,003128 53,709

110 58,076 642,186 5,53 DSTL2 0,000 0,002345 58,076

111 109,156 642,186 3,92 DSTL2 50,000 0,006305 109,156

112 104,662 642,186 3,34 DSTL2 50,000 0,005138 104,662

113 6,123 642,186 1,17 DSTL2 50,000 0,001427 6,123

114 1,329 642,186 1,51 DSTL2 50,000 0,003933 1,329

115 4,004 642,186 2,08 DSTL2 50,000 0,003780 4,004

116 49,259 642,186 0,99 DSTL2 50,000 0,001128 49,259

117 44,641 642,186 1,26 DSTL2 50,000 0,001250 44,641

118 44,426 642,186 1,77 DSTL2 50,000 0,002432 44,426

119 49,022 642,186 1,59 DSTL2 50,000 0,002541 49,022

120 39,944 642,186 1,62 DSTL2 50,000 0,001558 39,944

121 35,289 642,186 0,57 DSTL2 50,000 0,001355 35,289

122 30,624 642,186 1,78 DSTL2 50,000 0,001615 30,624

123 25,944 642,186 0,13 DSTL2 50,000 0,001453 25,944

124 21,304 642,186 1,77 DSTL2 50,000 0,001721 21,304

125 16,608 642,186 0,73 DSTL2 50,000 0,001556 16,608

126 11,986 642,186 1,64 DSTL2 50,000 0,001823 11,986

127 7,281 642,186 1,23 DSTL2 50,000 0,001657 7,281

128 2,668 642,186 1,37 DSTL2 50,000 0,001924 2,668

129 2,544 642,186 1,62 DSTL2 50,000 0,001759 2,544

130 7,155 642,186 0,97 DSTL2 50,000 0,002026 7,155

131 11,856 642,186 1,90 DSTL2 50,000 0,001861 11,856

132 16,473 642,186 0,45 DSTL2 50,000 0,002128 16,473

133 21,162 642,186 2,08 DSTL2 50,000 0,001962 21,162

134 25,792 642,186 0,20 DSTL2 50,000 0,002230 25,792

135 30,460 642,186 2,15 DSTL2 50,000 0,002068 30,460

136 35,110 642,186 0,97 DSTL2 50,000 0,002328 35,110

137 39,750 642,186 2,09 DSTL2 50,000 0,002127 39,750

11 13,155 444,560 1,24 DSTL2 0,000 0,000637 13,155

12 5,414 444,560 3,66 DSTL2 0,000 0,000674 5,414

13 11,785 444,560 1,53 DSTL2 0,000 0,011523 11,785

14 4,867 444,560 14,35 DSTL2 0,000 0,004508 4,867

15 5,721 444,560 3,68 DSTL2 0,000 0,001222 5,721

52 14,109 444,560 1,34 DSTL2 0,000 0,001044 14,109

53 4,436 444,560 14,77 DSTL2 0,000 0,004775 4,436

54 10,863 444,560 4,00 DSTL2 0,000 0,010765 10,863

56 2,517 444,560 2,99 DSTL2 0,000 0,000000 2,517

57 2,516 444,560 2,95 DSTL2 0,000 0,000000 2,516

59 16,031 642,186 0,35 DSTL2 0,000 0,001171 16,031

60 11,360 642,186 0,23 DSTL2 0,000 0,001287 11,360

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 130 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 2 of 4

Frame VsdMajDsgn VrdMajor TuMajor VMinorCombo VMinorLoc VMinorRatio VsdMinDsgn

KN KN KN-cm cm KN

61 15,851 642,186 0,85 DSTL2 0,000 0,000707 15,851

62 11,176 642,186 1,42 DSTL2 0,000 0,000601 11,176

64 8,748 642,186 1,37 DSTL2 50,000 0,003482 8,748

65 13,491 642,186 2,10 DSTL2 50,000 0,003060 13,491

66 13,599 642,186 3,02 DSTL2 0,000 0,003118 13,599

67 18,202 642,186 2,59 DSTL2 0,000 0,003790 18,202

69 19,990 642,186 0,28 DSTL2 47,500 0,001710 19,990

70 19,813 642,186 1,43 DSTL2 0,000 0,000761 19,813

71 17,514 642,186 1,57 DSTL2 47,500 0,004528 17,514

72 22,106 642,186 3,27 DSTL2 0,000 0,001376 22,106

75 0,119 102,283 3,303E-03 DSTL2 0,000 0,000000 0,119

76 0,120 102,283 4,240E-03 DSTL2 0,000 0,000000 0,120

77 0,151 102,283 5,901E-03 DSTL2 0,000 0,000000 0,151

78 0,324 102,283 1,098E-02 DSTL2 0,000 0,000000 0,324

79 0,120 102,283 8,484E-03 DSTL2 0,000 0,000000 0,120

80 0,119 102,283 6,535E-03 DSTL2 0,000 0,000000 0,119

81 0,119 102,283 5,038E-03 DSTL2 0,000 0,000000 0,119

82 0,119 102,283 3,906E-03 DSTL2 0,000 0,000000 0,119

83 0,119 102,283 3,074E-03 DSTL2 0,000 0,000000 0,119

84 0,119 102,283 2,491E-03 DSTL2 0,000 0,000000 0,119

85 0,119 102,283 2,125E-03 DSTL2 0,000 0,000000 0,119

86 0,119 102,283 6,394E-04 DSTL2 0,000 0,000000 0,119

87 0,119 102,283 4,857E-04 DSTL2 0,000 0,000000 0,119

88 0,119 102,283 2,161E-03 DSTL2 0,000 0,000000 0,119

89 0,119 102,283 2,554E-03 DSTL2 0,000 0,000000 0,119

90 0,121 102,283 3,167E-03 DSTL2 0,000 0,000000 0,121

91 0,316 102,283 4,058E-03 DSTL2 0,000 0,000000 0,316

92 0,216 102,283 8,145E-03 DSTL2 0,000 0,000000 0,216

93 0,123 102,283 2,837E-02 DSTL2 0,000 0,000000 0,123

94 0,121 102,283 4,005E-02 DSTL2 0,000 0,000000 0,121

96 1,202 642,186 0,60 DSTL2 0,000 0,000000 1,202

97 1,341 642,186 2,40 DSTL2 0,000 0,000823 1,341

98 0,900 444,560 0,23 DSTL2 0,000 0,000637 0,900

99 0,942 444,560 5,06 DSTL2 0,000 0,000000 0,942

100 0,784 444,560 1,35 DSTL2 0,000 0,000739 0,784

101 1,063 444,560 19,01 DSTL2 0,000 0,000156 1,063

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 3 of 4

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 3 of 4

Frame VrdMinor TuMinor SRLimit RLLF FramingType

KN KN-cm

16 1571,720 0,30 0,950000 1,000000 Ductility Class High Moment Resisting Frame

17 1571,720 0,77 0,950000 1,000000 Ductility Class High Moment Resisting Frame

18 1571,720 1,38 0,950000 1,000000 Ductility Class High Moment Resisting Frame

19 1571,720 0,38 0,950000 1,000000 Ductility Class High Moment Resisting Frame

20 1571,720 0,91 0,950000 1,000000 Ductility Class High Moment Resisting Frame

21 1571,720 0,28 0,950000 1,000000 Ductility Class High Moment Resisting Frame

22 1571,720 1,31 0,950000 1,000000 Ductility Class High Moment Resisting Frame

23 1571,720 0,68 0,950000 1,000000 Ductility Class High Moment Resisting Frame

24 1571,720 0,61 0,950000 1,000000 Ductility Class High Moment Resisting Frame

25 1571,720 2,62 0,950000 1,000000 Ductility Class High Moment Resisting Frame

26 1571,720 9,794E-02 0,950000 1,000000 Ductility Class High Moment Resisting Frame

27 1571,720 2,47 0,950000 1,000000 Ductility Class High Moment Resisting Frame

28 1571,720 1,81 0,950000 1,000000 Ductility Class High Moment Resisting Frame

29 1571,720 1,47 0,950000 1,000000 Ductility Class High Moment Resisting Frame

30 1571,720 1,92 0,950000 1,000000 Ductility Class High Moment Resisting Frame

31 1571,720 1,99 0,950000 1,000000 Ductility Class High Moment Resisting Frame

32 1571,720 1,48 0,950000 1,000000 Ductility Class High Moment Resisting Frame

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 131 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 3 of 4

Frame VrdMinor TuMinor SRLimit RLLF FramingType

KN KN-cm

33 1571,720 1,32 0,950000 1,000000 Ductility Class High Moment Resisting Frame

34 1571,720 2,29 0,950000 1,000000 Ductility Class High Moment Resisting Frame

35 1571,720 1,14 0,950000 1,000000 Ductility Class High Moment Resisting Frame

36 1571,720 2,30 0,950000 1,000000 Ductility Class High Moment Resisting Frame

37 1571,720 0,31 0,950000 1,000000 Ductility Class High Moment Resisting Frame

38 1571,720 2,18 0,950000 1,000000 Ductility Class High Moment Resisting Frame

39 1571,720 0,38 0,950000 1,000000 Ductility Class High Moment Resisting Frame

40 1571,720 1,96 0,950000 1,000000 Ductility Class High Moment Resisting Frame

41 1571,720 0,95 0,950000 1,000000 Ductility Class High Moment Resisting Frame

42 1571,720 1,63 0,950000 1,000000 Ductility Class High Moment Resisting Frame

43 1571,720 1,38 0,950000 1,000000 Ductility Class High Moment Resisting Frame

44 1571,720 1,20 0,950000 1,000000 Ductility Class High Moment Resisting Frame

45 1571,720 1,69 0,950000 1,000000 Ductility Class High Moment Resisting Frame

46 1571,720 0,66 0,950000 1,000000 Ductility Class High Moment Resisting Frame

47 1571,720 1,87 0,950000 1,000000 Ductility Class High Moment Resisting Frame

48 1571,720 1,355E-02 0,950000 1,000000 Ductility Class High Moment Resisting Frame

49 1571,720 1,92 0,950000 1,000000 Ductility Class High Moment Resisting Frame

50 1571,720 0,73 0,950000 1,000000 Ductility Class High Moment Resisting Frame

51 1571,720 1,82 0,950000 1,000000 Ductility Class High Moment Resisting Frame

102 1571,720 0,92 0,950000 1,000000 Ductility Class High Moment Resisting Frame

103 1571,720 0,51 0,950000 1,000000 Ductility Class High Moment Resisting Frame

104 1571,720 2,42 0,950000 1,000000 Ductility Class High Moment Resisting Frame

105 1571,720 2,69 0,950000 1,000000 Ductility Class High Moment Resisting Frame

106 1571,720 2,84 0,950000 1,000000 Ductility Class High Moment Resisting Frame

107 1571,720 6,46 0,950000 1,000000 Ductility Class High Moment Resisting Frame

108 1571,720 1,04 0,950000 1,000000 Ductility Class High Moment Resisting Frame

109 1571,720 1,69 0,950000 1,000000 Ductility Class High Moment Resisting Frame

110 1571,720 5,53 0,950000 1,000000 Ductility Class High Moment Resisting Frame

111 1571,720 3,92 0,950000 1,000000 Ductility Class High Moment Resisting Frame

112 1571,720 3,34 0,950000 1,000000 Ductility Class High Moment Resisting Frame

113 1571,720 1,17 0,950000 1,000000 Ductility Class High Moment Resisting Frame

114 1571,720 1,51 0,950000 1,000000 Ductility Class High Moment Resisting Frame

115 1571,720 2,08 0,950000 1,000000 Ductility Class High Moment Resisting Frame

116 1571,720 0,99 0,950000 1,000000 Ductility Class High Moment Resisting Frame

117 1571,720 1,26 0,950000 1,000000 Ductility Class High Moment Resisting Frame

118 1571,720 1,77 0,950000 1,000000 Ductility Class High Moment Resisting Frame

119 1571,720 1,59 0,950000 1,000000 Ductility Class High Moment Resisting Frame

120 1571,720 1,62 0,950000 1,000000 Ductility Class High Moment Resisting Frame

121 1571,720 0,57 0,950000 1,000000 Ductility Class High Moment Resisting Frame

122 1571,720 1,78 0,950000 1,000000 Ductility Class High Moment Resisting Frame

123 1571,720 0,13 0,950000 1,000000 Ductility Class High Moment Resisting Frame

124 1571,720 1,77 0,950000 1,000000 Ductility Class High Moment Resisting Frame

125 1571,720 0,73 0,950000 1,000000 Ductility Class High Moment Resisting Frame

126 1571,720 1,64 0,950000 1,000000 Ductility Class High Moment Resisting Frame

127 1571,720 1,23 0,950000 1,000000 Ductility Class High Moment Resisting Frame

128 1571,720 1,37 0,950000 1,000000 Ductility Class High Moment Resisting Frame

129 1571,720 1,62 0,950000 1,000000 Ductility Class High Moment Resisting Frame

130 1571,720 0,97 0,950000 1,000000 Ductility Class High Moment Resisting Frame

131 1571,720 1,90 0,950000 1,000000 Ductility Class High Moment Resisting Frame

132 1571,720 0,45 0,950000 1,000000 Ductility Class High Moment Resisting Frame

133 1571,720 2,08 0,950000 1,000000 Ductility Class High Moment Resisting Frame

134 1571,720 0,20 0,950000 1,000000 Ductility Class High Moment Resisting Frame

135 1571,720 2,15 0,950000 1,000000 Ductility Class High Moment Resisting Frame

136 1571,720 0,97 0,950000 1,000000 Ductility Class High Moment Resisting Frame

137 1571,720 2,09 0,950000 1,000000 Ductility Class High Moment Resisting Frame

11 444,560 1,24 0,950000 1,000000 Ductility Class High Moment Resisting Frame

12 444,560 3,66 0,950000 1,000000 Ductility Class High Moment Resisting Frame

13 444,560 1,53 0,950000 1,000000 Ductility Class High Moment Resisting Frame

14 444,560 14,35 0,950000 1,000000 Ductility Class High Moment Resisting Frame

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 132 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 3 of 4

Frame VrdMinor TuMinor SRLimit RLLF FramingType

KN KN-cm

15 444,560 3,68 0,950000 1,000000 Ductility Class High Moment Resisting Frame

52 444,560 1,34 0,950000 1,000000 Ductility Class High Moment Resisting Frame

53 444,560 14,77 0,950000 1,000000 Ductility Class High Moment Resisting Frame

54 444,560 4,00 0,950000 1,000000 Ductility Class High Moment Resisting Frame

56 444,560 2,99 0,950000 1,000000 Ductility Class High Moment Resisting Frame

57 444,560 2,95 0,950000 1,000000 Ductility Class High Moment Resisting Frame

59 1571,720 0,35 0,950000 1,000000 Ductility Class High Moment Resisting Frame

60 1571,720 0,23 0,950000 1,000000 Ductility Class High Moment Resisting Frame

61 1571,720 0,85 0,950000 1,000000 Ductility Class High Moment Resisting Frame

62 1571,720 1,42 0,950000 1,000000 Ductility Class High Moment Resisting Frame

64 1571,720 1,37 0,950000 1,000000 Ductility Class High Moment Resisting Frame

65 1571,720 2,10 0,950000 1,000000 Ductility Class High Moment Resisting Frame

66 1571,720 3,02 0,950000 1,000000 Ductility Class High Moment Resisting Frame

67 1571,720 2,59 0,950000 1,000000 Ductility Class High Moment Resisting Frame

69 1571,720 0,28 0,950000 1,000000 Ductility Class High Moment Resisting Frame

70 1571,720 1,43 0,950000 1,000000 Ductility Class High Moment Resisting Frame

71 1571,720 1,57 0,950000 1,000000 Ductility Class High Moment Resisting Frame

72 1571,720 3,27 0,950000 1,000000 Ductility Class High Moment Resisting Frame

75 134,730 1,095E-02 0,950000 1,000000 Ductility Class High Moment Resisting Frame

76 134,730 1,133E-02 0,950000 1,000000 Ductility Class High Moment Resisting Frame

77 134,730 1,203E-02 0,950000 1,000000 Ductility Class High Moment Resisting Frame

78 134,730 1,098E-02 0,950000 1,000000 Ductility Class High Moment Resisting Frame

79 134,730 8,484E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

80 134,730 6,535E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

81 134,730 5,038E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

82 134,730 3,906E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

83 134,730 3,074E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

84 134,730 2,491E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

85 134,730 2,125E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

86 134,730 1,952E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

87 134,730 1,964E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

88 134,730 2,161E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

89 134,730 2,554E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

90 134,730 3,167E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

91 134,730 4,058E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

92 134,730 8,145E-03 0,950000 1,000000 Ductility Class High Moment Resisting Frame

93 134,730 2,837E-02 0,950000 1,000000 Ductility Class High Moment Resisting Frame

94 134,730 4,005E-02 0,950000 1,000000 Ductility Class High Moment Resisting Frame

96 1571,720 0,60 0,950000 1,000000 Ductility Class High Moment Resisting Frame

97 1571,720 2,40 0,950000 1,000000 Ductility Class High Moment Resisting Frame

98 444,560 0,23 0,950000 1,000000 Ductility Class High Moment Resisting Frame

99 444,560 5,06 0,950000 1,000000 Ductility Class High Moment Resisting Frame

100 444,560 14,15 0,950000 1,000000 Ductility Class High Moment Resisting Frame

101 444,560 19,01 0,950000 1,000000 Ductility Class High Moment Resisting Frame

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 4 of 4

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 4 of 4

Frame ErrMsg WarnMsg

16 No Messages No Messages

17 No Messages No Messages

18 No Messages No Messages

19 No Messages No Messages

20 No Messages No Messages

21 No Messages No Messages

22 No Messages No Messages

23 No Messages No Messages

24 No Messages No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 133 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 4 of 4

Frame ErrMsg WarnMsg

25 No Messages No Messages

26 No Messages No Messages

27 No Messages No Messages

28 No Messages No Messages

29 No Messages No Messages

30 No Messages No Messages

31 No Messages No Messages

32 No Messages No Messages

33 No Messages No Messages

34 No Messages No Messages

35 No Messages No Messages

36 No Messages No Messages

37 No Messages No Messages

38 No Messages No Messages

39 No Messages No Messages

40 No Messages No Messages

41 No Messages No Messages

42 No Messages No Messages

43 No Messages No Messages

44 No Messages No Messages

45 No Messages No Messages

46 No Messages No Messages

47 No Messages No Messages

48 No Messages No Messages

49 No Messages No Messages

50 No Messages No Messages

51 No Messages No Messages

102 No Messages No Messages

103 No Messages No Messages

104 No Messages No Messages

105 No Messages No Messages

106 No Messages No Messages

107 No Messages No Messages

108 No Messages No Messages

109 No Messages No Messages

110 No Messages No Messages

111 No Messages No Messages

112 No Messages No Messages

113 No Messages No Messages

114 No Messages No Messages

115 No Messages No Messages

116 No Messages No Messages

117 No Messages No Messages

118 No Messages No Messages

119 No Messages No Messages

120 No Messages No Messages

121 No Messages No Messages

122 No Messages No Messages

123 No Messages No Messages

124 No Messages No Messages

125 No Messages No Messages

126 No Messages No Messages

127 No Messages No Messages

128 No Messages No Messages

129 No Messages No Messages

130 No Messages No Messages

131 No Messages No Messages

132 No Messages No Messages

133 No Messages No Messages

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 134 a 174

Table: Steel Design 3 - Shear Details - Eurocode 3-2005, Part 4 of 4

Frame ErrMsg WarnMsg

134 No Messages No Messages

135 No Messages No Messages

136 No Messages No Messages

137 No Messages No Messages

11 No Messages No Messages

12 No Messages No Messages

13 No Messages No Messages

14 No Messages No Messages

15 No Messages No Messages

52 No Messages No Messages

53 No Messages No Messages

54 No Messages No Messages

56 No Messages No Messages

57 No Messages No Messages

59 No Messages No Messages

60 No Messages No Messages

61 No Messages No Messages

62 No Messages No Messages

64 No Messages No Messages

65 No Messages No Messages

66 No Messages No Messages

67 No Messages No Messages

69 No Messages No Messages

70 No Messages No Messages

71 No Messages No Messages

72 No Messages No Messages

75 No Messages No Messages

76 No Messages No Messages

77 No Messages No Messages

78 No Messages No Messages

79 No Messages No Messages

80 No Messages No Messages

81 No Messages No Messages

82 No Messages No Messages

83 No Messages No Messages

84 No Messages No Messages

85 No Messages No Messages

86 No Messages No Messages

87 No Messages No Messages

88 No Messages No Messages

89 No Messages No Messages

90 No Messages No Messages

91 No Messages No Messages

92 No Messages No Messages

93 No Messages No Messages

94 No Messages No Messages

96 No Messages No Messages

97 No Messages No Messages

98 No Messages No Messages

99 No Messages No Messages

100 No Messages No Messages

101 No Messages No Messages

Table: Steel Design 7 - Beam Shear Forces - Eurocode 3-2005

Table: Steel Design 7 - Beam Shear Forces - Eurocode 3-2005

Frame DesignSect ComboLeft VMajorLeft ComboRight VMajorRight

KN KN

16 HE280A DSTL2 6,529 DSTL2 6,023

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 135 a 174

Table: Steel Design 7 - Beam Shear Forces - Eurocode 3-2005

Frame DesignSect ComboLeft VMajorLeft ComboRight VMajorRight

KN KN

17 HE280A DSTL2 1,847 DSTL2 1,341

18 HE280A DSTL2 2,836 DSTL2 3,342

19 HE280A DSTL2 110,016 DSTL2 110,522

20 HE280A DSTL2 114,645 DSTL2 115,151

21 HE280A DSTL2 58,134 DSTL2 57,628

22 HE280A DSTL2 53,587 DSTL2 53,081

23 HE280A DSTL2 53,345 DSTL2 53,850

24 HE280A DSTL2 57,917 DSTL2 58,422

25 HE280A DSTL2 123,060 DSTL2 122,555

26 HE280A DSTL2 118,488 DSTL2 117,982

27 HE280A DSTL2 0,523 DSTL1 0,535

28 HE280A DSTL2 4,024 DSTL2 4,530

29 HE280A DSTL2 8,551 DSTL2 9,056

30 HE280A DSTL2 48,936 DSTL2 48,430

31 HE280A DSTL2 44,350 DSTL2 43,845

32 HE280A DSTL2 44,058 DSTL2 44,564

33 HE280A DSTL2 48,666 DSTL2 49,172

34 HE280A DSTL2 39,685 DSTL2 39,179

35 HE280A DSTL2 35,055 DSTL2 34,550

36 HE280A DSTL2 30,414 DSTL2 29,908

37 HE280A DSTL2 25,754 DSTL2 25,248

38 HE280A DSTL2 21,132 DSTL2 20,626

39 HE280A DSTL2 16,450 DSTL2 15,945

40 HE280A DSTL2 11,841 DSTL2 11,335

41 HE280A DSTL2 7,146 DSTL2 6,640

42 HE280A DSTL2 2,542 DSTL2 2,036

43 HE280A DSTL2 2,159 DSTL2 2,665

44 HE280A DSTL2 6,765 DSTL2 7,270

45 HE280A DSTL2 11,463 DSTL2 11,969

46 HE280A DSTL2 16,078 DSTL2 16,584

47 HE280A DSTL2 20,767 DSTL2 21,273

48 HE280A DSTL2 25,399 DSTL2 25,905

49 HE280A DSTL2 30,071 DSTL2 30,576

50 HE280A DSTL2 34,727 DSTL2 35,232

51 HE280A DSTL2 39,373 DSTL2 39,878

102 HE280A DSTL2 6,719 DSTL2 6,214

103 HE280A DSTL2 2,046 DSTL2 1,540

104 HE280A DSTL2 2,616 DSTL2 3,121

105 HE280A DSTL2 112,699 DSTL2 113,205

106 HE280A DSTL2 117,140 DSTL2 117,645

107 HE280A DSTL2 58,364 DSTL2 57,859

108 HE280A DSTL2 53,973 DSTL2 53,468

109 HE280A DSTL2 53,203 DSTL2 53,709

110 HE280A DSTL2 57,570 DSTL2 58,076

111 HE280A DSTL2 109,156 DSTL2 108,651

112 HE280A DSTL2 104,662 DSTL2 104,156

113 HE280A DSTL2 6,123 DSTL2 5,618

114 HE280A DSTL2 1,329 DSTL2 0,824

115 HE280A DSTL2 3,499 DSTL2 4,004

116 HE280A DSTL2 49,259 DSTL2 48,753

117 HE280A DSTL2 44,641 DSTL2 44,136

118 HE280A DSTL2 43,921 DSTL2 44,426

119 HE280A DSTL2 48,516 DSTL2 49,022

120 HE280A DSTL2 39,944 DSTL2 39,439

121 HE280A DSTL2 35,289 DSTL2 34,783

122 HE280A DSTL2 30,624 DSTL2 30,118

123 HE280A DSTL2 25,944 DSTL2 25,439

124 HE280A DSTL2 21,304 DSTL2 20,799

125 HE280A DSTL2 16,608 DSTL2 16,103

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 136 a 174

Table: Steel Design 7 - Beam Shear Forces - Eurocode 3-2005

Frame DesignSect ComboLeft VMajorLeft ComboRight VMajorRight

KN KN

126 HE280A DSTL2 11,986 DSTL2 11,481

127 HE280A DSTL2 7,281 DSTL2 6,775

128 HE280A DSTL2 2,668 DSTL2 2,163

129 HE280A DSTL2 2,039 DSTL2 2,544

130 HE280A DSTL2 6,649 DSTL2 7,155

131 HE280A DSTL2 11,351 DSTL2 11,856

132 HE280A DSTL2 15,967 DSTL2 16,473

133 HE280A DSTL2 20,656 DSTL2 21,162

134 HE280A DSTL2 25,286 DSTL2 25,792

135 HE280A DSTL2 29,954 DSTL2 30,460

136 HE280A DSTL2 34,605 DSTL2 35,110

137 HE280A DSTL2 39,244 DSTL2 39,750

56 F12 DSTL1 2,512 DSTL2 2,517

57 F12 DSTL2 2,516 DSTL1 2,513

59 HE280A DSTL2 16,031 DSTL2 15,525

60 HE280A DSTL2 11,360 DSTL2 10,854

61 HE280A DSTL2 15,851 DSTL2 15,345

62 HE280A DSTL2 11,176 DSTL2 10,670

64 HE280A DSTL2 8,242 DSTL2 8,748

65 HE280A DSTL2 12,986 DSTL2 13,491

66 HE280A DSTL2 13,094 DSTL2 13,599

67 HE280A DSTL2 17,697 DSTL2 18,202

69 HE280A DSTL2 19,510 DSTL2 19,990

70 HE280A DSTL2 19,332 DSTL2 19,813

71 HE280A DSTL2 17,034 DSTL2 17,514

72 HE280A DSTL2 21,625 DSTL2 22,106

75 IPE100 DSTL1 0,119 DSTL2 0,119

76 IPE100 DSTL1 0,120 DSTL2 0,119

77 IPE100 DSTL1 0,151 DSTL2 0,109

78 IPE100 DSTL2 0,324 DSTL2 0,086

79 IPE100 DSTL2 0,120 DSTL1 0,118

80 IPE100 DSTL1 0,118 DSTL2 0,119

81 IPE100 DSTL1 0,119 DSTL2 0,119

82 IPE100 DSTL1 0,119 DSTL2 0,119

83 IPE100 DSTL1 0,119 DSTL2 0,119

84 IPE100 DSTL1 0,119 DSTL2 0,119

85 IPE100 DSTL1 0,119 DSTL2 0,119

86 IPE100 DSTL2 0,119 DSTL1 0,119

87 IPE100 DSTL2 0,119 DSTL1 0,119

88 IPE100 DSTL2 0,119 DSTL1 0,119

89 IPE100 DSTL2 0,119 DSTL1 0,119

90 IPE100 DSTL2 0,121 DSTL1 0,117

91 IPE100 DSTL2 0,316 DSTL2 0,078

92 IPE100 DSTL2 0,216 DSTL1 0,048

93 IPE100 DSTL1 0,118 DSTL2 0,123

94 IPE100 DSTL1 0,118 DSTL2 0,121

96 HE280A DSTL1 1,106 DSTL2 1,202

97 HE280A DSTL1 1,046 DSTL2 1,341

Table: Steel Design 8 - Brace Max Axial Load - Eurocode 3-2005

Table: Steel Design 8 - Brace Max Axial Load - Eurocode 3-2005

Frame DesignSect ComboComp PMaxComp ComboTens PMaxTens

KN KN

11 F12 DSTL2 -291,489 DSTL2 -291,166

12 F12 DSTL2 167,110 DSTL2 167,433

13 F12 DSTL2 -307,347 DSTL2 -307,024

14 F12 DSTL2 177,004 DSTL2 177,328

15 F12 DSTL2 181,885 DSTL2 182,208

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 137 a 174

Table: Steel Design 8 - Brace Max Axial Load - Eurocode 3-2005

Frame DesignSect ComboComp PMaxComp ComboTens PMaxTens

KN KN

52 F12 DSTL2 -302,693 DSTL2 -302,370

53 F12 DSTL2 160,318 DSTL2 160,641

54 F12 DSTL2 -294,731 DSTL2 -294,408

98 F12 DSTL2 437,185 DSTL2 436,862

99 F12 DSTL2 430,528 DSTL2 430,205

100 F12 DSTL2 452,198 DSTL2 452,521

101 F12 DSTL2 416,064 DSTL2 416,387

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 138 a 174

09.03. Spalla n.1 e 2 e relative fondazioni

Si riportano di seguito le verifiche agli stati limite ultimi e di esercizio delle spalle dei muri d’ala e delle relative

fondazioni., nonché le verifiche geotecniche sul relativo piano di fondazione. L’operea è stata calcolata considerando la

linea di falda sul piede della fondazione, il carico trasmesso dal ponte e un carico accidentale uniforemente ripartito sulle

rampe ovvero sul terrapieno paria a 5 KN/mq.

Geometria muro e fondazione e relativi carichi

Geometria del manufatto

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 139 a 174

Diagramma delle sollecitazioni sul paramento – inviluppo

Diagramma delle sollecitazioni sulla fondazione – inviluppo

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 140 a 174

Normative di riferimento - Legge nr. 1086 del 05/11/1971. Norme per la disciplina delle opere in conglomerato cementizio, normale e precompresso ed a struttura metallica. - Legge nr. 64 del 02/02/1974. Provvedimenti per le costruzioni con particolari prescrizioni per le zone sismiche. - D.M. LL.PP. del 11/03/1988. Norme tecniche riguardanti le indagini sui terreni e sulle rocce, la stabilitàdei pendii naturali e delle scarpate, i criteri generali e le prescrizioni per la progettazione, l'esecuzione e il collaudo delle opere di sostegno delle terre e delle opere di fondazione. - D.M. LL.PP. del 14/02/1992. Norme tecniche per l'esecuzione delle opere in cemento armato normale e precompresso e per le strutture metalliche. - D.M. 9 Gennaio 1996 Norme Tecniche per il calcolo, l' esecuzione ed il collaudo delle strutture in cemento armato normale e precompresso e per le strutture metalliche - D.M. 16 Gennaio 1996 Norme Tecniche relative ai 'Criteri generali per la verifica di sicurezza delle costruzioni e dei carichi e sovraccarichi' - D.M. 16 Gennaio 1996 Norme Tecniche per le costruzioni in zone sismiche - Circolare Ministero LL.PP. 15 Ottobre 1996 N. 252 AA.GG./S.T.C. Istruzioni per l'applicazione delle Norme Tecniche di cui al D.M. 9 Gennaio 1996 - Circolare Ministero LL.PP. 10 Aprile 1997 N. 65/AA.GG. Istruzioni per l'applicazione delle Norme Tecniche per le costruzioni in zone sismiche di cui al D.M. 16 Gennaio 1996 - Norme Tecniche per le Costruzioni 2008 (D.M. 14 Gennaio 2008) - Circolare 617 del 02/02/2009 - Circolare C.S.L.P. 02/02/2009 n.617 - Istruzioni per l’applicazione delle Norme Tecniche per le Costruzioni di cui al D.M. 14 gennaio 2008 Il calcolo dei muri di sostegno viene eseguito secondo le seguenti fasi: - Calcolo della spinta del terreno - Verifica a ribaltamento - Verifica a scorrimento del muro sul piano di posa - Verifica della stabilità complesso fondazione terreno (carico limite) - Verifica della stabilità globale Calcolo delle sollecitazioni sia del muro che della fondazione, progetto delle armature e relative verifiche dei materiali

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 141 a 174

Calcolo della spinta sul muro

Valori caratteristici e valori di calcolo Effettuando il calcolo tramite gli Eurocodici è necessario fare la distinzione fra i parametri caratteristici ed i valodi di calcolo (o di progetto) sia delle azioni che delle resistenze. I valori di calcolo si ottengono dai valori caratteristici mediante l'applicazione di opportuni coefficienti di sicurezza parziali γ. In particolare si distinguono combinazioni di carico di tipo A1-M1 nelle quali vengono incrementati i carichi e lasciati inalterati i parametri di resistenza del terreno e combinazioni di carico di tipo A2-M2 nelle quali vengono ridotti i parametri di resistenza del terreno e incrementati i soli carichi variabili.

Metodo di Culmann Il metodo di Culmann adotta le stesse ipotesi di base del metodo di Coulomb. La differenza sostanziale è che mentre Coulomb considera un terrapieno con superficie a pendenza costante e carico uniformemente distribuito (il che permette di ottenere una espressione in forma chiusa per il coefficiente di spinta) il metodo di Culmann consente di analizzare situazioni con profilo di forma generica e carichi sia concentrati che distribuiti comunque disposti. Inoltre, rispetto al metodo di Coulomb, risulta più immediato e lineare tener conto della coesione del masso spingente. Il metodo di Culmann, nato come metodo essenzialmente grafico, si è evoluto per essere trattato mediante analisi numerica (noto in questa forma come metodo del cuneo di tentativo). Come il metodo di Coulomb anche questo metodo considera una superficie di rottura rettilinea. I passi del procedimento risolutivo sono i seguenti: - si impone una superficie di rottura (angolo di inclinazione ρ rispetto all'orizzontale) e si considera il cuneo di spinta delimitato dalla superficie di rottura stessa, dalla parete su cui si calcola la spinta e dal profilo del terreno; - si valutano tutte le forze agenti sul cuneo di spinta e cioè peso proprio (W), carichi sul terrapieno, resistenza per attrito e per coesione lungo la superficie di rottura (R e C) e resistenza per coesione lungo la parete (A); - dalle equazioni di equilibrio si ricava il valore della spinta S sulla parete. Questo processo viene iterato fino a trovare l'angolo di rottura per cui la spinta risulta massima. La convergenza non si raggiunge se il terrapieno risulta inclinato di un angolo maggiore dell'angolo d'attrito del terreno. Nei casi in cui è applicabile il metodo di Coulomb (profilo a monte rettilineo e carico uniformemente distribuito) i risultati ottenuti col metodo di Culmann coincidono con quelli del metodo di Coulomb. Le pressioni sulla parete di spinta si ricavano derivando l'espressione della spinta S rispetto all'ordinata z. Noto il diagramma delle pressioni è possibile ricavare il punto di applicazione della spinta.

Spinta in presenza di sisma Per tener conto dell'incremento di spinta dovuta al sisma si fa riferimento al metodo di Mononobe-Okabe (cui fa riferimento la Normativa Italiana). La Normativa Italiana suggerisce di tener conto di un incremento di spinta dovuto al sisma nel modo seguente. Detta ε l'inclinazione del terrapieno rispetto all'orizzontale e β l'inclinazione della parete rispetto alla verticale, si calcola la spinta S' considerando un'inclinazione del terrapieno e della parte pari a

ε' = ε + θ

β' = β + θ

dove θ = arctg(kh/(1±kv)) essendo kh il coefficiente sismico orizzontale e kv il coefficiente sismico verticale, definito in funzione di kh. In presenza di falda a monte, θ assume le seguenti espressioni: Terreno a bassa permeabilità

θ = arctg[(γsat/(γsat-γw))*(k h/(1±kv))]

Terreno a permeabilità elevata

θ = arctg[(γ/(γsat-γw))*(k h/(1±kv))]

Detta S la spinta calcolata in condizioni statiche l'incremento di spinta da applicare è espresso da

∆S = AS' - S

dove il coefficiente A vale

cos2(β + θ)

A = ––––––––––––––––––––––––––––– cos2βcosθ

In presenza di falda a monte, nel coefficiente A si tiene conto dell'influenza dei pesi di volume nel calcolo di θ. Adottando il metodo di Mononobe-Okabe per il calcolo della spinta, il coefficiente A viene posto pari a 1.

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 142 a 174

Tale incremento di spinta è applicato a metà altezza della parete di spinta nel caso di forma rettangolare del diagramma di incremento sismico, allo stesso punto di applicazione della spinta statica nel caso in cui la forma del diagramma di incremento sismico è uguale a quella del diagramma statico. Oltre a questo incremento bisogna tener conto delle forze d'inerzia orizzontali e verticali che si destano per effetto del sisma. Tali forze vengono valutate come

FiH = khW FiV = ±kvW

dove W è il peso del muro, del terreno soprastante la mensola di monte ed i relativi sovraccarichi e va applicata nel baricentro dei pesi. Il metodo di Culmann tiene conto automaticamente dell'incremento di spinta. Basta inserire nell'equazione risolutiva la forza d'inerzia del cuneo di spinta. La superficie di rottura nel caso di sisma risulta meno inclinata della corrispondente superficie in assenza di sisma.

Verifica a ribaltamento La verifica a ribaltamento consiste nel determinare il momento risultante di tutte le forze che tendono a fare ribaltare il muro (momento ribaltante Mr) ed il momento risultante di tutte le forze che tendono a stabilizzare il muro (momento stabilizzante Ms) rispetto allo spigolo a valle della fondazione e verificare che il rapporto Ms/Mr sia maggiore di un determinato coefficiente di sicurezza ηr. Eseguendo il calcolo mediante gli eurocodici si puo impostare ηr>= 1.0. Deve quindi essere verificata la seguente diseguaglianza

Ms

––––––– >= ηr Mr

Il momento ribaltante Mr è dato dalla componente orizzontale della spinta S, dalle forze di inerzia del muro e del terreno gravante sulla fondazione di monte (caso di presenza di sisma) per i rispettivi bracci. Nel momento stabilizzante interviene il peso del muro (applicato nel baricentro) ed il peso del terreno gravante sulla fondazione di monte. Per quanto riguarda invece la componente verticale della spinta essa sarà stabilizzante se l'angolo d'attrito terra-muro δ è positivo, ribaltante se δ è negativo. δ è positivo quando è il terrapieno che scorre rispetto al muro, negativo quando è il muro che tende a scorrere rispetto al terrapieno (questo può essere il caso di una spalla da ponte gravata da carichi notevoli). Se sono presenti dei tiranti essi contribuiscono al momento stabilizzante. Questa verifica ha significato solo per fondazione superficiale e non per fondazione su pali.

Verifica a scorrimento Per la verifica a scorrimento del muro lungo il piano di fondazione deve risultare che la somma di tutte le forze parallele al piano di posa che tendono a fare scorrere il muro deve essere minore di tutte le forze, parallele al piano di scorrimento, che si oppongono allo scivolamento, secondo un certo coefficiente di sicurezza. La verifica a scorrimento sisulta soddisfatta se il rapporto fra la risultante delle forze resistenti allo scivolamento Fr e la risultante delle forze che tendono a fare scorrere il muro Fs risulta maggiore di un determinato coefficiente di sicurezza ηs Eseguendo il calcolo mediante gli Eurocodici si può impostare ηs>=1.0

Fr

––––– >= ηs Fs

Le forze che intervengono nella Fs sono: la componente della spinta parallela al piano di fondazione e la componente delle forze d'inerzia parallela al piano di fondazione. La forza resistente è data dalla resistenza d'attrito e dalla resistenza per adesione lungo la base della fondazione. Detta N la componente normale al piano di fondazione del carico totale gravante in fondazione e indicando con δf l'angolo d'attrito terreno-fondazione, con ca l'adesione terreno-fondazione e con Br la larghezza della fondazione reagente, la forza resistente può esprimersi come

Fr = N tg δf + caBr

La Normativa consente di computare, nelle forze resistenti, una aliquota dell'eventuale spinta dovuta al terreno posto a valle del muro. In tal caso, però, il coefficiente di sicurezza deve essere aumentato opportunamente. L'aliquota di spinta passiva che si può considerare ai fini della verifica a scorrimento non può comunque superare il 50 percento. Per quanto riguarda l'angolo d'attrito terra-fondazione, δf, diversi autori suggeriscono di assumere un valore di δf pari all'angolo d'attrito del terreno di fondazione.

Verifica al carico limite Il rapporto fra il carico limite in fondazione e la componente normale della risultante dei carichi trasmessi dal muro sul terreno di fondazione deve essere superiore a ηq. Cioè, detto Qu, il carico limite ed R la risultante verticale dei carichi in fondazione, deve essere:

Qu

––––– >= ηq R

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 143 a 174

Eseguendo il calcolo mediante gli Eurocodici si può impostare ηq>=1.0 Si adotta per il calcolo del carico limite in fondazione il metodo di MEYERHOF. L'espressione del carico ultimo è data dalla relazione:

Qu = c Ncdcic + qNqdqiq + 0.5γBNγdγiγ

In questa espressione c coesione del terreno in fondazione; φ angolo di attrito del terreno in fondazione; γ peso di volume del terreno in fondazione; B larghezza della fondazione; D profondità del piano di posa; q pressione geostatica alla quota del piano di posa. I vari fattori che compaiono nella formula sono dati da: A = eπ tg φ Nq = A tg2(45°+φ/2) Nc = (Nq - 1) ctg φ Nγ = (Nq - 1) tg (1.4φ) Indichiamo con Kp il coefficiente di spinta passiva espresso da: Kp = tg2(45°+φ/2) I fattori d e i che compaiono nella formula sono rispettivamente i fattori di profondità ed i fattori di inclinazione del carico espressi dalle seguenti relazioni: Fattori di profondità D dq = 1 + 0.2 ––– √Kp B dq = dγ = 1 per φ = 0 D dq = dγ = 1 + 0.1 ––– √Kp per φ > 0 B Fattori di inclinazione Indicando con θ l'angolo che la risultante dei carichi forma con la verticale ( espresso in gradi ) e con φ l'angolo d'attrito del terreno di posa abbiamo: ic = iq = (1 - θ°/90)2 θ° iγ = (1 - ––––– )2 per φ > 0 φ° iγ = 0 per φ = 0

Verifica alla stabilità globale La verifica alla stabilità globale del complesso muro+terreno deve fornire un coefficiente di sicurezza non inferiore a ηg Eseguendo il calcolo mediante gli Eurocodici si può impostare ηg>=1.0 Viene usata la tecnica della suddivisione a strisce della superficie di scorrimento da analizzare. La superficie di scorrimento viene supposta circolare e determinata in modo tale da non avere intersezione con il profilo del muro o con i pali di fondazione. Si determina il minimo coefficiente di sicurezza su una maglia di centri di dimensioni 10x10 posta in prossimità della sommità del muro. Il numero di strisce è pari a 50.

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 144 a 174

Il coefficiente di sicurezza fornito da Fellenius si esprime secondo la seguente formula:

cibi

Σni ( ––––––––– + [Wicosαi-uil i]tgφi )

cosαi η = –––––––––––––––––––––––––––––––––––––

ΣniWisinαi

dove n è il numero delle strisce considerate, bi e αi sono la larghezza e l'inclinazione della base della striscia iesima rispetto all'orizzontale, Wi è il peso della striscia iesima e ci e φi sono le caratteristiche del terreno (coesione ed angolo di attrito) lungo la base della striscia. Inoltre ui ed l i rappresentano la pressione neutra lungo la base della striscia e la lunghezza della base della striscia (l i = bi/cosαi ). Quindi, assunto un cerchio di tentativo lo si suddivide in n strisce e dalla formula precedente si ricava η. Questo procedimento viene eseguito per il numero di centri prefissato e viene assunto come coefficiente di sicurezza della scarpata il minimo dei coefficienti così determinati.

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 145 a 174

Normativa N.T.C. 2008 - Approccio 1 Simbologia adottata γGsfav Coefficiente parziale sfavorevole sulle azioni permanenti γGfav Coefficiente parziale favorevole sulle azioni permanenti γQsfav Coefficiente parziale sfavorevole sulle azioni variabili γQfav Coefficiente parziale favorevole sulle azioni variabili γtanφ' Coefficiente parziale di riduzione dell'angolo di attrito drenato γc' Coefficiente parziale di riduzione della coesione drenata γcu Coefficiente parziale di riduzione della coesione non drenata γqu Coefficiente parziale di riduzione del carico ultimo γγ Coefficiente parziale di riduzione della resistenza a compressione uniassiale delle rocce Coefficienti di partecipazione combinazioni statiche Coefficienti parziali per le azioni o per l'effetto delle azioni: Carichi Effetto A1 A2 EQU HYD Permanenti Favorevole γGfav 1,00 1,00 0,90 0,90 Permanenti Sfavorevole γGsfav 1,30 1,00 1,10 1,30 Variabili Favorevole γQfav 0,00 0,00 0,00 0,00 Variabili Sfavorevole γQsfav 1,50 1,30 1,50 1,50 Coefficienti parziali per i parametri geotecnici del terreno: Parametri M1 M2 M2 M1 Tangente dell'angolo di attrito γtanφ' 1,00 1,25 1,25 1,00 Coesione efficace γc' 1,00 1,25 1,25 1,00 Resistenza non drenata γcu 1,00 1,40 1,40 1,00 Resistenza a compressione uniassiale γqu 1,00 1,60 1,60 1,00 Peso dell'unità di volume γγ 1,00 1,00 1,00 1,00 Coefficienti di partecipazione combinazioni sismiche Coefficienti parziali per le azioni o per l'effetto delle azioni: Carichi Effetto A1 A2 EQU HYD Permanenti Favorevole γGfav 1,00 1,00 1,00 0,90 Permanenti Sfavorevole γGsfav 1,00 1,00 1,00 1,30 Variabili Favorevole γQfav 0,00 0,00 0,00 0,00 Variabili Sfavorevole γQsfav 1,00 1,00 1,00 1,50 Coefficienti parziali per i parametri geotecnici del terreno: Parametri M1 M2 M2 M1 Tangente dell'angolo di attrito γtanφ' 1,00 1,25 1,25 1,00 Coesione efficace γc' 1,00 1,25 1,25 1,00 Resistenza non drenata γcu 1,00 1,40 1,40 1,00 Resistenza a compressione uniassiale γqu 1,00 1,60 1,60 1,00 Peso dell'unità di volume γγ 1,00 1,00 1,00 1,00 FONDAZIONE SUPERFICIALE Coefficienti parziali γγγγR per le verifiche agli stati limite ultimi STR e GEO Verifica Coefficienti parziali R1 R2 R3 Capacità portante della fondazione 1,00 1,00 1,40 Scorrimento 1,00 1,00 1,10 Resistenza del terreno a valle 1,00 1,00 1,40 Stabilità globale 1,10

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 146 a 174

Geometria muro e fondazione Descrizione Muro a mensola in c.a. Altezza del paramento 3,60 [m] Spessore in sommità 0,40 [m] Spessore all'attacco con la fondazione 0,59 [m] Inclinazione paramento esterno 3,00 [°] Inclinazione paramento interno 0,00 [°] Lunghezza del muro 4,50 [m] Fondazione Lunghezza mensola fondazione di valle 0,70 [m] Lunghezza mensola fondazione di monte 2,00 [m] Lunghezza totale fondazione 3,29 [m] Inclinazione piano di posa della fondazione 0,00 [°] Spessore fondazione 0,60 [m] Spessore magrone 0,10 [m]

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 147 a 174

Materiali utilizzati per la struttura Calcestruzzo Peso specifico 2500,0 [kg/mc] Classe di Resistenza C28/35 Resistenza caratteristica a compressione Rck 356,9 [kg/cmq] Modulo elastico E 332299,69 [kg/cmq] Acciaio Tipo B450C Tensione di snervamento σfa 4588,0 [kg/cmq]

Geometria profilo terreno a monte del muro Simbologia adottata e sistema di riferimento (Sistema di riferimento con origine in testa al muro, ascissa X positiva verso monte, ordinata Y positiva verso l'alto) N numero ordine del punto X ascissa del punto espressa in [m] Y ordinata del punto espressa in [m] A inclinazione del tratto espressa in [°] N X Y A 1 12,00 0,00 0,00

Terreno a valle del muro Inclinazione terreno a valle del muro rispetto all'orizzontale 0,00 [°] Altezza del rinterro rispetto all'attacco fondaz.valle-paramento 1,05 [m]

Descrizione terreni Simbologia adottata Nr. Indice del terreno Descrizione Descrizione terreno γ Peso di volume del terreno espresso in [kg/mc] γs Peso di volume saturo del terreno espresso in [kg/mc] φ Angolo d'attrito interno espresso in [°] δ Angolo d'attrito terra-muro espresso in [°] c Coesione espressa in [kg/cmq] ca Adesione terra-muro espressa in [kg/cmq] Descrizione γγγγ γγγγs φφφφ δδδδ c ca Terreno 1 1800 2000 25.00 16.67 0,000 0,000 Terreno 2 1800 2000 29.00 19.33 0,000 0,000

Stratigrafia Simbologia adottata N Indice dello strato H Spessore dello strato espresso in [m] a Inclinazione espressa in [°] Kw Costante di Winkler orizzontale espressa in Kg/cm2/cm Ks Coefficiente di spinta Terreno Terreno dello strato Nr. H a Kw Ks Terreno 1 2,55 0,00 0,00 0,00 Terreno 1 2 3,00 0,00 4,23 0,00 Terreno 2

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 148 a 174

Condizioni di carico Simbologia e convenzioni di segno adottate Carichi verticali positivi verso il basso. Carichi orizzontali positivi verso sinistra. Momento positivo senso antiorario. X Ascissa del punto di applicazione del carico concentrato espressa in [m] Fx Componente orizzontale del carico concentrato espressa in [kg] Fy Componente verticale del carico concentrato espressa in [kg] M Momento espresso in [kgm] Xi Ascissa del punto iniziale del carico ripartito espressa in [m] Xf Ascissa del punto finale del carico ripartito espressa in [m] Qi Intensità del carico per x=Xi espressa in [kg/m] Qf Intensità del carico per x=Xf espressa in [kg/m] D / C Tipo carico : D=distribuito C=concentrato Condizione n° 1 (Condizione 1) D Profilo Xi=0,00 Xf=5,00 Qi=500,00 Qf=500,00 Condizione n° 2 (Condizione 2) C Paramento X=-0,20 Y=0,00 Fx=0,00 Fy=8300,00 M=0,00

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 149 a 174

Descrizione combinazioni di carico Simbologia adottata F/S Effetto dell'azione (FAV: Favorevole, SFAV: Sfavorevole) γ Coefficiente di partecipazione della condizione Ψ Coefficiente di combinazione della condizione Combinazione n° 1 - Caso A1-M1 (STR) - Sisma Vert. positivo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro SFAV 1,00 1.00 1,00 Peso proprio terrapieno SFAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Combinazione n° 2 - Caso A1-M1 (STR) - Sisma Vert. negativo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro SFAV 1,00 1.00 1,00 Peso proprio terrapieno SFAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Combinazione n° 3 - Caso A2-M2 (GEO) - Sisma Vert. positivo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro SFAV 1,00 1.00 1,00 Peso proprio terrapieno SFAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Combinazione n° 4 - Caso A2-M2 (GEO) - Sisma Vert. negativo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro SFAV 1,00 1.00 1,00 Peso proprio terrapieno SFAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Combinazione n° 5 - Caso EQU (SLU) - Sisma Vert. positivo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro FAV 1,00 1.00 1,00 Peso proprio terrapieno FAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Combinazione n° 6 - Caso EQU (SLU) - Sisma Vert. negativo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro FAV 1,00 1.00 1,00 Peso proprio terrapieno FAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Combinazione n° 7 - Caso A2-M2 (GEO-STAB) - Sisma Vert. positivo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro SFAV 1,00 1.00 1,00 Peso proprio terrapieno SFAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Combinazione n° 8 - Caso A2-M2 (GEO-STAB) - Sisma Vert. negativo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro SFAV 1,00 1.00 1,00 Peso proprio terrapieno SFAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Combinazione n° 9 - Caso A1-M1 (STR) S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro FAV 1,00 1.00 1,00 Peso proprio terrapieno FAV 1,00 1.00 1,00 Spinta terreno SFAV 1,30 1.00 1,30 Condizione 2 SFAV 1.30 1.00 1.30 Condizione 1 SFAV 1.50 1.00 1.50 Combinazione n° 10 - Caso A2-M2 (GEO) S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 150 a 174

Peso proprio muro SFAV 1,00 1.00 1,00 Peso proprio terrapieno SFAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.30 1.00 1.30 Combinazione n° 11 - Caso EQU (SLU) S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro FAV 0,90 1.00 0,90 Peso proprio terrapieno FAV 0,90 1.00 0,90 Spinta terreno SFAV 1,10 1.00 1,10 Condizione 2 SFAV 1.10 1.00 1.10 Condizione 1 SFAV 1.50 1.00 1.50 Combinazione n° 12 - Caso A2-M2 (GEO-STAB) S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro SFAV 1,00 1.00 1,00 Peso proprio terrapieno SFAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.30 1.00 1.30 Combinazione n° 13 - Caso A1-M1 (STR) - Sisma Vert. negativo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro SFAV 1,00 1.00 1,00 Peso proprio terrapieno SFAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 14 - Caso A1-M1 (STR) - Sisma Vert. positivo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro FAV 1,00 1.00 1,00 Peso proprio terrapieno FAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 15 - Caso A2-M2 (GEO) - Sisma Vert. negativo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro SFAV 1,00 1.00 1,00 Peso proprio terrapieno SFAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 16 - Caso A2-M2 (GEO) - Sisma Vert. positivo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro SFAV 1,00 1.00 1,00 Peso proprio terrapieno SFAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 17 - Caso EQU (SLU) - Sisma Vert. negativo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro FAV 1,00 1.00 1,00 Peso proprio terrapieno FAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 18 - Caso EQU (SLU) - Sisma Vert. positivo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro FAV 1,00 1.00 1,00 Peso proprio terrapieno FAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 19 - Caso A2-M2 (GEO-STAB) - Sisma Vert. positivo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro SFAV 1,00 1.00 1,00 Peso proprio terrapieno SFAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 151 a 174

Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 20 - Caso A2-M2 (GEO-STAB) - Sisma Vert. negativo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro SFAV 1,00 1.00 1,00 Peso proprio terrapieno SFAV 1,00 1.00 1,00 Spinta terreno SFAV 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 21 - Quasi Permanente (SLE) S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro -- 1,00 1.00 1,00 Peso proprio terrapieno -- 1,00 1.00 1,00 Spinta terreno -- 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 22 - Frequente (SLE) S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro -- 1,00 1.00 1,00 Peso proprio terrapieno -- 1,00 1.00 1,00 Spinta terreno -- 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 23 - Rara (SLE) S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro -- 1,00 1.00 1,00 Peso proprio terrapieno -- 1,00 1.00 1,00 Spinta terreno -- 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 24 - Quasi Permanente (SLE) - Sisma Vert. positivo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro -- 1,00 1.00 1,00 Peso proprio terrapieno -- 1,00 1.00 1,00 Spinta terreno -- 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 25 - Quasi Permanente (SLE) - Sisma Vert. negativo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro -- 1,00 1.00 1,00 Peso proprio terrapieno -- 1,00 1.00 1,00 Spinta terreno -- 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 26 - Frequente (SLE) - Sisma Vert. positivo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro -- 1,00 1.00 1,00 Peso proprio terrapieno -- 1,00 1.00 1,00 Spinta terreno -- 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 27 - Frequente (SLE) - Sisma Vert. negativo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro -- 1,00 1.00 1,00 Peso proprio terrapieno -- 1,00 1.00 1,00 Spinta terreno -- 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00 Combinazione n° 28 - Rara (SLE) - Sisma Vert. positivo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro -- 1,00 1.00 1,00 Peso proprio terrapieno -- 1,00 1.00 1,00 Spinta terreno -- 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 152 a 174

Combinazione n° 29 - Rara (SLE) - Sisma Vert. negativo S/F γγγγ ΨΨΨΨ γγγγ * ΨΨΨΨ Peso proprio muro -- 1,00 1.00 1,00 Peso proprio terrapieno -- 1,00 1.00 1,00 Spinta terreno -- 1,00 1.00 1,00 Condizione 2 SFAV 1.00 1.00 1.00 Condizione 1 SFAV 1.00 1.00 1.00

Impostazioni di analisi Metodo verifica sezioni Stato limite Impostazioni verifiche SLU Coefficienti parziali per resistenze di calcolo dei materiali Coefficiente di sicurezza calcestruzzo a compressione 1.50 Coefficiente di sicurezza calcestruzzo a trazione 1.50 Coefficiente di sicurezza acciaio 1.15 Fattore riduzione da resistenza cubica a cilindrica 0.83 Fattore di riduzione per carichi di lungo periodo 0.85 Coefficiente di sicurezza per la sezione 1.00 Impostazioni verifiche SLE Condizioni ambientali Molto aggressive Armatura ad aderenza migliorata Verifica fessurazione Sensibilità delle armature Poco sensibile Valori limite delle aperture delle fessure w1 = 0.20 w2 = 0.30 w3 = 0.40 Metodo di calcolo aperture delle fessure Circ. Min. 252 (15/10/1996) Verifica delle tensioni Combinazione di carico Rara σc < 0.60 fck - σf < 0.80 fyk Quasi permanente σc < 0.45 fck Calcolo della portanza metodo di Meyerhof Coefficiente correttivo su Nγ per effetti cinematici (combinazioni sismiche SLU): 1,00 Coefficiente correttivo su Nγ per effetti cinematici (combinazioni sismiche SLE): 1,00 Impostazioni avanzate Diagramma correttivo per eccentricità negativa con aliquota di parzializzazione pari a 0.00

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 153 a 174

Quadro riassuntivo coeff. di sicurezza calcolati Simbologia adottata C Identificativo della combinazione Tipo Tipo combinazione Sisma Combinazione sismica CSSCO Coeff. di sicurezza allo scorrimento CSRIB Coeff. di sicurezza al ribaltamento CSQLIM Coeff. di sicurezza a carico limite CSSTAB Coeff. di sicurezza a stabilità globale C Tipo Sisma cssco csrib csqlim csstab 1 A1-M1 - [1] Orizzontale + Verticale positivo 2,06 -- 5,65 -- 2 A1-M1 - [1] Orizzontale + Verticale negativo 2,07 -- 5,70 -- 3 A2-M2 - [1] Orizzontale + Verticale positivo 1,36 -- 2,48 -- 4 A2-M2 - [1] Orizzontale + Verticale negativo 1,37 -- 2,51 -- 5 EQU - [1] Orizzontale + Verticale positivo -- 5,60 -- -- 6 EQU - [1] Orizzontale + Verticale negativo -- 5,47 -- -- 7 STAB - [1] Orizzontale + Verticale positivo -- -- -- 1,77 8 STAB - [1] Orizzontale + Verticale negativo -- -- -- 1,77 9 A1-M1 - [2] -- 1,75 -- 4,41 -- 10 A2-M2 - [2] -- 1,33 -- 2,37 -- 11 EQU - [2] -- -- 4,68 -- -- 12 STAB - [2] -- -- -- -- 1,69 13 A1-M1 - [4] Orizzontale + Verticale negativo 1,90 -- 5,24 -- 14 A1-M1 - [4] Orizzontale + Verticale positivo 1,90 -- 5,18 -- 15 A2-M2 - [4] Orizzontale + Verticale negativo 1,26 -- 2,28 -- 16 A2-M2 - [4] Orizzontale + Verticale positivo 1,26 -- 2,26 -- 17 EQU - [4] Orizzontale + Verticale negativo -- 4,89 -- -- 18 EQU - [4] Orizzontale + Verticale positivo -- 4,98 -- -- 19 STAB - [4] Orizzontale + Verticale positivo -- -- -- 1,66 20 STAB - [4] Orizzontale + Verticale negativo -- -- -- 1,66 21 SLEQ - [1] -- 2,09 -- 5,60 -- 22 SLEF - [1] -- 2,09 -- 5,60 -- 23 SLER - [1] -- 2,09 -- 5,60 -- 24 SLEQ - [1] Orizzontale + Verticale positivo 1,99 -- 5,40 -- 25 SLEQ - [1] Orizzontale + Verticale negativo 2,00 -- 5,43 -- 26 SLEF - [1] Orizzontale + Verticale positivo 1,99 -- 5,40 -- 27 SLEF - [1] Orizzontale + Verticale negativo 2,00 -- 5,43 -- 28 SLER - [1] Orizzontale + Verticale positivo 1,99 -- 5,40 -- 29 SLER - [1] Orizzontale + Verticale negativo 2,00 -- 5,43 --

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 154 a 174

Analisi della spinta e verifiche Sistema di riferimento adottato per le coordinate : Origine in testa al muro (spigolo di monte) Ascisse X (espresse in [m]) positive verso monte Ordinate Y (espresse in [m]) positive verso l'alto Le forze orizzontali sono considerate positive se agenti da monte verso valle Le forze verticali sono considerate positive se agenti dall'alto verso il basso Calcolo riferito ad 1 metro di muro Tipo di analisi Calcolo della spinta metodo di Culmann Calcolo del carico limite metodo di Meyerhof Calcolo della stabilità globale metodo di Fellenius Calcolo della spinta in condizioni di Spinta attiva Sisma Combinazioni SLU Accelerazione al suolo ag 0.49 [m/s^2] Coefficiente di amplificazione per tipo di sottosuolo (S) 1.50 Coefficiente di amplificazione topografica (St) 1.00 Coefficiente riduzione (βm) 0.18 Rapporto intensità sismica verticale/orizzontale 0.50 Coefficiente di intensità sismica orizzontale (percento) kh=(ag/g*βm*St*S) = 1.35 Coefficiente di intensità sismica verticale (percento) kv=0.50 * kh = 0.67 Combinazioni SLE Accelerazione al suolo ag 0.23 [m/s^2] Coefficiente di amplificazione per tipo di sottosuolo (S) 1.50 Coefficiente di amplificazione topografica (St) 1.00 Coefficiente riduzione (βm) 0.18 Rapporto intensità sismica verticale/orizzontale 0.50 Coefficiente di intensità sismica orizzontale (percento) kh=(ag/g*βm*St*S) = 0.64 Coefficiente di intensità sismica verticale (percento) kv=0.50 * kh = 0.32 Forma diagramma incremento sismico Stessa forma diagramma statico Partecipazione spinta passiva (percento) 0,0 Lunghezza del muro 4,50 [m] Peso muro 9382,01 [kg] Baricentro del muro X=0,07 Y=-2,96 Superficie di spinta Punto inferiore superficie di spinta X = 2,00 Y = -4,20 Punto superiore superficie di spinta X = 2,00 Y = 0,00 Altezza della superficie di spinta 4,20 [m] Inclinazione superficie di spinta(rispetto alla verticale) 0,00 [°] COMBINAZIONE n° 11 Valore della spinta statica 8151,23 [kg] Componente orizzontale della spinta statica 7886,03 [kg] Componente verticale della spinta statica 2062,32 [kg] Punto d'applicazione della spinta X = 2,00 [m] Y = -2,62 [m] Inclinaz. della spinta rispetto alla normale alla superficie 14,66 [°] Inclinazione linea di rottura in condizioni statiche 53,65 [°] Peso terrapieno gravante sulla fondazione a monte 13164,00 [kg] Baricentro terrapieno gravante sulla fondazione a monte X = 1,00 [m] Y = -1,80 [m] Risultanti carichi esterni Componente dir. Y 9130 [kg] Risultanti Risultante dei carichi applicati in dir. orizzontale 7886,03 [kg] Risultante dei carichi applicati in dir. verticale 32800,13 [kg] Momento ribaltante rispetto allo spigolo a valle 12469,50 [kgm]

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 155 a 174

Momento stabilizzante rispetto allo spigolo a valle 58308,48 [kgm] Sforzo normale sul piano di posa della fondazione 32800,13 [kg] Sforzo tangenziale sul piano di posa della fondazione 7886,03 [kg] Eccentricità rispetto al baricentro della fondazione 0,25 [m] Lunghezza fondazione reagente 3,29 [m] Risultante in fondazione 33734,82 [kg] Inclinazione della risultante (rispetto alla normale) 13,52 [°] Momento rispetto al baricentro della fondazione 8095,39 [kgm] COEFFICIENTI DI SICUREZZA Coefficiente di sicurezza a ribaltamento 4.68 COMBINAZIONE n° 16 Valore della spinta statica 7099,84 [kg] Componente orizzontale della spinta statica 6868,24 [kg] Componente verticale della spinta statica 1798,61 [kg] Punto d'applicazione della spinta X = 2,00 [m] Y = -2,65 [m] Inclinaz. della spinta rispetto alla normale alla superficie 14,67 [°] Inclinazione linea di rottura in condizioni statiche 53,65 [°] Incremento sismico della spinta 199,38 [kg] Punto d'applicazione dell'incremento sismico di spinta X = 2,00 [m] Y = -2,65 [m] Inclinazione linea di rottura in condizioni sismiche 53,33 [°] Peso terrapieno gravante sulla fondazione a monte 13960,00 [kg] Baricentro terrapieno gravante sulla fondazione a monte X = 1,00 [m] Y = -1,80 [m] Inerzia del muro 126,58 [kg] Inerzia verticale del muro 63,29 [kg] Inerzia del terrapieno fondazione di monte 188,35 [kg] Inerzia verticale del terrapieno fondazione di monte 94,17 [kg] Risultanti carichi esterni Componente dir. X 112 [kg] Componente dir. Y 8300 [kg] Risultanti Risultante dei carichi applicati in dir. orizzontale 7488,03 [kg] Risultante dei carichi applicati in dir. verticale 33648,59 [kg] Sforzo normale sul piano di posa della fondazione 33648,59 [kg] Sforzo tangenziale sul piano di posa della fondazione 7488,03 [kg] Eccentricità rispetto al baricentro della fondazione 0,22 [m] Lunghezza fondazione reagente 3,29 [m] Risultante in fondazione 34471,70 [kg] Inclinazione della risultante (rispetto alla normale) 12,55 [°] Momento rispetto al baricentro della fondazione 7287,81 [kgm] Carico ultimo della fondazione 75992,56 [kg] Tensioni sul terreno Lunghezza fondazione reagente 3,29 [m] Tensione terreno allo spigolo di valle 1,4275 [kg/cmq] Tensione terreno allo spigolo di monte 0,6189 [kg/cmq] Fattori per il calcolo della capacità portante Coeff. capacità portante Nc = 27.86 Nq = 16.44 Nγ = 13.24 Fattori forma sc = 1,00 sq = 1,00 sγ = 1,00 Fattori inclinazione ic = 0,74 iq = 0,74 iγ = 0,23 Fattori profondità dc = 1,15 dq = 1,08 dγ = 1,08 I coefficienti N' tengono conto dei fattori di forma, profondità, inclinazione carico, inclinazione piano di posa, inclinazione pendio. N'c = 25.99 N'q = 14.22 N'γ = 6.39 COEFFICIENTI DI SICUREZZA Coefficiente di sicurezza a scorrimento 1.26 Coefficiente di sicurezza a carico ultimo 2.26

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 156 a 174

Sollecitazioni paramento Combinazione n° 16 L'ordinata Y(espressa in m) è considerata positiva verso il basso con origine in testa al muro Momento positivo se tende le fibre contro terra (a monte), espresso in kgm Sforzo normale positivo di compressione, espresso in kg Taglio positivo se diretto da monte verso valle, espresso in kg

Nr. Y N M T 1 0,00 8300,00 0,00 111,98 2 0,18 8482,12 -14,97 165,71 3 0,36 8668,48 -18,84 244,83 4 0,54 8859,09 -7,09 349,22 5 0,72 9053,93 24,81 478,86 6 0,90 9253,01 81,39 633,73 7 1,08 9456,34 167,16 813,85 8 1,26 9663,91 286,66 1019,20 9 1,44 9875,72 444,41 1249,80 10 1,62 10091,77 644,92 1505,64 11 1,80 10312,06 892,73 1786,71 12 1,98 10536,59 1192,35 2093,03 13 2,16 10765,36 1548,31 2424,59 14 2,34 10998,38 1965,13 2781,39 15 2,52 11235,63 2447,25 3161,01 16 2,70 11477,13 2996,32 3531,53 17 2,88 11722,87 3610,69 3906,54 18 3,06 11972,85 4293,36 4303,43 19 3,24 12227,07 5048,25 4722,18 20 3,42 12485,53 5879,27 5162,80 21 3,60 12748,23 6790,15 5621,50

Sollecitazioni fondazione di valle Combinazione n° 16 L'ascissa X(espressa in m) è considerata positiva verso monte con origine in corrispondenza dell'estremo libero della fondazione di valle Momento positivo se tende le fibre inferiori, espresso in kgm Taglio positivo se diretto verso l'alto, espresso in kg

Nr. X M T 1 0,00 0,00 0,00 2 0,07 31,16 888,21 3 0,14 124,07 1764,36 4 0,21 277,89 2628,48 5 0,28 491,77 3480,54 6 0,35 764,88 4320,55 7 0,42 1096,37 5148,52 8 0,49 1485,39 5964,44 9 0,56 1931,11 6768,31 10 0,63 2432,68 7560,13 11 0,70 2989,25 8339,90

Sollecitazioni fondazione di monte Combinazione n° 16 L'ascissa X(espressa in m) è considerata positiva verso valle con origine in corrispondenza dell'estremo libero della fondazione di monte Momento positivo se tende le fibre inferiori, espresso in kgm Taglio positivo se diretto verso l'alto, espresso in kg

Nr. X M T 1 0,00 0,00 0,00 2 0,20 -42,55 -409,10 3 0,40 -157,08 -719,85 4 0,60 -323,93 -932,24 5 0,80 -523,42 -1046,29

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 157 a 174

6 1,00 -735,89 -1061,98 7 1,20 -941,66 -979,32 8 1,40 -1121,06 -798,32 9 1,60 -1254,43 -518,96 10 1,80 -1322,09 -141,25 11 2,00 -1304,37 334,81

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 158 a 174

Armature e tensioni nei materiali del muro Combinazione n° 16 L'ordinata Y(espressa in [m]) è considerata positiva verso il basso con origine in testa al muro B base della sezione espressa in [cm] H altezza della sezione espressa in [cm] Afs area di armatura in corrispondenza del lembo di monte in [cmq] Afi area di armatura in corrispondenza del lembo di valle in [cmq] Nu sforzo normale ultimo espresso in [kg] Mu momento ultimo espresso in [kgm] CS coefficiente sicurezza sezione VRcd Aliquota di taglio assorbito dal cls, espresso in [kg] VRsd Aliquota di taglio assorbito dall'armatura, espresso in [kg] VRd Resistenza al taglio, espresso in [kg] Nr. Y B, H A fs Afi Nu Mu CS VRd VRcd VRsd 1 0,00 100, 40 6,16 7,70 592424 0 71,38 17591 -- -- 2 0,18 100, 41 6,16 7,70 603403 1065 71,14 17904 -- -- 3 0,36 100, 42 6,16 7,70 615689 1338 71,03 18216 -- -- 4 0,54 100, 43 6,16 7,70 629666 504 71,08 18527 -- -- 5 0,72 100, 44 9,24 7,70 652728 -1788 72,09 18838 -- -- 6 0,90 100, 45 9,24 7,70 659647 -5802 71,29 19148 -- -- 7 1,08 100, 46 9,24 7,70 664104 -11740 70,23 19458 -- -- 8 1,26 100, 47 9,24 7,70 666046 -19757 68,92 19767 -- -- 9 1,44 100, 48 9,24 7,70 665509 -29948 67,39 20076 -- -- 10 1,62 100, 48 9,24 7,70 638323 -40793 63,25 20384 -- -- 11 1,80 100, 49 9,24 7,70 584929 -50638 56,72 20692 -- -- 12 1,98 100, 50 9,24 7,70 524513 -59355 49,78 21000 -- -- 13 2,16 100, 51 9,24 7,70 463313 -66635 43,04 21307 -- -- 14 2,34 100, 52 9,24 7,70 397863 -71088 36,17 21614 -- -- 15 2,52 100, 53 9,24 7,70 322153 -70169 28,67 21921 -- -- 16 2,70 100, 54 9,24 7,70 250642 -65435 21,84 22228 -- -- 17 2,88 100, 55 9,24 7,70 190447 -58658 16,25 22534 -- -- 18 3,06 100, 56 9,24 7,70 144177 -51701 12,04 22840 -- -- 19 3,24 100, 57 9,24 7,70 111677 -46109 9,13 23146 -- -- 20 3,42 100, 58 9,24 7,70 86689 -40821 6,94 23452 -- -- 21 3,60 100, 59 9,24 7,70 70291 -37440 5,51 23758 -- --

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 159 a 174

Armature e tensioni nei materiali della fondazione Combinazione n° 16 Simbologia adottata B base della sezione espressa in [cm] H altezza della sezione espressa in [cm] Afi area di armatura in corrispondenza del lembo inferiore in [cmq] Afs area di armatura in corrispondenza del lembo superiore in [cmq] Nu sforzo normale ultimo espresso in [kg] Mu momento ultimo espresso in [kgm] CS coefficiente sicurezza sezione VRcd Aliquota di taglio assorbito dal cls, espresso in [kg] VRsd Aliquota di taglio assorbito dall'armatura, espresso in [kg] VRd Resistenza al taglio, espresso in [kg] Fondazione di valle (L'ascissa X, espressa in [m], è positiva verso monte con origine in corrispondenza dell'estremo libero della fondazione di valle) Nr. Y B, H A fs Afi Nu Mu CS VRd VRcd VRsd 1 0,00 100, 60 6,16 12,32 0 0 1000,00 22263 -- -- 2 0,07 100, 60 6,16 12,32 0 26962 865,35 22263 -- -- 3 0,14 100, 60 6,16 12,32 0 26962 217,32 22263 -- -- 4 0,21 100, 60 6,16 12,32 0 26962 97,03 22263 -- -- 5 0,28 100, 60 6,16 12,32 0 26962 54,83 22263 -- -- 6 0,35 100, 60 6,16 12,32 0 26962 35,25 22263 -- -- 7 0,42 100, 60 6,16 12,32 0 26962 24,59 22263 -- -- 8 0,49 100, 60 6,16 12,32 0 26962 18,15 22263 -- -- 9 0,56 100, 60 6,16 12,32 0 26962 13,96 22263 -- -- 10 0,63 100, 60 6,16 12,32 0 26962 11,08 22263 -- -- 11 0,70 100, 60 6,16 12,32 0 26962 9,02 22263 -- -- Fondazione di monte (L'ascissa X, espressa in [m], è positiva verso valle con origine in corrispondenza dell'estremo libero della fondazione di monte) Nr. Y B, H A fs Afi Nu Mu CS VRd VRcd VRsd 1 0,00 100, 60 12,32 6,16 0 0 1000,00 22263 -- -- 2 0,20 100, 60 12,32 6,16 0 -26962 633,67 22263 -- -- 3 0,40 100, 60 12,32 6,16 0 -26962 171,64 22263 -- -- 4 0,60 100, 60 12,32 6,16 0 -26962 83,23 22263 -- -- 5 0,80 100, 60 12,32 6,16 0 -26962 51,51 22263 -- -- 6 1,00 100, 60 12,32 6,16 0 -26962 36,64 22263 -- -- 7 1,20 100, 60 12,32 12,32 0 -26963 28,63 22263 -- -- 8 1,40 100, 60 12,32 12,32 0 -26963 24,05 22263 -- -- 9 1,60 100, 60 12,32 12,32 0 -26963 21,49 22263 -- -- 10 1,80 100, 60 12,32 12,32 0 -26963 20,39 22263 -- -- 11 2,00 100, 60 12,32 12,32 0 -26963 20,67 22263 -- --

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 160 a 174

Stabilità globale muro + terreno Combinazione n° 20 Le ascisse X sono considerate positive verso monte Le ordinate Y sono considerate positive verso l'alto Origine in testa al muro (spigolo contro terra) W peso della striscia espresso in [kg] α angolo fra la base della striscia e l'orizzontale espresso in [°] (positivo antiorario) φ angolo d'attrito del terreno lungo la base della striscia c coesione del terreno lungo la base della striscia espressa in [kg/cmq] b larghezza della striscia espressa in [m] u pressione neutra lungo la base della striscia espressa in [kg/cmq] Metodo di Fellenius Numero di cerchi analizzati 36 Numero di strisce 25 Cerchio critico Coordinate del centro X[m]= -1,81 Y[m]= 0,73 Raggio del cerchio R[m]= 6,23 Ascissa a valle del cerchio Xi[m]= -7,12 Ascissa a monte del cerchio Xs[m]= 4,38 Larghezza della striscia dx[m]= 0,46 Coefficiente di sicurezza C= 1.66 Le strisce sono numerate da monte verso valle Caratteristiche delle strisce Striscia W αααα(°) Wsinαααα b/cosαααα φφφφ c u 1 937.61 74.92 905.35 1.77 20.46 0.000 0.000 2 2010.08 62.42 1781.74 0.99 20.61 0.000 0.000 3 2639.52 54.23 2141.52 0.79 23.91 0.000 0.000 4 3111.80 47.47 2293.22 0.68 23.91 0.000 0.000 5 3488.26 41.51 2311.96 0.61 23.91 0.000 0.000 6 3955.51 36.07 2328.70 0.57 23.91 0.000 0.000 7 4242.24 30.98 2183.55 0.54 23.91 0.000 0.000 8 4450.23 26.15 1961.41 0.51 23.91 0.000 0.000 9 4618.94 21.52 1694.20 0.49 23.91 0.000 0.000 10 13499.04 17.03 3953.25 0.48 23.91 0.000 0.000 11 4327.85 12.65 947.47 0.47 23.91 0.000 0.000 12 2582.01 8.34 374.39 0.47 23.91 0.000 0.000 13 2492.10 4.08 177.14 0.46 23.91 0.000 0.000 14 2443.29 -0.16 -6.93 0.46 23.91 0.000 0.000 15 2428.08 -4.40 -186.37 0.46 23.91 0.000 0.000 16 2384.36 -8.67 -359.27 0.47 23.91 0.000 0.000 17 2311.38 -12.98 -519.14 0.47 23.91 0.000 0.000 18 2207.84 -17.37 -659.11 0.48 23.91 0.000 0.000 19 2071.74 -21.87 -771.67 0.50 23.91 0.000 0.000 20 1900.17 -26.51 -848.28 0.51 23.91 0.000 0.000 21 1688.95 -31.36 -878.93 0.54 23.91 0.000 0.000 22 1431.93 -36.47 -851.15 0.57 23.91 0.000 0.000 23 1119.77 -41.95 -748.54 0.62 23.91 0.000 0.000 24 737.13 -47.96 -547.43 0.69 23.91 0.000 0.000 25 255.70 -54.79 -208.92 0.80 23.91 0.000 0.000 ΣWi= 73335,53 [kg] ΣWisinαi= 16468,17 [kg] ΣWicosαitanφi= 28301,29 [kg] Σcibi/cosαi= 0,00 [kg]

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 161 a 174

Inviluppo Sollecitazioni paramento L'ordinata Y(espressa in [m]) è considerata positiva verso il basso con origine in testa al muro Momento positivo se tende le fibre contro terra (a monte), espresso in [kgm] Sforzo normale positivo di compressione, espresso in [kg] Taglio positivo se diretto da monte verso valle, espresso in [kg] Inviluppo combinazioni SLU Nr. Y Nmin Nmax Mmin Mmax Tmin Tmax 1 0,00 8300,00 10790,00 0,00 0,00 0,00 111,98 2 0,18 8482,12 10972,12 -46,36 -14,97 59,54 165,71 3 0,36 8668,48 11158,48 -80,49 -18,84 145,48 244,83 4 0,54 8859,09 11349,09 -97,69 -7,09 212,04 349,22 5 0,72 9053,93 11543,93 -93,24 24,81 286,62 478,86 6 0,90 9253,01 11743,01 -62,45 81,39 381,82 633,73 7 1,08 9456,34 11946,34 -0,63 167,16 497,63 813,85 8 1,26 9663,91 12153,91 67,94 286,66 634,06 1019,20 9 1,44 9875,72 12365,72 149,81 444,41 791,11 1249,80 10 1,62 10091,77 12581,77 260,79 644,92 968,77 1505,64 11 1,80 10312,06 12802,06 404,58 892,73 1167,05 1786,71 12 1,98 10536,59 13026,59 584,86 1192,35 1385,94 2098,48 13 2,16 10765,36 13255,36 805,33 1548,31 1625,45 2446,51 14 2,34 10998,38 13488,38 1069,68 1965,13 1885,57 2820,75 15 2,52 11235,63 13725,63 1381,51 2447,25 2164,33 3218,67 16 2,70 11477,13 13967,13 1742,07 2996,32 2433,86 3600,04 17 2,88 11722,87 14212,87 2149,67 3610,69 2706,04 3982,14 18 3,06 11972,85 14462,85 2606,67 4293,36 2995,64 4386,36 19 3,24 12227,07 14717,07 3116,16 5048,25 3302,63 4812,69 20 3,42 12485,53 14975,53 3681,27 5879,27 3627,04 5261,13 21 3,60 12748,23 15238,23 4304,96 6790,15 3965,83 5727,85 Inviluppo combinazioni SLE Nr. Y Nmin Nmax Mmin Mmax Tmin Tmax 1 0,00 8300,00 8300,00 0,00 0,00 0,00 52,77 2 0,18 8482,12 8482,12 -36,19 -26,53 41,04 95,61 3 0,36 8668,48 8668,48 -64,03 -44,37 102,36 159,07 4 0,54 8859,09 8859,09 -79,91 -49,82 183,86 243,06 5 0,72 9053,93 9053,93 -80,21 -39,22 285,53 347,54 6 0,90 9253,01 9253,01 -61,33 -8,90 407,35 472,53 7 1,08 9456,34 9456,34 -19,66 44,82 549,33 618,01 8 1,26 9663,91 9663,91 48,41 125,60 711,47 784,00 9 1,44 9875,72 9875,72 146,49 237,11 893,76 970,48 10 1,62 10091,77 10091,77 278,19 383,02 1096,22 1177,46 11 1,80 10312,06 10312,06 447,12 567,00 1318,83 1404,95 12 1,98 10536,59 10536,59 656,87 792,72 1561,60 1652,93 13 2,16 10765,36 10765,36 911,08 1063,86 1824,53 1921,41 14 2,34 10998,38 10998,38 1213,33 1384,08 2107,61 2210,39 15 2,52 11235,63 11235,63 1567,17 1756,97 2408,92 2517,90 16 2,70 11477,13 11477,13 1973,58 2183,54 2697,98 2813,00 17 2,88 11722,87 11722,87 2430,32 2661,53 2987,87 3108,96 18 3,06 11972,85 11972,85 2939,60 3193,18 3294,76 3422,23 19 3,24 12227,07 12227,07 3504,47 3781,58 3618,67 3752,81 20 3,42 12485,53 12485,53 4127,95 4429,84 3959,59 4100,68 21 3,60 12748,23 12748,23 4812,96 5140,89 4314,56 4462,85

Inviluppo Sollecitazioni fondazione di valle L'ascissa X(espressa in m) è considerata positiva verso monte con origine in corrispondenza dell'estremo libero della fondazione di valle Momento positivo se tende le fibre inferiori, espresso in [kgm] Taglio positivo se diretto verso l'alto, espresso in [kg] Inviluppo combinazioni SLU Nr. X Mmin Mmax Tmin Tmax 1 0,00 0,00 0,00 0,00 0,00 2 0,07 26,62 33,39 759,27 952,09 3 0,14 106,12 133,02 1510,71 1892,51 4 0,21 237,94 298,07 2254,33 2821,28

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 162 a 174

5 0,28 421,54 527,73 2990,11 3738,38 6 0,35 656,37 821,17 3718,07 4643,82 7 0,42 941,89 1177,59 4438,20 5537,60 8 0,49 1277,54 1596,16 5150,50 6419,72 9 0,56 1662,77 2076,08 5854,97 7290,17 10 0,63 2097,05 2616,52 6551,61 8148,96 11 0,70 2579,82 3216,66 7240,43 8996,09 Inviluppo combinazioni SLE Nr. X Mmin Mmax Tmin Tmax 1 0,00 0,00 0,00 0,00 0,00 2 0,07 26,69 27,54 761,45 785,55 3 0,14 106,45 109,80 1516,22 1563,45 4 0,21 238,80 246,24 2264,29 2333,71 5 0,28 423,29 436,34 3005,67 3096,33 6 0,35 659,44 679,55 3740,37 3851,31 7 0,42 946,79 975,34 4468,38 4598,64 8 0,49 1284,86 1323,18 5189,69 5338,34 9 0,56 1673,19 1722,53 5904,32 6070,39 10 0,63 2111,31 2172,86 6612,26 6794,79 11 0,70 2598,75 2673,63 7313,51 7511,56

Inviluppo Sollecitazioni fondazione di monte L'ascissa X(espressa in m) è considerata positiva verso valle con origine in corrispondenza dell'estremo libero della fondazione di monte Momento positivo se tende le fibre inferiori, espresso in [kgm] Taglio positivo se diretto verso l'alto, espresso in [kg] Inviluppo combinazioni SLU Nr. X Mmin Mmax Tmin Tmax 1 0,00 0,00 0,00 0,00 0,00 2 0,20 -63,15 -12,38 -615,68 -113,21 3 0,40 -239,92 -41,04 -1136,16 -162,71 4 0,60 -511,27 -73,22 -1561,44 -148,49 5 0,80 -858,15 -96,18 -1891,52 -70,55 6 1,00 -1261,53 -97,19 -2126,40 71,09 7 1,20 -1702,36 -63,50 -2266,08 276,46 8 1,40 -2161,62 17,64 -2310,57 545,53 9 1,60 -2620,24 158,96 -2259,85 878,33 10 1,80 -3059,21 373,22 -2113,94 1274,83 11 2,00 -3459,47 673,14 -1872,82 1735,05 Inviluppo combinazioni SLE Nr. X Mmin Mmax Tmin Tmax 1 0,00 0,00 0,00 0,00 0,00 2 0,20 -15,58 -9,05 -145,42 -81,45 3 0,40 -54,00 -28,94 -228,40 -108,29 4 0,60 -102,78 -48,73 -248,95 -80,53 5 0,80 -149,42 -57,51 -207,06 1,83 6 1,00 -181,44 -44,36 -102,74 138,80 7 1,20 -186,35 1,65 64,02 330,38 8 1,40 -151,67 91,43 293,21 576,56 9 1,60 -64,91 235,91 584,83 877,34 10 1,80 86,42 446,01 938,89 1232,73 11 2,00 314,81 732,65 1355,39 1642,73

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 163 a 174

Inviluppo armature e tensioni nei materiali del muro L'ordinata Y(espressa in [m]) è considerata positiva verso il basso con origine in testa al muro B base della sezione espressa in [cm] H altezza della sezione espressa in [cm] Afs area di armatura in corrispondenza del lembo di monte in [cmq] Afi area di armatura in corrispondenza del lembo di valle in [cmq] σc tensione nel calcestruzzo espressa in [kg/cmq] τc tensione tangenziale nel calcestruzzo espressa in [kg/cmq] σfs tensione nell'armatura disposta sul lembo di monte in [kg/cmq] σfi tensione nell'armatura disposta sul lembo di valle in [kg/cmq] Nu sforzo normale ultimo espresso in [kg] Mu momento ultimo espresso in [kgm] CS coefficiente sicurezza sezione VRcd Aliquota di taglio assorbito dal cls, espresso in [kg] VRsd Aliquota di taglio assorbito dall'armatura, espresso in [kg] VRd Resistenza al taglio, espresso in [kg] Inviluppo SLU Nr. Y B, H A fs Afi Nu Mu CS VRd VRcd VRsd 1 0,00 100, 40 6,16 7,70 592424 0 54,90 17936 -- -- 2 0,18 100, 41 6,16 7,70 601064 1065 54,78 18250 -- -- 3 0,36 100, 42 6,16 7,70 610943 1338 54,75 18562 -- -- 4 0,54 100, 43 6,16 7,70 622341 504 54,84 18527 -- -- 5 0,72 100, 44 9,24 7,70 648121 -410 56,14 18838 -- -- 6 0,90 100, 45 9,24 7,70 659647 374 56,48 19148 -- -- 7 1,08 100, 46 9,24 7,70 664104 36 56,98 19458 -- -- 8 1,26 100, 47 9,24 7,70 666046 -4827 56,43 19767 -- -- 9 1,44 100, 48 9,24 7,70 665509 -10495 55,67 20076 -- -- 10 1,62 100, 48 9,24 7,70 638323 -17958 54,71 20384 -- -- 11 1,80 100, 49 9,24 7,70 584929 -27305 53,59 20692 -- -- 12 1,98 100, 50 9,24 7,70 524513 -38578 49,46 21000 -- -- 13 2,16 100, 51 9,24 7,70 463313 -48684 43,04 21307 -- -- 14 2,34 100, 52 9,24 7,70 397863 -58194 36,17 21614 -- -- 15 2,52 100, 53 9,24 7,70 322153 -66659 28,67 21921 -- -- 16 2,70 100, 54 9,24 7,70 250642 -65435 21,84 22228 -- -- 17 2,88 100, 55 9,24 7,70 190447 -58658 16,25 22534 -- -- 18 3,06 100, 56 9,24 7,70 144177 -51701 12,04 22840 -- -- 19 3,24 100, 57 9,24 7,70 111677 -46109 9,13 23146 -- -- 20 3,42 100, 58 9,24 7,70 86689 -40821 6,94 23452 -- -- 21 3,60 100, 59 9,24 7,70 70291 -37440 5,51 23758 -- -- Inviluppo SLE Nr. Y B, H A fs Afi σσσσc ττττc σσσσfs σσσσfi 1 0,00 100, 40 6,16 7,70 2,00 0,02 -29,92 -29,26 2 0,18 100, 41 6,16 7,70 2,11 0,03 -31,40 -28,16 3 0,36 100, 42 6,16 7,70 2,20 0,05 -32,45 -27,50 4 0,54 100, 43 6,16 7,70 2,23 0,07 -32,97 -27,38 5 0,72 100, 44 9,24 7,70 2,15 0,10 -31,88 -28,22 6 0,90 100, 45 9,24 7,70 2,10 0,13 -31,18 -29,37 7 1,08 100, 46 9,24 7,70 2,10 0,17 -29,78 -31,23 8 1,26 100, 47 9,24 7,70 2,30 0,21 -27,65 -33,85 9 1,44 100, 48 9,24 7,70 2,56 0,26 -24,76 -37,25 10 1,62 100, 48 9,24 7,70 2,88 0,30 -21,09 -41,47 11 1,80 100, 49 9,24 7,70 3,26 0,36 -16,60 -46,52 12 1,98 100, 50 9,24 7,70 3,70 0,41 -11,30 -52,41 13 2,16 100, 51 9,24 7,70 4,21 0,47 -5,16 -59,26 14 2,34 100, 52 9,24 7,70 4,89 0,53 10,33 -68,32 15 2,52 100, 53 9,24 7,70 5,84 0,59 30,37 -80,61 16 2,70 100, 54 9,24 7,70 7,10 0,65 64,20 -96,48 17 2,88 100, 55 9,24 7,70 8,62 0,70 114,92 -115,30 18 3,06 100, 56 9,24 7,70 10,35 0,76 182,61 -136,14 19 3,24 100, 57 9,24 7,70 12,21 0,82 265,48 -158,28 20 3,42 100, 58 9,24 7,70 14,18 0,88 361,58 -181,39 21 3,60 100, 59 9,24 7,70 16,24 0,94 469,48 -205,37

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 164 a 174

Inviluppo armature e tensioni nei materiali della fondazione Simbologia adottata B base della sezione espressa in [cm] H altezza della sezione espressa in [cm] Afi area di armatura in corrispondenza del lembo inferiore in [cmq] Afs area di armatura in corrispondenza del lembo superiore in [cmq] σc tensione nel calcestruzzo espressa in [kg/cmq] τc tensione tangenziale nel calcestruzzo espressa in [kg/cmq] σfi tensione nell'armatura disposta in corrispondenza del lembo inferiore in [kg/cmq] σfs tensione nell'armatura disposta in corrispondenza del lembo superiore in [kg/cmq] Nu sforzo normale ultimo espresso in [kg] Mu momento ultimo espresso in [kgm] CS coefficiente sicurezza sezione VRcd Aliquota di taglio assorbito dal cls, espresso in [kg] VRsd Aliquota di taglio assorbito dall'armatura, espresso in [kg] VRd Resistenza al taglio, espresso in [kg] Fondazione di valle (L'ascissa X, espressa in [m], è positiva verso monte con origine in corrispondenza dell'estremo libero della fondazione di valle) Inviluppo SLU Nr. Y B, H A fs Afi Nu Mu CS VRd VRcd VRsd 1 0,00 100, 60 6,16 12,32 0 0 1000,00 22263 -- -- 2 0,07 100, 60 6,16 12,32 0 26962 807,47 22263 -- -- 3 0,14 100, 60 6,16 12,32 0 26962 202,69 22263 -- -- 4 0,21 100, 60 6,16 12,32 0 26962 90,46 22263 -- -- 5 0,28 100, 60 6,16 12,32 0 26962 51,09 22263 -- -- 6 0,35 100, 60 6,16 12,32 0 26962 32,83 22263 -- -- 7 0,42 100, 60 6,16 12,32 0 26962 22,90 22263 -- -- 8 0,49 100, 60 6,16 12,32 0 26962 16,89 22263 -- -- 9 0,56 100, 60 6,16 12,32 0 26962 12,99 22263 -- -- 10 0,63 100, 60 6,16 12,32 0 26962 10,30 22263 -- -- 11 0,70 100, 60 6,16 12,32 0 26962 8,38 22263 -- -- Inviluppo SLE Nr. X B, H A fs Afi σσσσc ττττc σσσσfi σσσσfs 12 0,00 100, 60 6,16 12,32 0,00 0,00 0,00 0,00 13 0,07 100, 60 6,16 12,32 0,08 0,16 4,22 -0,86 14 0,14 100, 60 6,16 12,32 0,30 0,32 16,81 -3,45 15 0,21 100, 60 6,16 12,32 0,68 0,48 37,69 -7,73 16 0,28 100, 60 6,16 12,32 1,21 0,64 66,79 -13,70 17 0,35 100, 60 6,16 12,32 1,89 0,79 104,02 -21,33 18 0,42 100, 60 6,16 12,32 2,71 0,95 149,30 -30,62 19 0,49 100, 60 6,16 12,32 3,67 1,10 202,55 -41,54 20 0,56 100, 60 6,16 12,32 4,78 1,25 263,68 -54,07 21 0,63 100, 60 6,16 12,32 6,03 1,40 332,62 -68,21 22 0,70 100, 60 6,16 12,32 7,42 1,55 409,27 -83,93 Fondazione di monte (L'ascissa X, espressa in [m], è positiva verso valle con origine in corrispondenza dell'estremo libero della fondazione di monte) Inviluppo SLU Nr. Y B, H A fs Afi Nu Mu CS VRd VRcd VRsd 1 0,00 100, 60 12,32 6,16 0 0 1000,00 22263 -- -- 2 0,20 100, 60 12,32 6,16 0 -26962 426,93 22263 -- -- 3 0,40 100, 60 12,32 6,16 0 -26962 112,38 22263 -- -- 4 0,60 100, 60 12,32 6,16 0 -26962 52,74 22263 -- -- 5 0,80 100, 60 12,32 6,16 0 -26962 31,42 22263 -- -- 6 1,00 100, 60 12,32 6,16 0 -26962 21,37 22263 -- -- 7 1,20 100, 60 12,32 12,32 0 -26963 15,84 22263 -- -- 8 1,40 100, 60 12,32 12,32 0 26963 12,47 22263 -- -- 9 1,60 100, 60 12,32 12,32 0 26963 10,29 22263 -- -- 10 1,80 100, 60 12,32 12,32 0 26963 8,81 22263 -- -- 11 2,00 100, 60 12,32 12,32 0 26963 7,79 22263 -- -- Inviluppo SLE Nr. X B, H A fs Afi σσσσc ττττc σσσσfi σσσσfs 12 0,00 100, 60 12,32 6,16 0,00 0,00 0,00 0,00 13 0,20 100, 60 12,32 6,16 0,04 -0,03 -0,49 2,39 14 0,40 100, 60 12,32 6,16 0,15 -0,05 -1,70 8,27 15 0,60 100, 60 12,32 6,16 0,29 -0,05 -3,23 15,73

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 165 a 174

16 0,80 100, 60 12,32 6,16 0,41 -0,04 -4,69 22,87 17 1,00 100, 60 12,32 6,16 0,50 0,03 -5,70 27,77 18 1,20 100, 60 12,32 12,32 0,49 0,07 -5,41 28,40 19 1,40 100, 60 12,32 12,32 0,40 0,12 13,93 23,11 20 1,60 100, 60 12,32 12,32 0,62 0,18 35,95 9,89 21 1,80 100, 60 12,32 12,32 1,16 0,25 67,97 -12,96 22 2,00 100, 60 12,32 12,32 1,91 0,34 111,65 -21,28

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 166 a 174

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 167 a 174

Armature e tensioni nei materiali della fondazione Combinazione n° 16 Simbologia adottata B base della sezione espressa in [cm] H altezza della sezione espressa in [cm] Afi area di armatura in corrispondenza del lembo inferiore in [cmq] Afs area di armatura in corrispondenza del lembo superiore in [cmq] Nu sforzo normale ultimo espresso in [kg] Mu momento ultimo espresso in [kgm] CS coefficiente sicurezza sezione VRcd Aliquota di taglio assorbito dal cls, espresso in [kg] VRsd Aliquota di taglio assorbito dall'armatura, espresso in [kg] VRd Resistenza al taglio, espresso in [kg] Fondazione di valle (L'ascissa X, espressa in [m], è positiva verso monte con origine in corrispondenza dell'estremo libero della fondazione di valle) Nr. Y B, H A fs Afi Nu Mu CS VRd VRcd VRsd 1 0,00 100, 60 12,06 12,06 0 0 1000,00 22263 -- -- 2 0,07 100, 60 12,06 12,06 0 26421 847,98 22263 -- -- 3 0,14 100, 60 12,06 12,06 0 26421 212,95 22263 -- -- 4 0,21 100, 60 12,06 12,06 0 26421 95,08 22263 -- -- 5 0,28 100, 60 12,06 12,06 0 26421 53,73 22263 -- -- 6 0,35 100, 60 12,06 12,06 0 26421 34,54 22263 -- -- 7 0,42 100, 60 12,06 12,06 0 26421 24,10 22263 -- -- 8 0,49 100, 60 12,06 12,06 0 26421 17,79 22263 -- -- 9 0,56 100, 60 12,06 12,06 0 26421 13,68 22263 -- -- 10 0,63 100, 60 12,06 12,06 0 26421 10,86 22263 -- -- 11 0,70 100, 60 12,06 12,06 0 26421 8,84 22263 -- -- Fondazione di monte (L'ascissa X, espressa in [m], è positiva verso valle con origine in corrispondenza dell'estremo libero della fondazione di monte) Nr. Y B, H A fs Afi Nu Mu CS VRd VRcd VRsd 1 0,00 100, 60 12,06 12,06 0 0 1000,00 22263 -- -- 2 0,20 100, 60 12,06 12,06 0 -26421 620,95 22263 -- -- 3 0,40 100, 60 12,06 12,06 0 -26421 168,20 22263 -- -- 4 0,60 100, 60 12,06 12,06 0 -26421 81,56 22263 -- -- 5 0,80 100, 60 12,06 12,06 0 -26421 50,48 22263 -- -- 6 1,00 100, 60 12,06 12,06 0 -26421 35,90 22263 -- -- 7 1,20 100, 60 12,06 12,06 0 -26421 28,06 22263 -- -- 8 1,40 100, 60 12,06 12,06 0 -26421 23,57 22263 -- -- 9 1,60 100, 60 12,06 12,06 0 -26421 21,06 22263 -- -- 10 1,80 100, 60 12,06 12,06 0 -26421 19,98 22263 -- -- 11 2,00 100, 60 12,06 12,06 0 -26421 20,26 22263 -- --

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 168 a 174

Stabilità globale muro + terreno Combinazione n° 20 Le ascisse X sono considerate positive verso monte Le ordinate Y sono considerate positive verso l'alto Origine in testa al muro (spigolo contro terra) W peso della striscia espresso in [kg] α angolo fra la base della striscia e l'orizzontale espresso in [°] (positivo antiorario) φ angolo d'attrito del terreno lungo la base della striscia c coesione del terreno lungo la base della striscia espressa in [kg/cmq] b larghezza della striscia espressa in [m] u pressione neutra lungo la base della striscia espressa in [kg/cmq] Metodo di Fellenius Numero di cerchi analizzati 36 Numero di strisce 25 Cerchio critico Coordinate del centro X[m]= -2,18 Y[m]= 0,00 Raggio del cerchio R[m]= 5,92 Ascissa a valle del cerchio Xi[m]= -7,53 Ascissa a monte del cerchio Xs[m]= 3,75 Larghezza della striscia dx[m]= 0,45 Coefficiente di sicurezza C= 1.54 Le strisce sono numerate da monte verso valle Caratteristiche delle strisce Striscia W αααα(°) Wsinαααα b/cosαααα φφφφ c u 1 1145.92 78.75 1123.89 2.31 20.46 0.000 0.000 2 2421.52 62.73 2152.37 0.98 22.80 0.000 0.000 3 3030.89 54.23 2459.10 0.77 23.91 0.000 0.000 4 3507.57 47.28 2576.77 0.66 23.91 0.000 0.000 5 4031.11 41.16 2653.13 0.60 23.91 0.000 0.025 6 4322.18 35.58 2514.68 0.55 23.91 0.000 0.061 7 4560.46 30.37 2305.37 0.52 23.91 0.000 0.091 8 4754.77 25.42 2040.99 0.50 23.91 0.000 0.115 9 13896.44 20.67 4905.59 0.48 23.91 0.000 0.134 10 3964.86 16.07 1097.41 0.47 23.91 0.000 0.149 11 2944.60 11.57 590.59 0.46 23.91 0.000 0.160 12 2875.36 7.14 357.57 0.45 23.91 0.000 0.167 13 2884.25 2.76 138.88 0.45 23.91 0.000 0.171 14 2888.35 -1.61 -81.04 0.45 23.91 0.000 0.172 15 2861.31 -5.98 -298.33 0.45 23.91 0.000 0.169 16 2802.65 -10.40 -505.80 0.46 23.91 0.000 0.162 17 2711.28 -14.87 -695.95 0.47 23.91 0.000 0.152 18 2585.41 -19.45 -860.71 0.48 23.91 0.000 0.138 19 2422.35 -24.15 -991.09 0.49 23.91 0.000 0.120 20 2218.16 -29.04 -1076.70 0.52 23.91 0.000 0.097 21 1967.07 -34.17 -1104.88 0.55 23.91 0.000 0.070 22 1660.36 -39.64 -1059.35 0.59 23.91 0.000 0.036 23 1292.37 -45.60 -923.33 0.64 23.91 0.000 0.000 24 865.80 -52.29 -684.91 0.74 23.91 0.000 0.000 25 308.52 -60.26 -267.88 0.91 23.91 0.000 0.000 ΣWi= 78923,54 [kg] ΣWisinαi= 16366,37 [kg] ΣWicosαitanφi= 30062,06 [kg] Σcibi/cosαi= 0,00 [kg]

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 169 a 174

Inviluppo Sollecitazioni paramento L'ordinata Y(espressa in [m]) è considerata positiva verso il basso con origine in testa al muro Momento positivo se tende le fibre contro terra (a monte), espresso in [kgm] Sforzo normale positivo di compressione, espresso in [kg] Taglio positivo se diretto da monte verso valle, espresso in [kg] Inviluppo combinazioni SLU Nr. Y Nmin Nmax Mmin Mmax Tmin Tmax 1 0,00 8300,00 10790,00 0,00 0,00 0,00 111,98 2 0,18 8482,12 10972,12 -46,36 -14,97 59,54 165,71 3 0,36 8668,48 11158,48 -80,49 -18,84 145,48 244,83 4 0,54 8859,09 11349,09 -97,69 -7,09 212,04 349,22 5 0,72 9053,93 11543,93 -93,24 24,81 286,62 478,86 6 0,90 9253,01 11743,01 -62,45 81,39 381,82 633,73 7 1,08 9456,34 11946,34 -0,63 167,16 497,63 813,85 8 1,26 9663,91 12153,91 67,94 286,66 634,06 1019,20 9 1,44 9875,72 12365,72 149,81 444,41 791,11 1249,80 10 1,62 10091,77 12581,77 260,79 644,92 968,77 1505,64 11 1,80 10312,06 12802,06 404,58 892,73 1167,05 1786,71 12 1,98 10536,59 13026,59 584,86 1192,35 1385,94 2098,48 13 2,16 10765,36 13255,36 805,33 1548,31 1625,45 2446,51 14 2,34 10998,38 13488,38 1069,68 1965,13 1885,57 2820,75 15 2,52 11235,63 13725,63 1381,51 2447,25 2164,33 3218,67 16 2,70 11477,13 13967,13 1742,07 2996,32 2433,86 3600,04 17 2,88 11722,87 14212,87 2149,67 3610,69 2706,04 3982,14 18 3,06 11972,85 14462,85 2606,67 4293,36 2995,64 4386,36 19 3,24 12227,07 14717,07 3116,16 5048,25 3302,63 4812,69 20 3,42 12485,53 14975,53 3681,27 5879,27 3627,04 5261,13 21 3,60 12748,23 15238,23 4304,96 6790,15 3965,83 5727,85 Inviluppo combinazioni SLE Nr. Y Nmin Nmax Mmin Mmax Tmin Tmax 1 0,00 8300,00 8300,00 0,00 0,00 0,00 52,77 2 0,18 8482,12 8482,12 -36,19 -26,53 41,04 95,61 3 0,36 8668,48 8668,48 -64,03 -44,37 102,36 159,07 4 0,54 8859,09 8859,09 -79,91 -49,82 183,86 243,06 5 0,72 9053,93 9053,93 -80,21 -39,22 285,53 347,54 6 0,90 9253,01 9253,01 -61,33 -8,90 407,35 472,53 7 1,08 9456,34 9456,34 -19,66 44,82 549,33 618,01 8 1,26 9663,91 9663,91 48,41 125,60 711,47 784,00 9 1,44 9875,72 9875,72 146,49 237,11 893,76 970,48 10 1,62 10091,77 10091,77 278,19 383,02 1096,22 1177,46 11 1,80 10312,06 10312,06 447,12 567,00 1318,83 1404,95 12 1,98 10536,59 10536,59 656,87 792,72 1561,60 1652,93 13 2,16 10765,36 10765,36 911,08 1063,86 1824,53 1921,41 14 2,34 10998,38 10998,38 1213,33 1384,08 2107,61 2210,39 15 2,52 11235,63 11235,63 1567,17 1756,97 2408,92 2517,90 16 2,70 11477,13 11477,13 1973,58 2183,54 2697,98 2813,00 17 2,88 11722,87 11722,87 2430,32 2661,53 2987,87 3108,96 18 3,06 11972,85 11972,85 2939,60 3193,18 3294,76 3422,23 19 3,24 12227,07 12227,07 3504,47 3781,58 3618,67 3752,81 20 3,42 12485,53 12485,53 4127,95 4429,84 3959,59 4100,68 21 3,60 12748,23 12748,23 4812,96 5140,89 4314,56 4462,85

Inviluppo Sollecitazioni fondazione di valle L'ascissa X(espressa in m) è considerata positiva verso monte con origine in corrispondenza dell'estremo libero della fondazione di valle Momento positivo se tende le fibre inferiori, espresso in [kgm] Taglio positivo se diretto verso l'alto, espresso in [kg] Inviluppo combinazioni SLU Nr. X Mmin Mmax Tmin Tmax 1 0,00 0,00 0,00 0,00 0,00 2 0,07 26,62 33,39 759,27 952,09 3 0,14 106,12 133,02 1510,71 1892,51 4 0,21 237,94 298,07 2254,33 2821,28

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 170 a 174

5 0,28 421,54 527,73 2990,11 3738,38 6 0,35 656,37 821,17 3718,07 4643,82 7 0,42 941,89 1177,59 4438,20 5537,60 8 0,49 1277,54 1596,16 5150,50 6419,72 9 0,56 1662,77 2076,08 5854,97 7290,17 10 0,63 2097,05 2616,52 6551,61 8148,96 11 0,70 2579,82 3216,66 7240,43 8996,09 Inviluppo combinazioni SLE Nr. X Mmin Mmax Tmin Tmax 1 0,00 0,00 0,00 0,00 0,00 2 0,07 26,69 27,54 761,45 785,55 3 0,14 106,45 109,80 1516,22 1563,45 4 0,21 238,80 246,24 2264,29 2333,71 5 0,28 423,29 436,34 3005,67 3096,33 6 0,35 659,44 679,55 3740,37 3851,31 7 0,42 946,79 975,34 4468,38 4598,64 8 0,49 1284,86 1323,18 5189,69 5338,34 9 0,56 1673,19 1722,53 5904,32 6070,39 10 0,63 2111,31 2172,86 6612,26 6794,79 11 0,70 2598,75 2673,63 7313,51 7511,56

Inviluppo Sollecitazioni fondazione di monte L'ascissa X(espressa in m) è considerata positiva verso valle con origine in corrispondenza dell'estremo libero della fondazione di monte Momento positivo se tende le fibre inferiori, espresso in [kgm] Taglio positivo se diretto verso l'alto, espresso in [kg] Inviluppo combinazioni SLU Nr. X Mmin Mmax Tmin Tmax 1 0,00 0,00 0,00 0,00 0,00 2 0,20 -63,15 -12,38 -615,68 -113,21 3 0,40 -239,92 -41,04 -1136,16 -162,71 4 0,60 -511,27 -73,22 -1561,44 -148,49 5 0,80 -858,15 -96,18 -1891,52 -70,55 6 1,00 -1261,53 -97,19 -2126,40 71,09 7 1,20 -1702,36 -63,50 -2266,08 276,46 8 1,40 -2161,62 17,64 -2310,57 545,53 9 1,60 -2620,24 158,96 -2259,85 878,33 10 1,80 -3059,21 373,22 -2113,94 1274,83 11 2,00 -3459,47 673,14 -1872,82 1735,05 Inviluppo combinazioni SLE Nr. X Mmin Mmax Tmin Tmax 1 0,00 0,00 0,00 0,00 0,00 2 0,20 -15,58 -9,05 -145,42 -81,45 3 0,40 -54,00 -28,94 -228,40 -108,29 4 0,60 -102,78 -48,73 -248,95 -80,53 5 0,80 -149,42 -57,51 -207,06 1,83 6 1,00 -181,44 -44,36 -102,74 138,80 7 1,20 -186,35 1,65 64,02 330,38 8 1,40 -151,67 91,43 293,21 576,56 9 1,60 -64,91 235,91 584,83 877,34 10 1,80 86,42 446,01 938,89 1232,73 11 2,00 314,81 732,65 1355,39 1642,73

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 171 a 174

Inviluppo armature e tensioni nei materiali del muro L'ordinata Y(espressa in [m]) è considerata positiva verso il basso con origine in testa al muro B base della sezione espressa in [cm] H altezza della sezione espressa in [cm] Afs area di armatura in corrispondenza del lembo di monte in [cmq] Afi area di armatura in corrispondenza del lembo di valle in [cmq] σc tensione nel calcestruzzo espressa in [kg/cmq] τc tensione tangenziale nel calcestruzzo espressa in [kg/cmq] σfs tensione nell'armatura disposta sul lembo di monte in [kg/cmq] σfi tensione nell'armatura disposta sul lembo di valle in [kg/cmq] Nu sforzo normale ultimo espresso in [kg] Mu momento ultimo espresso in [kgm] CS coefficiente sicurezza sezione VRcd Aliquota di taglio assorbito dal cls, espresso in [kg] VRsd Aliquota di taglio assorbito dall'armatura, espresso in [kg] VRd Resistenza al taglio, espresso in [kg] Inviluppo SLU Nr. Y B, H A fs Afi Nu Mu CS VRd VRcd VRsd 1 0,00 100, 40 14,07 14,07 649452 0 60,19 19122 -- -- 2 0,18 100, 41 14,07 14,07 657727 1165 59,95 19353 -- -- 3 0,36 100, 42 14,07 14,07 667372 1462 59,81 19583 -- -- 4 0,54 100, 43 14,07 14,07 678680 550 59,80 19464 -- -- 5 0,72 100, 44 14,07 14,07 691931 -438 59,94 19691 -- -- 6 0,90 100, 45 14,07 14,07 703928 399 60,24 19916 -- -- 7 1,08 100, 46 14,07 14,07 707956 38 60,72 20140 -- -- 8 1,26 100, 47 18,10 14,07 722026 -5246 61,32 22024 -- -- 9 1,44 100, 48 18,10 14,07 719406 -11379 60,33 22263 -- -- 10 1,62 100, 48 18,10 14,07 682119 -19425 59,14 22500 -- -- 11 1,80 100, 49 18,10 14,07 629136 -29463 57,77 22736 -- -- 12 1,98 100, 50 18,10 14,07 571573 -41078 52,79 22972 -- -- 13 2,16 100, 51 18,10 14,07 513877 -51958 47,50 23206 -- -- 14 2,34 100, 52 18,10 14,07 459287 -62616 41,76 23439 -- -- 15 2,52 100, 53 18,10 14,07 402323 -72598 35,81 23671 -- -- 16 2,70 100, 54 18,10 14,07 338398 -81607 29,48 23903 -- -- 17 2,88 100, 55 18,10 14,07 279235 -86005 23,82 24134 -- -- 18 3,06 100, 56 18,10 14,07 229808 -82407 19,19 24363 -- -- 19 3,24 100, 57 18,10 14,07 189276 -78147 15,48 24592 -- -- 20 3,42 100, 58 18,10 14,07 156880 -73873 12,56 24821 -- -- 21 3,60 100, 59 18,10 14,07 132302 -70469 10,38 25049 -- -- Inviluppo SLE Nr. Y B, H A fs Afi σσσσc ττττc σσσσfs σσσσfi 1 0,00 100, 40 14,07 14,07 1,88 0,02 -28,15 -28,15 2 0,18 100, 41 14,07 14,07 1,98 0,03 -29,52 -27,18 3 0,36 100, 42 14,07 14,07 2,06 0,05 -30,50 -26,60 4 0,54 100, 43 14,07 14,07 2,10 0,07 -31,01 -26,52 5 0,72 100, 44 14,07 14,07 2,09 0,10 -30,97 -26,99 6 0,90 100, 45 14,07 14,07 2,04 0,13 -30,33 -28,07 7 1,08 100, 46 14,07 14,07 2,00 0,17 -29,05 -29,83 8 1,26 100, 47 18,10 14,07 2,21 0,21 -26,12 -32,58 9 1,44 100, 48 18,10 14,07 2,45 0,26 -23,54 -35,73 10 1,62 100, 48 18,10 14,07 2,75 0,30 -20,23 -39,63 11 1,80 100, 49 18,10 14,07 3,10 0,36 -16,19 -44,31 12 1,98 100, 50 18,10 14,07 3,51 0,41 -11,39 -49,77 13 2,16 100, 51 18,10 14,07 3,97 0,47 -5,82 -56,04 14 2,34 100, 52 18,10 14,07 4,57 0,53 6,93 -63,95 15 2,52 100, 53 18,10 14,07 5,35 0,59 21,52 -74,12 16 2,70 100, 54 18,10 14,07 6,31 0,65 43,51 -86,50 17 2,88 100, 55 18,10 14,07 7,42 0,70 73,40 -100,59 18 3,06 100, 56 18,10 14,07 8,64 0,76 110,86 -115,98 19 3,24 100, 57 18,10 14,07 9,95 0,82 155,21 -132,38 20 3,42 100, 58 18,10 14,07 11,35 0,88 205,83 -149,66 21 3,60 100, 59 18,10 14,07 12,81 0,94 262,25 -167,76

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 172 a 174

Inviluppo armature e tensioni nei materiali della fondazione Simbologia adottata B base della sezione espressa in [cm] H altezza della sezione espressa in [cm] Afi area di armatura in corrispondenza del lembo inferiore in [cmq] Afs area di armatura in corrispondenza del lembo superiore in [cmq] σc tensione nel calcestruzzo espressa in [kg/cmq] τc tensione tangenziale nel calcestruzzo espressa in [kg/cmq] σfi tensione nell'armatura disposta in corrispondenza del lembo inferiore in [kg/cmq] σfs tensione nell'armatura disposta in corrispondenza del lembo superiore in [kg/cmq] Nu sforzo normale ultimo espresso in [kg] Mu momento ultimo espresso in [kgm] CS coefficiente sicurezza sezione VRcd Aliquota di taglio assorbito dal cls, espresso in [kg] VRsd Aliquota di taglio assorbito dall'armatura, espresso in [kg] VRd Resistenza al taglio, espresso in [kg] Fondazione di valle (L'ascissa X, espressa in [m], è positiva verso monte con origine in corrispondenza dell'estremo libero della fondazione di valle) Inviluppo SLU Nr. Y B, H A fs Afi Nu Mu CS VRd VRcd VRsd 1 0,00 100, 60 12,06 12,06 0 0 1000,00 22263 -- -- 2 0,07 100, 60 12,06 12,06 0 26421 791,25 22263 -- -- 3 0,14 100, 60 12,06 12,06 0 26421 198,62 22263 -- -- 4 0,21 100, 60 12,06 12,06 0 26421 88,64 22263 -- -- 5 0,28 100, 60 12,06 12,06 0 26421 50,07 22263 -- -- 6 0,35 100, 60 12,06 12,06 0 26421 32,17 22263 -- -- 7 0,42 100, 60 12,06 12,06 0 26421 22,44 22263 -- -- 8 0,49 100, 60 12,06 12,06 0 26421 16,55 22263 -- -- 9 0,56 100, 60 12,06 12,06 0 26421 12,73 22263 -- -- 10 0,63 100, 60 12,06 12,06 0 26421 10,10 22263 -- -- 11 0,70 100, 60 12,06 12,06 0 26421 8,21 22263 -- -- Inviluppo SLE Nr. X B, H A fs Afi σσσσc ττττc σσσσfi σσσσfs 12 0,00 100, 60 12,06 12,06 0,00 0,00 0,00 0,00 13 0,07 100, 60 12,06 12,06 0,07 0,16 4,28 -0,81 14 0,14 100, 60 12,06 12,06 0,29 0,32 17,07 -3,21 15 0,21 100, 60 12,06 12,06 0,65 0,48 38,29 -7,21 16 0,28 100, 60 12,06 12,06 1,15 0,64 67,85 -12,77 17 0,35 100, 60 12,06 12,06 1,79 0,79 105,67 -19,89 18 0,42 100, 60 12,06 12,06 2,57 0,95 151,66 -28,55 19 0,49 100, 60 12,06 12,06 3,49 1,10 205,75 -38,73 20 0,56 100, 60 12,06 12,06 4,54 1,25 267,85 -50,42 21 0,63 100, 60 12,06 12,06 5,73 1,40 337,87 -63,60 22 0,70 100, 60 12,06 12,06 7,05 1,55 415,74 -78,26 Fondazione di monte (L'ascissa X, espressa in [m], è positiva verso valle con origine in corrispondenza dell'estremo libero della fondazione di monte) Inviluppo SLU Nr. Y B, H A fs Afi Nu Mu CS VRd VRcd VRsd 1 0,00 100, 60 12,06 12,06 0 0 1000,00 22263 -- -- 2 0,20 100, 60 12,06 12,06 0 -26421 418,35 22263 -- -- 3 0,40 100, 60 12,06 12,06 0 -26421 110,12 22263 -- -- 4 0,60 100, 60 12,06 12,06 0 -26421 51,68 22263 -- -- 5 0,80 100, 60 12,06 12,06 0 -26421 30,79 22263 -- -- 6 1,00 100, 60 12,06 12,06 0 -26421 20,94 22263 -- -- 7 1,20 100, 60 12,06 12,06 0 -26421 15,52 22263 -- -- 8 1,40 100, 60 12,06 12,06 0 26421 12,22 22263 -- -- 9 1,60 100, 60 12,06 12,06 0 26421 10,08 22263 -- -- 10 1,80 100, 60 12,06 12,06 0 26421 8,64 22263 -- -- 11 2,00 100, 60 12,06 12,06 0 26421 7,64 22263 -- -- Inviluppo SLE Nr. X B, H A fs Afi σσσσc ττττc σσσσfi σσσσfs 12 0,00 100, 60 12,06 12,06 0,00 0,00 0,00 0,00 13 0,20 100, 60 12,06 12,06 0,04 -0,03 -0,46 2,42 14 0,40 100, 60 12,06 12,06 0,14 -0,05 -1,58 8,40 15 0,60 100, 60 12,06 12,06 0,27 -0,05 -3,01 15,98

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 173 a 174

16 0,80 100, 60 12,06 12,06 0,39 -0,04 -4,37 23,23 17 1,00 100, 60 12,06 12,06 0,48 0,03 -5,31 28,21 18 1,20 100, 60 12,06 12,06 0,49 0,07 -5,45 28,98 19 1,40 100, 60 12,06 12,06 0,40 0,12 14,22 23,58 20 1,60 100, 60 12,06 12,06 0,62 0,18 36,68 10,09 21 1,80 100, 60 12,06 12,06 1,18 0,25 69,35 -13,06 22 2,00 100, 60 12,06 12,06 1,93 0,34 113,92 -21,45

PROGETTO DI UNA RETE DI PERCORSI CICLABILI NELL’AREA VASTA DI CAGLIARI – I LOTTO

Progetto Esecutivo Ponte Ciclabile - Pedonale Relazione Dei Calcoli Esecutivi Delle Strutture

Pag. 174 a 174