Costo de Insumos
1
ITEM INSUMOS COSTO UND 1 Gasolina de 84 S/. 12.25 lt 2 Calamina de 3.6*0.80 S/. 22.00 und 3 Triplay de 4mm S/. 25.00 pln 4 Madera Tornillo S/. 5.00 p2 5 Aditivo Plastificante S/. 30.00 gln 6 Aditivo Acelerante S/. 59.00 gln 7 Aditivo Desmoldante S/. 180.00 gln 8 Bisagras Capuchinas S/. 6.00 und 9 Alambre # 8 S/. 4.50 kg 10 Alambre # 16 S/. 4.50 kg 11 Pintura Esmalte S/. 30.00 bld 12 Cordel S/. 0.30 m 13 Cilindros S/. 45.00 und 14 Regla Metalica S/. 7.00 und 15 Cemento IP S/. 19.80 bol 16 Acero de 3/8" S/. 14.50 kg 17 Clavo de 3" S/. 4.50 kg 18 Yeso S/. 6.50 bol
-
Upload
pilar-enma-condori-carrillo -
Category
Documents
-
view
3 -
download
0
description
k
Transcript of Costo de Insumos
ITEM INSUMOS COSTO UND1 Gasolina de 84 S/. 12.25 lt2 Calamina de 3.6*0.80 S/. 22.00 und3 Triplay de 4mm S/. 25.00 pln4 Madera Tornillo S/. 5.00 p25 Aditivo Plastificante S/. 30.00 gln6 Aditivo Acelerante S/. 59.00 gln7 Aditivo Desmoldante S/. 180.00 gln8 Bisagras Capuchinas S/. 6.00 und9 Alambre # 8 S/. 4.50 kg
10 Alambre # 16 S/. 4.50 kg11 Pintura Esmalte S/. 30.00 bld12 Cordel S/. 0.30 m13 Cilindros S/. 45.00 und14 Regla Metalica S/. 7.00 und15 Cemento IP S/. 19.80 bol16 Acero de 3/8" S/. 14.50 kg17 Clavo de 3" S/. 4.50 kg18 Yeso S/. 6.50 bol