Lessico e metodo del Project Management

33
Lessico e metodo del Project Management Dott. Chiara Tuoni Pisa, Master CIBA 28.02.13

description

What is Project Management? From the pyramids to this day and age is a discipline, a branch of knowledge, with its topics, concepts, trends, responsibilities, tasks, targets and tools. And PM Schools and courses, of course.

Transcript of Lessico e metodo del Project Management

Page 1: Lessico e metodo del Project Management

Lessico e metodo del Project Management

Dott. Chiara Tuoni

Pisa, Master CIBA 28.02.13

Page 2: Lessico e metodo del Project Management

http://www.ted.com/talks/sheena_iyengar_choosing_what_to_choose.html

Page 3: Lessico e metodo del Project Management

http://www.repubblica.it/scienze/2011/01/24/news/labirinto_ikea-11593733/

Page 4: Lessico e metodo del Project Management

La nudge regulation

«Regolare informando»

O Perché sistematicamente gli individui tendono

a compiere delle scelte sbagliate?

O Per quali ragioni spesso essi sono irragionevolmente

ottimisti, anche quando la posta in gioco risulta

molto alta? Chi e in base a quali motivazioni

giuridiche o scientifiche decide che, ad esempio,

certi comportamenti debbano essere incoraggiati?

E a quali costi per la collettività?

http://www.amministrazioneincammino.luiss.it/wp-content/uploads/2012/07/Candido_Regolazione_nudge.pdf

Page 5: Lessico e metodo del Project Management

La nudge regulation

O Quando si parla di nudge (termine che, tradotto

alla lettera, significa “leggera spinta”, o “pungolo”,

o “spinta gentile”), si prende in considerazione

l’insieme degli strumenti, prevalentemente basati

sull’informazione, che i poteri pubblici potrebbero

mettere in pratica per promuovere determinati

comportamenti ritenuti (dallo stesso regolatore)

desiderabili.

O Campo d’interesse: la pubblica amministrazione.

vedi anche CorrieredellaSera.it Il club de La Lettura: Il paternalismo di Stato che funziona

Page 6: Lessico e metodo del Project Management

Chi orienta le scelte

sul lavoro?

sponsor capo

mercato PA

Page 7: Lessico e metodo del Project Management

Chi orienta le scelte

nel lavoro?

PM dirigente

esperto tecnico

Page 8: Lessico e metodo del Project Management

In pratica…

O Abbiamo visto le dinamiche che ci portano dal preventivo alla pianificazione progetto. Ora vediamo come questa pianificazione può essere resa efficace all'interno dell'operatività “fluida” di un'Agenzia.

La logica di pianificazione più utilizzata (65%) all'interno delle Agenzie è la “pianificazione per consegne”

O Questa logica – opposta alla calendarizzazione classica - prevede l'assegnazione dell'attività alla risorsa indicando una durata prevista (generata dal preventivo), una data di apertura e una data di consegna. In pratica il responsabile (solitamente il PM) indica all'operativo quante ore deve orientativamente investire sull'attività ed entro quando la deve concludere.

Page 9: Lessico e metodo del Project Management

In pratica…

O In questo modo si delineano due livelli organizzativi:

- il PM impartisce le linee organizzative macro sulla

base del quadro di disponibilità delle risorse e degli

accordi di consegna con il cliente

- l'operativo mantiene la libertà di modulare in

autonomia i dettagli della sua operatività

eventualmente integrando un margine di imprevisti

e cambi all'interno della sua micro-pianificazione

Best Practice gestionali: Pianificazione in movimento.

Page 10: Lessico e metodo del Project Management

Il Project Management

O Project management is the

discipline of planning, organizing,

motivating, and controlling

resources to achieve specific goals.

http://en.wikipedia.org/wiki/Project_management

Page 11: Lessico e metodo del Project Management

O A project is a temporary endeavor with

a defined beginning and end (usually

time-constrained, and often constrained

by funding or deliverables), undertaken

to meet unique goals and objectives,

typically to bring about beneficial change

or added value.

Il Progetto

http://en.wikipedia.org/wiki/Project_management

Page 12: Lessico e metodo del Project Management

Triangolo di progetto

Page 13: Lessico e metodo del Project Management

I corsi di PM

http://www.isipm.org/home

Page 14: Lessico e metodo del Project Management

La Certificazione Base di PM http://www.isipm.org/certificazione-isipm

Page 15: Lessico e metodo del Project Management

http://www.sdabocconi.it/it/formazione-executive/trasversale/project-management

Page 16: Lessico e metodo del Project Management

http://www.lbs.luiss.it/catalogo/project-management/

Page 17: Lessico e metodo del Project Management

http://www.formazione.ilsole24ore.com/business-school/

YZ5991-project-management.-lavorare-progetti.php

Page 18: Lessico e metodo del Project Management

EARLY CIVILIZATIONS

• 2570 BC Great pyramid of Giza

• 208 BC The Great Wall of China

15th – 19th CENTURY

• Christopher Wren (1632–1723) St Paul's

Cathedral

• Thomas Telford (1757-1834) Ellesmere

Canal and Pontcysyllte Aqueduct

• Isambard Kingdom Brunel (1806–

1859) Great Western Railway

20th CENTURY

• 1910s The Gantt Chart developed

by Henry Laurence Gantt (1861–1919)

• 1950s The Critical path method (CPM)

• 1950s The US DoD used modern project

management techniques in their Polaris

project

• 1956 The American Association of Cost

Engineers (now AACE International)

• 1958 The Program Evaluation and Review

Technique (PERT) method

20th CENTURY

• 1965 International Project Management

Association (IPMA) established

• 1969 Project Management Institute (PMI)

• 1987 First Project Management Body of

Knowledge Guide published by PMI

• 1989 PRINCE method derived from

PROMPTII is published by the UK

Government agency CCTA and becomes the

UK standard for all government info project

• 1996 PRINCE2 published by CCTA (now

OGC) as a generic product management

methodology for all UK government projects

21st CENTURY

• 2001 AgileAlliance to promote "lightweight"

software development projects

• 2006 Total Cost Management by AACE

• 2009 PRINCE2 2009 edition

PM Timeline

Page 19: Lessico e metodo del Project Management
Page 20: Lessico e metodo del Project Management

O Project Management vincoli di progetto

O Products and Services Progetto

O Project Tools es. work breakdown structures

critical path analysis e earned value management

O Project Teams PM, Core Team e Contracted Team

O Risk open communication

Il Project Manager - Topic

Page 21: Lessico e metodo del Project Management

O Dependency in a project network is a link amongst a project's terminal

elements.

O Duration of a project's terminal element is the number of calendar periods

it takes from the time the execution of element starts to the moment it is

completed.

O Float in a project network is the amount of time that a task in a project

network can be delayed without causing a delay to subsequent tasks and

or the project completion date.

O Product breakdown structure (PBS) in project management is an

exhaustive, hierarchical tree structure of components that make up an

item, arranged in whole-part relationship.

O Project Management Body of Knowledge (PMBOK) the sum of knowledge

within the profession of project management that is standardized by ISO.

Il Project Manager - Concept

Page 22: Lessico e metodo del Project Management

O Project Management Triangle is a model of the constraints of project

management.

O Resources they can be people, equipment, facilities, funding, or anything

else capable of definition required for the completion of a project activity.

O Scope of a project in project management is the sum total of all of its

products.

O Tasks in project management are activity that needs to be accomplished

within a defined period.

O Work in project management is the amount of effort applied to produce a

deliverable or to accomplish a task (a terminal element).

O Vertical slice is a type of milestone, benchmark, or deadline, with emphasis

on demonstrating progress across all components of a project.

O Work package is a subset of a project that can be assigned to a specific

party for execution.

Il Project Manager - Concept

Page 23: Lessico e metodo del Project Management

Agile Project Management

Page 24: Lessico e metodo del Project Management

O Developing the project plan

O Managing the project stakeholders

O Managing the project team

O Managing the project risk

O Managing the project schedule

O Managing the project budget

O Managing the project conflicts

Il Project Manager - Responsabilità

Page 25: Lessico e metodo del Project Management

O Elaborare la pianificazione e la programmazione di dettaglio

O Organizzare efficientemente ed efficacemente le risorse umane

a sua disposizione

O Favorire la comunicazione e l'affiatamento del team di progetto

O Distribuire le risorse sulle attività e monitorarne lo svolgimento

O Svolgere periodicamente il processo di controllo, riportando

allo steering committee lo stato di avanzamento dei lavori e le

stime di conclusione

O Partecipare allo steering committee e mettere in atto le decisioni

Il Project Manager - Task

Page 26: Lessico e metodo del Project Management

O Prendere tutte le iniziative volte a prevenire i rischi

O Mantenere i contatti con gli utenti di riferimento e gli interessati

pianificandone il coinvolgimento nelle varie attività del progetto

(comunicazione di progetto)

O Produrre la documentazione di sua competenza e supervisionare

quella prodotta

O Controllare la qualità dei prodotti parziali e assicurarsi che gli

standard di qualità adottati siano rispettati

O Dopo la chiusura di progetto, provvedere al riepilogo delle attività

(chiusura di contratto, relazioni)

O Porre sempre attenzione al miglioramento dei processi produttivi

del progetto

Il Project Manager - Task

Page 27: Lessico e metodo del Project Management

Triangolo di progetto - Venn

Page 28: Lessico e metodo del Project Management

O Specifico/Semplice – definito e chiaramente comprensibile

O Misurabile – valutabile nella sua raggiungibilità

O Accettabile – considerato raggiungibile dalle persone coinvolte

O Rilevante – orientato al risultato, realistico

O Tempificato/Tracciabile – conseguito entro una data certa e tracciabile nel suo avanzamento

Il Project Manager - Obiettivi

SMART criteria

Page 29: Lessico e metodo del Project Management

O Mappe mentali e concettuali per supportare la fase di ideazione iniziale, il team

building e la rielaborazione finale delle esperienze in info e conoscenza

O Diagrammi di causa ed effetto/Ishikawa per analizzare e valutare la catena causale

delle problematiche che si presentano nel corso delle attività

O Diagrammi di Pert per descrivere in struttura reticolare le attività e la loro

connessione, individuando i percorsi critici (crithical path)

O WBS per descrivere l'articolazione delle attività in fasi e sottofasi - fino alle attività

elementari (item) - con strutture gerarchico-associative

O Diagrammi di Gantt per descrivere i legami logico-temporali delle fasi e delle attività

O Diagrammi Event Chain (Event Chain Diagrams) per relazionare eventi e tasks

O Diagrammi per la rilevazione di indicatori (Run chart) per visualizzare i dati/output

in una sequenza temporale

O PDCA (Ciclo di Deming) per il miglioramento continuo della qualità

O Participatory Impact Pathways Analysis (PIPA) per costruire una teoria/visione

comune tra gli attori di un progetto

O Software & App v. Webliografia

Il Project Manager - Tools

Page 30: Lessico e metodo del Project Management

Ciclo di Deming (PDCA)

Page 32: Lessico e metodo del Project Management
Page 33: Lessico e metodo del Project Management

Project Management