PAGE 1 OF 7 CANDIDATE SUMMARY Candidate information 1. Name of candidate GIANLUIGI SAVORANI 2. Date of birth: 30th September 1972 3. Professional qualification Project Manager - Technical Director Present employment 4. Name of employer TADDEI S.P.A. Address of employer Avenue Mazzini, 121– CAP I-00195 ROMA - (ITALY) Contact information Telephone +393383520133; email: [email protected] 5. Education From To Institution 1992 1998 University of L’Aquila – Italy Architectural and Civil Engineering Degree 6. Language skills (from 1- excellent to 5 – basic) Language Reading Speaking Writing Italian (m.l) 1 1 1 English 1 1 1 Russian 3 2 3 Spanish 2 2 3 7. Key qualification Gianluigi Savorani is an architectural and civil engineer and has significant experience in major road, bridge and airport construction projects in EMEA. He held roles of Construction Director, Project Manager, Site Manager and Engineer, and was in care of all production processes and project management activities (including project analysis and all construction phases). Also as Technical Director he was in charge of setting up new companies in UAE (Abu Dhabi, where he also has working residence), Romania (for real estate operations), Moldavia (asphalt production), Ukraine (aggregates production), Albania and Libya (for infrastructural projects). He delivered projects in line with CE requirements and has extensive experience with FIDIC contract conditions (Red Book and Yellow Book). 8. Countries of work experience Italy, UAE, Libya, Romania, Moldova, Serbia, Albania

Transcript of CV-Gianluigi Savorani (r12.2015) ENG

Page 1: CV-Gianluigi Savorani (r12.2015) ENG

PAGE 1 OF 7 CANDIDATE SUMMARY

Candidate information

1. Name of candidate GIANLUIGI SAVORANI

2. Date of birth: 30th September 1972

3. Professional qualification Project Manager - Technical Director

Present employment

4. Name of employer TADDEI S.P.A.

Address of employer Avenue Mazzini, 121– CAP I-00195 ROMA - (ITALY)

Contact information Telephone +393383520133; email: [email protected]

5. Education

From To Institution 1992 1998 University of L’Aquila – Italy

Architectural and Civil Engineering Degree

6. Language skills (from 1- excellent to 5 – basic) Language Reading Speaking Writing Italian (m.l) 1 1 1 English 1 1 1 Russian 3 2 3 Spanish 2 2 3

7. Key qualification Gianluigi Savorani is an architectural and civil engineer and has significant experience in major road, bridge and airport construction projects in EMEA. He held roles of Construction Director, Project Manager, Site Manager and Engineer, and was in care of all production processes and project management activities (including project analysis and all construction phases). Also as Technical Director he was in charge of setting up new companies in UAE (Abu Dhabi, where he also has working residence), Romania (for real estate operations), Moldavia (asphalt production), Ukraine (aggregates production), Albania and Libya (for infrastructural projects). He delivered projects in line with CE requirements and has extensive experience with FIDIC contract conditions (Red Book and Yellow Book).

8. Countries of work experience

Italy, UAE, Libya, Romania, Moldova, Serbia, Albania

Page 2: CV-Gianluigi Savorani (r12.2015) ENG

2

9. Summary professional experience over the last 15 years, in reverse chronological order. Indicate particular technical and managerial experience relevant to the Project.

From To Company/Project/Position/Relevant technical and management experience March 2015 Present date Temar S.r.l. – L’Aquila - (ITALY)

CEO - Administrator

Description

Supervision of NEWCO involved in precast construction for civil works (industrial and civil buildings, beams and slabs for road constructions,..); the Company has started its activities on march 2015, and has established the Headquarters in an industrial areas of over 40.000 s.m. (more than 20.000 s.m. of “covered” industrial buildings); the capacity of the site is of more than 20.000 c.m. of precast concrete elements/year, that leads Temar S.r.l. in leader position for centre and south Italy. Responsible for coordination and execution of the following tasks: management of all company activities, monitoring of financial and material progress, administration and management of the Developing Programs of the Company (estimated Company turnover: 6,0MLN€ -2015; 12,0 MLN€ 2016, 18 MLN€ 2017)

From To Company/Project/Position/Relevant technical and management experience

2014 Present date

Taddei S.p.a. – ROMA - (ITALY) Reconstruction after the 2009 earthquake

Contract budget: € 16 MLN. Project Manager - Technical Director

Description

Supervision of work as Project Manager, awarded to Taddei S.p.a. for the reconstruction of residential buildings damaged due to the earthquake of 2009 in L’Aquila (Italy) Responsible for coordination and execution of the following tasks: management of all construction works, monitoring of financial and material progress, project administration and contract management until completions of works.

From To Company/Project/Position/Relevant technical and management experience

2014 Present date

TADDEI S.p.a. - ROMA - (ITALY) Serbian Railways

“Construction of “Zezelj Bridge on River Danube”-Novi Sad, Republic of Serbia Contract budget: € 45 MLN.

Project Manager - Technical Director

Description

Supervision of work as Project Manager, under FIDIC Condition of contract, awarded to Taddei S.p.a. in association with AZVI SA (Spain) for the construction of an arch steel bridge on the river Danube (Italy), including 1 main steel cable-stayed bridge (220+180 m – 10 000 tons) over the river, more than 50 000 m3 earthwork, cement stabilized and asphalt concrete paving, drainage works, sound barriers, and more than 10 000 lm drilled piles (with diameters from 1,00 to 1,50 m). Responsible for coordination and execution of the following tasks: management of all construction works, monitoring of financial and material progress, project administration and contract management until expiry of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience 2014 Present date Taddei Ogranak – Serbian Branch - (Republic of Serbia)

Project manager

Description Supervision of the branch established by Taddei S.p.a. in 2011 in order to carry out opportunities in the country. Responsible for local tendering procedures and developing of the construction market.

From To Company/Project/Position/Relevant technical and management experience 2013 Present date Taddei S.p.a. – Albanian Branch - (Republic of Albany)

Project manager

Description Supervision of the branch established by Taddei S.p.a. in 2011 in order to carry out opportunities in the country.

From To Company/Project/Position/Relevant technical and management experience 2013 Present date ICS Taddei S.r.l. – Chisinau - (Republic of Moldova)

CEO - Administrator

Description

Supervision of NEWCO involved in civil construction (asphalt works, earth works, bridge works,..); the Company has been created on march 2013, and has established the Headquarters in an industrial areas of over 30.000 s.m. in which is present: an asphalt plan, a crushing plant, a laboratory for test on all construction materials, offices, equipments for asphalt laying (3 pavers, 8 trucks, 4 rubber and steel roller,..) ; the capacity of the site is of more than 80.000 tons/year of asphalt, and more than 150.000 tons/year of crushed aggregates, that leads ICS Taddei S.r.l. in leader position for the whole territory of Republic of Moldova. Responsible for coordination and execution of the following tasks: management of all company activities, monitoring of financial and material progress, administration and management of the Developing Programs of the Company (estimated Company turnover: 2,0MLN€ -2015; 6,0 MLN€ 2016, 10 MLN€ 2017)

Page 3: CV-Gianluigi Savorani (r12.2015) ENG

3

From To Company/Project/Position/Relevant technical and management experience

2012 2013

TADDEI S.p.a. - ROMA - (ITALY) Ministry of Transport and Road Infrastructure of Republic of Moldova – Moldova

Contract RSPSP/W2/02 – “Rehabilitation of M2 Chisinau Soroca Road – km 26+200 – km 54+850”. Contract budget: € 16.5 MLN.

Project Manager – Contractor’s Representative

Description

Supervision of work as Project Manager under FIDIC contract requirements for the rehabilitation of 28 km of motorway, including works on 8 main bridges in concrete (250 m), more than 100 000 tons of asphalt concrete paving, drainage works, and side roads. Responsible for coordination and execution of the following tasks: management of all construction works, monitoring of financial and material progress, project administration and contract management until expiry of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2012 2013

TADDEI S.p.a. - ROMA - (ITALY) Ministry of Transport and Road Infrastructure of Republic of Moldova – Moldova

Contract RSPSP/W2/03 – “Rehabilitation of M2 Chisinau Soroca Road – km 54+850 – km 71+165”. Contract budget: € 6.5 MLN.

Project Manager – Contractor’s Representative

Description

Supervision of work as Project Manager under FIDIC requirements for rehabilitation of 16 km of motorway, including works on 2 main bridges in concrete (20 m), more than 40 000 tons of asphalt concrete paving, drainage works, and side roads. Responsible for coordination and execution of the following tasks: management of all construction works, monitoring of financial and material progress, project administration and contract management until expiry of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2008 2011

CONSORZIO STABILE MODENESE - MODENA - (ITALY) PROVINCIA DI BOLOGNA – Italy

Rehabilitation S.P. 3. Contract budget: € 10 MLN.

Project Manager - Technical Director

Description

Supervision of work as Project Manager under CE contract requirements for the construction of 3.5 km of motorway, including 1 main bridge in pre stressed concrete and steel (250 m), 4 additional viaducts in pre-stressed concrete (20 m each), more than 300 000 m3 earthwork, cement stabilized and asphalt concrete paving, drainage works, and sound barriers. Responsible for coordination and execution of the following tasks: management of all construction works, monitoring of financial and material progress, project administration and contract management until expiry of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2008 2011

CONSORZIO STABILE MODENESE - MODENA - (ITALY) COMUNE DI PADOVA - ITALY

Design and Construction Urban Bridge "Ponte Verde" Contract budget: € 14 MLN.

Project Manager - Technical Director

Description

Supervision of work as Project Manager under CE contract requirements for the construction of a new urban ring road in the centre of the historical City of Padova (Italy), including 6,5 km of streets, 1 main steel cable-stayed bridge (150 m) over the high-speed rail, 2 additional steel viaducts (200 m each) over the Padova City Fair, more than 350 000 m3 earthwork, cement stabilized and asphalt concrete paving, drainage works, sound barriers, more than 15.000 of drilled piles (with diameters from 1.50 to 2 m), one artificial tunnel (150 m) under a urban park. Responsible for coordination and execution of the following tasks: management of all construction works, including monitoring of financial and material progress, project administration and contract management until expiry of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2009 2010

CONSORZIO STABILE MODENESE - MODENA - (ITALY) PROVINCIA DI MODENA - ITALY

Rehabilitation of Modena’s aqueduct system – lotto 2. Contract budget: € 2.5 MLN.

Project Manager - Technical Director

Description

Supervision of work as Site Manager under CE contract requirements for construction of a new aqueduct for Modena (Italy), including 3 km of new steel pipeline (0.3 m diameter), and drainage works. Coordination and implementation of the following tasks: management of all construction works, including monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period.

Page 4: CV-Gianluigi Savorani (r12.2015) ENG

4

From To Company/Project/Position/Relevant technical and management experience

2010 2011

ITALIAN EMIRAITIAN CONTRACTING LLC ABU DHABI

Improvement of the Project & Business Plan for rehabilitation of local transport system Contract budget: € 30 MLN.

Consultant Project Manager

Description

Supervision of company start-up as a Project Manager for several projects including motorway construction, railroad construction, and building renovations. All projects were in advanced starting phases. I was responsible for coordination and implementation of the following tasks: complete design review, preparation of cost estimates, business and financial plan.

From To Company/Project/Position/Relevant technical and management experience

2008 2010

CONSORZIO STABILE MODENESE – LIBIAN BRANCH - MODENA - (ITALY) LIBYA

Improvement of the Project & Business Plan for rehabilitation of local transport system; Contract budget: € 30 MNL.

Project Manager

Description

Supervision of company start-up for several projects concerning motorway construction, railroad construction, and building renovations. All projects were in advanced starting phases. I was responsible for coordination and implementation of the following tasks: complete design review, preparation of cost estimates, business and financial plan.

From To Company/Project/Position/Relevant technical and management experience

2008 2011

MODROM - MODENA - (ITALY) BRASOV - ROMANIA

Improvement of the Project & Business Plan per real estate investments; Contract budget: € 30 MLN.

Consultant Project Manager

Description

Supervision of company start-up as Project Manager for several projects concerning real estate and building renovations. All projects were in advanced starting phase. I was responsible for coordination and implementation of the following tasks: complete design review, preparation of cost estimates, business and financial plan.

From To Company/Project/Position/Relevant technical and management experience

2009 2010

CONSORZIO STABILE MODENESE - MODENA - (ITALY) PROVINCIA DI MANTOVA - ITALY

Construction of district heating system – lotto 2. Contract budget: € 3.5 MLN.

Project Manager - Technical Director

Description

Supervision of work as Project Manager (under CE contract requirements) for construction of a new district heating for Mantova (Italy), including 3 km of new steel pipeline (0.3 m diameter), one of which was performed using micro tunnelling technology (TBM cutter of 1.2 m diameter), and drainage works. Responsible for coordination and execution of the following tasks: management of all construction works.

From To Company/Project/Position/Relevant technical and management experience

2008 2011

CONSORZIO STABILE MODENESE - MODENA - (ITALY) COMUNE DI MODENA – Italy

Rehabilitation of historical buildings in S. Paolo’s sector Contract budget: € 18 MLN.

Project Manager - Technical Director

Description

Supervision of work as Project Manager under CE contract requirements for construction of a new museum including complete renovation of more than 4 000 m2 of a historical building. Responsible for coordination and execution of the following tasks: full management of construction works, monitoring of financial and material progress, and project administration.

From To Company/Project/Position/Relevant technical and management experience

2008 2011

CONSORZIO STABILE MODENESE - MODENA - (ITALY) COMUNE DI MODENA – Italy

Construction of New Exhibition Gallery “Enzo Ferrari”. Contract budget: € 15 MLN.

Project Manager - Technical Director

Description

Supervision of work as Project Manager under CE contract requirements for construction of a new exhibition gallery in memory of “Enzo Ferrari”, including a pavilion (5 000 m2) with a steel coverage structure. Responsible for coordination and execution of the following tasks: management of construction works, monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period.

Page 5: CV-Gianluigi Savorani (r12.2015) ENG

5

From To Company/Project/Position/Relevant technical and management experience

2008 2009

CONSORZIO STABILE MODENESE - MODENA - (ITALY) PROVINCIA PARMA - ITALY

Hydrogeological risk containment project. Contract budget: € 3 MLN.

Project Manager - Technical Director

Description

Supervision of work as Project Manager for removal of landslide risk near Parma (Italy), including 200 000 m3 earthwork, drainage works, and more than 10 000 m of drilled shafts (2 m. diameter). Responsible for coordination and execution of the following tasks: management of construction works, monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2007 Today

CONSORZIO STABILE MODENESE - MODENA - (ITALY) R.F.I. RETE FERROVIARIA ITALIANA - Rome – Italy

Level crossing suppression program of Rete Ferroviaria Italiana – Emilia Romagna, anno 2007-2009. Contract budget: € 14 MLN.

Project Manager - Technical Director

Description

Supervision of work as Project Manager under CE requirements for strengthening of a new rail road from Parma to Collecchio (Italy), including 10 artificial tunnels under the existing rail road, more than 10 km of streets, one main steel bridge (250 m) over the new high-speed rail, more than 250 000 m3 earthwork, cement stabilized and asphalt concrete paving, drainage works, sound barriers, and more than 10 000 m of drilled shafts (with diameters from 1.00 to 1.50 m). Responsible for coordination and execution of the following tasks: management of construction works, monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2007 2007

CONSORZIO STABILE INFRASTRUTTURE - ROME - (ITALY) Construction of Variante di Valico - Lotto 5°. Contract budget: € 230 MLN.

Technical Director – Site Manager

Description

Supervision of work as Site Manager for construction of a new highway from Bologna to Florence (Italy) - lot 5, including 7.5 km of new section, 2 km. rehabilitation of existing motorway (under traffic), 1 main steel bridge (650 m) over the river “Setta”, 2 additional steel viaducts (300 m each), more than 1 250 000 m3 earthwork, cement stabilized and asphalt concrete paving, drainage works, more than 15 000 m of sound barriers, more than 55 000 m of drilled shafts (with diameters from 1.50 to 2 m), 2 artificial tunnel (350 m) and one two way traditional gallery (160 m2 section each way, 1 km length). Responsible for coordination and execution of the following tasks: coordination of construction works, quality control and measurement, monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2006 2006

PAVIMENTAL S.p.A. - ROME - (ITALY) FIRENZE PERETOLA AIRPORT

Runway rehabilitation. Contract budget: € 10.5 MLN.

Technical Director – Site Manager

Description

Supervision of work as Site Manager under CE requirements for rehabilitation of the runway of Florence Airport (Italy), including complete demolition of existing paving, more than 200 000 m3 earthwork, cement stabilized and asphalt concrete paving, drainage works, and lighting system. Responsible for coordination and execution of the following tasks: full management of construction works, quality control and measurement, monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2005 2007

PAVIMENTAL S.p.A. - ROME - (ITALY) Construction of Terza Corsia Dinamica Tangenziale Bologna, Lotti 1,2,3. Motorway A14 Contract budget: € 115 MLN

Technical Director – Site Manager

Description

Supervision of work as Site Manager for complete rehabilitation of the Bologna Ring Road (Italy), including 23 km of complete demolition and repaving of existing highway (under traffic), enlargement of one main steel bridge (650 m) over the river “Reno”, 15 additional steel viaducts (60 m each), more than 550 000 m3 earthwork, cement and bitumen stabilized and asphalt concrete paving, drainage works, more than 10.000 m of sound barriers, more than 65 000 m of drilled shafts (with diameters from 1.50 to 2.50 ml), one artificial sound tunnel with steel baffles structure (300 ml), lighting system, and motorway information system. Responsible for coordination and execution of the following tasks: management of construction works, quality control and measurement, monitoring of financial and material progress, contract management until the end of Defects Notification Period.

Page 6: CV-Gianluigi Savorani (r12.2015) ENG

6

From To Company/Project/Position/Relevant technical and management experience

2004 2006

PAVIMENTAL S.p.A. - ROME - (ITALY) Construction of lotto 1 and 2 - Autostrada A1 Variante di Valico Contract budget: € 8.5 MLN.

Technical Director – Site Manager

Description

Supervision of work as Site Manager for construction of a new highway in from Bologna to Florence (Italy) – Lot 1-2, including 5 km of new section, 1 km. of rehabilitation of existing highway (under traffic), cement and bitumen stabilized and asphalt concrete paving, drainage works. Responsible for coordination and execution of the following tasks: construction works management, quality control and measurement, monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2003 2005

PAVIMENTAL S.p.A. - ROME - (ITALY) Construction of Lotto 1-A Quarta Corsia Autostrada A1 Modena – Bologna. Contract budget: € 23 MLN.

Technical Director – Site Manager

Description

Supervision of work as Site Manager (under CE contract requirements), for construction of a new highway from Modena to Bologna (lot 1-A), including 1.5 km of new section, 4.5 km. of rehabilitation of existing highway (under traffic), one main steel bridge (350 m) over the river “Secchia”, 2 additional steel viaducts (50 m each) over the high speed railway Bologna-Milano, more than 250 000 m3 earthwork, cement stabilized and asphalt concrete paving, drainage works, more than 5 000 m of sound barriers, more than 15 000 m of drilled shafts (with diameters from 0.80 to 1.50 m), lighting system, motorway information system. Responsible for coordination and execution of the following tasks: management of construction works, quality control and measurement, including monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period, in staff with the Project Manager.

From To Company/Project/Position/Relevant technical and management experience

2002 2007

PAVIMENTAL S.p.A. - ROME - (ITALY) Hydraulic tunnel Reno – Setta, 2002-2007. Contract budget: € 17.5 MLN.

Technical Director – Site Manager

Description

Supervision of work as Site Manager for construction of a new aqueduct of Bologna (Italy), including 5 km of new steel pipeline (1.8 m diameter), 2 of which with the micro tunnelling technology (TBM cutter of 2.5 m diameter), and drainage works. Responsible for coordination and execution of the following tasks: construction works management, quality control and measurement, monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2002 2003

PAVIMENTAL S.p.A. - ROME - (ITALY) Preliminary Rehabilitation Project for Quarta Corsia Autostrada A1 Modena – Bologna. Contract budget: € 22.5 MLN.

Technical Director – Site Manager

Description

Supervision of work as Site Manager for complete rehabilitation of Modena - Bologna highway, including 33 km complete demolition of the concrete slab paving (under traffic), cement and bitumen stabilized and asphalt concrete repaving, and drainage works. Responsible for coordination and execution of the following tasks: construction works management, quality control and measurement, financial and material progress monitoring, project administration and contract management until the end of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2002 2002

PAVIMENTAL S.p.A. - ROME - (ITALY) TREVISO AIRPORT

Runway rehabilitation. Contract budget: € 2.5 MLN.

Technical Director – Site Manager

Description

Supervision of work as Site Manager for rehabilitation of Treviso airport runway, including partial demolition of existing paving, asphalt concrete paving, drainage works, and lighting system. Responsible for coordination and execution of the following tasks: management of construction works, quality control and measurement, monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period.

Page 7: CV-Gianluigi Savorani (r12.2015) ENG

7

From To Company/Project/Position/Relevant technical and management experience

2001 2001

PAVIMENTAL S.p.A. - ROME - (ITALY) G. MARCONI AIRPORT - BOLOGNA

Construction Apron West. Contract budget: € 2.5 MLN.

Foreman – Site Manager

Description

Supervision of work as Foreman and Site Manager for construction of the apron of Bologna Airport, including partial demolition of existing paving, asphalt concrete and concrete slab paving, drainage works, and lighting system. Responsible for coordination and execution of the following tasks: management of construction works, quality control and measurement, monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2001 2001

PAVIMENTAL S.p.A. - ROME - (ITALY) C. COLOMBO AIRPORT - GENOVA Runway rehabilitation. Contract budget: € 10.5 MLN.

Foreman

Description

Supervision of work as Foreman for rehabilitation of the Genova Airport runway, including partial demolition of existing paving, asphalt concrete paving, drainage works, and lighting system. Responsible for coordination and execution of the following tasks: management of construction works, quality control and measurement, monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2001 2001

PAVIMENTAL S.p.A. - ROME - (ITALY) Construction of motorway interchange - Nuovo Svincolo Mezzi di Soccorso di Citerna (FI) Contract budget: € 2.5 MLN.

Foreman

Description

Supervision of work as Foreman for construction of a new motorway junction for the Bologna - Firenze highway, including asphalt concrete paving, drainage works, more than 80 000 m3 earthwork, and lighting system. Responsible for coordination and execution of the following tasks: management of construction works, quality control and measurement, monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2001 2001

PAVIMENTAL S.p.A. - ROME - (ITALY) Construction of new airport traffic system - Genova. Contract budget: € 2.00 MLN.

Foreman

Description

Supervision of work as Foreman for construction of a new urban ring road in the centre of Genova (Italy), including 1.5 km of motorway, one steel bridge (150 m) over high-speed rail, more than 60 000 m3 earthwork, cement stabilized and asphalt concrete paving, drainage works, and lighting system. Responsible for coordination and execution of the following tasks: management of construction works, quality control and measurement, monitoring of financial and material progress, project administration and contract management until the end of Defects Notification Period.

From To Company/Project/Position/Relevant technical and management experience

2000 2000

PAVIMENTAL S.p.A. - ROME - (ITALY) Rehabilitation motorway A4 Milano – Trezzo sull’Adda. Contract budget: € 22 MLN.

Project engineer

Description

Supervision of work as Project engineer for complete rehabilitation of the Milano - Bergamo highway, including 20 km demolition of existing paving (under traffic), cement and bitumen stabilized and asphalt concrete repaving, and drainage works. Responsible for coordination and execution of the following tasks: design review, preparation of cost estimates, quality control and measurement, implementation of field investigations, in staff with the Project Manager.

Page 8: CV-Gianluigi Savorani (r12.2015) ENG

8

From To Company/Project/Position/Relevant technical and management experience

1998 1999

PAVIMENTAL S.p.A. - ROME - (ITALY) Rehabilitation of motorway A8 - Quarta Corsia dell’Autostrada A8 Milano – Laghi, Contract value: € 100 MLN.

Project engineer

Description

Supervision of work as Project engineer for complete rehabilitation of the Milano -Varese highway, including 35 km rehabilitation of existing motorway (under traffic), 11 main steel viaducts (120 m each), 35 additional concrete underpass (60 m each), more than 1 000 000 m3 earthwork, cement stabilized and asphalt concrete paving, drainage works, more than 10.000 m of sound barriers, more than 65.000 m of drilled shafts (with diameters from 1 to 1.50 m), lighting system, motorway information system. Responsible for coordination and execution of the following tasks: complete design review, preparation of cost estimates, quality control and measurement, implementation of field investigations, in staff with the Project Manager.

31th December, 2015 Gianluigi Savorani