DPR 15-8-13

download DPR 15-8-13

of 94

Transcript of DPR 15-8-13

  • 7/27/2019 DPR 15-8-13

    1/94

    Designation/

    Contact No.Remark

    Name of

    TownStatus as on today

    Cummulative S

    D

    Erection work Baghpat

    No work done

    ,because 4 no. of

    manpower so work

    stopped by me

    3 nos of 250 kva T

    with chemical ear

    Reconducting we

    conductor

    Erection workBaraut 1st

    divisionpit digging

    31 nos of SP-33 po

    55,5 nos of DP for

    Erection workBaraut 2nd

    division

    7 nos, of SP-33 pole

    are erected at site

    11 kv line 300 mtr

    SP-33,23 nos DP f

    Erection work Khekra

    250 Kva T/f are

    insttalation at site,no

    load charging

    11kv line 2.5 km,1

    KVAT/F & 1 nos

    charging at no load

    BaghpatBhanu Partap

    Singh

    Khekra

    Restructured Accelerated Power Development and Reforms Progra

    DAILY PROGRESS REPORT OF DATE-23/7/13

    Name of

    Circle

    Name of Circle

    Engineer

    Name of

    Town/Site

    visited

    DISCOM Activities Contractor Activities

    Name of

    Person

    interacted with

    Activity

  • 7/27/2019 DPR 15-8-13

    2/94

    Restructured Accel

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Site

    visited

    Name of Person interacted

    with

    Baghpat

    Bhanu

    Partap

    Singh

    Baghpat&Baraut DK GARG

  • 7/27/2019 DPR 15-8-13

    3/94

    Designation/Contact

    No.Remark

    Erection

    work

    Erection

    work

    Erection

    work

    Erection

    work

    rated Power Development and Reforms ProgrDAILY PROGRESS REPORT OF DATE-24/7/13

    DISCOM Activities

    Activity

    SE/94127-49205

    To meet SE sir, discuss the Progressive Month

    target & july or August month target.Transformerlocation with serial No. &11kv line new or

    reconducting both which area progress,A

    summrised copy send or discuss with Executive

    engg.

  • 7/27/2019 DPR 15-8-13

    4/94

    Name of

    TownStatus as on today

    Cummulative Status of work

    till DateRemark

    Baghpat3 span of 11kv line& 2 nos of

    SP_55 pole are erected

    3 nos of 250 kva T/F

    insttalation with chemical

    earthing,300 mtr.

    Reconducting weasel to Dog

    conductor. SP-55 pole 2nos.

    Baraut

    1stdivision

    4 nos of SP-33 pole are erected

    35 nos of SP-33 pole, 5 nos of

    SP-55,5 nos of DP for 100 kvaT/F

    Baraut

    2nd

    division

    no work because labour holiday

    11 kv line 300 mtr.,103 nos of

    pole SP-33,23 nos DP for 100

    KVA T/F.

    Khekra8 Span of Reconducting i.e. 300

    mtr.

    11kv line 2.5 km,1 nos of 250

    KVAT/F & 1 nos 100 KVA

    T/F charging at noload.Reconducting ACSR Dog

    conductor 300 mtr.

    am Part -B,PVVNL

    Contractor Activities Name of Contractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    5/94

    Name of CircleName of Circle

    Engineer

    Name of Town/Site

    visitedName of

    Baghpat Bhanu Partap Singh Baraut

  • 7/27/2019 DPR 15-8-13

    6/94

    Designation/Contact No. Remark

    Restructured Accelerated Power DevelopmDAILY PROGRESS RE

    DISCOM Activities

    erson interacted

    with

  • 7/27/2019 DPR 15-8-13

    7/94

    Name of Town

    Erection work Baghpat

    Erection work Baraut 1st division

    Erection work Baraut 2nd division

    Erection work Khekra

    ent and Reforms Program Part -BORT OF DATE-25/7/13

    Contractor Activities

    Activity

  • 7/27/2019 DPR 15-8-13

    8/94

    Status as on today Cummulative Status of work till Date

    3 span of 11kv line

    3 nos of 250 kva T/F insttalation with

    chemical earthing, mtr. Reconducting

    weasel to Dog conductor. SP-55 pole

    2nos.

    4 nos of SP-33 pole are erected39 nos of SP-33 pole, 5 nos of SP-55,5

    nos of DP for 100 kva T/F

    5 nos. of SP-55 pole are erected11 kv line 300 mtr.,108 nos of pole SP-

    33,23 nos DP for 100 KVA T/F.

    10 Span of Reconducting i.e. 500mtr.

    11kv line 2.5 km,1 nos of 250 KVAT/F

    & 1 nos 100 KVA T/F charging at noload.Reconducting ACSR Dog

    conductor 800 mtr.

    PVVNL

    Name of Contra

  • 7/27/2019 DPR 15-8-13

    9/94

    Remark

    tor- VVIPL

  • 7/27/2019 DPR 15-8-13

    10/94

    Designat

    ion/Cont

    act No.

    Remark

    Restructu

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Sit

    e visited

    DISCOM Activities

    Name of Person

    interacted with

    Baghpat

    Bhanu

    Partap

    Singh

    Khekra

  • 7/27/2019 DPR 15-8-13

    11/94

    Name of Town

    Erection work Baghpat

    Erection work Baraut 1st division

    Erection work Baraut 2nd division

    Erection work Khekra

    ed Accelerated Power Development andDAILY PROGRESS REPORT OF

    Contractor Activities

    Activity

  • 7/27/2019 DPR 15-8-13

    12/94

    Status as on today

    7 span of 11kv line i.e. 385 mtr.

    5 nos of SP-33 pole are erected

    Pit digging

    4 Span of Reconducting i.e. 240 mtr.

    Reforms Program ParATE-26/7/13

  • 7/27/2019 DPR 15-8-13

    13/94

    Cummulative Status of work till Date

    3 nos of 250 kva T/F insttalation with chemical

    earthing,835 mtr. Reconducting weasel to Dog

    conductor. SP-55 pole 2nos.

    43 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP for 100

    kva T/F

    11 kv line 300 mtr.,108 nos of pole SP-33,23 nos DP for

    100 KVA T/F.

    11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100

    KVA T/F charging at no load.Reconducting ACSR Dog

    conductor 1040mtr.

    t -B,PVVNL

    Name of Contracto

  • 7/27/2019 DPR 15-8-13

    14/94

    Remark

    - VVIPL

  • 7/27/2019 DPR 15-8-13

    15/94

    Baghpat Bhanu Partap Singh Baraut

    Restructured A

    Name of CircleName of Circle

    Engineer

    Name of Town/Site

    visitedName of Person

    interacted with

  • 7/27/2019 DPR 15-8-13

    16/94

    Designation/Contact No. Remark

    Erection work

    Erection work

    Erection work

    Erection work

    ccelerated Power Development and ReformsDAILY PROGRESS REPORT OF DATE-27/7/13

    DISCOM Activities C

    Activity

  • 7/27/2019 DPR 15-8-13

    17/94

    Name of

    TownStatus as on today

    Cummulative Status of work till

    Date

    BaghpatPit digging for Replacement

    pole

    3 nos of 250 kva T/F insttalation

    with chemical earthing,835 mtr.

    Reconducting weasel to Dog

    conductor. SP-55 pole 2nos.

    Baraut 1st

    divisionno work because no laboure

    43 nos of SP-33 pole, 5 nos of SP-55,5

    nos of DP for 100 kva T/F

    Baraut 2nddivision

    4 nos . of SP-33 pole are erected 11 kv line 300 mtr.,112 nos of pole SP-33,23 nos DP for 100 KVA T/F.

    Khekra7 Span of Reconducting i.e. 400

    mtr.

    11kv line 2.5 km,1 nos of 250

    KVAT/F & 1 nos 100 KVA T/F

    charging at no load.Reconducting

    ACSR Dog conductor 1440mtr.

    Program Part -B,PVVNL

    ntractor Activities Name of Contracto

  • 7/27/2019 DPR 15-8-13

    18/94

    Remark

    - VVIPL

  • 7/27/2019 DPR 15-8-13

    19/94

    Designation/Cont

    act No.

    Baghpat BhanuPartap

    Singh

    Baghpat Rvinder Singh JE/9412749600

    Restru

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Sit

    e visited

    DISC

    Name of Person

    interacted with

  • 7/27/2019 DPR 15-8-13

    20/94

    Remark

    Erection work

    Erection work

    Erection work

    Erection work

    to meet sir at the site,site check pole areerected & some other location where pole are

    replaced

    ctured Accelerated Power Development aDAILY PROGRESS REPORT

    M Activities

    Activity

  • 7/27/2019 DPR 15-8-13

    21/94

    Name of Town Status as on today

    Baghpat 6 nos. of SP-55 pole arected

    Baraut 1st division no work because no laboure

    Baraut 2nd division no work because no laboure

    Khekrano work because laboure

    Sunday holiday

    nd Reforms Program Part -B,PF DATE-28/7/13Contractor Activities

  • 7/27/2019 DPR 15-8-13

    22/94

    Cummulative Status of work till Date Remark

    3 nos of 250 kva T/F insttalation with

    chemical earthing,835 mtr. Reconducting

    weasel to Dog conductor. SP-55 pole 8nos.

    43 nos of SP-33 pole, 5 nos of SP-55,5 nos

    of DP for 100 kva T/F

    11 kv line 300 mtr.,108 nos of pole SP-33,23

    nos DP for 100 KVA T/F.

    11kv line 2.5 km,1 nos of 250 KVAT/F & 1

    nos 100 KVA T/F charging at no

    load.Reconducting ACSR Dog conductor1040mtr.

    VVNL

    Name of Contractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    23/94

    Name of Circle Name of Circle Engineer Name of Town/Site visitedNam

    Baghpat Bhanu Partap SinghBaghpat

    Khekra

  • 7/27/2019 DPR 15-8-13

    24/94

    Designation/Contact No.

    Restructured Accelerate

    DISCOM Activities

    e of Person interacted with

  • 7/27/2019 DPR 15-8-13

    25/94

    Remark

    Erection work

    Erection work

    Erection work

    Erection work

    d Power Development and Reforms ProgrDAILY PROGRESS REPORT OF DATE-30/7/13

    Con

    Activity

  • 7/27/2019 DPR 15-8-13

    26/94

    Name of Town Status as on today Cummulative Status of work till Date

    Baghpat5 nos of span are

    conducting i.e. 250 mtr.

    3 nos of 250 kva T/F insttalation with

    chemical earthing,1085 mtr.

    Reconducting weasel to Dog

    conductor. SP-55 pole 14nos.

    Baraut 1st division6 nos SP-33 of pole are

    erected

    49 nos of SP-33 pole, 5 nos of SP-55,5

    nos of DP for 100 kva T/F

    Baraut 2nd division3 SP-33 pole are erected at

    site

    11 kv line 300 mtr.,114 nos of pole SP-

    33,23 nos DP for 100 KVA T/F.

    Khekra

    6 span ACSR Dog atre string

    i.e. 300 mtr. 1 nos

    of SP_55 are erected

    11kv line 2.5 km,1 nos of 250 KVAT/F

    & 1 nos 100 KVA T/F charging at no

    load.Reconducting ACSR Dog

    conductor 1540mtr.

    m Part -B,PVVNL

    tractor Activities Name

  • 7/27/2019 DPR 15-8-13

    27/94

    Remark

    of Contractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    28/94

    Designation/Contact

    No.

    R

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Sit

    e visited

    DISCOM

    Name of Person

    interacted with

    Baghpat

    Bhanu

    Partap

    Singh

    Baghpat

    KhekraPooshp Dev G JE/9412749592

  • 7/27/2019 DPR 15-8-13

    29/94

    Remark Name of Town

    Erection work Baghpat

    Erection work Baraut 1st division

    Erection work Baraut 2nd division

    Erection work Khekra

    structured Accelerated Power Development andDAILY PROGRESS REPORT OF D

    ctivities Contractor Activitie

    Activity

    to meet sir, discuss the AB cable laying

    process & populated , thief area are most

    pariority

  • 7/27/2019 DPR 15-8-13

    30/94

    Status as on today Cummulative Status of work till Date

    5 nos of span are conducting i.e.

    280 mtr.

    3 nos of 250 kva T/F insttalation with chemical

    earthing,1365 mtr. Reconducting weasel to Dog

    conductor. SP-55 pole 14nos.

    2 nos SP-33 of pole are erected

    51 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP for 100

    kva T/F

    5 SP-33 pole are erected at site11 kv line 300 mtr.,119 nos of pole SP-33,23 nos DP for

    100 KVA T/F.

    no work because shutdown

    problem,Roushting time change

    11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100

    KVA T/F charging at no load.Reconducting ACSR Dog

    conductor 1540mtr.

    Reforms Program Part -B,PVVNLTE-31/7/13

    s Name of Co

  • 7/27/2019 DPR 15-8-13

    31/94

    Remark

    tractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    32/94

    Name of CircleName of Circle

    Engineer

    Name of Town/Site

    visited Name of Person interacted

    Baghpat Bhanu Partap Singh Baghpat Ravinder kr.

  • 7/27/2019 DPR 15-8-13

    33/94

    Designation/Contact No. Remark

    Restructured Accelerated PowDAIL

    DISCOM Activities

    JE/9412749600

    to meet sir, check the site where

    pole are erected at site,some

    other location mid span pole are

    required

  • 7/27/2019 DPR 15-8-13

    34/94

    Name of Town

    Erection work Baghpat

    Erection work Baraut 1st division

    Erection work Baraut 2nd division

    Erection work Khekra

    r Development and Reforms ProgramY PROGRESS REPORT OF DATE-1/8/13

    Contractor Activities

    Activity

  • 7/27/2019 DPR 15-8-13

    35/94

    Status as on today Cummulative Status of work till Date

    2 SP-55 pole are erected & 1 SP-33 pole are

    erected

    3 nos of 250 kva T/F insttalation with chemical

    earthing,1365 mtr. Reconducting weasel to Dog

    conductor. SP-55 pole 16nos.

    2 nos SP-33 of pole are erected ,6 span of

    Reconducting of 11 KV line i.e. 350 mtr.

    53 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP

    for 100 kva T/F,

    Reconducting of 11 kv line 350 mtr.

    3 SP-33 pole are erected at site11 kv line 300 mtr.,122 nos of pole SP-33,23 nos

    DP for 100 KVA T/F.

    no work because labour holiday

    11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos

    100 KVA T/F charging at no load.Reconducting

    ACSR Dog conductor 1540mtr.

    art -B,PVVNL

    Name of Con

  • 7/27/2019 DPR 15-8-13

    36/94

    Remark

    ractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    37/94

    Baghpat Bhanu Partap Singh Baghpat

    Name of CircleName of Circle

    Engineer

    Name of Town/Site

    visited Name of Person

  • 7/27/2019 DPR 15-8-13

    38/94

    Designation/Contact No. Remark

    Restructured Accelerated PowerDAILY PR

    DISCOM Activities

  • 7/27/2019 DPR 15-8-13

    39/94

    Name of Town

    Erection work Baghpat

    Erection work Baraut 1st division

    Erection work Baraut 2nd division

    Erection work Khekra

    evelopment and Reforms PrograOGRESS REPORT OF DATE-2/8/13

    Contractor Activities

    Activity

  • 7/27/2019 DPR 15-8-13

    40/94

    Status as on today Cummulative Status of work till Date

    Reconducting of 11 KV line work

    on progress.

    Pit Digging for SP-55 pole

    3 nos of 250 kva T/F insttalation with

    chemical earthing,1365 mtr. Reconducting

    weasel to Dog conductor. SP-55 pole 16nos.

    Pit digging for LT line

    53 nos of SP-33 pole, 5 nos of SP-55,5 nos of

    DP for 100 kva T/F,

    Reconducting of 11 kv line 350 mtr.

    AB cable laying 12 Span i.e. 440 mtr.

    11 kv line 300 mtr.,122 nos of pole SP-33,23

    nos DP for 100 KVA T/F. AB

    cable laying 1140 mtr.

    no work because labour holiday

    11kv line 2.5 km,1 nos of 250 KVAT/F & 1

    nos 100 KVA T/F charging at no

    load.Reconducting ACSR Dog conductor

    1540mtr.

    Part -B,PVVNL

    Name of

  • 7/27/2019 DPR 15-8-13

    41/94

    Remark

    ontractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    42/94

    Designat

    ion/Cont

    act No.

    Remark

    Restructured Accelerated Power DeveloDAILY PROGRESS REPO

    Name of Circle

    Name of

    CircleEngineer

    Name of

    Town/Site visited

    DISCOM Activities

    Name of Personinteracted with

    Acti

    Bhanu

  • 7/27/2019 DPR 15-8-13

    43/94

    Singh

  • 7/27/2019 DPR 15-8-13

    44/94

    Name ofTown

    Status as on today

    Cummul

    ative

    Status of

    work till

    Date

    Remark

    Erection

    workBaghpat

    Reconducting of 11 KV line work on

    progress.

    2 nos. SP-55 pole are erected at site

    3 nos of

    250 kva

    T/F

    insttalati

    on with

    chemical

    earthing,1365

    mtr.

    Recondu

    cting

    weasel to

    Dog

    conducto

    r. SP-55

    pole

    16nos.

    Erection

    work

    Baraut

    1st

    division

    Reconducting of 11 KV line work on

    progress.

    400 mtr. ACSR conductor

    53 nos of

    SP-33

    pole, 5

    nos of SP-

    55,5 nos

    of DP for

    100 kva

    T/F,

    Reconducting of

    11 kv

    line 350

    mtr.

    ment and Reforms Program Part -RT OF DATE-3/8/13

    Contractor Activities Name of

    vity

  • 7/27/2019 DPR 15-8-13

    45/94

    Erectionwork

    Baraut

    2nd

    division

    AB cable laying 6 Span i.e. 230 mtr.

    11 kv

    line 300

    mtr.,122

    nos of

    pole SP-

    33,23 nosDP for

    100 KVA

    T/F.

    AB cable

    laying

    1370 mtr.

    Erection

    workKhekra no work because labour holiday

    11kv line

    2.5 km,1nos of

    250

    KVAT/F

    & 1 nos

    100 KVA

    T/F

    charging

    at no

    load.Rec

    onductin

    g ACSR

    Dog

    conducto

    r

    1540mtr.

  • 7/27/2019 DPR 15-8-13

    46/94

    Designat

    ion/Cont

    act No.

    Remark

    Restructured Accelerated Power DeveDAILY PROGR

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Sit

    e visited

    DISCOM Activities

    Name of Person

    interacted with

    Acti

    Baghpat

    Bhanu

    Partap

    Singh

    Baghpat

  • 7/27/2019 DPR 15-8-13

    47/94

    Name of

    Town

    Status as on today

    Erection

    workBaghpat

    Reconducting of 11 KV line work on progress.

    7 nos span of reconducting i.e. 370 mtr.

    Erectionwork

    Baraut

    1st

    division

    no work labour holiday

    Erection

    work

    Baraut

    2nd

    division

    AB cable work on progress

    pit digging for SP-33 pole

    Erection

    workKhekra no work because labour holiday

    opment and Reforms Program Part -SS REPORT OF DATE-4/8/13

    Contractor Activities

    vity

  • 7/27/2019 DPR 15-8-13

    48/94

    Cummulative Status of

    work till Date

    Remark

    3 nos of 250 kva T/F

    insttalation with

    chemical earthing,1735

    mtr. Reconducting

    weasel to Dog

    conductor. SP-55 pole

    16nos.

    53 nos of SP-33 pole, 5

    nos of SP-55,5 nos of DP

    for 100 kva T/F,

    Reconducting of 11 kv

    line 350 mtr.

    11 kv line 300 mtr.,122

    nos of pole SP-33,23 nos

    DP for 100 KVA T/F.

    AB cable laying 1140

    mtr.

    11kv line 2.5 km,1 nosof 250 KVAT/F & 1 nos

    100 KVA T/F charging at

    no load.Reconducting

    ACSR Dog conductor

    1540mtr.

    B,PVVNL

    Name of Contractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    49/94

    Designat

    ion/Cont

    act No.

    Remark

    Baghpat

    Bhanu

    Partap

    Singh

    BARAUT

    Restructured Accelerated

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Site

    visited

    DISCOM Activities

    Name of Person

    interacted with

    Acti

  • 7/27/2019 DPR 15-8-13

    50/94

    Name of

    Town

    Status as on today

    Erection

    workBaghpat

    Reconducting of 11 KV line work on

    progress.

    No work because labour holiday

    Erectionwork

    Baraut

    1stdivision

    LT line work on progress12 nos. of SP-33 pole are erected at site

    Erection

    work

    Baraut

    2nd

    division

    pit digging

    Erection

    workKhekra no work because labour holiday

    ower Development and RefDAILY PROGRESS REPORT OF DATE-

    Contractor Activities

    vity

  • 7/27/2019 DPR 15-8-13

    51/94

    Cummulative Status of work till Date

    3 nos of 250 kva T/F insttalation with chemical

    earthing,1735 mtr. Reconducting weasel to Dog

    conductor. SP-55 pole 16nos.

    65 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP for

    100 kva T/F,Reconducting of 11 kv line 350 mtr.

    11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP

    for 100 KVA T/F. AB cable laying

    1140 mtr.

    11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100

    KVA T/F charging at no load.Reconducting ACSR

    Dog conductor 1540mtr.

    rms Program Part -B,PV/8/13

    Name of Contr

  • 7/27/2019 DPR 15-8-13

    52/94

    Remark

    NL

    actor- VVIPL

  • 7/27/2019 DPR 15-8-13

    53/94

    Designat

    ion/Cont

    act No.

    Remark

    Restructured Acc

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Sit

    e visited

    DISCOM Activities

    Name of Person

    interacted with

    Acti

    Baghpat

    Bhanu

    Partap

    Singh

    BARAUT

  • 7/27/2019 DPR 15-8-13

    54/94

    Name of

    Town

    Status as on today

    Erection

    workBaghpat

    Reconducting of 11 KV line work on progress.

    No work because labour holiday

    Erection

    work

    Baraut

    1stdivision

    LT line work on progress

    No work because rain day

    Erection

    work

    Baraut

    2nd

    division

    No work because labour holiday

    Erection

    workKhekra no work because labour holiday

    lerated Power Development and RefoDAILY PROGRESS REPORT OF DATE-6

    Contractor Activities

    vity

  • 7/27/2019 DPR 15-8-13

    55/94

    Cummulative Status of work till Date

    3 nos of 250 kva T/F insttalation with chemical

    earthing,1735 mtr. Reconducting weasel to Dog

    conductor. SP-55 pole 16nos.

    65 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP for 100

    kva T/F,Reconducting of 11 kv line 350 mtr.

    11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP for

    100 KVA T/F. AB cable laying 1140 mtr.

    11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100

    KVA T/F charging at no load.Reconducting ACSR Dog

    conductor 1540mtr.

    ms Program Part -B,PVV8/13

    Name of Con

  • 7/27/2019 DPR 15-8-13

    56/94

    Remark

    L

    ractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    57/94

    Restructured Accelerated Power DDAILY PRO

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Site

    visited

    DISCOM

    Name of Person interacted

    with

    BaghpatBhanu Partap

    SinghBARAUT

  • 7/27/2019 DPR 15-8-13

    58/94

    Designation/C

    ontact No. Remark

    Name of

    Town

    Status as on

    today

    Erection

    workBaghpat

    Reconducting

    of 11 KV line

    work on

    progress.

    No work

    because

    labour

    holida

    Erection

    work

    Baraut 1st

    division

    ew o

    KV line work

    on progress.

    6 Span of

    Erection

    work

    Baraut 2nd

    division

    No work

    because labour

    holiday

    Erection

    workKhekra

    Abcable are

    stringing i.e.

    500 mtr.

    velopment and Reforms Program Part -B,PGRESS REPORT OF DATE-7/8/13Activities Contractor Activities

    Activity

  • 7/27/2019 DPR 15-8-13

    59/94

    Cummulative

    Status ofwork till Date

    Remark

    3 nos of 250

    kva T/F

    insttalation

    with chemical

    earthing,1735

    mtr.

    Reconducting

    weasel to Donos o -

    33 pole, 5 nos

    of SP-55,5 nos

    of DP for 100

    11 v ne 300

    mtr.,122 nos of

    pole SP-33,23

    nos DP for 100

    KVA T/F.

    AB cable .

    km,1 nos of250 KVAT/F

    & 1 nos 100

    KVA T/F

    charging at no

    VNL

    Name of Contractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    60/94

    Designat

    ion/Cont

    act No.

    Remark

    Baghpat

    Bhanu

    Partap

    Singh

    Restructured Acceler

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Site

    visited

    DISCOM Activities

    Name of Person

    interacted with

    Acti

  • 7/27/2019 DPR 15-8-13

    61/94

    Name of

    Town

    Status as on today

    Erection

    workBaghpat

    Reconducting of 11 KV line work on progress.

    No work because labour holiday

    Erectionwork

    Baraut

    1st

    division

    New of 11 KV line work on progress.No work due to raining day.

    Erection

    work

    Baraut

    2nd

    division

    No work because labour holiday

    Erection

    workKhekra No work due to raining day

    ted Power Development and ReformsDAILY PROGRESS REPORT OF DATE-8/8/13

    Contractor Activities

    vity

  • 7/27/2019 DPR 15-8-13

    62/94

    Cummulative Status of work till Date

    3 nos of 250 kva T/F insttalation with chemical

    earthing,1735 mtr. Reconducting weasel to Dog

    conductor. SP-55 pole 16nos.

    65 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP

    for 100 kva T/F,

    Reconducting of 11 kv line 350 mtr.

    11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP

    for 100 KVA T/F. AB cable laying

    1140 mtr.

    11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100KVA T/F charging at no load.Reconducting ACSR

    Dog conductor 1540mtr.

    Program Part -B,PVVN

    Name of Con

  • 7/27/2019 DPR 15-8-13

    63/94

    Remark

    tractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    64/94

    Designat

    ion/Cont

    act No.

    Remark

    Baghpat

    Bhanu

    Partap

    Singh

    Restructured Accele

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Sit

    e visited

    DISCOM Activities

    Name of Person

    interacted with

    Acti

  • 7/27/2019 DPR 15-8-13

    65/94

    Name of

    Town

    Status as on today

    Erection

    workBaghpat

    Reconducting of 11 KV line work on progress.

    No work because labour holiday

    Eid festival

    Erectionwork

    Baraut

    1st

    division

    No work because Eid festival

    Erection

    work

    Baraut

    2nd

    division

    No work because Eid festival

    Erection

    workKhekra No work because Eid festival

    ated Power Development and ReforDAILY PROGRESS REPORT OF DATE-9/8/1

    Contractor Activities

    vity

  • 7/27/2019 DPR 15-8-13

    66/94

    Cummulative Status of work till Date

    3 nos of 250 kva T/F insttalation with chemical

    earthing,1735 mtr. Reconducting weasel to Dog

    conductor. SP-55 pole 16nos.

    65 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP

    for 100 kva T/F,

    Reconducting of 11 kv line 350 mtr.

    11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP

    for 100 KVA T/F. AB cable laying

    1140 mtr.

    11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100KVA T/F charging at no load.Reconducting ACSR

    Dog conductor 1540mtr.

    s Program Part -B,PVV3

    Name of Con

  • 7/27/2019 DPR 15-8-13

    67/94

    Remark

    L

    tractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    68/94

    Designat

    ion/Cont

    act No.

    Remark

    Baghpat

    Bhanu

    Partap

    Singh

    BARAUT

    Restructured Accel

    Name of Circle

    Name of

    Circle

    Engineer

    Name of Town/Site

    visited

    DISCOM Activities

    Name of Person

    interacted with

  • 7/27/2019 DPR 15-8-13

    69/94

    Name of

    Town

    Status as on today

    Erection

    workBaghpat

    Reconducting of 11 KV line work on progress.

    No work because labour holiday

    Erectionwork

    Baraut

    1st

    division

    LT line work on progress.10 span of AB cable 95 sq mm i.e. 400 mtr.

    Erection

    work

    Baraut

    2nd

    division

    No work because labour holiday

    Erection

    workKhekra Abcable are stringing i.e. 350 mtr.

    erated Power Development and Reforms PDAILY PROGRESS REPORT OF DATE-10/8/13

    Contractor Activities

    Activity

  • 7/27/2019 DPR 15-8-13

    70/94

    Cummulative Status of work till Date

    3 nos of 250 kva T/F insttalation with chemical

    earthing,1735 mtr. Reconducting weasel to Dog

    conductor. SP-55 pole 16nos.

    65 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP

    for 100 kva T/F,Reconducting of 11 kv line 350 mtr.

    95 sq mm AB cable 400 mtr.

    11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP

    for 100 KVA T/F. AB cable laying

    1140 mtr.

    11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100KVA T/F charging at no load.Reconducting ACSR

    Dog conductor 1540mtr.

    95 sq mm AB cable stringing 850 mtr.

    ogram Part -B,PVVNL

    Name of Con

  • 7/27/2019 DPR 15-8-13

    71/94

    Remark

    tractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    72/94

    Designat

    ion/Cont

    act No.

    Remark

    Baghpat

    Bhanu

    Partap

    Singh

    Restructured Accelera

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Site visited

    DISCOM Activities

    Name of Person

    interacted with

    Acti

  • 7/27/2019 DPR 15-8-13

    73/94

    Name of

    Town

    Status as on today

    Erection

    workBaghpat

    Reconducting of 11 KV line work on progress.

    No work because labour holiday

    Erectionwork

    Baraut

    1st

    division

    New of 11 KV line work on progress.Material shifted to main store Baghpat

    Erection

    work

    Baraut

    2nd

    division

    No work because labour holiday

    Erection

    workKhekra 4 nos of SP-33 9 mtr. Pole are erected at site.

    ed Power Development and ReformsDAILY PROGRESS REPORT OF DATE-11/8/13

    Contractor Activities

    vity

  • 7/27/2019 DPR 15-8-13

    74/94

    Cummulative Status of work till Date

    3 nos of 250 kva T/F insttalation with chemical

    earthing,1735 mtr. Reconducting weasel to Dog

    conductor. SP-55 pole 16nos.

    65 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP

    for 100 kva T/F,

    Reconducting of 11 kv line 350 mtr.

    11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP

    for 100 KVA T/F. AB cable laying

    1140 mtr.

    11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100KVA T/F charging at no load.Reconducting ACSR

    Dog conductor 1540mtr.

    SP=33 pole:-14

    rogram Part -B,PVVNL

    Name of Con

  • 7/27/2019 DPR 15-8-13

    75/94

    Remark

    tractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    76/94

    Name of CircleName of Circle

    Engineer

    Name of Town/Site

    visited Name

    Baghpat Bhanu Partap Singh KhekraBaghpat

  • 7/27/2019 DPR 15-8-13

    77/94

    Designation/Contact No.

    Restruct

    DISCOM Activit

    of Person interacted with

    Mr. DK Garg SE/9412749205

  • 7/27/2019 DPR 15-8-13

    78/94

    Remark

    Erection work

    Erection work

    Erection work

    Erection work

    red Accelerated Power Development and ReDAILY PROGRESS REPORT OF DAT

    es

    Activity

    to meet sir,Discuss the status of R-APDRP work.

    & Photo copy of invoice Bill but the accountant Mr. Rajive

    are goes to meerut.

  • 7/27/2019 DPR 15-8-13

    79/94

    Name of Town Status as on today

    Baghpat No work because labour holiday

    Baraut 1st division 8 nos of SP-33 pole are erected at site

    Baraut 2nd division No work because labour holiday

    Khekra 500 mtr. AB cable are stringing

    forms Program Part -B,PVVNL-12/8/13

    Contractor Activities

  • 7/27/2019 DPR 15-8-13

    80/94

    Cummulative Status of work till Date

    3 nos of 250 kva T/F insttalation with chemical

    earthing,1735 mtr. Reconducting weasel to Dog

    conductor. SP-55 pole 16nos.

    73 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP

    for 100 kva T/F,

    Reconducting of 11 kv line 350 mtr.

    11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP

    for 100 KVA T/F.

    AB cable laying 3 km

    11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100

    KVA T/F charging at no load.Reconducting ACSR

    Dog conductor 1540mtr.

    SP=33 pole:-1495 sq mmAB cable :- 2km

    Name of Con

  • 7/27/2019 DPR 15-8-13

    81/94

    Remark

    tractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    82/94

    Designation/Contact

    No.

    Baghpat

    Bhanu

    Partap

    Singh

    Baraut

    Baghpat

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Sit

    e visited

    Name of Person

    interacted with

  • 7/27/2019 DPR 15-8-13

    83/94

    Remark

    go SE office & send the copy of invoice bill.

    Restructured Accelerated PowDAIL

    DISCOM Activities

  • 7/27/2019 DPR 15-8-13

    84/94

    Name of Town

    Erection work Baghpat

    Erection work Baraut 1st division

    Erection work Baraut 2nd division

    Erection work Khekra

    r Development and Reforms PPROGRESS REPORT OF DATE-13/8/13

    Contractor Activiti

    Activity

  • 7/27/2019 DPR 15-8-13

    85/94

    Status as on today

    8 span of Reconducting i.e. 470mtr.

    6 nos of SP-33 pole are erected at site.

    AB cable laying 500 mtr.

    No work because labour holiday

    500 mtr. AB cable are stringing

    ogram Part -B,PVVNL

    es

  • 7/27/2019 DPR 15-8-13

    86/94

    Cummulative Status of work till Date

    3 nos of 250 kva T/F insttalation with chemical

    earthing,2205 mtr. Reconducting weasel to Dog

    conductor. SP-55 pole 16nos.

    79 nos of SP-33 pole, 5 nos of SP-55,5 nos of DP for 100kva T/F,

    Reconducting of 11 kv line 350 mtr.

    95 sq mm AB cable :- 2 km

    11 kv line 300 mtr.,122 nos of pole SP-33,23 nos DP for

    100 KVA T/F. AB

    cable laying 3 km

    11kv line 2.5 km,1 nos of 250 KVAT/F & 1 nos 100 KVA

    T/F charging at no load.Reconducting ACSR Dog

    conductor 1540mtr.

    SP=33 pole:-14 95

    sq mmAB cable :- 2.5 km

    Name of Contr

  • 7/27/2019 DPR 15-8-13

    87/94

    Remark

    actor- VVIPL

  • 7/27/2019 DPR 15-8-13

    88/94

    R

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Sit

    e visited

    Name of Person interacted

    with

    Baghpat

    Bhanu

    Partap

    Singh

    Baraut

    BaghpatMr. Arya Naresh

  • 7/27/2019 DPR 15-8-13

    89/94

    Designation/Contact No. Remark

    structured Accelerated Power DevelopmeDAILY PROGRESS REP

    DISCOM Activities

    JE/9412749679 to meet sir ,discuss the progress of work .

  • 7/27/2019 DPR 15-8-13

    90/94

    Name of Town Status as on today

    Erection work BaghpatNo work because labour

    holiday

    Erection work Baraut 1st division

    4 nos of SP-33 pole are

    erected at site.AB cable laying 500 mtr.

    Erection work Baraut 2nd divisionNo work because labour

    holiday

    Erection work Khekra500 mtr. AB cable are

    stringing

    t and Reforms Program Part -B,PRT OF DATE-14/8/13

    Contractor Activities

    Activity

  • 7/27/2019 DPR 15-8-13

    91/94

    Cummulative Status of work till

    DateRemark

    3 nos of 250 kva T/F insttalation

    with chemical earthing,2205 mtr.

    Reconducting weasel to Dog

    conductor. SP-55 pole 16nos.

    83 nos of SP-33 pole, 5 nos of SP-

    55,5 nos of DP for 100 kva T/F,

    Reconducting of 11 kv line 350 mtr.

    95 sq mm AB cable :- 2.5km

    11 kv line 300 mtr.,122 nos of pole SP-

    33,23 nos DP for 100 KVA T/F.

    AB cable laying 3 km

    11kv line 2.5 km,1 nos of 250

    KVAT/F & 1 nos 100 KVA T/F

    charging at no load.Reconducting

    ACSR Dog conductor 1540mtr.

    SP=33 pole:-14

    95 sq mmAB cable :- 3 km

    VVNL

    Name of Contractor- VVIPL

  • 7/27/2019 DPR 15-8-13

    92/94

    Designat

    ion/Cont

    act No.

    Remark

    Restructured Accelerated

    Name of Circle

    Name of

    Circle

    Engineer

    Name of

    Town/Sit

    e visited

    DISCOM Activities

    Name of Person

    interacted with

    BaghpatBhanuPartap

    Singh

  • 7/27/2019 DPR 15-8-13

    93/94

    Name of Town Status as on today

    Erection work Baghpat No work because labour holiday

    Erection work Baraut 1st division No work because labour holiday

    Erection work Baraut 2nd division No work because labour holiday

    Erection work Khekra Independent holiday

    Power Development and Reforms PrograDAILY PROGRESS REPORT OF DATE-15/8/13

    Contractor Activities

    Activity

  • 7/27/2019 DPR 15-8-13

    94/94

    Cummulative Status of work till

    Date

    Remark

    3 nos of 250 kva T/F insttalation

    with chemical earthing,2205 mtr.

    Reconducting weasel to Dog

    conductor. SP-55 pole 16nos.

    79 nos of SP-33 pole, 5 nos of SP-

    55,5 nos of DP for 100 kva T/F,

    Reconducting of 11 kv line 350 mtr.

    95 sq mm AB cable :- 2 km

    11 kv line 300 mtr.,122 nos of pole

    SP-33,23 nos DP for 100 KVA T/F.

    AB cable laying 3 km

    11kv line 2.5 km,1 nos of 250

    KVAT/F & 1 nos 100 KVA T/F

    charging at no load.Reconducting

    ACSR Dog conductor 1540mtr.

    SP=33 pole:-1495 sq mmAB cable :- 2.5 km

    Part -B,PVVNL

    Name of Contractor- VVIPL