PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13...

134
TRAINING K3 SERTIFIKASI BNSP RI TRAINING SERTIFIKASI ESDM TRAINING K3 SERTIFIKASI KEMNAKER RI TRAINING ENGINEERING, MANAJEMEN, MOTIVASI, KOMUNIKASI, LEGAL, MARINE, DLL PUBLIC TRAINING SCHEDULE 2020 PT. MAIRODI MANDIRI SEJAHTERA

Transcript of PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13...

Page 1: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

TRAINING K3 SERTIFIKASI BNSP RI

TRAINING SERTIFIKASI ESDM

TRAINING K3 SERTIFIKASI KEMNAKER RI

TRAINING ENGINEERING, MANAJEMEN, MOTIVASI, KOMUNIKASI, LEGAL, MARINE, DLL

PUBLIC TRAINING SCHEDULE

2 0 2 0

PT. MAIRODI MANDIRI SEJAHTERA

Page 2: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

DAFTAR   ISI

6. Website dan Media Sosial

2. Public Training Schedule di Bandung

3. Public Training Schedule di Jakarta

4. Public Training Schedule di Yogyakarta

5. Public Training Schedule Sertifikasi K3 (Kemnaker RI dan BNSP RI) dan Sertifikasi ESDM di 3 Kota: Bandung, Jakarta, Yogyakarta

1. Alamat dan Daftar Kontak Kami

Page 3: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

ALAMAT DAN DAFTAR KONTAK KAMI

kantor pusat: Bandung Gedung Dapenpos Lt.2 Jl.PH.H.Mustofa No.35 Bandung 40124 Telp/fax: (022)7215668 atau (022)7215416 Mobile : 0818 0940 8069 / 0813 1252 6663 0813 2205 0262/ 0818 0960 0076 / 0818 0222 8095 / 0853 1854 1405 Email : [email protected] [email protected]

kantor cabang: Jakarta Pulomas Office Park, Gedung 2

LT 2 Ruang 11 Jl. Jend. A Yani No 2, Pulomas

Jakarta Timur, 13210 Telp/fax :

(021)4710404 Mobile :

0859 5600 9692 / 0812 2145 4928

Email : [email protected]

[email protected]

kantor cabang: Yogyakarta Jl. Ireda No. 175B, Yogyakarta

Telp/fax : (0274) 386971

Mobile : 0877 3930 9038 / 0856 4399 6014 0878 3829 4238 / 0852 9259 3334

Email : [email protected]

[email protected]

Page 4: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

PUBLIC TRAINING SCHEDULE 2020 DI BANDUNG 

Page 5: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

Accounting - Finance/ Keuangan - Tax/Pajak

1 ACCOUNT RECEIVABLE MANAGEMENT 2 02-03 10-11 23-24 27-28 04-05 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.000

2 ACCOUNT OfficeR 3 27-29 24-26 09-11 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

3 ACCOUNT PAYABLE MANAGEMENT 2 02-03 20-21 19-20 27-28 18-19 18-19 27-28 18-19 02-03 22-23 19-20 28-29 4.500.000

4 Accounting Information Systems 3 13-15 17-19 02-04 30-01 11-13 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

5 Akuntansi Perpajakan pada Badan Usaha Milik Negara (BUMN) 3 06-08 17-19 16-18 27-29 18-20 15-17 27-29 18-20 28-30 19-21 16-18 28-30 6.500.000

6 ANALISA KEUANGAN 2 02-03 17-18 23-24 20-21 18-19 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

7 ANALISA KREDIT MODAL KERJA KONTRAKTOR DAN STANDBY KREDIT 2 02-03 24-25 23-24 27-28 19-20 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

8 ANALISA PERKREDITAN 4 06-09 03-06 02-05 30-02 11-14 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.000

9 Analisa Scoring Rating System 2 02-03 17-18 23-24 30-31 18-19 15-16 29-30 20-21 31-01 19-20 16-17 30-01 4.500.000

10 APPLIED FINANCE 3 08-10 05-07 09-11 01-03 04-06 02-04 01-03 05-07 31-02 07-09 04-06 02-04 6.500.000

11 Asset Management 3 20-22 24-26 09-11 06-08 18-20 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.500.000

12 ASSET MANAGEMENT 3 06-08 17-19 09-11 13-15 18-20 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.000

13 ASSET MANAGEMENT BERBASIS ICT 3 13-15 24-26 16-18 20-22 18-20 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.000

14 Audit Perkreditan Bank 3 08-10 03-05 11-13 22-24 18-20 03-05 22-24 03-05 23-25 05-07 02-04 21-23 6.500.000

15 BALANCED SCORECARD (BSC) CONCEPT AND IMPLEMENTATION 2 02-03 03-04 23-24 13-14 06-07 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

16 BASIC AUDIT FINANCE 3 06-08 19-21 04-06 28-30 18-20 17-19 28-30 19-21 30-02 21-23 18-20 29-31 6.500.000

17 BASIC ACCOUNTING 3 27-29 12-14 16-18 20-22 13-15 10-12 20-22 12-14 21-23 14-16 11-13 21-23 6.500.000

18 BASIC ACCOUNTING 4 13-16 10-13 09-12 06-09 04-07 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.000

19 BASIC KNOWLEDGE ABOUT FINANCIAL MANAGEMENT 3 15-17 26-28 11-13 01-03 06-08 24-26 01-03 26-28 02-04 28-30 25-27 02-04 6.500.000

20 Basic Understanding of Tax 2 02-03 19-20 23-24 29-30 18-19 17-18 29-30 20-21 01-02 21-22 18-19 30-31 4.500.000

21 BUDGET PLANNING, CONTROLLING & ANALYSING 3 22-24 05-07 18-20 07-09 11-13 03-05 08-10 05-07 09-11 07-09 04-06 09-11 6.500.000

22 BUDGETING AND PROJECT COST CONTROL 3 29-31 10-12 02-04 15-17 18-20 08-10 15-17 10-12 16-18 12-14 09-11 16-18 6.500.000

23 BUDGETING AND REPORTING 3 08-10 17-19 09-11 22-24 04-06 15-17 22-24 18-20 23-25 19-21 16-18 22-24 6.500.000

24 BUDGETING FOR OPERATING EXPENDITURE 3 29-31 26-28 02-04 27-29 18-20 24-26 27-29 26-28 30-02 28-30 25-27 28-30 6.500.000

25 CASH MANAGEMENT 2 02-03 24-25 23-24 27-28 14-15 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

26 COMPENSATION SYSTEM DEVELOPMENT 2 02-03 24-25 23-24 13-14 19-20 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.000

27 COST ACCOUNTING 3 08-10 26-28 02-04 06-08 06-08 24-26 06-08 26-28 07-09 28-30 25-27 07-09 6.500.000

PUBLIC TRAINING SCHEDULE 2020 DI BANDUNG

Page 6: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga28 Cost control 3 15-17 05-07 04-06 20-22 18-20 02-04 20-22 05-07 21-23 07-09 04-06 21-23 5.950.000

29 COST CONTROL AND ESTIMATING 4 27-30 03-06 17-20 14-17 04-07 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.500.000

30 COST MANAGEMENT 3 13-15 17-19 16-18 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

31 COST VOLUME PROFIT ANALYSIS 3 06-08 24-26 11-13 30-01 13-15 22-24 29-01 24-26 02-04 26-28 23-25 30-02 6.500.000

32 CREATIVE ACCOUNTING DAN DISCLOSURE 3 13-15 24-26 16-18 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

33 DASAR-DASAR PERBENDAHARAAN 4 20-23 24-27 02-05 27-30 04-07 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

34 FINANCE FOR NON FINANCE FOR OIL & GAS INDUSTRY 3 15-17 26-28 02-04 15-17 06-08 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000

35 FINANCE FOR NON FINANCE MANAGER 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000

36 Financial Planning and Budgeting for Banking 3 29-31 12-14 16-18 27-29 18-20 10-12 27-29 12-14 30-02 14-16 11-13 28-30 6.500.000

37 FINANCING CONDOTEL HOTEL OPERATION 4 13-16 24-27 10-13 27-30 05-08 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

38 FIXED ASSET 3 13-15 05-07 09-11 13-15 11-13 02-04 13-15 05-07 14-16 07-09 04-06 14-16 6.500.000

39 Hukum Perkreditan 1 02-02 24-24 23-23 09-09 20-20 22-22 06-06 24-24 07-07 26-26 23-23 07-07 2.750.000

40IMPLEMENTASI BALANCED SCORE CARD (BSC) SEBAGAI ALAT UKURPERFORMANSI KARYAWAN

3 13-15 03-05 02-04 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

41 INDONESIA TAX OUTLOOK 2015-2016 DAN TAX AMNESTY 2 02-03 17-18 23-24 30-31 18-19 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000

42 INTERMEDIATE ACCOUNTING 3 20-22 10-12 11-13 20-22 06-08 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.500.000

43 INTERNATIONAL FINANCIAL REPORTING STANDARD (IFRS) 2 02-03 03-04 23-24 08-09 18-19 04-05 09-10 03-04 10-11 05-06 02-03 10-11 4.500.000

44 INVENTORY MANAGEMENT AND COST INVESTMENT RECOVERY 4 27-30 04-07 03-06 21-24 05-08 02-05 21-24 04-07 22-25 06-09 03-06 21-24 8.500.000

45 LAPORAN KEUANGAN PEMAHAMAN DAN PENGGUNAANNYA 3 06-08 26-28 02-04 30-01 18-20 24-26 29-01 26-28 31-02 28-30 25-27 30-02 6.500.000

46 LIFE CYCLE COSTING (WHOLE LIFE COSTING) 2 02-03 19-20 23-24 15-16 13-14 17-18 15-16 20-21 16-17 21-22 18-19 16-17 4.500.000

47 MANAJEMEN KEUANGAN UNTUK NON MANAJER KEUANGAN 2 02-03 10-11 23-24 06-07 18-19 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000

48 MANAJEMEN PERPAJAKAN 3 27-29 10-12 09-11 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

49 MEASURING AND MANAGING COST ESCALATION IN PROJECT 2 02-03 27-28 23-24 23-24 06-07 25-26 23-24 27-28 24-25 29-30 26-27 21-22 4.500.000

50 Menyusun dan Menganalisa Laporan Keuangan 2 02-03 06-07 23-24 13-14 18-19 02-03 13-14 06-07 14-15 08-09 05-06 14-15 4.500.000

51 PAJAK DAN PROSEDUR IMPLEMENTASI 4 06-09 10-13 02-05 27-30 04-07 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

52PEMBERIAN KREDIT DENGAN PENDEKATAN LAPORAN ARUSKAS_CASH FLOW

2 02-03 19-20 23-24 13-14 18-19 17-18 13-14 20-21 14-15 21-22 18-19 14-15 4.500.000

53 Penanganan Kredit Bermasalah 1 02-02 13-13 23-23 20-20 20-20 11-11 20-20 13-13 21-21 15-15 12-12 24-24 2.750.000

54 Pencegahan dan Audit Fraud di Lingkungan Perbankan 3 15-17 10-12 18-20 27-29 18-20 08-10 27-29 10-12 30-02 12-14 09-11 28-30 6.500.000

55 PENYELESAIAN KREDIT BERMASALAH 2 02-03 06-07 23-24 29-30 18-19 02-03 29-30 06-07 30-01 08-09 05-06 30-31 4.500.000

56 PENYUSUNAN DAN ANALISA SCORING RATING 2 02-03 13-14 23-24 02-03 19-20 11-12 02-03 13-14 03-04 15-16 12-13 03-04 4.500.000

57 PENYUSUNAN PERATURAN INTERNAL PERKREDITAN BANK 3 20-22 19-21 16-18 06-08 18-20 17-19 08-10 18-20 09-11 21-23 18-20 09-11 6.500.000

58 Perhitungan KMK Kontraktor 2 02-03 19-20 23-24 29-30 18-19 17-18 29-30 18-19 28-29 21-22 18-19 30-31 4.500.000

Page 7: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

59Perhitungan Perkiraan Biaya Proyek Mekanikal Elektrikal UntukBangunan Gedung

2 02-03 06-07 23-24 02-03 18-19 04-05 02-03 06-07 03-04 08-09 05-06 03-04 4.500.000

60PETROLEUM FINANCE, COST CONTROL & RESERVOIR MANAJEMEN(Petroleum Economics)

4 28-31 04-07 03-06 30-02 04-07 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.000

61 PETTY CASH MANAGEMENT & ADMINISTRATION 2 02-03 19-20 23-24 23-24 18-19 17-18 23-24 20-21 24-25 21-22 18-19 23-24 4.500.000

62 PRACTICAL PROJECT EVALUATION AND FINANCING 2 02-03 19-20 23-24 15-16 18-19 17-18 15-16 20-21 16-17 21-22 18-19 16-17 4.500.000

63 PROFIT PLANNING COST - VOLUME - PROFIT RELATIONSHIP ANALYSIS 3 13-15 10-12 18-20 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

64 Project Cost Estimation & Cost Control 3 20-22 19-21 02-04 13-15 04-06 17-19 13-15 18-20 14-16 21-23 18-20 14-16 6.500.000

65 PROJECT COST MANAGEMENT 3 27-29 12-14 04-06 07-09 04-06 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

66 PROJECT EVALUATION AND FINANCING 3 27-29 17-19 09-11 30-01 13-15 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

67 Rekonsiliasi Fiskal & Penyusunan SPT Tahunan PPH Badan 3 06-08 24-26 16-18 06-08 18-20 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.500.000

68RESTITUSI PAJAK, PEMERIKSAAN PAJAK, KEBERATAN, BANDING DANGUGATAN

3 06-08 03-05 16-18 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

69 SERTIFIKASI MANAJEMEN RISIKO LEVEL 1 2 02-03 25-26 23-24 01-02 19-20 23-24 01-02 25-26 02-03 27-28 24-25 02-03 4.500.000

70 SISTEM INFORMASI MANAJEMEN DAN AKUNTANSI 3 27-29 17-19 04-06 28-30 04-06 15-17 28-30 19-21 28-30 19-21 16-18 29-31 6.500.000

71 Sistem Life Cycle Costing 2 06-07 06-07 04-05 08-09 06-07 02-03 06-07 06-07 07-08 08-09 05-06 07-08 4.500.000

72 Standard Operational Procedure, Accounting & Finance 3 27-29 26-28 09-11 20-22 13-15 24-26 20-22 26-28 21-23 28-30 25-27 21-23 6.500.000

73 SYSTEM AND COST PRODUCTION 4 20-23 24-27 10-13 06-09 11-14 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.500.000

74 TAX ACCOUNTING 3 27-29 24-26 09-11 27-29 18-20 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.000

75 TAX AND FINANCIAL CONTROL 3 13-15 17-19 09-11 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

76TIPIKOR DALAM PENGELOLAAN KEUANGAN PERUSAHAAN &PERBANKAN

3 27-29 17-19 02-04 07-09 11-13 15-17 08-10 18-20 09-11 19-21 16-18 09-11 6.500.000

77 TOTAL COST OF OWNERSHIP ANALYSIS 3 20-22 24-26 04-06 06-08 13-15 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.000

78 TRANSFER PRICING DOCUMENTATION 2 02-03 03-04 23-24 13-14 18-19 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

79 TREASURY AND CASH FLOW MANAGEMENT 2 16-17 13-14 23-24 16-17 07-08 11-12 16-17 13-14 17-18 15-16 12-13 17-18 4.500.000

Boiler - Turbin - Generator1 AIR COMPRESSOR 3 20-22 17-19 16-18 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

2 ALIGNMENT AND BALANCING IN ROTATING EQUIPMENT 3 27-29 24-26 02-04 27-29 18-20 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.000

3 ALIGNMENT, LEVELLING AND ROTOR BALANCING 3 06-08 17-19 16-18 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

4BOILER (KETEL UAP) DAN TURBIN UAP OPERASI, PERAWATAN DANTROUBLESHOOTING

4 06-09 24-27 16-19 13-16 11-14 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.000

5 BOILER CONTROL SYSTEMS ENGINEERING 4 20-23 17-20 02-05 13-16 04-07 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.000

6 BOILER OPERATION, MAINTENANCE & TROUBLESHOOTING 4 27-30 17-20 03-06 30-02 12-15 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.000

Page 8: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga7 BOILER OPERATION, MAINTENANCE & TROUBLESHOOTING 4 27-30 10-13 16-19 27-30 04-07 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.750.000

8 BOILER WATER TREATMENT 4 27-30 17-20 02-05 30-02 12-15 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.000

9 CENTRIFUGAL COMPRESSOR 4 06-09 24-27 10-13 06-09 05-08 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.500.000

10 CENTRIFUGAL COMPRESSOR & STEAM TURBINE PERFORMANCE 4 14-17 04-07 17-20 13-16 11-14 02-05 13-16 04-07 14-17 06-09 03-06 14-17 8.500.000

11 CENTRIFUGAL GAS COMPRESSOR Anti Surge Control 4 06-09 10-13 10-13 30-02 12-15 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.000

12 CENTRIFUGAL GAS COMPRESSOR OPERATION & MAINTENANCE 4 13-16 17-20 17-20 06-09 05-08 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

13 CENTRIFUGAL PUMP OPERATION AND MAINTENANCE 4 21-24 25-28 02-05 13-16 11-14 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.000

14 CENTRIFUGAL PUMP AND SEAL 4 21-24 11-14 03-06 21-24 04-07 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.000

15 CENTRIFUGAL PUMP Selection, Operation, and Maintenance 5 13-17 17-21 02-06 30-03 11-15 15-19 29-03 24-28 31-04 19-23 16-20 30-04 9.750.000

16 Compressor and Prime Mover Operation & Maintenance 3 22-24 19-21 04-06 15-17 18-20 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

17 COMPRESSOR Operation, Maintenance and Troubleshooting 3 06-08 17-19 02-04 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.750.000

18COMPRESSOR OPERATION, MAINTENANCE, TROUBLESHOOTING ANDDIAGNOSTIC OF FAILURE ANALYSIS

4 13-16 10-13 09-12 06-09 04-07 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.000

19ELECTRIC SUBMERSIBLE PUMP PRINCIPLES, INSTALLATION,OPERATION, MAINTENANCE AND TROUBLESHOOTING

3 29-31 05-07 11-13 07-09 18-20 03-05 08-10 05-07 09-11 07-09 04-06 09-11 7.950.000

20ELECTRICAL POWER GENERATOR OPERATION, PROTECTION ANDMAINTANANCE

5 27-31 10-14 09-13 30-03 04-08 08-12 29-03 10-14 28-02 12-16 09-13 30-04 9.750.000

21 ELECTRICAL SYSTEM GENERATORSET 4 27-30 10-13 17-20 20-23 05-08 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.750.000

22GAS AND STEAM TURBINE Operation, Maintenance AndTroubleshooting

4 13-16 24-27 09-12 06-09 11-14 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.750.000

23 Gas Compressor Operation, Maintenance & Troubleshooting 4 20-23 24-27 09-12 06-09 04-07 22-25 06-09 18-21 07-10 26-29 23-26 07-10 8.750.000

24 GAS TURBINE OPERATION & MAINTENANCE 4 07-10 04-07 16-19 27-30 05-08 02-05 27-30 04-07 29-02 06-09 03-06 28-31 8.500.000

25 GAS TURBINE OPERATION, MAINTENANCE AND TROUBLESHOOTING 4 28-31 18-21 09-12 27-30 12-15 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.500.000

26 GAS TURBINE OPERATION, PERFORMANCE & TROUBLESHOOTING 4 27-30 03-06 09-12 31-03 04-07 02-05 30-03 03-06 01-04 05-08 02-05 01-04 8.500.000

27GAS TURBINE PRINCIPLES, INSPECTION, OPERATION, MAINTENANCEAND TROUBLESHOOTING

4 20-23 03-06 17-20 13-16 05-08 02-05 13-16 03-06 14-17 05-08 02-05 14-17 8.750.000

28 GENERATOR EXCITATION SYSTEM 4 14-17 25-28 10-13 30-02 04-07 23-26 29-02 25-28 31-03 27-30 24-27 30-03 8.750.000

29 GENERATOR OPERATION, MAINTENANCE & TROUBLESHOOTING 4 06-09 10-13 16-19 06-09 12-15 08-11 07-10 10-13 08-11 12-15 09-12 08-11 8.500.000

30HIGH PRESSURE PUMP (HPP) OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 07-10 18-21 10-13 27-30 04-07 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.750.000

31KOMPRESOR SENTRIFUGAL OPERASI, PEMELIHARAAN, DANTROUBLESHOOTING

4 06-09 10-13 02-05 20-23 05-08 02-05 20-23 10-13 21-24 12-15 09-12 21-24 8.750.000

Page 9: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga32 LV AND MV GENERATOR 4 13-16 24-27 17-20 27-30 04-07 22-25 27-30 24-27 29-02 26-29 23-26 28-31 8.750.000

33 MACHINERY FLUID MECHANICS 4 20-23 17-20 16-19 13-16 11-14 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.000

34 OPERASI DAN PEMELIHARAAN TURBIN GAS DAN GENERATOR 4 06-09 24-27 03-06 27-30 05-08 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

35 OPERATION & MAINTENANCE OF BOILER 4 06-09 24-27 16-19 31-03 04-07 22-25 30-03 24-27 01-04 26-29 23-26 01-04 8.500.000

36OPERATION, MAINTENANCE AND TROUBLESHOOTING OF GASTURBINE

4 13-16 03-06 03-06 06-09 11-14 02-05 07-10 03-06 08-11 05-08 02-05 08-11 8.500.000

37 PEMBANGKIT UAP (BOILER) 4 20-23 10-13 02-05 27-30 05-08 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

38PERFORMANCE ANALISYS AND OPERATING OF GENERATOR SET FORSENIOR OPERATOR AND ENGINEER

4 06-09 10-13 10-13 30-02 12-15 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.000

39POMPA DAN KOMPRESOR OPERASI, PERAWATAN DANTROUBLESHOOTING

4 28-31 18-21 17-20 30-02 04-07 16-19 29-02 18-21 31-03 20-23 17-20 30-03 8.500.000

40 POMPA OPERASI DAN PERAWATAN 4 14-17 04-07 09-12 30-02 11-14 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.000

41 PREVENTIVE MAINTENANCE GENERATOR 4 28-31 18-21 02-05 13-16 12-15 16-19 13-16 18-21 14-17 20-23 17-20 14-17 8.500.000

42PUMP AND COMPRESSOR OPERATION, MAINTENANCE &TROUBLESHOOTING

5 13-17 17-21 09-13 30-03 11-15 15-19 29-03 24-28 28-02 19-23 16-20 30-04 9.750.000

43PUMP AND COMPRESSOR OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 28-31 11-14 16-19 06-09 05-08 09-12 06-09 11-14 07-10 13-16 10-13 07-10 8.750.000

44 PUMP OPERATION AND MAINTENANCE 4 14-17 18-21 17-20 06-09 04-07 16-19 06-09 18-21 07-10 20-23 17-20 07-10 8.500.000

45 Pump Operation, Maintenance & Troubleshooting 4 14-17 04-07 09-12 14-17 05-08 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.000

46 PUMP OPERATION, MAINTENANCE AND TROUBLESHOOTING 4 20-23 03-06 10-13 30-02 11-14 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.750.000

47Pump Selection, Design and Operation for Oil and Gas SurfaceProduction Facilities

3 20-22 24-26 04-06 15-17 13-15 22-24 15-17 24-26 16-18 26-28 23-25 16-18 7.950.000

48 ROTATING EQUIPMENT 4 21-24 04-07 17-20 27-30 11-14 02-05 27-30 04-07 29-02 06-09 03-06 28-31 8.750.000

49 ROTATING EQUIPMENTS 3 15-17 19-21 04-06 07-09 18-20 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.750.000

50 ROTATING EQUIPMENTS 4 07-10 25-28 10-13 21-24 05-08 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.000

51 STEAM GENERATOR AND TURBINE OPERATION AND MAINTENANCE 4 27-30 17-20 17-20 20-23 05-08 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000

52STEAM TURBINE OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 27-30 10-13 03-06 31-03 05-08 08-11 30-03 10-13 01-04 12-15 09-12 01-04 8.750.000

53 SUCKER ROD PUMP DESIGN, OPERATION AND TROUBLESHOOTING 3 27-29 03-05 11-13 22-24 18-20 02-04 22-24 03-05 23-25 05-07 02-04 22-24 7.950.000

54 TURBIN & GENERATOR OPERATION 4 27-30 17-20 09-12 06-09 12-15 15-18 07-10 18-21 08-11 19-22 16-19 08-11 8.500.000

55 TURBIN GAS 4 07-10 25-28 17-20 06-09 04-07 23-26 06-09 25-28 07-10 27-30 24-27 07-10 8.500.000

56 TURBIN UAP 4 14-17 04-07 03-06 14-17 11-14 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.000

Electrical1 ACDC ELECTRICAL MOTOR CONTROL 4 06-09 17-20 02-05 13-16 04-07 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.750.000

Page 10: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

2ADVANCE COURSE ON LIGHTNING PROTECTION AND GROUNDINGSYSTEM

5 20-24 24-28 16-20 30-03 04-08 22-26 29-03 24-28 28-02 26-30 23-27 30-04 9.750.000

3 ADVANCED CONTROL FOUNDATION 4 13-16 10-13 16-19 06-09 11-14 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.000

4 ADVANCED PLC PROGRAMMING AND IMPLEMENTATION 4 20-23 17-20 09-12 30-02 11-14 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.000

5AUTOMATIC VOLTAGE REGULATOR(AVR) OPERATION ANDMAINTENANCE

4 21-24 25-28 10-13 27-30 11-14 23-26 27-30 25-28 28-01 27-30 24-27 28-31 8.500.000

6 BASIC ELECTRICAL 3 13-15 24-26 09-11 20-22 11-13 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.000

7 BASIC ELECTRICAL FOR NON ELECTRICIAN 4 20-23 03-06 16-19 27-30 05-08 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.750.000

8 Data Akuisisi, Interfacing, dan Sistem Monitoring 3 06-08 24-26 16-18 06-08 04-06 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.750.000

9DISTRIBUTED CONTROL SYSTEM (DCS) PRINCIPLES, MAINTENANCE,OPERATION, PROGRAMMING & TROUBLESHOOTING

5 06-10 10-14 16-20 13-17 04-08 08-12 13-17 10-14 14-18 12-16 09-13 14-18 9.750.000

10 DISTRIBUTED CONTROL SYSTEMS (DCS) FUNDAMENTAL 4 14-17 18-21 03-06 21-24 11-14 16-19 21-24 18-21 22-25 20-23 17-20 21-24 8.750.000

11 DISTRIBUTION SYSTEM PROTECTION 4 27-30 10-13 03-06 30-02 12-15 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.750.000

12 Electric Installation In Hazardous Area 4 07-10 18-21 10-13 06-09 04-07 16-19 06-09 18-21 07-10 20-23 17-20 07-10 8.750.000

13 Electric motor Operation, Maintenance & Troubleshooting 4 21-24 25-28 16-19 30-02 11-14 23-26 29-02 25-28 31-03 27-30 24-27 30-03 8.500.000

14 ELECTRICAL CALIBRATION 3 15-17 26-28 18-20 15-17 18-20 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000

15 Electrical Control Wiring 4 21-24 25-28 09-12 27-30 04-07 23-26 27-30 25-28 29-02 27-30 24-27 28-31 8.750.000

16 ELECTRICAL EQUIPMENT SYSTEM AND MAINTENANCE 4 21-24 04-07 02-05 21-24 11-14 02-05 21-24 04-07 22-25 06-09 03-06 21-24 8.750.000

17 Electrical Panel Design 3 27-29 10-12 18-20 15-17 18-20 08-10 15-17 10-12 16-18 12-14 09-11 16-18 6.500.000

18ELECTRICAL POWER GENERATOR OPERATION, PROTECTION ANDMAINTANANCE

5 27-31 10-14 09-13 30-03 04-08 08-12 29-03 10-14 28-02 12-16 09-13 30-04 9.750.000

19 ELECTRICAL POWER SYSTEM ANALYSIS 4 06-09 17-20 16-19 27-30 12-15 15-18 27-30 18-21 01-04 19-22 16-19 28-31 8.750.000

20ELECTRICAL POWER SYSTEM ANALYSIS USING SOFTWAREAPPLICATION

4 13-16 24-27 03-06 06-09 04-07 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.750.000

21 ELECTRICAL POWER SYSTEM PROTECTION 4 20-23 03-06 09-12 13-16 11-14 02-05 13-16 03-06 14-17 05-08 02-05 14-17 8.750.000

22 Electrical Safety For Electrical Technician 4 07-10 18-21 02-05 21-24 05-08 16-19 21-24 18-21 22-25 20-23 17-20 21-24 8.750.000

23 ELECTRICAL SAFETY FOR POWER LINE 3 29-31 17-19 04-06 13-15 18-20 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.000

24 ELECTRICAL SYSTEM GENERATORSET 4 27-30 10-13 17-20 20-23 05-08 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.750.000

25 ELECTRONIC SWITCHBOARD RESCUE 3 13-15 24-26 04-06 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

26 ELECTRONIC SHUTDOWN AND LOGIC SYSTEM 4 07-10 18-21 02-05 27-30 12-15 16-19 27-30 18-21 28-01 20-23 17-20 28-31 8.750.000

27 FLOWMETERING AND CUSTODY TRANSFER 4 27-30 24-27 09-12 20-23 12-15 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.500.000

28 GARDU INDUK 3 20-22 03-05 09-11 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

29 GENERATOR EXCITATION SYSTEM 4 14-17 25-28 10-13 30-02 04-07 23-26 29-02 25-28 31-03 27-30 24-27 30-03 8.750.000

Page 11: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

30 GENERATOR OPERATION, MAINTENANCE & TROUBLESHOOTING 4 06-09 10-13 16-19 06-09 12-15 08-11 07-10 10-13 08-11 12-15 09-12 08-11 8.500.000

31 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 13-16 03-06 02-05 20-23 05-08 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

32 GROUNDING SYSTEM AND LIGHTNING PROTECTION 4 21-24 04-07 16-19 06-09 11-14 02-05 06-09 04-07 07-10 06-09 03-06 07-10 8.750.000

33High Voltage Electrical Equipmment Operation, Maintenance andRepair

5 27-31 10-14 02-06 13-17 04-08 08-12 13-17 10-14 14-18 12-16 09-13 14-18 9.750.000

34 Implementasi DSP (digital signal processing) Dalam Sistem Komunikasi 4 06-09 03-06 09-12 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

35 INDUSTRIAL ROBOTICS SENSING, PLANNING, AND CONTROL 4 20-23 17-20 02-05 27-30 04-07 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.500.000

36 Instalasi Tegangan Menengah 3 06-08 24-26 09-11 20-22 18-20 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.000

37 INSTRUMENTATION AND BASIC CONTROL SYSTEM 3 27-29 24-26 04-06 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

38 INSTRUMENTATION AND CONTROL SYSTEM 4 27-30 24-27 09-12 13-16 05-08 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.000

39 INSTRUMENTATION ELECTRIC Operation and Maintenance 4 06-09 17-20 09-12 21-24 12-15 15-18 21-24 18-21 22-25 19-22 16-19 21-24 8.750.000

40Lightning Protection and Grounding System for Oil & Gas Refinery andPetrochemical Installation

3 27-29 03-05 02-04 27-29 18-20 02-04 27-29 03-05 31-02 05-07 02-04 28-30 6.950.000

41LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR POWERPLANT, TRANSMISSION, DISTRIBUTION AND LARGE INDUSTRY

3 06-08 10-12 09-11 06-08 11-13 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.950.000

42 LV AND MV GENERATOR 4 13-16 24-27 17-20 27-30 04-07 22-25 27-30 24-27 29-02 26-29 23-26 28-31 8.750.000

43 LV ELECTRICAL POWER DISTRIBUTION SYSTEM 4 20-23 03-06 02-05 31-03 11-14 02-05 30-03 03-06 01-04 05-08 02-05 01-04 8.750.000

44 LV SWITCHGEAR MAINTENANCE AND COORDINATION 4 27-30 10-13 10-13 06-09 05-08 08-11 07-10 10-13 08-11 12-15 09-12 08-11 8.750.000

45 Motor Rewinding 3 15-17 26-28 11-13 28-30 18-20 24-26 28-30 26-28 30-02 28-30 25-27 29-31 6.500.000

46 NUMERICAL CONTROL AND ROBOTIC 4 20-23 24-27 09-12 30-02 11-14 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.500.000

47 PEMELIHARAAN MOTOR MOTOR LISTRIK 4 28-31 11-14 10-13 20-23 11-14 09-12 20-23 11-14 21-24 13-16 10-13 21-24 8.750.000

48 Pemrograman Mikrokontroler AVR dengan CodeVisionAVR 3 13-15 03-05 02-04 13-15 11-13 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.750.000

49 Pemrograman Mikrokontroler untuk Robotika 3 20-22 10-12 09-11 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.750.000

50 PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK 4 13-16 17-20 09-12 20-23 05-08 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000

51PERFORMANCE ANALISYS AND MAINTENANCE OF ELECTRICALDISTRIBUTION NETWORKS FOR SUPERVISOR

4 27-30 03-06 02-05 27-30 05-08 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

52PERFORMANCE ANALISYS AND OPERATING OF GENERATOR SET FORSENIOR OPERATOR AND ENGINEER

4 06-09 10-13 10-13 30-02 12-15 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.000

53PERFORMANCE ANALISYS AND OPERATING OF INDUCTION MOTORFOR SENIOR OPERATOR AND JUNIOR SUPERVISOR

4 14-17 18-21 17-20 06-09 04-07 16-19 06-09 18-21 07-10 20-23 17-20 07-10 8.500.000

54Perhitungan Perkiraan Biaya Proyek Mekanikal Elektrikal UntukBangunan Gedung

2 02-03 06-07 23-24 02-03 18-19 04-05 02-03 06-07 03-04 08-09 05-06 03-04 4.500.000

55 PLC ( Tingkat dasar ) 4 07-10 11-14 10-13 06-09 12-15 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.500.000

Page 12: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

56PLC (ROGRAMMABLE LOGIC CONTROLLER) PRINCIPLES, OPERATIONAND PROGRAMMING

4 06-09 03-06 02-05 13-16 12-15 02-05 13-16 03-06 14-17 05-08 02-05 14-17 8.500.000

57 PLC (TINGKAT MAHIR) 4 14-17 18-21 17-20 14-17 05-08 16-19 14-17 18-21 15-18 20-23 17-20 15-18 8.500.000

58 PLC COMMUNICATION AND LAN 4 14-17 18-21 16-19 06-09 11-14 16-19 06-09 18-21 07-10 20-23 17-20 07-10 8.750.000

59 PLC INTEGRATION TO LOCAL AREA NETWORK (LAN) 4 27-30 24-27 16-19 06-09 04-07 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.500.000

60PLC OPERATION, PROGRAMMING, TROUBLESHOOTING ANDMAINTENANCE

4 20-23 24-27 02-05 14-17 05-08 22-25 14-17 24-27 15-18 26-29 23-26 15-18 8.750.000

61 POWER DISTRIBUTION TRANSFORMER 4 21-24 04-07 02-05 13-16 04-07 02-05 13-16 04-07 14-17 06-09 03-06 14-17 8.750.000

62 POWER ELECTRICAL INSTALLATION SYSTEM 4 07-10 18-21 16-19 13-16 12-15 16-19 13-16 18-21 14-17 20-23 17-20 14-17 8.750.000

63 POWER ELECTRONICS 4 14-17 25-28 03-06 20-23 04-07 23-26 20-23 25-28 21-24 27-30 24-27 21-24 8.750.000

64 POWER FACTOR IMPROVEMENT 4 20-23 24-27 02-05 21-24 11-14 22-25 21-24 24-27 22-25 26-29 23-26 21-24 8.500.000

65 POWER PROTECTION RELAY SYSTEM 4 21-24 04-07 09-12 27-30 11-14 02-05 27-30 04-07 28-01 06-09 03-06 28-31 8.750.000

66 POWER TRANSFORMER 4 28-31 11-14 17-20 30-02 05-08 09-12 29-02 11-14 31-03 13-16 10-13 30-03 8.750.000

67 Power Transformer (Operation, Testing, Asessment And Maintenance) 4 21-24 11-14 16-19 06-09 12-15 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.750.000

68 PRACTICAL PROCESS CONTROL 4 06-09 03-06 17-20 27-30 05-08 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

69 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 27-30 03-06 02-05 27-30 05-08 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

70 PROGRAMMABLE LOGIC CONTROLLER(PLC) 4 06-09 17-20 02-05 06-09 12-15 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.750.000

71 PROTEKSI TERHADAP GANGGUAN SAMBARAN PETIR 4 21-24 25-28 10-13 13-16 11-14 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.000

72SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION)PRINCIPLES, HARDWARE SYSTEM, OPERATION & PROGRAMMING

4 13-16 10-13 10-13 20-23 05-08 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.500.000

73 SISTEM INSTALASI DAN PROTEKSI JARINGAN TENAGA LISTRIK 4 07-10 11-14 02-05 27-30 12-15 09-12 27-30 11-14 28-01 13-16 10-13 28-31 8.500.000

74 SISTEM INSTALASI TENAGA LISTRIK 4 14-17 18-21 09-12 31-03 05-08 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.500.000

75 SISTEM KONTROL MOTOR LISTRIK 4 13-16 03-06 17-20 27-30 11-14 02-05 27-30 03-06 29-02 05-08 02-05 28-31 8.500.000

76 Soft Starter (Operation, Protection and Maintanance) 3 13-15 24-26 11-13 15-17 18-20 22-24 15-17 24-26 16-18 26-28 23-25 16-18 6.500.000

77TEKNIK KONSERVASI ENERGI MELALUI AUDIT ENERGI PADABANGUNAN GEDUNG

4 21-24 11-14 16-19 21-24 12-15 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.000

78 TRAFO PRINCIPLES, APPLICATION AND MAINTENANCE 4 20-23 10-13 03-06 31-03 04-07 08-11 30-03 10-13 01-04 12-15 09-12 01-04 8.500.000

79 TRANFORMER OPERATION & MAINTENANCE 4 13-16 17-20 17-20 27-30 05-08 15-18 27-30 18-21 29-02 19-22 16-19 28-31 8.500.000

80 TRANSFORMATOR DAYA OPERASI DAN PEMELIHARAAN 3 06-08 17-19 16-18 27-29 18-20 15-17 27-29 18-20 28-30 19-21 16-18 28-30 6.500.000

81 TRANSMISSION AND DISTRIBUTION OPERATION AND MAINTENANCE 4 20-23 03-06 16-19 21-24 04-07 02-05 21-24 03-06 22-25 05-08 02-05 21-24 8.750.000

82 Uninterruptible Power Suply Operation and Maintenance 4 27-30 10-13 03-06 27-30 11-14 08-11 27-30 10-13 29-02 12-15 09-12 28-31 8.750.000

83 Uninterupted Power Suply 4 21-24 25-28 02-05 30-02 11-14 23-26 29-02 25-28 31-03 27-30 24-27 30-03 8.500.000

Page 13: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga84 VARIABLE FREQUENCY DRIVES 4 07-10 18-21 09-12 31-03 05-08 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.750.000

85 VARIABLE SPEED DRIVES 4 14-17 25-28 17-20 06-09 12-15 23-26 07-10 25-28 08-11 27-30 24-27 08-11 8.750.000

Engineering1 ADVANCE PROCESS CONTROL, INSTRUMENTATION AND METERING 4 06-09 24-27 16-19 20-23 04-07 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.750.000

2 ADVANCED CCTV Perencanaan, Desain dan Implementasi 3 20-22 24-26 18-20 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

3 ADVANCED FLOW MEASUREMENT 4 06-09 10-13 09-12 20-23 04-07 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.750.000

4 ADVANCED PID CONTROLLER 4 13-16 17-20 16-19 27-30 11-14 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.750.000

5 ANSYS ADVANCED FLUENT CFD 4 20-23 10-13 02-05 20-23 12-15 08-11 20-23 10-13 21-24 12-15 09-12 21-24 9.500.000

6 ANSYS BASIC FLUENT CFD 4 06-09 24-27 09-12 06-09 11-14 22-25 06-09 24-27 07-10 26-29 23-26 07-10 9.500.000

7 ANSYS INTERMEDIATE FLUENT CFD 4 13-16 03-06 16-19 13-16 04-07 02-05 13-16 03-06 14-17 05-08 02-05 14-17 9.500.000

8 APPLICATION STATISTIC IN ENGINEERING INDUSTRY 4 06-09 10-13 10-13 13-16 12-15 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.000

9 BASIC CIVIL 4 28-31 04-07 17-20 31-03 04-07 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.500.000

10BASIC FUZZY LOGIC CONTROL AND ITS SIMULATION WITHSPREADSHEET APPLICATION PROGRAM

4 27-30 10-13 02-05 30-02 11-14 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.000

11 CALIBRATION ISO IEC 17025 4 14-17 18-21 09-12 27-30 11-14 16-19 27-30 18-21 28-01 20-23 17-20 28-31 8.750.000

12 CALLIBRATION OF MEASURING TOOL 4 21-24 25-28 03-06 27-30 11-14 23-26 27-30 25-28 29-02 27-30 24-27 28-31 8.500.000

13 CARTOGRAFI 4 20-23 24-27 16-19 21-24 11-14 22-25 21-24 24-27 22-25 26-29 23-26 21-24 8.500.000

14 CATHODIC PROTECTION CORROSION CONTROL AND PREVENTION 4 27-30 03-06 03-06 27-30 04-07 02-05 27-30 03-06 29-02 05-08 02-05 28-31 8.500.000

15CATHODIC PROTECTION FOR MINE STEEL STRUCTURE AND MININGSUPORTING FACILITIES

4 06-09 10-13 09-12 20-23 11-14 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.950.000

16 CCTV INSTALASI, PEMROGRAMAN DAN PERAWATAN 3 13-15 17-19 16-18 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

17 CHOKE AND CONTROL VALVE 4 14-17 11-14 17-20 06-09 11-14 09-12 06-09 11-14 07-10 13-16 10-13 07-10 8.500.000

18 CIVIL CONSTRUCTION OBSERVATION of EXECUTION BUILDING 4 28-31 04-07 09-12 20-23 04-07 02-05 20-23 04-07 21-24 06-09 03-06 21-24 8.500.000

19 CIVIL CONSTRUCTION PENGAWASAN PELAKSANAAN BANGUNAN 4 07-10 11-14 16-19 27-30 12-15 09-12 27-30 11-14 28-01 13-16 10-13 28-31 8.500.000

20 COMPUTATIONAL FLUID DYNAMICS PADA MESIN TURBO 3 27-29 24-26 09-11 27-29 04-06 22-24 27-29 24-26 28-30 26-28 23-25 28-30 7.500.000

21 CONTROL AND CHOKE VALVES 4 20-23 24-27 02-05 30-02 05-08 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.750.000

22 CONTROL SYSTEM FUNDAMENTALS 4 27-30 03-06 10-13 06-09 12-15 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.750.000

23 CONTROL VALVE AND VALVE OPERATION AND SIZING 4 20-23 24-27 10-13 06-09 11-14 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.500.000

24CONTROL VALVE OPERATION, MAINTENANCE, ANDTROUBLESHOOTING

4 13-16 17-20 02-05 14-17 04-07 15-18 14-17 18-21 15-18 19-22 16-19 15-18 8.500.000

25 CORROSION AND SCALING PREVENTION 4 27-30 03-06 10-13 06-09 05-08 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.950.000

Page 14: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga26 Corrosion Engineering for Non Corrosion Engineers 4 07-10 11-14 17-20 13-16 11-14 09-12 13-16 11-14 14-17 13-16 10-13 14-17 8.950.000

27DESIGN OF EXPRIMENTS (DOE) FUNDAMENTAL CONCEPT ANDAPPLICATION

4 13-16 24-27 02-05 30-02 04-07 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.750.000

28 DOKUMEN KONTROL 4 13-16 17-20 09-12 27-30 05-08 15-18 27-30 18-21 29-02 19-22 16-19 28-31 8.500.000

29Electrical Test Instrumentation dan Sistem Pengukuran(Measurements)

4 20-23 03-06 09-12 06-09 11-14 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.750.000

30 Energy Audit and Application 4 20-23 03-06 16-19 30-02 11-14 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.750.000

31 FIELDBUS AND INDUSTRIAL DATA COMMUNICATION 4 28-31 04-07 16-19 31-03 12-15 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.750.000

32 FINITE ELEMENT METHODS (FEM) 4 28-31 04-07 02-05 20-23 05-08 02-05 20-23 04-07 21-24 06-09 03-06 21-24 8.500.000

33 FISCAL AND CUSTODY METERING 4 06-09 10-13 02-05 06-09 05-08 08-11 07-10 10-13 08-11 12-15 09-12 08-11 8.750.000

34 FLOW ASSURANCE IN PIPING SYSTEMS 4 13-16 17-20 10-13 13-16 11-14 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.750.000

35 Flow Measurement and Control Element 4 07-10 11-14 10-13 27-30 12-15 09-12 27-30 11-14 29-02 13-16 10-13 28-31 8.500.000

36 FLUID FLOW – GAS METERING AND CUSTODY TRANSFER 5 20-24 24-28 16-20 20-24 04-08 22-26 20-24 24-28 21-25 26-30 23-27 30-04 9.750.000

37FLUID FLOW MEASUREMENT AND METER PROVING IN OIL AND GASINDUSTRY

4 07-10 25-28 16-19 31-03 05-08 23-26 30-03 25-28 01-04 27-30 24-27 01-04 8.500.000

38 FUZZY LOGIC CONTROL 4 14-17 18-21 17-20 20-23 05-08 16-19 20-23 18-21 21-24 20-23 17-20 21-24 8.500.000

39 GAS AND LIQUID FLOW MEASUREMENT 4 20-23 24-27 02-05 27-30 11-14 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

40 GPS(Global Positioning System) for mining and Petroleum 4 27-30 10-13 02-05 20-23 11-14 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.750.000

41 HUMAN MACHINE INTERFACE (HMI) 4 27-30 03-06 03-06 27-30 12-15 02-05 27-30 03-06 28-01 05-08 02-05 21-24 8.750.000

42 INDUSTRIAL COMBUSTION AND BURNER 4 13-16 24-27 02-05 27-30 11-14 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.950.000

43 INDUSTRIAL METROLOGY 4 06-09 10-13 16-19 21-24 12-15 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.500.000

44 Inspeksi dan Korosi 4 14-17 18-21 02-05 27-30 04-07 16-19 27-30 18-21 28-01 20-23 17-20 28-31 8.500.000

45 INSTRUMENTATION AND CONTROL SYSTEM 4 28-31 25-28 10-13 13-16 04-07 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.000

46 Instrumentation Systems 4 27-30 10-13 16-19 13-16 05-08 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.750.000

47INTERNAL AND EXTERNAL CORROSION CONTROL AND MONITORINGFOR PIPELINE AND SURFACE FACILITY

4 06-09 10-13 02-05 06-09 11-14 08-11 07-10 10-13 08-11 12-15 09-12 08-11 8.950.000

48 LIFE CYCLE COSTING 3 13-15 17-19 16-18 13-15 11-13 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.750.000

49 MEASUREMENT SYSTEM ANALYSIS 4 28-31 04-07 09-12 27-30 05-08 02-05 27-30 04-07 28-01 06-09 03-06 28-31 8.500.000

50 Measurements Systems 4 06-09 17-20 03-06 20-23 12-15 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.750.000

51OLE FOR PROCESS CONTROL (OPC) & DISTRIBUTED COMPONENTOBJECT MODEL (DCOM)

4 13-16 03-06 02-05 27-30 11-14 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.750.000

52 OPC (OPEN PROCESS CONTROL) 4 07-10 11-14 09-12 30-02 04-07 09-12 29-02 11-14 31-03 13-16 10-13 28-31 8.750.000

53PERHITUNGAN KETIDAKPASTIAN HASIL PENGUKURAN DANPENGUJIAN

3 27-29 17-19 16-18 06-08 11-13 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

54 PRESSURE SAFETY VALVE SELECTION AND SIZING 3 20-22 24-26 02-04 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

Page 15: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga55 PROCESS CONTROL AND INSTRUMENTATION 4 20-23 10-13 09-12 30-02 05-08 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.750.000

56 PROCESS CONTROL SYSTEMS APPLICATION, DESIGN, AND TUNING 4 13-16 17-20 03-06 06-09 05-08 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

57 PRODUCTION SAFETY SYSTEM 4 21-24 18-21 09-12 31-03 12-15 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.500.000

58 ROOT CAUSE FAILURE ANALYSIS (RCFA) 4 28-31 04-07 10-13 20-23 12-15 02-05 20-23 04-07 21-24 06-09 03-06 21-24 8.750.000

59 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 27-30 17-20 17-20 06-09 12-15 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.750.000

60 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 27-30 24-27 16-19 06-09 04-07 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.500.000

61 SAFETY INSTRUMENTED SYSTEMS (SIS) ISA, IEC 4 06-09 10-13 17-20 27-30 04-07 08-11 27-30 10-13 29-02 12-15 09-12 28-31 8.750.000

62SAFETY RELIEF VALVE FUNDAMENTAL CONCEPTS, SIZING ANDSELECTION

4 07-10 25-28 03-06 13-16 04-07 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.750.000

63 SCADA SYSTEMS 4 13-16 17-20 03-06 31-03 11-14 15-18 30-03 18-21 01-04 19-22 16-19 30-03 8.750.000

64 Scale In Oilfield Water 4 06-09 03-06 03-06 14-17 11-14 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.500.000

65 SIMULASI PROSES TEKNIK KIMIA MENGGUNAKAN HYSYS 4 13-16 10-13 10-13 20-23 05-08 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.500.000

66 Statistical Process Control BERBASIS MINITAB 14 3 06-08 19-21 09-11 07-09 06-08 17-19 08-10 18-20 09-11 21-23 18-20 09-11 6.500.000

67 STATISTIK INDUSTRI 4 27-30 17-20 16-19 27-30 04-07 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.500.000

68 SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) 4 20-23 24-27 16-19 06-09 11-14 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.500.000

69 Survey & Mapping 4 27-30 03-06 03-06 14-17 04-07 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.500.000

70 Ultrasonic Gas Flow Meter 5 20-24 24-28 09-13 13-17 04-08 22-26 06-10 24-28 07-11 26-30 23-27 07-11 9.750.000

71 WATER TREATMENT 4 27-30 03-06 03-06 27-30 05-08 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.950.000

72 WELLHEAD INSTRUMENTATION AND HYDRAULIC CONTROL SYSTEMS 4 27-30 03-06 16-19 06-09 12-15 02-05 13-16 03-06 14-17 05-08 02-05 14-17 8.750.000

73 WIRELESS LAN IN INDUSTRIAL AUTOMATION & ISA 100.11a 4 07-10 11-14 02-05 21-24 04-07 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.750.000

Export Import1 ADMINISTRASI KEPABEANAN 4 13-16 17-20 16-19 13-16 04-07 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.000

2 Custom facility, Shipping Documents & Export Import Procedure 2 02-03 24-25 23-24 20-21 18-19 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.000

3 Export import 3 06-08 17-19 18-20 07-09 18-20 15-17 08-10 18-20 09-11 19-21 16-18 09-11 6.500.000

4 Export-Import 3 27-29 10-12 09-11 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

5 Export-Import and Incoterm 3 06-08 19-21 18-20 06-08 06-08 17-19 06-08 18-20 07-09 21-23 18-20 07-09 6.500.000

6 FREIGHT FORWARDING 2 02-03 26-27 23-24 16-17 14-15 24-25 16-17 26-27 17-18 28-29 25-26 17-18 4.500.000

7 Incoterm 2010 2 02-03 06-07 23-24 22-23 18-19 04-05 22-23 06-07 23-24 08-09 05-06 23-24 4.500.000

8 PEMAHAMAN SHIPPING DOCUMENT & PROSEDUR KEPABEANAN 3 15-17 12-14 04-06 28-30 04-06 10-12 28-30 12-14 30-02 14-16 11-13 29-31 6.500.000

Page 16: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

Health, Safety and Environment (HSE)1

AMDAL ( ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT) FOREXECUTIVE

4 13-16 24-27 02-05 06-09 04-07 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.500.000

2AMDAL ( ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT) FOREXECUTIVE

4 06-09 10-13 02-05 06-09 11-14 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.000

3 AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOR EXECUTIVES 3 27-29 10-12 09-11 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

4 APLIKASI PROGRAM PERLINDUNGAN PERNAFASAN 2 02-03 24-25 23-24 06-07 18-19 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.000

5 APPLIED ERGONOMICS AT WORKPLACE 4 20-23 03-06 09-12 13-16 11-14 02-05 13-16 03-06 14-17 05-08 02-05 14-17 8.500.000

6 AUTHORISED GAS TESTING 4 27-30 10-13 16-19 20-23 05-08 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.500.000

7 BASIC SAFETY ORIENTATION FOR CONTRACTORS 5 06-10 17-21 02-06 30-03 11-15 15-19 29-03 24-28 28-02 19-23 16-20 30-04 9.750.000

8 BASIC SURFACE SAFETY SYSTEM 3 22-24 26-28 04-06 30-01 18-20 24-26 29-01 26-28 31-02 28-30 25-27 30-02 7.950.000

9 BEHAVIOR BASED SAFETY 2 02-03 03-04 23-24 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

10 BEHAVIOR BASED SAFETY (BBS) 3 13-15 17-19 09-11 27-29 18-20 15-17 27-29 18-20 28-30 19-21 16-18 28-30 6.750.000

11 CANTEEN HYGIENE 2 02-03 27-28 23-24 27-28 18-19 25-26 27-28 18-19 31-01 29-30 26-27 28-29 4.500.000

12CATERING & ACCOMMODATION MANAGEMENT (INCLUDING TABLEMANNER)

4 20-23 03-06 09-12 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

13CATERING SERVICE, HYGIENE & SANITATION (INCLUDING PERSONALHYGIENE)

3 27-29 10-12 16-18 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

14 Chemical Hazard Safety in Mining and Workplace 4 20-23 24-27 02-05 30-02 12-15 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.950.000

15 CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS) 4 14-17 04-07 10-13 06-09 04-07 02-05 07-10 04-07 08-11 06-09 03-06 08-11 8.500.000

16 CSMS AWARENESS 2 02-03 10-11 23-24 06-07 19-20 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000

17 DUKUNGAN TEKNOLOGI BARU DAN MODERN 4 27-30 10-13 16-19 06-09 11-14 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.000

18 ELECTRICAL SAFETY 3 22-24 12-14 18-20 15-17 18-20 10-12 15-17 12-14 16-18 14-16 11-13 16-18 6.500.000

19 EMERGENCY PREPAREDNESS 3 06-08 17-19 16-18 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

20 ENVIRONMENTAL LEGISLATION (ANTICIPATING CONFLICS) 3 13-15 24-26 02-04 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

21 ENVIRONMENTAL MONITORING KEY TO POLUTION FREE 3 20-22 03-05 11-13 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.000

22 FIRE ALARMS & PROTECTION 4 07-10 11-14 10-13 13-16 12-15 09-12 13-16 11-14 14-17 13-16 10-13 14-17 8.500.000

23 FIT FOR DUTY 2 02-03 10-11 23-24 27-28 18-19 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.000

24 FOOD HYGIENE SANITATION AND MONITORING 2 02-03 03-04 23-24 13-14 19-20 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

25 GAS DISPERSION ANALYSIS 3 13-15 10-12 09-11 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.950.000

26 H2S AWARENESS 3 08-10 05-07 09-11 06-08 18-20 02-04 06-08 05-07 07-09 07-09 04-06 07-09 6.500.000

27 HANDLING OF DANGEROUS GOODS IN AIR TRANSPORT 3 06-08 17-19 09-11 27-29 18-20 15-17 27-29 18-20 28-30 19-21 16-18 28-30 6.500.000

28 HAZARD AND OPERABILITY STUDIES (HAZOPS) 3 29-31 17-19 02-04 22-24 18-20 15-17 22-24 19-21 23-25 19-21 16-18 21-23 6.500.000

29 HAZARD AND OPERABILITY STUDY ( HAZOPS ) 4 20-23 24-27 16-19 30-02 11-14 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.750.000

Page 17: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga30 HAZARD IDENTIFICATION 3 06-08 03-05 18-20 15-17 04-06 02-04 15-17 03-05 16-18 05-07 02-04 16-18 7.950.000

31 HAZARDOUS MATERIAL HANDLING 4 13-16 17-20 03-06 14-17 05-08 15-18 14-17 18-21 15-18 19-22 16-19 15-18 8.500.000

32 HAZARDOUS MATERIAL HANDLING 4 06-09 03-06 09-12 27-30 11-14 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

33 HAZARDOUS MATERIALS SAFE HANDLING 4 27-30 03-06 02-05 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.750.000

34 HAZID (HAZARD IDENTIFICATON) 4 13-16 10-13 16-19 30-02 05-08 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.000

35 HAZOPS(HAZARD AND OPERABILITY STUDIES) 4 20-23 17-20 03-06 06-09 12-15 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

36 HEALTH IMPACT ASSESSMENT (HIA) 4 06-09 24-27 09-12 27-30 11-14 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

37HEALTH, SAFETY & ENVIRONMENT (HSE) ASPECTS IN LOGISTICSACTIVITIES

4 06-09 10-13 10-13 13-16 12-15 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.750.000

38 HEARING CONSERVATION PROGRAM 2 02-03 12-13 23-24 20-21 18-19 10-11 20-21 12-13 21-22 14-15 11-12 21-22 4.500.000

39 Higiene Sanitasi Makanan Berbasis HACCP 2 02-03 26-27 23-24 01-02 18-19 24-25 01-02 26-27 02-03 28-29 25-26 02-03 4.500.000

40 HIRADC 3 15-17 19-21 02-04 28-30 18-20 17-19 28-30 19-21 28-30 21-23 18-20 29-31 6.750.000

41 Hot Works 3 15-17 19-21 18-20 20-22 18-20 17-19 20-22 19-21 21-23 21-23 18-20 21-23 6.750.000

42 HSE AUDIT TECHNIQUES 3 29-31 12-14 18-20 27-29 18-20 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.000

43 HSE LEADERSHIP 2 02-03 17-18 23-24 13-14 18-19 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000

44 HSE MANAGEMENT SYSTEM 4 21-24 25-28 03-06 27-30 05-08 23-26 27-30 25-28 29-02 27-30 24-27 28-31 8.750.000

45 HSE MANAGEMENT SYSTEM INTERNAL AUDITOR 4 06-09 10-13 02-05 13-16 11-14 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.000

46 HSE WORK PRACTICES AT CONFINED SPACE 3 29-31 05-07 09-11 01-03 18-20 02-04 01-03 05-07 02-04 07-09 04-06 02-04 6.750.000

47 HUMAN RELIABILITY ASSESSMENT & ANALYSIS 4 13-16 24-27 02-05 06-09 04-07 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.500.000

48IDENTIFIKASI BAHAYA, PENILAIAN, PENGENDALIAN RESIKO (HIRAC)DAN ANALISA BAHAYA DI PEKERJAAN (JSA)

5 20-24 24-28 09-13 13-17 04-08 22-26 13-17 24-28 14-18 26-30 23-27 14-18 9.750.000

49 INCIDENT INVESTIGATION 3 13-15 24-26 02-04 20-22 18-20 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.000

50INCIDENT INVESTIGATION, PREVENTION AND PROACTIVEIMPROVEMENT

3 13-15 03-05 16-18 30-01 18-20 02-04 29-01 03-05 02-04 05-07 02-04 30-02 6.500.000

51 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 3 20-22 03-05 16-18 13-15 18-20 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.950.000

52 INDUSTRIAL POLLUTION CONTROL 4 07-10 11-14 02-05 30-02 12-15 09-12 29-02 11-14 31-03 13-16 10-13 30-03 8.500.000

53 ISU PEMENUHAN KUALITAS DAN KEAMANAN PANGAN 4 06-09 17-20 02-05 13-16 04-07 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.000

54 JOB SAFETY ANALYSIS (JSA) 2 02-03 10-11 23-24 06-07 07-08 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000

55 JOB SAFETY ANALYSIS (JSA) ANALISA KESELAMATAN PEKERJAAN 3 08-10 12-14 16-18 06-08 18-20 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.750.000

56 JOB SAFETY ANALYSIS TRAINING 4 20-23 24-27 16-19 13-16 11-14 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.000

57 K3 RUMAH SAKIT 2 02-03 20-21 23-24 13-14 14-15 18-19 13-14 18-19 14-15 22-23 19-20 14-15 4.500.000

58 LINGKUNGAN KERJA YANG BERSIH DAN AMAN PADA INDUSTRI KIMIA 4 27-30 03-06 03-06 20-23 04-07 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

59 LOCKOUT TAGOUT (LOTO) 2 02-03 27-28 23-24 20-21 18-19 25-26 20-21 27-28 21-22 29-30 26-27 23-24 4.500.000

Page 18: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga60 MANAGING CONTRACTOR SAFETY 3 13-15 17-19 02-04 15-17 18-20 15-17 15-17 18-20 16-18 19-21 16-18 16-18 6.750.000

61 MANAGING SAFE WORK 4 20-23 04-07 03-06 27-30 04-07 02-05 27-30 04-07 29-02 06-09 03-06 28-31 8.500.000

62 MANAJEMEN LINGKUNGAN 4 06-09 03-06 09-12 27-30 11-14 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

63 MATERIAL SAFETY DATA SHEETS (MSDS) 2 02-03 12-13 23-24 02-03 11-12 10-11 02-03 12-13 31-01 14-15 11-12 03-04 4.500.000

64 MENGELOLA KESEHATAN DI TEMPAT KERJA 2 02-03 19-20 23-24 29-30 19-20 17-18 29-30 20-21 30-01 21-22 18-19 30-31 4.500.000

65 MODERN SAFETY AND LOSS CONTROL MANAGEMENT 4 20-23 24-27 10-13 21-24 11-14 22-25 21-24 24-27 22-25 26-29 23-26 21-24 8.750.000

66 MODERN SAFETY MANAGEMENT (MSM) 4 27-30 17-20 10-13 06-09 05-08 15-18 07-10 18-21 08-11 19-22 16-19 08-11 8.500.000

67OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENT (HSE)AUDITING

5 27-31 03-07 16-20 30-03 04-08 08-12 29-03 03-07 28-02 05-09 02-06 30-04 9.750.000

68Occupational Health, Safety and Environment (HSE) on Paper and PulpIndustry

4 06-09 10-13 03-06 27-30 12-15 02-05 27-30 10-13 31-03 12-15 09-12 28-31 8.750.000

69OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTAL IN THE OIL &GAS INDUSTRY

3 08-10 19-21 04-06 01-03 18-20 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.000

70 OHSAS 180012007 AUDITOR 5 06-10 24-28 16-20 13-17 11-15 22-26 13-17 24-28 14-18 26-30 23-27 14-18 9.750.000

71 OIL SPILL - OIL BOOM AND ENVIRONMENTAL MANAGEMENT 4 13-16 17-20 10-13 14-17 04-07 15-18 14-17 18-21 15-18 19-22 16-19 15-18 8.950.000

72ONSHORE DRILLING SAFETY OPERATIONS HSE ASPECTS IN ONSHOREDRILLING OPERATIONS

4 14-17 18-21 09-12 06-09 04-07 16-19 06-09 18-21 07-10 20-23 17-20 07-10 8.750.000

73ONSHORE DRILLING SAFETY OPERATIONS HSE ASPECTS IN ONSHOREDRILLING OPERATIONS FOR MANAGERS AND SUPERINTENDENTS

3 22-24 26-28 16-18 13-15 18-20 24-26 13-15 26-28 14-16 28-30 25-27 14-16 6.750.000

74 OVERVIEW OF PROCESS SAFETY MANAGEMENT 2 02-03 03-04 23-24 22-23 19-20 02-03 22-23 03-04 23-24 05-06 02-03 21-22 4.500.000

75 PANITIA PEMBINA KESELAMATAN DAN KESEHATAN KERJA (P2K3) 4 14-17 11-14 02-05 27-30 04-07 09-12 27-30 11-14 28-01 13-16 10-13 28-31 8.500.000

76 PEMENUHAN PERSYARATAN PERIZINAN 4 13-16 24-27 09-12 20-23 12-15 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.500.000

77PENCEGAHAN DAN PENANGGULANGAN KEBAKARAN (FIREPREVENTION & PROTECTION)

3 27-29 03-05 02-04 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.750.000

78 PENERAPAN BEHAVIOR BASED SAFETY 3 08-10 12-14 11-13 22-24 18-20 08-10 22-24 12-14 23-25 14-16 11-13 21-23 6.500.000

79 PENERAPAN HACCP 4 13-16 18-21 02-05 06-09 11-14 16-19 07-10 18-21 08-11 20-23 17-20 08-11 8.500.000

80Penerapan Hazard Analysis Critical Control Point (HACCP) padaPengelolaan Makanan

3 29-31 12-14 04-06 06-08 18-20 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

81 PENERAPAN PENGENDALIAN BISING TERPADU DI TEMPAT KERJA 3 22-24 19-21 09-11 30-01 18-20 17-19 29-01 18-20 02-04 21-23 18-20 30-02 6.500.000

82 PENGELOLAAN B3 DAN LIMBAH B3 4 13-16 18-21 16-19 27-30 05-08 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.500.000

83 PENGELOLAAN BAHAN KIMIA BERBAHAYA 3 29-31 24-26 16-18 06-08 11-13 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.500.000

84 Pengelolaan K3 di Pergudangan 4 14-17 17-20 09-12 31-03 04-07 15-18 30-03 18-21 01-04 19-22 16-19 30-03 8.500.000

85 PENGENDALIAN PENCEMARAN AIR 3 15-17 12-14 16-18 13-15 18-20 10-12 13-15 12-14 14-16 14-16 11-13 14-16 6.500.000

86 PENGENDALIAN PENCEMARAN UDARA 3 22-24 19-21 04-06 22-24 18-20 17-19 22-24 18-20 23-25 21-23 18-20 21-23 6.500.000

Page 19: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

87 PERLINDUNGAN LINGKUNGAN DAN PENGELOLAAN LIMBAH B3 4 06-09 04-07 03-06 13-16 05-08 02-05 13-16 04-07 14-17 06-09 03-06 14-17 8.500.000

88 PERMIT TO WORK (PTW) 2 02-03 10-11 23-24 23-24 18-19 08-09 23-24 10-11 24-25 12-13 09-10 23-24 4.500.000

89 POTENSI DAN PERKEMBANGAN INDUSTRI PANGAN 4 20-23 03-06 17-20 27-30 05-08 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

90 Process Hazard Analysis (PHA) 3 13-15 17-19 11-13 27-29 13-15 15-17 27-29 19-21 30-02 19-21 16-18 28-30 6.500.000

91 Process Hazard Analysis (PHA) for Facilitator 4 20-23 25-28 17-20 31-03 04-07 23-26 30-03 25-28 31-03 27-30 24-27 01-04 8.500.000

92 Process Safety Management 3 27-29 03-05 02-04 07-09 18-20 02-04 08-10 03-05 09-11 05-07 02-04 09-11 6.500.000

93 PROCESS SAFETY MANAGEMENT 4 21-24 25-28 10-13 30-02 12-15 23-26 29-02 25-28 31-03 27-30 24-27 30-03 8.750.000

94 PRODUCTION SAFETY SYSTEM 5 06-10 10-14 09-13 30-03 11-15 08-12 29-03 10-14 28-02 12-16 09-13 30-04 9.750.000

95 PRODUCTION SAFETY SYSTEM 4 21-24 18-21 09-12 31-03 12-15 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.500.000

96 PRODUCTION SYSTEM SAFETY 4 20-23 24-27 16-19 21-24 11-14 22-25 21-24 24-27 22-25 26-29 23-26 21-24 8.500.000

97 PROFESSIONAL ACCIDENT INCIDENT INVESTIGATION 3 13-15 17-19 18-20 27-29 18-20 15-17 27-29 18-20 02-04 19-21 16-18 28-30 6.750.000

98 PROJECT HSE MANAGEMENT 3 08-10 12-14 09-11 15-17 11-13 10-12 15-17 12-14 16-18 14-16 11-13 16-18 6.500.000

99RISK ASSESSMENT AND OPTIMAL RISK MANAGEMENT BASED ON ISO31000

2 02-03 20-21 23-24 20-21 18-19 18-19 20-21 18-19 21-22 22-23 19-20 21-22 4.500.000

100 SAFETY AUDITS AND SITE INSPECTION 3 15-17 24-26 16-18 28-30 06-08 22-24 28-30 24-26 28-30 26-28 23-25 29-31 6.500.000

101 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 27-30 24-27 16-19 06-09 04-07 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.500.000

102 SAFETY MANAGEMENT FOR SUPERVISORS AND MANAGERS 4 20-23 24-27 03-06 06-09 05-08 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.750.000

103 SAFETY OFFICER DEVELOPMENT PROGRAM 5 20-24 03-07 02-06 30-03 11-15 08-12 29-03 03-07 31-04 05-09 02-06 30-04 9.750.000

104 SAFETY TRAINING FOR THE LABORATORY 3 29-31 10-12 11-13 06-08 18-20 03-05 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

105 SELF CONTAINED BREATHING APPARATUS(SCBA) 1 02-02 17-17 23-23 13-13 04-04 15-15 13-13 20-20 14-14 19-19 16-16 14-14 2.950.000

106 Supervisor SMK3 Kontraktor 3 29-31 03-05 02-04 13-15 18-20 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.500.000

107 SURVEILANS KESEHATAN PEKERJA 2 02-03 17-18 23-24 30-31 19-20 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000

108 SYSTEM SAFETY ENGINEERING AND MANAGEMENT 4 27-30 10-13 16-19 20-23 05-08 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.500.000

109 THE FUNDAMENTAL OF INDUSTRIAL HYGIENE 5 06-10 24-28 16-20 20-24 11-15 22-26 20-24 24-28 21-25 26-30 23-27 30-04 9.750.000

110 TRANSPORTATION SAFETY MANAGEMENT SYSTEM 4 28-31 04-07 09-12 14-17 11-14 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.750.000

111 WAREHOUSE SAFETY MANAGEMENT 4 06-09 10-13 16-19 21-24 04-07 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.750.000

112 WASTE HANDLING & TREATMENT IN THE OIL & GAS INDUSTRIES 3 15-17 26-28 09-11 07-09 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.000

113 WASTE WATER TREATMENT & MANAGEMENT 4 20-23 17-20 17-20 27-30 12-15 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.500.000

114 Water Treating and Chemicals 4 28-31 25-28 02-05 30-02 04-07 23-26 29-02 25-28 31-03 27-30 24-27 30-03 8.500.000

115 WATER TREATMENT 4 27-30 03-06 03-06 27-30 05-08 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.950.000

116 Water Treatment 4 28-31 04-07 09-12 06-09 04-07 02-05 06-09 04-07 07-10 06-09 03-06 07-10 8.500.000

117 WELDING SAFETY 2 02-03 03-04 23-24 27-28 18-19 02-03 27-28 03-04 01-02 05-06 02-03 23-24 4.500.000

Page 20: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga118 WORKING AT HEIGHT 2 02-03 13-14 23-24 30-31 05-06 08-09 29-30 13-14 31-01 15-16 12-13 28-29 4.500.000

Information Technology (IT)1 ADVANCE EXPERT MS EXCEL 2019 3 13-15 24-26 02-04 28-30 06-08 22-24 28-30 24-26 30-02 26-28 23-25 29-31 6.500.000

2 ADVANCE MICROSOFT EXCEL 3 27-29 10-12 02-04 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

3 ADVANCE MICROSOFT POWERPOINT 3 08-10 19-21 09-11 27-29 13-15 17-19 27-29 19-21 28-30 21-23 18-20 28-30 6.500.000

4 ADVANCE MICROSOFT WORD 3 15-17 26-28 16-18 30-01 18-20 24-26 29-01 26-28 31-02 28-30 25-27 30-02 6.500.000

5 ADVANCE MS EXCEL 2019 3 20-22 03-05 09-11 01-03 13-15 02-04 01-03 03-05 02-04 05-07 02-04 02-04 6.500.000

6 ADVANCED EXCEL 4 27-30 17-20 09-12 27-30 04-07 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.500.000

7 AUTOCAD COSTUMIZATION 4 13-16 17-20 03-06 20-23 05-08 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000

8 BASIC AUTOCAD 2D (2D TECHNICAL DRAWING WITH AUTOCAD) 5 13-17 24-28 02-06 20-24 11-15 22-26 20-24 24-28 21-25 26-30 23-27 30-04 9.750.000

9 BASIC AUTOCAD 3D (3D TECHNICAL DRAWING WITH AUTOCAD) 2 02-03 03-04 23-24 27-28 18-19 02-03 27-28 03-04 28-29 05-06 02-03 21-22 4.500.000

10 BASIC TELECOMMUNICATION PABX 3 27-29 03-05 02-04 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

11 BASIC VSAT SYSTEM 3 06-08 10-12 09-11 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

12 BIG DATA 4 20-23 10-13 10-13 13-16 11-14 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.000

13 BIG DATA FOR EXECUTIVE 3 06-08 24-26 16-18 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

14 BIG DATA FOR TECHNICAL MANAGER & DECISION MAKERS 3 13-15 03-05 02-04 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

15CAD BIDANG TEKNIK MESIN (CAD FOR MECHANICAL AUTOCAD ORCATIA)

4 14-17 18-21 17-20 20-23 04-07 16-19 20-23 18-21 21-24 20-23 17-20 21-24 8.500.000

16 COLLABORATION MS Office AND EFFECTIVE PRESENTATION 3 29-31 12-14 02-04 20-22 06-08 10-12 20-22 12-14 21-23 14-16 11-13 21-23 6.500.000

17 DATA ANALYSIS AND DASHBOARD REPORTING IN EXCEL 4 28-31 18-21 17-20 20-23 05-08 16-19 20-23 18-21 21-24 20-23 17-20 21-24 8.500.000

18DATA MANAGEMENT AND MANIPULATION USING IBM SPSSSTATISTICS

4 07-10 25-28 03-06 27-30 12-15 23-26 27-30 25-28 29-02 27-30 24-27 28-31 8.500.000

19 FIBER OPTIC SYSTEM 3 20-22 24-26 04-06 27-29 18-20 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.000

20 FINANCIAL MODELLING IN EXCEL 4 14-17 04-07 09-12 31-03 04-07 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.500.000

21 Fraud Management in telecommunication business 3 29-31 05-07 11-13 30-01 18-20 03-05 29-01 05-07 31-02 07-09 04-06 30-02 6.500.000

22 FUNDAMENTAL OF RADIO COMMUNICATIONS 3 08-10 12-14 09-11 27-29 13-15 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.000

23 Holistic Information Security 3 20-22 24-26 09-11 13-15 04-06 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

24 Information Security System 3 27-29 03-05 16-18 20-22 11-13 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.000

25 INFORMATION TECHNOLOGY & TELECOMUNICATION 4 14-17 18-21 09-12 06-09 05-08 16-19 06-09 18-21 07-10 20-23 17-20 07-10 8.500.000

26INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY (I T I L)VERSION 3.1

4 13-16 18-21 09-12 20-23 12-15 16-19 20-23 18-21 21-24 20-23 17-20 21-24 8.500.000

27 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 06-09 03-06 09-12 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

Page 21: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga28 INTERNETWORKING DENGAN TCP IP 3 08-10 12-14 18-20 07-09 18-20 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

29 INTRODUCTION TO DATA ANALYSIS USING EXCEL 4 21-24 11-14 16-19 06-09 11-14 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.500.000

30 INTRODUCTION TO IBM SPSS STATISTICS 4 27-30 17-20 02-05 14-17 05-08 15-18 14-17 18-21 15-18 19-22 16-19 15-18 8.500.000

31 IPTV - TEKNOLOGI, PELUANG BISNIS DAN REGULASI 3 15-17 19-21 02-04 15-17 18-20 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

32 IT AUDIT PRACTICES 3 22-24 19-21 04-06 20-22 18-20 17-19 20-22 18-20 21-23 21-23 18-20 21-23 6.500.000

33 IT HELPDESK 3 29-31 26-28 11-13 27-29 13-15 24-26 27-29 26-28 30-02 28-30 25-27 28-30 6.500.000

34 ITIL FOUNDATION 3 06-08 24-26 11-13 22-24 18-20 22-24 22-24 24-26 23-25 26-28 23-25 21-23 6.500.000

35 MANAJEMEN KABEL PADA JARINGAN TELEKOMUNIKASI 4 13-16 17-20 10-13 06-09 11-14 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.750.000

36 MASTERING MICROSOFT EXCEL 2007 2 02-03 17-18 23-24 16-17 19-20 15-16 16-17 18-19 17-18 19-20 16-17 17-18 4.500.000

37 MICROSOFT EXCEL VISUAL BASIC For Application (VBA-MACRO) 3 22-24 05-07 04-06 07-09 04-06 03-05 08-10 05-07 09-11 07-09 04-06 09-11 6.500.000

38 MIKROTIK FUNDAMENTAL 3 29-31 05-07 02-04 20-22 04-06 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.000

39 MS OFFICE 2019 3 29-31 12-14 16-18 06-08 18-20 10-12 06-08 12-14 07-09 14-16 11-13 07-09 6.500.000

40 MS VISIO 2019 3 06-08 17-19 18-20 22-24 18-20 15-17 22-24 18-20 23-25 19-21 16-18 22-24 6.500.000

41 NETWORK MANAGEMENT AND OPERATIONS SUPPORT SYSTEM 3 22-24 26-28 09-11 22-24 18-20 24-26 22-24 26-28 23-25 28-30 25-27 22-24 6.500.000

42 OPTIMALISASI CYBER PUBLIC RELATION 3 06-08 10-12 02-04 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

43 PENGEMBANGAN KONTEN SITUS WEB PERUSAHAAN 3 13-15 17-19 11-13 30-01 06-08 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

44 PENGEMBANGAN SITUS WEB 3 20-22 03-05 02-04 27-29 18-20 02-04 27-29 03-05 28-30 05-07 02-04 28-30 6.500.000

45 POWER LINE CARRIER 3 27-29 03-05 16-18 28-30 18-20 02-04 28-30 03-05 30-02 05-07 02-04 29-31 6.500.000

46PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING STAFF(USING MICROSOFT POWER POINT)

2 02-03 13-14 23-24 29-30 04-05 11-12 29-30 13-14 28-29 15-16 12-13 30-31 4.500.000

47 PROBLEM MANAGEMENT FOR IT SERVICES 2 02-03 03-04 23-24 27-28 18-19 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000

48 RADIO VHF COMMUNICATION 3 15-17 19-21 16-18 30-01 18-20 17-19 29-01 18-20 31-02 21-23 18-20 30-02 6.500.000

49 TEKNIK DESAIN GRAFIS PADA WEB 3 22-24 26-28 18-20 06-08 13-15 24-26 06-08 26-28 07-09 28-30 25-27 07-09 6.500.000

50 TEKNIK DESAIN WEB 3 29-31 05-07 04-06 15-17 18-20 03-05 15-17 05-07 16-18 07-09 04-06 16-18 6.500.000

51 Teknologi CAD CAM 4 27-30 03-06 17-20 14-17 05-08 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.500.000

52 Teknologi dan Bisnis di WiMAX dan Sub WiMAX 3 06-08 10-12 04-06 01-03 18-20 08-10 01-03 10-12 02-04 12-14 09-11 02-04 6.500.000

53 VOICE OVER IP 2 02-03 27-28 23-24 06-07 07-08 25-26 09-10 27-28 10-11 29-30 26-27 10-11 4.500.000

Leadership/Kepemimpinan1 ACHIEVEMENT MOTIVATION 2 02-03 03-04 23-24 13-14 11-12 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

2 ACHIEVEMENT MOTIVATION 3 20-22 24-26 09-11 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

Page 22: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga3 ACHIEVEMENT MOTIVATION TRAINING 2 02-03 10-11 23-24 27-28 18-19 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.000

4 Advance Negotiation Skill 3 20-22 10-12 02-04 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.500.000

5 ASSERTIVE TRAINING 3 06-08 03-05 16-18 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

6 BASIC LEADERSHIP 3 27-29 12-14 11-13 27-29 04-06 08-10 27-29 12-14 28-30 14-16 11-13 28-30 6.500.000

7 BASIC LEADERSHIP 3 22-24 26-28 04-06 27-29 18-20 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.000

8 BASIC RELATIONSHIP MANAGEMENT FOR LEADERS 3 06-08 24-26 16-18 30-01 13-15 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

9 BOOST YOUR CREATIVITY IN THINKING MIND MAP 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000

10 BRAIN POWER 3 20-22 17-19 11-13 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

11 BREATHING ARTS FOR CREATIVE THINKING 3 27-29 24-26 09-11 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

12 Change & conflict management and dealing with difficult people 2 02-03 03-04 23-24 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

13CHANGE & CONFLICT MANAGEMENT AND DEALING WITH DIFFICULTPEOPLE

2 02-03 17-18 23-24 06-07 18-19 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.000

14 CHANGE YOUR MINDSET 4 13-16 04-07 03-06 06-09 05-08 02-05 06-09 04-07 07-10 06-09 03-06 07-10 8.500.000

15 COACHING & CONSELING DI PERUSAHAAN 3 15-17 12-14 09-11 07-09 04-06 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

16 COACHING AND COUNSELING ( MONITORING) 3 06-08 10-12 02-04 27-29 11-13 02-04 27-29 10-12 28-30 12-14 09-11 21-23 6.500.000

17 Communication SKILL 2 02-03 13-14 23-24 06-07 07-08 11-12 06-07 13-14 07-08 15-16 12-13 07-08 4.500.000

18 COMMUNICATION, ASSERTIVENESS AND CONFLICT MANAGEMENT 2 02-03 13-14 23-24 15-16 18-19 11-12 15-16 13-14 16-17 15-16 12-13 16-17 4.500.000

19 COMPREHENSIVE MANAGERIAL SKILLS & LEADERSHIP TRAINING 3 22-24 19-21 11-13 22-24 11-13 17-19 22-24 19-21 23-25 21-23 18-20 22-24 6.500.000

20 CONTEMPORARY COMMUNICATION & LEADERSHIP 3 06-08 03-05 16-18 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

21 CONTEMPORARY LEADERSHIP 3 13-15 10-12 02-04 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

22 Creative Problem Solving 4 21-24 11-14 10-13 27-30 11-14 09-12 27-30 11-14 29-02 13-16 10-13 28-31 8.500.000

23DECISION MAKING BY USING STRATEGIC THINKING (PENDEKATANSISTEMIK DAN NEW 7 TOOLS APPROACH)

2 02-03 24-25 23-24 30-31 11-12 22-23 29-30 24-25 31-01 26-27 23-24 28-29 4.500.000

24 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 2 02-03 12-13 23-24 29-30 19-20 10-11 29-30 12-13 30-01 14-15 11-12 30-31 4.500.000

25 Dynamic Interpersonal & Comunication Skills 2 20-21 26-27 23-24 20-21 19-20 24-25 20-21 26-27 21-22 28-29 25-26 21-22 4.500.000

26 EFFECTIVE COMMUNICATION SKILL 3 27-29 03-05 04-06 15-17 13-15 03-05 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

27 EFFECTIVE PRESENTATION & NEGOTIATION SKILLS 2 27-28 05-06 05-06 29-30 04-05 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.000

28 EFFECTIVE STRATEGY TO CONTROL STRESS 3 29-31 26-28 18-20 27-29 18-20 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.000

29 EMOTIONAL INTELLIGENCE FOR MENTAL ATTITUDE 3 29-31 10-12 18-20 06-08 13-15 08-10 08-10 10-12 09-11 12-14 09-11 09-11 6.500.000

30 EMOTIONAL QUETIENTS 3 15-17 19-21 18-20 28-30 06-08 17-19 28-30 19-21 30-02 21-23 18-20 29-31 6.500.000

31 ESQ FOR PEAK PERFORMANCE 3 15-17 12-14 09-11 07-09 18-20 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

32 FINDING YOUR ESSENTIAL SELF 3 15-17 24-26 09-11 20-22 06-08 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.000

Page 23: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga33 GOOD CORPORATE GOVERNANCE 3 20-22 24-26 02-04 01-03 11-13 22-24 01-03 24-26 02-04 26-28 23-25 30-02 6.500.000

34 GOOD CORPORATE GOVERNANCE 3 27-29 26-28 04-06 15-17 18-20 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000

35 HSE LEADERSHIP 2 02-03 17-18 23-24 13-14 18-19 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000

36 HUMAN PERFORMANCE AND LIMITATION 3 22-24 19-21 16-18 15-17 18-20 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

37 HUMAN QUOTIENS (IQ, EQ, AQ, SQ) 3 27-29 24-26 02-04 22-24 18-20 22-24 22-24 24-26 23-25 26-28 23-25 22-24 6.500.000

38 INTERPERSONAL COMMUNICATION SKILL 2 02-03 27-28 23-24 13-14 13-14 25-26 13-14 27-28 14-15 29-30 26-27 14-15 4.500.000

39 KEMADYAAN 5 13-17 17-21 02-06 20-24 11-15 15-19 20-24 24-28 21-25 19-23 16-20 30-04 9.750.000

40 KEPEMIMPINAN (LEADERSHIP HIGH LEVEL MANAGER) 5 13-17 10-14 16-20 30-03 11-15 08-12 29-03 10-14 31-04 12-16 09-13 30-04 9.750.000

41 KEPEMIMPINAN (LEADERSHIP LOWER LEVEL MANAGER) 3 20-22 17-19 04-06 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

42 KEPEMIMPINAN (LEADERSHIP MIDDLE LEVEL MANAGER) 4 28-31 25-28 09-12 13-16 04-07 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.000

43 LEADERSHIP AND EFFECTIVE SUPERVISORY 3 13-15 10-12 04-06 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

44 LEADERSHIP FOR MANAGER 4 13-16 18-21 09-12 20-23 12-15 16-19 20-23 18-21 21-24 20-23 17-20 21-24 8.500.000

45 Leadership Skill How Become a More Effective Leader 3 22-24 12-14 02-04 13-15 11-13 10-12 13-15 12-14 14-16 14-16 11-13 14-16 6.500.000

46 Maintenance Strategic Planning 4 07-10 04-07 16-19 31-03 05-08 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.500.000

47 MANAJEMEN PERUBAHAN (CHANGE MANAGEMENT) 3 13-15 10-12 02-04 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

48 MANAJEMEN STRATEGI 3 20-22 12-14 02-04 06-08 18-20 10-12 06-08 12-14 07-09 14-16 11-13 07-09 6.500.000

49 MANAJEMEN STRATEGI 3 06-08 03-05 04-06 15-17 18-20 02-04 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

50 MENGGALI POTENSI DIRI UNTUK MENCAPAI PRIBADI YANG UNGGUL 2 02-03 10-11 23-24 30-31 18-19 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.000

51 Menjadi pribadi yang asertif 3 29-31 19-21 09-11 20-22 18-20 17-19 20-22 18-20 21-23 21-23 18-20 21-23 6.500.000

52 Menjadi pribadi yang berpengaruh 3 08-10 26-28 18-20 27-29 06-08 24-26 27-29 26-28 30-02 28-30 25-27 28-30 6.500.000

53NEGOTIATION IMPROVE YOUR NEGOTIATING SKILLS AND MAKE YOUMORE EFFECTIVE NEGOTIATOR

2 02-03 03-04 23-24 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

54PENINGKATAN MOTIVASI BERPRESTASI(ACHIEVEMENTMOTIVATION TRAINING)

3 20-22 05-07 16-18 06-08 06-08 03-05 06-08 05-07 07-09 07-09 04-06 07-09 6.500.000

55 PEOPLE SKILL 3 29-31 10-12 02-04 13-15 13-15 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

56 PERFORMANCE COACHING FOR MANAGER 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000

57 PERFORMANCE, BEHAVIOR AND STRESS MANAGEMENT 3 08-10 12-14 16-18 27-29 18-20 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.000

58PERSONALITY DEVELOPMENT BERBASIS EMOTIONAL AND SPRITUALQUETIENTS

4 20-23 03-06 09-12 30-02 04-07 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.000

59 PRIBADI EFEKTIF 2 02-03 20-21 23-24 20-21 19-20 18-19 20-21 20-21 21-22 22-23 19-20 21-22 4.500.000

60 PROBLEM SOLVING & DECISION MAKING 3 06-08 17-19 04-06 06-08 04-06 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

61 PROBLEM SOLVING & DECISION MAKING 3 27-29 03-05 18-20 28-30 18-20 02-04 28-30 03-05 28-30 05-07 02-04 29-31 6.500.000

62 PROBLEM SOLVING AND DECISION MAKING 4 07-10 03-06 10-13 31-03 11-14 02-05 30-03 03-06 01-04 05-08 02-05 01-04 8.500.000

Page 24: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga63 SELF-EFFECTIVENESS & DEVELOPMENT 2 02-03 03-04 23-24 06-07 13-14 04-05 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

64 SENSITIVITY TRAINING (TURNING POINT ATAU NEW BORN) 3 08-10 03-05 11-13 30-01 11-13 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

65 SPEED AND INNOVATION 3 13-15 12-14 18-20 07-09 18-20 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

66 Strategic and Systematic Thinking 2 02-03 06-07 23-24 29-30 18-19 02-03 29-30 06-07 28-29 08-09 05-06 30-31 4.500.000

67 STRATEGIC MANAGEMENT 3 20-22 26-28 02-04 20-22 18-20 24-26 20-22 26-28 21-23 28-30 25-27 21-23 6.500.000

68 STRESS & CONFLICT MANAGEMENT 3 22-24 17-19 04-06 15-17 06-08 15-17 15-17 18-20 16-18 19-21 16-18 16-18 6.500.000

69 Stress Management Strategies 3 22-24 12-14 18-20 30-01 06-08 10-12 29-01 12-14 31-02 14-16 11-13 30-02 6.500.000

70 SUPERVISORY LEADERSHIP AND DECISSION MAKING 3 20-22 10-12 11-13 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

71 TEAM DEVELOPMENT 3 27-29 26-28 09-11 22-24 13-15 24-26 22-24 26-28 23-25 28-30 25-27 22-24 6.500.000

72 TEKNIK NEGOSIASI 3 06-08 05-07 16-18 28-30 18-20 03-05 28-30 05-07 30-02 07-09 04-06 29-31 6.500.000

73 THE LEADERSHIP CHALLENGE 2 02-03 13-14 23-24 30-31 07-08 11-12 29-30 13-14 31-01 15-16 12-13 30-01 4.500.000

74 TRANSFORMATION LEADERSHIP 3 22-24 05-07 16-18 20-22 18-20 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.000

Maintenance/Perawatan1 ADVANCED MAINTENANCE MANAGEMENT 4 27-30 03-06 09-12 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

2 ADVANCED MAINTENANCE MANAGEMENT 4 13-16 17-20 09-12 27-30 04-07 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.500.000

3 COMPETITIVE MAINTENANCE & SPARE PARTS MANAGEMENT 4 20-23 17-20 16-19 27-30 11-14 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.500.000

4 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 07-10 11-14 16-19 06-09 12-15 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.500.000

5CULTURE CHANGE FOR MAINTENANCE AND RELIABILITYIMPROVEMENT

3 06-08 10-12 09-11 06-08 04-06 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.750.000

6 Effective and Efficient of Maintenance Management 3 22-24 19-21 16-18 15-17 13-15 17-19 15-17 18-20 16-18 21-23 18-20 16-18 6.500.000

7EFFECTIVENESS DESIGN OF MAINTENANCE ORGANIZATION ANDADMINISTRATION

3 08-10 05-07 04-06 01-03 18-20 03-05 01-03 05-07 02-04 07-09 04-06 02-04 6.500.000

8 FAULT FINDING SKILLS TECHNICAL TROUBLESHOOTING 3 29-31 26-28 09-11 22-24 18-20 24-26 22-24 26-28 23-25 28-30 25-27 22-24 6.500.000

9 Integrated Maintenance Management 4 13-16 11-14 09-12 06-09 05-08 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.500.000

10MACHINERY CONDITION MONITORING FOR PREDICTIVE ANDPREVENTIVE MAINTENANCE

4 06-09 10-13 10-13 27-30 12-15 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

11 MAINTENANCE AND SPARE PART MANAGEMENT 4 20-23 03-06 09-12 13-16 11-14 02-05 13-16 03-06 14-17 05-08 02-05 14-17 8.500.000

12 MAINTENANCE CONTROL AND MONITORING 3 06-08 03-05 11-13 28-30 18-20 02-04 28-30 03-05 30-02 05-07 02-04 29-31 6.500.000

13 MAINTENANCE MANAGEMENT 3 13-15 10-12 18-20 22-24 18-20 08-10 22-24 10-12 23-25 12-14 09-11 22-24 6.500.000

14 MAINTENANCE MANAGEMENT 4 13-16 17-20 09-12 20-23 04-07 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000

15 MAINTENANCE MANAGEMENT SYSTEM FOR SUPERVISOR 4 13-16 17-20 09-12 13-16 04-07 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.000

16 MAINTENANCE OF MACHINE COMPONENTS 4 20-23 24-27 16-19 27-30 11-14 22-25 27-30 24-27 29-02 26-29 23-26 28-31 8.500.000

Page 25: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga17 MAINTENANCE OF MACHINE TOOLS 4 20-23 03-06 09-12 20-23 11-14 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

18 MAINTENANCE PLANNING AND SCHEDULING 3 20-22 24-26 02-04 20-22 18-20 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.750.000

19 MAINTENANCE PLANNING SCHEDULING AND COORDINATING 4 13-16 17-20 17-20 31-03 05-08 15-18 30-03 18-21 01-04 19-22 16-19 01-04 8.500.000

20 Maintenance Strategic Planning 4 07-10 04-07 16-19 31-03 05-08 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.500.000

21 MAINTENANCE SYSTEM AND COST 4 27-30 03-06 02-05 31-03 05-08 02-05 30-03 03-06 01-04 05-08 02-05 01-04 8.500.000

22 MAINTENANCE SYSTEM AND DOCUMENTATION 4 14-17 11-14 02-05 06-09 11-14 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.500.000

23 MANAGING MAINTENANCE RESOURCES 4 20-23 17-20 09-12 14-17 04-07 15-18 14-17 18-21 15-18 19-22 16-19 15-18 8.500.000

24 MODERN MAINTENANCE MANAGEMENT 4 13-16 17-20 02-05 06-09 04-07 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

25PERENCANAAN DAN PENJADWALAN PERAWATAN (MAINTENANCEPLANNING AND SCHEDULING)

4 20-23 24-27 03-06 30-02 11-14 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.500.000

26 PREDICTIVE MAINTENANCE 4 14-17 18-21 02-05 20-23 04-07 16-19 20-23 18-21 21-24 20-23 17-20 21-24 8.500.000

27 PREVENTIVE & PREDICTIVE MAINTENANCE (PPM) 4 27-30 03-06 10-13 27-30 05-08 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.750.000

28 PREVENTIVE MAINTENANCE 4 21-24 11-14 16-19 06-09 04-07 09-12 06-09 11-14 07-10 13-16 10-13 07-10 8.500.000

29PREVENTIVE MAINTENANCE (SCHEDULE & PREDICTIVEMAINTENANCE)

4 07-10 25-28 03-06 06-09 11-14 23-26 07-10 25-28 08-11 27-30 24-27 08-11 8.500.000

30 PREVENTIVE MAINTENANCE GENERATOR 4 28-31 18-21 02-05 13-16 12-15 16-19 13-16 18-21 14-17 20-23 17-20 14-17 8.500.000

31 Production Optimization and Minimize Down Time 3 06-08 03-05 04-06 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.000

32 RELIABILITY CENTERED MAINTENANCE 3 08-10 12-14 18-20 30-01 13-15 10-12 29-01 12-14 31-02 14-16 11-13 30-02 6.750.000

33 RELIABILITY CENTERED MAINTENANCE & RISK BASED INSPECTION 5 06-10 10-14 02-06 30-03 11-15 08-12 29-03 10-14 31-04 12-16 09-13 30-04 9.750.000

34 RELIABILITY CENTERED MAINTENANCE (RCM) 3 22-24 19-21 16-18 30-01 18-20 17-19 29-01 19-21 31-02 21-23 18-20 30-02 6.500.000

35 RELIABILITY CENTERED MAINTENANCE (RCM) 4 07-10 11-14 16-19 27-30 12-15 09-12 27-30 11-14 29-02 13-16 10-13 28-31 8.500.000

36RELIABILITY CENTERED MAINTENANCE (RCM) Increasing Safety &Reliability in Gas Pipeline System

3 29-31 26-28 02-04 07-09 18-20 24-26 06-08 26-28 07-09 28-30 25-27 07-09 6.500.000

37 RELIABILITY ENGINEERING (TEKNIK KEANDALAN) 2 02-03 17-18 19-20 30-31 07-08 15-16 29-30 20-21 31-01 19-20 16-17 30-01 4.500.000

38 RELIABILITY, AVAILABILITY & MAINTAINABILITY ANALYSIS 3 29-31 26-28 09-11 01-03 06-08 24-26 01-03 26-28 02-04 28-30 25-27 29-31 6.950.000

39 ROOT CAUSE ANALYSIS 4 13-16 18-21 10-13 06-09 05-08 16-19 06-09 18-21 07-10 20-23 17-20 07-10 8.500.000

40 Spare Part Management 4 21-24 25-28 16-19 13-16 11-14 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.000

41 SPARE PARTS MAINTENANCE MANAGEMENT 3 20-22 17-19 04-06 28-30 18-20 15-17 28-30 18-20 30-02 19-21 16-18 29-31 6.500.000

42TEKNIK PEMELIHARAAN KENDARAAN (PREVENTIVE MAINTENANCEUNTUK KENDARAAN)

4 27-30 17-20 02-05 27-30 04-07 15-18 27-30 18-21 29-02 19-22 16-19 28-31 8.500.000

43 TEKNIK PERAWATAN MEKANIK 4 06-09 24-27 10-13 31-03 11-14 22-25 30-03 24-27 01-04 26-29 23-26 01-04 8.500.000

44 TEKNOLOGI PERAWATAN MESIN 4 06-09 10-13 03-06 21-24 12-15 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.500.000

45 THE ECONOMICS OF MAINTENANCE MANAGEMENT 3 27-29 03-05 18-20 15-17 18-20 02-04 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

46 Total Productive Maintenance (TPM) 4 07-10 25-28 02-05 27-30 12-15 23-26 27-30 25-28 28-01 27-30 24-27 28-31 8.500.000

Page 26: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga47 Total Productive Maintenance (TPM) 4 21-24 25-28 16-19 30-02 11-14 23-26 29-02 25-28 31-03 27-30 24-27 30-03 8.500.000

Manajemen1 ACCOUNT OfficeR 3 27-29 24-26 09-11 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

2 ACCOUNT PAYABLE MANAGEMENT 2 02-03 20-21 19-20 27-28 18-19 18-19 27-28 18-19 02-03 22-23 19-20 28-29 4.500.000

3 ACCOUNT RECEIVABLE MANAGEMENT 2 02-03 10-11 23-24 27-28 04-05 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.000

4 Accounting Information Systems 3 13-15 17-19 02-04 30-01 11-13 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

5 ACTIVITY BASED MANAGEMENT 2 02-03 24-25 23-24 27-28 11-12 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

6 ADMINISTRASI KEPABEANAN 4 13-16 17-20 16-19 13-16 04-07 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.000

7 ADVANCE SECURITY MANAGEMENT 4 06-09 17-20 09-12 06-09 04-07 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

8 ADVANCED LAND TRANSPORT 3 13-15 24-26 16-18 22-24 18-20 22-24 22-24 24-26 23-25 26-28 23-25 21-23 6.500.000

9 Akuntansi Perpajakan pada Badan Usaha Milik Negara (BUMN) 3 06-08 17-19 16-18 27-29 18-20 15-17 27-29 18-20 28-30 19-21 16-18 28-30 6.500.000

10 ANALISA KEBUTUHAN BARANG PERSEDIAAN 3 22-24 03-05 18-20 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

11 ANALISA KEUANGAN 2 02-03 17-18 23-24 20-21 18-19 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

12 ANALISA KREDIT MODAL KERJA KONTRAKTOR DAN STANDBY KREDIT 2 02-03 24-25 23-24 27-28 19-20 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

13 ANALISA PERKREDITAN 4 06-09 03-06 02-05 30-02 11-14 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.000

14 Analisa Scoring Rating System 2 02-03 17-18 23-24 30-31 18-19 15-16 29-30 20-21 31-01 19-20 16-17 30-01 4.500.000

15 ANALISIS BEBAN KERJA 2 02-03 10-11 23-24 13-14 18-19 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000

16 ANALISIS KEEKONOMISAN PROYEK 3 20-22 10-12 16-18 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.500.000

17 ANALISIS KEPUTUSAN 2 15-16 13-14 11-12 15-16 11-12 11-12 15-16 13-14 16-17 15-16 12-13 16-17 4.500.000

18 ANALITYCAL HIERARCHY PROCESS 2 02-03 17-18 23-24 20-21 04-05 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

19 ANTI MONOPOLI 3 06-08 24-26 16-18 27-29 18-20 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.000

20 APPLIED FINANCE 3 08-10 05-07 09-11 01-03 04-06 02-04 01-03 05-07 31-02 07-09 04-06 02-04 6.500.000

21 ASPEK HUKUM DAN PENYELESAIAN KONFLIK PERTANAHAN 3 27-29 17-19 09-11 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

22 Asset Management 3 20-22 24-26 09-11 06-08 18-20 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.500.000

23 ASSET MANAGEMENT 3 06-08 17-19 09-11 13-15 18-20 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.000

24 ASSET MANAGEMENT BERBASIS ICT 3 13-15 24-26 16-18 20-22 18-20 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.000

25 ASSET SECURITY MANAGEMENT 3 15-17 24-26 18-20 07-09 18-20 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.000

26 Audit Perkreditan Bank 3 08-10 03-05 11-13 22-24 18-20 03-05 22-24 03-05 23-25 05-07 02-04 21-23 6.500.000

27 AUDITING SDM 3 13-15 10-12 02-04 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

28 BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI 5 27-31 03-07 16-20 20-24 04-08 08-12 20-24 03-07 21-25 05-09 02-06 30-04 9.750.000

Page 27: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

29 BALANCED SCORECARD (BSC) CONCEPT AND IMPLEMENTATION 2 02-03 03-04 23-24 13-14 06-07 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

30 BASIC AUDIT FINANCE 3 06-08 19-21 04-06 28-30 18-20 17-19 28-30 19-21 30-02 21-23 18-20 29-31 6.500.000

31 BASIC ACCOUNTING 3 27-29 12-14 16-18 20-22 13-15 10-12 20-22 12-14 21-23 14-16 11-13 21-23 6.500.000

32 BASIC ACCOUNTING 4 13-16 10-13 09-12 06-09 04-07 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.000

33 BASIC KNOWLEDGE ABOUT FINANCIAL MANAGEMENT 3 15-17 26-28 11-13 01-03 06-08 24-26 01-03 26-28 02-04 28-30 25-27 02-04 6.500.000

34 BASIC LEADERSHIP 3 27-29 12-14 11-13 27-29 04-06 08-10 27-29 12-14 28-30 14-16 11-13 28-30 6.500.000

35 BASIC LEADERSHIP 3 22-24 26-28 04-06 27-29 18-20 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.000

36 BASIC OF SUPPLY CHAIN MANAGEMENT 2 02-03 17-18 23-24 27-28 04-05 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.000

37 BASIC RELATIONSHIP MANAGEMENT FOR LEADERS 3 06-08 24-26 16-18 30-01 13-15 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

38 Basic Understanding of Tax 2 02-03 19-20 23-24 29-30 18-19 17-18 29-30 20-21 01-02 21-22 18-19 30-31 4.500.000

39 BERITA ACARA PEMERIKSAAN 3 06-08 24-26 11-13 15-17 18-20 22-24 15-17 24-26 16-18 26-28 23-25 16-18 6.500.000

40 BIG DATA 4 20-23 10-13 10-13 13-16 11-14 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.000

41 BIG DATA FOR EXECUTIVE 3 06-08 24-26 16-18 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

42 BIG DATA FOR TECHNICAL MANAGER & DECISION MAKERS 3 13-15 03-05 02-04 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

43 BUDGET PLANNING, CONTROLLING & ANALYSING 3 22-24 05-07 18-20 07-09 11-13 03-05 08-10 05-07 09-11 07-09 04-06 09-11 6.500.000

44 BUDGETING AND PROJECT COST CONTROL 3 29-31 10-12 02-04 15-17 18-20 08-10 15-17 10-12 16-18 12-14 09-11 16-18 6.500.000

45 BUDGETING AND REPORTING 3 08-10 17-19 09-11 22-24 04-06 15-17 22-24 18-20 23-25 19-21 16-18 22-24 6.500.000

46 BUDGETING FOR OPERATING EXPENDITURE 3 29-31 26-28 02-04 27-29 18-20 24-26 27-29 26-28 30-02 28-30 25-27 28-30 6.500.000

47 BUILDING A TEAM 2 02-03 03-04 23-24 27-28 18-19 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000

48 BUSINESS STRATEGY FOR MANAGERS 3 29-31 26-28 18-20 27-29 11-13 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.000

49 BUSINESS PROCESS REENGINEERING 2 02-03 17-18 23-24 20-21 19-20 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

50 CAREER MANAGEMENT 3 13-15 10-12 09-11 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

51 CAREER PLANNING SYSTEM 2 02-03 10-11 23-24 30-31 19-20 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.000

52 CASH MANAGEMENT 2 02-03 24-25 23-24 27-28 14-15 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

53CATERING & ACCOMMODATION MANAGEMENT (INCLUDING TABLEMANNER)

4 20-23 03-06 09-12 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

54 Change & conflict management and dealing with difficult people 2 02-03 03-04 23-24 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

55CHANGE & CONFLICT MANAGEMENT AND DEALING WITH DIFFICULTPEOPLE

2 02-03 17-18 23-24 06-07 18-19 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.000

56 COACHING & CONSELING DI PERUSAHAAN 3 15-17 12-14 09-11 07-09 04-06 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

57 COACHING AND COUNSELING ( MONITORING) 3 06-08 10-12 02-04 27-29 11-13 02-04 27-29 10-12 28-30 12-14 09-11 21-23 6.500.000

58 COMERCIAL CONTRACT DRAFTING AND MANAGEMENT 3 20-22 10-12 02-04 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

Page 28: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

59 COMMUNICATION, ASSERTIVENESS AND CONFLICT MANAGEMENT 2 02-03 13-14 23-24 15-16 18-19 11-12 15-16 13-14 16-17 15-16 12-13 16-17 4.500.000

60 COMPENSATION SYSTEM DEVELOPMENT 2 02-03 24-25 23-24 13-14 19-20 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.000

61 COMPETENCY-BASED HUMAN RESOURCES MANAGEMENT 2 02-03 05-06 23-24 20-21 18-19 04-05 20-21 05-06 21-22 07-08 04-05 21-22 4.500.000

62 COMPREHENSIVE MANAGERIAL SKILLS & LEADERSHIP TRAINING 3 22-24 19-21 11-13 22-24 11-13 17-19 22-24 19-21 23-25 21-23 18-20 22-24 6.500.000

63 COMPREHENSIVE TRAINING MANAGEMENT SYSTEM 3 20-22 17-19 16-18 20-22 11-13 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

64 CONTEMPORARY COMMUNICATION & LEADERSHIP 3 06-08 03-05 16-18 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

65 CONTEMPORARY LEADERSHIP 3 13-15 10-12 02-04 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

66 CONTRACT MANAGEMENT 3 06-08 24-26 18-20 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

67 CONTRACT MANAGEMENT 4 27-30 03-06 16-19 20-23 11-14 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

68CORPORATE BUILDING DALAM MEMBANGUN KULTUR DAN ETIKAINTERNAL ORGANISASI

3 13-15 17-19 11-13 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 28-30 6.500.000

69 CORPORATE dan PERSONAL STORYTELING BRANDING 3 20-22 24-26 16-18 06-08 11-13 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.500.000

70 COST ACCOUNTING 3 08-10 26-28 02-04 06-08 06-08 24-26 06-08 26-28 07-09 28-30 25-27 07-09 6.500.000

71 Cost control 3 15-17 05-07 04-06 20-22 18-20 02-04 20-22 05-07 21-23 07-09 04-06 21-23 5.950.000

72 COST CONTROL AND ESTIMATING 4 27-30 03-06 17-20 14-17 04-07 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.500.000

73 COST MANAGEMENT 3 13-15 17-19 16-18 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

74 COST VOLUME PROFIT ANALYSIS 3 06-08 24-26 11-13 30-01 13-15 22-24 29-01 24-26 02-04 26-28 23-25 30-02 6.500.000

75 COSTUMER SERVICE(CS) 3 22-24 19-21 16-18 15-17 13-15 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

76 CREATIVE ACCOUNTING DAN DISCLOSURE 3 13-15 24-26 16-18 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

77 Creative Problem Solving 4 21-24 11-14 10-13 27-30 11-14 09-12 27-30 11-14 29-02 13-16 10-13 28-31 8.500.000

78 Crisis Management 3 20-22 24-26 16-18 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

79 CRYSTALL BALL 3 27-29 17-19 16-18 27-29 18-20 15-17 27-29 18-20 28-30 19-21 16-18 21-23 6.500.000

80 CSR FUNDAMENTAL PERENCANAAN & IMPLEMENTASI 3 06-08 10-12 09-11 20-22 04-06 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.500.000

81 CSR PROJECT DESIGN, IMPLEMENTATION & REPORTING 4 13-16 17-20 16-19 27-30 11-14 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.500.000

82 CSR PROJECT DESIGN, IMPLEMENTATION AND REPORTING 3 20-22 24-26 02-04 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

83CULTURE CHANGE FOR MAINTENANCE AND RELIABILITYIMPROVEMENT

3 06-08 10-12 09-11 06-08 04-06 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.750.000

84 Custom facility, Shipping Documents & Export Import Procedure 2 02-03 24-25 23-24 20-21 18-19 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.000

85 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 06-09 17-20 02-05 20-23 11-14 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000

86 CUSTOMER LOYALITY STRATEGY 3 20-22 03-05 09-11 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

87 CUSTOMER RELATION MANAGEMENT(CRM) 3 13-15 19-21 16-18 13-15 11-13 17-19 13-15 19-21 14-16 21-23 18-20 14-16 6.500.000

88 CUSTOMER SERVICE EXCELLENCE STRATEGY 3 22-24 26-28 16-18 06-08 04-06 24-26 06-08 26-28 07-09 28-30 25-27 07-09 6.500.000

Page 29: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga89 CUSTOMER SERVICE IN CREDIT UNION 3 20-22 17-19 11-13 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

90 DASAR-DASAR PERBENDAHARAAN 4 20-23 24-27 02-05 27-30 04-07 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

91DECISION MAKING BY USING STRATEGIC THINKING (PENDEKATANSISTEMIK DAN NEW 7 TOOLS APPROACH)

2 02-03 24-25 23-24 30-31 11-12 22-23 29-30 24-25 31-01 26-27 23-24 28-29 4.500.000

92 DEVELOVING HIGH PERFORMANCE TEAMS 2 02-03 27-28 23-24 29-30 19-20 25-26 29-30 27-28 01-02 29-30 26-27 30-31 4.500.000

93 DIGITAL FILING SYSTEM 3 27-29 10-12 11-13 15-17 11-13 08-10 15-17 10-12 16-18 12-14 09-11 16-18 6.500.000

94DINAMIKA SERIKAT PEKERJA DALAM PERUSAHAAN TERKAITMENGHADAPI ERA GLOBALISASI

2 02-03 06-07 23-24 02-03 18-19 04-05 02-03 06-07 03-04 08-09 05-06 03-04 4.500.000

95 DOCUMENT CONTROL ( VERIFICATION AND CLASSIFICATION ) 3 20-22 03-05 04-06 27-29 04-06 02-04 27-29 03-05 28-30 05-07 02-04 28-30 6.500.000

96 DOCUMENT MANAGEMENT SYSTEM AND ELECTRONIC FILING 3 29-31 12-14 11-13 30-01 11-13 10-12 29-01 12-14 31-02 14-16 11-13 30-02 6.500.000

97 Effective Business Letters Writing 3 29-31 19-21 16-18 01-03 18-20 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.000

98 EFFECTIVE EXECUTIVE SECRETARY 2 02-03 03-04 23-24 02-03 04-05 02-03 02-03 03-04 03-04 05-06 02-03 03-04 4.500.000

99Effective Inventory Management and Modern Warehousing forSupport Personal

4 07-10 25-28 02-05 06-09 05-08 23-26 07-10 25-28 08-11 27-30 24-27 08-11 8.500.000

100 EFFECTIVE LINE BALANCING 2 02-03 24-25 23-24 30-31 11-12 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000

101 EFFECTIVE PERFORMANCE APPRAISAL 2 02-03 19-20 23-24 01-02 18-19 17-18 01-02 20-21 02-03 21-22 18-19 02-03 4.500.000

102 EFFECTIVE PRESENTATION AND REPORT WRITING 3 13-15 03-05 09-11 15-17 18-20 03-05 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

103 EFFECTIVE PUBLIC RELATIONS SKILL 3 20-22 03-05 02-04 27-29 11-13 02-04 27-29 03-05 28-30 05-07 02-04 28-30 6.500.000

104 EFFECTIVE REPORT WRITING TECHNIQUE 3 06-08 17-19 04-06 01-03 04-06 15-17 01-03 18-20 02-04 19-21 16-18 02-04 6.500.000

105 Effective Time Management 3 20-22 10-12 18-20 22-24 18-20 08-10 22-24 10-12 23-25 12-14 09-11 22-24 6.500.000

106 EFFECTIVE TRAINING MANAGEMENT 3 13-15 26-28 16-18 07-09 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.000

107 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 13-16 03-06 16-19 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

108 ENGINEERING MATERIAL KNOWLEDGE FOR WAREHOUSE PEOPLE 3 27-29 03-05 16-18 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.750.000

109 ENTERPRISE RESOURCES PLANNING (ERP) 4 14-17 25-28 09-12 27-30 11-14 23-26 27-30 25-28 28-01 27-30 24-27 28-31 8.500.000

110ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATIONPROFESSIONAL

4 07-10 04-07 10-13 31-03 04-07 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.500.000

111 Excellent Supervisory 4 27-30 17-20 03-06 27-30 12-15 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.500.000

112 Export import 3 06-08 17-19 18-20 07-09 18-20 15-17 08-10 18-20 09-11 19-21 16-18 09-11 6.500.000

113 Export-Import 3 27-29 10-12 09-11 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

114 Export-Import and Incoterm 3 06-08 19-21 18-20 06-08 06-08 17-19 06-08 18-20 07-09 21-23 18-20 07-09 6.500.000

115 FEASIBILITY STUDY & PROJECT EVALUATION 4 28-31 04-07 03-06 06-09 04-07 02-05 06-09 04-07 07-10 06-09 03-06 07-10 8.500.000

116FILLING MANAGEMENT FOR SECRETARY AND ADMINISTRATIONSTAFF

3 27-29 03-05 16-18 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

117 FILLING SYSTEM FOR SECRETARY 3 08-10 17-19 02-04 15-17 18-20 15-17 15-17 18-20 16-18 19-21 16-18 16-18 6.500.000

Page 30: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga118 FINANCE FOR NON FINANCE FOR OIL & GAS INDUSTRY 3 15-17 26-28 02-04 15-17 06-08 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000

119 FINANCE FOR NON FINANCE MANAGER 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000

120 Financial Planning and Budgeting for Banking 3 29-31 12-14 16-18 27-29 18-20 10-12 27-29 12-14 30-02 14-16 11-13 28-30 6.500.000

121 FINANCING CONDOTEL HOTEL OPERATION 4 13-16 24-27 10-13 27-30 05-08 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

122 FIXED ASSET 3 13-15 05-07 09-11 13-15 11-13 02-04 13-15 05-07 14-16 07-09 04-06 14-16 6.500.000

123 Fraud Prevention, Detection And Investigation Audit 3 13-15 24-26 02-04 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

124 Fraud Risk Management 3 13-15 12-14 02-04 20-22 18-20 10-12 20-22 12-14 21-23 14-16 11-13 21-23 6.500.000

125 FREIGHT FORWARDING 2 02-03 26-27 23-24 16-17 14-15 24-25 16-17 26-27 17-18 28-29 25-26 17-18 4.500.000

126 General Affairs Management 3 20-22 03-05 09-11 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

127 GENERAL AFFAIRS MANAGEMENT SYSTEM 3 20-22 03-05 04-06 15-17 04-06 02-04 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

128 GOOD CORPORATE GOVERNANCE 3 20-22 24-26 02-04 01-03 11-13 22-24 01-03 24-26 02-04 26-28 23-25 30-02 6.500.000

129 GOOD CORPORATE GOVERNANCE 3 27-29 26-28 04-06 15-17 18-20 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000

130 HANDLING CONFLICT AND COMPLAINT EFFECTIVELY 3 06-08 24-26 11-13 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

131 HANDLING CUSTOMER COMPLAINT 2 02-03 06-07 23-24 29-30 14-15 02-03 29-30 06-07 01-02 08-09 05-06 30-31 4.500.000

132 Holistic CSR and Sustainable Community Development 2 02-03 20-21 23-24 02-03 04-05 18-19 02-03 20-21 03-04 22-23 19-20 03-04 4.500.000

133 HOUR OF CHANGE MANAGEMENT 3 29-31 12-14 11-13 07-09 18-20 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

134 HOW TO HANDLE CRITICISM AND COMPLAIN 2 09-10 24-25 23-24 06-07 14-15 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.000

135 HOW TO IMPROVE BUSINESS PERFORMANCE 3 29-31 05-07 11-13 07-09 18-20 02-04 08-10 05-07 09-11 07-09 04-06 09-11 6.500.000

136 HR Based On Competency for Recruitment 2 13-14 03-04 05-06 13-14 18-19 04-05 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

137 HR MANAGEMENT 2 02-03 05-06 23-24 27-28 11-12 04-05 27-28 05-06 28-29 07-08 04-05 28-29 4.500.000

138 HR MANAGEMENT OF CHANGE 3 20-22 12-14 16-18 30-01 18-20 10-12 29-01 12-14 31-02 14-16 11-13 30-02 6.500.000

139 Hubungan Industrial Dan Tenaga Kerja 3 27-29 10-12 18-20 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

140 HUBUNGAN INDUSTRIAL KEPEGAWAIAN 3 08-10 19-21 16-18 15-17 18-20 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

141 HUKUM DAN KONTRAK KONSTRUKSI 3 20-22 10-12 04-06 27-29 13-15 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

142HUKUM KEIMIGRASIAN TERKAIT PEMBERIAN IJIN MEMPERKERJAKANTENAGA KERJA ASING

3 15-17 24-26 02-04 22-24 18-20 22-24 22-24 24-26 23-25 26-28 23-25 22-24 6.500.000

143 HUKUM KEPAILITAN 3 13-15 03-05 02-04 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

144 HUKUM KETENAGAKERJAAN & HUBUNGAN INDUSTRIAL 3 20-22 10-12 11-13 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

145 Hukum Perkreditan 1 02-02 24-24 23-23 09-09 20-20 22-22 06-06 24-24 07-07 26-26 23-23 07-07 2.750.000

146 HUKUM PERLINDUNGAN KONSUMEN DAN PERSAINGAN BISNIS 3 29-31 19-21 18-20 13-15 18-20 17-19 13-15 19-21 14-16 21-23 18-20 14-16 6.500.000

147 HUKUM TINDAK PIDANA KORUPSI 3 08-10 26-28 04-06 22-24 18-20 24-26 22-24 26-28 23-25 28-30 25-27 22-24 6.500.000

148 HUMAN RESOURCE PLANNING AND PRODUCTIVITY 3 06-08 17-19 09-11 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

Page 31: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga149 HUMAN RESOURCES MANAGEMENT FOR NON-HR MANAGER 2 02-03 06-07 23-24 15-16 04-05 02-03 15-16 06-07 16-17 08-09 05-06 16-17 4.500.000

150HYPNOTIC SELLING TECHNIQUE Menjual Tanpa Hambatan denganAplikasi Hypnosis dan NLP

2 02-03 03-04 23-24 06-07 19-20 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

151IMPLEMENTASI BALANCED SCORE CARD (BSC) SEBAGAI ALAT UKURPERFORMANSI KARYAWAN

3 13-15 03-05 02-04 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

152 Incoterm 2010 2 02-03 06-07 23-24 22-23 18-19 04-05 22-23 06-07 23-24 08-09 05-06 23-24 4.500.000

153 INDONESIA TAX OUTLOOK 2015-2016 DAN TAX AMNESTY 2 02-03 17-18 23-24 30-31 18-19 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000

154INFORMATION SYSTEMS AND INFORMATION TECHNOLOGIES FORSUPPLY CHAIN MANAGEMENT

3 06-08 10-12 02-04 13-15 06-08 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

155 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 06-09 03-06 09-12 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

156 INNER SUCCESS TRAINING 4 06-09 03-06 02-05 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

157 INOVASI DAN KREATIFITAS MENUJU ORGANISASI PEMBELAJARAN 2 02-03 10-11 23-24 13-14 18-19 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000

158 Integrated and Effective Logistic Management 4 14-17 04-07 16-19 06-09 04-07 02-05 06-09 04-07 07-10 06-09 03-06 07-10 8.500.000

159 INTEGRATED DOCUMENT & ELECTRONIC FILING SYSTEM 2 02-03 20-21 23-24 08-09 04-05 18-19 06-07 20-21 07-08 22-23 19-20 07-08 4.500.000

160 INTEGRATED HUMAN RESOURCES MANAGEMENT 3 06-08 03-05 16-18 28-30 11-13 02-04 28-30 03-05 30-02 05-07 02-04 29-31 6.500.000

161 INTELLIGENT AND INVESTIGATION SKILLS 3 08-10 19-21 09-11 01-03 13-15 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.000

162 INTERMEDIATE ACCOUNTING 3 20-22 10-12 11-13 20-22 06-08 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.500.000

163 INTERNATIONAL FINANCIAL REPORTING STANDARD (IFRS) 2 02-03 03-04 23-24 08-09 18-19 04-05 09-10 03-04 10-11 05-06 02-03 10-11 4.500.000

164 INTERVIEWING SKILL FOR RECRUITMENT PROMOTION 3 27-29 03-05 02-04 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

165 INVENTORY MANAGEMENT AND COST INVESTMENT RECOVERY 4 27-30 04-07 03-06 21-24 05-08 02-05 21-24 04-07 22-25 06-09 03-06 21-24 8.500.000

166 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 13-15 10-12 18-20 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

167 Inventory Management Manufacturing Industry 4 21-24 25-28 10-13 30-02 11-14 23-26 29-02 25-28 31-03 27-30 24-27 30-03 8.500.000

168 ISO 26000 UNDERSTANDING AND IMPLEMENTING CSR 3 08-10 19-21 04-06 20-22 04-06 17-19 20-22 19-21 21-23 21-23 18-20 21-23 6.500.000

169 ISO IEC 17020 2012 2 02-03 03-04 23-24 06-07 04-05 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

170 ISO WAREHOUSING 2 02-03 26-27 23-24 29-30 18-19 24-25 29-30 26-27 30-01 28-29 25-26 30-31 4.500.000

171 IT AUDIT PRACTICES 3 22-24 19-21 04-06 20-22 18-20 17-19 20-22 18-20 21-23 21-23 18-20 21-23 6.500.000

172 IT HELPDESK 3 29-31 26-28 11-13 27-29 13-15 24-26 27-29 26-28 30-02 28-30 25-27 28-30 6.500.000

173 JOB COMPETENCY PROFILING 2 02-03 13-14 23-24 22-23 11-12 11-12 22-23 13-14 23-24 15-16 12-13 23-24 4.500.000

174 JOB DESCRIPTION ANALYSIS, DEVELOPMENT, AND DESIGN 2 02-03 24-25 23-24 13-14 18-19 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.000

175 KEMADYAAN 5 13-17 17-21 02-06 20-24 11-15 15-19 20-24 24-28 21-25 19-23 16-20 30-04 9.750.000

176 KEPEMIMPINAN (LEADERSHIP HIGH LEVEL MANAGER) 5 13-17 10-14 16-20 30-03 11-15 08-12 29-03 10-14 31-04 12-16 09-13 30-04 9.750.000

177 KEPEMIMPINAN (LEADERSHIP LOWER LEVEL MANAGER) 3 20-22 17-19 04-06 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

178 KEPEMIMPINAN (LEADERSHIP MIDDLE LEVEL MANAGER) 4 28-31 25-28 09-12 13-16 04-07 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.000

Page 32: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga179 KESEIMBANGAN LINTAS PRODUKSI (LINE BALANCING) 2 02-03 12-13 23-24 06-07 06-07 10-11 06-07 12-13 07-08 14-15 11-12 07-08 4.500.000

180Keterampilan Pengelolaan Hubungan Industrial Sampai DenganPenyelesaian Perselisihan

3 22-24 05-07 16-18 01-03 18-20 03-05 01-03 05-07 02-04 07-09 04-06 02-04 6.500.000

181 KEWIRANIAGAAN (SALESMANSHIP) 3 08-10 05-07 16-18 20-22 11-13 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.000

182 KEWIRAUSAHAAN ENTERPRENEURSHIP 3 20-22 10-12 09-11 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.500.000

183 KEWIRAUSAHAAN PRA PURNA BAKTI 4 27-30 24-27 02-05 21-24 04-07 22-25 21-24 24-27 22-25 26-29 23-26 21-24 8.500.000

184 Key Account Management 2 27-28 17-18 19-20 29-30 11-12 15-16 29-30 18-19 28-29 19-20 16-17 30-31 4.500.000

185 KOMPUTERISASI PERGUDANGAN 2 02-03 06-07 23-24 01-02 04-05 04-05 01-02 06-07 02-03 08-09 05-06 02-03 4.500.000

186 LAPORAN KEUANGAN PEMAHAMAN DAN PENGGUNAANNYA 3 06-08 26-28 02-04 30-01 18-20 24-26 29-01 26-28 31-02 28-30 25-27 30-02 6.500.000

187 LEADERSHIP AND EFFECTIVE SUPERVISORY 3 13-15 10-12 04-06 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

188 LEADERSHIP FOR MANAGER 4 13-16 18-21 09-12 20-23 12-15 16-19 20-23 18-21 21-24 20-23 17-20 21-24 8.500.000

189 Leadership Skill How Become a More Effective Leader 3 22-24 12-14 02-04 13-15 11-13 10-12 13-15 12-14 14-16 14-16 11-13 14-16 6.500.000

190 Legal Due Diligence (LC Perdagangan) 3 15-17 26-28 11-13 28-30 11-13 24-26 28-30 26-28 30-02 28-30 25-27 29-31 6.500.000

191 LEGAL FOR NON LEGAL PROFESIONAL 3 29-31 19-21 09-11 30-01 18-20 17-19 29-01 19-21 31-02 21-23 18-20 30-02 6.500.000

192 LIFE CYCLE COSTING 3 13-15 17-19 16-18 13-15 11-13 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.750.000

193 LIFE CYCLE COSTING (WHOLE LIFE COSTING) 2 02-03 19-20 23-24 15-16 13-14 17-18 15-16 20-21 16-17 21-22 18-19 16-17 4.500.000

194 LOBBYING AND SCHEDULLING 3 20-22 03-05 09-11 28-30 18-20 02-04 28-30 03-05 30-02 05-07 02-04 29-31 6.500.000

195 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 13-16 10-13 09-12 27-30 11-14 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

196 Logistic Management 2 02-03 10-11 23-24 29-30 18-19 08-09 29-30 10-11 30-01 12-13 09-10 30-31 4.500.000

197 LOGISTIC MANAGEMENT & SUPPLY CHAIN MANAGEMENT 3 06-08 17-19 11-13 01-03 13-15 15-17 01-03 18-20 02-04 19-21 16-18 02-04 6.500.000

198LOGISTICS AND SUPPLY CHAIN MANAGEMENT CONCEPT, STRATEGYAND IMPLEMENTATION

4 13-16 03-06 16-19 30-02 11-14 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.000

199MAINTENANCE MANAGEMENT (FOR MANUFACTURE AND OIL & GASCOMPANY)

3 20-22 12-14 18-20 07-09 11-13 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

200 MAN POWER PLANNING 3 27-29 10-12 18-20 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

201 MAN POWER PLANNING 3 13-15 24-26 18-20 06-08 18-20 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.000

202 MANAGEMENT INFORMATION SYSTEM 3 08-10 19-21 18-20 07-09 18-20 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.500.000

203 MANAGEMENT OF DOCUMENT CONTROL & MODERN LIBRARY 3 15-17 26-28 02-04 15-17 06-08 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000

204MANAGEMENT OF OUTSOURCE STAFF HOUSING AND CATERINGSERVICES

4 21-24 04-07 17-20 30-02 12-15 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.000

205 MANAGEMENT PROJECT STRATEGI DAN IMPLEMENTASI 3 22-24 26-28 09-11 27-29 18-20 24-26 27-29 18-20 28-30 28-30 25-27 21-23 6.500.000

206 Managing Training Function 3 15-17 05-07 09-11 07-09 04-06 02-04 08-10 05-07 09-11 07-09 04-06 09-11 6.500.000

207 MANAJEMEN OPERASI – PRODUKSI 3 27-29 03-05 18-20 30-01 06-08 03-05 29-01 03-05 31-02 05-07 02-04 28-30 6.500.000

208 MANAJEMEN PERUBAHAN (CHANGE MANAGEMENT) 3 13-15 10-12 02-04 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

Page 33: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga209 MANAJEMEN SDM (PERSONALIA ATAU TENAGA KERJA) 3 22-24 19-21 11-13 30-01 06-08 17-19 29-01 19-21 31-02 21-23 18-20 30-02 6.500.000

210 MANAJEMEN ARSIP DINAMIS DAN PERPUSTAKAAN BERBASIS TI 2 02-03 03-04 23-24 06-07 18-19 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

211 MANAJEMEN KEUANGAN UNTUK NON MANAJER KEUANGAN 2 02-03 10-11 23-24 06-07 18-19 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000

212 MANAJEMEN KOMPENSASI BERBASIS KINERJA 2 20-21 26-27 23-24 22-23 18-19 24-25 22-23 26-27 23-24 28-29 25-26 23-24 4.500.000

213 MANAJEMEN LOGISTIK 3 27-29 05-07 09-11 28-30 06-08 03-05 28-30 05-07 30-02 07-09 04-06 29-31 6.500.000

214 MANAJEMEN MUTU TERPADU 2 02-03 10-11 23-24 06-07 18-19 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000

215 MANAJEMEN PENGEMBANGAN PRODUK 3 06-08 12-14 16-18 01-03 13-15 10-12 01-03 12-14 02-04 14-16 11-13 02-04 6.500.000

216 MANAJEMEN PERGUDANGAN DAN PERSEDIAAN 2 02-03 20-21 23-24 08-09 19-20 18-19 08-09 18-19 09-10 22-23 19-20 09-10 4.500.000

217MANAJEMEN PERILAKU DALAM ORGANISASI(MANAGEMENT OFORGANIZATION BEHAVIOR)

3 27-29 24-26 18-20 07-09 13-15 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.000

218 MANAJEMEN PERPAJAKAN 3 27-29 10-12 09-11 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

219 MANAJEMEN PERPUSTAKAAN 3 22-24 03-05 02-04 22-24 18-20 03-05 22-24 03-05 23-25 05-07 02-04 21-23 6.500.000

220 MANAJEMEN PRODUKSI 2 20-21 20-21 18-19 22-23 19-20 18-19 22-23 20-21 23-24 22-23 19-20 21-22 4.500.000

221 MANAJEMEN PRODUKSI DAN OPERASI (MPO) 4 21-24 03-06 02-05 14-17 04-07 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.500.000

222 MANAJEMEN PROYEK 3 15-17 26-28 04-06 15-17 04-06 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000

223 MANAJEMEN RESIKO 3 29-31 12-14 02-04 27-29 06-08 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.000

224 MANAJEMEN RISIKO INVESTASI 4 27-30 03-06 09-12 30-02 11-14 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.000

225 MANAJEMEN STRATEGI 3 20-22 12-14 02-04 06-08 18-20 10-12 06-08 12-14 07-09 14-16 11-13 07-09 6.500.000

226 MANAJEMEN STRATEGI 3 06-08 03-05 04-06 15-17 18-20 02-04 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

227 MANUSIA DALAM KERJA (MEN IN WORK) 2 02-03 13-14 23-24 23-24 04-05 11-12 23-24 13-14 24-25 15-16 12-13 23-24 4.500.000

228 MARITIME & SHIPPING LAW IN INDONESIA 3 13-15 03-05 18-20 20-22 06-08 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.000

229 MARKETING MANAGEMENT 3 15-17 26-28 18-20 13-15 11-13 24-26 13-15 26-28 14-16 28-30 25-27 14-16 6.500.000

230 MATERIAL MANAGEMENT 4 07-10 11-14 16-19 21-24 12-15 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.000

231 MATERIAL MANAGEMENT FOR PROJECT 4 28-31 11-14 09-12 20-23 11-14 09-12 20-23 11-14 21-24 13-16 10-13 21-24 8.500.000

232 MEASURING AND MANAGING COST ESCALATION IN PROJECT 2 02-03 27-28 23-24 23-24 06-07 25-26 23-24 27-28 24-25 29-30 26-27 21-22 4.500.000

233 MEASURING CUSTOMER SATISFACTION 3 27-29 10-12 11-13 22-24 11-13 08-10 22-24 10-12 23-25 12-14 09-11 22-24 6.500.000

234 MEASURING TRAINING IMPACT 2 02-03 20-21 23-24 27-28 18-19 18-19 27-28 18-19 01-02 22-23 19-20 28-29 4.500.000

235 MEMBEDAH PROFESI SEKRETARIS PROFESSIONAL 4 06-09 17-20 16-19 20-23 04-07 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000

236MENINGKATKAN EFEKTIVITAS FUNGSI SUPERVISOR(SUPERVISORYMANAGEMENT)

3 15-17 17-19 09-11 28-30 11-13 15-17 28-30 18-20 30-02 19-21 16-18 29-31 6.500.000

237 MENINGKATKAN EFEKTIVITAS FUNGSI SUPERVISOR 2 02-03 20-21 23-24 27-28 18-19 18-19 27-28 20-21 01-02 22-23 19-20 28-29 4.500.000

238 Menyusun dan Menganalisa Laporan Keuangan 2 02-03 06-07 23-24 13-14 18-19 02-03 13-14 06-07 14-15 08-09 05-06 14-15 4.500.000

239 Merger Dan Akuisisi 2 02-03 13-14 23-24 08-09 07-08 11-12 09-10 13-14 10-11 15-16 12-13 10-11 4.500.000

Page 34: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga240 METODE PENGAMBILAN KEPUTUSAN 2 29-30 27-28 23-24 27-28 07-08 25-26 27-28 27-28 01-02 29-30 26-27 28-29 4.500.000

241MODEL PEMBINAAN ANGGOTA YANG EXCELLENT DALAM DUNIAKERJA PERUSAHAAN

3 13-15 17-19 18-20 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

242 Modern Office Administration and Filling System 4 13-16 03-06 03-06 31-03 12-15 02-05 30-03 03-06 01-04 05-08 02-05 01-04 8.500.000

243 MODERN WAREHOUSE DESIGN 2 02-03 03-04 23-24 27-28 14-15 02-03 27-28 03-04 01-02 05-06 02-03 28-29 4.500.000

244 MOSSAD STRATEGY ON BUSINESS 3 20-22 26-28 04-06 13-15 18-20 24-26 13-15 26-28 14-16 28-30 25-27 14-16 6.500.000

245NEGOTIATION IMPROVE YOUR NEGOTIATING SKILLS AND MAKE YOUMORE EFFECTIVE NEGOTIATOR

2 02-03 03-04 23-24 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

246 NEGOTIATION SKILL FOR PURCHASING STAFF 3 29-31 10-12 04-06 01-03 18-20 08-10 01-03 10-12 02-04 12-14 09-11 02-04 6.500.000

247 Office Automation 2 02-03 24-25 23-24 23-24 18-19 22-23 23-24 24-25 24-25 26-27 23-24 23-24 4.500.000

248 Office AUTOMATION SKILL 3 13-15 24-26 11-13 06-08 11-13 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.500.000

249 Office COMMUNICATION AND BEHAVIOR ETHIC 3 29-31 05-07 09-11 20-22 18-20 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.000

250 Office MANAGEMENT AND ELECTRONIC FILING SYSTEM 3 22-24 05-07 09-11 22-24 13-15 03-05 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000

251 Office MANAGEMENT AND FILING SYSTEM 4 27-30 03-06 17-20 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

252 Office MODERN FILING MANAGEMENT 3 27-29 10-12 16-18 28-30 18-20 08-10 28-30 10-12 30-02 12-14 09-11 29-31 6.500.000

253OPERATING SYSTEMS TECHNOLOGIES AND INSTALLATIONPROCEDURES

3 08-10 19-21 11-13 06-08 06-08 17-19 06-08 19-21 07-09 21-23 18-20 07-09 6.500.000

254 OPERATION MANAGEMENT 2 22-23 03-04 23-24 23-24 11-12 02-03 23-24 03-04 24-25 05-06 02-03 21-22 4.500.000

255 OPTIMIZATION FOR PRODUCTION SYSTEM 4 06-09 10-13 03-06 27-30 12-15 08-11 27-30 10-13 29-02 12-15 09-12 28-31 8.500.000

256 OTOMASI PERPUSTAKAAN BERBASIS SLIMS 3 20-22 10-12 02-04 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

257 OUTSOURCING MANAGEMENT 3 22-24 12-14 16-18 15-17 13-15 10-12 15-17 12-14 16-18 14-16 11-13 16-18 6.500.000

258 PAJAK DAN PROSEDUR IMPLEMENTASI 4 06-09 10-13 02-05 27-30 04-07 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

259PELAKSANAAN DAN PERMASALAHAN PENGADAAN TANAHPEMBEBASAN LAHAN

3 20-22 17-19 11-13 06-08 04-06 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

260 PELAYANAN PRIMA BAGI APARATUR PEMERINTAHAN 3 29-31 10-12 04-06 01-03 18-20 10-12 01-03 10-12 02-04 12-14 09-11 30-02 6.500.000

261Pemahaman Integrasi Sistem Manajemen ISO 14001-2015, ISO 9001-2015, dan ISO 45001-2016

3 06-08 10-12 04-06 28-30 18-20 10-12 28-30 10-12 28-30 12-14 09-11 29-31 6.500.000

262 PEMAHAMAN SHIPPING DOCUMENT & PROSEDUR KEPABEANAN 3 15-17 12-14 04-06 28-30 04-06 10-12 28-30 12-14 30-02 14-16 11-13 29-31 6.500.000

263PEMBERIAN KREDIT DENGAN PENDEKATAN LAPORAN ARUSKAS_CASH FLOW

2 02-03 19-20 23-24 13-14 18-19 17-18 13-14 20-21 14-15 21-22 18-19 14-15 4.500.000

264 PEMILIHAN PEMASOK (VENDOR) 2 30-31 10-11 12-13 27-28 18-19 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.000

265 Penanganan Kredit Bermasalah 1 02-02 13-13 23-23 20-20 20-20 11-11 20-20 13-13 21-21 15-15 12-12 24-24 2.750.000

266 Pencegahan dan Audit Fraud di Lingkungan Perbankan 3 15-17 10-12 18-20 27-29 18-20 08-10 27-29 10-12 30-02 12-14 09-11 28-30 6.500.000

267 PENCEGAHAN FRAUD DAN INVESTIGATIF 3 20-22 03-05 02-04 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.000

Page 35: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

268PENERAPAN EKONOMI TEKNIK DALAM PROSES PENGAMBILANKEPUTUSAN BISNIS

4 27-30 25-28 17-20 13-16 12-15 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.000

269PENGANTAR KONSEP MANAJEMEN(INTRODUCTION TOMANAGEMENT)

2 02-03 27-28 23-24 02-03 18-19 25-26 02-03 27-28 03-04 29-30 26-27 03-04 4.500.000

270 Pengendalian Dokumen Integrasi ISO 4 20-23 24-27 17-20 06-09 11-14 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.500.000

271 Pengendalian Dokumen ISO 9001 2015 4 27-30 04-07 16-19 20-23 12-15 02-05 20-23 04-07 21-24 06-09 03-06 21-24 8.500.000

272 Pengendalian Kinerja Bisnis Dan Aliran Kas 3 29-31 17-19 02-04 15-17 13-15 15-17 15-17 18-20 16-18 19-21 16-18 16-18 6.500.000

273 PENILAIAN KELAYAKAN PROYEK (FEASIBILITY STUDY) 2 02-03 26-27 23-24 22-23 19-20 24-25 22-23 26-27 23-24 28-29 25-26 23-24 4.500.000

274 PENYELESAIAN KREDIT BERMASALAH 2 02-03 06-07 23-24 29-30 18-19 02-03 29-30 06-07 30-01 08-09 05-06 30-31 4.500.000

275 PENYUSUNAN DAN ANALISA SCORING RATING 2 02-03 13-14 23-24 02-03 19-20 11-12 02-03 13-14 03-04 15-16 12-13 03-04 4.500.000

276 PENYUSUNAN PERATURAN INTERNAL PERKREDITAN BANK 3 20-22 19-21 16-18 06-08 18-20 17-19 08-10 18-20 09-11 21-23 18-20 09-11 6.500.000

277 Perancangan Tata Letak Pabrik 4 13-16 17-20 17-20 27-30 04-07 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.500.000

278 PERFORMANCE BASED PAY 2 02-03 24-25 23-24 02-03 06-07 22-23 02-03 24-25 03-04 26-27 23-24 03-04 4.500.000

279 PERFORMANCE COACHING FOR MANAGER 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000

280 PERFORMANCE MANAGEMENT 3 08-10 12-14 02-04 06-08 11-13 08-10 06-08 12-14 07-09 14-16 11-13 07-09 6.500.000

281 Perhitungan KMK Kontraktor 2 02-03 19-20 23-24 29-30 18-19 17-18 29-30 18-19 28-29 21-22 18-19 30-31 4.500.000

282 PERSONAL BRANDING – BOOSTING YOUR IMAGE IN A MONTH 3 27-29 03-05 02-04 13-15 18-20 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.500.000

283 PERSUASIVE MARKETING 3 15-17 19-21 02-04 01-03 18-20 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.000

284PETROLEUM FINANCE, COST CONTROL & RESERVOIR MANAJEMEN(Petroleum Economics)

4 28-31 04-07 03-06 30-02 04-07 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.000

285 PETTY CASH MANAGEMENT & ADMINISTRATION 2 02-03 19-20 23-24 23-24 18-19 17-18 23-24 20-21 24-25 21-22 18-19 23-24 4.500.000

286 PLAN LAY OUT Office 3 08-10 26-28 16-18 30-01 06-08 24-26 29-01 26-28 31-02 28-30 25-27 30-02 6.500.000

287 PLANNING AND MANAGING INVENTORIES IN A SUPPLY CHAIN 3 15-17 24-26 16-18 13-15 11-13 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

288 PLANNING AND ORGANIZE TRAINING 3 08-10 05-07 02-04 20-22 18-20 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.000

289 PLANNING DEMAND AND SUPPLY IN A SUPPLY CHAIN 3 22-24 05-07 02-04 20-22 18-20 03-05 20-22 05-07 21-23 07-09 04-06 22-24 6.500.000

290 PRACTICAL PROJECT EVALUATION AND FINANCING 2 02-03 19-20 23-24 15-16 18-19 17-18 15-16 20-21 16-17 21-22 18-19 16-17 4.500.000

291PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING STAFF(USING MICROSOFT POWER POINT)

2 02-03 13-14 23-24 29-30 04-05 11-12 29-30 13-14 28-29 15-16 12-13 30-31 4.500.000

292 PROBLEM SOLVING & DECISION MAKING 3 06-08 17-19 04-06 06-08 04-06 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

293 PROBLEM SOLVING & DECISION MAKING 3 27-29 03-05 18-20 28-30 18-20 02-04 28-30 03-05 28-30 05-07 02-04 29-31 6.500.000

294 PROBLEM SOLVING AND DECISION MAKING 4 07-10 03-06 10-13 31-03 11-14 02-05 30-03 03-06 01-04 05-08 02-05 01-04 8.500.000

295 PRODUCTION AND OPERATION MANAGEMENT 4 21-24 25-28 10-13 27-30 11-14 23-26 27-30 25-28 29-02 27-30 24-27 28-31 8.500.000

296 PRODUCTION AND PLANNING CONTROL 4 28-31 04-07 17-20 31-03 05-08 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.500.000

297 Production Handling Separation and Measurement 4 07-10 11-14 03-06 06-09 12-15 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.500.000

Page 36: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga298 PRODUCTION PLANNING AND INVENTORY CONTROL (PPIC) 3 06-08 24-26 02-04 22-24 11-13 22-24 22-24 24-26 23-25 26-28 23-25 22-24 6.500.000

299 PROFIT PLANNING COST - VOLUME - PROFIT RELATIONSHIP ANALYSIS 3 13-15 10-12 18-20 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

300 Project Cost Estimation & Cost Control 3 20-22 19-21 02-04 13-15 04-06 17-19 13-15 18-20 14-16 21-23 18-20 14-16 6.500.000

301 PROJECT COST MANAGEMENT 3 27-29 12-14 04-06 07-09 04-06 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

302 PROJECT EVALUATION AND FINANCING 3 27-29 17-19 09-11 30-01 13-15 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

303 PROJECT HSE MANAGEMENT 3 08-10 12-14 09-11 15-17 11-13 10-12 15-17 12-14 16-18 14-16 11-13 16-18 6.500.000

304 PROJECT MANAGEMENT 4 14-17 11-14 17-20 21-24 11-14 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.000

305 Project Management (3 Hr) 3 13-15 03-05 16-18 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.000

306 PROJECT MANAGEMENT (PM) (5Hr) 5 20-24 10-14 02-06 30-03 11-15 08-12 29-03 10-14 28-02 12-16 09-13 30-04 9.750.000

307 PROJECT MANAGEMENT DARI KONSEPTUAL SAMPAI OPERASIONAL 4 27-30 17-20 16-19 14-17 04-07 15-18 14-17 18-21 15-18 19-22 16-19 15-18 8.500.000

308PROJECT MANAGEMENT IN ENGINEERING, PROCUREMENT &CONSTRUCTION

3 06-08 19-21 11-13 15-17 13-15 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

309 PROJECT MANAGEMENT USING MICROSOFT PROJECT 3 06-08 26-28 18-20 07-09 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.000

310PROJECT MANAGEMENT WITH MICROSOFT PROJECTAPPLICATION,Win QSB & MONTE CARLO SIMULATION

3 27-29 26-28 09-11 22-24 18-20 24-26 22-24 26-28 23-25 28-30 25-27 22-24 6.500.000

311 PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6 3 13-15 03-05 04-06 15-17 06-08 02-04 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

312 PROJECT QUALITY MANAGEMENT 3 29-31 10-12 09-11 01-03 11-13 08-10 01-03 10-12 02-04 12-14 09-11 02-04 6.500.000

313 PSYCHO-SPIRITUALITY IN ENTREPRENEURSHIP 3 22-24 24-26 11-13 07-09 18-20 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.000

314 QA & QC Inspection Program 3 15-17 12-14 09-11 27-29 18-20 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.000

315 QUALITY CONTROL OF PRODUCT 4 21-24 25-28 03-06 13-16 11-14 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.000

316QUALITY MANAGEMENT SYSTEM ISO 9001 2008 STANDARD (SISTEMMANAJEMEN MUTU)

3 06-08 10-12 09-11 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

317 QUALITY SYSTEM ENGINEERING 4 28-31 04-07 09-12 20-23 05-08 02-05 20-23 04-07 21-24 06-09 03-06 21-24 8.500.000

318 RAPAT YANG PRODUKTIF (PRODUCTIVE MEETING) 2 02-03 24-25 23-24 27-28 04-05 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

319 Rekonsiliasi Fiskal & Penyusunan SPT Tahunan PPH Badan 3 06-08 24-26 16-18 06-08 18-20 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.500.000

320RESTITUSI PAJAK, PEMERIKSAAN PAJAK, KEBERATAN, BANDING DANGUGATAN

3 06-08 03-05 16-18 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

321 RFID for WAREHOUSE 2 02-03 10-11 23-24 23-24 11-12 08-09 23-24 10-11 24-25 12-13 09-10 21-22 4.500.000

322 RISK-BASED MANAGEMENT 3 06-08 05-07 18-20 28-30 18-20 02-04 28-30 05-07 30-02 07-09 04-06 29-31 6.500.000

323 Salesmanship Skills 2 02-03 03-04 23-24 16-17 04-05 02-03 16-17 03-04 17-18 05-06 02-03 17-18 4.500.000

324 SECURITY MANAGEMENT SYSTEM 3 13-15 17-19 18-20 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

325 SERTIFIKASI MANAJEMEN RISIKO LEVEL 1 2 02-03 25-26 23-24 01-02 19-20 23-24 01-02 25-26 02-03 27-28 24-25 02-03 4.500.000

326 SERVICE EXCELLENT 3 15-17 05-07 04-06 07-09 13-15 02-04 06-08 05-07 07-09 07-09 04-06 07-09 6.500.000

Page 37: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga327 Service Recovery Create Loyal Customers for Life 3 08-10 19-21 09-11 15-17 18-20 17-19 15-17 18-20 16-18 21-23 18-20 16-18 6.500.000

328 SISTEM INFORMASI MANAJEMEN DAN AKUNTANSI 3 27-29 17-19 04-06 28-30 04-06 15-17 28-30 19-21 28-30 19-21 16-18 29-31 6.500.000

329 Sistem Informasi manajemen Pergudangan 2 02-03 26-27 23-24 01-02 18-19 24-25 01-02 26-27 02-03 28-29 25-26 02-03 4.500.000

330 Sistem Life Cycle Costing 2 06-07 06-07 04-05 08-09 06-07 02-03 06-07 06-07 07-08 08-09 05-06 07-08 4.500.000

331 SIX SIGMA CHAMPIONS 3 13-15 17-19 11-13 15-17 18-20 15-17 15-17 19-21 16-18 19-21 16-18 16-18 6.500.000

332 SOAR Analysis 2 02-03 10-11 23-24 13-14 11-12 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000

333 SPEED AND INNOVATION 3 13-15 12-14 18-20 07-09 18-20 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

334 STANDARD OPERATING PROCEDURE 2 09-10 24-25 23-24 06-07 13-14 22-23 09-10 24-25 10-11 26-27 23-24 10-11 4.500.000

335 Standard Operational Procedure, Accounting & Finance 3 27-29 26-28 09-11 20-22 13-15 24-26 20-22 26-28 21-23 28-30 25-27 21-23 6.500.000

336 STRATEGI MEMBANGUN IMAGE CORPORATE 3 13-15 26-28 11-13 13-15 11-13 24-26 13-15 26-28 14-16 28-30 25-27 14-16 6.500.000

337 Strategi Menangani Proyek Bermasalah 3 22-24 19-21 18-20 22-24 11-13 17-19 22-24 18-20 23-25 21-23 18-20 22-24 6.500.000

338 STRATEGI MENGANTISIPASI RISIKO TINDAK PIDANA (KORUPSI) 3 15-17 05-07 09-11 28-30 18-20 03-05 28-30 05-07 30-02 07-09 04-06 29-31 6.500.000

339 STRATEGI PENGEMBANGAN BISNIS 3 15-17 10-12 04-06 01-03 18-20 08-10 01-03 10-12 02-04 12-14 09-11 02-04 6.500.000

340 STRATEGI SISTEM INFORMASI KESEHATAN DI RUMAH SAKIT 3 20-22 19-21 11-13 27-29 18-20 17-19 27-29 19-21 30-02 21-23 18-20 28-30 6.500.000

341 Strategic and Systematic Thinking 2 02-03 06-07 23-24 29-30 18-19 02-03 29-30 06-07 28-29 08-09 05-06 30-31 4.500.000

342 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 27-29 19-21 11-13 27-29 18-20 17-19 27-29 19-21 31-02 21-23 18-20 28-30 6.500.000

343STRATEGIC HUMAN RESOURCE MANAGEMENT AND ORGANIZATIONDEVELOPMENT

3 08-10 26-28 18-20 07-09 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.000

344STRATEGIC HUMAN RESOURCES MANAGEMENT FOR GLOBALCOMPETITIVE ADVANTAGE

2 02-03 10-11 23-24 16-17 19-20 08-09 16-17 10-11 17-18 12-13 09-10 17-18 4.500.000

345 STRATEGIC MANAGEMENT 3 20-22 26-28 02-04 20-22 18-20 24-26 20-22 26-28 21-23 28-30 25-27 21-23 6.500.000

346 Strategic Performance Management 3 15-17 05-07 02-04 15-17 18-20 03-05 15-17 05-07 16-18 07-09 04-06 16-18 6.500.000

347 Strategic Planning 5 20-24 10-14 09-13 20-24 04-08 08-12 20-24 10-14 21-25 12-16 09-13 30-04 9.750.000

348 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 3 29-31 05-07 02-04 20-22 18-20 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.000

349 Strategic Time Management 3 15-17 05-07 09-11 28-30 18-20 02-04 28-30 05-07 28-30 07-09 04-06 29-31 6.500.000

350 STRESS & CONFLICT MANAGEMENT 3 22-24 17-19 04-06 15-17 06-08 15-17 15-17 18-20 16-18 19-21 16-18 16-18 6.500.000

351STUDI KELAYAKAN INVESTASI MENGGUNAKAN APLIKASI MICROSOFTEXCEL

3 29-31 24-26 16-18 01-03 04-06 22-24 01-03 24-26 02-04 26-28 23-25 02-04 6.500.000

352 STUDI KELAYAKAN PROYEK 2 13-14 05-06 02-03 13-14 19-20 04-05 13-14 05-06 14-15 07-08 04-05 14-15 4.500.000

353 STUDY KELAYAKAN BISNIS 2 02-03 17-18 23-24 13-14 19-20 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000

354 SUPERVISORY LEADERSHIP AND DECISSION MAKING 3 20-22 10-12 11-13 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

355 Supplier Management 2 02-03 12-13 23-24 01-02 14-15 10-11 01-02 12-13 02-03 14-15 11-12 02-03 4.500.000

356 SUPPLY CHAIN MANAGEMENT 3 22-24 19-21 11-13 07-09 04-06 17-19 08-10 18-20 09-11 21-23 18-20 09-11 6.500.000

Page 38: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga357 Supply Chain Management (SCM) 2 02-03 05-06 23-24 29-30 06-07 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.000

358 Supply Chain Management For Project & Services 2 02-03 19-20 23-24 01-02 07-08 17-18 01-02 20-21 02-03 21-22 18-19 02-03 4.500.000

359 SUPPLY MARKET ANALYSIS 4 06-09 10-13 09-12 27-30 04-07 08-11 27-30 10-13 29-02 12-15 09-12 28-31 8.500.000

360 SWOT Analysis 2 02-03 17-18 23-24 20-21 18-19 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

361 SYSTEM AND COST PRODUCTION 4 20-23 24-27 10-13 06-09 11-14 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.500.000

362 TALENT MANAGEMENT 4 21-24 18-21 16-19 31-03 11-14 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.500.000

363TANGGUNG JAWAB SOSIAL PERUSAHAAN (CORPORATE SOCIALRESPONSIBILITY)

2 23-24 12-13 09-10 20-21 04-05 10-11 20-21 12-13 21-22 14-15 11-12 23-24 4.500.000

364 TATACARA PENYUSUNAN SILABUS DIKLAT 3 20-22 03-05 18-20 13-15 18-20 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.500.000

365 TAX ACCOUNTING 3 27-29 24-26 09-11 27-29 18-20 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.000

366 TAX AND FINANCIAL CONTROL 3 13-15 17-19 09-11 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

367 TEAM DEVELOPMENT 3 27-29 26-28 09-11 22-24 13-15 24-26 22-24 26-28 23-25 28-30 25-27 22-24 6.500.000

368 TEKNIK NEGOSIASI 3 06-08 05-07 16-18 28-30 18-20 03-05 28-30 05-07 30-02 07-09 04-06 29-31 6.500.000

369 THE LEADERSHIP CHALLENGE 2 02-03 13-14 23-24 30-31 07-08 11-12 29-30 13-14 31-01 15-16 12-13 30-01 4.500.000

370 TIME MANAGEMENT 4 27-30 17-20 17-20 21-24 04-07 15-18 21-24 18-21 22-25 19-22 16-19 21-24 8.500.000

371TINDAK PIDANA PENCUCIAN UANG DAN PERANAN BANK UNTUKMENCEGAHNYA

3 22-24 12-14 16-18 01-03 04-06 10-12 01-03 12-14 02-04 14-16 11-13 02-04 6.500.000

372TIPIKOR DALAM PENGELOLAAN KEUANGAN PERUSAHAAN &PERBANKAN

3 27-29 17-19 02-04 07-09 11-13 15-17 08-10 18-20 09-11 19-21 16-18 09-11 6.500.000

373 TOTAL COST OF OWNERSHIP ANALYSIS 3 20-22 24-26 04-06 06-08 13-15 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.000

374 Total Quality Management 3 06-08 17-19 16-18 07-09 11-13 15-17 08-10 19-21 09-11 19-21 16-18 09-11 6.500.000

375 TOTAL QUALITY MANAGEMENT SERIES MANAJEMEN MUTU TERPADU 2 02-03 17-18 23-24 13-14 19-20 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000

376 Training Analysis Program 3 06-08 17-19 16-18 28-30 18-20 15-17 28-30 18-20 30-02 19-21 16-18 29-31 6.500.000

377 TRAINING DEVELOPMENT MANAGEMENT 3 29-31 24-26 04-06 07-09 18-20 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.000

378 TRAINING EVALUATION AND MEASUREMENT METHOD 2 16-17 24-25 23-24 16-17 19-20 22-23 16-17 24-25 17-18 26-27 23-24 17-18 4.500.000

379 TRAINING NEED ANALYSIS 2 23-24 03-04 05-06 23-24 04-05 04-05 23-24 03-04 24-25 05-06 02-03 23-24 4.500.000

380TRAINING NEEDS ANALYSIS(TNA),TRAINING PLAN, TRAINING BUDGETAND TRAINING IMPACT EVALUATION(TIE)

3 29-31 19-21 04-06 07-09 13-15 17-19 06-08 18-20 07-09 21-23 18-20 07-09 6.500.000

381Training untuk pegawai persiapan masa pensiun (training pra-purnabakti)

5 27-31 10-14 09-13 30-03 11-15 08-12 29-03 10-14 28-02 12-16 09-13 30-04 9.750.000

382 TRANSFER PRICING DOCUMENTATION 2 02-03 03-04 23-24 13-14 18-19 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

383 TRANSFORMATION LEADERSHIP 3 22-24 05-07 16-18 20-22 18-20 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.000

384 TRANSPORTATION AND FACILITY DECISIONS IN A SUPPLY CHAIN 3 08-10 05-07 02-04 06-08 13-15 03-05 06-08 05-07 07-09 07-09 04-06 07-09 6.500.000

385 TREASURY AND CASH FLOW MANAGEMENT 2 16-17 13-14 23-24 16-17 07-08 11-12 16-17 13-14 17-18 15-16 12-13 17-18 4.500.000

Page 39: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga386 VALUE ENGINEERING (REKAYASA NILAI) 2 27-28 19-20 16-17 29-30 14-15 17-18 29-30 18-19 30-01 21-22 18-19 30-31 4.500.000

387 VENDOR MANAGED INVENTORY 2 02-03 12-13 23-24 13-14 18-19 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.000

388 Warehouse Management For Project & Services 2 02-03 12-13 23-24 29-30 18-19 10-11 29-30 12-13 30-01 14-15 11-12 30-31 4.500.000

389 WAREHOUSE MANAGEMENT OPERATION AND CONTROL 2 02-03 24-25 23-24 29-30 11-12 22-23 29-30 24-25 28-29 26-27 23-24 30-31 4.500.000

390 Warehousing & Distribution Management 3 06-08 03-05 02-04 01-03 18-20 03-05 01-03 03-05 02-04 05-07 02-04 02-04 6.500.000

391 WORKLOAD ANALYSIS 2 02-03 17-18 23-24 23-24 07-08 15-16 23-24 20-21 24-25 19-20 16-17 21-22 4.500.000

392 Workload Analysis 2 02-03 17-18 23-24 20-21 07-08 15-16 20-21 18-19 21-22 19-20 16-17 23-24 4.500.000

Measurement/Pengukuran - Instrumentasi -Otomasi Industri

1AC & REFRIGERATION PRINCIPLES, OPERATION ANDTROUBLESHOOTING

4 20-23 24-27 02-05 30-02 11-14 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.500.000

2 ACDC ELECTRICAL MOTOR CONTROL 4 06-09 17-20 02-05 13-16 04-07 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.750.000

3 ADVANCE PROCESS CONTROL, INSTRUMENTATION AND METERING 4 06-09 24-27 16-19 20-23 04-07 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.750.000

4 ADVANCED CONTROL FOUNDATION 4 13-16 10-13 16-19 06-09 11-14 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.000

5 ADVANCED FLOW MEASUREMENT 4 06-09 10-13 09-12 20-23 04-07 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.750.000

6ANALISIS DAN PENGUKURAN GETARAN MEKANIK (ANALYSIS ANDMEASURING OF VIBRATION MACHINERY)

4 27-30 03-06 02-05 06-09 05-08 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

7 Basic CNC 3 06-08 03-05 02-04 30-01 11-13 02-04 29-01 03-05 31-02 05-07 02-04 30-02 7.250.000

8 BLOWOUT PREVENTION AND WELL CONTROL 3 22-24 26-28 09-11 06-08 18-20 24-26 06-08 26-28 07-09 28-30 25-27 07-09 7.950.000

9 BOILER CONTROL SYSTEMS ENGINEERING 4 20-23 17-20 02-05 13-16 04-07 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.000

10 CALIBRATION ISO IEC 17025 4 14-17 18-21 09-12 27-30 11-14 16-19 27-30 18-21 28-01 20-23 17-20 28-31 8.750.000

11 CALLIBRATION OF MEASURING TOOL 4 21-24 25-28 03-06 27-30 11-14 23-26 27-30 25-28 29-02 27-30 24-27 28-31 8.500.000

12 CHOKE AND CONTROL VALVE 4 14-17 11-14 17-20 06-09 11-14 09-12 06-09 11-14 07-10 13-16 10-13 07-10 8.500.000

13 CONTROL AND CHOKE VALVES 4 20-23 24-27 02-05 30-02 05-08 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.750.000

14 CONTROL SYSTEM FUNDAMENTALS 4 27-30 03-06 10-13 06-09 12-15 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.750.000

15 CONTROL VALVE AND VALVE OPERATION AND SIZING 4 20-23 24-27 10-13 06-09 11-14 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.500.000

16CONTROL VALVE OPERATION, MAINTENANCE, ANDTROUBLESHOOTING

4 13-16 17-20 02-05 14-17 04-07 15-18 14-17 18-21 15-18 19-22 16-19 15-18 8.500.000

17 Data Akuisisi, Interfacing, dan Sistem Monitoring 3 06-08 24-26 16-18 06-08 04-06 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.750.000

18 DESIGN OF HEATING, VENTILATION AND AIR CONDITIONING SYSTEM 5 13-17 17-21 16-20 13-17 11-15 15-19 06-10 24-28 07-11 19-23 16-20 07-11 9.750.000

19 DOKUMEN KONTROL 4 13-16 17-20 09-12 27-30 05-08 15-18 27-30 18-21 29-02 19-22 16-19 28-31 8.500.000

Page 40: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga20 ELECTRICAL CALIBRATION 3 15-17 26-28 18-20 15-17 18-20 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000

21 Electrical Control Wiring 4 21-24 25-28 09-12 27-30 04-07 23-26 27-30 25-28 29-02 27-30 24-27 28-31 8.750.000

22Electrical Test Instrumentation dan Sistem Pengukuran(Measurements)

4 20-23 03-06 09-12 06-09 11-14 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.750.000

23 ELECTRONIC SHUTDOWN AND LOGIC SYSTEM 4 07-10 18-21 02-05 27-30 12-15 16-19 27-30 18-21 28-01 20-23 17-20 28-31 8.750.000

24 ELECTRO-PNEUMATICS SYSTEM PRINCIPLES AND APPLICATION 4 20-23 17-20 02-05 06-09 11-14 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

25 FIELDBUS AND INDUSTRIAL DATA COMMUNICATION 4 28-31 04-07 16-19 31-03 12-15 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.750.000

26 FISCAL AND CUSTODY METERING 4 06-09 10-13 02-05 06-09 05-08 08-11 07-10 10-13 08-11 12-15 09-12 08-11 8.750.000

27 FLOW ASSURANCE IN PIPING SYSTEMS 4 13-16 17-20 10-13 13-16 11-14 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.750.000

28 Flow Measurement and Control Element 4 07-10 11-14 10-13 27-30 12-15 09-12 27-30 11-14 29-02 13-16 10-13 28-31 8.500.000

29 FLOWMETERING AND CUSTODY TRANSFER 4 27-30 24-27 09-12 20-23 12-15 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.500.000

30 FLUID FLOW – GAS METERING AND CUSTODY TRANSFER 5 20-24 24-28 16-20 20-24 04-08 22-26 20-24 24-28 21-25 26-30 23-27 30-04 9.750.000

31FLUID FLOW MEASUREMENT AND METER PROVING IN OIL AND GASINDUSTRY

4 07-10 25-28 16-19 31-03 05-08 23-26 30-03 25-28 01-04 27-30 24-27 01-04 8.500.000

32 GAS AND LIQUID FLOW MEASUREMENT 4 20-23 24-27 02-05 27-30 11-14 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

33 GAS DISPERSION ANALYSIS 3 13-15 10-12 09-11 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.950.000

34 GAS PROCESSING AND EQUIPMENT 4 06-09 17-20 16-19 30-02 11-14 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.950.000

35 Gas, Oil and Water Pipeline Design and Maintenance 4 28-31 04-07 16-19 31-03 05-08 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.950.000

36 HUMAN MACHINE INTERFACE (HMI) 4 27-30 03-06 03-06 27-30 12-15 02-05 27-30 03-06 28-01 05-08 02-05 21-24 8.750.000

37 HVAC SYSTEM Operation & Maintenance 4 20-23 24-27 02-05 06-09 04-07 22-25 13-16 18-21 14-17 26-29 23-26 14-17 8.750.000

38 HYDRAULIC CONTROL SYSTEM 4 27-30 03-06 09-12 14-17 05-08 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.500.000

39 HYDRAULIC PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 20-23 10-13 10-13 14-17 04-07 08-11 14-17 10-13 15-18 12-15 09-12 15-18 8.500.000

40 Hydraulics Power System 5 27-31 03-07 16-20 13-17 11-15 08-12 13-17 03-07 14-18 05-09 02-06 14-18 9.750.000

41 HYDRAULICS SYSTEMS Engineering Applications 4 21-24 25-28 10-13 21-24 11-14 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.000

42 HYDRAULICS SYSTEMS MAINTENANCE & TROUBLESHOOTING 4 28-31 04-07 17-20 27-30 04-07 02-05 27-30 04-07 29-02 06-09 03-06 28-31 8.500.000

43 INDUSTRIAL METROLOGY 4 06-09 10-13 16-19 21-24 12-15 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.500.000

44 INDUSTRIAL ROBOTICS SENSING, PLANNING, AND CONTROL 4 20-23 17-20 02-05 27-30 04-07 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.500.000

45 INSTRUMENTATION AND BASIC CONTROL SYSTEM 3 27-29 24-26 04-06 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

46 INSTRUMENTATION AND CONTROL SYSTEM 4 28-31 25-28 10-13 13-16 04-07 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.000

47 INSTRUMENTATION AND CONTROL SYSTEM 4 27-30 24-27 09-12 13-16 05-08 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.000

48 INSTRUMENTATION ELECTRIC Operation and Maintenance 4 06-09 17-20 09-12 21-24 12-15 15-18 21-24 18-21 22-25 19-22 16-19 21-24 8.750.000

49 Instrumentation Systems 4 27-30 10-13 16-19 13-16 05-08 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.750.000

50 KONTROL ELEKTRIK 4 06-09 03-06 17-20 20-23 12-15 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

Page 41: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga51 MANAGING THE INTEGRITY OF GAS PIPELINE SYSTEM 3 20-22 17-19 11-13 06-08 18-20 15-17 08-10 18-20 09-11 19-21 16-18 09-11 6.500.000

52 MANUFACTURING PROCESS TO USE CNC MACHINING 4 06-09 10-13 10-13 06-09 12-15 08-11 07-10 10-13 08-11 12-15 09-12 08-11 8.500.000

53 MEASUREMENT SYSTEM ANALYSIS 4 28-31 04-07 09-12 27-30 05-08 02-05 27-30 04-07 28-01 06-09 03-06 28-31 8.500.000

54MEASUREMENT TECHNIQUE FOR MAINTENANCE AND OPERATIONLATHE MACHINE

4 07-10 11-14 16-19 30-02 12-15 09-12 29-02 11-14 31-03 13-16 10-13 30-03 8.500.000

55 Measurements Systems 4 06-09 17-20 03-06 20-23 12-15 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.750.000

56 MOTOR CONTROL CENTER OPERATION & MAINTENANCE 4 20-23 24-27 10-13 30-02 11-14 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.500.000

57 NUMERICAL CONTROL AND ROBOTIC 4 20-23 24-27 09-12 30-02 11-14 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.500.000

58 OIL & GAS MEASUREMENT AND CALCULATION 3 27-29 03-05 18-20 01-03 04-06 02-04 01-03 03-05 02-04 05-07 02-04 02-04 7.950.000

59 Oil and Gas Measurements 4 14-17 25-28 10-13 27-30 04-07 23-26 27-30 25-28 28-01 27-30 24-27 28-31 8.750.000

60OLE FOR PROCESS CONTROL (OPC) & DISTRIBUTED COMPONENTOBJECT MODEL (DCOM)

4 13-16 03-06 02-05 27-30 11-14 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.750.000

61 OPC (OPEN PROCESS CONTROL) 4 07-10 11-14 09-12 30-02 04-07 09-12 29-02 11-14 31-03 13-16 10-13 28-31 8.750.000

62 PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK 4 13-16 17-20 09-12 20-23 05-08 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000

63PERHITUNGAN KETIDAKPASTIAN HASIL PENGUKURAN DANPENGUJIAN

3 27-29 17-19 16-18 06-08 11-13 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

64PETROLEUM INDUSTRIAL REFRIGERATION OPERATION ANDMAINTENANCE

4 27-30 03-06 10-13 20-23 11-14 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.750.000

65 PETROLEUM PLANT & PIPELINE SECURITY MANAGEMENT 3 20-22 17-19 16-18 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.950.000

66 PIPELINE PIGGING OPERATIONS AND EQUIPMENT 3 27-29 24-26 18-20 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

67 Pipeline Risk & Integrity Management 3 27-29 24-26 02-04 06-08 18-20 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.950.000

68Piping & Pipeline System Design, Specification, Installation &Maintenance

4 06-09 03-06 10-13 13-16 04-07 02-05 13-16 03-06 14-17 05-08 02-05 14-17 8.750.000

69 PLANT LIFE MANAGEMENT THROUGH RELIABILITY BASED INSPECTION 5 13-17 10-14 16-20 20-24 11-15 08-12 20-24 10-14 21-25 12-16 09-13 30-04 9.750.000

70 PLUMBING SYSTEM AND MAINTENANCE 3 13-15 10-12 02-04 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

71 PNEUMATIC CONTROL SYSTEM 4 06-09 10-13 16-19 13-16 12-15 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.000

72 PNEUMATIC SYSTEM AND APPLICATION 4 28-31 25-28 16-19 06-09 05-08 23-26 07-10 25-28 08-11 27-30 24-27 08-11 8.500.000

73 Practical and Advanced Course on HVAC Systems 4 07-10 11-14 16-19 27-30 05-08 09-12 27-30 11-14 28-01 13-16 10-13 28-31 8.750.000

74 PRACTICAL PROCESS CONTROL 4 06-09 03-06 17-20 27-30 05-08 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

75 PRESSURE SAFETY VALVE SELECTION AND SIZING 3 20-22 24-26 02-04 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

76Pressure Vessel Calculation, Codes, Production, Operation, Control &Safeties

4 13-16 24-27 03-06 27-30 04-07 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.750.000

77 PROCESS CONTROL AND INSTRUMENTATION 4 20-23 10-13 09-12 30-02 05-08 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.750.000

78 PROCESS CONTROL SYSTEMS APPLICATION, DESIGN, AND TUNING 4 13-16 17-20 03-06 06-09 05-08 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

Page 42: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga79 Production Handling Separation and Measurement 4 07-10 11-14 03-06 06-09 12-15 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.500.000

80 QC for Water Network (Pipeline) Construction 3 22-24 19-21 04-06 28-30 18-20 17-19 28-30 19-21 30-02 21-23 18-20 21-23 6.950.000

81 REFRIGERATION RETROFIT 4 27-30 24-27 16-19 06-09 04-07 22-25 13-16 18-21 14-17 26-29 23-26 14-17 8.500.000

82REFRIGERATION OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 14-17 25-28 09-12 20-23 04-07 23-26 20-23 25-28 21-24 27-30 24-27 21-24 8.750.000

83 REKAYASA ELEKTRO HIDROLIK AND APLIKASI 4 13-16 10-13 09-12 21-24 04-07 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.500.000

84 REKAYASA HIDROLIK AND APLIKASI 4 20-23 17-20 17-20 27-30 11-14 15-18 27-30 18-21 29-02 19-22 16-19 28-31 8.500.000

85RELIABILITY CENTERED MAINTENANCE (RCM) Increasing Safety &Reliability in Gas Pipeline System

3 29-31 26-28 02-04 07-09 18-20 24-26 06-08 26-28 07-09 28-30 25-27 07-09 6.500.000

86 RELIABILITY ENGINEERING (TEKNIK KEANDALAN) 2 02-03 17-18 19-20 30-31 07-08 15-16 29-30 20-21 31-01 19-20 16-17 30-01 4.500.000

87 RELIABILITY, AVAILABILITY & MAINTAINABILITY ANALYSIS 3 29-31 26-28 09-11 01-03 06-08 24-26 01-03 26-28 02-04 28-30 25-27 29-31 6.950.000

88 Risk Based Inspection 3 08-10 05-07 16-18 07-09 11-13 02-04 08-10 05-07 09-11 07-09 04-06 09-11 6.950.000

89 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 27-30 17-20 17-20 06-09 12-15 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.750.000

90 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 27-30 24-27 16-19 06-09 04-07 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.500.000

91 SAFETY INSTRUMENTED SYSTEMS (SIS) ISA, IEC 4 06-09 10-13 17-20 27-30 04-07 08-11 27-30 10-13 29-02 12-15 09-12 28-31 8.750.000

92SAFETY RELIEF VALVE FUNDAMENTAL CONCEPTS, SIZING ANDSELECTION

4 07-10 25-28 03-06 13-16 04-07 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.750.000

93 SISTEM HIDROLIK DAN PNEUMATIK 4 21-24 25-28 16-19 27-30 04-07 23-26 27-30 18-21 31-03 27-30 24-27 28-31 8.750.000

94 SISTEM KONTROL MOTOR LISTRIK 4 13-16 03-06 17-20 27-30 11-14 02-05 27-30 03-06 29-02 05-08 02-05 28-31 8.500.000

95SISTEM KONTROL RHVAC (REFRIGERATION HEATING VENTILATINGAND AIR CONDITIONING)

5 20-24 17-21 09-13 13-17 11-15 15-19 06-10 24-28 07-11 19-23 16-20 07-11 9.750.000

96 SPESIFIKASI DAN PENGUKURAN GEOMETRIK 3 06-08 03-05 16-18 30-01 11-13 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.950.000

97 Ultrasonic Gas Flow Meter 5 20-24 24-28 09-13 13-17 04-08 22-26 06-10 24-28 07-11 26-30 23-27 07-11 9.750.000

98 VALVE 4 21-24 11-14 16-19 06-09 11-14 09-12 06-09 11-14 07-10 13-16 10-13 07-10 8.500.000

99 VALVE (CHOKE & CONTROL VALVE) 4 06-09 24-27 16-19 14-17 05-08 22-25 14-17 24-27 15-18 26-29 23-26 15-18 8.500.000

100 Vibration Monitoring & Control System 3 08-10 05-07 11-13 15-17 18-20 03-05 15-17 05-07 16-18 07-09 04-06 16-18 6.500.000

101 WELLHEAD INSTRUMENTATION AND HYDRAULIC CONTROL SYSTEMS 4 27-30 03-06 16-19 06-09 12-15 02-05 13-16 03-06 14-17 05-08 02-05 14-17 8.750.000

102 WIRELESS LAN IN INDUSTRIAL AUTOMATION & ISA 100.11a 4 07-10 11-14 02-05 21-24 04-07 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.750.000

Mechanical1

AC & REFRIGERATION PRINCIPLES, OPERATION ANDTROUBLESHOOTING

4 20-23 24-27 02-05 30-02 11-14 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.500.000

2 ADVANCED VIBRATION MONITORING TECHNIQUE 4 06-09 10-13 16-19 13-16 12-15 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.000

3 AEROENGINE BEARING INSPECTION 3 13-15 10-12 09-11 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

Page 43: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga4 AIR COMPRESSOR 3 20-22 17-19 16-18 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

5ALAT PENUKAR KALOR (HEAT EXCHANGER) OPERASI DANPERAWATAN

4 20-23 24-27 16-19 30-02 11-14 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.500.000

6 ALIGNMENT AND BALANCING IN ROTATING EQUIPMENT 3 27-29 24-26 02-04 27-29 18-20 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.000

7 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 27-30 17-20 09-12 06-09 04-07 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

8 ALIGNMENT, LEVELLING AND ROTOR BALANCING 3 06-08 17-19 16-18 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

9ANALISIS DAN PENGUKURAN GETARAN MEKANIK (ANALYSIS ANDMEASURING OF VIBRATION MACHINERY)

4 27-30 03-06 02-05 06-09 05-08 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

10 ANALISIS GETARAN DALAM PERAWATAN ROTARY EQUIPMENT 4 13-16 03-06 09-12 20-23 11-14 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

11 ANALISIS VIBRASI 4 27-30 17-20 09-12 20-23 11-14 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.750.000

12 ASME PTC 4 – 1 4 06-09 24-27 02-05 13-16 04-07 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.000

13 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 06-09 03-06 03-06 20-23 11-14 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

14 Basic CNC 3 06-08 03-05 02-04 30-01 11-13 02-04 29-01 03-05 31-02 05-07 02-04 30-02 7.250.000

15 BASIC GAS ENGINE 4 13-16 03-06 09-12 20-23 11-14 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

16 BASIC WELDING 4 20-23 03-06 09-12 27-30 11-14 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.950.000

17 BEARING AND OIL LUBRICATION FOR MACHINERY 3 13-15 24-26 02-04 13-15 04-06 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

18 BEARING LUBRICATION TECHNOLOGY 4 06-09 03-06 10-13 30-02 04-07 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.000

19 BEARING TECHNOLOGY AND LUBRICATION SYSTEM 4 14-17 18-21 09-12 14-17 05-08 16-19 14-17 18-21 15-18 20-23 17-20 15-18 8.500.000

20 BELT CONVEYOR OPERATION & MAINTENANCE 4 06-09 03-06 02-05 20-23 04-07 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

21 Belt Conveyor Technology, Design Cacilation and Troubleshooting 4 20-23 10-13 16-19 27-30 05-08 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

22 BENGKEL ALAT BERAT 4 20-23 10-13 16-19 27-30 04-07 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

23BOILER (KETEL UAP) DAN TURBIN UAP OPERASI, PERAWATAN DANTROUBLESHOOTING

4 06-09 24-27 16-19 13-16 11-14 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.000

24 BOILER CONTROL SYSTEMS ENGINEERING 4 20-23 17-20 02-05 13-16 04-07 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.000

25 BOILER OPERATION, MAINTENANCE & TROUBLESHOOTING 4 27-30 17-20 03-06 30-02 12-15 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.000

26 BOILER OPERATION, MAINTENANCE & TROUBLESHOOTING 4 27-30 10-13 16-19 27-30 04-07 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.750.000

27 BOILER WATER TREATMENT 4 27-30 17-20 02-05 30-02 12-15 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.000

28 BRAZING 4 27-30 10-13 10-13 21-24 11-14 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.950.000

29 CENTRIFUGAL COMPRESSOR 4 06-09 24-27 10-13 06-09 05-08 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.500.000

30 CENTRIFUGAL COMPRESSOR & STEAM TURBINE PERFORMANCE 4 14-17 04-07 17-20 13-16 11-14 02-05 13-16 04-07 14-17 06-09 03-06 14-17 8.500.000

31 CENTRIFUGAL GAS COMPRESSOR Anti Surge Control 4 06-09 10-13 10-13 30-02 12-15 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.000

32 CENTRIFUGAL GAS COMPRESSOR OPERATION & MAINTENANCE 4 13-16 17-20 17-20 06-09 05-08 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

Page 44: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga33 CENTRIFUGAL PUMP OPERATION AND MAINTENANCE 4 21-24 25-28 02-05 13-16 11-14 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.000

34 CENTRIFUGAL PUMP AND SEAL 4 21-24 11-14 03-06 21-24 04-07 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.000

35 CENTRIFUGAL PUMP Selection, Operation, and Maintenance 5 13-17 17-21 02-06 30-03 11-15 15-19 29-03 24-28 31-04 19-23 16-20 30-04 9.750.000

36 Chiller and Cooling Tower Design and Operation 3 06-08 10-12 09-11 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

37COAL FIRED POWER PLANT COMBUSTION OPERATION &MAINTENANCE

4 07-10 25-28 10-13 06-09 04-07 23-26 06-09 25-28 07-10 27-30 24-27 07-10 8.500.000

38 COATING SYSTEM AND PROTECTION CORROSION 4 28-31 04-07 09-12 31-03 05-08 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.500.000

39 COLD STORAGE PRINCIPLE, OPERATION & TROUBLESHOOTING 4 14-17 18-21 03-06 31-03 05-08 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.500.000

40 Compressor and Prime Mover Operation & Maintenance 3 22-24 19-21 04-06 15-17 18-20 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

41 COMPRESSOR Operation, Maintenance and Troubleshooting 3 06-08 17-19 02-04 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.750.000

42COMPRESSOR OPERATION, MAINTENANCE, TROUBLESHOOTING ANDDIAGNOSTIC OF FAILURE ANALYSIS

4 13-16 10-13 09-12 06-09 04-07 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.000

43 CONVEYOR OPERASI DAN PERAWATAN 4 20-23 24-27 10-13 21-24 11-14 22-25 21-24 24-27 22-25 26-29 23-26 21-24 8.500.000

44 CORROSION AND CATHODIC PROTECTION 4 28-31 18-21 09-12 27-30 12-15 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.500.000

45 DESIGN OF HEATING, VENTILATION AND AIR CONDITIONING SYSTEM 5 13-17 17-21 16-20 13-17 11-15 15-19 06-10 24-28 07-11 19-23 16-20 07-11 9.750.000

46 DIESEL ENGINE OPERATION AND MAINTENANCE 4 14-17 04-07 17-20 14-17 11-14 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.000

47 DIESEL ENGINES OPERATION AND MAINTENANCE 4 06-09 10-13 02-05 21-24 12-15 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.500.000

48 DIESEL GUNSET OPERATION AND MAINTENANCE 4 21-24 11-14 02-05 21-24 05-08 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.000

49DISAIN ALAT BANTU CEKAM DAN PEGANG (DESIGN OF JIGS ANDFIXTURES)

4 27-30 03-06 17-20 27-30 05-08 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

50 DISAIN ALAT PENEKAN DAN PEMBENTUK 4 06-09 10-13 03-06 30-02 12-15 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.000

51 DISAIN KONSTRUKSI MESIN DAN PERALATAN INDUSTRI 4 14-17 18-21 09-12 06-09 04-07 16-19 06-09 18-21 07-10 20-23 17-20 07-10 8.500.000

52 DYNAMIC OF MACHINE TOOLS 4 21-24 25-28 16-19 13-16 11-14 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.000

53ELECTRIC CHARGING SYSTEM AND STARTING SYSTEM OF HEAVYDUTY EQUIPMENT

4 13-16 10-13 16-19 30-02 04-07 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.000

54 Electric motor Operation, Maintenance & Troubleshooting 4 21-24 25-28 16-19 30-02 11-14 23-26 29-02 25-28 31-03 27-30 24-27 30-03 8.500.000

55 ELECTROPLATING 4 27-30 03-06 09-12 13-16 04-07 02-05 13-16 03-06 14-17 05-08 02-05 14-17 9.250.000

56 ELECTRO-PNEUMATICS SYSTEM PRINCIPLES AND APPLICATION 4 20-23 17-20 02-05 06-09 11-14 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

57 EMISSION SAMPLING TECHNIQUES ON IMMOVABLE CHIMNEY 3 13-15 10-12 02-04 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.950.000

58 ENGINEERING MATERIAL KNOWLEDGE FOR WAREHOUSE PEOPLE 3 27-29 03-05 16-18 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.750.000

59 FAILURE ANALYSIS METHODS AND CASES 4 06-09 10-13 16-19 20-23 11-14 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.500.000

Page 45: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

60GAS AND STEAM TURBINE Operation, Maintenance AndTroubleshooting

4 13-16 24-27 09-12 06-09 11-14 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.750.000

61 Gas Compressor Operation, Maintenance & Troubleshooting 4 20-23 24-27 09-12 06-09 04-07 22-25 06-09 18-21 07-10 26-29 23-26 07-10 8.750.000

62 GAS DISPERSION ANALYSIS 3 13-15 10-12 09-11 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.950.000

63 Gas Metal Arc Welding 4 20-23 17-20 09-12 13-16 04-07 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.950.000

64 GAS METAL ARC WELDING (LAS MIGMAG) 4 27-30 10-13 16-19 30-02 04-07 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.950.000

65 GAS TUNGSTEN ARC WELDING (LAS TIG) 4 06-09 17-20 02-05 06-09 12-15 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.950.000

66 GAS TURBINE OPERATION & MAINTENANCE 4 07-10 04-07 16-19 27-30 05-08 02-05 27-30 04-07 29-02 06-09 03-06 28-31 8.500.000

67 GAS TURBINE OPERATION, MAINTENANCE AND TROUBLESHOOTING 4 28-31 18-21 09-12 27-30 12-15 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.500.000

68 GAS TURBINE OPERATION, PERFORMANCE & TROUBLESHOOTING 4 27-30 03-06 09-12 31-03 04-07 02-05 30-03 03-06 01-04 05-08 02-05 01-04 8.500.000

69GAS TURBINE PRINCIPLES, INSPECTION, OPERATION, MAINTENANCEAND TROUBLESHOOTING

4 20-23 03-06 17-20 13-16 05-08 02-05 13-16 03-06 14-17 05-08 02-05 14-17 8.750.000

70 Gas, Oil and Water Pipeline Design and Maintenance 4 28-31 04-07 16-19 31-03 05-08 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.950.000

71 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 13-16 03-06 02-05 20-23 05-08 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

72 HAND TOOL UTILIZATION 4 13-16 17-20 17-20 31-03 04-07 15-18 30-03 18-21 01-04 19-22 16-19 01-04 8.500.000

73 HEAT EXCHANGERS Operation, maintenance and troubleshooting 4 28-31 11-14 03-06 20-23 12-15 09-12 20-23 11-14 21-24 13-16 10-13 21-24 8.750.000

74 HEAVY DUTY EQUIPMENT 4 20-23 24-27 03-06 06-09 11-14 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.500.000

75 HEAVY EQUIPMENT MANAGEMENT 4 13-16 03-06 02-05 06-09 11-14 02-05 07-10 03-06 08-11 05-08 02-05 08-11 8.500.000

76HIGH PRESSURE PUMP (HPP) OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 07-10 18-21 10-13 27-30 04-07 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.750.000

77 HVAC SYSTEM Operation & Maintenance 4 20-23 24-27 02-05 06-09 04-07 22-25 13-16 18-21 14-17 26-29 23-26 14-17 8.750.000

78 HYDRAULIC CONTROL SYSTEM 4 27-30 03-06 09-12 14-17 05-08 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.500.000

79 HYDRAULIC PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 20-23 10-13 10-13 14-17 04-07 08-11 14-17 10-13 15-18 12-15 09-12 15-18 8.500.000

80 Hydraulics Power System 5 27-31 03-07 16-20 13-17 11-15 08-12 13-17 03-07 14-18 05-09 02-06 14-18 9.750.000

81 HYDRAULICS SYSTEMS Engineering Applications 4 21-24 25-28 10-13 21-24 11-14 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.000

82 HYDRAULICS SYSTEMS MAINTENANCE & TROUBLESHOOTING 4 28-31 04-07 17-20 27-30 04-07 02-05 27-30 04-07 29-02 06-09 03-06 28-31 8.500.000

83 INSTRUMENTATION AND BASIC CONTROL SYSTEM 3 27-29 24-26 04-06 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

84 INSTRUMENTATION AND CONTROL SYSTEM 4 27-30 24-27 09-12 13-16 05-08 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.000

85KINEMATIKA DAN DINAMIKA MESIN (KINEMATICS AND DYNAMICS OFMACHINERIES)

4 28-31 04-07 17-20 06-09 05-08 02-05 06-09 04-07 07-10 06-09 03-06 07-10 8.500.000

86KOMPRESOR SENTRIFUGAL OPERASI, PEMELIHARAAN, DANTROUBLESHOOTING

4 06-09 10-13 02-05 20-23 05-08 02-05 20-23 10-13 21-24 12-15 09-12 21-24 8.750.000

87 KONTROL ELEKTRIK 4 06-09 03-06 17-20 20-23 12-15 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

Page 46: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga88 LIQUID PENETRANT TESTING 5 13-17 24-28 16-20 30-03 04-08 22-26 29-03 24-28 31-04 26-30 23-27 30-04 11.500.000

89 Lubrication and Bearing Technology 4 14-17 25-28 16-19 31-03 11-14 23-26 30-03 25-28 01-04 27-30 24-27 01-04 8.750.000

90 LUBRIKASI Prinsip Dasar dan Aplikasi 3 22-24 05-07 02-04 06-08 18-20 02-04 08-10 05-07 09-11 07-09 04-06 09-11 6.500.000

91 Machinery Diagnostic 4 13-16 10-13 02-05 31-03 12-15 08-11 30-03 10-13 01-04 12-15 09-12 01-04 8.500.000

92 MACHINERY FLUID MECHANICS 4 20-23 17-20 16-19 13-16 11-14 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.000

93 MACHINERY NOISE AND PROBLEM SOLVING 4 07-10 11-14 03-06 13-16 12-15 09-12 13-16 11-14 14-17 13-16 10-13 14-17 8.500.000

94 MAGNETIC PARTICLE TESTING 5 20-24 03-07 02-06 13-17 11-15 08-12 06-10 03-07 07-11 05-09 02-06 07-11 11.500.000

95 MANAGING THE INTEGRITY OF GAS PIPELINE SYSTEM 3 20-22 17-19 11-13 06-08 18-20 15-17 08-10 18-20 09-11 19-21 16-18 09-11 6.500.000

96 MANAJEMEN BENGKEL 4 20-23 24-27 16-19 20-23 11-14 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.500.000

97 MANAJEMEN MATERIAL 4 20-23 17-20 16-19 30-02 05-08 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.000

98 Manajemen Perbengkelan 4 27-30 24-27 03-06 06-09 12-15 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.500.000

99MANAJEMEN POST WELD HEAT TREATMENT TEORI, STANDARDPROSEDUR DAN APLIKASI

3 06-08 10-12 02-04 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.750.000

100 MANUAL METAL ARC WELDING (LAS LISTRIK) 4 13-16 24-27 10-13 13-16 05-08 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.950.000

101 MANUFACTURING PROCESS TO USE CNC MACHINING 4 06-09 10-13 10-13 06-09 12-15 08-11 07-10 10-13 08-11 12-15 09-12 08-11 8.500.000

102 MANUFACTURING PROCESSES TO USE CASTING 4 14-17 18-21 17-20 14-17 04-07 16-19 14-17 18-21 15-18 20-23 17-20 15-18 8.500.000

103 MANUFACTURING PROCESSES TO USE METAL FORMING 4 21-24 25-28 03-06 21-24 11-14 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.000

104 MATERIAL ATTITUDE USES AND PROBLEMS 4 21-24 25-28 02-05 06-09 11-14 23-26 07-10 25-28 08-11 27-30 24-27 08-11 8.500.000

105MATERIAL CERTIFICATION REQUIREMENT FOR OIL AND GASINDUSTRY

3 20-22 24-26 18-20 27-29 11-13 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.750.000

106 MATERIAL HANDLING & PACKAGING 4 06-09 17-20 02-05 27-30 11-14 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.500.000

107 MATERIAL IDENTIFICATION 4 28-31 04-07 09-12 14-17 04-07 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.000

108MEASUREMENT TECHNIQUE FOR MAINTENANCE AND OPERATIONLATHE MACHINE

4 07-10 11-14 16-19 30-02 12-15 09-12 29-02 11-14 31-03 13-16 10-13 30-03 8.500.000

109 MECHATRONICS APPLICATION IN INDUSTRY 4 14-17 11-14 03-06 27-30 04-07 09-12 27-30 11-14 28-01 13-16 10-13 28-31 8.500.000

110 Mekatronika 4 21-24 18-21 10-13 31-03 11-14 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.500.000

111 METALLURGY FOR NON METALLURGIST 4 14-17 18-21 03-06 27-30 05-08 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.500.000

112 MOTOR CONTROL CENTER OPERATION & MAINTENANCE 4 20-23 24-27 10-13 30-02 11-14 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.500.000

113 MOTOR DIESEL PRINSIP DASAR, OPERASI DAN PERAWATAN 4 06-09 24-27 09-12 13-16 04-07 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.000

114 NON DESTRUCTIVE TEST 4 20-23 24-27 10-13 13-16 11-14 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.000

115 NON DESTRUCTIVE TEST(NDT) 4 20-23 10-13 09-12 30-02 04-07 08-11 29-02 10-13 31-03 12-15 09-12 28-31 8.500.000

116 NON DESTRUCTIVE TESTING (NDT) 4 27-30 17-20 17-20 20-23 12-15 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000

117OIL FILM BEARING (JOURNAL DAN THRUST BEARING HYDRODYNAMICBEARINGS)

4 27-30 10-13 09-12 14-17 05-08 08-11 14-17 10-13 15-18 12-15 09-12 15-18 8.750.000

Page 47: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga118 Oil Transportation Piping 4 27-30 03-06 17-20 20-23 05-08 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

119 OPERASI DAN PEMELIHARAAN TURBIN GAS DAN GENERATOR 4 06-09 24-27 03-06 27-30 05-08 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

120 OPERATING AND MAINTENANCE OF HEAVY DUTY EQUIPMENTS 4 06-09 10-13 02-05 13-16 12-15 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.000

121 OPERATION & MAINTENANCE OF BOILER 4 06-09 24-27 16-19 31-03 04-07 22-25 30-03 24-27 01-04 26-29 23-26 01-04 8.500.000

122 OPERATION AND MAINTENANCE OF HEAVY DUTY EQUIPMENT 4 20-23 10-13 02-05 13-16 11-14 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.000

123OPERATION, MAINTENANCE AND TROUBLESHOOTING OF GASTURBINE

4 13-16 03-06 03-06 06-09 11-14 02-05 07-10 03-06 08-11 05-08 02-05 08-11 8.500.000

124 OXY ACETYLENE WELDING 4 14-17 18-21 09-12 31-03 04-07 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.750.000

125 OXY ACETYLENE WELDING (LAS ASETILIN) 4 21-24 04-07 17-20 20-23 11-14 02-05 20-23 04-07 21-24 06-09 03-06 21-24 8.950.000

126 PELUMAS DAN SISTEM PELUMASAN 4 27-30 24-27 02-05 20-23 05-08 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.500.000

127 PELUMASAN MESIN 4 13-16 03-06 16-19 20-23 11-14 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

128 PEMBANGKIT UAP (BOILER) 4 20-23 10-13 02-05 27-30 05-08 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

129PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL (OIL FENCE)SEBAGAI PENGUMPUL TUMPAHAN MINYAK

4 20-23 10-13 10-13 27-30 12-15 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

130 PEMILIHAN MATERIAL KOMPONEN MESIN (MATERIAL SELECTION) 4 21-24 25-28 16-19 06-09 11-14 23-26 07-10 25-28 08-11 27-30 24-27 08-11 8.500.000

131 PENGEMBANGAN TEKNOLOGI DAN STANDAR MATERIAL 4 28-31 04-07 02-05 14-17 05-08 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.000

132 PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK 4 13-16 17-20 09-12 20-23 05-08 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000

133 PENGETAHUAN MATERIAL HANDLING & APLIKASI 4 07-10 04-07 10-13 13-16 04-07 02-05 13-16 04-07 14-17 06-09 03-06 14-17 8.500.000

134 PENGGERAK MULA (PRIME MOVER) 4 27-30 17-20 10-13 30-02 12-15 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.000

135 PENGUJIAN MATERIAL BERSIFAT MERUSAK (DESTRUCTIVE TEST) 4 07-10 11-14 10-13 21-24 12-15 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.000

136 Perawatan Belt Conveyor 3 20-22 10-12 11-13 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

137 PERLAKUAN PANAS LOGAM (HEAT TREATMENT FOR METAL) 4 27-30 03-06 09-12 06-09 05-08 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

138PETROLEUM INDUSTRIAL REFRIGERATION OPERATION ANDMAINTENANCE

4 27-30 03-06 10-13 20-23 11-14 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.750.000

139 PETROLEUM PLANT & PIPELINE SECURITY MANAGEMENT 3 20-22 17-19 16-18 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.950.000

140 PIPELINE Design, Testing, Inspection And Maintenance 4 06-09 17-20 17-20 21-24 12-15 15-18 21-24 18-21 22-25 19-22 16-19 21-24 8.750.000

141 PIPELINE INTERNAL CORROSION CONTROL AND MONITORING 4 20-23 24-27 17-20 20-23 12-15 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.950.000

142 PIPELINE PIGGING OPERATIONS AND EQUIPMENT 3 27-29 24-26 18-20 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

143 Pipeline Risk & Integrity Management 3 27-29 24-26 02-04 06-08 18-20 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.950.000

144Piping & Pipeline System Design, Specification, Installation &Maintenance

4 06-09 03-06 10-13 13-16 04-07 02-05 13-16 03-06 14-17 05-08 02-05 14-17 8.750.000

145 PIPING SYSTEM 4 06-09 24-27 16-19 27-30 04-07 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.750.000

146 PIPING SYSTEM MATERIAL DESIGN AND MAINTENANCE 4 28-31 04-07 03-06 31-03 04-07 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.500.000

Page 48: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

147 PLANT LIFE MANAGEMENT THROUGH RELIABILITY BASED INSPECTION 5 13-17 10-14 16-20 20-24 11-15 08-12 20-24 10-14 21-25 12-16 09-13 30-04 9.750.000

148 PLUMBING SYSTEM AND MAINTENANCE 3 13-15 10-12 02-04 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

149 PNEUMATIC CONTROL SYSTEM 4 06-09 10-13 16-19 13-16 12-15 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.000

150 PNEUMATIC SYSTEM AND APPLICATION 4 28-31 25-28 16-19 06-09 05-08 23-26 07-10 25-28 08-11 27-30 24-27 08-11 8.500.000

151POMPA DAN KOMPRESOR OPERASI, PERAWATAN DANTROUBLESHOOTING

4 28-31 18-21 17-20 30-02 04-07 16-19 29-02 18-21 31-03 20-23 17-20 30-03 8.500.000

152 POMPA OPERASI DAN PERAWATAN 4 14-17 04-07 09-12 30-02 11-14 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.000

153 Practical and Advanced Course on HVAC Systems 4 07-10 11-14 16-19 27-30 05-08 09-12 27-30 11-14 28-01 13-16 10-13 28-31 8.750.000

154 PRACTICAL WELDING 4 27-30 03-06 09-12 27-30 04-07 02-05 27-30 03-06 29-02 05-08 02-05 28-31 8.500.000

155 PRACTICE CONSIDERATIONS OF ARC WELDING 4 06-09 10-13 16-19 30-02 12-15 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.000

156Pressure Vessel Calculation, Codes, Production, Operation, Control &Safeties

4 13-16 24-27 03-06 27-30 04-07 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.750.000

157 PRESSURE VESSEL DESIGN, OPERATION & MAINTENANCE 4 06-09 24-27 10-13 21-24 12-15 22-25 21-24 24-27 22-25 26-29 23-26 21-24 8.500.000

158 PRODUCTION OF HELICAL GEAR 4 13-16 17-20 09-12 14-17 04-07 15-18 14-17 18-21 15-18 19-22 16-19 15-18 8.500.000

159 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 07-10 04-07 02-05 14-17 12-15 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.000

160 PROSES PEMESINAN (MACHINING) 4 06-09 10-13 10-13 30-02 12-15 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.000

161PROSES PENGERJAAN AKHIR DENGAN PELAPIS LOGAM(ELECTROPLATING)

4 13-16 17-20 02-05 27-30 05-08 15-18 27-30 18-21 28-01 19-22 16-19 28-31 9.250.000

162 PROTECTIVE COATING TECHNOLOGY FOR CORROSION CONTROL 3 29-31 05-07 04-06 30-01 18-20 03-05 29-01 05-07 31-02 07-09 04-06 30-02 6.750.000

163PUMP AND COMPRESSOR OPERATION, MAINTENANCE &TROUBLESHOOTING

5 13-17 17-21 09-13 30-03 11-15 15-19 29-03 24-28 28-02 19-23 16-20 30-04 9.750.000

164PUMP AND COMPRESSOR OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 28-31 11-14 16-19 06-09 05-08 09-12 06-09 11-14 07-10 13-16 10-13 07-10 8.750.000

165 PUMP OPERATION AND MAINTENANCE 4 14-17 18-21 17-20 06-09 04-07 16-19 06-09 18-21 07-10 20-23 17-20 07-10 8.500.000

166 Pump Operation, Maintenance & Troubleshooting 4 14-17 04-07 09-12 14-17 05-08 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.000

167 PUMP OPERATION, MAINTENANCE AND TROUBLESHOOTING 4 20-23 03-06 10-13 30-02 11-14 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.750.000

168 PV ELITE PRESSURE VESSEL DESIGN & ANALYSIS 4 13-16 10-13 09-12 27-30 04-07 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

169 QC for Water Network (Pipeline) Construction 3 22-24 19-21 04-06 28-30 18-20 17-19 28-30 19-21 30-02 21-23 18-20 21-23 6.950.000

170 Refractory and Heat Insulation 4 07-10 18-21 02-05 13-16 12-15 16-19 13-16 18-21 14-17 20-23 17-20 14-17 8.750.000

171 REFRIGERATION RETROFIT 4 27-30 24-27 16-19 06-09 04-07 22-25 13-16 18-21 14-17 26-29 23-26 14-17 8.500.000

172REFRIGERATION OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 14-17 25-28 09-12 20-23 04-07 23-26 20-23 25-28 21-24 27-30 24-27 21-24 8.750.000

173 REKAYASA ELEKTRO HIDROLIK AND APLIKASI 4 13-16 10-13 09-12 21-24 04-07 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.500.000

174 REKAYASA HIDROLIK AND APLIKASI 4 20-23 17-20 17-20 27-30 11-14 15-18 27-30 18-21 29-02 19-22 16-19 28-31 8.500.000

Page 49: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga175 Risk Based Inspection 3 08-10 05-07 16-18 07-09 11-13 02-04 08-10 05-07 09-11 07-09 04-06 09-11 6.950.000

176 ROTATING EQUIPMENT 4 21-24 04-07 17-20 27-30 11-14 02-05 27-30 04-07 29-02 06-09 03-06 28-31 8.750.000

177 ROTATING EQUIPMENTS 3 15-17 19-21 04-06 07-09 18-20 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.750.000

178 ROTATING EQUIPMENTS 4 07-10 25-28 10-13 21-24 05-08 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.000

179 ROTOR BALANCING AND SHAFT ALIGNMENT 4 28-31 04-07 17-20 20-23 04-07 02-05 20-23 04-07 21-24 06-09 03-06 21-24 8.500.000

180 SISTEM HIDROLIK DAN PNEUMATIK 4 21-24 25-28 16-19 27-30 04-07 23-26 27-30 18-21 31-03 27-30 24-27 28-31 8.750.000

181 SISTEM KONTROL MOTOR LISTRIK 4 13-16 03-06 17-20 27-30 11-14 02-05 27-30 03-06 29-02 05-08 02-05 28-31 8.500.000

182SISTEM KONTROL RHVAC (REFRIGERATION HEATING VENTILATINGAND AIR CONDITIONING)

5 20-24 17-21 09-13 13-17 11-15 15-19 06-10 24-28 07-11 19-23 16-20 07-11 9.750.000

183 SISTEM PEMIPAAN (PIPING) 4 13-16 17-20 02-05 31-03 04-07 15-18 30-03 18-21 01-04 19-22 16-19 01-04 8.500.000

184 SPESIFIKASI DAN PENGUKURAN GEOMETRIK 3 06-08 03-05 16-18 30-01 11-13 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.950.000

185 STEAM GENERATOR AND TURBINE OPERATION AND MAINTENANCE 4 27-30 17-20 17-20 20-23 05-08 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000

186STEAM TURBINE OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 27-30 10-13 03-06 31-03 05-08 08-11 30-03 10-13 01-04 12-15 09-12 01-04 8.750.000

187 TESTING OF MACHINE TOOLS 4 14-17 18-21 09-12 27-30 04-07 16-19 27-30 18-21 28-01 20-23 17-20 28-31 8.500.000

188 THERMAL SPRAY COATING 4 27-30 03-06 09-12 20-23 11-14 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

189 TRAFO PRINCIPLES, APPLICATION AND MAINTENANCE 4 20-23 10-13 03-06 31-03 04-07 08-11 30-03 10-13 01-04 12-15 09-12 01-04 8.500.000

190 TRANSMISI DAYA MEKANIK (MECHANICAL POWER TRANSMISSION) 4 14-17 04-07 09-12 30-02 04-07 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.000

191 Transmisi Daya Mekanik (Mechanical Power Transmission) 4 28-31 04-07 02-05 06-09 05-08 02-05 06-09 04-07 07-10 06-09 03-06 07-10 8.500.000

192TROUBLE SHOOTING, INSPECTION, AND MONITORING OFMACHINERY

4 07-10 11-14 10-13 13-16 12-15 09-12 13-16 11-14 14-17 13-16 10-13 14-17 8.500.000

193 TURBIN & GENERATOR OPERATION 4 27-30 17-20 09-12 06-09 12-15 15-18 07-10 18-21 08-11 19-22 16-19 08-11 8.500.000

194 TURBIN GAS 4 07-10 25-28 17-20 06-09 04-07 23-26 06-09 25-28 07-10 27-30 24-27 07-10 8.500.000

195 TURBIN UAP 4 14-17 04-07 03-06 14-17 11-14 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.000

196 Turbomachinery Operation, Maintenance and Troubleshooting 4 28-31 18-21 03-06 14-17 05-08 16-19 14-17 18-21 15-18 20-23 17-20 15-18 8.500.000

197 VALVE 4 21-24 11-14 16-19 06-09 11-14 09-12 06-09 11-14 07-10 13-16 10-13 07-10 8.500.000

198 VALVE (CHOKE & CONTROL VALVE) 4 06-09 24-27 16-19 14-17 05-08 22-25 14-17 24-27 15-18 26-29 23-26 15-18 8.500.000

199 Vibration Monitoring & Control System 3 08-10 05-07 11-13 15-17 18-20 03-05 15-17 05-07 16-18 07-09 04-06 16-18 6.500.000

200 Welding 4 07-10 11-14 16-19 13-16 12-15 09-12 13-16 11-14 14-17 13-16 10-13 14-17 8.500.000

201 WELDING INSPECTION 4 28-31 11-14 03-06 27-30 04-07 09-12 27-30 11-14 29-02 13-16 10-13 28-31 9.500.000

202 WELDING INSPECTION 4 14-17 04-07 02-05 20-23 11-14 02-05 20-23 04-07 21-24 06-09 03-06 21-24 8.500.000

203 Welding Joint Inspection 4 14-17 18-21 03-06 20-23 05-08 16-19 20-23 18-21 21-24 20-23 17-20 21-24 8.500.000

Page 50: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga204 Welding Metallurgy 4 20-23 24-27 10-13 27-30 11-14 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

205 WELDING METALLURGY 4 27-30 24-27 16-19 20-23 11-14 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.950.000

206 WELDING METALLURGY 4 07-10 18-21 09-12 31-03 12-15 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.950.000

207 Welding Oxy Acetylene 4 27-30 03-06 17-20 31-03 04-07 02-05 30-03 03-06 01-04 05-08 02-05 01-04 8.500.000

208 WELDING SAFETY 2 02-03 03-04 23-24 27-28 18-19 02-03 27-28 03-04 01-02 05-06 02-03 23-24 4.500.000

209 WELDING SAFETY 3 15-17 26-28 16-18 06-08 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.950.000

210 WELDING SUPERVISOR 4 06-09 03-06 02-05 27-30 05-08 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.950.000

211 WELDING TECHNOLOGY 4 20-23 03-06 02-05 14-17 05-08 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.950.000

Minyak dan Gas Bumi (Migas)1 Advanced Oil and Gas Production System 3 20-22 24-26 16-18 06-08 18-20 22-24 06-08 24-26 07-09 26-28 23-25 07-09 7.950.000

2 APPLIED ROCK MECHANICS 3 13-15 10-12 16-18 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 7.950.000

3 ARTIFICIAL LIFT 4 13-16 17-20 03-06 06-09 11-14 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

4 ARUS MINYAK KORPORATE 3 29-31 05-07 18-20 13-15 04-06 03-05 13-15 05-07 14-16 07-09 04-06 14-16 7.950.000

5 BASIC DRILLING ENGINEERING 3 20-22 17-19 02-04 06-08 11-13 15-17 06-08 18-20 07-09 19-21 16-18 07-09 7.950.000

6BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &ENVIRONMENTAL CONSIDERATION

3 27-29 03-05 02-04 13-15 18-20 02-04 13-15 03-05 14-16 05-07 02-04 14-16 7.950.000

7 BASIC DRILLING TECHNOLOGY 3 27-29 24-26 09-11 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 7.950.000

8 BASIC DRILLING, COMPLETION AND WORKOVER OPERATIONS 3 06-08 03-05 18-20 20-22 04-06 02-04 20-22 03-05 21-23 05-07 02-04 21-23 7.950.000

9BASIC OF SURFACE OPERATION AND MAINTENANCE FOR OIL ANDGAS INDUSTRIES

4 07-10 11-14 02-05 06-09 12-15 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.500.000

10 Basic Petroleum Engineering 3 06-08 10-12 09-11 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 21-23 7.950.000

11 BASIC PETROLEUM ENGINEERING FOR NON-PETROLEUM ENGINEERS 3 15-17 12-14 04-06 27-29 13-15 10-12 27-29 12-14 28-30 14-16 11-13 28-30 7.950.000

12 BASIC PETROLEUM ENGINEERING PRACTICES 3 22-24 19-21 11-13 01-03 18-20 17-19 01-03 19-21 02-04 21-23 18-20 02-04 7.950.000

13 BASIC PETROLEUM TECHNOLOGY 3 29-31 26-28 16-18 07-09 06-08 24-26 08-10 26-28 09-11 28-30 25-27 09-11 7.950.000

14 Basic Reservoir Engineering for Non Petroleum Engineer 3 13-15 17-19 18-20 27-29 18-20 15-17 27-29 18-20 28-30 19-21 16-18 28-30 7.950.000

15 BASIC SURFACE SAFETY SYSTEM 3 22-24 26-28 04-06 30-01 18-20 24-26 29-01 26-28 31-02 28-30 25-27 30-02 7.950.000

16 BLOWOUT PREVENTION AND WELL CONTROL 3 22-24 26-28 09-11 06-08 18-20 24-26 06-08 26-28 07-09 28-30 25-27 07-09 7.950.000

17 CARBONATE RESERVOIRS 3 08-10 05-07 02-04 15-17 11-13 03-05 15-17 05-07 16-18 07-09 04-06 16-18 7.950.000

18 CASING AND CEMENTING 3 13-15 10-12 09-11 22-24 18-20 08-10 22-24 10-12 23-25 12-14 09-11 22-24 7.950.000

19 Cathodic Protection for Onshore and Offshore Structure 4 13-16 17-20 16-19 27-30 04-07 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.950.000

20 CEMENTING PRACTICES - CEMENTING II 3 20-22 17-19 18-20 28-30 04-06 15-17 28-30 18-20 30-02 19-21 16-18 29-31 7.950.000

Page 51: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga21 COALBED METHANE – CBM 3 27-29 24-26 04-06 30-01 13-15 22-24 29-01 24-26 31-02 26-28 23-25 30-02 7.950.000

22 COMPLETE THE WELL ON PAPER 3 06-08 03-05 11-13 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 7.950.000

23 COMPLETIONS AND WORKOVERS 3 15-17 12-14 16-18 13-15 06-08 10-12 13-15 12-14 14-16 14-16 11-13 14-16 7.950.000

24 DEEPWATER DRILLING RIGS, EQUIPMENT AND OPERATIONS 3 22-24 19-21 02-04 20-22 11-13 17-19 20-22 19-21 21-23 21-23 18-20 21-23 7.950.000

25 DESIGN PRIMARY CEMENTING - CEMENTING I 3 29-31 26-28 09-11 27-29 18-20 24-26 27-29 26-28 28-30 28-30 25-27 28-30 7.950.000

26 DIRECTIONAL, HORIZONTAL, AND MULTILATERAL DRILLING 3 08-10 05-07 18-20 01-03 04-06 03-05 01-03 05-07 02-04 07-09 04-06 02-04 7.950.000

27 DRILL STRING DESIGN AND OPTIMIZATION 3 13-15 10-12 04-06 07-09 13-15 08-10 08-10 10-12 09-11 12-14 09-11 09-11 7.950.000

28 DRILL STRING FAILURE PREVENTION 1 3 20-22 17-19 11-13 15-17 18-20 15-17 15-17 18-20 16-18 19-21 16-18 16-18 7.950.000

29 DRILL STRING FAILURE PREVENTION 2 3 27-29 24-26 16-18 22-24 06-08 22-24 22-24 24-26 23-25 26-28 23-25 22-24 7.950.000

30 DRILLING ENGINEERING FOR NON-DRILLING ENGINEERS 3 06-08 03-05 02-04 28-30 11-13 02-04 28-30 03-05 30-02 05-07 02-04 29-31 7.950.000

31 DRILLING FLUIDS TECHNOLOGY 3 15-17 12-14 09-11 30-01 18-20 10-12 29-01 12-14 31-02 14-16 11-13 30-02 7.950.000

32 DRILLING MECHANICS AND MATH 1 3 22-24 19-21 18-20 06-08 04-06 17-19 06-08 19-21 07-09 21-23 18-20 07-09 7.950.000

33 DRILLING MECHANICS AND MATH 2 3 29-31 26-28 04-06 13-15 13-15 24-26 13-15 26-28 14-16 28-30 25-27 14-16 7.950.000

34 Drilling operations for operator in oil and gas industries 4 27-30 03-06 16-19 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

35 DRILLING PRACTICES 3 08-10 05-07 11-13 20-22 18-20 03-05 20-22 05-07 21-23 07-09 04-06 21-23 7.950.000

36ELECTRIC SUBMERSIBLE PUMP PRINCIPLES, INSTALLATION,OPERATION, MAINTENANCE AND TROUBLESHOOTING

3 29-31 05-07 11-13 07-09 18-20 03-05 08-10 05-07 09-11 07-09 04-06 09-11 7.950.000

37EXPLORATION AND PRODUCTION PROCESS BASICS UNDERSTANDINGTHE PETROLEUM INDUSTRY VALUE CYCLE

3 13-15 10-12 16-18 27-29 06-08 08-10 27-29 10-12 28-30 12-14 09-11 28-30 7.950.000

38 FORMATION DAMAGE AND WELL STIMULATION 3 08-10 12-14 16-18 15-17 18-20 10-12 15-17 12-14 16-18 14-16 11-13 16-18 7.950.000

39 FORMATION DAMAGE CAUSES, PREVENTION, AND REMEDIATION 3 20-22 17-19 02-04 01-03 11-13 15-17 01-03 18-20 02-04 19-21 16-18 02-04 7.950.000

40 FUNDAMENTALS OF CASING DESIGN 3 27-29 24-26 09-11 07-09 18-20 22-24 08-10 24-26 09-11 26-28 23-25 09-11 7.950.000

41 GAS DEHYDRATION AND GLYCOL REGENERATION 4 14-17 18-21 03-06 21-24 04-07 16-19 21-24 18-21 22-25 20-23 17-20 21-24 8.950.000

42 GAS DISPERSION ANALYSIS 3 13-15 10-12 09-11 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.950.000

43 GAS HANDLING, CONDITIONING, AND PROCESSING FACILITIES 4 27-30 24-27 02-05 20-23 04-07 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.500.000

44 GAS PROCESSING AND EQUIPMENT 4 06-09 17-20 16-19 30-02 11-14 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.950.000

45GAS SWEETENING H2S AND CO2 REMOVAL IN CHEMICAL, OIL ANDGAS

4 21-24 25-28 09-12 27-30 12-15 23-26 27-30 25-28 29-02 27-30 24-27 28-31 8.950.000

46 Gas, Oil and Water Pipeline Design and Maintenance 4 28-31 04-07 16-19 31-03 05-08 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.950.000

47 H2S AWARENESS 3 08-10 05-07 09-11 06-08 18-20 02-04 06-08 05-07 07-09 07-09 04-06 07-09 6.500.000

48 HAZARD IDENTIFICATION 3 06-08 03-05 18-20 15-17 04-06 02-04 15-17 03-05 16-18 05-07 02-04 16-18 7.950.000

49HORIZONTAL AND MULTILATERAL WELLS COMPLETIONS ANDSTIMULATION

3 15-17 12-14 04-06 22-24 13-15 10-12 22-24 12-14 23-25 14-16 11-13 22-24 7.950.000

Page 52: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga50 INTERPRETATION OF ROCKS, LOG, AND TEST DATA 3 22-24 19-21 11-13 28-30 18-20 17-19 28-30 19-21 30-02 21-23 18-20 29-31 7.950.000

51 INTRO TO DRILLING 3 29-31 26-28 16-18 30-01 06-08 24-26 29-01 26-28 31-02 28-30 25-27 30-02 7.950.000

52INTRODUCTION OF PETROLEUM GEOLOGY, GEOPHYSISCS &PETROLEUM ENGINEERING FOR NON ENGINEER

3 08-10 05-07 02-04 06-08 11-13 03-05 06-08 05-07 07-09 07-09 04-06 07-09 7.950.000

53 INTRODUCTION TO DRILLING ENGINEERING 3 13-15 10-12 09-11 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 7.950.000

54Lightning Protection and Grounding System for Oil & Gas Refinery andPetrochemical Installation

3 27-29 03-05 02-04 27-29 18-20 02-04 27-29 03-05 31-02 05-07 02-04 28-30 6.950.000

55 MANAGING WELLSITE OPERATIONS 3 20-22 17-19 18-20 20-22 04-06 15-17 20-22 18-20 21-23 19-21 16-18 21-23 7.950.000

56 MARINE CORROSION AND PREVENTION FOR OFFSHORE STRUCTURE 3 13-15 17-19 09-11 20-22 04-06 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.750.000

57MATERIAL CERTIFICATION REQUIREMENT FOR OIL AND GASINDUSTRY

3 20-22 24-26 18-20 27-29 11-13 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.750.000

58MODERN HYDROCARBON WELL PRODUCTION LOGGING DATAANALYSIS AND INTERPRETATION

3 08-10 12-14 04-06 20-22 13-15 10-12 20-22 12-14 21-23 14-16 11-13 21-23 7.950.000

59 NATURAL GAS PROCESSING - FRACTINATION AND REFREGERATION 4 13-16 17-20 09-12 20-23 05-08 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000

60 NATURAL GAS RESERVOIR, PROCESSING AND ECONOMICS ASPECTS 3 15-17 19-21 02-04 22-24 11-13 17-19 22-24 19-21 23-25 21-23 18-20 22-24 7.950.000

61 OFFSHORE DRILLING OPERATIONS 3 27-29 24-26 04-06 27-29 13-15 22-24 27-29 24-26 28-30 26-28 23-25 28-30 7.950.000

62 OFFSHORE WELLHEAD FUNCTION AND TROUBLESHOOTING 4 20-23 24-27 10-13 13-16 05-08 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.000

63 OIL & GAS MEASUREMENT AND CALCULATION 3 27-29 03-05 18-20 01-03 04-06 02-04 01-03 03-05 02-04 05-07 02-04 02-04 7.950.000

64 Oil & Gas Production System 3 20-22 24-26 09-11 28-30 18-20 22-24 28-30 24-26 30-02 26-28 23-25 29-31 7.950.000

65 OIL AND GAS HANDLING FACILITIES 4 07-10 04-07 17-20 21-24 11-14 02-05 21-24 04-07 22-25 06-09 03-06 21-24 8.500.000

66 OIL AND GAS HANDLING FACILITIES 3 06-08 10-12 04-06 06-08 13-15 08-10 06-08 10-12 07-09 12-14 09-11 07-09 7.950.000

67 Oil and Gas Measurements 4 14-17 25-28 10-13 27-30 04-07 23-26 27-30 25-28 28-01 27-30 24-27 28-31 8.750.000

68 OIL AND GAS PROCESSING PLANT DESIGN AND OPERATION 4 14-17 11-14 02-05 27-30 05-08 09-12 27-30 11-14 29-02 13-16 10-13 28-31 8.500.000

69OIL AND GAS WELLS STIMULATION BY ACIDIZING AND HYDRAULICFRACTURING

3 13-15 17-19 11-13 13-15 18-20 15-17 13-15 18-20 14-16 19-21 16-18 14-16 7.950.000

70 Oil Field, and 100 Methods to Maintain and Increase Production 3 22-24 26-28 16-18 20-22 06-08 24-26 20-22 26-28 21-23 28-30 25-27 21-23 7.950.000

71 OIL SPILL - OIL BOOM AND ENVIRONMENTAL MANAGEMENT 4 13-16 17-20 10-13 14-17 04-07 15-18 14-17 18-21 15-18 19-22 16-19 15-18 8.950.000

72 Oil Transportation Piping 4 27-30 03-06 17-20 20-23 05-08 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.000

73PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL (OIL FENCE)SEBAGAI PENGUMPUL TUMPAHAN MINYAK

4 20-23 10-13 10-13 27-30 12-15 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

74 PENGETAHUAN TEKNIK PERMINYAKAN UNTUK MANAJERIAL 4 21-24 25-28 16-19 27-30 11-14 23-26 27-30 25-28 28-01 27-30 24-27 28-31 8.500.000

75 PETROLEUM ENGINEERING FOR NON PETROLEUM EMPLOYEE 4 20-23 24-27 17-20 27-30 12-15 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

76 PETROLEUM ENGINEERING FOR NON PETROLEUM ENGINEERS 3 29-31 05-07 02-04 27-29 11-13 03-05 27-29 05-07 28-30 07-09 04-06 28-30 7.950.000

Page 53: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

77PETROLEUM FINANCE, COST CONTROL & RESERVOIR MANAJEMEN(Petroleum Economics)

4 28-31 04-07 03-06 30-02 04-07 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.000

78 PETROLEUM PLANT & PIPELINE SECURITY MANAGEMENT 3 20-22 17-19 16-18 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.950.000

79PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR PETROLEUMPRODUCTION SYSTEM

4 07-10 11-14 10-13 06-09 11-14 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.500.000

80 PRACTICAL DRILLING SKILLS 3 06-08 03-05 11-13 01-03 18-20 02-04 01-03 03-05 02-04 05-07 02-04 02-04 7.950.000

81 PRODUCTION DOWNHOLE AND SUBSURFACE EQUIPMENTS 3 08-10 12-14 09-11 30-01 18-20 10-12 29-01 12-14 31-02 14-16 11-13 30-02 7.950.000

82 PRODUCTION LOGGING 4 14-17 18-21 16-19 14-17 05-08 16-19 14-17 18-21 15-18 20-23 17-20 15-18 8.500.000

83 PRODUCTION OPERATION AND PROBLEM SOLVING 3 15-17 12-14 16-18 07-09 06-08 10-12 08-10 12-14 09-11 14-16 11-13 09-11 7.950.000

84 PRODUCTION OPERATION MANAGEMENT FOR MANAGERS 3 15-17 19-21 18-20 07-09 04-06 17-19 08-10 19-21 09-11 21-23 18-20 09-11 7.950.000

85Pump Selection, Design and Operation for Oil and Gas SurfaceProduction Facilities

3 20-22 24-26 04-06 15-17 13-15 22-24 15-17 24-26 16-18 26-28 23-25 16-18 7.950.000

86 SAND CONTROL 3 22-24 19-21 02-04 15-17 11-13 17-19 15-17 19-21 16-18 21-23 18-20 16-18 7.950.000

87 SOLIDS CONTROL SYSTEMS 3 29-31 26-28 09-11 22-24 18-20 24-26 22-24 26-28 23-25 28-30 25-27 22-24 7.950.000

88 STUCK PIPE PREVENTION 3 08-10 05-07 18-20 28-30 04-06 03-05 28-30 05-07 30-02 07-09 04-06 29-31 7.950.000

89 SUCKER ROD PUMP DESIGN, OPERATION AND TROUBLESHOOTING 3 27-29 03-05 11-13 22-24 18-20 02-04 22-24 03-05 23-25 05-07 02-04 22-24 7.950.000

90SUPPLY CHAIN MANAGEMENT IN THE UPSTREAM OIL & GASINDUSTRY

3 22-24 26-28 02-04 22-24 18-20 24-26 22-24 26-28 23-25 28-30 25-27 21-23 6.500.000

91 Surface Production Operation and Equipments 3 06-08 10-12 16-18 28-30 06-08 08-10 28-30 10-12 30-02 12-14 09-11 29-31 7.950.000

92 UNCONVENTIONAL RESOURCES COMPLETION AND STIMULATION 3 13-15 10-12 04-06 30-01 13-15 08-10 29-01 10-12 31-02 12-14 09-11 30-02 7.950.000

93 WATER FLOODING 4 27-30 03-06 09-12 27-30 12-15 02-05 27-30 03-06 29-02 05-08 02-05 28-31 8.500.000

94 WELL COMPLETION AND WORK OVER 3 13-15 17-19 02-04 01-03 11-13 15-17 01-03 18-20 02-04 19-21 16-18 02-04 7.950.000

95 WELL CONTROL 3 20-22 17-19 11-13 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 7.950.000

96 WELL DESIGN AND ENGINEERING 3 27-29 24-26 16-18 13-15 06-08 22-24 13-15 24-26 14-16 26-28 23-25 14-16 7.950.000

97 WELLBORE STABILITY AND GEOMECHANICS 3 06-08 03-05 02-04 20-22 11-13 02-04 20-22 03-05 21-23 05-07 02-04 21-23 7.950.000

98 WP&B, AFE and POD 4 06-09 10-13 17-20 31-03 04-07 08-11 30-03 10-13 01-04 12-15 09-12 01-04 8.500.000

Motivasi - Personal Development1 ACHIEVEMENT MOTIVATION 2 02-03 03-04 23-24 13-14 11-12 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

2 ACHIEVEMENT MOTIVATION 3 20-22 24-26 09-11 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

3 ACHIEVEMENT MOTIVATION TRAINING 2 02-03 10-11 23-24 27-28 18-19 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.000

4 Advance Negotiation Skill 3 20-22 10-12 02-04 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.500.000

5 ASSERTIVE TRAINING 3 06-08 03-05 16-18 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

Page 54: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga6 BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI 5 27-31 03-07 16-20 20-24 04-08 08-12 20-24 03-07 21-25 05-09 02-06 30-04 9.750.000

7 BOOST YOUR CREATIVITY IN THINKING MIND MAP 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000

8 BRAIN POWER 3 20-22 17-19 11-13 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

9 BRAIN DEVELOPMENT FOR PERSONAL ASSISTANT & SECRETARY 3 06-08 03-05 02-04 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

10 BREATHING ARTS FOR CREATIVE THINKING 3 27-29 24-26 09-11 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

11 CAPACITY BUILDING SOFT SKILL PROGRAM 3 06-08 17-19 16-18 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

12 CAPACITY BUILDING(MEMBANGUN KAPASITAS DAN KEMAMPUAN) 3 08-10 05-07 04-06 01-03 18-20 03-05 01-03 05-07 02-04 07-09 04-06 02-04 6.500.000

13 CARA MENYENANGKAN MEMBANGUN TIM IMPIAN 4 13-16 03-06 16-19 27-30 04-07 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

14 Change & conflict management and dealing with difficult people 2 02-03 03-04 23-24 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

15CHANGE & CONFLICT MANAGEMENT AND DEALING WITH DIFFICULTPEOPLE

2 02-03 17-18 23-24 06-07 18-19 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.000

16 CHANGE YOUR MINDSET 4 13-16 04-07 03-06 06-09 05-08 02-05 06-09 04-07 07-10 06-09 03-06 07-10 8.500.000

17 COACHING & CONSELING DI PERUSAHAAN 3 15-17 12-14 09-11 07-09 04-06 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

18 COACHING AND COUNSELING ( MONITORING) 3 06-08 10-12 02-04 27-29 11-13 02-04 27-29 10-12 28-30 12-14 09-11 21-23 6.500.000

19 COLLABORATION MS Office AND EFFECTIVE PRESENTATION 3 29-31 12-14 02-04 20-22 06-08 10-12 20-22 12-14 21-23 14-16 11-13 21-23 6.500.000

20 Communication SKILL 2 02-03 13-14 23-24 06-07 07-08 11-12 06-07 13-14 07-08 15-16 12-13 07-08 4.500.000

21 COMMUNICATION, ASSERTIVENESS AND CONFLICT MANAGEMENT 2 02-03 13-14 23-24 15-16 18-19 11-12 15-16 13-14 16-17 15-16 12-13 16-17 4.500.000

22 Constructive Anger Management 3 27-29 17-19 09-11 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

23 CONTEMPORARY COMMUNICATION & LEADERSHIP 3 06-08 03-05 16-18 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

24CORPORATE BUILDING DALAM MEMBANGUN KULTUR DAN ETIKAINTERNAL ORGANISASI

3 13-15 17-19 11-13 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 28-30 6.500.000

25 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 2 02-03 12-13 23-24 29-30 19-20 10-11 29-30 12-13 30-01 14-15 11-12 30-31 4.500.000

26 Dynamic Interpersonal & Comunication Skills 2 20-21 26-27 23-24 20-21 19-20 24-25 20-21 26-27 21-22 28-29 25-26 21-22 4.500.000

27 DYNAMIC SPEAKING AND INTERPERSONAL COMMUNICATION SKILL 2 02-03 17-18 23-24 30-31 18-19 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000

28 EFFECTIVE COMMUNICATION SKILL 3 27-29 03-05 04-06 15-17 13-15 03-05 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

29 EFFECTIVE MASTER OF CEREMONY (MC) 3 27-29 26-28 04-06 27-29 18-20 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.000

30 EFFECTIVE PRESENTATION & NEGOTIATION SKILLS 2 27-28 05-06 05-06 29-30 04-05 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.000

31 EFFECTIVE PRESENTATION AND REPORT WRITING 3 13-15 03-05 09-11 15-17 18-20 03-05 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

32 EFFECTIVE PRESENTATION SKILLS 3 08-10 12-14 09-11 20-22 18-20 08-10 20-22 12-14 21-23 14-16 11-13 22-24 6.500.000

33 Effective public speaking and business presentation 2 02-03 10-11 12-13 01-02 14-15 08-09 01-02 10-11 02-03 12-13 09-10 02-03 4.500.000

34 EFFECTIVE STRATEGY TO CONTROL STRESS 3 29-31 26-28 18-20 27-29 18-20 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.000

Page 55: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga35 Effective Time Management 3 20-22 10-12 18-20 22-24 18-20 08-10 22-24 10-12 23-25 12-14 09-11 22-24 6.500.000

36 EMOTIONAL INTELLIGENCE FOR MENTAL ATTITUDE 3 29-31 10-12 18-20 06-08 13-15 08-10 08-10 10-12 09-11 12-14 09-11 09-11 6.500.000

37 EMOTIONAL QUETIENTS 3 15-17 19-21 18-20 28-30 06-08 17-19 28-30 19-21 30-02 21-23 18-20 29-31 6.500.000

38 ESQ FOR PEAK PERFORMANCE 3 15-17 12-14 09-11 07-09 18-20 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

39 FINDING YOUR ESSENTIAL SELF 3 15-17 24-26 09-11 20-22 06-08 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.000

40 HANDLING CONFLICT AND COMPLAINT EFFECTIVELY 3 06-08 24-26 11-13 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

41 HOW TO HANDLE CRITICISM AND COMPLAIN 2 09-10 24-25 23-24 06-07 14-15 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.000

42 HUMAN PERFORMANCE AND LIMITATION 3 22-24 19-21 16-18 15-17 18-20 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

43 HUMAN QUOTIENS (IQ, EQ, AQ, SQ) 3 27-29 24-26 02-04 22-24 18-20 22-24 22-24 24-26 23-25 26-28 23-25 22-24 6.500.000

44 HYPNO-PRESENTATION SKILL UNLOCKING YOUR POTENTIAL POWER 3 15-17 12-14 18-20 07-09 13-15 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

45HYPNOTIC SELLING TECHNIQUE Menjual Tanpa Hambatan denganAplikasi Hypnosis dan NLP

2 02-03 03-04 23-24 06-07 19-20 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

46 ICE BREAKER FOR EFFECTIVE TRAINING DELIVERY 3 22-24 19-21 02-04 15-17 18-20 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

47 ICE BREAKING AND ENERGIZERS 3 06-08 10-12 16-18 13-15 04-06 10-12 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

48IMPROVING PERSONAL SKILL FOR SECRETARY & ADMINISTRATIVEASSISTANT

3 29-31 24-26 09-11 22-24 06-08 22-24 22-24 24-26 23-25 26-28 23-25 22-24 6.500.000

49 INDIVIDUAL DEVELOPMENT (SERVICE PRODUCT) 3 06-08 03-05 11-13 28-30 06-08 02-04 28-30 03-05 30-02 05-07 02-04 29-31 6.500.000

50 INNER SUCCESS TRAINING 4 06-09 03-06 02-05 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

51 INTERPERSONAL COMMUNICATION SKILL 2 02-03 27-28 23-24 13-14 13-14 25-26 13-14 27-28 14-15 29-30 26-27 14-15 4.500.000

52 MANAGING PRESSURE FOR PEAK PERFORMANCE 3 27-29 10-12 16-18 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

53 MC (MASTER OF CEREMONY) 3 27-29 10-12 09-11 06-08 18-20 02-04 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

54 MENGGALI POTENSI DIRI UNTUK MENCAPAI PRIBADI YANG UNGGUL 2 02-03 10-11 23-24 30-31 18-19 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.000

55 Menjadi pribadi yang asertif 3 29-31 19-21 09-11 20-22 18-20 17-19 20-22 18-20 21-23 21-23 18-20 21-23 6.500.000

56 Menjadi pribadi yang berpengaruh 3 08-10 26-28 18-20 27-29 06-08 24-26 27-29 26-28 30-02 28-30 25-27 28-30 6.500.000

57MODEL PEMBINAAN ANGGOTA YANG EXCELLENT DALAM DUNIAKERJA PERUSAHAAN

3 13-15 17-19 18-20 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

58 Motivating staff for excellent performance 3 20-22 10-12 11-13 06-08 18-20 08-10 08-10 10-12 09-11 12-14 09-11 09-11 6.500.000

59 Office COMMUNICATION AND BEHAVIOR ETHIC 3 29-31 05-07 09-11 20-22 18-20 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.000

60PENINGKATAN MOTIVASI BERPRESTASI(ACHIEVEMENTMOTIVATION TRAINING)

3 20-22 05-07 16-18 06-08 06-08 03-05 06-08 05-07 07-09 07-09 04-06 07-09 6.500.000

61 PEOPLE SKILL 3 29-31 10-12 02-04 13-15 13-15 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

62 PERFORMANCE COACHING FOR MANAGER 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000

63 PERFORMANCE, BEHAVIOR AND STRESS MANAGEMENT 3 08-10 12-14 16-18 27-29 18-20 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.000

Page 56: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

64PERSONALITY DEVELOPMENT BERBASIS EMOTIONAL AND SPRITUALQUETIENTS

4 20-23 03-06 09-12 30-02 04-07 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.000

65 PRIBADI EFEKTIF 2 02-03 20-21 23-24 20-21 19-20 18-19 20-21 20-21 21-22 22-23 19-20 21-22 4.500.000

66 SELF-EFFECTIVENESS & DEVELOPMENT 2 02-03 03-04 23-24 06-07 13-14 04-05 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

67 SENSITIVITY TRAINING (TURNING POINT ATAU NEW BORN) 3 08-10 03-05 11-13 30-01 11-13 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

68 SEVEN HABITS WITH NLP APPROACH 3 15-17 12-14 09-11 27-29 06-08 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.000

69 SPEED AND INNOVATION 3 13-15 12-14 18-20 07-09 18-20 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

70 Strategic and Systematic Thinking 2 02-03 06-07 23-24 29-30 18-19 02-03 29-30 06-07 28-29 08-09 05-06 30-31 4.500.000

71 Strategic Time Management 3 15-17 05-07 09-11 28-30 18-20 02-04 28-30 05-07 28-30 07-09 04-06 29-31 6.500.000

72 STRESS & CONFLICT MANAGEMENT 3 22-24 17-19 04-06 15-17 06-08 15-17 15-17 18-20 16-18 19-21 16-18 16-18 6.500.000

73 Stress Management Strategies 3 22-24 12-14 18-20 30-01 06-08 10-12 29-01 12-14 31-02 14-16 11-13 30-02 6.500.000

74 TALENT MANAGEMENT 4 21-24 18-21 16-19 31-03 11-14 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.500.000

75 TEKNIK PRESENTASI 2 02-03 10-11 23-24 02-03 04-05 08-09 02-03 10-11 03-04 12-13 09-10 03-04 4.500.000

76 THE LEADERSHIP CHALLENGE 2 02-03 13-14 23-24 30-31 07-08 11-12 29-30 13-14 31-01 15-16 12-13 30-01 4.500.000

77 TIME MANAGEMENT 4 27-30 17-20 17-20 21-24 04-07 15-18 21-24 18-21 22-25 19-22 16-19 21-24 8.500.000

78 TOTOK AURA MENUJU TOTAL BEAUTY 3 06-08 10-12 04-06 22-24 18-20 08-10 22-24 10-12 23-25 12-14 09-11 22-24 6.500.000

79 Train the trainers 4 06-09 10-13 10-13 21-24 12-15 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.500.000

80 TRAINING OF TRAINER 3 15-17 19-21 02-04 06-08 11-13 17-19 06-08 19-21 07-09 21-23 18-20 07-09 6.500.000

81 TRAINING OF TRAINER (TOT) 3 20-22 24-26 16-18 20-22 04-06 22-24 20-22 24-26 21-23 26-28 23-25 22-24 6.500.000

82 WOMENS PRIME POWER, BEAUTY AND BRAIN 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000

PLC - DCS - Microcontroller1 ADVANCED PID CONTROLLER 4 13-16 17-20 16-19 27-30 11-14 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.750.000

2 ADVANCED PLC PROGRAMMING AND IMPLEMENTATION 4 20-23 17-20 09-12 30-02 11-14 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.000

3BASIC FUZZY LOGIC CONTROL AND ITS SIMULATION WITHSPREADSHEET APPLICATION PROGRAM

4 27-30 10-13 02-05 30-02 11-14 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.000

4DISTRIBUTED CONTROL SYSTEM (DCS) PRINCIPLES, MAINTENANCE,OPERATION, PROGRAMMING & TROUBLESHOOTING

5 06-10 10-14 16-20 13-17 04-08 08-12 13-17 10-14 14-18 12-16 09-13 14-18 9.750.000

5 DISTRIBUTED CONTROL SYSTEMS (DCS) FUNDAMENTAL 4 14-17 18-21 03-06 21-24 11-14 16-19 21-24 18-21 22-25 20-23 17-20 21-24 8.750.000

6 FUZZY LOGIC CONTROL 4 14-17 18-21 17-20 20-23 05-08 16-19 20-23 18-21 21-24 20-23 17-20 21-24 8.500.000

7 MECHATRONICS APPLICATION IN INDUSTRY 4 14-17 11-14 03-06 27-30 04-07 09-12 27-30 11-14 28-01 13-16 10-13 28-31 8.500.000

8 Mekatronika 4 21-24 18-21 10-13 31-03 11-14 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.500.000

9 Pemrograman Mikrokontroler AVR dengan CodeVisionAVR 3 13-15 03-05 02-04 13-15 11-13 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.750.000

Page 57: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga10 Pemrograman Mikrokontroler untuk Robotika 3 20-22 10-12 09-11 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.750.000

11 PLC ( Tingkat dasar ) 4 07-10 11-14 10-13 06-09 12-15 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.500.000

12PLC (ROGRAMMABLE LOGIC CONTROLLER) PRINCIPLES, OPERATIONAND PROGRAMMING

4 06-09 03-06 02-05 13-16 12-15 02-05 13-16 03-06 14-17 05-08 02-05 14-17 8.500.000

13 PLC (TINGKAT MAHIR) 4 14-17 18-21 17-20 14-17 05-08 16-19 14-17 18-21 15-18 20-23 17-20 15-18 8.500.000

14 PLC COMMUNICATION AND LAN 4 14-17 18-21 16-19 06-09 11-14 16-19 06-09 18-21 07-10 20-23 17-20 07-10 8.750.000

15 PLC INTEGRATION TO LOCAL AREA NETWORK (LAN) 4 27-30 24-27 16-19 06-09 04-07 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.500.000

16PLC OPERATION, PROGRAMMING, TROUBLESHOOTING ANDMAINTENANCE

4 20-23 24-27 02-05 14-17 05-08 22-25 14-17 24-27 15-18 26-29 23-26 15-18 8.750.000

17 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 27-30 03-06 02-05 27-30 05-08 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

18 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 07-10 04-07 02-05 14-17 12-15 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.000

19 PROGRAMMABLE LOGIC CONTROLLER(PLC) 4 06-09 17-20 02-05 06-09 12-15 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.750.000

20SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION)PRINCIPLES, HARDWARE SYSTEM, OPERATION & PROGRAMMING

4 13-16 10-13 10-13 20-23 05-08 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.500.000

21 SCADA SYSTEMS 4 13-16 17-20 03-06 31-03 11-14 15-18 30-03 18-21 01-04 19-22 16-19 30-03 8.750.000

22 SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) 4 20-23 24-27 16-19 06-09 11-14 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.500.000

Port/Pelabuhan - Marine -Pelayaran/Shipping

1 Custom facility, Shipping Documents & Export Import Procedure 2 02-03 24-25 23-24 20-21 18-19 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.000

2 FREIGHT FORWARDING 2 02-03 26-27 23-24 16-17 14-15 24-25 16-17 26-27 17-18 28-29 25-26 17-18 4.500.000

3 MARITIME & SHIPPING LAW IN INDONESIA 3 13-15 03-05 18-20 20-22 06-08 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.000

4 PEMAHAMAN SHIPPING DOCUMENT & PROSEDUR KEPABEANAN 3 15-17 12-14 04-06 28-30 04-06 10-12 28-30 12-14 30-02 14-16 11-13 29-31 6.500.000

Prapurnabakti - Prapensiun1 BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI 5 27-31 03-07 16-20 20-24 04-08 08-12 20-24 03-07 21-25 05-09 02-06 30-04 9.750.000

2 KEWIRAUSAHAAN PRA PURNA BAKTI 4 27-30 24-27 02-05 21-24 04-07 22-25 21-24 24-27 22-25 26-29 23-26 21-24 8.500.000

3Training untuk pegawai persiapan masa pensiun (training pra-purnabakti)

5 27-31 10-14 09-13 30-03 11-15 08-12 29-03 10-14 28-02 12-16 09-13 30-04 9.750.000

Procurement/Pengadaan Barang & Jasa1 ASPEK TKDN 2 02-03 10-11 23-24 13-14 18-19 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000

Page 58: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga2 BASIC PROCUREMENT & PURCHASING 3 27-29 17-19 09-11 27-29 04-06 15-17 27-29 18-20 28-30 19-21 16-18 28-30 6.500.000

3 E-PROCUREMENT (E-Proc) 3 27-29 24-26 02-04 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

4 HARGA PERKIRAAN SENDIRI (HPS) 2 02-03 24-25 23-24 27-28 11-12 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

5 INTEGRATED PROCUREMENT MANAGEMENT 2 02-03 24-25 23-24 27-28 18-19 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

6 Metode Penyusunan Spesifikasi & Harga Perkiraan Sendiri 2 02-03 10-11 23-24 30-31 11-12 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.000

7 Negotiation Skills For Procurement 2 02-03 17-18 23-24 06-07 19-20 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.000

8 PRINCIPLES OF PROCUREMENT MANAGEMENT 3 20-22 05-07 02-04 27-29 06-08 03-05 27-29 05-07 30-02 07-09 04-06 28-30 6.500.000

9 Prinsip dasar dan prosedur pengadaan barang & jasa 3 29-31 24-26 04-06 27-29 06-08 22-24 27-29 24-26 30-02 26-28 23-25 28-30 6.500.000

10 Procurement & Purchasing Management 2 02-03 24-25 23-24 20-21 18-19 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.000

11 Procurement Fraud & Audit 2 02-03 05-06 23-24 22-23 13-14 04-05 22-23 05-06 23-24 07-08 04-05 23-24 4.500.000

12 PROCUREMENT MANAGEMENT 2 02-03 10-11 23-24 06-07 04-05 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000

13 Procurement Progress & Order Monitoring 2 02-03 26-27 23-24 13-14 06-07 24-25 13-14 26-27 14-15 28-29 25-26 14-15 4.500.000

14 PROCUREMENT STRATEGY 2 02-03 17-18 23-24 13-14 13-14 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000

15 Strategic Sourcing & Vendor Management 2 02-03 03-04 23-24 27-28 04-05 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000

16SUSTAINABLE PROCUREMENT IN RELATION WITH QUALITYASSURANCE

4 14-17 25-28 16-19 21-24 04-07 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.000

17TEKNIK DAN METODE PENYUSUNAN HPS OE (HARGA PERKIRAANSENDIRI) ATAS PENGADAAN BARANG DAN JASA

3 29-31 24-26 16-18 15-17 13-15 22-24 15-17 24-26 16-18 26-28 23-25 16-18 6.500.000

18 TEKNIK HARGA PERHITUNGAN SENDIRI (HPS) 3 15-17 17-19 18-20 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

Project Management (PM)1 ANALISIS KEEKONOMISAN PROYEK 3 20-22 10-12 16-18 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.500.000

2 FEASIBILITY STUDY & PROJECT EVALUATION 4 28-31 04-07 03-06 06-09 04-07 02-05 06-09 04-07 07-10 06-09 03-06 07-10 8.500.000

3 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 06-09 03-06 09-12 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

4 MANAGEMENT PROJECT STRATEGI DAN IMPLEMENTASI 3 22-24 26-28 09-11 27-29 18-20 24-26 27-29 18-20 28-30 28-30 25-27 21-23 6.500.000

5 MANAJEMEN PROYEK 3 15-17 26-28 04-06 15-17 04-06 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000

6 MATERIAL MANAGEMENT FOR PROJECT 4 28-31 11-14 09-12 20-23 11-14 09-12 20-23 11-14 21-24 13-16 10-13 21-24 8.500.000

7 MEASURING AND MANAGING COST ESCALATION IN PROJECT 2 02-03 27-28 23-24 23-24 06-07 25-26 23-24 27-28 24-25 29-30 26-27 21-22 4.500.000

8 PENILAIAN KELAYAKAN PROYEK (FEASIBILITY STUDY) 2 02-03 26-27 23-24 22-23 19-20 24-25 22-23 26-27 23-24 28-29 25-26 23-24 4.500.000

9Perhitungan Perkiraan Biaya Proyek Mekanikal Elektrikal UntukBangunan Gedung

2 02-03 06-07 23-24 02-03 18-19 04-05 02-03 06-07 03-04 08-09 05-06 03-04 4.500.000

10 PRACTICAL PROJECT EVALUATION AND FINANCING 2 02-03 19-20 23-24 15-16 18-19 17-18 15-16 20-21 16-17 21-22 18-19 16-17 4.500.000

11 Project Cost Estimation & Cost Control 3 20-22 19-21 02-04 13-15 04-06 17-19 13-15 18-20 14-16 21-23 18-20 14-16 6.500.000

Page 59: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga12 PROJECT COST MANAGEMENT 3 27-29 12-14 04-06 07-09 04-06 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

13 PROJECT EVALUATION AND FINANCING 3 27-29 17-19 09-11 30-01 13-15 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

14 PROJECT HSE MANAGEMENT 3 08-10 12-14 09-11 15-17 11-13 10-12 15-17 12-14 16-18 14-16 11-13 16-18 6.500.000

15 PROJECT MANAGEMENT 4 14-17 11-14 17-20 21-24 11-14 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.000

16 Project Management (3 Hr) 3 13-15 03-05 16-18 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.000

17 PROJECT MANAGEMENT (PM) (5Hr) 5 20-24 10-14 02-06 30-03 11-15 08-12 29-03 10-14 28-02 12-16 09-13 30-04 9.750.000

18 PROJECT MANAGEMENT DARI KONSEPTUAL SAMPAI OPERASIONAL 4 27-30 17-20 16-19 14-17 04-07 15-18 14-17 18-21 15-18 19-22 16-19 15-18 8.500.000

19PROJECT MANAGEMENT IN ENGINEERING, PROCUREMENT &CONSTRUCTION

3 06-08 19-21 11-13 15-17 13-15 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

20 PROJECT MANAGEMENT USING MICROSOFT PROJECT 3 06-08 26-28 18-20 07-09 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.000

21PROJECT MANAGEMENT WITH MICROSOFT PROJECTAPPLICATION,Win QSB & MONTE CARLO SIMULATION

3 27-29 26-28 09-11 22-24 18-20 24-26 22-24 26-28 23-25 28-30 25-27 22-24 6.500.000

22 PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6 3 13-15 03-05 04-06 15-17 06-08 02-04 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

23 PROJECT QUALITY MANAGEMENT 3 29-31 10-12 09-11 01-03 11-13 08-10 01-03 10-12 02-04 12-14 09-11 02-04 6.500.000

24 Strategi Menangani Proyek Bermasalah 3 22-24 19-21 18-20 22-24 11-13 17-19 22-24 18-20 23-25 21-23 18-20 22-24 6.500.000

25 STUDI KELAYAKAN PROYEK 2 13-14 05-06 02-03 13-14 19-20 04-05 13-14 05-06 14-15 07-08 04-05 14-15 4.500.000

26 Supply Chain Management For Project & Services 2 02-03 19-20 23-24 01-02 07-08 17-18 01-02 20-21 02-03 21-22 18-19 02-03 4.500.000

27 Warehouse Management For Project & Services 2 02-03 12-13 23-24 29-30 18-19 10-11 29-30 12-13 30-01 14-15 11-12 30-31 4.500.000

Sales - Marketing/Pemasaran - Bisnis1 Advance Negotiation Skill 3 20-22 10-12 02-04 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.500.000

2 BALANCED SCORECARD (BSC) CONCEPT AND IMPLEMENTATION 2 02-03 03-04 23-24 13-14 06-07 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

3 BIG DATA 4 20-23 10-13 10-13 13-16 11-14 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.000

4 BIG DATA FOR EXECUTIVE 3 06-08 24-26 16-18 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

5 BIG DATA FOR TECHNICAL MANAGER & DECISION MAKERS 3 13-15 03-05 02-04 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

6 BUSINESS STRATEGY FOR MANAGERS 3 29-31 26-28 18-20 27-29 11-13 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.000

7 BUSINESS PROCESS REENGINEERING 2 02-03 17-18 23-24 20-21 19-20 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

8 COLLABORATION MS Office AND EFFECTIVE PRESENTATION 3 29-31 12-14 02-04 20-22 06-08 10-12 20-22 12-14 21-23 14-16 11-13 21-23 6.500.000

9 CORPORATE dan PERSONAL STORYTELING BRANDING 3 20-22 24-26 16-18 06-08 11-13 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.500.000

10 COSTUMER SERVICE(CS) 3 22-24 19-21 16-18 15-17 13-15 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

11 Custom facility, Shipping Documents & Export Import Procedure 2 02-03 24-25 23-24 20-21 18-19 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.000

12 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 06-09 17-20 02-05 20-23 11-14 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000

Page 60: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga13 CUSTOMER LOYALITY STRATEGY 3 20-22 03-05 09-11 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

14 CUSTOMER RELATION MANAGEMENT(CRM) 3 13-15 19-21 16-18 13-15 11-13 17-19 13-15 19-21 14-16 21-23 18-20 14-16 6.500.000

15 CUSTOMER SERVICE EXCELLENCE STRATEGY 3 22-24 26-28 16-18 06-08 04-06 24-26 06-08 26-28 07-09 28-30 25-27 07-09 6.500.000

16 CUSTOMER SERVICE IN CREDIT UNION 3 20-22 17-19 11-13 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

17 Effective Business Letters Writing 3 29-31 19-21 16-18 01-03 18-20 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.000

18 EFFECTIVE PRESENTATION & NEGOTIATION SKILLS 2 27-28 05-06 05-06 29-30 04-05 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.000

19 EFFECTIVE PRESENTATION AND REPORT WRITING 3 13-15 03-05 09-11 15-17 18-20 03-05 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

20 EFFECTIVE PRESENTATION SKILLS 3 08-10 12-14 09-11 20-22 18-20 08-10 20-22 12-14 21-23 14-16 11-13 22-24 6.500.000

21 Effective public speaking and business presentation 2 02-03 10-11 12-13 01-02 14-15 08-09 01-02 10-11 02-03 12-13 09-10 02-03 4.500.000

22 Export import 3 06-08 17-19 18-20 07-09 18-20 15-17 08-10 18-20 09-11 19-21 16-18 09-11 6.500.000

23 Export-Import 3 27-29 10-12 09-11 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

24 Export-Import and Incoterm 3 06-08 19-21 18-20 06-08 06-08 17-19 06-08 18-20 07-09 21-23 18-20 07-09 6.500.000

25 Fraud Management in telecommunication business 3 29-31 05-07 11-13 30-01 18-20 03-05 29-01 05-07 31-02 07-09 04-06 30-02 6.500.000

26 HANDLING CUSTOMER COMPLAINT 2 02-03 06-07 23-24 29-30 14-15 02-03 29-30 06-07 01-02 08-09 05-06 30-31 4.500.000

27 HOW TO IMPROVE BUSINESS PERFORMANCE 3 29-31 05-07 11-13 07-09 18-20 02-04 08-10 05-07 09-11 07-09 04-06 09-11 6.500.000

28 HUKUM PERLINDUNGAN KONSUMEN DAN PERSAINGAN BISNIS 3 29-31 19-21 18-20 13-15 18-20 17-19 13-15 19-21 14-16 21-23 18-20 14-16 6.500.000

29 HYPNO-PRESENTATION SKILL UNLOCKING YOUR POTENTIAL POWER 3 15-17 12-14 18-20 07-09 13-15 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

30HYPNOTIC SELLING TECHNIQUE Menjual Tanpa Hambatan denganAplikasi Hypnosis dan NLP

2 02-03 03-04 23-24 06-07 19-20 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

31IMPLEMENTASI BALANCED SCORE CARD (BSC) SEBAGAI ALAT UKURPERFORMANSI KARYAWAN

3 13-15 03-05 02-04 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

32 KEWIRANIAGAAN (SALESMANSHIP) 3 08-10 05-07 16-18 20-22 11-13 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.000

33 Key Account Management 2 27-28 17-18 19-20 29-30 11-12 15-16 29-30 18-19 28-29 19-20 16-17 30-31 4.500.000

34 MARKETING MANAGEMENT 3 15-17 26-28 18-20 13-15 11-13 24-26 13-15 26-28 14-16 28-30 25-27 14-16 6.500.000

35 MEASURING CUSTOMER SATISFACTION 3 27-29 10-12 11-13 22-24 11-13 08-10 22-24 10-12 23-25 12-14 09-11 22-24 6.500.000

36 MOSSAD STRATEGY ON BUSINESS 3 20-22 26-28 04-06 13-15 18-20 24-26 13-15 26-28 14-16 28-30 25-27 14-16 6.500.000

37NEGOTIATION IMPROVE YOUR NEGOTIATING SKILLS AND MAKE YOUMORE EFFECTIVE NEGOTIATOR

2 02-03 03-04 23-24 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

38 NEGOTIATION SKILL FOR PURCHASING STAFF 3 29-31 10-12 04-06 01-03 18-20 08-10 01-03 10-12 02-04 12-14 09-11 02-04 6.500.000

39 Negotiation Skills For Procurement 2 02-03 17-18 23-24 06-07 19-20 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.000

40PENERAPAN EKONOMI TEKNIK DALAM PROSES PENGAMBILANKEPUTUSAN BISNIS

4 27-30 25-28 17-20 13-16 12-15 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.000

41 Pengendalian Kinerja Bisnis Dan Aliran Kas 3 29-31 17-19 02-04 15-17 13-15 15-17 15-17 18-20 16-18 19-21 16-18 16-18 6.500.000

Page 61: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga42 PERSONAL BRANDING – BOOSTING YOUR IMAGE IN A MONTH 3 27-29 03-05 02-04 13-15 18-20 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.500.000

43 PERSUASIVE MARKETING 3 15-17 19-21 02-04 01-03 18-20 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.000

44PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING STAFF(USING MICROSOFT POWER POINT)

2 02-03 13-14 23-24 29-30 04-05 11-12 29-30 13-14 28-29 15-16 12-13 30-31 4.500.000

45 Salesmanship Skills 2 02-03 03-04 23-24 16-17 04-05 02-03 16-17 03-04 17-18 05-06 02-03 17-18 4.500.000

46 SERVICE EXCELLENT 3 15-17 05-07 04-06 07-09 13-15 02-04 06-08 05-07 07-09 07-09 04-06 07-09 6.500.000

47 Service Recovery Create Loyal Customers for Life 3 08-10 19-21 09-11 15-17 18-20 17-19 15-17 18-20 16-18 21-23 18-20 16-18 6.500.000

48 STRATEGI PENGEMBANGAN BISNIS 3 15-17 10-12 04-06 01-03 18-20 08-10 01-03 10-12 02-04 12-14 09-11 02-04 6.500.000

49 STUDY KELAYAKAN BISNIS 2 02-03 17-18 23-24 13-14 19-20 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000

50 TEKNIK NEGOSIASI 3 06-08 05-07 16-18 28-30 18-20 03-05 28-30 05-07 30-02 07-09 04-06 29-31 6.500.000

51 TEKNIK PRESENTASI 2 02-03 10-11 23-24 02-03 04-05 08-09 02-03 10-11 03-04 12-13 09-10 03-04 4.500.000

52 Total Quality Management 3 06-08 17-19 16-18 07-09 11-13 15-17 08-10 19-21 09-11 19-21 16-18 09-11 6.500.000

53 TOTAL QUALITY MANAGEMENT SERIES MANAJEMEN MUTU TERPADU 2 02-03 17-18 23-24 13-14 19-20 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000

SDM - HRD - GA1 ACHIEVEMENT MOTIVATION 2 02-03 03-04 23-24 13-14 11-12 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

2 ACHIEVEMENT MOTIVATION 3 20-22 24-26 09-11 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

3 ACHIEVEMENT MOTIVATION TRAINING 2 02-03 10-11 23-24 27-28 18-19 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.000

4 Advance Negotiation Skill 3 20-22 10-12 02-04 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.500.000

5 ANALISIS BEBAN KERJA 2 02-03 10-11 23-24 13-14 18-19 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000

6 ASSERTIVE TRAINING 3 06-08 03-05 16-18 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

7 AUDITING SDM 3 13-15 10-12 02-04 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

8 BALANCED SCORECARD (BSC) CONCEPT AND IMPLEMENTATION 2 02-03 03-04 23-24 13-14 06-07 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

9 BOOST YOUR CREATIVITY IN THINKING MIND MAP 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000

10 BRAIN POWER 3 20-22 17-19 11-13 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

11 BRAIN DEVELOPMENT FOR PERSONAL ASSISTANT & SECRETARY 3 06-08 03-05 02-04 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

12 BREATHING ARTS FOR CREATIVE THINKING 3 27-29 24-26 09-11 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

13 BUILDING A TEAM 2 02-03 03-04 23-24 27-28 18-19 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000

14 CAPACITY BUILDING SOFT SKILL PROGRAM 3 06-08 17-19 16-18 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

15 CAPACITY BUILDING(MEMBANGUN KAPASITAS DAN KEMAMPUAN) 3 08-10 05-07 04-06 01-03 18-20 03-05 01-03 05-07 02-04 07-09 04-06 02-04 6.500.000

16 CARA MENYENANGKAN MEMBANGUN TIM IMPIAN 4 13-16 03-06 16-19 27-30 04-07 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

Page 62: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga17 CAREER MANAGEMENT 3 13-15 10-12 09-11 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

18 CAREER PLANNING SYSTEM 2 02-03 10-11 23-24 30-31 19-20 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.000

19 Change & conflict management and dealing with difficult people 2 02-03 03-04 23-24 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

20CHANGE & CONFLICT MANAGEMENT AND DEALING WITH DIFFICULTPEOPLE

2 02-03 17-18 23-24 06-07 18-19 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.000

21 COACHING & CONSELING DI PERUSAHAAN 3 15-17 12-14 09-11 07-09 04-06 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

22 COACHING AND COUNSELING ( MONITORING) 3 06-08 10-12 02-04 27-29 11-13 02-04 27-29 10-12 28-30 12-14 09-11 21-23 6.500.000

23 COMMUNICATION, ASSERTIVENESS AND CONFLICT MANAGEMENT 2 02-03 13-14 23-24 15-16 18-19 11-12 15-16 13-14 16-17 15-16 12-13 16-17 4.500.000

24 COMPETENCY-BASED HUMAN RESOURCES MANAGEMENT 2 02-03 05-06 23-24 20-21 18-19 04-05 20-21 05-06 21-22 07-08 04-05 21-22 4.500.000

25 COMPREHENSIVE TRAINING MANAGEMENT SYSTEM 3 20-22 17-19 16-18 20-22 11-13 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

26CORPORATE BUILDING DALAM MEMBANGUN KULTUR DAN ETIKAINTERNAL ORGANISASI

3 13-15 17-19 11-13 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 28-30 6.500.000

27 Creative Problem Solving 4 21-24 11-14 10-13 27-30 11-14 09-12 27-30 11-14 29-02 13-16 10-13 28-31 8.500.000

28DECISION MAKING BY USING STRATEGIC THINKING (PENDEKATANSISTEMIK DAN NEW 7 TOOLS APPROACH)

2 02-03 24-25 23-24 30-31 11-12 22-23 29-30 24-25 31-01 26-27 23-24 28-29 4.500.000

29 DEVELOVING HIGH PERFORMANCE TEAMS 2 02-03 27-28 23-24 29-30 19-20 25-26 29-30 27-28 01-02 29-30 26-27 30-31 4.500.000

30DINAMIKA SERIKAT PEKERJA DALAM PERUSAHAAN TERKAITMENGHADAPI ERA GLOBALISASI

2 02-03 06-07 23-24 02-03 18-19 04-05 02-03 06-07 03-04 08-09 05-06 03-04 4.500.000

31 EFFECTIVE EXECUTIVE SECRETARY 2 02-03 03-04 23-24 02-03 04-05 02-03 02-03 03-04 03-04 05-06 02-03 03-04 4.500.000

32 EFFECTIVE PERFORMANCE APPRAISAL 2 02-03 19-20 23-24 01-02 18-19 17-18 01-02 20-21 02-03 21-22 18-19 02-03 4.500.000

33 EFFECTIVE PRESENTATION & NEGOTIATION SKILLS 2 27-28 05-06 05-06 29-30 04-05 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.000

34 EFFECTIVE STRATEGY TO CONTROL STRESS 3 29-31 26-28 18-20 27-29 18-20 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.000

35 Effective Time Management 3 20-22 10-12 18-20 22-24 18-20 08-10 22-24 10-12 23-25 12-14 09-11 22-24 6.500.000

36 EFFECTIVE TRAINING MANAGEMENT 3 13-15 26-28 16-18 07-09 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.000

37 EMOTIONAL INTELLIGENCE FOR MENTAL ATTITUDE 3 29-31 10-12 18-20 06-08 13-15 08-10 08-10 10-12 09-11 12-14 09-11 09-11 6.500.000

38 EMOTIONAL QUETIENTS 3 15-17 19-21 18-20 28-30 06-08 17-19 28-30 19-21 30-02 21-23 18-20 29-31 6.500.000

39 ESQ FOR PEAK PERFORMANCE 3 15-17 12-14 09-11 07-09 18-20 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

40ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATIONPROFESSIONAL

4 07-10 04-07 10-13 31-03 04-07 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.500.000

41 Excellent Supervisory 4 27-30 17-20 03-06 27-30 12-15 15-18 27-30 18-21 28-01 19-22 16-19 28-31 8.500.000

42 General Affairs Management 3 20-22 03-05 09-11 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

43 GENERAL AFFAIRS MANAGEMENT SYSTEM 3 20-22 03-05 04-06 15-17 04-06 02-04 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

44 GOOD CORPORATE GOVERNANCE 3 20-22 24-26 02-04 01-03 11-13 22-24 01-03 24-26 02-04 26-28 23-25 30-02 6.500.000

45 GOOD CORPORATE GOVERNANCE 3 27-29 26-28 04-06 15-17 18-20 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000

Page 63: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga46 HANDLING CONFLICT AND COMPLAINT EFFECTIVELY 3 06-08 24-26 11-13 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

47 HR Based On Competency for Recruitment 2 13-14 03-04 05-06 13-14 18-19 04-05 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

48 HR MANAGEMENT 2 02-03 05-06 23-24 27-28 11-12 04-05 27-28 05-06 28-29 07-08 04-05 28-29 4.500.000

49 HR MANAGEMENT OF CHANGE 3 20-22 12-14 16-18 30-01 18-20 10-12 29-01 12-14 31-02 14-16 11-13 30-02 6.500.000

50 Hubungan Industrial Dan Tenaga Kerja 3 27-29 10-12 18-20 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

51 HUBUNGAN INDUSTRIAL KEPEGAWAIAN 3 08-10 19-21 16-18 15-17 18-20 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

52 HUKUM KETENAGAKERJAAN & HUBUNGAN INDUSTRIAL 3 20-22 10-12 11-13 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

53 HUMAN PERFORMANCE AND LIMITATION 3 22-24 19-21 16-18 15-17 18-20 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

54 HUMAN QUOTIENS (IQ, EQ, AQ, SQ) 3 27-29 24-26 02-04 22-24 18-20 22-24 22-24 24-26 23-25 26-28 23-25 22-24 6.500.000

55 HUMAN RESOURCE PLANNING AND PRODUCTIVITY 3 06-08 17-19 09-11 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

56 HUMAN RESOURCES MANAGEMENT FOR NON-HR MANAGER 2 02-03 06-07 23-24 15-16 04-05 02-03 15-16 06-07 16-17 08-09 05-06 16-17 4.500.000

57 ICE BREAKER FOR EFFECTIVE TRAINING DELIVERY 3 22-24 19-21 02-04 15-17 18-20 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

58 ICE BREAKING AND ENERGIZERS 3 06-08 10-12 16-18 13-15 04-06 10-12 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

59IMPLEMENTASI BALANCED SCORE CARD (BSC) SEBAGAI ALAT UKURPERFORMANSI KARYAWAN

3 13-15 03-05 02-04 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

60IMPROVING PERSONAL SKILL FOR SECRETARY & ADMINISTRATIVEASSISTANT

3 29-31 24-26 09-11 22-24 06-08 22-24 22-24 24-26 23-25 26-28 23-25 22-24 6.500.000

61 INOVASI DAN KREATIFITAS MENUJU ORGANISASI PEMBELAJARAN 2 02-03 10-11 23-24 13-14 18-19 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000

62 INTEGRATED HUMAN RESOURCES MANAGEMENT 3 06-08 03-05 16-18 28-30 11-13 02-04 28-30 03-05 30-02 05-07 02-04 29-31 6.500.000

63 JOB COMPETENCY PROFILING 2 02-03 13-14 23-24 22-23 11-12 11-12 22-23 13-14 23-24 15-16 12-13 23-24 4.500.000

64 JOB DESCRIPTION ANALYSIS, DEVELOPMENT, AND DESIGN 2 02-03 24-25 23-24 13-14 18-19 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.000

65 KEMADYAAN 5 13-17 17-21 02-06 20-24 11-15 15-19 20-24 24-28 21-25 19-23 16-20 30-04 9.750.000

66Keterampilan Pengelolaan Hubungan Industrial Sampai DenganPenyelesaian Perselisihan

3 22-24 05-07 16-18 01-03 18-20 03-05 01-03 05-07 02-04 07-09 04-06 02-04 6.500.000

67 Maintenance Strategic Planning 4 07-10 04-07 16-19 31-03 05-08 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.500.000

68 MAN POWER PLANNING 3 27-29 10-12 18-20 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

69 MAN POWER PLANNING 3 13-15 24-26 18-20 06-08 18-20 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.000

70MANAGEMENT OF OUTSOURCE STAFF HOUSING AND CATERINGSERVICES

4 21-24 04-07 17-20 30-02 12-15 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.000

71 MANAGING PRESSURE FOR PEAK PERFORMANCE 3 27-29 10-12 16-18 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

72 Managing Training Function 3 15-17 05-07 09-11 07-09 04-06 02-04 08-10 05-07 09-11 07-09 04-06 09-11 6.500.000

73 MANAJEMEN PERUBAHAN (CHANGE MANAGEMENT) 3 13-15 10-12 02-04 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

74 MANAJEMEN SDM (PERSONALIA ATAU TENAGA KERJA) 3 22-24 19-21 11-13 30-01 06-08 17-19 29-01 19-21 31-02 21-23 18-20 30-02 6.500.000

75 MANAJEMEN KOMPENSASI BERBASIS KINERJA 2 20-21 26-27 23-24 22-23 18-19 24-25 22-23 26-27 23-24 28-29 25-26 23-24 4.500.000

Page 64: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

76MANAJEMEN PERILAKU DALAM ORGANISASI(MANAGEMENT OFORGANIZATION BEHAVIOR)

3 27-29 24-26 18-20 07-09 13-15 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.000

77 MANUSIA DALAM KERJA (MEN IN WORK) 2 02-03 13-14 23-24 23-24 04-05 11-12 23-24 13-14 24-25 15-16 12-13 23-24 4.500.000

78 MEASURING TRAINING IMPACT 2 02-03 20-21 23-24 27-28 18-19 18-19 27-28 18-19 01-02 22-23 19-20 28-29 4.500.000

79 MEMBEDAH PROFESI SEKRETARIS PROFESSIONAL 4 06-09 17-20 16-19 20-23 04-07 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000

80 MENGGALI POTENSI DIRI UNTUK MENCAPAI PRIBADI YANG UNGGUL 2 02-03 10-11 23-24 30-31 18-19 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.000

81MENINGKATKAN EFEKTIVITAS FUNGSI SUPERVISOR(SUPERVISORYMANAGEMENT)

3 15-17 17-19 09-11 28-30 11-13 15-17 28-30 18-20 30-02 19-21 16-18 29-31 6.500.000

82 MENINGKATKAN EFEKTIVITAS FUNGSI SUPERVISOR 2 02-03 20-21 23-24 27-28 18-19 18-19 27-28 20-21 01-02 22-23 19-20 28-29 4.500.000

83 Menjadi pribadi yang asertif 3 29-31 19-21 09-11 20-22 18-20 17-19 20-22 18-20 21-23 21-23 18-20 21-23 6.500.000

84MODEL PEMBINAAN ANGGOTA YANG EXCELLENT DALAM DUNIAKERJA PERUSAHAAN

3 13-15 17-19 18-20 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

85 Motivating staff for excellent performance 3 20-22 10-12 11-13 06-08 18-20 08-10 08-10 10-12 09-11 12-14 09-11 09-11 6.500.000

86NEGOTIATION IMPROVE YOUR NEGOTIATING SKILLS AND MAKE YOUMORE EFFECTIVE NEGOTIATOR

2 02-03 03-04 23-24 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

87 Office COMMUNICATION AND BEHAVIOR ETHIC 3 29-31 05-07 09-11 20-22 18-20 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.000

88 OUTSOURCING MANAGEMENT 3 22-24 12-14 16-18 15-17 13-15 10-12 15-17 12-14 16-18 14-16 11-13 16-18 6.500.000

89 PELAYANAN PRIMA BAGI APARATUR PEMERINTAHAN 3 29-31 10-12 04-06 01-03 18-20 10-12 01-03 10-12 02-04 12-14 09-11 30-02 6.500.000

90PENINGKATAN MOTIVASI BERPRESTASI(ACHIEVEMENTMOTIVATION TRAINING)

3 20-22 05-07 16-18 06-08 06-08 03-05 06-08 05-07 07-09 07-09 04-06 07-09 6.500.000

91 PEOPLE SKILL 3 29-31 10-12 02-04 13-15 13-15 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

92 PERFORMANCE BASED PAY 2 02-03 24-25 23-24 02-03 06-07 22-23 02-03 24-25 03-04 26-27 23-24 03-04 4.500.000

93 PERFORMANCE COACHING FOR MANAGER 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000

94 PERFORMANCE, BEHAVIOR AND STRESS MANAGEMENT 3 08-10 12-14 16-18 27-29 18-20 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.000

95PERSONALITY DEVELOPMENT BERBASIS EMOTIONAL AND SPRITUALQUETIENTS

4 20-23 03-06 09-12 30-02 04-07 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.000

96 PLANNING AND ORGANIZE TRAINING 3 08-10 05-07 02-04 20-22 18-20 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.000

97 PRIBADI EFEKTIF 2 02-03 20-21 23-24 20-21 19-20 18-19 20-21 20-21 21-22 22-23 19-20 21-22 4.500.000

98 PROBLEM SOLVING & DECISION MAKING 3 06-08 17-19 04-06 06-08 04-06 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

99 PROBLEM SOLVING & DECISION MAKING 3 27-29 03-05 18-20 28-30 18-20 02-04 28-30 03-05 28-30 05-07 02-04 29-31 6.500.000

100 PROBLEM SOLVING AND DECISION MAKING 4 07-10 03-06 10-13 31-03 11-14 02-05 30-03 03-06 01-04 05-08 02-05 01-04 8.500.000

101 RAPAT YANG PRODUKTIF (PRODUCTIVE MEETING) 2 02-03 24-25 23-24 27-28 04-05 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

102 SELF-EFFECTIVENESS & DEVELOPMENT 2 02-03 03-04 23-24 06-07 13-14 04-05 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

103 SENSITIVITY TRAINING (TURNING POINT ATAU NEW BORN) 3 08-10 03-05 11-13 30-01 11-13 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

104 SOAR Analysis 2 02-03 10-11 23-24 13-14 11-12 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000

Page 65: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga105 SPEED AND INNOVATION 3 13-15 12-14 18-20 07-09 18-20 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

106 Strategic and Systematic Thinking 2 02-03 06-07 23-24 29-30 18-19 02-03 29-30 06-07 28-29 08-09 05-06 30-31 4.500.000

107 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 27-29 19-21 11-13 27-29 18-20 17-19 27-29 19-21 31-02 21-23 18-20 28-30 6.500.000

108STRATEGIC HUMAN RESOURCE MANAGEMENT AND ORGANIZATIONDEVELOPMENT

3 08-10 26-28 18-20 07-09 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.000

109STRATEGIC HUMAN RESOURCES MANAGEMENT FOR GLOBALCOMPETITIVE ADVANTAGE

2 02-03 10-11 23-24 16-17 19-20 08-09 16-17 10-11 17-18 12-13 09-10 17-18 4.500.000

110 Strategic Performance Management 3 15-17 05-07 02-04 15-17 18-20 03-05 15-17 05-07 16-18 07-09 04-06 16-18 6.500.000

111 Strategic Planning 5 20-24 10-14 09-13 20-24 04-08 08-12 20-24 10-14 21-25 12-16 09-13 30-04 9.750.000

112 Strategic Time Management 3 15-17 05-07 09-11 28-30 18-20 02-04 28-30 05-07 28-30 07-09 04-06 29-31 6.500.000

113 STRESS & CONFLICT MANAGEMENT 3 22-24 17-19 04-06 15-17 06-08 15-17 15-17 18-20 16-18 19-21 16-18 16-18 6.500.000

114 Stress Management Strategies 3 22-24 12-14 18-20 30-01 06-08 10-12 29-01 12-14 31-02 14-16 11-13 30-02 6.500.000

115 SWOT Analysis 2 02-03 17-18 23-24 20-21 18-19 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

116 TALENT MANAGEMENT 4 21-24 18-21 16-19 31-03 11-14 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.500.000

117 TATACARA PENYUSUNAN SILABUS DIKLAT 3 20-22 03-05 18-20 13-15 18-20 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.500.000

118 TEAM DEVELOPMENT 3 27-29 26-28 09-11 22-24 13-15 24-26 22-24 26-28 23-25 28-30 25-27 22-24 6.500.000

119 TEKNIK NEGOSIASI 3 06-08 05-07 16-18 28-30 18-20 03-05 28-30 05-07 30-02 07-09 04-06 29-31 6.500.000

120 TIME MANAGEMENT 4 27-30 17-20 17-20 21-24 04-07 15-18 21-24 18-21 22-25 19-22 16-19 21-24 8.500.000

121 Total Quality Management 3 06-08 17-19 16-18 07-09 11-13 15-17 08-10 19-21 09-11 19-21 16-18 09-11 6.500.000

122 TOTAL QUALITY MANAGEMENT SERIES MANAJEMEN MUTU TERPADU 2 02-03 17-18 23-24 13-14 19-20 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000

123 Train the trainers 4 06-09 10-13 10-13 21-24 12-15 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.500.000

124 TRAINING OF TRAINER 3 15-17 19-21 02-04 06-08 11-13 17-19 06-08 19-21 07-09 21-23 18-20 07-09 6.500.000

125 Training Analysis Program 3 06-08 17-19 16-18 28-30 18-20 15-17 28-30 18-20 30-02 19-21 16-18 29-31 6.500.000

126 TRAINING DEVELOPMENT MANAGEMENT 3 29-31 24-26 04-06 07-09 18-20 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.000

127 TRAINING EVALUATION AND MEASUREMENT METHOD 2 16-17 24-25 23-24 16-17 19-20 22-23 16-17 24-25 17-18 26-27 23-24 17-18 4.500.000

128 TRAINING NEED ANALYSIS 2 23-24 03-04 05-06 23-24 04-05 04-05 23-24 03-04 24-25 05-06 02-03 23-24 4.500.000

129TRAINING NEEDS ANALYSIS(TNA),TRAINING PLAN, TRAINING BUDGETAND TRAINING IMPACT EVALUATION(TIE)

3 29-31 19-21 04-06 07-09 13-15 17-19 06-08 18-20 07-09 21-23 18-20 07-09 6.500.000

130 TRAINING OF TRAINER (TOT) 3 20-22 24-26 16-18 20-22 04-06 22-24 20-22 24-26 21-23 26-28 23-25 22-24 6.500.000

131 WORKLOAD ANALYSIS 2 02-03 17-18 23-24 23-24 07-08 15-16 23-24 20-21 24-25 19-20 16-17 21-22 4.500.000

132 Workload Analysis 2 02-03 17-18 23-24 20-21 07-08 15-16 20-21 18-19 21-22 19-20 16-17 23-24 4.500.000

Tambang/Mining - Mineral - Batubara

Page 66: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga1 BATUBARA 3 06-08 03-05 02-04 30-01 04-06 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

2CATHODIC PROTECTION FOR MINE STEEL STRUCTURE AND MININGSUPORTING FACILITIES

4 06-09 10-13 09-12 20-23 11-14 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.950.000

3 Chemical Hazard Safety in Mining and Workplace 4 20-23 24-27 02-05 30-02 12-15 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.950.000

4 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 13-16 10-13 09-12 06-09 11-14 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.000

5COAL FIRED POWER PLANT COMBUSTION OPERATION &MAINTENANCE

4 07-10 25-28 10-13 06-09 04-07 23-26 06-09 25-28 07-10 27-30 24-27 07-10 8.500.000

6 EVALUASI STUDI KELAYAKAN DALAM USAHA PERTAMBANGAN 3 22-24 19-21 02-04 06-08 04-06 17-19 08-10 18-20 09-11 21-23 18-20 09-11 6.500.000

7 GEOLOGY FOR NON GEOLOGIST 4 20-23 17-20 16-19 13-16 05-08 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.000

8 GPS(Global Positioning System) for mining and Petroleum 4 27-30 10-13 02-05 20-23 11-14 08-11 20-23 10-13 21-24 12-15 09-12 21-24 8.750.000

9 PEMBORAN DAN PELEDAKAN UNTUK PERTAMBANGAN 3 27-29 24-26 04-06 20-22 18-20 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.000

10 PEMBORAN EKSPLORASI BATUBARA 3 06-08 03-05 16-18 22-24 18-20 02-04 22-24 03-05 23-25 05-07 02-04 22-24 6.500.000

11 PEMINDAHAN TANAH MEKANIS 3 08-10 05-07 11-13 27-29 13-15 03-05 27-29 05-07 28-30 07-09 04-06 28-30 6.500.000

12 PERENCANAAN TAMBANG TERBUKA 3 29-31 26-28 09-11 15-17 11-13 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000

13 VENTILASI TAMBANG 3 15-17 12-14 18-20 01-03 18-20 10-12 01-03 12-14 02-04 14-16 11-13 02-04 6.500.000

Welding/Las1 BASIC WELDING 4 20-23 03-06 09-12 27-30 11-14 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.950.000

2 BRAZING 4 27-30 10-13 10-13 21-24 11-14 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.950.000

3 Gas Metal Arc Welding 4 20-23 17-20 09-12 13-16 04-07 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.950.000

4 GAS METAL ARC WELDING (LAS MIGMAG) 4 27-30 10-13 16-19 30-02 04-07 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.950.000

5 GAS TUNGSTEN ARC WELDING (LAS TIG) 4 06-09 17-20 02-05 06-09 12-15 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.950.000

6MANAJEMEN POST WELD HEAT TREATMENT TEORI, STANDARDPROSEDUR DAN APLIKASI

3 06-08 10-12 02-04 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.750.000

7 MANUAL METAL ARC WELDING (LAS LISTRIK) 4 13-16 24-27 10-13 13-16 05-08 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.950.000

8 OXY ACETYLENE WELDING 4 14-17 18-21 09-12 31-03 04-07 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.750.000

9 OXY ACETYLENE WELDING (LAS ASETILIN) 4 21-24 04-07 17-20 20-23 11-14 02-05 20-23 04-07 21-24 06-09 03-06 21-24 8.950.000

10 PRACTICAL WELDING 4 27-30 03-06 09-12 27-30 04-07 02-05 27-30 03-06 29-02 05-08 02-05 28-31 8.500.000

11 PRACTICE CONSIDERATIONS OF ARC WELDING 4 06-09 10-13 16-19 30-02 12-15 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.000

12 Welding 4 07-10 11-14 16-19 13-16 12-15 09-12 13-16 11-14 14-17 13-16 10-13 14-17 8.500.000

13 WELDING INSPECTION 4 28-31 11-14 03-06 27-30 04-07 09-12 27-30 11-14 29-02 13-16 10-13 28-31 9.500.000

14 WELDING INSPECTION 4 14-17 04-07 02-05 20-23 11-14 02-05 20-23 04-07 21-24 06-09 03-06 21-24 8.500.000

15 Welding Joint Inspection 4 14-17 18-21 03-06 20-23 05-08 16-19 20-23 18-21 21-24 20-23 17-20 21-24 8.500.000

Page 67: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga16 Welding Metallurgy 4 20-23 24-27 10-13 27-30 11-14 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

17 WELDING METALLURGY 4 27-30 24-27 16-19 20-23 11-14 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.950.000

18 WELDING METALLURGY 4 07-10 18-21 09-12 31-03 12-15 16-19 30-03 18-21 01-04 20-23 17-20 01-04 8.950.000

19 Welding Oxy Acetylene 4 27-30 03-06 17-20 31-03 04-07 02-05 30-03 03-06 01-04 05-08 02-05 01-04 8.500.000

20 WELDING SAFETY 2 02-03 03-04 23-24 27-28 18-19 02-03 27-28 03-04 01-02 05-06 02-03 23-24 4.500.000

21 WELDING SAFETY 3 15-17 26-28 16-18 06-08 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.950.000

22 WELDING SUPERVISOR 4 06-09 03-06 02-05 27-30 05-08 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.950.000

23 WELDING TECHNOLOGY 4 20-23 03-06 02-05 14-17 05-08 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.950.000

Page 68: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

PUBLIC TRAINING SCHEDULE 2020 DI JAKARTA 

Page 69: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

Accounting - Finance/Keuangan - Tax/Pajak

1 ACCOUNT PAYABLE MANAGEMENT 2 02-03 12-13 09-10 01-02 18-19 10-11 01-02 12-13 02-03 14-15 11-12 02-03 4.500.0002 Accounting For Non Accountant 3 27-29 17-19 16-18 27-29 18-20 15-17 27-29 18-20 28-30 19-21 16-18 28-30 6.500.0003 AFE Budget Preparation Skills of Oil & Gas Projects 4 20-23 24-27 02-05 20-23 04-07 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.750.0004 BASIC ACCOUNTING - Teori dan Praktek 2 02-03 24-25 23-24 20-21 18-19 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.0005 BUDGETING & BUSINESS PLAN 2 02-03 03-04 23-24 27-28 19-20 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.0006 CORPORATE CASH MANAGEMENT 2 02-03 24-25 23-24 27-28 18-19 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.0007 CORPORATE FINANCE 2 02-03 03-04 23-24 30-31 04-05 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.0008 CORPORATE FINANCIAL ACCOUNTING & TAX FOUNDATION 2 02-03 10-11 23-24 30-31 18-19 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.0009 COST ACCOUNTING & MANAGEMENT 2 02-03 17-18 23-24 06-07 11-12 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.000

10 Effective Estimating and Cost Control for EPC Projects 3 15-17 19-21 04-06 06-08 18-20 17-19 06-08 19-21 07-09 21-23 18-20 07-09 6.950.00011 FINANCE FOR NON FINANCE 2 02-03 26-27 23-24 13-14 19-20 24-25 13-14 26-27 14-15 28-29 25-26 14-15 4.500.00012 Finance for Non Finance Staff 2 08-09 05-06 04-05 08-09 07-08 04-05 08-09 05-06 09-10 07-08 04-05 09-10 4.500.00013 FINANCIAL ACCOUNTING FOR NON 2 02-03 10-11 23-24 06-07 11-12 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000

14Financial Accounting Information System Development With Excel2007 and VBA

2 27-28 06-07 05-06 27-28 18-19 04-05 27-28 06-07 28-29 08-09 05-06 28-29 4.500.000

15Financial Accounting Information System Development With Excel2010 and VBA

2 02-03 13-14 12-13 02-03 06-07 11-12 02-03 13-14 03-04 15-16 12-13 03-04 4.500.000

16 FINANCIAL-ACCOUNTING ANALYSIS & REPORTING 2 02-03 17-18 23-24 13-14 19-20 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.00017 INTERNATIONAL FINANCIAL REPORTING STANDARDS (IFRS) 2 13-14 17-18 16-17 13-14 04-05 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.00018 INTRODUCTION TO FINANCIAL MODELING 2 20-21 05-06 23-24 22-23 04-05 04-05 22-23 05-06 23-24 07-08 04-05 23-24 4.500.00019 KOMPUTER AKUNTANSI DAN PAJAK UMKM 2 27-28 24-25 23-24 27-28 13-14 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.00020 L C, UCP 600, ISBP DAN EXIM TRADE FINANCE 3 06-08 03-05 09-11 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.00021 PAJAK BISNIS PROPERTI 1 27-27 12-12 23-23 29-29 13-13 10-10 29-29 12-12 30-30 14-14 11-11 30-30 2.750.00022 PAJAK PERUSAHAAN KUP, HP, PPh & PPN 2 02-03 19-20 16-17 01-02 18-19 17-18 01-02 20-21 02-03 21-22 18-19 02-03 4.500.000

23PAYROLL ADMINISTRATION SYSTEM IMPLEMENTATION WITH EXCEL2010 & VBA

2 13-14 05-06 04-05 16-17 11-12 04-05 16-17 05-06 17-18 07-08 04-05 17-18 4.500.000

24 PENGANTAR HUKUM PASAR MODAL INDONESIA 2 06-07 27-28 23-24 08-09 06-07 25-26 08-09 27-28 09-10 29-30 26-27 09-10 4.500.00025 PERSONAL FINANCE PLANNING 2 13-14 06-07 02-03 15-16 14-15 02-03 15-16 06-07 16-17 08-09 05-06 16-17 4.500.00026 REGULASI DAN APLIKASI WITHOLDING TAX DI INDONESIA 2 22-23 13-14 09-10 23-24 19-20 11-12 23-24 13-14 24-25 15-16 12-13 21-22 4.500.00027 REGULASI DAN PRAKTEK PENGELOLAAN PPh WP BADAN 1 28-28 21-21 18-18 30-30 08-08 19-19 30-30 18-18 01-01 23-23 20-20 31-31 2.750.00028 STRATEGIC BUSINESS & FINANCIAL ANALYSIS 2 20-21 26-27 23-24 20-21 06-07 24-25 20-21 26-27 21-22 28-29 25-26 21-22 4.500.000

29SYSTEM PERPAJAKAN KEPABEANAN PELABUHAN DAN IT INVENTORYKAWASAN BERIKAT

2 20-21 27-28 23-24 20-21 18-19 25-26 20-21 27-28 21-22 29-30 26-27 21-22 4.500.000

30 THE STATEMENT OF CASH FLOW 2 27-28 05-06 23-24 29-30 13-14 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.000

31 UPDATED PPh 21 atau 26 & PPh WAJIB PAJAK ORANG PRIBADI 1 08-08 03-03 04-04 06-06 18-18 04-04 10-10 03-03 11-11 05-05 02-02 11-11 2.750.000

32 UPDATED REGULASI DAN APLIKASI PPh 21 atau 26 & PPN 1 15-15 10-10 11-11 17-17 04-04 08-08 17-17 10-10 18-18 12-12 09-09 18-18 2.750.000

PUBLIC TRAINING SCHEDULE 2020 DI JAKARTA

Page 70: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

Boiler - Turbin - Generator1

INSTALLATION, MAINTENANCE AND TROUBLESHOOTING OF GASCOMPRESSOR AND PIPING SYSTEM

3 20-22 24-26 02-04 20-22 04-06 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.000

2ROTATING EQUIPMENT PUMP, COMPRESSOR, GAS TURBINE,MAINTENANCE AND TROUBLESHOOTING

3 06-08 10-12 18-20 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

Engineering1 ASPEK HUKUM PADA PROYEK KONSTRUKSI 3 27-29 24-26 02-04 27-29 11-13 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.0002 DASAR-DASAR REKAYASA PERANCANGAN PABRIK 3 13-15 10-12 09-11 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.950.000

3ISO 10012 MEASUREMENT MANAGEMENT SYSTEM FORSUPPORTING ISO 9001 CERTIFICATION

2 27-28 03-04 02-03 27-28 04-05 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000

4 Kalibrasi dan Tera 2 02-03 03-04 02-03 30-31 04-05 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.0005 Kalibrasi Massa & Dimensi 2 06-07 10-11 09-10 06-07 11-12 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.0006 MANAJEMEN KALIBRASI 4 06-09 10-13 09-12 30-02 11-14 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.0007 MANAJEMEN PROYEK KONSTRUKSI 3 15-17 12-14 02-04 01-03 11-13 10-12 01-03 12-14 02-04 14-16 11-13 02-04 6.500.0008 PENGENDALIAN MUTU PADA PROYEK KONSTRUKSI 3 22-24 19-21 09-11 07-09 18-20 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.500.0009 Root Cause Analysis 2 13-14 20-21 19-20 13-14 11-12 18-19 13-14 20-21 14-15 22-23 19-20 14-15 4.500.000

10 SAP 2000 3 06-08 03-05 09-11 30-01 04-06 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.00011 Simulasi Proses Kimia Dengan Hysys 4 20-23 17-20 16-19 30-02 04-07 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.00012 TEKLA STRUCTURE 3 13-15 10-12 16-18 06-08 11-13 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

Export Import1 EXPORT IMPORT DALAM RANGKA EFISIENSI BIAYA KEPABEANAN 3 27-29 24-26 02-04 27-29 11-13 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.000

2EXPORT IMPORT DALAM RANGKA EFISIENSI BIAYA KEPABEANAN PLUSVISIT TJ. PRIOK

3 13-15 17-19 16-18 13-15 13-15 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.000

3 L C, UCP 600, ISBP DAN EXIM TRADE FINANCE 3 06-08 03-05 09-11 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.0004 MANAGEMENT EXPORT–IMPORT 2 02-03 10-11 23-24 06-07 04-05 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000

Health, Safety & Environment (HSE)1 ACCIDENT INVESTIGATIONS 2 02-03 17-18 23-24 06-07 04-05 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.0002 Advanced Rigging 5 20-24 24-28 02-06 20-24 04-08 22-26 20-24 24-28 21-25 26-30 23-27 30-04 9.500.000

3ASPEK DAN DAMPAK LINGKUNGAN SISTEM MANAJEMEN ISO 14001-2004

2 27-28 17-18 16-17 27-28 11-12 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.000

4 Assesment And Evaluation Of Waste Water Treatment System (WWT) 2 02-03 10-11 09-10 30-31 11-12 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.000

5 Basic K3 (Non-certification) 2 06-07 17-18 16-17 06-07 18-19 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.0006 Basic rigging 5 27-31 03-07 09-13 30-03 11-15 08-12 29-03 03-07 28-02 05-09 02-06 07-11 9.500.0007 Basic Scaffolding 4 06-09 10-13 16-19 27-30 04-07 02-05 27-30 10-13 31-03 12-15 09-12 21-24 8.500.0008 Clean Development Mechanism (CDM) 2 13-14 24-25 23-24 13-14 04-05 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.0009 CONFINED SPACE 1 13-13 24-24 24-24 13-13 11-11 22-22 13-13 24-24 14-14 26-26 23-23 14-14 2.750.000

10 Contractor Safety Management System 2 20-21 03-04 02-03 20-21 13-14 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.000

Page 71: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga11 CONTRACTOR SAFETY MANAGEMENT SYSTEM 3 13-15 10-12 16-18 06-08 04-06 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.00012 Forklift Safety 1 02-02 17-17 23-23 06-06 18-18 15-15 06-06 18-18 07-07 19-19 16-16 28-28 2.750.00013 HAZARD IDENTIFICATION & KYT TRAINING 1 22-22 05-05 04-04 22-22 20-20 04-04 22-22 05-05 23-23 07-07 04-04 23-23 2.750.00014 HSE Internal Audit Based on ISO 19011-2011 3 06-08 03-05 02-04 06-08 04-06 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.00015 HSE Risk Assesment 2 27-28 12-13 11-12 27-28 19-20 10-11 27-28 12-13 28-29 14-15 11-12 28-29 4.500.00016 Improvement Of Waste Water Treatment 2 02-03 19-20 18-19 01-02 06-07 17-18 01-02 20-21 02-03 21-22 18-19 02-03 4.500.000

17INTEGRATED QHSE MANAGEMENT SYSTEM (ISO 9001-2008, ISO14001 2004 & OHSAS 18001-2007)

4 20-23 18-21 17-20 20-23 05-08 16-19 20-23 18-21 21-24 20-23 17-20 21-24 8.500.000

18 INTERNAL AUDIT HSE 2 29-30 26-27 23-24 29-30 19-20 24-25 29-30 26-27 30-01 28-29 25-26 30-31 4.500.000

19Internal Audit Integrated QHSE Management System Based on ISO19011-2011

4 21-24 25-28 02-05 21-24 11-14 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.000

20 Internal Audit OHSAS 18001-2007 Based on ISO 19011-2013 2 15-16 17-18 16-17 15-16 04-05 15-16 15-16 18-19 16-17 19-20 16-17 16-17 4.500.000

21 INTERPRETING & DOCUMENTING OF OHSAS 18001 2007 2 16-17 24-25 23-24 16-17 18-19 22-23 16-17 24-25 17-18 26-27 23-24 17-18 4.500.00022 Job Safety Analysis 2 08-09 26-27 23-24 08-09 14-15 24-25 08-09 26-27 09-10 28-29 25-26 09-10 4.500.00023 Pandemic Preparedness for Leaders 1 27-27 10-10 09-09 27-27 18-18 08-08 27-27 10-10 28-28 12-12 09-09 28-28 2.750.00024 Pemahaman, Dokumentasi & Implementasi SMK3 2 28-29 17-18 16-17 29-30 06-07 15-16 29-30 20-21 29-30 19-20 16-17 30-31 4.500.00025 Penanganan Limbah B3, Bahan Berbahaya dan Beracun 1 22-22 14-14 13-13 22-22 08-08 12-12 22-22 14-14 23-23 16-16 13-13 23-23 2.750.00026 Permit To Work System 2 15-16 05-06 04-05 15-16 18-19 04-05 15-16 05-06 16-17 07-08 04-05 16-17 4.500.00027 SISTEM MANAJEMEN KESEHATAN DAN KESELAMATAN KERJA 3 06-08 03-05 04-06 22-24 13-15 02-04 22-24 03-05 23-25 05-07 02-04 22-24 6.500.000

28Understanding & Implementing Of HSE (Health, Safety &Environment) Management Systems

2 08-09 26-27 23-24 08-09 04-05 24-25 08-09 26-27 09-10 28-29 25-26 09-10 4.500.000

Information Technology (IT)1 COBIT 4.1 Foundation 2 30-31 27-28 23-24 29-30 13-14 25-26 29-30 27-28 01-02 29-30 26-27 30-31 4.500.0002 COBIT 5 Foundation 2 02-03 05-06 05-06 02-03 19-20 04-05 02-03 05-06 03-04 07-08 04-05 03-04 4.500.000

3COMPREHENSIVE WEBSITE WRITING SKILL FOR CORPORATEBRANDING

2 29-30 06-07 02-03 27-28 14-15 04-05 27-28 06-07 30-01 08-09 05-06 28-29 4.500.000

4Database Management System Development And Graphic DisplayWith Access 2010 And SQL Method

3 06-08 03-05 02-04 30-01 11-13 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

5DUNIA MAYA MERK DAN ADVERTENSI (CARA PRAKTISMENGKOMUNIKASIKAN MEREK DI MEDIA ONLINE)

2 16-17 26-27 23-24 16-17 11-12 24-25 16-17 26-27 17-18 28-29 25-26 17-18 4.500.000

6Excellent Automation Office Data Processing System and Data Exportwith visual basic aplication excel 2007

2 02-03 17-18 16-17 13-14 04-05 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000

7Excellent Automation Office Data Processing System and Data ExportWith Visual Basic Aplication Excel 2010

2 20-21 24-25 23-24 20-21 14-15 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.000

8Financial Accounting Information System Development With Excel2007 and VBA

2 27-28 06-07 05-06 27-28 18-19 04-05 27-28 06-07 28-29 08-09 05-06 28-29 4.500.000

9Financial Accounting Information System Development With Excel2010 and VBA

2 02-03 13-14 12-13 02-03 06-07 11-12 02-03 13-14 03-04 15-16 12-13 03-04 4.500.000

10 GRAFIC DESIGN & PRODUCT PACKAGING 4 27-30 10-13 09-12 27-30 04-07 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.00011 GRAPHIC DESIGN & DESKTOP PUBLISHING 4 06-09 17-20 16-19 30-02 11-14 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.000

Page 72: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

12Implementation Of Payroll Admisnistration System With Excel 2010For HRD

3 08-10 19-21 18-20 07-09 11-13 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.500.000

13 Inventory System Development Using Acces 2007 2 16-17 26-27 23-24 15-16 19-20 24-25 15-16 26-27 16-17 28-29 25-26 16-17 4.500.00014 Inventory System Development Using Acces 2010 2 22-23 03-04 02-03 22-23 07-08 02-03 22-23 03-04 23-24 05-06 02-03 23-24 4.500.00015 ISO 20000 Foundation 3 22-24 24-26 02-04 22-24 18-20 22-24 22-24 24-26 23-25 26-28 23-25 22-24 6.500.00016 ISO IEC 20000 IT SERVICE MANAGEMENT 2 06-07 20-21 19-20 08-09 07-08 18-19 06-07 20-21 07-08 22-23 19-20 07-08 4.500.00017 ISO IEC 38500 IT-GOVERNANCE 2 16-17 27-28 23-24 13-14 13-14 25-26 16-17 27-28 17-18 29-30 26-27 17-18 4.500.00018 IT BUSINESS ANALYSIS 3 06-08 19-21 18-20 06-08 18-20 17-19 06-08 19-21 07-09 21-23 18-20 07-09 6.500.00019 IT HELPDESK 3 15-17 17-19 16-18 13-15 13-15 15-17 13-15 19-21 14-16 19-21 16-18 14-16 6.500.00020 IT PROJECT MANAGEMENT 3 15-17 26-28 04-06 15-17 04-06 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.00021 IT RISK MANAGEMENT 5 20-24 03-07 09-13 20-24 11-15 08-12 20-24 03-07 21-25 05-09 02-06 30-04 9.500.00022 IT Strategic Planning 2 29-30 12-13 23-24 29-30 18-19 04-05 29-30 12-13 30-01 14-15 11-12 21-22 4.500.00023 ITIL V.3 FOUNDATION 3 08-10 17-19 16-18 01-03 06-08 15-17 01-03 18-20 02-04 19-21 16-18 29-31 6.500.00024 ITIL V2011Foundation with Intl Cert. Exam Preps 3 13-15 24-26 02-04 07-09 11-13 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.00025 Managing Software Requirements 3 29-31 19-21 18-20 27-29 13-15 17-19 27-29 19-21 30-02 21-23 18-20 28-30 6.500.00026 Mastering Excel 2010 For Office Data Processing 2 29-30 10-11 09-10 29-30 14-15 08-09 29-30 10-11 30-01 12-13 09-10 30-31 4.500.000

27 Mastering Microsoft Project 2007 (Concept and Application) 2 02-03 17-18 16-17 30-31 18-19 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000

28MENGOPTIMALKAN WEBSITE KORPORAT SEBAGAI MEDIAKOMUNIKASI CSR

1 13-13 05-05 06-06 13-13 06-06 04-04 13-13 05-05 14-14 07-07 04-04 14-14 2.750.000

29 PENYUSUNAN PENGELOLAAN TEKNOLOGI INFORMASI BUMN 3 06-08 26-28 04-06 30-01 18-20 24-26 29-01 26-28 31-02 28-30 25-27 30-02 6.500.000

30POS AND INVENTORY SYSTEM DEVELOPMENT WITH USING ACCESS2010

2 23-24 12-13 11-12 23-24 19-20 10-11 23-24 12-13 24-25 14-15 11-12 21-22 4.500.000

31 Powerful Database Analysis and Dashboard Reporting with Excel 2010 2 30-31 19-20 18-19 27-28 06-07 17-18 27-28 20-21 01-02 21-22 18-19 28-29 4.500.000

32 Presentation Skill With Power Point 2007, Swishmax and ULEAD 3 08-10 24-26 04-06 01-03 13-15 22-24 01-03 24-26 02-04 26-28 23-25 02-04 6.500.000

33 SOFTWARE PROJECT MANAGEMENT 3 06-08 10-12 09-11 20-22 18-20 10-12 20-22 10-12 21-23 12-14 09-11 22-24 6.500.00034 SOFTWARE QUALITY ASSURANCE 3 15-17 17-19 18-20 27-29 06-08 15-17 27-29 18-20 30-02 19-21 16-18 28-30 6.500.00035 SOFTWARE TESTING FOUNDATION 3 22-24 24-26 04-06 30-01 11-13 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.00036 Systems Analysis and Design 3 08-10 12-14 16-18 15-17 04-06 08-10 15-17 12-14 16-18 14-16 11-13 16-18 6.500.00037 SYSTEMS ANALYSIS AND DESIGN WITH UML 3 13-15 19-21 02-04 22-24 13-15 17-19 22-24 19-21 23-25 21-23 18-20 21-23 6.500.000

38 TEKNIK DAN SKILL PUBLIKASI COMPANY PROFILE BERBASIS DIGITAL 1 29-29 26-26 23-23 29-29 13-13 24-24 29-29 26-26 30-30 28-28 25-25 30-30 2.750.000

39TRAVEL WRITER DAN KETERAMPILAN MENULIS PERJALANAN WISATAMELALUI MEDIA ONLINE

2 02-03 03-04 04-05 01-02 19-20 02-03 01-02 03-04 02-03 05-06 02-03 02-03 4.500.000

40 Workload Analysis Implementation With Excel 2007 for HR & Non HR 2 20-21 20-21 19-20 20-21 11-12 18-19 20-21 18-19 21-22 22-23 19-20 23-24 4.500.000

Leadership/Kepemimpinan1 15 ETOS KERJA DAN KEPRIBADIAN 2 20-21 10-11 09-10 20-21 04-05 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.0002 ACHIEVEMENT MOTIVATION 2 02-03 03-04 02-03 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.0003 ACHIEVEMENT MOTIVATION 2 20-21 17-18 16-17 20-21 11-12 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

Page 73: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga4 ACHIEVMENT ORIENTATION 2 06-07 10-11 09-10 06-07 04-05 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.0005 Analytical Thinking & Problem Solving 2 02-03 24-25 23-24 13-14 11-12 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.0006 ASSERTIVE COMMUNICATION SKILLS 2 27-28 24-25 23-24 27-28 18-19 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.0007 BASIC LEADERSHIP FOR STAF & SUPERVISOR 2 08-09 20-21 19-20 08-09 07-08 18-19 08-09 18-19 09-10 22-23 19-20 09-10 4.500.0008 BASIC MANAGERIAL AND LEADERSHIP 2 02-03 17-18 16-17 30-31 11-12 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000

9Best Practice Be Proactive Supervisor Team Leader Foreman(Supervisory Skill)

2 15-16 27-28 23-24 15-16 11-12 25-26 15-16 27-28 16-17 29-30 26-27 16-17 4.500.000

10BEST PRACTICE CREATIVE THINKING & PROBLEM SOLVING TO LEADYOU SUCCESS

2 23-24 06-07 05-06 23-24 19-20 02-03 23-24 06-07 24-25 08-09 05-06 21-22 4.500.000

11 BEST PRACTICE EFFECTIVE COMMUNICATION SKILL AT WORK PLACE 2 02-03 17-18 16-17 02-03 13-14 15-16 02-03 20-21 03-04 19-20 16-17 03-04 4.500.000

12 CHANGE MANAGEMENT 2 27-28 17-18 16-17 27-28 11-12 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.00013 CHARACTER BUILDING 2 13-14 19-20 18-19 13-14 19-20 17-18 13-14 20-21 14-15 21-22 18-19 14-15 4.500.00014 CHARACTER BUILDING 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.00015 COACHING & COUNSELING 2 13-14 17-18 16-17 13-14 11-12 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.00016 COACHING & KONSELING YANG EFEKTIF 2 06-07 03-04 02-03 06-07 06-07 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.00017 commitment to change 2 13-14 03-04 02-03 13-14 11-12 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.00018 communication for best result 2 20-21 10-11 09-10 20-21 18-19 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.00019 CREATIVE & CONSULTATIVE SELLING 2 29-30 05-06 04-05 29-30 14-15 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.00020 CREATIVE & INNOVATIVE THINKING 2 13-14 12-13 11-12 13-14 13-14 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.00021 CREATIVE & INNOVATIVE THINKING 2 02-03 12-13 11-12 01-02 18-19 10-11 01-02 12-13 02-03 14-15 11-12 02-03 4.500.00022 CREATIVE PROBLEM SOLVING & DECISION MAKING 2 15-16 27-28 23-24 15-16 11-12 25-26 15-16 27-28 16-17 29-30 26-27 16-17 4.500.00023 CREATIVE PROBLEM SOLVING AND DECISION MAKING 2 20-21 24-25 23-24 20-21 19-20 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.00024 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 2 27-28 24-25 23-24 27-28 04-05 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.00025 DIRECTING COACHING COUNSELING DELEGATING 1 06-06 24-24 23-23 06-06 18-18 22-22 06-06 24-24 07-07 26-26 23-23 07-07 2.750.00026 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 2 06-07 10-11 09-10 06-07 18-19 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.00027 EMOTIONAL INTELLIGENCE 3 29-31 26-28 04-06 28-30 06-08 24-26 28-30 26-28 30-02 28-30 25-27 29-31 6.500.00028 EMOTIONAL INTELLIGENSI 2 27-28 05-06 04-05 27-28 06-07 04-05 27-28 05-06 28-29 07-08 04-05 28-29 4.500.00029 EMPOWERING EMOTIONAL INTELLIGENCE 1 13-13 03-03 02-02 13-13 04-04 02-02 13-13 03-03 14-14 05-05 02-02 14-14 2.750.00030 ENHANCING MANAGERIAL SKILL & LEADERSHIP 2 27-28 03-04 02-03 27-28 11-12 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.00031 Fundamental Strategic Thinking Skill 2 20-21 26-27 23-24 20-21 19-20 24-25 20-21 26-27 21-22 28-29 25-26 23-24 4.500.00032 GOAL SETTING 2 08-09 13-14 12-13 08-09 18-19 11-12 08-09 13-14 09-10 15-16 12-13 09-10 4.500.00033 HANDLING COMPLAINT SKILLS 2 09-10 24-25 23-24 06-07 18-19 22-23 09-10 24-25 10-11 26-27 23-24 10-11 4.500.00034 How To Manage & Motivate an Excellent Team 2 15-16 20-21 19-20 15-16 04-05 18-19 15-16 18-19 16-17 22-23 19-20 16-17 4.500.00035 Influential Leadership Excellence 3 20-22 05-07 11-13 20-22 13-15 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.00036 INTERNAL COMMUNICATION AND CHANGE COMMUNICATION 2 09-10 27-28 23-24 06-07 04-05 25-26 09-10 27-28 10-11 29-30 26-27 10-11 4.500.00037 INTERPERSONAL COMMUNICATION FOR SELF DEVELOPMENT 2 13-14 24-25 23-24 13-14 04-05 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.00038 Kebiasaan Efektif Menuju Sukses 2 02-03 06-07 23-24 01-02 11-12 02-03 01-02 06-07 02-03 08-09 05-06 02-03 4.500.00039 KEPEMIMPINAN (LEADERSHIP) 2 13-14 19-20 18-19 13-14 13-14 17-18 13-14 20-21 14-15 21-22 18-19 14-15 4.500.00040 Kepemimpinan Gemba 2 09-10 10-11 09-10 06-07 19-20 08-09 09-10 10-11 10-11 12-13 09-10 10-11 4.500.00041 Komunikasi Cerdas 2 13-14 05-06 04-05 15-16 06-07 04-05 15-16 05-06 16-17 07-08 04-05 16-17 4.500.00042 Kreativitas 2 16-17 20-21 19-20 16-17 07-08 18-19 16-17 18-19 17-18 22-23 19-20 17-18 4.500.00043 KREATIVITAS DAN INOVASI 2 23-24 24-25 23-24 23-24 11-12 22-23 23-24 24-25 24-25 26-27 23-24 21-22 4.500.000

Page 74: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga44 Leader as a C.O.A.C.H 3 29-31 12-14 18-20 28-30 18-20 10-12 28-30 12-14 30-02 14-16 11-13 29-31 6.500.00045 LEADERSHIP & SUPERVISORY MANAGEMENT 2 08-09 13-14 11-12 08-09 19-20 11-12 08-09 13-14 09-10 15-16 12-13 09-10 4.500.00046 LEADERSHIP DEVELOPMENT PROGRAM 2 23-24 26-27 23-24 23-24 13-14 24-25 23-24 26-27 24-25 28-29 25-26 23-24 4.500.00047 LEADERSHIP FOR FORMEN 2 29-30 05-06 04-05 29-30 19-20 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.00048 LEADERSHIP FOR OFFICER & STAFF 2 27-28 06-07 02-03 27-28 19-20 02-03 27-28 06-07 28-29 08-09 05-06 28-29 4.500.00049 Leadership Skill For Sales Leader 3 06-08 17-19 16-18 30-01 11-13 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.00050 LEADERSHIP SKILLS 2 16-17 03-04 02-03 16-17 06-07 04-05 16-17 03-04 17-18 05-06 02-03 17-18 4.500.00051 LEADERSHIP SKILLS FOR TOP MANAGEMENT 2 02-03 10-11 09-10 02-03 06-07 08-09 02-03 10-11 03-04 12-13 09-10 03-04 4.500.00052 LEADERSHIP TRAINING 2 09-10 17-18 16-17 06-07 13-14 15-16 09-10 20-21 10-11 19-20 16-17 10-11 4.500.00053 Managerial Skills & Leadership Training 2 16-17 26-27 23-24 16-17 18-19 24-25 16-17 26-27 17-18 28-29 25-26 17-18 4.500.00054 Managing Stress for Practical Purpose 3 08-10 19-21 02-04 01-03 04-06 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.00055 MANAJEMEN WAKTU (TIME MANAGEMENT) 2 02-03 20-21 19-20 08-09 18-19 18-19 08-09 18-19 09-10 22-23 19-20 09-10 4.500.00056 MANAJEMEN KONFLIK 2 20-21 03-04 04-05 20-21 07-08 04-05 20-21 03-04 21-22 05-06 02-03 23-24 4.500.00057 MANAJEMEN STRATEGI (STRATEGIC MANAGEMENT) 2 15-16 27-28 23-24 15-16 04-05 25-26 15-16 27-28 16-17 29-30 26-27 16-17 4.500.00058 Manajemen Stres 1 02-02 12-12 11-11 03-03 04-04 10-10 03-03 12-12 04-04 14-14 11-11 04-04 2.750.000

59 MEMBANGUN BUDAYA PERUSAHAAN YANG KUAT DAN UNGGUL 2 02-03 19-20 18-19 30-31 19-20 17-18 29-30 18-19 31-01 21-22 18-19 30-01 4.500.000

60MEMOTIVASI ANGGOTA TIM DAN STAF UNTUK MENINGKATKANPRODUKTIVITAS MEREKA

2 06-07 27-28 23-24 08-09 04-05 25-26 06-07 27-28 07-08 29-30 26-27 07-08 4.500.000

61 MENGOPTIMALKAN KINERJA KARYAWAN BACK OFFICE 2 13-14 05-06 05-06 13-14 11-12 02-03 13-14 05-06 14-15 07-08 04-05 14-15 4.500.00062 MENTALITAS DASAR 3 29-31 10-12 09-11 27-29 18-20 08-10 27-29 10-12 30-02 12-14 09-11 28-30 6.500.00063 METAZONE Class 1 20-20 03-03 02-02 20-20 11-11 02-02 20-20 03-03 21-21 05-05 02-02 21-21 2.750.00064 NEGOTIATION AND LOBBYING SKILLS FOR DECISION MAKER 2 13-14 10-11 09-10 13-14 14-15 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.00065 PENGAMBILAN KEPUTUSAN (DECISION MAKING) 2 02-03 17-18 16-17 30-31 06-07 15-16 29-30 20-21 31-01 19-20 16-17 30-01 4.500.00066 Personal Development 2 02-03 24-25 23-24 30-31 13-14 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.00067 Personal Excellence Winner Attitude 3 15-17 26-28 09-11 07-09 11-13 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.00068 PERSONALITY DEVELOPMENT FOR HIGH 2 02-03 26-27 23-24 30-31 07-08 24-25 29-30 26-27 31-01 28-29 25-26 30-01 4.500.00069 Practical Problem Solving 2 20-21 13-14 12-13 20-21 07-08 11-12 20-21 13-14 21-22 15-16 12-13 23-24 4.500.00070 PRESENTATION AND EFFECTIVE COMMUNICATION SKILLS 2 02-03 03-04 23-24 08-09 19-20 04-05 06-07 03-04 07-08 05-06 02-03 07-08 4.500.00071 PROBLEM SOLVING & DECISION MAKING 1 22-22 21-21 20-20 22-22 04-04 19-19 22-22 20-20 23-23 23-23 20-20 21-21 2.750.00072 PROJECT LEADERSHIP 2 02-03 05-06 23-24 27-28 18-19 04-05 27-28 05-06 01-02 07-08 04-05 28-29 4.500.000

73 PROSDEM Pemecahan Masalah dan Pengambilan Keputusan 3 27-29 17-19 16-18 27-29 06-08 15-17 27-29 19-21 28-30 19-21 16-18 28-30 6.500.000

74 Sales Coaching Skill For Leader 2 13-14 05-06 04-05 13-14 06-07 04-05 13-14 05-06 14-15 07-08 04-05 14-15 4.500.00075 Self Coaching for Life Optimization 2 20-21 03-04 02-03 20-21 11-12 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.00076 SEVEN HABITS 3 06-08 24-26 02-04 06-08 13-15 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.00077 SMART GOALS SETTING 1 20-20 19-19 18-18 20-20 07-07 17-17 20-20 20-20 21-21 21-21 18-18 21-21 2.750.00078 STRESS MANAGEMENT FOR PRODUCTIVE PEOPLE 1 27-27 10-10 09-09 27-27 19-19 08-08 27-27 10-10 28-28 12-12 09-09 28-28 2.750.00079 TABLE MANNER & GROOMING 2 13-14 12-13 11-12 13-14 18-19 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.00080 TEKNIK HUBUNGAN ANTAR MANUSIA 2 16-17 03-04 23-24 16-17 18-19 04-05 16-17 03-04 17-18 05-06 02-03 17-18 4.500.00081 TEKNIK PENDELEGASIAN TUGAS & WEWENANG 2 02-03 06-07 05-06 01-02 19-20 04-05 01-02 06-07 02-03 08-09 05-06 02-03 4.500.00082 Terrorism Risk Management for Leaders 1 16-16 12-12 13-13 16-16 15-15 10-10 16-16 12-12 17-17 14-14 11-11 17-17 2.750.00083 THE HEART OF LEADERSHIP 2 13-14 12-13 11-12 13-14 04-05 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.000

Page 75: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga84 TIME MANAGEMENT 2 09-10 12-13 11-12 08-09 11-12 10-11 09-10 12-13 10-11 14-15 11-12 10-11 4.500.000

Maintenance/Perawatan1 AUTONOMOUS MAINTENANCE 2 20-21 24-25 23-24 20-21 04-05 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.0002 Maintenance Management 2 20-21 24-25 23-24 20-21 13-14 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.0003 MAINTENANCE MANAJEMEN 2 08-09 27-28 23-24 08-09 18-19 25-26 08-09 27-28 09-10 29-30 26-27 09-10 4.500.0004 MAINTENANCE PLANNING & SCHEDULING 3 20-22 24-26 02-04 20-22 11-13 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.000

5 PRACTICAL PROBLEM SOLVING FOR MAINTENANCE AND ENGINEER 1 10-10 07-07 06-06 06-06 13-13 02-02 10-10 07-07 11-11 09-09 06-06 11-11 2.750.000

6 RELIABILITY CENTERED MAINTENANCE (RCM) IN INDUSTRY 3 27-29 03-05 09-11 27-29 18-20 02-04 27-29 03-05 28-30 05-07 02-04 28-30 6.500.0007 ROOT CAUSE ANALYSIS (RCA) IN INDUSTRY 3 06-08 10-12 16-18 30-01 04-06 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.0008 TOTAL PRODUCTIVE MAINTENANCE 2 06-07 12-13 11-12 07-08 07-08 10-11 06-07 12-13 07-08 14-15 11-12 07-08 4.500.0009 TPM (TOTAL PREVENTIVE MAINTENANCE) 2 27-28 26-27 23-24 29-30 14-15 24-25 29-30 26-27 28-29 28-29 25-26 30-31 4.500.000

10 TURNAROUND & SHUTDOWNS MANAGEMENT 3 13-15 17-19 04-06 06-08 13-15 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.00011 ZERO BREAK DOWN THROUGH SMALL DEFECT ELIMINATION 1 02-02 03-03 02-02 30-30 20-20 03-03 29-29 03-03 31-31 05-05 02-02 30-30 2.750.000

Manajemen1 5S - Housekeeping Management 2 30-31 24-25 23-24 27-28 13-14 22-23 27-28 24-25 01-02 26-27 23-24 28-29 4.500.0002 5S IN MANUFACTURING 1 13-13 17-17 16-16 13-13 18-18 15-15 13-13 18-18 14-14 19-19 16-16 14-14 2.750.0003 7 Management Tools 2 13-14 03-04 02-03 13-14 18-19 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.0004 7 QC Tools (7 Alat Pengendali Mutu) 3 20-22 10-12 09-11 20-22 04-06 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.500.0005 A3 REPORT 2 27-28 24-25 23-24 27-28 18-19 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.0006 ACCOUNT PAYABLE MANAGEMENT 2 02-03 12-13 09-10 01-02 18-19 10-11 01-02 12-13 02-03 14-15 11-12 02-03 4.500.0007 Accounting For Non Accountant 3 27-29 17-19 16-18 27-29 18-20 15-17 27-29 18-20 28-30 19-21 16-18 28-30 6.500.0008 Advance Business Process Management 3 06-08 24-26 02-04 30-01 04-06 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.0009 ADVANCE SECURITY INVESTIGATION 2 29-30 20-21 18-19 29-30 18-19 18-19 29-30 18-19 30-01 22-23 19-20 30-31 4.500.000

10 Advance Supervisory Management 3 27-29 03-05 02-04 27-29 04-06 02-04 27-29 03-05 28-30 05-07 02-04 28-30 6.500.00011 ADVANCED PROJECT MANAGEMENT 2 02-03 03-04 23-24 06-07 11-12 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

12 ADVANCED PROJECT MANAGEMENT BASED ON PMBOK 5th Edition 3 13-15 17-19 16-18 13-15 11-13 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.950.000

13 AFE Budget Preparation Skills of Oil & Gas Projects 4 20-23 24-27 02-05 20-23 04-07 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.750.00014 ALL COMPETENCIES IN HRD MANAGEMENT 2 02-03 03-04 23-24 13-14 18-19 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

15 ANALISIS KEBUTUHAN PELATIHAN (TRAINING NEEDS ANALYSIS) 2 02-03 10-11 09-10 30-31 11-12 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.000

16 Analytical Thinking & Problem Solving 2 02-03 24-25 23-24 13-14 11-12 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.00017 Annual Report Writing 2 06-07 12-13 11-12 06-07 05-06 10-11 09-10 12-13 10-11 14-15 11-12 10-11 4.500.00018 Applied Risk Assessment into EPC Project 4 27-30 03-06 09-12 27-30 12-15 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.750.00019 ASPECTS OF CONTRACT 2 06-07 17-18 16-17 06-07 04-05 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.00020 ASPEK HUKUM PADA PROYEK KONSTRUKSI 3 27-29 24-26 02-04 27-29 11-13 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.00021 ASSERTIVE COMMUNICATION SKILLS 2 27-28 24-25 23-24 27-28 18-19 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.00022 AUDIT OPERASIONAL & KINERJA 2 02-03 24-25 23-24 06-07 18-19 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.00023 BASIC ACCOUNTING - Teori dan Praktek 2 02-03 24-25 23-24 20-21 18-19 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.00024 BASIC AUDIT TECHNIQUES & TOOLS FOR THE NEW AUDITORS 3 13-15 03-05 02-04 13-15 04-06 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.500.000

Page 76: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga25 BASIC LEADERSHIP FOR STAF & SUPERVISOR 2 08-09 20-21 19-20 08-09 07-08 18-19 08-09 18-19 09-10 22-23 19-20 09-10 4.500.00026 BASIC MANAGERIAL AND LEADERSHIP 2 02-03 17-18 16-17 30-31 11-12 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.00027 Basic Professional Salesperson 2 20-21 17-18 16-17 20-21 11-12 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

28BEING A GREAT SUPERVISOR SUPERVISORS THE MOST IMPORTANTPOSITION OF THE ORGANIZATION OPERATIONALLY

2 20-21 03-04 02-03 20-21 18-19 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.000

29 BERITA ACARA PEMERIKSAAN 2 13-14 24-25 23-24 13-14 11-12 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.000

30Best Practice Be Proactive Supervisor Team Leader Foreman(Supervisory Skill)

2 15-16 27-28 23-24 15-16 11-12 25-26 15-16 27-28 16-17 29-30 26-27 16-17 4.500.000

31 BEST PRACTICE CUSTOMER CARE & SERVICE EXCELLENCE 2 30-31 13-14 12-13 27-28 04-05 11-12 27-28 13-14 01-02 15-16 12-13 28-29 4.500.000

32 BEST PRACTICE EFFECTIVE COMMUNICATION SKILL AT WORK PLACE 2 02-03 17-18 16-17 02-03 13-14 15-16 02-03 20-21 03-04 19-20 16-17 03-04 4.500.000

33 BEST PRACTICE EFFECTIVE TRAINING NEEDS ANALYSIS (TNA) 2 09-10 24-25 23-24 06-07 18-19 22-23 09-10 24-25 10-11 26-27 23-24 10-11 4.500.00034 Best Practice Effective Work Management 2 16-17 03-04 02-03 16-17 06-07 04-05 16-17 03-04 17-18 05-06 02-03 17-18 4.500.00035 Best Practice In Online Event Community Management 2 16-17 18-19 17-18 16-17 14-15 16-17 16-17 20-21 17-18 20-21 17-18 17-18 4.500.000

36BEST PRACTICE SCM DAN STRATEGIC INVENTORY CONTROL ANDWAREHOUSING PERUSAHAAN TAMBANG DAN MIGAS

3 06-08 03-05 09-11 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

37 Best Practice Selling Skill & Closing Sales 2 27-28 19-20 18-19 29-30 19-20 17-18 29-30 18-19 28-29 21-22 18-19 30-31 4.500.000

38Best Practice Strategi Penjualan Sukses Salesperson Perusahaan(Mastery Selling Skill)

2 02-03 26-27 23-24 30-31 07-08 24-25 29-30 26-27 31-01 28-29 25-26 30-01 4.500.000

39 Boosting Sales Promotion Girl or Boy (SPG or SPB) 2 27-28 24-25 23-24 27-28 18-19 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.00040 Brand Engagement Di Media Sosial 2 23-24 27-28 23-24 23-24 18-19 25-26 23-24 27-28 24-25 29-30 26-27 23-24 4.500.00041 Brand Strategy & Creativity 2 30-31 05-06 05-06 29-30 07-08 04-05 29-30 05-06 01-02 07-08 04-05 30-31 4.500.00042 BUDGETING & BUSINESS PLAN 2 02-03 03-04 23-24 27-28 19-20 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.00043 BUILDING COLLABORATIVE RELATIONSHIPS TRAINING 2 27-28 10-11 09-10 27-28 04-05 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.00044 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 20-22 17-19 16-18 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.00045 BUSINESS ANALYSIS FOUNDATION 2 13-14 10-11 09-10 13-14 18-19 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.00046 BUSINESS ETIQUETTE & PERSONAL IMAGES 2 02-03 03-04 02-03 30-31 04-05 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.00047 BUSINESS PROCESS MANAGEMENT 2 27-28 24-25 23-24 27-28 18-19 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.00048 Business Process Mapping 2 20-21 20-21 19-20 20-21 07-08 18-19 20-21 20-21 21-22 22-23 19-20 21-22 4.500.00049 CHANGE MANAGEMENT 2 27-28 17-18 16-17 27-28 11-12 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.00050 COACHING & COUNSELING 2 13-14 17-18 16-17 13-14 11-12 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.00051 COACHING & KONSELING YANG EFEKTIF 2 06-07 03-04 02-03 06-07 06-07 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.00052 COACHING AND COUNSELING 2 27-28 24-25 23-24 27-28 11-12 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

53 COMMUNITY SAFETY, CRIME PREVENTION AND SOCIAL CONTROL 2 02-03 27-28 23-24 01-02 04-05 25-26 01-02 27-28 02-03 29-30 26-27 02-03 4.500.000

54COMPREHENSIVE IN HOUSE MAGAZINE WRITING SKILL FORCORPORATE BRANDING

2 02-03 05-06 05-06 30-31 04-05 02-03 29-30 05-06 31-01 07-08 04-05 30-01 4.500.000

55COMPREHENSIVE NEWSLETTER WRITING SKILL FOR CORPORATEBRANDING

2 09-10 13-14 12-13 06-07 13-14 11-12 08-09 13-14 09-10 15-16 12-13 09-10 4.500.000

56 COMPREHENSIVE PROBLEM SOLVING OF DIRECT MARKETING 2 15-16 20-21 19-20 15-16 19-20 18-19 15-16 20-21 16-17 22-23 19-20 16-17 4.500.00057 COMPREHENSIVE SUSTAINABLE REPORT WRITING SKILL 2 22-23 24-25 23-24 22-23 06-07 22-23 22-23 24-25 23-24 26-27 23-24 21-22 4.500.00058 Comprehensive Talent Management 2 02-03 24-25 23-24 06-07 11-12 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.000

Page 77: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

59COMPREHENSIVE WEBSITE WRITING SKILL FOR CORPORATEBRANDING

2 29-30 06-07 02-03 27-28 14-15 04-05 27-28 06-07 30-01 08-09 05-06 28-29 4.500.000

60 CONFLICT MANAGEMENT 2 22-23 26-27 23-24 22-23 06-07 24-25 22-23 26-27 23-24 28-29 25-26 23-24 4.500.00061 Conflict Management & Handling Difficult People 2 02-03 13-14 12-13 30-31 18-19 11-12 29-30 13-14 31-01 15-16 12-13 30-01 4.500.00062 Consultative Selling Process 2 20-21 03-04 02-03 20-21 18-19 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.00063 CONTINUOUS IMPROVEMENT 3 06-08 03-05 02-04 30-01 04-06 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.00064 CONTRACT RISK MANAGEMENT & COMPLIANCE 4 06-09 10-13 17-20 30-02 05-08 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.750.00065 Corporate Advertising & Media Placement Strategy 2 02-03 13-14 12-13 02-03 11-12 11-12 02-03 13-14 03-04 15-16 12-13 03-04 4.500.00066 CORPORATE CASH MANAGEMENT 2 02-03 24-25 23-24 27-28 18-19 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.00067 CORPORATE COMMUNITY RELATION 2 06-07 10-11 09-10 06-07 18-19 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.00068 CORPORATE FINANCE 2 02-03 03-04 23-24 30-31 04-05 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.00069 CORPORATE FINANCIAL ACCOUNTING & TAX FOUNDATION 2 02-03 10-11 23-24 30-31 18-19 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.00070 Corporate Identity Process And Development 2 08-09 20-21 19-20 08-09 19-20 18-19 06-07 18-19 07-08 22-23 19-20 07-08 4.500.00071 COST ACCOUNTING & MANAGEMENT 2 02-03 17-18 23-24 06-07 11-12 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.00072 CREATIVE & CONSULTATIVE SELLING 2 29-30 05-06 04-05 29-30 14-15 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.00073 CREATIVE & INNOVATIVE THINKING 2 13-14 12-13 11-12 13-14 13-14 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.00074 CREATIVE ENTERPRENEURSHIP 2 08-09 20-21 19-20 08-09 07-08 18-19 08-09 18-19 09-10 22-23 19-20 09-10 4.500.00075 CREATIVE PROBLEM SOLVING & DECISION MAKING 2 15-16 27-28 23-24 15-16 11-12 25-26 15-16 27-28 16-17 29-30 26-27 16-17 4.500.00076 CREATIVE PROBLEM SOLVING AND DECISION MAKING 2 20-21 24-25 23-24 20-21 19-20 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.00077 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 2 27-28 24-25 23-24 27-28 04-05 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.00078 CSR COMMUNICATION AND SOCIAL BRANDING BUILDING 2 13-14 17-18 16-17 13-14 04-05 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000

79CSR COMMUNICATION FOR ORGANIZATIONAL LEGITIMACY IN SOCIALMEDIA

2 20-21 24-25 23-24 20-21 11-12 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.000

80 CSR COMMUNICATION IN OFFICIAL WEBSITE 2 27-28 03-04 02-03 27-28 19-20 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.00081 CSR Communication Management 2 13-14 24-25 23-24 13-14 04-05 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.00082 CSR PATNERSHIP & STAKEHOLDER RELATIONSHIP 2 02-03 12-13 11-12 30-31 06-07 10-11 29-30 12-13 31-01 14-15 11-12 30-01 4.500.00083 CSR STRATEGIC & CORPORATE REPUTATION 2 08-09 19-20 18-19 08-09 13-14 17-18 08-09 20-21 09-10 21-22 18-19 09-10 4.500.00084 Customer Care and Service Excellence 2 06-07 10-11 09-10 06-07 04-05 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.00085 CUSTOMER RELATIONSHIP MANAGEMENT 2 23-24 06-07 05-06 23-24 19-20 02-03 23-24 06-07 24-25 08-09 05-06 21-22 4.500.000

86CUSTOMER RETENTION MARKETING MEMBANGUN HUBUNGANLEBIH BAIK DENGAN PELANGGAN

2 15-16 26-27 23-24 15-16 18-19 24-25 15-16 26-27 16-17 28-29 25-26 16-17 4.500.000

87 CUSTOMER SERVICE EXCELLENT 2 02-03 03-04 02-03 30-31 11-12 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.00088 CUSTOMER SERVICE EXCELLENT 2 30-31 13-14 12-13 27-28 04-05 11-12 27-28 13-14 01-02 15-16 12-13 28-29 4.500.000

89CUSTOMER SERVICE SKILL (MENINGKATKAN HUBUNGAN HARMONISDENGAN PELANGGAN MELALUI CUSTOMER SERVICE)

2 02-03 10-11 09-10 01-02 18-19 08-09 01-02 10-11 02-03 12-13 09-10 02-03 4.500.000

90 CUSTOMER SERVICE TRAINING 2 22-23 19-20 18-19 22-23 19-20 17-18 22-23 20-21 23-24 21-22 18-19 23-24 4.500.00091 Dasar-Dasar Audit Internal 2 20-21 10-11 09-10 20-21 11-12 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.00092 DASAR-DASAR MANAJEMEN 2 02-03 03-04 02-03 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.00093 Dasar-dasar Manajemen Produksi 2 27-28 17-18 16-17 27-28 13-14 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.00094 Dasar-dasar Organisasi 2 02-03 26-27 23-24 30-31 19-20 24-25 29-30 26-27 31-01 28-29 25-26 30-01 4.500.00095 Design & Delivery Sales Presentation 2 02-03 03-04 02-03 30-31 04-05 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.00096 Developing Excellent Internal Trainer 3 06-08 17-19 16-18 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

Page 78: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

97DIGITAL MARKETING COMMUNICATIONS UNTUK MENINGKATKANPENJUALAN

2 06-07 17-18 16-17 08-09 07-08 15-16 09-10 18-19 10-11 19-20 16-17 10-11 4.500.000

98 DIRECTING COACHING COUNSELING DELEGATING 1 06-06 24-24 23-23 06-06 18-18 22-22 06-06 24-24 07-07 26-26 23-23 07-07 2.750.00099 DOCUMENT CONTROLLER 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000

100DOCUMENTING AND IMPLEMENTING OF ISO 9001 2008 FOR SERVICEINDUSTRIES

2 09-10 03-04 04-05 06-07 19-20 04-05 09-10 03-04 10-11 05-06 02-03 10-11 4.500.000

101DUNIA MAYA MERK DAN ADVERTENSI (CARA PRAKTISMENGKOMUNIKASIKAN MEREK DI MEDIA ONLINE)

2 16-17 26-27 23-24 16-17 11-12 24-25 16-17 26-27 17-18 28-29 25-26 17-18 4.500.000

102 Effective Business Writing And Communication 2 20-21 06-07 02-03 20-21 13-14 02-03 20-21 06-07 21-22 08-09 05-06 21-22 4.500.000103 EFFECTIVE COMMUNICATION FOR MANAGERS 1 02-02 17-17 16-16 06-06 18-18 15-15 06-06 18-18 07-07 19-19 16-16 07-07 2.750.000104 EFFECTIVE CSR COMMUNICATION IN MASS MEDIA 2 22-23 05-06 04-05 22-23 07-08 04-05 22-23 05-06 23-24 07-08 04-05 23-24 4.500.000105 Effective Estimating and Cost Control for EPC Projects 3 15-17 19-21 04-06 06-08 18-20 17-19 06-08 19-21 07-09 21-23 18-20 07-09 6.950.000106 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 2 06-07 10-11 09-10 06-07 18-19 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000107 EFFECTIVE MEETING PLANING 2 20-21 19-20 18-19 20-21 18-19 17-18 20-21 18-19 21-22 21-22 18-19 23-24 4.500.000108 EFFECTIVE WAYS TO INCREASE SALES 2 13-14 12-13 11-12 13-14 18-19 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.000109 ELECTRONIC FILING & DOCUMENT MANAGEMENT SYSTEM 3 27-29 17-19 16-18 27-29 11-13 15-17 27-29 18-20 28-30 19-21 16-18 28-30 6.500.000

110ELECTRONIC FILING IMPLEMENTATION WITH RMS & EFS METHODBASED ON DOCUMENT REGULATION

3 13-15 10-12 09-11 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

111 EMPLOYMENT RECRUITMENT & SELECTION 2 27-28 17-18 23-24 27-28 11-12 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.000112 Engagement and Retention 2 06-07 26-27 23-24 06-07 19-20 24-25 06-07 26-27 07-08 28-29 25-26 07-08 4.500.000113 ENHANCING MANAGERIAL SKILL & LEADERSHIP 2 27-28 03-04 02-03 27-28 11-12 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000114 Enterprise Resource Planing (ERP) with SAP Business One 3 20-22 17-19 16-18 20-22 04-06 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000115 ESSENTIALS OF PROJECT MANAGEMENT 3 08-10 12-14 11-13 07-09 04-06 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000116 ESTIMASI DAN ANALISIS BIAYA PROYEK 3 20-22 17-19 04-06 13-15 13-15 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.000

117 EXCELLENT MOTIVATION AND TEAM WORK OUTBOUND TRAINING 2 13-14 20-21 19-20 13-14 06-07 18-19 13-14 20-21 14-15 22-23 19-20 14-15 2.950.000

118 EXCELLENT SUPERVISORY SKILLS 2 02-03 05-06 23-24 01-02 14-15 04-05 01-02 05-06 02-03 07-08 04-05 02-03 4.500.000

119 EXPORT IMPORT DALAM RANGKA EFISIENSI BIAYA KEPABEANAN 3 27-29 24-26 02-04 27-29 11-13 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.000

120EXPORT IMPORT DALAM RANGKA EFISIENSI BIAYA KEPABEANAN PLUSVISIT TJ. PRIOK

3 13-15 17-19 16-18 13-15 13-15 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.000

121 FACILITATION SKILL FOR COMMUNITY DEVELOPMENT 2 23-24 03-04 04-05 23-24 19-20 02-03 23-24 03-04 24-25 05-06 02-03 23-24 4.500.000

122 FAILURE MANAGEMENT WITH FAILURE MODE AND EFFECT ANALYSIS 1 02-02 10-10 09-09 30-30 19-19 08-08 29-29 10-10 31-31 12-12 09-09 30-30 2.750.000

123 FINANCE FOR NON FINANCE 2 02-03 26-27 23-24 13-14 19-20 24-25 13-14 26-27 14-15 28-29 25-26 14-15 4.500.000124 Finance for Non Finance Staff 2 08-09 05-06 04-05 08-09 07-08 04-05 08-09 05-06 09-10 07-08 04-05 09-10 4.500.000125 FINANCIAL ACCOUNTING FOR NON 2 02-03 10-11 23-24 06-07 11-12 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000

126Financial Accounting Information System Development With Excel2007 and VBA

2 27-28 06-07 05-06 27-28 18-19 04-05 27-28 06-07 28-29 08-09 05-06 28-29 4.500.000

127Financial Accounting Information System Development With Excel2010 and VBA

2 02-03 13-14 12-13 02-03 06-07 11-12 02-03 13-14 03-04 15-16 12-13 03-04 4.500.000

128 FINANCIAL-ACCOUNTING ANALYSIS & REPORTING 2 02-03 17-18 23-24 13-14 19-20 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000129 FORMASI PENDALAMAN IFRS-PSAK terbaru 2013-2015 2 02-03 10-11 09-10 06-07 18-19 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000

Page 79: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga130 FRAUD & INVESTIGATIVE AUDITING 2 16-17 12-13 11-12 16-17 18-19 10-11 16-17 12-13 17-18 14-15 11-12 17-18 4.500.000131 Fundamental Project Management For Non Engineers 3 22-24 26-28 11-13 15-17 18-20 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.950.000132 Fundamental Strategic Thinking Skill 2 20-21 26-27 23-24 20-21 19-20 24-25 20-21 26-27 21-22 28-29 25-26 23-24 4.500.000133 FUNDAMENTAL SUPERVISORY TRAINING 2 20-21 10-11 09-10 20-21 13-14 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.000134 FUNDAMENTALS OF STRATEGIC PLANNING 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000135 GEMBA KAIZEN 2 06-07 18-19 17-18 06-07 06-07 16-17 06-07 19-20 07-08 20-21 17-18 07-08 4.500.000136 Gemba Kaizen (Continuous Improvement) 2 15-16 13-14 12-13 15-16 14-15 11-12 15-16 13-14 16-17 15-16 12-13 16-17 4.500.000137 GOAL SETTING 2 08-09 13-14 12-13 08-09 18-19 11-12 08-09 13-14 09-10 15-16 12-13 09-10 4.500.000138 GRAFIC DESIGN & PRODUCT PACKAGING 4 27-30 10-13 09-12 27-30 04-07 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000139 GREAT SUPERVISOR 2 02-03 17-18 16-17 02-03 13-14 15-16 02-03 20-21 03-04 19-20 16-17 03-04 4.500.000140 GUGUS KENDALI MUTU (GKM) & PDCA DELTA 2 14-15 26-27 23-24 14-15 13-14 24-25 14-15 26-27 15-16 28-29 25-26 15-16 4.500.000141 HANDLING COMPLAINT SKILLS 2 09-10 24-25 23-24 06-07 18-19 22-23 09-10 24-25 10-11 26-27 23-24 10-11 4.500.000

142 HANDLING NEGATIVE COMMENT OR COMPLAIN IN SOCIAL MEDIA 2 30-31 12-13 11-12 29-30 04-05 10-11 29-30 12-13 01-02 14-15 11-12 30-31 4.500.000

143 HAPPY PENSION 2 27-28 17-18 16-17 27-28 04-05 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.000144 How To Manage & Motivate an Excellent Team 2 15-16 20-21 19-20 15-16 04-05 18-19 15-16 18-19 16-17 22-23 19-20 16-17 4.500.000145 HR Audit 2 22-23 19-20 18-19 22-23 04-05 17-18 22-23 20-21 23-24 21-22 18-19 23-24 4.500.000146 HR Audit (Audit SDM) 2 06-07 24-25 23-24 06-07 11-12 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.000147 HR for Non HR 2 23-24 19-20 18-19 23-24 18-19 17-18 23-24 20-21 24-25 21-22 18-19 23-24 4.500.000148 HRD AUDIT 2 02-03 24-25 23-24 30-31 19-20 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000149 HRD MANAGEMENT FOR BEGINNERS 2 06-07 05-06 02-03 06-07 05-06 04-05 06-07 05-06 07-08 07-08 04-05 07-08 4.500.000150 HRD MANAGEMENT FOR NON HRD EXECUTIVES 2 13-14 11-12 09-10 15-16 13-14 09-10 15-16 11-12 16-17 13-14 10-11 16-17 4.500.000151 HUKUM KEPAILITAN 2 20-21 03-04 02-03 20-21 18-19 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.000152 Human Resources Management 3 29-31 26-28 04-06 28-30 04-06 24-26 28-30 26-28 30-02 28-30 25-27 29-31 6.500.000153 Human Resources Policies And SOP HRD 2 15-16 17-18 16-17 15-16 14-15 15-16 15-16 18-19 16-17 19-20 16-17 16-17 4.500.000

154IMC DRIVER FOR INTEGRATED MARKETING COMMUNICATIONS(IMC)

2 29-30 13-14 12-13 29-30 14-15 11-12 29-30 13-14 30-01 15-16 12-13 30-31 4.500.000

155 IMPLEMENTASI 5R 2 02-03 10-11 09-10 06-07 11-12 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000

156Implementation Of Payroll Admisnistration System With Excel 2010For HRD

3 08-10 19-21 18-20 07-09 11-13 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.500.000

157 IMPROVING PERFORMANCE THROUGH COACHING and COUNSELLING 2 27-28 20-21 19-20 29-30 07-08 18-19 29-30 18-19 28-29 22-23 19-20 30-31 4.500.000

158 Inbound & Outbound Sales Call 2 27-28 10-11 09-10 27-28 04-05 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.000159 INCREASING MANUFACTURING PROFIT 2 29-30 11-12 10-11 29-30 07-08 09-10 29-30 11-12 30-01 13-14 10-11 30-31 4.500.000

160INDUSTRIAL RELATIONS SYSTEM IN INDONESIA FOR EXPATRIATEEXECUTIVES

1 20-20 19-19 16-16 21-21 18-18 17-17 21-21 20-20 22-22 21-21 18-18 22-22 2.750.000

161 Influential Leadership Excellence 3 20-22 05-07 11-13 20-22 13-15 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.000162 INTEGRATED CORPORATE COMMUNICATION 2 02-03 20-21 19-20 01-02 19-20 18-19 01-02 18-19 02-03 22-23 19-20 02-03 4.500.000

163INTEGRATED ISO 9001-2008 & ISO 14001-2004 MANAGEMENTSYSTEM

2 13-14 10-11 09-10 13-14 13-14 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000

164 INTEGRATED OF PROJECT MANAGEMENT 4 07-10 11-14 02-05 27-30 04-07 09-12 27-30 11-14 29-02 13-16 10-13 28-31 8.750.000165 INTELLIGENT & BOMB THREAT 3 08-10 05-07 04-06 06-08 11-13 02-04 08-10 05-07 09-11 07-09 04-06 09-11 6.500.000166 INTELLIGENT & INVESTIGATION 2 20-21 03-04 02-03 20-21 18-19 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.000

Page 80: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga167 INTELLIGENT SECURITY DALAM INDUSTRI 2 16-17 13-14 12-13 16-17 19-20 11-12 16-17 13-14 17-18 15-16 12-13 17-18 4.500.000168 INTENSIVE COURSE HRD MANAGEMENT 3 29-31 26-28 04-06 28-30 06-08 24-26 28-30 26-28 30-02 28-30 25-27 29-31 6.500.000169 Internal Audit ISO 14001-2004 Based on ISO 19011-2012 2 09-10 12-13 11-12 08-09 18-19 10-11 09-10 12-13 10-11 14-15 11-12 10-11 4.500.000170 Internal Audit ISO 17025-2005 Based on ISO 19011-2011 2 02-03 06-07 05-06 01-02 14-15 04-05 01-02 06-07 02-03 08-09 05-06 02-03 4.500.000171 INTERNAL COMMUNICATION AND CHANGE COMMUNICATION 2 09-10 27-28 23-24 06-07 04-05 25-26 09-10 27-28 10-11 29-30 26-27 10-11 4.500.000

172 INTERNAL QUALITY AUDIT ISO 9001 2008 Based on ISO 19011 2011 2 02-03 20-21 19-20 30-31 19-20 18-19 29-30 18-19 31-01 22-23 19-20 30-01 4.500.000

173 INTERNAL QUALITY AUDIT ISO 9001_2015 2 02-03 17-18 16-17 30-31 18-19 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000174 INTERNATIONAL FINANCIAL REPORTING STANDARDS (IFRS) 2 13-14 17-18 16-17 13-14 04-05 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000175 Interpreting & Documenting of ISO 14001-2004 2 06-07 19-20 18-19 06-07 14-15 17-18 06-07 20-21 07-08 21-22 18-19 07-08 4.500.000176 Interpreting & Documenting of ISO 9001 with IWA-2 2 30-31 03-04 23-24 27-28 19-20 02-03 27-28 03-04 01-02 05-06 02-03 28-29 4.500.000177 Interpreting & Documenting of ISO 9001 with IWA-4 2 02-03 13-14 12-13 02-03 06-07 11-12 02-03 13-14 03-04 15-16 12-13 03-04 4.500.000178 INTERPRETING AND DOCUMENTING OF ISO 9001 2008 2 20-21 05-06 05-06 20-21 07-08 04-05 20-21 05-06 21-22 07-08 04-05 21-22 4.500.000179 INTERPRETING OF ISO 9001 2008 1 27-27 10-10 09-09 29-29 11-11 08-08 29-29 10-10 28-28 12-12 09-09 30-30 2.750.000180 INTERVIEW AND INTERROGATION 2 22-23 12-13 11-12 22-23 14-15 10-11 22-23 12-13 23-24 14-15 11-12 23-24 4.500.000181 INTRODUCTION TO FINANCIAL MODELING 2 20-21 05-06 23-24 22-23 04-05 04-05 22-23 05-06 23-24 07-08 04-05 23-24 4.500.000182 Inventory System Development Using Acces 2007 2 16-17 26-27 23-24 15-16 19-20 24-25 15-16 26-27 16-17 28-29 25-26 16-17 4.500.000183 Inventory System Development Using Acces 2010 2 22-23 03-04 02-03 22-23 07-08 02-03 22-23 03-04 23-24 05-06 02-03 23-24 4.500.000184 INVESTIGATION REPORTING 2 23-24 17-18 19-20 23-24 06-07 15-16 23-24 20-21 24-25 19-20 16-17 21-22 4.500.000185 INVESTIGATIVE TECHNIQUES 2 02-03 19-20 16-17 30-31 13-14 17-18 29-30 20-21 31-01 21-22 18-19 30-01 4.500.000186 ISO 20000 Foundation 3 22-24 24-26 02-04 22-24 18-20 22-24 22-24 24-26 23-25 26-28 23-25 22-24 6.500.000187 ISO 27001 INFORMATION SECURITY MANAGEMENT SYSTEM 2 02-03 03-04 02-03 30-31 04-05 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

188ISO 27001 INFORMATION SECURITY MANAGEMENT SYSTEMCOMPLETE IMPLEMENTATION

5 06-10 10-14 09-13 13-17 11-15 08-12 06-10 10-14 07-11 12-16 09-13 07-11 9.500.000

189ISO 27001 INFORMATION SECURITY MANAGEMENT SYSTEM COREIMPLEMENTATION

3 13-15 17-19 16-18 06-08 18-20 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.000

190ISO 27001 INFORMATION SECURITY MANAGEMENT SYSTEMINTERNAL AUDIT

2 20-21 26-27 23-24 20-21 06-07 24-25 20-21 26-27 21-22 28-29 25-26 21-22 4.500.000

191 ISO 27001 FOUNDATION TRAINING 2 27-28 06-07 23-24 27-28 07-08 02-03 27-28 06-07 28-29 08-09 05-06 28-29 4.500.000192 ISO 28000 SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 2 29-30 05-06 04-05 29-30 11-12 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.000

193 ISO 31000 - RISK MANAGEMENT PRINCIPLES AND GUIDELINES 2 02-03 10-11 09-10 01-02 18-19 08-09 01-02 10-11 02-03 12-13 09-10 02-03 4.500.000

194 ISO IEC 20000 IT SERVICE MANAGEMENT 2 06-07 20-21 19-20 08-09 07-08 18-19 06-07 20-21 07-08 22-23 19-20 07-08 4.500.000195 ISO IEC 38500 IT-GOVERNANCE 2 16-17 27-28 23-24 13-14 13-14 25-26 16-17 27-28 17-18 29-30 26-27 17-18 4.500.000196 ISO IEC 9000 2008 QUALITY MANAGEMENT SYSTEM 2 22-23 06-07 05-06 22-23 19-20 02-03 22-23 06-07 23-24 08-09 05-06 23-24 4.500.000197 IT BALANCED SCORECARD 2 02-03 10-11 09-10 30-31 11-12 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.000198 IT BUSINESS ANALYSIS 3 06-08 19-21 18-20 06-08 18-20 17-19 06-08 19-21 07-09 21-23 18-20 07-09 6.500.000199 IT HELPDESK 3 15-17 17-19 16-18 13-15 13-15 15-17 13-15 19-21 14-16 19-21 16-18 14-16 6.500.000200 IT PROJECT MANAGEMENT 3 15-17 26-28 04-06 15-17 04-06 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000201 IT RISK MANAGEMENT 5 20-24 03-07 09-13 20-24 11-15 08-12 20-24 03-07 21-25 05-09 02-06 30-04 9.500.000202 IT Strategic Planning 2 29-30 12-13 23-24 29-30 18-19 04-05 29-30 12-13 30-01 14-15 11-12 21-22 4.500.000203 JOB GRADING MERANCANG STRUKTUR & SKALA UPAH 1 02-02 07-07 23-23 01-01 15-15 02-02 01-01 07-07 02-02 09-09 06-06 02-02 2.750.000204 Kebiasaan Efektif Menuju Sukses 2 02-03 06-07 23-24 01-02 11-12 02-03 01-02 06-07 02-03 08-09 05-06 02-03 4.500.000

Page 81: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga205 KEPEMIMPINAN (LEADERSHIP) 2 13-14 19-20 18-19 13-14 13-14 17-18 13-14 20-21 14-15 21-22 18-19 14-15 4.500.000206 Kepemimpinan Gemba 2 09-10 10-11 09-10 06-07 19-20 08-09 09-10 10-11 10-11 12-13 09-10 10-11 4.500.000207 KETERAMPILAN NEGOSIASI (NEGOTIATION SKILL) 2 29-30 05-06 04-05 29-30 07-08 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.000208 KETERAMPILAN SUPERVISI (SUPERVISORY SKILL) 3 08-10 12-14 11-13 01-03 13-15 10-12 01-03 12-14 02-04 14-16 11-13 02-04 6.500.000209 Key Changes ISO 9001.2008 to ISO 9001.2015 1 15-15 13-13 12-12 15-15 08-08 11-11 15-15 13-13 16-16 15-15 12-12 16-16 2.750.000210 KEY PERFORMANCE INDICATORS 2 27-28 05-06 04-05 29-30 07-08 02-03 29-30 05-06 28-29 07-08 04-05 30-31 4.500.000211 KOMPUTER AKUNTANSI DAN PAJAK UMKM 2 27-28 24-25 23-24 27-28 13-14 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000212 KOMUNIKASI ORGANISASI PENINGKATAN KINERJA KOPERASI 2 16-17 06-07 05-06 16-17 11-12 02-03 16-17 06-07 17-18 08-09 05-06 17-18 4.500.000213 KPIs With Balance Score Card 2 02-03 03-04 23-24 13-14 19-20 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000214 KREATIVITAS DAN INOVASI 2 23-24 24-25 23-24 23-24 11-12 22-23 23-24 24-25 24-25 26-27 23-24 21-22 4.500.000215 L C, UCP 600, ISBP DAN EXIM TRADE FINANCE 3 06-08 03-05 09-11 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000216 Leader as a C.O.A.C.H 3 29-31 12-14 18-20 28-30 18-20 10-12 28-30 12-14 30-02 14-16 11-13 29-31 6.500.000217 LEADERSHIP & SUPERVISORY MANAGEMENT 2 08-09 13-14 11-12 08-09 19-20 11-12 08-09 13-14 09-10 15-16 12-13 09-10 4.500.000218 LEADERSHIP DEVELOPMENT PROGRAM 2 23-24 26-27 23-24 23-24 13-14 24-25 23-24 26-27 24-25 28-29 25-26 23-24 4.500.000219 LEADERSHIP FOR FORMEN 2 29-30 05-06 04-05 29-30 19-20 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.000220 LEADERSHIP FOR OFFICER & STAFF 2 27-28 06-07 02-03 27-28 19-20 02-03 27-28 06-07 28-29 08-09 05-06 28-29 4.500.000221 Leadership Skill For Sales Leader 3 06-08 17-19 16-18 30-01 11-13 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000222 LEADERSHIP SKILLS 2 16-17 03-04 02-03 16-17 06-07 04-05 16-17 03-04 17-18 05-06 02-03 17-18 4.500.000223 LEADERSHIP SKILLS FOR TOP MANAGEMENT 2 02-03 10-11 09-10 02-03 06-07 08-09 02-03 10-11 03-04 12-13 09-10 03-04 4.500.000224 LEADERSHIP TRAINING 2 09-10 17-18 16-17 06-07 13-14 15-16 09-10 20-21 10-11 19-20 16-17 10-11 4.500.000225 Leading Project Management for Construction Projects 3 13-15 17-19 09-11 01-03 18-20 15-17 01-03 18-20 02-04 19-21 16-18 02-04 6.950.000226 Lean Manufacturing 2 27-28 24-25 23-24 27-28 04-05 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000227 LEAN MANUFACTURING SYSTEM 2 02-03 20-21 19-20 31-01 14-15 18-19 30-01 20-21 01-02 22-23 19-20 01-02 4.500.000228 Lean Thinking In Improving Workplace Performance 2 22-23 12-13 11-12 22-23 14-15 10-11 22-23 12-13 23-24 14-15 11-12 23-24 4.500.000229 Lean Warehousing 2 02-03 03-04 02-03 30-31 11-12 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000230 LOGISTICS MANAGEMENT TRAINING 3 20-22 12-14 09-11 20-22 04-06 08-10 20-22 12-14 21-23 14-16 11-13 22-24 6.500.000

231Maketing Communication For Cooperatives And Small-MediumBusinesses

2 27-28 10-11 09-10 27-28 18-19 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.000

232 MANAGEMENT EXPORT–IMPORT 2 02-03 10-11 23-24 06-07 04-05 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000

233MANAGEMENT OF CORPORATE DOCUMENT PENGELOLAANDOKUMEN

3 13-15 03-05 02-04 13-15 04-06 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.500.000

234 MANAGEMENT OPERATING SYSTEM THROUGH RACI CONCEPT 1 16-16 06-06 05-05 16-16 04-04 05-05 16-16 06-06 17-17 08-08 05-05 17-17 2.750.000235 Managerial Skills & Leadership Training 2 16-17 26-27 23-24 16-17 18-19 24-25 16-17 26-27 17-18 28-29 25-26 17-18 4.500.000236 Managers Training of Enlightment 2 02-03 03-04 02-03 02-03 18-19 04-05 02-03 03-04 03-04 05-06 02-03 03-04 4.500.000237 MANAGING AND CONDUCTING MEETING EFFECTIVELY 2 02-03 26-27 23-24 30-31 11-12 24-25 29-30 26-27 31-01 28-29 25-26 30-01 4.500.000238 MANAGING AND SUPERVISING PEOPLE AT WORK 2 02-03 12-13 11-12 01-02 13-14 10-11 01-02 12-13 02-03 14-15 11-12 02-03 4.500.000239 Managing Complex Project Oil & Gas Professionals 4 20-23 24-27 17-20 06-09 12-15 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.750.000240 MANAGING CONFLICT SKILLS 2 20-21 10-11 09-10 20-21 14-15 08-09 20-21 10-11 21-22 12-13 09-10 23-24 4.500.000241 MANAGING ISSUE AND RESPONDING TO CRISIS 2 23-24 10-11 09-10 23-24 18-19 08-09 23-24 10-11 24-25 12-13 09-10 21-22 4.500.000242 Managing Objection, Customer Solution 2 06-07 10-11 09-10 06-07 13-14 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000243 Managing Software Requirements 3 29-31 19-21 18-20 27-29 13-15 17-19 27-29 19-21 30-02 21-23 18-20 28-30 6.500.000244 MANAJEMEN WAKTU (TIME MANAGEMENT) 2 02-03 20-21 19-20 08-09 18-19 18-19 08-09 18-19 09-10 22-23 19-20 09-10 4.500.000245 MANAJEMEN ATASAN 2 08-09 19-20 18-19 08-09 18-19 17-18 08-09 20-21 09-10 21-22 18-19 09-10 4.500.000

Page 82: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga246 MANAJEMEN KONFLIK 2 20-21 03-04 04-05 20-21 07-08 04-05 20-21 03-04 21-22 05-06 02-03 23-24 4.500.000247 Manajemen Mutu 2 27-28 03-04 02-03 27-28 18-19 04-05 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000248 MANAJEMEN PERGUDANGAN (WAREHOUSING) 3 29-31 26-28 11-13 20-22 18-20 24-26 20-22 26-28 21-23 28-30 25-27 21-23 6.500.000249 MANAJEMEN PERKANTORAN MODERN 2 15-16 26-27 23-24 15-16 07-08 24-25 15-16 26-27 16-17 28-29 25-26 16-17 4.500.000250 MANAJEMEN PERUBAHAN 2 22-23 06-07 05-06 22-23 14-15 02-03 22-23 06-07 23-24 08-09 05-06 23-24 4.500.000251 MANAJEMEN PRODUKSI DAN OPERASI 3 08-10 05-07 18-20 28-30 06-08 03-05 28-30 05-07 30-02 07-09 04-06 29-31 6.500.000252 MANAJEMEN PROYEK KONSTRUKSI 3 15-17 12-14 02-04 01-03 11-13 10-12 01-03 12-14 02-04 14-16 11-13 02-04 6.500.000

253 MANAJEMEN RANTAI SUPLAI DI INDUSTRI HULU MIGAS INDONESIA 2 02-03 24-25 23-24 13-14 18-19 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.000

254 MANAJEMEN STRATEGI (STRATEGIC MANAGEMENT) 2 15-16 27-28 23-24 15-16 04-05 25-26 15-16 27-28 16-17 29-30 26-27 16-17 4.500.000255 Manajemen Stres 1 02-02 12-12 11-11 03-03 04-04 10-10 03-03 12-12 04-04 14-14 11-11 04-04 2.750.000256 MANAJEMEN SUMBER DAYA MANUSIA 2 02-03 20-21 19-20 02-03 04-05 18-19 02-03 18-19 03-04 22-23 19-20 03-04 4.500.000257 Manajemen Supervisi 3 06-08 17-19 16-18 07-09 13-15 15-17 06-08 19-21 07-09 19-21 16-18 07-09 6.500.000

258MANAJEMEN USAHA KECIL Untuk mendukung Program CSR bidangEkonomi

2 02-03 19-20 18-19 02-03 13-14 17-18 02-03 20-21 03-04 21-22 18-19 03-04 4.500.000

259 Manufacturing Cost Improvement 2 23-24 13-14 12-13 23-24 11-12 11-12 23-24 13-14 24-25 15-16 12-13 23-24 4.500.000260 Manufacturing Planning & Control 2 20-21 24-25 23-24 20-21 18-19 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.000261 Marketing for Non Marketing Staff 2 13-14 26-27 23-24 13-14 19-20 24-25 13-14 26-27 14-15 28-29 25-26 14-15 4.500.000262 MASA PERSIAPAN PENSIUN (MPP) 2 29-30 12-13 11-12 29-30 14-15 10-11 29-30 12-13 30-01 14-15 11-12 30-31 4.500.000

263 Mastering Microsoft Project 2007 (Concept and Application) 2 02-03 17-18 16-17 30-31 18-19 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000

264MASTERING PROJECT MANAGEMENT BASED ON THE 5TH EDITION OFPMBOK® GUIDE

4 27-30 03-06 03-06 13-16 05-08 02-05 13-16 03-06 14-17 05-08 02-05 14-17 8.750.000

265 MASTERING QC 7 TOOLS FOR PROBLEM SOLVING & IMPROVEMENT 2 30-31 17-18 16-17 27-28 19-20 15-16 27-28 18-19 01-02 19-20 16-17 28-29 4.500.000

266 Materials Management 2 22-23 05-06 04-05 22-23 05-06 02-03 22-23 05-06 23-24 07-08 04-05 23-24 4.500.000267 MEDIA HANDLING & COMMUNICATION SKILLS 2 08-09 27-28 23-24 06-07 18-19 25-26 06-07 27-28 07-08 29-30 26-27 07-08 4.500.000268 Media Relation and Communication 3 13-15 24-26 16-18 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

269 MEDIA RELATIONS PRACTICE DAN TECHNIQUES IN MEDIA RELATIONS 2 30-31 17-18 16-17 27-28 06-07 15-16 27-28 20-21 01-02 19-20 16-17 28-29 4.500.000

270 Media Relations Strategy & Executions 2 02-03 03-04 23-24 06-07 04-05 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000271 Media Relations Strategy for Effective Promotion 2 02-03 10-11 23-24 13-14 11-12 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000

272MEMBANGUN & MENGEMBANGKAN INTERNAL AUDITDEPARTEMENT

2 27-28 17-18 16-17 27-28 19-20 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.000

273 MEMBANGUN BUDAYA PERUSAHAAN YANG KUAT DAN UNGGUL 2 02-03 19-20 18-19 30-31 19-20 17-18 29-30 18-19 31-01 21-22 18-19 30-01 4.500.000

274 MEMBINA KELOMPOK KERJA 3 22-24 05-07 04-06 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 21-23 6.500.000

275MEMOTIVASI ANGGOTA TIM DAN STAF UNTUK MENINGKATKANPRODUKTIVITAS MEREKA

2 06-07 27-28 23-24 08-09 04-05 25-26 06-07 27-28 07-08 29-30 26-27 07-08 4.500.000

276 MENGOPTIMALKAN KINERJA KARYAWAN BACK OFFICE 2 13-14 05-06 05-06 13-14 11-12 02-03 13-14 05-06 14-15 07-08 04-05 14-15 4.500.000

277MENGOPTIMALKAN WEBSITE KORPORAT SEBAGAI MEDIAKOMUNIKASI CSR

1 13-13 05-05 06-06 13-13 06-06 04-04 13-13 05-05 14-14 07-07 04-04 14-14 2.750.000

278 MENJADI SEKRETARIS PROFESIONAL 2 16-17 03-04 02-03 16-17 18-19 04-05 16-17 03-04 17-18 05-06 02-03 17-18 4.500.000

Page 83: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

279 MERANCANG MEDIA PROMOSI WISATA YANG EFEKTIF DAN EFISIEN 2 20-21 13-14 12-13 20-21 14-15 11-12 20-21 13-14 21-22 15-16 12-13 21-22 4.500.000

280MODERN OFFICE ADMINISTRATION FOR EXECUTIVE SECRETARY ANDEXECUTIVE ADMINISTRATION

2 06-07 03-04 02-03 06-07 04-05 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

281 MOTIVASI MENJUAL 2 30-31 20-21 19-20 27-28 06-07 18-19 27-28 20-21 01-02 22-23 19-20 28-29 4.500.000282 NEGOTIATION AND LOBBYING SKILLS FOR DECISION MAKER 2 13-14 10-11 09-10 13-14 14-15 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000283 NLP FOR NEGOTIATION 2 20-21 27-28 23-24 20-21 06-07 25-26 20-21 27-28 21-22 29-30 26-27 21-22 4.500.000284 Office Management And Filing System 2 06-07 27-28 23-24 06-07 04-05 25-26 06-07 27-28 07-08 29-30 26-27 07-08 4.500.000285 OPTIMALISASI CYBER PUBLIC RELATIONS 3 06-08 24-26 02-04 01-03 13-15 22-24 01-03 24-26 02-04 26-28 23-25 02-04 6.500.000

286OUTSOURCING MANAGEMENT MEMBERDAYAKAN TENAGA MITRAKERJA (TMK) DI PERUSAHAAN

2 30-31 26-27 23-24 29-30 06-07 24-25 29-30 26-27 01-02 28-29 25-26 30-31 4.500.000

287 OUTSOURCING MANAGEMENT Memberdayakan Tenaga Outsourcing 2 20-21 20-21 19-20 20-21 19-20 18-19 20-21 20-21 21-22 22-23 19-20 21-22 4.500.000

288 PAJAK BISNIS PROPERTI 1 27-27 12-12 23-23 29-29 13-13 10-10 29-29 12-12 30-30 14-14 11-11 30-30 2.750.000289 PAJAK PERUSAHAAN KUP, HP, PPh & PPN 2 02-03 19-20 16-17 01-02 18-19 17-18 01-02 20-21 02-03 21-22 18-19 02-03 4.500.000

290PAYROLL ADMINISTRATION SYSTEM IMPLEMENTATION WITH EXCEL2010 & VBA

2 13-14 05-06 04-05 16-17 11-12 04-05 16-17 05-06 17-18 07-08 04-05 17-18 4.500.000

291 Pelatihan Aplikasi DELTA 3 29-31 12-14 11-13 28-30 11-13 10-12 28-30 12-14 30-02 14-16 11-13 29-31 6.500.000

292PELATIHAN PROMOSI WISATA MELALUI VIDEO YANG EFEKTIF DANEFISIEN

2 27-28 20-21 19-20 27-28 19-20 18-19 27-28 18-19 28-29 22-23 19-20 28-29 4.500.000

293 PELATIHAN TEAM WORK 2 02-03 03-04 04-05 02-03 04-05 02-03 02-03 03-04 03-04 05-06 02-03 03-04 4.500.000

294PEMAHAMAN & PENERAPAN SISTEM MANAJEMEN KEAMANANINFORMASI ISO 27001-2005

2 22-23 11-12 10-11 22-23 18-19 09-10 22-23 11-12 23-24 13-14 10-11 23-24 4.500.000

295 Penerapan Program 5S 2 02-03 20-21 19-20 30-31 18-19 18-19 29-30 18-19 31-01 22-23 19-20 30-01 4.500.000296 PENGAMANAN OBYEK VITAL 2 30-31 24-25 23-24 27-28 14-15 22-23 27-28 24-25 01-02 26-27 23-24 28-29 4.500.000297 PENGAMBILAN KEPUTUSAN (DECISION MAKING) 2 02-03 17-18 16-17 30-31 06-07 15-16 29-30 20-21 31-01 19-20 16-17 30-01 4.500.000298 PENGANTAR HUKUM PASAR MODAL INDONESIA 2 06-07 27-28 23-24 08-09 06-07 25-26 08-09 27-28 09-10 29-30 26-27 09-10 4.500.000

299PENGEMBANGAN KETERAMPILAN FASILITATOR PEMBERDAYAANMASYARAKAT

2 09-10 06-07 02-03 08-09 11-12 04-05 08-09 06-07 09-10 08-09 05-06 09-10 4.500.000

300 Pengenalan Program 5S 1 09-09 28-28 23-23 06-06 07-07 26-26 09-09 28-28 10-10 30-30 27-27 10-10 2.750.000301 PENGENDALIAN MUTU PADA PROYEK KONSTRUKSI 3 22-24 19-21 09-11 07-09 18-20 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.500.000302 PENYUSUNAN PENGELOLAAN TEKNOLOGI INFORMASI BUMN 3 06-08 26-28 04-06 30-01 18-20 24-26 29-01 26-28 31-02 28-30 25-27 30-02 6.500.000

303 Peran Auditor Internal Dalam Mencegah Kecurangan (Fraud) 2 02-03 26-27 23-24 30-31 07-08 24-25 29-30 26-27 31-01 28-29 25-26 30-01 4.500.000

304 Perencanaan & Pengendalian Produksi 3 15-17 05-07 04-06 15-17 13-15 03-05 15-17 05-07 16-18 07-09 04-06 16-18 6.500.000305 PERENCANAAN KEUANGAN PENSIUN DENGAN METODE PASTI 2 27-28 03-04 02-03 27-28 18-19 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000306 PERFORMANCE MANAGEMENT 2 15-16 20-21 17-18 16-17 04-05 18-19 16-17 20-21 17-18 22-23 19-20 17-18 4.500.000307 Perilaku Organisasi 3 22-24 10-12 09-11 22-24 18-20 08-10 22-24 10-12 23-25 12-14 09-11 21-23 6.500.000308 PERSIAPAN MEMASUKI MASA PURNABHAKTI 3 27-29 19-21 18-20 28-30 18-20 17-19 28-30 18-20 28-30 21-23 18-20 29-31 6.950.000309 PERSONAL FINANCE PLANNING 2 13-14 06-07 02-03 15-16 14-15 02-03 15-16 06-07 16-17 08-09 05-06 16-17 4.500.000310 Planning and Scheduling Skills for EPC Projects 3 06-08 10-12 11-13 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 22-24 6.950.000

311 PLANNING, ORGANISING & CONTROL PROJECTS WITH EVM TRACKING 4 14-17 18-21 16-19 27-30 11-14 16-19 27-30 18-21 28-01 20-23 17-20 28-31 8.750.000

Page 84: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga312 PMBOK PROJECT MANAGEMENT 3 15-17 05-07 11-13 06-08 06-08 03-05 06-08 05-07 07-09 07-09 04-06 07-09 6.500.000313 PMP EXAM PREPARATION 4 21-24 25-28 02-05 30-02 04-07 23-26 29-02 25-28 31-03 27-30 24-27 30-03 8.750.000

314POS AND INVENTORY SYSTEM DEVELOPMENT WITH USING ACCESS2010

2 23-24 12-13 11-12 23-24 19-20 10-11 23-24 12-13 24-25 14-15 11-12 21-22 4.500.000

315 POSITIVE FIGHTER FOR SALES PEOPLE 2 02-03 12-13 11-12 01-02 07-08 10-11 01-02 12-13 02-03 14-15 11-12 02-03 4.500.000

316 Powerful Database Analysis and Dashboard Reporting with Excel 2010 2 30-31 19-20 18-19 27-28 06-07 17-18 27-28 20-21 01-02 21-22 18-19 28-29 4.500.000

317 POWERFUL MARKETING AND SALES TO BOOSTING YOUR TARGET 2 15-16 27-28 23-24 15-16 18-19 25-26 15-16 27-28 16-17 29-30 26-27 16-17 4.500.000

318 POWERFUL SUPERVISOR DEVELOPMENT PROGRAM 2 30-31 13-14 12-13 27-28 11-12 11-12 27-28 13-14 01-02 15-16 12-13 28-29 4.500.000319 PRACTICAL BALANCED SCORECARD 3 22-24 10-12 16-18 15-17 11-13 10-12 15-17 10-12 16-18 12-14 09-11 16-18 6.500.000320 Practical Customer Service 3 27-29 10-12 04-06 22-24 06-08 08-10 22-24 10-12 23-25 12-14 09-11 22-24 6.500.000321 Practical Planning And Controlling Project 3 27-29 17-19 02-04 22-24 18-20 15-17 22-24 18-20 23-25 19-21 16-18 21-23 6.500.000322 Practical Problem Solving 2 20-21 13-14 12-13 20-21 07-08 11-12 20-21 13-14 21-22 15-16 12-13 23-24 4.500.000323 Practical Supply Chain Management 2 27-28 03-04 02-03 27-28 04-05 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000324 PRIMAVERA P6 FOR PROJECT MANAGEMENT(PM) 3 27-29 24-26 02-04 27-29 18-20 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.000325 Primavera P6 Professional Fundamental 3 08-10 24-26 09-11 28-30 04-06 22-24 28-30 24-26 28-30 26-28 23-25 29-31 6.500.000326 Principle of Manufacturing Management 2 02-03 10-11 09-10 30-31 11-12 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.000327 Principle of Operation Planning 2 06-07 17-18 16-17 06-07 19-20 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.000328 Probing Techniques 2 09-10 10-11 09-10 06-07 06-07 08-09 09-10 10-11 10-11 12-13 09-10 10-11 4.500.000329 Problem Solving Of Direct Marketing 2 02-03 17-18 16-17 30-31 06-07 15-16 29-30 20-21 31-01 19-20 16-17 30-01 4.500.000330 Production Optimization and Minimize Down Time 2 16-17 10-11 09-10 16-17 18-19 08-09 16-17 10-11 17-18 12-13 09-10 17-18 4.500.000331 PRODUCTION PLAN & INVENTORY CONTROL 2 13-14 26-27 23-24 13-14 06-07 24-25 13-14 26-27 14-15 28-29 25-26 14-15 4.500.000332 Profesional General Affair Officer With Data Processing 2 02-03 06-07 23-24 08-09 18-19 02-03 08-09 06-07 09-10 08-09 05-06 09-10 4.500.000333 PROFESSIONAL ADMINISTRATION SKILLS 2 23-24 10-11 09-10 23-24 06-07 08-09 23-24 10-11 24-25 12-13 09-10 21-22 4.500.000334 PROFESSIONAL WRITING AND PUBLISHING 2 13-14 12-13 11-12 13-14 07-08 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.000335 PROJECT COST ESTIMATION 3 13-15 12-14 18-20 07-09 18-20 08-10 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000336 PROJECT COST MANAGEMENT 3 20-22 19-21 04-06 13-15 06-08 17-19 13-15 19-21 14-16 21-23 18-20 14-16 6.500.000337 PROJECT FINANCING 3 29-31 26-28 11-13 20-22 11-13 24-26 20-22 26-28 21-23 28-30 25-27 22-24 6.500.000338 PROJECT LEADERSHIP 2 02-03 05-06 23-24 27-28 18-19 04-05 27-28 05-06 01-02 07-08 04-05 28-29 4.500.000339 PROJECT MANAGEMENT 3 27-29 24-26 16-18 15-17 04-06 22-24 15-17 24-26 16-18 26-28 23-25 16-18 6.500.000340 PROJECT MANAGEMENT based on PRINCE2 3 06-08 10-12 16-18 30-01 04-06 10-12 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000341 Project Management For Engineers & Professionals 4 28-31 04-07 09-12 06-09 12-15 02-05 06-09 04-07 07-10 06-09 03-06 07-10 8.750.000342 Project Management For HR Profesional 3 15-17 17-19 02-04 06-08 13-15 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

343PROJECT MANAGEMENT FOR NEW ENGINEERS & NON TECHNICALPROFESSIONAL

4 07-10 11-14 17-20 14-17 05-08 09-12 14-17 11-14 15-18 13-16 10-13 15-18 8.750.000

344 PROJECT MANAGEMENT FOR NON PROJECT MANAGER 2 20-21 03-04 23-24 20-21 04-05 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.000

345 Project Management Fundamental Based on PMBOK 5th. Edition 3 13-15 17-19 04-06 22-24 18-20 15-17 22-24 18-20 23-25 19-21 16-18 21-23 6.950.000

346 PROJECT MANAGEMENT FUNDAMENTALS 3 22-24 24-26 09-11 15-17 18-20 22-24 15-17 24-26 16-18 26-28 23-25 16-18 6.500.000347 PROJECT MANAGEMENT IN SALES 3 27-29 05-07 18-20 22-24 06-08 02-04 22-24 05-07 23-25 07-09 04-06 21-23 6.500.000348 PROJECT MANAGEMENT IN MARKETING 3 08-10 12-14 04-06 28-30 11-13 08-10 28-30 12-14 28-30 14-16 11-13 29-31 6.500.000

Page 85: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

349PROJECT MANAGEMENT IN OIL & GAS PRODUCTION FACILITIES, RISKPLANING & MITIGATION

4 20-23 24-27 10-13 27-30 11-14 22-25 27-30 24-27 29-02 26-29 23-26 28-31 8.750.000

350 PROJECT MANAGEMENT OFFICE 2 02-03 17-18 23-24 13-14 18-19 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000351 PROJECT MANAGEMENT USING MICROSOFT PROJECT 3 13-15 19-21 11-13 01-03 18-20 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.000352 Project Planning And Control Using microsoft project 2 06-07 03-04 02-03 06-07 11-12 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000353 Project Planning And Control Using Oracle Primavera P6 2 13-14 10-11 09-10 13-14 18-19 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000354 PROJECT QUALITY MANAGEMENT 3 20-22 26-28 16-18 07-09 04-06 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.000355 PROJECT RISK MANAGEMENT 3 29-31 03-05 02-04 13-15 13-15 03-05 13-15 03-05 14-16 05-07 02-04 14-16 6.500.000356 Project Scheduling & Controlling and Risk Analysis 4 27-30 03-06 16-19 31-03 04-07 02-05 30-03 03-06 01-04 05-08 02-05 01-04 8.750.000357 Proposal And Business Report 2 09-10 26-27 23-24 06-07 14-15 24-25 08-09 26-27 09-10 28-29 25-26 09-10 4.500.000

358 PROSDEM Pemecahan Masalah dan Pengambilan Keputusan 3 27-29 17-19 16-18 27-29 06-08 15-17 27-29 19-21 28-30 19-21 16-18 28-30 6.500.000

359 PROSEDUR DAN RENCANA AKSI SEKURITI 2 02-03 03-04 02-03 02-03 18-19 04-05 02-03 03-04 03-04 05-06 02-03 03-04 4.500.000360 Quality Awareness Peduli Mutu 2 02-03 24-25 23-24 01-02 11-12 22-23 01-02 24-25 02-03 26-27 23-24 02-03 4.500.000361 Records Management System (RMS) 3 06-08 17-19 16-18 30-01 11-13 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000362 REGULASI DAN APLIKASI WITHOLDING TAX DI INDONESIA 2 22-23 13-14 09-10 23-24 19-20 11-12 23-24 13-14 24-25 15-16 12-13 21-22 4.500.000363 REGULASI DAN PRAKTEK PENGELOLAAN PPh WP BADAN 1 28-28 21-21 18-18 30-30 08-08 19-19 30-30 18-18 01-01 23-23 20-20 31-31 2.750.000

364REMUNERATION MANAGEMENT JOB GRADING, SALARY STRUCTURE& SALARY SCALE

2 21-22 24-25 23-24 22-23 11-12 22-23 22-23 24-25 23-24 26-27 23-24 23-24 4.500.000

365 REPORT WRITING 2 27-28 26-27 23-24 29-30 04-05 24-25 29-30 26-27 28-29 28-29 25-26 30-31 4.500.000

366RESOURCES EVALUATION, PROJECT ECONOMICS AND PROJECTMANAGEMENT IN OIL & GAS

4 06-09 10-13 02-05 06-09 12-15 08-11 07-10 10-13 08-11 12-15 09-12 08-11 8.750.000

367 Retail Sales Training 2 02-03 24-25 23-24 06-07 19-20 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.000368 RISK MANAGEMENT FUNDAMENTAL 2 06-07 26-27 23-24 08-09 19-20 24-25 08-09 26-27 09-10 28-29 25-26 09-10 4.500.000369 RISK MANAGEMENT ON OPERATIONAL BUSINESS 2 30-31 12-13 11-12 27-28 04-05 10-11 27-28 12-13 01-02 14-15 11-12 28-29 4.500.000370 SALES AND MARKETING STRATEGIES 2 15-16 03-04 04-05 15-16 19-20 04-05 15-16 03-04 16-17 05-06 02-03 16-17 4.500.000371 Sales Coaching Skill For Leader 2 13-14 05-06 04-05 13-14 06-07 04-05 13-14 05-06 14-15 07-08 04-05 14-15 4.500.000372 SALES FIGHTER 2 22-23 06-07 02-03 22-23 19-20 02-03 22-23 06-07 23-24 08-09 05-06 23-24 4.500.000373 Sales Presentation Skill 2 22-23 12-13 11-12 22-23 14-15 10-11 22-23 12-13 23-24 14-15 11-12 23-24 4.500.000374 Salesmanship 2 02-03 24-25 23-24 01-02 13-14 22-23 01-02 24-25 02-03 26-27 23-24 02-03 4.500.000375 SECURITY INCIDENT REPORT WRITING 2 06-07 10-11 09-10 08-09 07-08 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000376 SECURITY RISK ASSESSMENT 2 27-28 10-11 09-10 27-28 06-07 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.000377 Security Risk Assessment for Leaders 2 02-03 17-18 16-17 30-31 04-05 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000378 Security Risk Management for High Risk Industries 3 06-08 24-26 02-04 06-08 11-13 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.500.000379 SECURITY VULNERABILITY ASSESSMENT 2 13-14 19-20 16-17 13-14 11-12 17-18 13-14 18-19 14-15 21-22 18-19 14-15 4.500.000380 SELLING SKILLS 2 08-09 06-07 02-03 06-07 19-20 04-05 08-09 06-07 09-10 08-09 05-06 09-10 4.500.000381 Service Excellence 2 09-10 03-04 02-03 07-08 18-19 02-03 09-10 03-04 10-11 05-06 02-03 10-11 4.500.000382 SERVICE EXCELLENT 2 15-16 10-11 09-10 15-16 07-08 08-09 15-16 10-11 16-17 12-13 09-10 16-17 4.500.000383 Service Quality (Level Basic) 2 13-14 19-20 18-19 13-14 19-20 17-18 13-14 20-21 14-15 21-22 18-19 14-15 4.500.000384 Service Quality (Level Intermediate) 2 22-23 26-27 23-24 22-23 06-07 24-25 22-23 26-27 23-24 28-29 25-26 23-24 4.500.000385 SERVICE WITH DELIGHT (FOR GA & SUPPORT TEAM ) 2 09-10 24-25 23-24 06-07 06-07 22-23 09-10 24-25 10-11 26-27 23-24 10-11 4.500.000386 SEVEN HABITS 3 06-08 24-26 02-04 06-08 13-15 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.000387 SHARIAH BANK & CORPORATE SOCIAL RESPONSIBILITY 2 20-21 19-20 18-19 20-21 11-12 17-18 20-21 18-19 21-22 21-22 18-19 23-24 4.500.000

Page 86: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga388 Shipping Agency 2 13-14 10-11 09-10 13-14 04-05 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000389 SIKAP KERJA 5S 2 02-03 17-18 16-17 30-31 04-05 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000390 SKILL AND ATTRIBUTE FOR NEW PUBLIC RELATIONS 2 14-15 10-11 09-10 14-15 18-19 08-09 14-15 10-11 15-16 12-13 09-10 15-16 4.500.000391 SKILLS FOR THE BEGINNING AUDITORS 2 06-07 06-07 05-06 08-09 13-14 04-05 08-09 06-07 09-10 08-09 05-06 09-10 4.500.000392 SMART GOALS SETTING 1 20-20 19-19 18-18 20-20 07-07 17-17 20-20 20-20 21-21 21-21 18-18 21-21 2.750.000393 SOFTWARE PROJECT MANAGEMENT 3 06-08 10-12 09-11 20-22 18-20 10-12 20-22 10-12 21-23 12-14 09-11 22-24 6.500.000394 SOFTWARE QUALITY ASSURANCE 3 15-17 17-19 18-20 27-29 06-08 15-17 27-29 18-20 30-02 19-21 16-18 28-30 6.500.000395 SOFTWARE TESTING FOUNDATION 3 22-24 24-26 04-06 30-01 11-13 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000396 Solution Selling Skill For Pharmaceutical Industry 2 29-30 20-21 19-20 29-30 18-19 18-19 29-30 20-21 30-01 22-23 19-20 30-31 4.500.000397 Soul Selling 2 06-07 05-06 04-05 06-07 19-20 04-05 06-07 05-06 07-08 07-08 04-05 07-08 4.500.000

398SPEAKING FOR BUSINESS (PRESENTATION, NEGOTIATION &LOBBYING)

2 20-21 17-18 23-24 20-21 18-19 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

399 Star Employee 2 23-24 17-18 16-17 23-24 14-15 15-16 23-24 18-19 24-25 19-20 16-17 23-24 4.500.000400 Statistical Quality Control 2 13-14 13-14 12-13 13-14 04-05 11-12 13-14 13-14 14-15 15-16 12-13 14-15 4.500.000

401 STRATEGI KOMUNIKASI PEMASARAN PRODUK DAN JASA KOPERASI 2 27-28 27-28 23-24 29-30 18-19 25-26 29-30 27-28 28-29 29-30 26-27 30-31 4.500.000

402 STRATEGIC BUSINESS & FINANCIAL ANALYSIS 2 20-21 26-27 23-24 20-21 06-07 24-25 20-21 26-27 21-22 28-29 25-26 21-22 4.500.000

403STRATEGIC HUMAN RESOURCE MANAGEMENT AND ORGANIZATIONDEVELOPMENT

3 15-17 03-05 02-04 15-17 13-15 03-05 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

404 Strategic Way Of Selling 2 29-30 05-06 04-05 29-30 14-15 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.000405 STUDI KELAYAKAN BISNIS – Konsep dan Aplikasi 2 02-03 24-25 23-24 02-03 11-12 22-23 02-03 24-25 03-04 26-27 23-24 03-04 4.500.000

406 Successful Project Cost Estimation, Budgeting & Risk Analysis 4 14-17 18-21 09-12 13-16 05-08 16-19 13-16 18-21 14-17 20-23 17-20 14-17 8.750.000

407 SUPERVISORY MANAGEMENT 2 02-03 24-25 23-24 30-31 19-20 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000408 SUPERVISORY PROGRAM 2 22-23 10-11 09-10 22-23 18-19 08-09 22-23 10-11 23-24 12-13 09-10 23-24 4.500.000409 Suppliers Evaluation 2 29-30 19-20 18-19 29-30 18-19 17-18 29-30 20-21 30-01 21-22 18-19 30-31 4.500.000410 SUPPLY CHAIN MANAGEMENT 3 27-29 05-07 11-13 06-08 18-20 02-04 06-08 05-07 07-09 07-09 04-06 07-09 6.500.000

411SYSTEM PERPAJAKAN KEPABEANAN PELABUHAN DAN IT INVENTORYKAWASAN BERIKAT

2 20-21 27-28 23-24 20-21 18-19 25-26 20-21 27-28 21-22 29-30 26-27 21-22 4.500.000

412 Systems Analysis and Design 3 08-10 12-14 16-18 15-17 04-06 08-10 15-17 12-14 16-18 14-16 11-13 16-18 6.500.000413 SYSTEMS ANALYSIS AND DESIGN WITH UML 3 13-15 19-21 02-04 22-24 13-15 17-19 22-24 19-21 23-25 21-23 18-20 21-23 6.500.000414 Talent Management 2 02-03 27-28 23-24 01-02 07-08 25-26 01-02 27-28 02-03 29-30 26-27 02-03 4.500.000415 TEAM & COMMITMENT BUILDING 2 06-07 05-06 04-05 08-09 07-08 02-03 06-07 05-06 07-08 07-08 04-05 07-08 4.500.000416 TEAM BUILDING 2 27-28 26-27 23-24 29-30 18-19 24-25 29-30 26-27 28-29 28-29 25-26 30-31 4.500.000417 TEAM BUILDING SESSION 2 14-15 12-13 11-12 14-15 19-20 10-11 14-15 12-13 15-16 14-15 11-12 15-16 4.500.000418 Technical Report Writing & Presentation Skills 3 08-10 05-07 04-06 01-03 11-13 03-05 01-03 05-07 02-04 07-09 04-06 02-04 6.500.000

419 TEKNIK DAN SKILL PERIKLANAN KORPORAT MELALUI AUDIO VISUAL 1 22-22 17-17 16-16 22-22 04-04 15-15 22-22 20-20 23-23 19-19 16-16 23-23 2.750.000

420 TEKNIK DAN SKILL PUBLIKASI COMPANY PROFILE BERBASIS DIGITAL 1 29-29 26-26 23-23 29-29 13-13 24-24 29-29 26-26 30-30 28-28 25-25 30-30 2.750.000

421 Teknik Investigasi Fraud Berbasis NLP 3 13-15 03-05 10-12 13-15 18-20 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.500.000422 Teknik Komunikasi Safety yang Prima Berbasis NLP 1 20-20 11-11 23-23 20-20 06-06 09-09 20-20 11-11 21-21 13-13 10-10 21-21 2.750.000423 Teknik Komunikasi Security yang Prima Berbasis NLP 1 28-28 19-19 18-18 28-28 14-14 17-17 28-28 20-20 29-29 21-21 18-18 29-29 2.750.000

Page 87: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

424TEKNIK MELAYANI KONSUMEN KECEWA (HOW TO WINNING BACKUPSET CUSTOMER)

2 29-30 27-28 23-24 27-28 13-14 25-26 27-28 27-28 30-01 29-30 26-27 28-29 4.500.000

425 TEKNIK NLP INVESTIGATION 2 15-16 05-06 04-05 15-16 07-08 04-05 15-16 05-06 16-17 07-08 04-05 16-17 4.500.000426 TEKNIK PENDELEGASIAN TUGAS & WEWENANG 2 02-03 06-07 05-06 01-02 19-20 04-05 01-02 06-07 02-03 08-09 05-06 02-03 4.500.000427 Teknik Penyusunan SOP Security 2 02-03 27-28 23-24 01-02 18-19 25-26 01-02 27-28 02-03 29-30 26-27 02-03 4.500.000428 Teknik Presentasi 2 20-21 20-21 19-20 20-21 13-14 18-19 20-21 18-19 21-22 22-23 19-20 23-24 4.500.000429 Teknik Rapat 2 30-31 26-27 23-24 29-30 19-20 24-25 29-30 26-27 01-02 28-29 25-26 30-31 4.500.000430 Teknik Wawancara 1 02-02 05-05 04-04 03-03 06-06 04-04 03-03 05-05 04-04 07-07 04-04 04-04 2.750.000431 Teknik Wawancara Investigasi Berbasis NLP 2 09-10 06-07 05-06 08-09 07-08 04-05 09-10 06-07 10-11 08-09 05-06 10-11 4.500.000432 TEKNIK WAWANCARA PEMERIKSAAN 2 20-21 26-27 23-24 20-21 19-20 24-25 20-21 26-27 21-22 28-29 25-26 23-24 4.500.000433 TEKNIK-TEKNIK PEMBENAHAN & RETENTION DOKUMEN 2 20-21 10-11 09-10 20-21 14-15 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.000434 Teknik-Teknik Pembenahan Dokumen Arsip In Aktif 2 02-03 24-25 23-24 06-07 18-19 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.000435 Terrorism Risk Management for Leaders 1 16-16 12-12 13-13 16-16 15-15 10-10 16-16 12-12 17-17 14-14 11-11 17-17 2.750.000436 TFT -FOR ICE BREAKER 2 06-07 06-07 05-06 08-09 19-20 02-03 06-07 06-07 07-08 08-09 05-06 07-08 4.500.000437 The 7 Skills of Salesmanship 2 02-03 26-27 23-24 02-03 07-08 24-25 02-03 26-27 03-04 28-29 25-26 03-04 4.500.000438 The AIDDA-SPIN Selling System 2 08-09 06-07 05-06 08-09 11-12 02-03 08-09 06-07 09-10 08-09 05-06 09-10 4.500.000439 The Art Of Persuasive Negotiation & Closing Sales 2 02-03 12-13 11-12 01-02 18-19 10-11 01-02 12-13 02-03 14-15 11-12 02-03 4.500.000440 The Champion Training 2 06-07 10-11 09-10 08-09 14-15 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000441 THE HEART OF LEADERSHIP 2 13-14 12-13 11-12 13-14 04-05 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.000442 THE STATEMENT OF CASH FLOW 2 27-28 05-06 23-24 29-30 13-14 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.000443 TIME MANAGEMENT 2 09-10 12-13 11-12 08-09 11-12 10-11 09-10 12-13 10-11 14-15 11-12 10-11 4.500.000

444TINGKAT KOMPONEN DALAM NEGERI (TKDN) PERATURAN,PENERAPAN DAN EVALUASI

2 27-28 10-11 09-10 27-28 11-12 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.000

445 TOTAL QUALITY CONTROL 2 06-07 24-25 23-24 06-07 04-05 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.000446 Total Quality Management 2 15-16 13-14 12-13 16-17 19-20 11-12 16-17 13-14 17-18 15-16 12-13 17-18 4.500.000447 TRAINING FOR TRAINER 2 22-23 17-18 16-17 22-23 04-05 15-16 22-23 20-21 23-24 19-20 16-17 21-22 4.500.000448 Training for Trainers 2 15-16 17-18 16-17 15-16 18-19 15-16 15-16 20-21 16-17 19-20 16-17 16-17 4.500.000449 Training Management 2 22-23 27-28 23-24 22-23 07-08 25-26 22-23 27-28 23-24 29-30 26-27 21-22 4.500.000450 Training Need Analysis which Comprehensive And Effective 2 15-16 13-14 12-13 13-14 07-08 11-12 13-14 13-14 14-15 15-16 12-13 14-15 4.500.000

451 Training SOP (Standard Operating Procedure) Writing & Improvement 2 02-03 27-28 23-24 01-02 14-15 25-26 01-02 27-28 02-03 29-30 26-27 02-03 4.500.000

452TRAVEL WRITER DAN KETERAMPILAN MENULIS PERJALANAN WISATAMELALUI MEDIA ONLINE

2 02-03 03-04 04-05 01-02 19-20 02-03 01-02 03-04 02-03 05-06 02-03 02-03 4.500.000

453TUMPANG TINDIH LAHAN PERTAMBANGAN DAN ISSUE TENTANNGSMELTER

2 13-14 24-25 23-24 13-14 11-12 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.000

454 Understanding and Documenting of ISO 9001 2015 2 23-24 19-20 18-19 23-24 11-12 17-18 23-24 18-19 24-25 21-22 18-19 21-22 4.500.000455 Understanding and Documenting of ISO 9001-2008 2 13-14 06-07 02-03 13-14 12-13 02-03 13-14 06-07 14-15 08-09 05-06 14-15 4.500.000456 UP TO A 5-STAR SERVICE 2 23-24 17-18 16-17 23-24 13-14 15-16 23-24 20-21 24-25 19-20 16-17 21-22 4.500.000

457 UPDATED PPh 21 atau 26 & PPh WAJIB PAJAK ORANG PRIBADI 1 08-08 03-03 04-04 06-06 18-18 04-04 10-10 03-03 11-11 05-05 02-02 11-11 2.750.000

458 UPDATED REGULASI DAN APLIKASI PPh 21 atau 26 & PPN 1 15-15 10-10 11-11 17-17 04-04 08-08 17-17 10-10 18-18 12-12 09-09 18-18 2.750.000459 USING PSYCHOLOGICAL TECHNIQUES IN SELLING 2 16-17 19-20 18-19 16-17 19-20 17-18 16-17 20-21 17-18 21-22 18-19 17-18 4.500.000460 Work Force Management 2 27-28 06-07 05-06 27-28 11-12 04-05 27-28 06-07 28-29 08-09 05-06 28-29 4.500.000

Page 88: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga461 Workforce Management 2 23-24 20-21 19-20 23-24 04-05 18-19 23-24 18-19 24-25 22-23 19-20 21-22 4.500.000462 Working as a Team Excellence 3 06-08 17-19 11-13 27-29 13-15 15-17 27-29 18-20 28-30 19-21 16-18 28-30 6.500.000

463 Workload Analysis Implementation With Excel 2007 for HR & Non HR 2 20-21 20-21 19-20 20-21 11-12 18-19 20-21 18-19 21-22 22-23 19-20 23-24 4.500.000

Measurement/Pengukuran - Instrumentasi -Otomasi Industri

1ISO 10012 MEASUREMENT MANAGEMENT SYSTEM FORSUPPORTING ISO 9001 CERTIFICATION

2 27-28 03-04 02-03 27-28 04-05 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000

2 Kalibrasi dan Tera 2 02-03 03-04 02-03 30-31 04-05 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.0003 Kalibrasi Massa & Dimensi 2 06-07 10-11 09-10 06-07 11-12 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.0004 MANAJEMEN KALIBRASI 4 06-09 10-13 09-12 30-02 11-14 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.0005 Simulasi Proses Kimia Dengan Hysys 4 20-23 17-20 16-19 30-02 04-07 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.000

Mechanical1 ELEMEN MESIN DESIGN, MAINTENANCE AND TROUBLESHOOTING 3 13-15 17-19 16-18 13-15 18-20 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.000

2INSTALLATION, MAINTENANCE AND TROUBLESHOOTING OF GASCOMPRESSOR AND PIPING SYSTEM

3 20-22 24-26 02-04 20-22 04-06 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.000

3 PRINSIP DASAR PENYUSUNAN TROUBLESHOOTING 3 27-29 03-05 09-11 27-29 11-13 02-04 27-29 03-05 28-30 05-07 02-04 28-30 6.500.000

4ROTATING EQUIPMENT PUMP, COMPRESSOR, GAS TURBINE,MAINTENANCE AND TROUBLESHOOTING

3 06-08 10-12 18-20 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

Minyak & Gas Bumi (Migas)1 MANAJEMEN RANTAI SUPLAI DI INDUSTRI HULU MIGAS INDONESIA 2 02-03 24-25 23-24 13-14 18-19 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.000

2 AFE Budget Preparation Skills of Oil & Gas Projects 4 20-23 24-27 02-05 20-23 04-07 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.750.000

3BEST PRACTICE SCM DAN STRATEGIC INVENTORY CONTROL ANDWAREHOUSING PERUSAHAAN TAMBANG DAN MIGAS

3 06-08 03-05 09-11 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

4 CHEMICALS TREATMENT FOR PRODUCED WATER 3 06-08 10-12 09-11 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

5INSIDE PROCUREMENT and CONTRACT MANAGEMENT in OIL & GASINDUSTRY

3 29-31 05-07 16-18 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 21-23 6.950.000

6 Managing Complex Project Oil & Gas Professionals 4 20-23 24-27 17-20 06-09 12-15 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.750.0007 Oilfield Production Chemicals 4 13-16 17-20 16-19 06-09 04-07 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

Motivasi & Personal Development1 15 ETOS KERJA DAN KEPRIBADIAN 2 20-21 10-11 09-10 20-21 04-05 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.0002 ACHIEVEMENT MOTIVATION 2 02-03 03-04 02-03 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.0003 ACHIEVEMENT MOTIVATION 2 20-21 17-18 16-17 20-21 11-12 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.0004 ACHIEVEMENT MOTIVATION TRAINING 2 20-21 17-18 16-17 20-21 04-05 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.0005 ACHIEVMENT ORIENTATION 2 06-07 10-11 09-10 06-07 04-05 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000

Page 89: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga6 Analytical Thinking & Problem Solving 2 02-03 24-25 23-24 13-14 11-12 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.0007 ASSERTIVE COMMUNICATION SKILLS 2 27-28 24-25 23-24 27-28 18-19 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

8BEST PRACTICE CREATIVE THINKING & PROBLEM SOLVING TO LEADYOU SUCCESS

2 23-24 06-07 05-06 23-24 19-20 02-03 23-24 06-07 24-25 08-09 05-06 21-22 4.500.000

9 BEST PRACTICE EFFECTIVE COMMUNICATION SKILL AT WORK PLACE 2 02-03 17-18 16-17 02-03 13-14 15-16 02-03 20-21 03-04 19-20 16-17 03-04 4.500.000

10 Best Practice Public Speaking & Presentation Skill 2 20-21 10-11 09-10 20-21 14-15 08-09 20-21 10-11 21-22 12-13 09-10 23-24 4.500.00011 BUILDING COLLABORATIVE RELATIONSHIPS TRAINING 2 27-28 10-11 09-10 27-28 04-05 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.00012 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 20-22 17-19 16-18 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.00013 BUSINESS PRESENTATION SKILL 1 02-02 10-10 23-23 20-20 04-04 08-08 20-20 10-10 21-21 12-12 09-09 21-21 2.750.00014 CAPACITY BUILDING 2 06-07 10-11 09-10 06-07 13-14 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.00015 CHARACTER BUILDING 2 13-14 19-20 18-19 13-14 19-20 17-18 13-14 20-21 14-15 21-22 18-19 14-15 4.500.00016 CHARACTER BUILDING 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.00017 COACHING & COUNSELING 2 13-14 17-18 16-17 13-14 11-12 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.00018 COACHING & KONSELING YANG EFEKTIF 2 06-07 03-04 02-03 06-07 06-07 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.00019 COACHING AND COUNSELING 2 27-28 24-25 23-24 27-28 11-12 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.00020 commitment to change 2 13-14 03-04 02-03 13-14 11-12 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.00021 communication for best result 2 20-21 10-11 09-10 20-21 18-19 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.00022 Comprehensive Talent Management 2 02-03 24-25 23-24 06-07 11-12 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.00023 CREATIVE & CONSULTATIVE SELLING 2 29-30 05-06 04-05 29-30 14-15 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.00024 CREATIVE & INNOVATIVE THINKING 2 02-03 12-13 11-12 01-02 18-19 10-11 01-02 12-13 02-03 14-15 11-12 02-03 4.500.00025 Developing Excellent Internal Trainer 3 06-08 17-19 16-18 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.00026 DIRECTING COACHING COUNSELING DELEGATING 1 06-06 24-24 23-23 06-06 18-18 22-22 06-06 24-24 07-07 26-26 23-23 07-07 2.750.00027 Dynamic Presentation Skill 2 02-03 17-18 16-17 30-31 13-14 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.00028 EFFECTIVE COMMUNICATION FOR MANAGERS 1 02-02 17-17 16-16 06-06 18-18 15-15 06-06 18-18 07-07 19-19 16-16 07-07 2.750.00029 EFFECTIVE COMMUNICATION SKILL 2 29-30 05-06 05-06 27-28 13-14 04-05 27-28 05-06 30-01 07-08 04-05 28-29 4.500.00030 EFFECTIVE PRESENTATION (PRESENTASI YANG EFEKTIF) 2 06-07 10-11 09-10 06-07 06-07 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.00031 EFFECTIVE PRESENTATION SKILLS 2 06-07 20-21 19-20 06-07 07-08 18-19 06-07 18-19 07-08 22-23 19-20 07-08 4.500.00032 EFFECTIVE SALES PRESENTATION TECHNIQUE 2 06-07 05-06 04-05 08-09 11-12 02-03 06-07 05-06 07-08 07-08 04-05 07-08 4.500.00033 EMOTIONAL INTELLIGENCE 3 29-31 26-28 04-06 28-30 06-08 24-26 28-30 26-28 30-02 28-30 25-27 29-31 6.500.00034 EMOTIONAL INTELLIGENSI 2 27-28 05-06 04-05 27-28 06-07 04-05 27-28 05-06 28-29 07-08 04-05 28-29 4.500.00035 EMPOWERING EMOTIONAL INTELLIGENCE 1 13-13 03-03 02-02 13-13 04-04 02-02 13-13 03-03 14-14 05-05 02-02 14-14 2.750.00036 Excellent Communication at Work 3 13-15 24-26 04-06 13-15 06-08 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

37 EXCELLENT MOTIVATION AND TEAM WORK OUTBOUND TRAINING 2 13-14 20-21 19-20 13-14 06-07 18-19 13-14 20-21 14-15 22-23 19-20 14-15 2.950.000

38 Fundamental Strategic Thinking Skill 2 20-21 26-27 23-24 20-21 19-20 24-25 20-21 26-27 21-22 28-29 25-26 23-24 4.500.00039 HAPPY PENSION 2 27-28 17-18 16-17 27-28 04-05 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.000

40 IMPROVING PERFORMANCE THROUGH COACHING and COUNSELLING 2 27-28 20-21 19-20 29-30 07-08 18-19 29-30 18-19 28-29 22-23 19-20 30-31 4.500.000

41 INTERPERSONAL COMMUNICATION FOR SELF DEVELOPMENT 2 13-14 24-25 23-24 13-14 04-05 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.00042 Kebiasaan Efektif Menuju Sukses 2 02-03 06-07 23-24 01-02 11-12 02-03 01-02 06-07 02-03 08-09 05-06 02-03 4.500.00043 KESEHATAN MENTAL & PSYCHO ENERGY - SELF THERAPY 1 27-27 19-19 18-18 27-27 19-19 17-17 27-27 20-20 28-28 21-21 18-18 28-28 2.750.00044 KETERAMPILAN KOMUNIKASI DAN INTERAKSI 2 22-23 26-27 23-24 22-23 19-20 24-25 22-23 26-27 23-24 28-29 25-26 23-24 4.500.000

Page 90: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga45 KETERAMPILAN NEGOSIASI (NEGOTIATION SKILL) 2 29-30 05-06 04-05 29-30 07-08 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.00046 Komunikasi Cerdas 2 13-14 05-06 04-05 15-16 06-07 04-05 15-16 05-06 16-17 07-08 04-05 16-17 4.500.00047 Kreativitas 2 16-17 20-21 19-20 16-17 07-08 18-19 16-17 18-19 17-18 22-23 19-20 17-18 4.500.00048 LEADERSHIP & SUPERVISORY MANAGEMENT 2 08-09 13-14 11-12 08-09 19-20 11-12 08-09 13-14 09-10 15-16 12-13 09-10 4.500.00049 Managing Stress for Practical Purpose 3 08-10 19-21 02-04 01-03 04-06 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.00050 Manajemen Stres 1 02-02 12-12 11-11 03-03 04-04 10-10 03-03 12-12 04-04 14-14 11-11 04-04 2.750.00051 MANAJEMEN STRES 2 29-30 13-14 12-13 29-30 19-20 11-12 29-30 13-14 30-01 15-16 12-13 30-31 4.500.00052 MASA PERSIAPAN PENSIUN (MPP) 2 29-30 12-13 11-12 29-30 14-15 10-11 29-30 12-13 30-01 14-15 11-12 30-31 4.500.00053 MENINGKATKAN KECERDASAN EMOSI 2 09-10 27-28 23-24 06-07 11-12 25-26 09-10 27-28 10-11 29-30 26-27 10-11 4.500.00054 MENTALITAS DASAR 3 29-31 10-12 09-11 27-29 18-20 08-10 27-29 10-12 30-02 12-14 09-11 28-30 6.500.000

55MERANCANG DAN MENYAMPAIKAN PRESENTASI YANGBERKARAKTER, UNIK, DAN MENARIK

2 22-23 13-14 12-13 22-23 18-19 11-12 22-23 13-14 23-24 15-16 12-13 21-22 4.500.000

56 METAZONE Class 1 20-20 03-03 02-02 20-20 11-11 02-02 20-20 03-03 21-21 05-05 02-02 21-21 2.750.00057 MY VALUE… SEBUAH TRAINING MOTIVASI UNTUK KARYAWAN 2 02-03 24-25 23-24 02-03 05-06 22-23 02-03 24-25 03-04 26-27 23-24 03-04 4.500.00058 NLP FOR NEGOTIATION 2 20-21 27-28 23-24 20-21 06-07 25-26 20-21 27-28 21-22 29-30 26-27 21-22 4.500.00059 PERSIAPAN MEMASUKI MASA PURNABHAKTI 3 27-29 19-21 18-20 28-30 18-20 17-19 28-30 18-20 28-30 21-23 18-20 29-31 6.950.00060 Personal Development 2 02-03 24-25 23-24 30-31 13-14 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.00061 Personal Excellence Winner Attitude 3 15-17 26-28 09-11 07-09 11-13 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.00062 PERSONALITY DEVELOPMENT FOR HIGH 2 02-03 26-27 23-24 30-31 07-08 24-25 29-30 26-27 31-01 28-29 25-26 30-01 4.500.00063 POWERFUL COMMUNICATION SKILL 2 08-09 17-18 16-17 08-09 14-15 15-16 08-09 18-19 09-10 19-20 16-17 09-10 4.500.00064 Powerful Presentation Excellence 3 22-24 03-05 16-18 15-17 18-20 02-04 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

65POWERFUL PUBLIC SPEAKING(From Designing Training to PowerfulDelivery)

2 20-21 06-07 05-06 20-21 04-05 02-03 20-21 06-07 21-22 08-09 05-06 21-22 4.500.000

66 PRESENTATION AND EFFECTIVE COMMUNICATION SKILLS 2 02-03 03-04 23-24 08-09 19-20 04-05 06-07 03-04 07-08 05-06 02-03 07-08 4.500.00067 PRESENTATION SKILL BASED ON NLP 2 13-14 24-25 23-24 13-14 14-15 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.000

68 Presentation Skill With Power Point 2007, Swishmax and ULEAD 3 08-10 24-26 04-06 01-03 13-15 22-24 01-03 24-26 02-04 26-28 23-25 02-04 6.500.000

69 PROBLEM SOLVING & DECISION MAKING 1 22-22 21-21 20-20 22-22 04-04 19-19 22-22 20-20 23-23 23-23 20-20 21-21 2.750.00070 PSYCHO ENERGY THERAPY 1 02-02 25-25 24-24 01-01 05-05 23-23 01-01 25-25 02-02 27-27 24-24 02-02 2.750.00071 PUBLIC SPEACING & PRESENTATION SKILLS 2 30-31 17-18 16-17 27-28 13-14 15-16 27-28 20-21 01-02 19-20 16-17 28-29 4.500.00072 PUBLIC SPEAKING & PRESENTATION SKILLS 2 06-07 05-06 04-05 08-09 11-12 02-03 06-07 05-06 07-08 07-08 04-05 07-08 4.500.00073 Sales Coaching Skill For Leader 2 13-14 05-06 04-05 13-14 06-07 04-05 13-14 05-06 14-15 07-08 04-05 14-15 4.500.00074 Sales Presentation Skill 2 22-23 12-13 11-12 22-23 14-15 10-11 22-23 12-13 23-24 14-15 11-12 23-24 4.500.00075 SAY NO!!! To GIVE UP 2 02-03 19-20 18-19 02-03 19-20 17-18 02-03 20-21 03-04 21-22 18-19 03-04 4.500.00076 Self Coaching for Life Optimization 2 20-21 03-04 02-03 20-21 11-12 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.00077 SELF EMPOWERING TRAINING 2 07-08 04-05 03-04 07-08 14-15 03-04 07-08 04-05 08-09 06-07 03-04 08-09 4.500.00078 SEVEN HABITS 3 06-08 24-26 02-04 06-08 13-15 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.00079 SMART GOALS SETTING 1 20-20 19-19 18-18 20-20 07-07 17-17 20-20 20-20 21-21 21-21 18-18 21-21 2.750.000

80SPEAKING FOR BUSINESS (PRESENTATION, NEGOTIATION &LOBBYING)

2 20-21 17-18 23-24 20-21 18-19 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

81 STRESS MANAGEMENT FOR PRODUCTIVE PEOPLE 1 27-27 10-10 09-09 27-27 19-19 08-08 27-27 10-10 28-28 12-12 09-09 28-28 2.750.00082 TABLE MANNER & GROOMING 2 13-14 12-13 11-12 13-14 18-19 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.00083 Talent Management 2 02-03 27-28 23-24 01-02 07-08 25-26 01-02 27-28 02-03 29-30 26-27 02-03 4.500.000

Page 91: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga84 TEAM & COMMITMENT BUILDING 2 06-07 05-06 04-05 08-09 07-08 02-03 06-07 05-06 07-08 07-08 04-05 07-08 4.500.00085 TEKNIK HUBUNGAN ANTAR MANUSIA 2 16-17 03-04 23-24 16-17 18-19 04-05 16-17 03-04 17-18 05-06 02-03 17-18 4.500.00086 TEKNIK MEMBACA DAN MENULIS 2 02-03 24-25 23-24 30-31 07-08 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.00087 Teknik Presentasi 2 20-21 20-21 19-20 20-21 13-14 18-19 20-21 18-19 21-22 22-23 19-20 23-24 4.500.00088 The Champion Training 2 06-07 10-11 09-10 08-09 14-15 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.00089 TRAINING FOR TRAINERS (TOT) 2 13-14 12-13 11-12 13-14 14-15 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.00090 TRAINING FOR TRAINER 2 30-31 10-11 09-10 29-30 04-05 08-09 29-30 10-11 01-02 12-13 09-10 30-31 4.500.000

Port/Pelabuhan - Marine -Pelayaran/Shipping

1SYSTEM PERPAJAKAN KEPABEANAN PELABUHAN DAN IT INVENTORYKAWASAN BERIKAT

2 20-21 27-28 23-24 20-21 18-19 25-26 20-21 27-28 21-22 29-30 26-27 21-22 4.500.000

2 Shipping Agency 2 13-14 10-11 09-10 13-14 04-05 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000

Prapurnabakti - Prapensiun1 HAPPY PENSION 2 27-28 17-18 16-17 27-28 04-05 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.0002 MASA PERSIAPAN PENSIUN (MPP) 2 29-30 12-13 11-12 29-30 14-15 10-11 29-30 12-13 30-01 14-15 11-12 30-31 4.500.0003 PERENCANAAN KEUANGAN PENSIUN DENGAN METODE PASTI 2 27-28 03-04 02-03 27-28 18-19 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.0004 PERSIAPAN MEMASUKI MASA PURNABHAKTI 3 27-29 19-21 18-20 28-30 18-20 17-19 28-30 18-20 28-30 21-23 18-20 29-31 6.950.000

Procurement/Pengadaan Barang & Jasa1

INSIDE PROCUREMENT and CONTRACT MANAGEMENT in OIL & GASINDUSTRY

3 29-31 05-07 16-18 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 21-23 6.950.000

2 PROCUREMENT MANAGEMENT 2 02-03 03-04 23-24 02-03 14-15 02-03 02-03 03-04 03-04 05-06 02-03 03-04 4.500.000

Project Management (PM)1 ADVANCED PROJECT MANAGEMENT 2 02-03 03-04 23-24 06-07 11-12 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

2 ADVANCED PROJECT MANAGEMENT BASED ON PMBOK 5th Edition 3 13-15 17-19 16-18 13-15 11-13 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.950.000

3 Applied Risk Assessment into EPC Project 4 27-30 03-06 09-12 27-30 12-15 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.750.0004 ASPEK HUKUM PADA PROYEK KONSTRUKSI 3 27-29 24-26 02-04 27-29 11-13 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.0005 Effective Estimating and Cost Control for EPC Projects 3 15-17 19-21 04-06 06-08 18-20 17-19 06-08 19-21 07-09 21-23 18-20 07-09 6.950.0006 ESSENTIALS OF PROJECT MANAGEMENT 3 08-10 12-14 11-13 07-09 04-06 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.0007 ESTIMASI DAN ANALISIS BIAYA PROYEK 3 20-22 17-19 04-06 13-15 13-15 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.0008 Fundamental Project Management For Non Engineers 3 22-24 26-28 11-13 15-17 18-20 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.950.0009 INTEGRATED OF PROJECT MANAGEMENT 4 07-10 11-14 02-05 27-30 04-07 09-12 27-30 11-14 29-02 13-16 10-13 28-31 8.750.000

10 IT PROJECT MANAGEMENT 3 15-17 26-28 04-06 15-17 04-06 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.00011 Leading Project Management for Construction Projects 3 13-15 17-19 09-11 01-03 18-20 15-17 01-03 18-20 02-04 19-21 16-18 02-04 6.950.00012 Managing Complex Project Oil & Gas Professionals 4 20-23 24-27 17-20 06-09 12-15 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.750.00013 MANAJEMEN PROYEK KONSTRUKSI 3 15-17 12-14 02-04 01-03 11-13 10-12 01-03 12-14 02-04 14-16 11-13 02-04 6.500.000

Page 92: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

14 Mastering Microsoft Project 2007 (Concept and Application) 2 02-03 17-18 16-17 30-31 18-19 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000

15MASTERING PROJECT MANAGEMENT BASED ON THE 5TH EDITION OFPMBOK® GUIDE

4 27-30 03-06 03-06 13-16 05-08 02-05 13-16 03-06 14-17 05-08 02-05 14-17 8.750.000

16 PENGENDALIAN MUTU PADA PROYEK KONSTRUKSI 3 22-24 19-21 09-11 07-09 18-20 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.500.00017 Planning and Scheduling Skills for EPC Projects 3 06-08 10-12 11-13 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 22-24 6.950.000

18 PLANNING, ORGANISING & CONTROL PROJECTS WITH EVM TRACKING 4 14-17 18-21 16-19 27-30 11-14 16-19 27-30 18-21 28-01 20-23 17-20 28-31 8.750.000

19 PMBOK PROJECT MANAGEMENT 3 15-17 05-07 11-13 06-08 06-08 03-05 06-08 05-07 07-09 07-09 04-06 07-09 6.500.00020 PMP EXAM PREPARATION 4 21-24 25-28 02-05 30-02 04-07 23-26 29-02 25-28 31-03 27-30 24-27 30-03 8.750.00021 Practical Planning And Controlling Project 3 27-29 17-19 02-04 22-24 18-20 15-17 22-24 18-20 23-25 19-21 16-18 21-23 6.500.00022 PRIMAVERA P6 FOR PROJECT MANAGEMENT(PM) 3 27-29 24-26 02-04 27-29 18-20 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.00023 Primavera P6 Professional Fundamental 3 08-10 24-26 09-11 28-30 04-06 22-24 28-30 24-26 28-30 26-28 23-25 29-31 6.500.00024 PROJECT COST ESTIMATION 3 13-15 12-14 18-20 07-09 18-20 08-10 08-10 12-14 09-11 14-16 11-13 09-11 6.500.00025 PROJECT COST MANAGEMENT 3 20-22 19-21 04-06 13-15 06-08 17-19 13-15 19-21 14-16 21-23 18-20 14-16 6.500.00026 PROJECT FINANCING 3 29-31 26-28 11-13 20-22 11-13 24-26 20-22 26-28 21-23 28-30 25-27 22-24 6.500.00027 PROJECT LEADERSHIP 2 02-03 05-06 23-24 27-28 18-19 04-05 27-28 05-06 01-02 07-08 04-05 28-29 4.500.00028 PROJECT MANAGEMENT 3 27-29 24-26 16-18 15-17 04-06 22-24 15-17 24-26 16-18 26-28 23-25 16-18 6.500.00029 PROJECT MANAGEMENT based on PRINCE2 3 06-08 10-12 16-18 30-01 04-06 10-12 29-01 10-12 31-02 12-14 09-11 30-02 6.500.00030 Project Management For Engineers & Professionals 4 28-31 04-07 09-12 06-09 12-15 02-05 06-09 04-07 07-10 06-09 03-06 07-10 8.750.00031 Project Management For HR Profesional 3 15-17 17-19 02-04 06-08 13-15 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

32PROJECT MANAGEMENT FOR NEW ENGINEERS & NON TECHNICALPROFESSIONAL

4 07-10 11-14 17-20 14-17 05-08 09-12 14-17 11-14 15-18 13-16 10-13 15-18 8.750.000

33 PROJECT MANAGEMENT FOR NON PROJECT MANAGER 2 20-21 03-04 23-24 20-21 04-05 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.000

34 Project Management Fundamental Based on PMBOK 5th. Edition 3 13-15 17-19 04-06 22-24 18-20 15-17 22-24 18-20 23-25 19-21 16-18 21-23 6.950.000

35 PROJECT MANAGEMENT FUNDAMENTALS 3 22-24 24-26 09-11 15-17 18-20 22-24 15-17 24-26 16-18 26-28 23-25 16-18 6.500.00036 PROJECT MANAGEMENT IN SALES 3 27-29 05-07 18-20 22-24 06-08 02-04 22-24 05-07 23-25 07-09 04-06 21-23 6.500.00037 PROJECT MANAGEMENT IN MARKETING 3 08-10 12-14 04-06 28-30 11-13 08-10 28-30 12-14 28-30 14-16 11-13 29-31 6.500.000

38PROJECT MANAGEMENT IN OIL & GAS PRODUCTION FACILITIES, RISKPLANING & MITIGATION

4 20-23 24-27 10-13 27-30 11-14 22-25 27-30 24-27 29-02 26-29 23-26 28-31 8.750.000

39 PROJECT MANAGEMENT OFFICE 2 02-03 17-18 23-24 13-14 18-19 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.00040 PROJECT MANAGEMENT USING MICROSOFT PROJECT 3 13-15 19-21 11-13 01-03 18-20 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.00041 Project Planning And Control Using microsoft project 2 06-07 03-04 02-03 06-07 11-12 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.00042 Project Planning And Control Using Oracle Primavera P6 2 13-14 10-11 09-10 13-14 18-19 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.00043 PROJECT QUALITY MANAGEMENT 3 20-22 26-28 16-18 07-09 04-06 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.00044 PROJECT RISK MANAGEMENT 3 29-31 03-05 02-04 13-15 13-15 03-05 13-15 03-05 14-16 05-07 02-04 14-16 6.500.00045 Project Scheduling & Controlling and Risk Analysis 4 27-30 03-06 16-19 31-03 04-07 02-05 30-03 03-06 01-04 05-08 02-05 01-04 8.750.000

46RESOURCES EVALUATION, PROJECT ECONOMICS AND PROJECTMANAGEMENT IN OIL & GAS

4 06-09 10-13 02-05 06-09 12-15 08-11 07-10 10-13 08-11 12-15 09-12 08-11 8.750.000

47 SOFTWARE PROJECT MANAGEMENT 3 06-08 10-12 09-11 20-22 18-20 10-12 20-22 10-12 21-23 12-14 09-11 22-24 6.500.000

48 Successful Project Cost Estimation, Budgeting & Risk Analysis 4 14-17 18-21 09-12 13-16 05-08 16-19 13-16 18-21 14-17 20-23 17-20 14-17 8.750.000

Page 93: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

Sales - Marketing/Pemasaran - Bisnis1 Advance Business Process Management 3 06-08 24-26 02-04 30-01 04-06 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.0002 Basic Professional Salesperson 2 20-21 17-18 16-17 20-21 11-12 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.0003 BEST PRACTICE CUSTOMER CARE & SERVICE EXCELLENCE 2 30-31 13-14 12-13 27-28 04-05 11-12 27-28 13-14 01-02 15-16 12-13 28-29 4.500.0004 Best Practice Selling Skill & Closing Sales 2 27-28 19-20 18-19 29-30 19-20 17-18 29-30 18-19 28-29 21-22 18-19 30-31 4.500.000

5Best Practice Strategi Penjualan Sukses Salesperson Perusahaan(Mastery Selling Skill)

2 02-03 26-27 23-24 30-31 07-08 24-25 29-30 26-27 31-01 28-29 25-26 30-01 4.500.000

6 Boosting Sales Promotion Girl or Boy (SPG or SPB) 2 27-28 24-25 23-24 27-28 18-19 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.0007 Brand Engagement Di Media Sosial 2 23-24 27-28 23-24 23-24 18-19 25-26 23-24 27-28 24-25 29-30 26-27 23-24 4.500.0008 Brand Strategy & Creativity 2 30-31 05-06 05-06 29-30 07-08 04-05 29-30 05-06 01-02 07-08 04-05 30-31 4.500.0009 BUDGETING & BUSINESS PLAN 2 02-03 03-04 23-24 27-28 19-20 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000

10 BUSINESS ANALYSIS FOUNDATION 2 13-14 10-11 09-10 13-14 18-19 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.00011 BUSINESS ETIQUETTE & PERSONAL IMAGES 2 02-03 03-04 02-03 30-31 04-05 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.00012 BUSINESS PRESENTATION SKILL 1 02-02 10-10 23-23 20-20 04-04 08-08 20-20 10-10 21-21 12-12 09-09 21-21 2.750.00013 BUSINESS PROCESS MANAGEMENT 2 27-28 24-25 23-24 27-28 18-19 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.00014 Business Process Mapping 2 20-21 20-21 19-20 20-21 07-08 18-19 20-21 20-21 21-22 22-23 19-20 21-22 4.500.00015 COMPREHENSIVE PROBLEM SOLVING OF DIRECT MARKETING 2 15-16 20-21 19-20 15-16 19-20 18-19 15-16 20-21 16-17 22-23 19-20 16-17 4.500.00016 Consultative Selling Process 2 20-21 03-04 02-03 20-21 18-19 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.00017 Corporate Advertising & Media Placement Strategy 2 02-03 13-14 12-13 02-03 11-12 11-12 02-03 13-14 03-04 15-16 12-13 03-04 4.500.00018 Customer Care and Service Excellence 2 06-07 10-11 09-10 06-07 04-05 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.00019 CUSTOMER RELATIONSHIP MANAGEMENT 2 23-24 06-07 05-06 23-24 19-20 02-03 23-24 06-07 24-25 08-09 05-06 21-22 4.500.000

20CUSTOMER RETENTION MARKETING MEMBANGUN HUBUNGANLEBIH BAIK DENGAN PELANGGAN

2 15-16 26-27 23-24 15-16 18-19 24-25 15-16 26-27 16-17 28-29 25-26 16-17 4.500.000

21 CUSTOMER SERVICE EXCELLENT 2 02-03 03-04 02-03 30-31 11-12 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.00022 CUSTOMER SERVICE EXCELLENT 2 30-31 13-14 12-13 27-28 04-05 11-12 27-28 13-14 01-02 15-16 12-13 28-29 4.500.000

23CUSTOMER SERVICE SKILL (MENINGKATKAN HUBUNGAN HARMONISDENGAN PELANGGAN MELALUI CUSTOMER SERVICE)

2 02-03 10-11 09-10 01-02 18-19 08-09 01-02 10-11 02-03 12-13 09-10 02-03 4.500.000

24 CUSTOMER SERVICE TRAINING 2 22-23 19-20 18-19 22-23 19-20 17-18 22-23 20-21 23-24 21-22 18-19 23-24 4.500.00025 Design & Delivery Sales Presentation 2 02-03 03-04 02-03 30-31 04-05 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

26DIGITAL MARKETING COMMUNICATIONS UNTUK MENINGKATKANPENJUALAN

2 06-07 17-18 16-17 08-09 07-08 15-16 09-10 18-19 10-11 19-20 16-17 10-11 4.500.000

27DUNIA MAYA MERK DAN ADVERTENSI (CARA PRAKTISMENGKOMUNIKASIKAN MEREK DI MEDIA ONLINE)

2 16-17 26-27 23-24 16-17 11-12 24-25 16-17 26-27 17-18 28-29 25-26 17-18 4.500.000

28 Effective Business Writing And Communication 2 20-21 06-07 02-03 20-21 13-14 02-03 20-21 06-07 21-22 08-09 05-06 21-22 4.500.00029 EFFECTIVE WAYS TO INCREASE SALES 2 13-14 12-13 11-12 13-14 18-19 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.000

30IMC DRIVER FOR INTEGRATED MARKETING COMMUNICATIONS(IMC)

2 29-30 13-14 12-13 29-30 14-15 11-12 29-30 13-14 30-01 15-16 12-13 30-31 4.500.000

31 Inbound & Outbound Sales Call 2 27-28 10-11 09-10 27-28 04-05 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.00032 IT BUSINESS ANALYSIS 3 06-08 19-21 18-20 06-08 18-20 17-19 06-08 19-21 07-09 21-23 18-20 07-09 6.500.00033 Leadership Skill For Sales Leader 3 06-08 17-19 16-18 30-01 11-13 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

Page 94: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

34Maketing Communication For Cooperatives And Small-MediumBusinesses

2 27-28 10-11 09-10 27-28 18-19 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.000

35 Managing Objection, Customer Solution 2 06-07 10-11 09-10 06-07 13-14 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.00036 Marketing for Non Marketing Staff 2 13-14 26-27 23-24 13-14 19-20 24-25 13-14 26-27 14-15 28-29 25-26 14-15 4.500.000

37 MERANCANG MEDIA PROMOSI WISATA YANG EFEKTIF DAN EFISIEN 2 20-21 13-14 12-13 20-21 14-15 11-12 20-21 13-14 21-22 15-16 12-13 21-22 4.500.000

38 MOTIVASI MENJUAL 2 30-31 20-21 19-20 27-28 06-07 18-19 27-28 20-21 01-02 22-23 19-20 28-29 4.500.00039 PAJAK BISNIS PROPERTI 1 27-27 12-12 23-23 29-29 13-13 10-10 29-29 12-12 30-30 14-14 11-11 30-30 2.750.000

40PELATIHAN PROMOSI WISATA MELALUI VIDEO YANG EFEKTIF DANEFISIEN

2 27-28 20-21 19-20 27-28 19-20 18-19 27-28 18-19 28-29 22-23 19-20 28-29 4.500.000

41 POSITIVE FIGHTER FOR SALES PEOPLE 2 02-03 12-13 11-12 01-02 07-08 10-11 01-02 12-13 02-03 14-15 11-12 02-03 4.500.000

42 POWERFUL MARKETING AND SALES TO BOOSTING YOUR TARGET 2 15-16 27-28 23-24 15-16 18-19 25-26 15-16 27-28 16-17 29-30 26-27 16-17 4.500.000

43 Practical Customer Service 3 27-29 10-12 04-06 22-24 06-08 08-10 22-24 10-12 23-25 12-14 09-11 22-24 6.500.00044 Problem Solving Of Direct Marketing 2 02-03 17-18 16-17 30-31 06-07 15-16 29-30 20-21 31-01 19-20 16-17 30-01 4.500.00045 PROJECT MANAGEMENT IN SALES 3 27-29 05-07 18-20 22-24 06-08 02-04 22-24 05-07 23-25 07-09 04-06 21-23 6.500.00046 PROJECT MANAGEMENT IN MARKETING 3 08-10 12-14 04-06 28-30 11-13 08-10 28-30 12-14 28-30 14-16 11-13 29-31 6.500.00047 Proposal And Business Report 2 09-10 26-27 23-24 06-07 14-15 24-25 08-09 26-27 09-10 28-29 25-26 09-10 4.500.00048 Retail Sales Training 2 02-03 24-25 23-24 06-07 19-20 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.00049 RISK MANAGEMENT ON OPERATIONAL BUSINESS 2 30-31 12-13 11-12 27-28 04-05 10-11 27-28 12-13 01-02 14-15 11-12 28-29 4.500.00050 SALES AND MARKETING STRATEGIES 2 15-16 03-04 04-05 15-16 19-20 04-05 15-16 03-04 16-17 05-06 02-03 16-17 4.500.00051 Sales Coaching Skill For Leader 2 13-14 05-06 04-05 13-14 06-07 04-05 13-14 05-06 14-15 07-08 04-05 14-15 4.500.00052 SALES FIGHTER 2 22-23 06-07 02-03 22-23 19-20 02-03 22-23 06-07 23-24 08-09 05-06 23-24 4.500.00053 Sales Presentation Skill 2 22-23 12-13 11-12 22-23 14-15 10-11 22-23 12-13 23-24 14-15 11-12 23-24 4.500.00054 Salesmanship 2 02-03 24-25 23-24 01-02 13-14 22-23 01-02 24-25 02-03 26-27 23-24 02-03 4.500.00055 SELLING SKILLS 2 08-09 06-07 02-03 06-07 19-20 04-05 08-09 06-07 09-10 08-09 05-06 09-10 4.500.00056 Service Excellence 2 09-10 03-04 02-03 07-08 18-19 02-03 09-10 03-04 10-11 05-06 02-03 10-11 4.500.00057 SERVICE EXCELLENT 2 15-16 10-11 09-10 15-16 07-08 08-09 15-16 10-11 16-17 12-13 09-10 16-17 4.500.00058 Service Quality (Level Basic) 2 13-14 19-20 18-19 13-14 19-20 17-18 13-14 20-21 14-15 21-22 18-19 14-15 4.500.00059 Service Quality (Level Intermediate) 2 22-23 26-27 23-24 22-23 06-07 24-25 22-23 26-27 23-24 28-29 25-26 23-24 4.500.00060 Solution Selling Skill For Pharmaceutical Industry 2 29-30 20-21 19-20 29-30 18-19 18-19 29-30 20-21 30-01 22-23 19-20 30-31 4.500.00061 Soul Selling 2 06-07 05-06 04-05 06-07 19-20 04-05 06-07 05-06 07-08 07-08 04-05 07-08 4.500.000

62SPEAKING FOR BUSINESS (PRESENTATION, NEGOTIATION &LOBBYING)

2 20-21 17-18 23-24 20-21 18-19 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

63 STRATEGI KOMUNIKASI PEMASARAN PRODUK DAN JASA KOPERASI 2 27-28 27-28 23-24 29-30 18-19 25-26 29-30 27-28 28-29 29-30 26-27 30-31 4.500.000

64 Strategic Way Of Selling 2 29-30 05-06 04-05 29-30 14-15 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.00065 STUDI KELAYAKAN BISNIS – Konsep dan Aplikasi 2 02-03 24-25 23-24 02-03 11-12 22-23 02-03 24-25 03-04 26-27 23-24 03-04 4.500.000

66TEKNIK MELAYANI KONSUMEN KECEWA (HOW TO WINNING BACKUPSET CUSTOMER)

2 29-30 27-28 23-24 27-28 13-14 25-26 27-28 27-28 30-01 29-30 26-27 28-29 4.500.000

67 The 7 Skills of Salesmanship 2 02-03 26-27 23-24 02-03 07-08 24-25 02-03 26-27 03-04 28-29 25-26 03-04 4.500.00068 The AIDDA-SPIN Selling System 2 08-09 06-07 05-06 08-09 11-12 02-03 08-09 06-07 09-10 08-09 05-06 09-10 4.500.00069 The Art Of Persuasive Negotiation & Closing Sales 2 02-03 12-13 11-12 01-02 18-19 10-11 01-02 12-13 02-03 14-15 11-12 02-03 4.500.000

Page 95: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga70 USING PSYCHOLOGICAL TECHNIQUES IN SELLING 2 16-17 19-20 18-19 16-17 19-20 17-18 16-17 20-21 17-18 21-22 18-19 17-18 4.500.000

SDM - HRD - GA1 15 ETOS KERJA DAN KEPRIBADIAN 2 20-21 10-11 09-10 20-21 04-05 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.0002 ACHIEVEMENT MOTIVATION 2 02-03 03-04 02-03 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.0003 ACHIEVEMENT MOTIVATION 2 20-21 17-18 16-17 20-21 11-12 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.0004 ACHIEVEMENT MOTIVATION TRAINING 2 20-21 17-18 16-17 20-21 04-05 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.0005 ACHIEVMENT ORIENTATION 2 06-07 10-11 09-10 06-07 04-05 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.0006 Advance Supervisory Management 3 27-29 03-05 02-04 27-29 04-06 02-04 27-29 03-05 28-30 05-07 02-04 28-30 6.500.0007 ALL COMPETENCIES IN HRD MANAGEMENT 2 02-03 03-04 23-24 13-14 18-19 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

8 ANALISIS KEBUTUHAN PELATIHAN (TRAINING NEEDS ANALYSIS) 2 02-03 10-11 09-10 30-31 11-12 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.000

9 Analytical Thinking & Problem Solving 2 02-03 24-25 23-24 13-14 11-12 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.00010 ASSERTIVE COMMUNICATION SKILLS 2 27-28 24-25 23-24 27-28 18-19 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

11BEING A GREAT SUPERVISOR SUPERVISORS THE MOST IMPORTANTPOSITION OF THE ORGANIZATION OPERATIONALLY

2 20-21 03-04 02-03 20-21 18-19 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.000

12BEST PRACTICE CREATIVE THINKING & PROBLEM SOLVING TO LEADYOU SUCCESS

2 23-24 06-07 05-06 23-24 19-20 02-03 23-24 06-07 24-25 08-09 05-06 21-22 4.500.000

13 BEST PRACTICE EFFECTIVE COMMUNICATION SKILL AT WORK PLACE 2 02-03 17-18 16-17 02-03 13-14 15-16 02-03 20-21 03-04 19-20 16-17 03-04 4.500.000

14 BEST PRACTICE EFFECTIVE TRAINING NEEDS ANALYSIS (TNA) 2 09-10 24-25 23-24 06-07 18-19 22-23 09-10 24-25 10-11 26-27 23-24 10-11 4.500.00015 BUILDING COLLABORATIVE RELATIONSHIPS TRAINING 2 27-28 10-11 09-10 27-28 04-05 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.00016 CAPACITY BUILDING 2 06-07 10-11 09-10 06-07 13-14 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.00017 CHANGE MANAGEMENT 2 27-28 17-18 16-17 27-28 11-12 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.00018 CHARACTER BUILDING 2 13-14 19-20 18-19 13-14 19-20 17-18 13-14 20-21 14-15 21-22 18-19 14-15 4.500.00019 CHARACTER BUILDING 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.00020 COACHING & COUNSELING 2 13-14 17-18 16-17 13-14 11-12 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.00021 COACHING & KONSELING YANG EFEKTIF 2 06-07 03-04 02-03 06-07 06-07 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.00022 COACHING AND COUNSELING 2 27-28 24-25 23-24 27-28 11-12 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.00023 commitment to change 2 13-14 03-04 02-03 13-14 11-12 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.00024 communication for best result 2 20-21 10-11 09-10 20-21 18-19 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.00025 Comprehensive Talent Management 2 02-03 24-25 23-24 06-07 11-12 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.00026 CONFLICT MANAGEMENT 2 22-23 26-27 23-24 22-23 06-07 24-25 22-23 26-27 23-24 28-29 25-26 23-24 4.500.00027 Conflict Management & Handling Difficult People 2 02-03 13-14 12-13 30-31 18-19 11-12 29-30 13-14 31-01 15-16 12-13 30-01 4.500.00028 CONTINUOUS IMPROVEMENT 3 06-08 03-05 02-04 30-01 04-06 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.00029 CREATIVE & CONSULTATIVE SELLING 2 29-30 05-06 04-05 29-30 14-15 04-05 29-30 05-06 30-01 07-08 04-05 30-31 4.500.00030 CREATIVE & INNOVATIVE THINKING 2 13-14 12-13 11-12 13-14 13-14 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.00031 CREATIVE & INNOVATIVE THINKING 2 02-03 12-13 11-12 01-02 18-19 10-11 01-02 12-13 02-03 14-15 11-12 02-03 4.500.00032 CREATIVE PROBLEM SOLVING & DECISION MAKING 2 15-16 27-28 23-24 15-16 11-12 25-26 15-16 27-28 16-17 29-30 26-27 16-17 4.500.00033 CREATIVE PROBLEM SOLVING AND DECISION MAKING 2 20-21 24-25 23-24 20-21 19-20 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.00034 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 2 27-28 24-25 23-24 27-28 04-05 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.00035 Dasar-dasar Organisasi 2 02-03 26-27 23-24 30-31 19-20 24-25 29-30 26-27 31-01 28-29 25-26 30-01 4.500.000

Page 96: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga36 Developing Excellent Internal Trainer 3 06-08 17-19 16-18 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.00037 DIRECTING COACHING COUNSELING DELEGATING 1 06-06 24-24 23-23 06-06 18-18 22-22 06-06 24-24 07-07 26-26 23-23 07-07 2.750.00038 EFFECTIVE COMMUNICATION FOR MANAGERS 1 02-02 17-17 16-16 06-06 18-18 15-15 06-06 18-18 07-07 19-19 16-16 07-07 2.750.00039 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 2 06-07 10-11 09-10 06-07 18-19 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.00040 EFFECTIVE MEETING PLANING 2 20-21 19-20 18-19 20-21 18-19 17-18 20-21 18-19 21-22 21-22 18-19 23-24 4.500.00041 EMOTIONAL INTELLIGENCE 3 29-31 26-28 04-06 28-30 06-08 24-26 28-30 26-28 30-02 28-30 25-27 29-31 6.500.00042 EMOTIONAL INTELLIGENSI 2 27-28 05-06 04-05 27-28 06-07 04-05 27-28 05-06 28-29 07-08 04-05 28-29 4.500.00043 EMPLOYMENT RECRUITMENT & SELECTION 2 27-28 17-18 23-24 27-28 11-12 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.00044 EMPOWERING EMOTIONAL INTELLIGENCE 1 13-13 03-03 02-02 13-13 04-04 02-02 13-13 03-03 14-14 05-05 02-02 14-14 2.750.00045 Engagement and Retention 2 06-07 26-27 23-24 06-07 19-20 24-25 06-07 26-27 07-08 28-29 25-26 07-08 4.500.00046 Excellent Communication at Work 3 13-15 24-26 04-06 13-15 06-08 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

47 EXCELLENT MOTIVATION AND TEAM WORK OUTBOUND TRAINING 2 13-14 20-21 19-20 13-14 06-07 18-19 13-14 20-21 14-15 22-23 19-20 14-15 2.950.000

48 EXCELLENT SUPERVISORY SKILLS 2 02-03 05-06 23-24 01-02 14-15 04-05 01-02 05-06 02-03 07-08 04-05 02-03 4.500.00049 Fundamental Strategic Thinking Skill 2 20-21 26-27 23-24 20-21 19-20 24-25 20-21 26-27 21-22 28-29 25-26 23-24 4.500.00050 FUNDAMENTAL SUPERVISORY TRAINING 2 20-21 10-11 09-10 20-21 13-14 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.00051 GOAL SETTING 2 08-09 13-14 12-13 08-09 18-19 11-12 08-09 13-14 09-10 15-16 12-13 09-10 4.500.00052 GREAT SUPERVISOR 2 02-03 17-18 16-17 02-03 13-14 15-16 02-03 20-21 03-04 19-20 16-17 03-04 4.500.00053 HANDLING COMPLAINT SKILLS 2 09-10 24-25 23-24 06-07 18-19 22-23 09-10 24-25 10-11 26-27 23-24 10-11 4.500.00054 How To Manage & Motivate an Excellent Team 2 15-16 20-21 19-20 15-16 04-05 18-19 15-16 18-19 16-17 22-23 19-20 16-17 4.500.00055 HR Audit 2 22-23 19-20 18-19 22-23 04-05 17-18 22-23 20-21 23-24 21-22 18-19 23-24 4.500.00056 HR Audit (Audit SDM) 2 06-07 24-25 23-24 06-07 11-12 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.00057 HR for Non HR 2 23-24 19-20 18-19 23-24 18-19 17-18 23-24 20-21 24-25 21-22 18-19 23-24 4.500.00058 HRD AUDIT 2 02-03 24-25 23-24 30-31 19-20 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.00059 HRD MANAGEMENT FOR BEGINNERS 2 06-07 05-06 02-03 06-07 05-06 04-05 06-07 05-06 07-08 07-08 04-05 07-08 4.500.00060 HRD MANAGEMENT FOR NON HRD EXECUTIVES 2 13-14 11-12 09-10 15-16 13-14 09-10 15-16 11-12 16-17 13-14 10-11 16-17 4.500.00061 Human Resources Management 3 29-31 26-28 04-06 28-30 04-06 24-26 28-30 26-28 30-02 28-30 25-27 29-31 6.500.00062 Human Resources Policies And SOP HRD 2 15-16 17-18 16-17 15-16 14-15 15-16 15-16 18-19 16-17 19-20 16-17 16-17 4.500.000

63Implementation Of Payroll Admisnistration System With Excel 2010For HRD

3 08-10 19-21 18-20 07-09 11-13 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.500.000

64 IMPROVING PERFORMANCE THROUGH COACHING and COUNSELLING 2 27-28 20-21 19-20 29-30 07-08 18-19 29-30 18-19 28-29 22-23 19-20 30-31 4.500.000

65 INTEGRATED CORPORATE COMMUNICATION 2 02-03 20-21 19-20 01-02 19-20 18-19 01-02 18-19 02-03 22-23 19-20 02-03 4.500.00066 INTENSIVE COURSE HRD MANAGEMENT 3 29-31 26-28 04-06 28-30 06-08 24-26 28-30 26-28 30-02 28-30 25-27 29-31 6.500.00067 INTERNAL COMMUNICATION AND CHANGE COMMUNICATION 2 09-10 27-28 23-24 06-07 04-05 25-26 09-10 27-28 10-11 29-30 26-27 10-11 4.500.00068 INTERPERSONAL COMMUNICATION FOR SELF DEVELOPMENT 2 13-14 24-25 23-24 13-14 04-05 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.00069 Kebiasaan Efektif Menuju Sukses 2 02-03 06-07 23-24 01-02 11-12 02-03 01-02 06-07 02-03 08-09 05-06 02-03 4.500.00070 KETERAMPILAN SUPERVISI (SUPERVISORY SKILL) 3 08-10 12-14 11-13 01-03 13-15 10-12 01-03 12-14 02-04 14-16 11-13 02-04 6.500.00071 KEY PERFORMANCE INDICATORS 2 27-28 05-06 04-05 29-30 07-08 02-03 29-30 05-06 28-29 07-08 04-05 30-31 4.500.00072 Komunikasi Cerdas 2 13-14 05-06 04-05 15-16 06-07 04-05 15-16 05-06 16-17 07-08 04-05 16-17 4.500.00073 Kreativitas 2 16-17 20-21 19-20 16-17 07-08 18-19 16-17 18-19 17-18 22-23 19-20 17-18 4.500.00074 KREATIVITAS DAN INOVASI 2 23-24 24-25 23-24 23-24 11-12 22-23 23-24 24-25 24-25 26-27 23-24 21-22 4.500.00075 Leader as a C.O.A.C.H 3 29-31 12-14 18-20 28-30 18-20 10-12 28-30 12-14 30-02 14-16 11-13 29-31 6.500.000

Page 97: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga76 Managers Training of Enlightment 2 02-03 03-04 02-03 02-03 18-19 04-05 02-03 03-04 03-04 05-06 02-03 03-04 4.500.00077 MANAGING AND CONDUCTING MEETING EFFECTIVELY 2 02-03 26-27 23-24 30-31 11-12 24-25 29-30 26-27 31-01 28-29 25-26 30-01 4.500.00078 MANAGING AND SUPERVISING PEOPLE AT WORK 2 02-03 12-13 11-12 01-02 13-14 10-11 01-02 12-13 02-03 14-15 11-12 02-03 4.500.00079 MANAGING CONFLICT SKILLS 2 20-21 10-11 09-10 20-21 14-15 08-09 20-21 10-11 21-22 12-13 09-10 23-24 4.500.00080 Managing Stress for Practical Purpose 3 08-10 19-21 02-04 01-03 04-06 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.00081 MANAJEMEN WAKTU (TIME MANAGEMENT) 2 02-03 20-21 19-20 08-09 18-19 18-19 08-09 18-19 09-10 22-23 19-20 09-10 4.500.00082 MANAJEMEN KONFLIK 2 20-21 03-04 04-05 20-21 07-08 04-05 20-21 03-04 21-22 05-06 02-03 23-24 4.500.00083 MANAJEMEN PERUBAHAN 2 22-23 06-07 05-06 22-23 14-15 02-03 22-23 06-07 23-24 08-09 05-06 23-24 4.500.00084 MANAJEMEN STRATEGI (STRATEGIC MANAGEMENT) 2 15-16 27-28 23-24 15-16 04-05 25-26 15-16 27-28 16-17 29-30 26-27 16-17 4.500.00085 Manajemen Stres 1 02-02 12-12 11-11 03-03 04-04 10-10 03-03 12-12 04-04 14-14 11-11 04-04 2.750.00086 MANAJEMEN STRES 2 29-30 13-14 12-13 29-30 19-20 11-12 29-30 13-14 30-01 15-16 12-13 30-31 4.500.00087 MANAJEMEN SUMBER DAYA MANUSIA 2 02-03 20-21 19-20 02-03 04-05 18-19 02-03 18-19 03-04 22-23 19-20 03-04 4.500.00088 Manajemen Supervisi 3 06-08 17-19 16-18 07-09 13-15 15-17 06-08 19-21 07-09 19-21 16-18 07-09 6.500.000

89 MEMBANGUN BUDAYA PERUSAHAAN YANG KUAT DAN UNGGUL 2 02-03 19-20 18-19 30-31 19-20 17-18 29-30 18-19 31-01 21-22 18-19 30-01 4.500.000

90 MEMBINA KELOMPOK KERJA 3 22-24 05-07 04-06 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 21-23 6.500.000

91MEMOTIVASI ANGGOTA TIM DAN STAF UNTUK MENINGKATKANPRODUKTIVITAS MEREKA

2 06-07 27-28 23-24 08-09 04-05 25-26 06-07 27-28 07-08 29-30 26-27 07-08 4.500.000

92 MENGOPTIMALKAN KINERJA KARYAWAN BACK OFFICE 2 13-14 05-06 05-06 13-14 11-12 02-03 13-14 05-06 14-15 07-08 04-05 14-15 4.500.00093 MENINGKATKAN KECERDASAN EMOSI 2 09-10 27-28 23-24 06-07 11-12 25-26 09-10 27-28 10-11 29-30 26-27 10-11 4.500.00094 MENTALITAS DASAR 3 29-31 10-12 09-11 27-29 18-20 08-10 27-29 10-12 30-02 12-14 09-11 28-30 6.500.00095 METAZONE Class 1 20-20 03-03 02-02 20-20 11-11 02-02 20-20 03-03 21-21 05-05 02-02 21-21 2.750.00096 MY VALUE… SEBUAH TRAINING MOTIVASI UNTUK KARYAWAN 2 02-03 24-25 23-24 02-03 05-06 22-23 02-03 24-25 03-04 26-27 23-24 03-04 4.500.00097 NEGOTIATION AND LOBBYING SKILLS FOR DECISION MAKER 2 13-14 10-11 09-10 13-14 14-15 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000

98OUTSOURCING MANAGEMENT MEMBERDAYAKAN TENAGA MITRAKERJA (TMK) DI PERUSAHAAN

2 30-31 26-27 23-24 29-30 06-07 24-25 29-30 26-27 01-02 28-29 25-26 30-31 4.500.000

99 OUTSOURCING MANAGEMENT Memberdayakan Tenaga Outsourcing 2 20-21 20-21 19-20 20-21 19-20 18-19 20-21 20-21 21-22 22-23 19-20 21-22 4.500.000

100 PELATIHAN TEAM WORK 2 02-03 03-04 04-05 02-03 04-05 02-03 02-03 03-04 03-04 05-06 02-03 03-04 4.500.000101 PENGAMBILAN KEPUTUSAN (DECISION MAKING) 2 02-03 17-18 16-17 30-31 06-07 15-16 29-30 20-21 31-01 19-20 16-17 30-01 4.500.000102 Perilaku Organisasi 3 22-24 10-12 09-11 22-24 18-20 08-10 22-24 10-12 23-25 12-14 09-11 21-23 6.500.000103 Personal Development 2 02-03 24-25 23-24 30-31 13-14 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000104 Personal Excellence Winner Attitude 3 15-17 26-28 09-11 07-09 11-13 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.000105 PERSONALITY DEVELOPMENT FOR HIGH 2 02-03 26-27 23-24 30-31 07-08 24-25 29-30 26-27 31-01 28-29 25-26 30-01 4.500.000106 POWERFUL COMMUNICATION SKILL 2 08-09 17-18 16-17 08-09 14-15 15-16 08-09 18-19 09-10 19-20 16-17 09-10 4.500.000107 POWERFUL SUPERVISOR DEVELOPMENT PROGRAM 2 30-31 13-14 12-13 27-28 11-12 11-12 27-28 13-14 01-02 15-16 12-13 28-29 4.500.000108 Practical Problem Solving 2 20-21 13-14 12-13 20-21 07-08 11-12 20-21 13-14 21-22 15-16 12-13 23-24 4.500.000109 PRESENTATION AND EFFECTIVE COMMUNICATION SKILLS 2 02-03 03-04 23-24 08-09 19-20 04-05 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000110 PROBLEM SOLVING & DECISION MAKING 1 22-22 21-21 20-20 22-22 04-04 19-19 22-22 20-20 23-23 23-23 20-20 21-21 2.750.000111 Profesional General Affair Officer With Data Processing 2 02-03 06-07 23-24 08-09 18-19 02-03 08-09 06-07 09-10 08-09 05-06 09-10 4.500.000

112 PROSDEM Pemecahan Masalah dan Pengambilan Keputusan 3 27-29 17-19 16-18 27-29 06-08 15-17 27-29 19-21 28-30 19-21 16-18 28-30 6.500.000

113 Self Coaching for Life Optimization 2 20-21 03-04 02-03 20-21 11-12 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.000

Page 98: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga114 SELF EMPOWERING TRAINING 2 07-08 04-05 03-04 07-08 14-15 03-04 07-08 04-05 08-09 06-07 03-04 08-09 4.500.000115 SERVICE WITH DELIGHT (FOR GA & SUPPORT TEAM ) 2 09-10 24-25 23-24 06-07 06-07 22-23 09-10 24-25 10-11 26-27 23-24 10-11 4.500.000116 SMART GOALS SETTING 1 20-20 19-19 18-18 20-20 07-07 17-17 20-20 20-20 21-21 21-21 18-18 21-21 2.750.000117 Star Employee 2 23-24 17-18 16-17 23-24 14-15 15-16 23-24 18-19 24-25 19-20 16-17 23-24 4.500.000

118STRATEGIC HUMAN RESOURCE MANAGEMENT AND ORGANIZATIONDEVELOPMENT

3 15-17 03-05 02-04 15-17 13-15 03-05 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000

119 STRESS MANAGEMENT FOR PRODUCTIVE PEOPLE 1 27-27 10-10 09-09 27-27 19-19 08-08 27-27 10-10 28-28 12-12 09-09 28-28 2.750.000120 SUPERVISORY MANAGEMENT 2 02-03 24-25 23-24 30-31 19-20 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000121 SUPERVISORY PROGRAM 2 22-23 10-11 09-10 22-23 18-19 08-09 22-23 10-11 23-24 12-13 09-10 23-24 4.500.000122 TABLE MANNER & GROOMING 2 13-14 12-13 11-12 13-14 18-19 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.000123 Talent Management 2 02-03 27-28 23-24 01-02 07-08 25-26 01-02 27-28 02-03 29-30 26-27 02-03 4.500.000124 TEAM & COMMITMENT BUILDING 2 06-07 05-06 04-05 08-09 07-08 02-03 06-07 05-06 07-08 07-08 04-05 07-08 4.500.000125 TEAM BUILDING 2 27-28 26-27 23-24 29-30 18-19 24-25 29-30 26-27 28-29 28-29 25-26 30-31 4.500.000126 TEAM BUILDING SESSION 2 14-15 12-13 11-12 14-15 19-20 10-11 14-15 12-13 15-16 14-15 11-12 15-16 4.500.000127 TEKNIK HUBUNGAN ANTAR MANUSIA 2 16-17 03-04 23-24 16-17 18-19 04-05 16-17 03-04 17-18 05-06 02-03 17-18 4.500.000128 Teknik Rapat 2 30-31 26-27 23-24 29-30 19-20 24-25 29-30 26-27 01-02 28-29 25-26 30-31 4.500.000129 Teknik Wawancara 1 02-02 05-05 04-04 03-03 06-06 04-04 03-03 05-05 04-04 07-07 04-04 04-04 2.750.000130 Teknik Wawancara Investigasi Berbasis NLP 2 09-10 06-07 05-06 08-09 07-08 04-05 09-10 06-07 10-11 08-09 05-06 10-11 4.500.000131 TFT -FOR ICE BREAKER 2 06-07 06-07 05-06 08-09 19-20 02-03 06-07 06-07 07-08 08-09 05-06 07-08 4.500.000132 The Champion Training 2 06-07 10-11 09-10 08-09 14-15 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000133 TIME MANAGEMENT 2 09-10 12-13 11-12 08-09 11-12 10-11 09-10 12-13 10-11 14-15 11-12 10-11 4.500.000134 TRAINING FOR TRAINERS (TOT) 2 13-14 12-13 11-12 13-14 14-15 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.000135 TRAINING FOR TRAINER 2 22-23 17-18 16-17 22-23 04-05 15-16 22-23 20-21 23-24 19-20 16-17 21-22 4.500.000136 TRAINING FOR TRAINER 2 30-31 10-11 09-10 29-30 04-05 08-09 29-30 10-11 01-02 12-13 09-10 30-31 4.500.000137 Training for Trainers 2 15-16 17-18 16-17 15-16 18-19 15-16 15-16 20-21 16-17 19-20 16-17 16-17 4.500.000138 Training Management 2 22-23 27-28 23-24 22-23 07-08 25-26 22-23 27-28 23-24 29-30 26-27 21-22 4.500.000139 Training Need Analysis which Comprehensive And Effective 2 15-16 13-14 12-13 13-14 07-08 11-12 13-14 13-14 14-15 15-16 12-13 14-15 4.500.000140 UP TO A 5-STAR SERVICE 2 23-24 17-18 16-17 23-24 13-14 15-16 23-24 20-21 24-25 19-20 16-17 21-22 4.500.000141 Work Force Management 2 27-28 06-07 05-06 27-28 11-12 04-05 27-28 06-07 28-29 08-09 05-06 28-29 4.500.000142 Workforce Management 2 23-24 20-21 19-20 23-24 04-05 18-19 23-24 18-19 24-25 22-23 19-20 21-22 4.500.000143 Working as a Team Excellence 3 06-08 17-19 11-13 27-29 13-15 15-17 27-29 18-20 28-30 19-21 16-18 28-30 6.500.000

144 Workload Analysis Implementation With Excel 2007 for HR & Non HR 2 20-21 20-21 19-20 20-21 11-12 18-19 20-21 18-19 21-22 22-23 19-20 23-24 4.500.000

Mining/Tambang - Mineral - Batubara1

BEST PRACTICE SCM DAN STRATEGIC INVENTORY CONTROL ANDWAREHOUSING PERUSAHAAN TAMBANG DAN MIGAS

3 06-08 03-05 09-11 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000

2TUMPANG TINDIH LAHAN PERTAMBANGAN DAN ISSUE TENTANNGSMELTER

2 13-14 24-25 23-24 13-14 11-12 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.000

Page 99: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

PUBLIC TRAINING SCHEDULE 2020 DI YOGYAKARTA 

Page 100: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

Accounting - Finance/Keuangan - Tax/Pajak

1 ACCOUNTING AND FINANCE FOR NON-FINANCIAL MANAGERS 3 27-29 24-26 02-04 13-15 04-06 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.0002 ACCOUNTING, FINANCE, AND TAX FOR MINING COMPANY 3 27-29 03-05 02-04 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.0003 ANALISA LAPORAN KEUANGAN 2 02-03 17-18 23-24 30-31 18-19 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.0004 ANALISA LAPORAN KEUANGAN DASAR 2 02-03 05-06 23-24 06-07 19-20 04-05 06-07 05-06 07-08 07-08 04-05 07-08 4.500.0005 ASPEK LEGAL LEMBAGA KEUANGAN SYARIAH 3 13-15 17-19 16-18 13-15 11-13 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.0006 ASPEK LEGAL PERBANKAN SYARIAH 3 20-22 24-26 02-04 20-22 18-20 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.0007 BANKING FRAUD AND PREVENTIONS 2 02-03 24-25 23-24 06-07 19-20 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.0008 BASIC ACCOUNTING 3 06-08 03-05 09-11 20-22 11-13 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.0009 BRANDING STRATEGY FOR RETAIL BANKING 2 02-03 03-04 23-24 13-14 18-19 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

10 CARA EFEKTIF MELAKUKAN PROSES PENAGIHAN HUTANG 2 27-28 10-11 09-10 27-28 04-05 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.00011 COMMERCIAL FINANCIAL AWARENESS 3 29-31 19-21 04-06 01-03 13-15 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.000

12COST CONTROL AND FINANCIAL REPORTING OF THE UPSTREAMOPERATION OF OIL AND GAS UNDER INDONESIA PSC

3 06-08 24-26 02-04 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

13 EFFECTIVE MANAGEMENT USING FINANCIAL PERFORMANCE 3 20-22 10-12 02-04 22-24 11-13 08-10 22-24 10-12 23-25 12-14 09-11 22-24 6.500.00014 FINANCIAL MODELLING AND DECISION MAKING 3 13-15 03-05 04-06 06-08 13-15 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.00015 FINANCIAL RISK MANAGEMENT 3 22-24 12-14 09-11 13-15 18-20 10-12 13-15 12-14 14-16 14-16 11-13 14-16 6.500.00016 FINANCIAL STATEMENT ANALYSIS 3 13-15 10-12 16-18 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.00017 INTERNAL CONTROL OVER FINANCIAL STATEMENT 2 02-03 26-27 23-24 29-30 18-19 24-25 29-30 26-27 30-01 28-29 25-26 30-31 4.500.00018 KREDIT BERMASALAH 2 02-03 17-18 23-24 20-21 11-12 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.00019 LEMBAGA KEUANGAN MIKRO SYARIAH 3 27-29 10-12 02-04 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.00020 MANAJEMEN PENGEMBANGAN PRODUK PERBANKAN 4 13-16 10-13 02-05 06-09 04-07 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.000

21MARKETING INTELLIGENCE FOR ENHANCING CUSTOMER RELATIONSIN RETAIL BANKING SERVICES

2 13-14 12-13 23-24 15-16 13-14 10-11 15-16 12-13 16-17 14-15 11-12 16-17 4.500.000

22MEMPERKUAT STRATEGI PENGANGGARAN DAN MENGEKSPLORASIPERAMALAN, PENGENDALIAN BIAYA DAN MASALAH PERILAKU

2 08-09 27-28 23-24 08-09 14-15 25-26 08-09 27-28 09-10 29-30 26-27 09-10 4.500.000

23 PAJAK PENGHASILAN 3 27-29 03-05 09-11 13-15 04-06 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.500.00024 PEMBELAJARAN AKUNTANSI IFRS 2 02-03 19-20 23-24 22-23 14-15 17-18 22-23 20-21 23-24 21-22 18-19 23-24 4.500.00025 Perhitungan Unit Cost 3 06-08 24-26 16-18 27-29 04-06 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.00026 REDUCTION COST DENGAN ACTIVITY BASED COST (ABC) SYSTEM 3 20-22 10-12 02-04 13-15 11-13 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

27SISTEMATIKA DAN STRATEGI PENANGANAN KREDIT BERMASALAHDENGAN KONSEP ORIENTASI PADA PROFIT

3 20-22 10-12 09-11 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

28 STRATEGIC FINANCIAL MANAGEMENT 3 15-17 05-07 04-06 20-22 13-15 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.00029 TOTAL COST OF OWNERSHIP ANALYSIS 3 13-15 17-19 18-20 27-29 18-20 15-17 27-29 18-20 30-02 19-21 16-18 28-30 6.500.000

Boiler - Turbin - Generator

PUBLIC TRAINING SCHEDULE 2020 DI YOGYAKARTA

Page 101: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga1 Alignment 4 07-10 18-21 02-05 06-09 04-07 16-19 06-09 18-21 07-10 20-23 17-20 07-10 8.500.000

2ALIGNMENT PRESISI, ALAT UKUR DAN ALAT BANTUPENGUKURANNYA

4 27-30 10-13 16-19 31-03 12-15 08-11 30-03 10-13 01-04 12-15 09-12 01-04 8.500.000

3 ANTI SURGE CENTRIFUGAL COMPRESSOR 4 14-17 25-28 10-13 13-16 11-14 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.0004 BALANCING AND TOTAL ALIGNMENT 4 28-31 17-20 03-06 30-02 05-08 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.0005 BASIC GAS COMPRESSOR OPERATION & MAINTENANCE 3 13-15 17-19 02-04 13-15 04-06 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.0006 Boiler combustion analysis and optimizing 4 13-16 03-06 16-19 14-17 04-07 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.500.000

7CENTRIFUGAL COMPRESSOR PERFORMANCE & CONDITIONEVALUATION

4 27-30 10-13 10-13 27-30 12-15 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

8 COMPRESSOR OPERATION, MAINTENANCE & TROUBLESHOOTING 4 07-10 18-21 17-20 30-02 04-07 16-19 29-02 18-21 31-03 20-23 17-20 30-03 8.500.000

9 Gas Turbine Operation, Maintenace & Control System 4 06-09 24-27 02-05 27-30 12-15 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.00010 OPERASI DAN PERAWATAN SISTEM POMPA SENTRIFUGAL 4 07-10 11-14 16-19 20-23 04-07 09-12 20-23 11-14 21-24 13-16 10-13 21-24 8.500.00011 POWER GENERATOR & AVR 4 21-24 25-28 16-19 21-24 12-15 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.00012 POWER GENERATOR DAN AUTOMATIC VOLTAGE REGULATOR 4 06-09 10-13 02-05 06-09 05-08 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.00013 PUMP OPERATION, MAINTENANCE & TROUBLESHOOTING 4 13-16 24-27 09-12 21-24 11-14 22-25 21-24 24-27 22-25 26-29 23-26 21-24 8.500.00014 RECIPROCATING COMPRESSOR 3 06-08 10-12 04-06 15-17 18-20 08-10 15-17 10-12 16-18 12-14 09-11 16-18 6.500.00015 Vibration and Alignment 4 07-10 25-28 02-05 06-09 12-15 23-26 07-10 25-28 08-11 27-30 24-27 08-11 8.500.000

Electrical1 4G LTE RF PLANNING 2 02-03 03-04 02-03 30-31 04-05 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.0002 AC DC Electrical Motor Drive 4 28-31 04-07 02-05 27-30 05-08 02-05 27-30 04-07 29-02 06-09 03-06 28-31 8.500.000

3ADVANCED ELECTRICAL MOTOR (Operation maintenancetroubleshooting and Failure)

4 07-10 11-14 09-12 31-03 11-14 09-12 30-03 11-14 01-04 13-16 10-13 01-04 8.500.000

4 ALARM AND PROTECTIVE DEVICES 4 06-09 17-20 09-12 06-09 04-07 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.0005 ARC Flash Protection For Electrical Safety Professionals 2 02-03 10-11 23-24 27-28 18-19 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.0006 AUDIT DAN MANAJEMEN ENERGI LISTRIK 3 20-22 24-26 16-18 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.0007 AUDIT ENERGY AND POWER SYSTEM MANAGEMENT 4 27-30 03-06 02-05 20-23 11-14 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.0008 BASIC ELECTRICAL 3 06-08 10-12 09-11 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.0009 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 13-15 17-19 18-20 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

10 DISTRIBUTED CONTROL SYSTEM (DCS) PRINCIPLES AND APPLICATION 4 21-24 25-28 03-06 06-09 04-07 23-26 06-09 25-28 07-10 27-30 24-27 07-10 8.500.000

11 Distributed Control Systems (DCS), Operation, and Maintenance 4 21-24 11-14 09-12 13-16 11-14 09-12 13-16 11-14 14-17 13-16 10-13 14-17 8.500.000

12 DISTRIBUTION SYSTEM FUZZY LOGIC & METERING LOAD CONTROL 4 28-31 04-07 10-13 14-17 12-15 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.000

13 ELECTRIC MOTOR SYSTEM PRINCIPLES, APPLICATIONS & CONTROL 4 07-10 11-14 16-19 21-24 05-08 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.000

14 ELECTRICAL MACHINES, DRIVES, TRANSFORMER AND POWER SYSTEM 3 15-17 19-21 02-04 28-30 18-20 17-19 28-30 19-21 30-02 21-23 18-20 29-31 6.500.000

15 Electrical Maintenance 4 14-17 18-21 17-20 06-09 04-07 16-19 07-10 18-21 08-11 20-23 17-20 08-11 8.500.00016 ELECTRICAL POWER SYSTEM ANALYSIS AND PROTECTION 4 20-23 24-27 09-12 31-03 11-14 22-25 30-03 24-27 01-04 26-29 23-26 01-04 8.500.00017 ELECTRICAL SAFETY 4 27-30 03-06 17-20 06-09 04-07 02-05 07-10 03-06 08-11 05-08 02-05 08-11 8.500.000

Page 102: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga18 ELECTRICAL SAFETY EXPLOSION 4 14-17 18-21 16-19 06-09 12-15 16-19 07-10 18-21 08-11 20-23 17-20 08-11 8.500.00019 ENGINEERING IN MINING - POWER SYSTEM PROTECTION 4 20-23 24-27 02-05 14-17 04-07 22-25 14-17 24-27 15-18 26-29 23-26 15-18 8.500.00020 ESTIMASI PROYEK KELISTRIKAN 4 06-09 10-13 03-06 13-16 12-15 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.00021 FIRE PREVENTION & PROTECTION SYSTEM 4 13-16 17-20 10-13 20-23 05-08 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.00022 FUNDAMENTAL CONTROLLER AND VALVE 4 20-23 24-27 09-12 27-30 04-07 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.00023 GARDU INDUK 3 22-24 26-28 16-18 27-29 18-20 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.00024 GROUNDING SYSTEM 4 28-31 04-07 02-05 30-02 11-14 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.00025 Induction Machine Maintenance 2 02-03 17-18 23-24 30-31 19-20 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.00026 INDUSTRIAL CONTROL SYSTEMS 4 27-30 03-06 10-13 21-24 11-14 02-05 21-24 03-06 22-25 05-08 02-05 21-24 8.500.00027 INDUSTRIAL PROCESS CONTROL & INSTRUMENTATION 3 08-10 12-14 09-11 06-08 18-20 10-12 06-08 12-14 07-09 14-16 11-13 07-09 6.500.00028 Infrared Thermography 4 20-23 24-27 03-06 13-16 12-15 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.00029 INSTRUMENT CONTROL AND SAFETY 4 13-16 03-06 10-13 30-02 04-07 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.00030 INSTRUMENTATION AND CALIBRATION 4 14-17 18-21 17-20 14-17 04-07 16-19 14-17 18-21 15-18 20-23 17-20 15-18 8.500.00031 Instrumentation Electric and Control System 4 27-30 03-06 10-13 20-23 05-08 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.00032 LABVIEW (PROGRAMMING AND INTERFACING) 3 15-17 19-21 11-13 27-29 18-20 17-19 27-29 18-20 30-02 21-23 18-20 28-30 6.950.00033 LIGTNING PROTECTION & GROUNDING SYSTEM 3 20-22 24-26 04-06 22-24 18-20 22-24 22-24 24-26 23-25 26-28 23-25 21-23 6.500.00034 Management and Audit Energy 4 13-16 17-20 10-13 14-17 04-07 15-18 14-17 18-21 15-18 19-22 16-19 15-18 8.500.000

35Manajemen Perawatan gedung dan fasilitas serta pencegahannyaterhadap bahaya kebakaran

4 06-09 10-13 16-19 27-30 11-14 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

36 MEKATRONIKA 4 27-30 03-06 10-13 27-30 12-15 02-05 27-30 03-06 29-02 05-08 02-05 28-31 8.500.00037 Mengaplikasikan Teknik Pencahayaan 4 13-16 17-20 02-05 30-02 04-07 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.00038 MICROCONTROLLER APPLICATION IN INDUSTRIAL PLANTS 3 06-08 10-12 16-18 01-03 18-20 08-10 01-03 10-12 02-04 12-14 09-11 02-04 6.500.00039 MV SWITCHGEAR & Power Circuit Breaker 4 27-30 03-06 17-20 30-02 05-08 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.00040 PEMBANGKIT DAN DISTRIBUSI LISTRIK 3 13-15 17-19 02-04 07-09 18-20 15-17 08-10 18-20 09-11 19-21 16-18 09-11 6.500.00041 PEMBANGKIT dan PENGUKURAN LISTRIK TEGANGAN TINGGI 4 27-30 03-06 16-19 30-02 11-14 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.00042 Pengambilan Data dan Kontrol Kualitas 4 07-10 25-28 09-12 21-24 12-15 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.00043 Perlengkapan Dan Sistem Distribusi Tegangan Tinggi 3 06-08 26-28 18-20 06-08 18-20 24-26 06-08 26-28 07-09 28-30 25-27 07-09 6.500.000

44 POWER DISTRIBUTION SYSTEM OPERATION AND CHARACTERISTIC 3 22-24 26-28 09-11 13-15 18-20 24-26 13-15 26-28 14-16 28-30 25-27 14-16 6.500.000

45 POWER DISTRIBUTION SYSTEM PROTECTION AND RELAYING 4 28-31 04-07 17-20 20-23 05-08 02-05 20-23 04-07 21-24 06-09 03-06 21-24 8.500.00046 Power Generation Operation & Control 4 06-09 10-13 03-06 06-09 11-14 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.00047 POWER GENERATOR & AVR 4 21-24 25-28 16-19 21-24 12-15 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.00048 POWER GENERATOR DAN AUTOMATIC VOLTAGE REGULATOR 4 06-09 10-13 02-05 06-09 05-08 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.00049 POWER MANAGEMENT SYSTEM 3 08-10 12-14 04-06 27-29 18-20 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.00050 PRESSURE TRANSMITTER 4 20-23 24-27 09-12 27-30 12-15 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.00051 PREVENTIVE DAN PERBAIKAN MESIN LAS LISTRIK 4 13-16 17-20 10-13 13-16 12-15 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.00052 PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT 4 14-17 18-21 10-13 30-02 11-14 16-19 29-02 18-21 31-03 20-23 17-20 30-03 8.500.00053 PROCESS CONTROL AND LOOP 4 20-23 24-27 16-19 06-09 04-07 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.500.000

54PROGRAMMABLE LOGIC CONTROLLER (PLC) ADVANCED ANDAPPLICATED

4 27-30 03-06 02-05 14-17 12-15 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.500.000

55PROGRAMMABLE LOGIC CONTROLLER (PLC) PRINCIPLES, HARDWAREAND SOFTWARE, DIAGNOSTICS AND TROUBLESHOOTING

4 06-09 10-13 09-12 21-24 05-08 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.500.000

Page 103: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga56 SCADA 4 20-23 10-13 09-12 27-30 11-14 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.00057 SOLAR PHOTOVOLTAIC BUILDING SYSTEM 4 28-31 18-21 16-19 27-30 12-15 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.500.00058 STABILITAS SISTEM TENAGA LISTRIK 4 21-24 25-28 17-20 20-23 04-07 23-26 20-23 25-28 21-24 27-30 24-27 21-24 8.500.00059 SUBSTATION EQUIPMENT & CONTROL RELAY 4 28-31 04-07 03-06 27-30 11-14 02-05 27-30 04-07 29-02 06-09 03-06 28-31 8.500.00060 SUBSTATION SWITCHYARD 150 KV 3 15-17 19-21 02-04 20-22 18-20 17-19 20-22 18-20 21-23 21-23 18-20 21-23 6.500.000

61 SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA) 4 13-16 17-20 17-20 27-30 11-14 15-18 27-30 18-21 29-02 19-22 16-19 28-31 8.500.000

62 Switchgear MCC Electrical Syatem and Troubleshooting 4 21-24 25-28 09-12 06-09 12-15 23-26 06-09 25-28 07-10 27-30 24-27 07-10 8.500.00063 TEKNIK INSTALASI DAN PROTEKSI LISTRIK 3 22-24 26-28 04-06 01-03 18-20 24-26 01-03 26-28 02-04 28-30 25-27 02-04 6.500.000

64TEKNIK LISTRIK TEGANGAN RENDAH & TINGGI DANELEKTROINSTRUMENT

4 28-31 04-07 10-13 06-09 04-07 02-05 07-10 04-07 08-11 06-09 03-06 08-11 8.500.000

65 Teknik Proteksi Korosi 3 13-15 05-07 04-06 13-15 18-20 02-04 13-15 05-07 14-16 07-09 04-06 14-16 6.500.00066 TRANSMISI DAN DISTRIBUSI LISTRIK 3 08-10 12-14 16-18 13-15 18-20 10-12 13-15 12-14 14-16 14-16 11-13 14-16 6.500.00067 UN INTERRUPTIBLE POWER SUPPLY (UPS) 4 07-10 11-14 09-12 31-03 05-08 09-12 30-03 11-14 01-04 13-16 10-13 01-04 8.500.000

68Uninterruptible Power Supply (UPS) Power Supply Analysis andTroubleshooting

4 28-31 04-07 17-20 14-17 05-08 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.000

69 Variable Frequency Drive or Variable Speed Drives 4 21-24 11-14 09-12 20-23 05-08 09-12 20-23 11-14 21-24 13-16 10-13 21-24 8.500.00070 Variable Speed Drive 4 27-30 18-21 16-19 30-02 05-08 16-19 29-02 18-21 31-03 20-23 17-20 30-03 8.500.000

Engineering1 Amoniak Handling Fasilities 4 20-23 03-06 17-20 27-30 04-07 02-05 27-30 03-06 29-02 05-08 02-05 28-31 8.500.0002 Audit Energi pada Pembangkit Listrik 3 08-10 12-14 04-06 22-24 18-20 10-12 22-24 12-14 23-25 14-16 11-13 21-23 6.950.0003 AUDIT HASIL PEKERJAAN KONSTRUKSI 4 27-30 03-06 02-05 20-23 04-07 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.0004 Aviation & Airport Operations 2 02-03 06-07 23-24 06-07 18-19 04-05 06-07 06-07 07-08 08-09 05-06 07-08 4.500.0005 BEST PRACTICE IN BUILDING MAINTENANCE 4 06-09 10-13 09-12 27-30 12-15 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.0006 Building Maintanance 3 06-08 10-12 09-11 30-01 11-13 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

7 CHEMICAL ENGINEERING FUNDAMENTALS FOR NON ENGINEER 4 13-16 24-27 16-19 30-02 11-14 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.500.000

8 Coating and Corrosion Protection 4 20-23 10-13 02-05 21-24 11-14 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.500.000

9 CONSTRUCTION METHODS AND CONSTRUCTION MANAGEMENT 4 21-24 25-28 03-06 06-09 11-14 23-26 06-09 25-28 07-10 27-30 24-27 07-10 8.500.000

10 CORROSION AND SCALING PREVENTION 4 27-30 18-21 10-13 27-30 05-08 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.500.00011 CORROSION MANAGEMENT 4 14-17 25-28 03-06 06-09 11-14 23-26 07-10 25-28 08-11 27-30 24-27 08-11 8.500.00012 DASAR TEKNIK KENDALI UNTUK INDUSTRI 4 27-30 03-06 02-05 27-30 04-07 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.00013 DRAUGHT SURVEY 3 27-29 03-05 09-11 20-22 11-13 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.950.00014 GREEN BUILDING CONCEPT 4 28-31 04-07 10-13 14-17 04-07 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.00015 INDUSTRIAL AUTOMATION & CONTROL 4 28-31 11-14 16-19 21-24 12-15 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.000

16INSTRUMENTASI PENGUKURAN LANJUT (ADVANCEINSTRUMENTATION)

4 06-09 17-20 02-05 27-30 04-07 15-18 27-30 18-21 29-02 19-22 16-19 28-31 8.500.000

17 INSTRUMENTASI, ALAT UKUR DAN PENGUKURAN 4 20-23 03-06 09-12 27-30 05-08 02-05 27-30 03-06 29-02 05-08 02-05 28-31 8.500.00018 INSTRUMENTATION AND CONTROL SYSTEMS 4 20-23 24-27 02-05 20-23 11-14 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.500.00019 INTRODUCTION AVIATION & AIRPORT OPERATIONS 3 27-29 24-26 02-04 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.750.00020 Kalibrasi 4 20-23 10-13 17-20 06-09 11-14 08-11 07-10 10-13 08-11 12-15 09-12 08-11 8.500.000

Page 104: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga21 MANAJEMEN PERAWATAN BANGUNAN GEDUNG 3 27-29 03-05 16-18 30-01 11-13 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.00022 MANAJEMEN PROYEK KONSTRUKSI 3 06-08 10-12 02-04 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

23POTENSI KESALAHAN PADA SISTEM PENGUKURAN, SENSOR, DANINSTRUMENTASI PENGUKURAN

4 07-10 18-21 09-12 20-23 04-07 16-19 20-23 18-21 21-24 20-23 17-20 21-24 8.500.000

24 PROCESS CONTROL INSTRUMENTATION 4 14-17 25-28 16-19 27-30 11-14 23-26 27-30 25-28 28-01 27-30 24-27 28-31 8.500.00025 QA & QC PEMELIHARAAN BANGUNAN GEDUNG 3 13-15 17-19 09-11 13-15 04-06 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.00026 QUALITY ASSURANCE FOR ENGINEER 3 20-22 24-26 18-20 20-22 13-15 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.00027 Risk Management Expect 4 06-09 24-27 17-20 13-16 12-15 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.00028 SCADA UNTUK ENGINEER 4 21-24 04-07 02-05 30-02 05-08 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.00029 SCADA UNTUK OPERATOR & TEKNISI 4 28-31 11-14 10-13 06-09 12-15 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.500.00030 SHIP’S HANDLING 3 27-29 05-07 11-13 27-29 13-15 03-05 27-29 05-07 28-30 07-09 04-06 28-30 6.500.00031 SISTEM PENGUKURAN DAN KALIBRASI 4 06-09 17-20 17-20 14-17 04-07 15-18 14-17 18-21 15-18 19-22 16-19 15-18 8.500.00032 SUPERVISI PROYEK BANGUNAN GEDUNG 3 20-22 24-26 02-04 13-15 04-06 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

Export Import119 CUSTOM PROCEDURE, SHIPPING & EXPORT-IMPORT DOCUMENT 3 13-15 17-19 11-13 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

117 INCOTERM DALAM EKSPOR-IMPOR 3 27-29 03-05 16-18 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.000

Health, Safety & Environment (HSE)1 ALARM AND PROTECTIVE DEVICES 4 06-09 17-20 09-12 06-09 04-07 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.0002 Basic Safety 2 02-03 10-11 23-24 20-21 04-05 08-09 20-21 10-11 21-22 12-13 09-10 21-22 5.500.0003 BASIC SAFETY MANAGEMENT 3 20-22 24-26 09-11 06-08 18-20 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.500.0004 DANGEROUS GOODS 2 02-03 10-11 23-24 20-21 18-19 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.0005 EFFLUENT PRODUCED WASTE WATER 4 20-23 03-06 02-05 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.0006 ELECTRICAL SAFETY 4 27-30 03-06 17-20 06-09 04-07 02-05 07-10 03-06 08-11 05-08 02-05 08-11 8.500.0007 H2S AWARENESS 4 27-30 10-13 09-12 13-16 12-15 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.0008 HACCP 2 02-03 19-20 23-24 22-23 18-19 17-18 22-23 20-21 23-24 21-22 18-19 23-24 5.500.0009 HACCP (HAZARD ANALYSIS CRITICAL CONTROL POINTS) 2 02-03 03-04 23-24 13-14 04-05 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000

10 Hazard Identification & Risk Assesment (HIRA) 2 02-03 27-28 23-24 29-30 07-08 25-26 29-30 27-28 30-01 29-30 26-27 30-31 5.500.00011 HYDROCARBON 4 21-24 04-07 10-13 31-03 04-07 02-05 30-03 04-07 01-04 06-09 03-06 01-04 8.500.00012 IMDG 3 06-08 19-21 11-13 22-24 18-20 17-19 22-24 19-21 23-25 21-23 18-20 22-24 6.750.00013 Implementasi K3 Di Sektor Pertambangan 2 02-03 13-14 23-24 06-07 19-20 11-12 09-10 13-14 10-11 15-16 12-13 10-11 5.500.00014 Incident Investigation 2 02-03 20-21 23-24 16-17 04-05 18-19 16-17 18-19 17-18 22-23 19-20 17-18 5.500.00015 Job Safety Analysis (JSA) 2 02-03 03-04 23-24 27-28 18-19 04-05 27-28 03-04 01-02 05-06 02-03 28-29 5.500.000

16KESELAMATAN DAN KESEHATAN KERJA PADA PELAKSANAAN PROYEKKONSTRUKSI

3 13-15 17-19 16-18 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

17 KESELAMATAN PELAYARAN 3 22-24 26-28 18-20 06-08 18-20 24-26 06-08 26-28 07-09 28-30 25-27 07-09 6.500.00018 Manajemen Risiko K3 2 02-03 05-06 23-24 20-21 07-08 02-03 20-21 05-06 21-22 07-08 04-05 23-24 5.500.00019 MARINE SAFETY MANAGEMENT 4 07-10 11-14 03-06 21-24 11-14 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.00020 MODERN SAFETY MANAGEMENT 3 29-31 05-07 09-11 13-15 11-13 03-05 13-15 05-07 14-16 07-09 04-06 14-16 6.500.000

21NEED ASSESMENT DAN READINESS ASSESMENT AKREDITASIPUSKESMAS

3 27-29 17-19 18-20 20-22 06-08 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

Page 105: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga22 OIL POLLUTION 4 21-24 25-28 16-19 31-03 12-15 23-26 30-03 25-28 01-04 27-30 24-27 01-04 8.500.00023 OIL TANKERS AND TERMINALS SAFETY 4 14-17 18-21 02-05 13-16 04-07 16-19 13-16 18-21 14-17 20-23 17-20 14-17 8.500.00024 Panitia Pembina Keselamatan & Kesehatan Kerja (P2K3) 2 02-03 19-20 23-24 30-31 18-19 17-18 29-30 18-19 31-01 21-22 18-19 30-01 5.500.00025 PERSONAL TRANSFER SAFETY 2 02-03 10-11 09-10 06-07 11-12 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.00026 PRODUCED WATER TREATMENT FOR RE-INJECTION 4 06-09 17-20 17-20 20-23 05-08 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.00027 Regulasi Keselamatan Kerja 2 29-30 20-21 23-24 27-28 06-07 18-19 27-28 20-21 30-01 22-23 19-20 28-29 5.500.00028 Regulasi Keselamatan Kerja Di Sektor Pertambangan 2 20-21 13-14 23-24 22-23 19-20 11-12 22-23 13-14 23-24 15-16 12-13 21-22 5.500.00029 SAFE FUEL TRANSFER 3 13-15 17-19 16-18 13-15 18-20 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.00030 SAFE NAVIGATION LESSON & ENGINE ROOM SAFETY 3 20-22 24-26 04-06 20-22 06-08 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.00031 SHIP’S SECURITY OFFICER 3 08-10 12-14 18-20 01-03 18-20 10-12 01-03 12-14 02-04 14-16 11-13 02-04 6.500.00032 SHIP’S STORAGE AND SAFE STORAGE 2 02-03 20-21 23-24 08-09 04-05 18-19 08-09 20-21 09-10 22-23 19-20 09-10 4.500.000

33 SMK3 (Sistem Manajemen Keselamatan & Kesehatan Kerja) 2 22-23 17-18 23-24 23-24 11-12 15-16 23-24 18-19 24-25 19-20 16-17 23-24 5.500.000

34 TAHAPAN DAN METODE PENYUSUNAN AMDAL 3 20-22 24-26 02-04 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.00035 TRAINING OF TRAINERS SAFETY 3 29-31 26-28 16-18 27-29 11-13 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.00036 WORKING ALOFT AND WORKING OVER SIDE 2 16-17 27-28 23-24 16-17 11-12 25-26 16-17 27-28 17-18 29-30 26-27 17-18 4.500.000

Information Technology (IT)1 APLIKASI CAD CAM LANJUT PADA JEWELRY I 2 02-03 06-07 23-24 20-21 18-19 02-03 20-21 06-07 21-22 08-09 05-06 21-22 5.500.0002 APLIKASI CAD CAM LANJUT PADA JEWELRY II 3 22-24 12-14 18-20 27-29 18-20 10-12 27-29 12-14 28-30 14-16 11-13 28-30 7.500.0003 Dasar-dasar Aplikasi CAD CAM pada Jewelry 4 14-17 04-07 03-06 06-09 04-07 02-05 06-09 04-07 07-10 06-09 03-06 07-10 8.500.0004 DASAR-DASAR APLIKASI CAD CAM PADA JEWELRY II 4 07-10 25-28 17-20 31-03 12-15 23-26 30-03 25-28 01-04 27-30 24-27 01-04 8.500.0005 DIGITAL MARKETING CONSULTANT 2 27-28 24-25 23-24 27-28 04-05 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.0006 GIS ANALISIS 3 06-08 24-26 02-04 27-29 11-13 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.0007 GIS MapInfo 4 13-16 03-06 09-12 30-02 04-07 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.0008 GIS OPERATOR 3 20-22 10-12 16-18 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.0009 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 27-30 24-27 02-05 27-30 05-08 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

10 INTERNET MARKETING MEMBANGUN BISNIS ONLINE SHOP 2 02-03 03-04 23-24 30-31 11-12 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.00011 IT AUDIT PRACTICES 3 15-17 12-14 18-20 06-08 13-15 10-12 06-08 12-14 07-09 14-16 11-13 07-09 6.500.00012 IT HELPDESK 3 22-24 19-21 04-06 15-17 18-20 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.00013 IT MANAJEMEN ESSENTIAL 3 06-08 10-12 02-04 30-01 04-06 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

14 Kurasi Digital Upaya Meningkatkan Nilai Guna Koleksi Digital 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000

15 PROJECT MANAGEMENT DENGAN MICROSOFT PROJECT 4 27-30 03-06 17-20 06-09 04-07 02-05 07-10 03-06 08-11 05-08 02-05 08-11 8.500.00016 PROJECT MANAGEMENT DENGAN PRIMAVERA 4 20-23 24-27 16-19 13-16 11-14 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.00017 SIG Training 4 27-30 17-20 03-06 13-16 12-15 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.000

Leadership/Kepemimpinan1 ACHIEVEMENT MOTIVATION 2 27-28 03-04 23-24 27-28 04-05 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.0002 ACHIEVEMENT MOTIVATION TRAINING 2 02-03 10-11 23-24 30-31 18-19 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.0003 BREAKTHROUGH LEADERSHIP AND DRIVING CHANGE 3 06-08 24-26 02-04 13-15 11-13 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.0004 BUILDING AND MANAGING HIGH PERFORMANCE TEAMS 3 13-15 03-05 11-13 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.0005 CAPACITY BUILDING 3 13-15 17-19 16-18 06-08 04-06 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

Page 106: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga6 CHARACTER BUILDING 3 06-08 10-12 09-11 06-08 11-13 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.0007 CHARACTER BUILDING FOR PEAK PERFORMANCE 2 02-03 24-25 23-24 20-21 18-19 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.0008 COMMUNICATION SKILL 3 13-15 17-19 16-18 13-15 18-20 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.0009 COMMUNICATION SKILLS 2 02-03 06-07 23-24 27-28 07-08 04-05 27-28 06-07 28-29 08-09 05-06 28-29 4.500.000

10 COMMUNICATION SKILLS 2 06-07 17-18 16-17 06-07 18-19 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.00011 COMMUNICATION SKILLS 3 06-08 24-26 02-04 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.00012 CREATIVE PROBLEM SOLVING 3 20-22 10-12 18-20 27-29 13-15 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.00013 DECISION MAKING BY USING STRATEGIC THINKING 2 02-03 24-25 23-24 06-07 11-12 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.00014 DECISION MAKING BY USING STRATEGIC THINKING 2 02-03 24-25 23-24 06-07 07-08 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.00015 DEVELOPING EXECUTIVE LEADERSHIP SKILLS 3 08-10 26-28 09-11 07-09 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.000

16 DEVELOPING POSITIVE PERSONAL CHARACTER IN PROBLEM SOLVING 2 02-03 03-04 23-24 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

17 EFFECTIVE COMMUNICATION SKILLS WITH NLP 2 02-03 26-27 23-24 29-30 14-15 24-25 29-30 26-27 30-01 28-29 25-26 30-31 4.500.00018 EFFECTIVE COACHING SKILLS 2 02-03 10-11 23-24 27-28 11-12 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.00019 EFFECTIVE COMMUNICATION SKILLS WITH NLP 2 02-03 10-11 23-24 20-21 11-12 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.00020 EFFECTIVE LEADERSHIP 3 29-31 19-21 04-06 30-01 18-20 17-19 29-01 19-21 31-02 21-23 18-20 30-02 6.500.000

21 EMOTIONAL FREEDOM TECHNIQUE (EFT) FOR PEAK PERFORMANCE 2 02-03 03-04 23-24 27-28 07-08 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000

22 INSPIRATIONAL LEADERSHIP AND CHANGE 3 15-17 05-07 11-13 01-03 18-20 03-05 01-03 05-07 02-04 07-09 04-06 02-04 6.500.00023 INSPIRATIONAL LEADERSHIP AND CREATIVITY 3 20-22 10-12 18-20 07-09 06-08 08-10 08-10 10-12 09-11 12-14 09-11 09-11 6.500.000

24KEPEMIMPINAN TRANSFORMASIONAL DALAM PROSES PERUBAHANORGANISASI

2 02-03 26-27 23-24 01-02 19-20 24-25 01-02 26-27 02-03 28-29 25-26 02-03 4.500.000

25KEPEMIMPINAN TRANSFORMATIF BERBASIS GOOD CORPORATEGOVERNANCE BAGI SUPERVISOR & MANAGER

2 06-07 05-06 23-24 08-09 06-07 04-05 08-09 05-06 09-10 07-08 04-05 09-10 4.500.000

26 Leadership 2 02-03 26-27 23-24 13-14 19-20 24-25 13-14 26-27 14-15 28-29 25-26 14-15 5.500.00027 LEADERSHIP AGILITY SKILLS 2 16-17 10-11 12-13 15-16 07-08 08-09 15-16 10-11 16-17 12-13 09-10 16-17 4.500.00028 LEADERSHIP AND DEVELOPMENT OF TALENT 3 27-29 17-19 04-06 15-17 13-15 15-17 15-17 18-20 16-18 19-21 16-18 16-18 6.500.00029 LEADERSHIP FOR QUALITY MANAGEMENT 3 06-08 03-05 04-06 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.00030 LEADERSHIP SKILLS 2 29-30 12-13 11-12 29-30 19-20 10-11 29-30 12-13 30-01 14-15 11-12 30-31 4.500.00031 LEADERSHIP SKILLS FOR SUPERVISORS 3 06-08 24-26 09-11 22-24 18-20 22-24 22-24 24-26 23-25 26-28 23-25 22-24 6.500.00032 LEADERSHIP WITH NLP 2 15-16 19-20 18-19 15-16 06-07 17-18 15-16 18-19 16-17 21-22 18-19 16-17 4.500.00033 LIFE QUALITY IMPROVEMENT CAMP 3 20-22 12-14 02-04 30-01 13-15 10-12 29-01 12-14 31-02 14-16 11-13 30-02 6.950.00034 LOBBY & NEGOTIATION SKILL 3 06-08 10-12 02-04 28-30 04-06 08-10 28-30 10-12 30-02 12-14 09-11 29-31 6.500.00035 MANAJEMEN STRATEGI 2 02-03 12-13 23-24 15-16 06-07 10-11 15-16 12-13 16-17 14-15 11-12 16-17 4.500.000

36MEMBANGUN PROFESSIONAL BEHAVIOR DENGAN KECERDASANEMOSI DAN KECERDASAN SPIRITUAL

2 02-03 10-11 23-24 20-21 11-12 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.000

37 Maintenance Strategic Planning 4 28-31 25-28 09-12 21-24 04-07 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.000

38MENDAPATKAN KETERAMPILAN, WAWASAN DAN KOMPETENSI YANGDIBUTUHKAN DALAM MEMENANGKAN NEGOSIASI MELALUI WIN-WIN SOLUTION

2 16-17 06-07 05-06 16-17 18-19 02-03 16-17 06-07 17-18 08-09 05-06 17-18 4.500.000

39 MENGELOLA PERUBAHAN DALAM ORGANISASI 2 20-21 24-25 23-24 20-21 11-12 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.00040 MENGEMBANGKAN EKOSISTEM INOVASI ORGANISASI 2 22-23 20-21 19-20 22-23 14-15 18-19 22-23 18-19 23-24 22-23 19-20 23-24 4.500.000

Page 107: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

41 MENGEMBANGKAN KAPABILITAS EKSEKUSI DI DALAM ORGANISASI 2 29-30 26-27 23-24 29-30 19-20 24-25 29-30 26-27 28-29 28-29 25-26 30-31 4.500.000

42 MOTIVATION YOUR SELF (ACHIEVEMENT MOTIVATION TRAINING) 3 08-10 12-14 09-11 20-22 11-13 10-12 20-22 12-14 21-23 14-16 11-13 21-23 6.500.000

43 NEGOTIATION SKILL 3 29-31 26-28 02-04 07-09 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.00044 ORGANIZATIONAL CHANGE 2 02-03 24-25 23-24 30-31 13-14 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.00045 PERFORMANCE GOALS SETTING 2 22-23 13-14 12-13 22-23 06-07 11-12 22-23 13-14 23-24 15-16 12-13 23-24 4.500.00046 PROBLEM SOLVING & DECISION MAKING 3 20-22 24-26 11-13 13-15 13-15 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.00047 PROBLEM SOLVING AND DECISION MAKING 2 02-03 24-25 23-24 02-03 19-20 22-23 02-03 24-25 03-04 26-27 23-24 03-04 4.500.00048 QUANTUM LEADERSHIP SKILLS WORKSHOP 3 06-08 19-21 02-04 15-17 11-13 17-19 15-17 18-20 16-18 21-23 18-20 16-18 6.500.00049 SELF MANAGEMENT EMOTION AND STRESS 3 22-24 12-14 02-04 22-24 18-20 10-12 22-24 12-14 23-25 14-16 11-13 22-24 6.500.00050 Seven Habbits 2 15-16 10-11 23-24 16-17 07-08 08-09 16-17 10-11 17-18 12-13 09-10 17-18 5.500.00051 STRATEGIC DECISION MAKING 3 08-10 26-28 18-20 13-15 06-08 24-26 13-15 26-28 14-16 28-30 25-27 14-16 6.500.00052 SUCCESSFUL STRATEGIC MANAGEMENT 3 13-15 03-05 11-13 15-17 18-20 02-04 15-17 03-05 16-18 05-07 02-04 16-18 6.500.00053 SUCCESSFUL SUPERVISORY SKILLS FOR TEAM LEADERS 3 22-24 12-14 18-20 22-24 06-08 10-12 22-24 12-14 23-25 14-16 11-13 22-24 6.500.00054 SUPERVISORY LEADERSHIP 3 27-29 19-21 11-13 07-09 18-20 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.500.00055 THE POWER OF POSITIVE MIND 3 20-22 24-26 09-11 28-30 11-13 22-24 28-30 24-26 30-02 26-28 23-25 29-31 6.500.00056 TIME MANAGEMENT 3 27-29 03-05 16-18 01-03 18-20 02-04 01-03 03-05 02-04 05-07 02-04 02-04 6.500.00057 Time Management 3 13-15 17-19 04-06 30-01 13-15 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

58 TRANSFORMATIONAL LEADERSHIP AND STRATEGY FORMULATION 3 15-17 05-07 16-18 06-08 04-06 03-05 06-08 05-07 07-09 07-09 04-06 07-09 6.500.000

Maintenance/Perawatan1

ADVANCE MAINTENANCE PLANNING, SCHEDULLING, AUDITING,BENCHMARKING & IMPROVEMENT

3 13-15 10-12 02-04 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

2 COMPETITIVE MAINTENANCE & SPARE PARTS MANAGEMENT 4 13-16 10-13 09-12 13-16 04-07 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.000

3 MAINTENANCE MANAGEMENT (PDM, PM, & Pro-Active Maintenance) 4 20-23 03-06 17-20 06-09 05-08 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.000

4 MAINTENANCE PLANNING, SCHEDULLING AND WORK CONTROL 3 15-17 12-14 11-13 27-29 18-20 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.000

5 Maintenance Strategic Planning 4 28-31 25-28 09-12 21-24 04-07 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.0006 MAINTENANCE SYSTEM AND DOCUMENTATION 4 07-10 04-07 16-19 27-30 11-14 02-05 27-30 04-07 29-02 06-09 03-06 28-31 8.500.0007 MANAGING MAINTENANCE RESOURCES 4 13-16 10-13 02-05 31-03 05-08 08-11 30-03 10-13 01-04 12-15 09-12 01-04 8.500.000

8 MODERN MAINTENANCE MANAGEMENT BY MEANS OF RELIABILITY 4 20-23 24-27 03-06 06-09 05-08 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.500.000

9 Predictive Maintenance By Condition Monitoring 4 14-17 04-07 16-19 27-30 04-07 02-05 27-30 04-07 29-02 06-09 03-06 28-31 8.500.000

10RELIABILITAS SISTEM SEBUAH CARA UNTUK MENILAI KEBERHASILANMAINTENANCE

3 13-15 17-19 09-11 22-24 18-20 15-17 22-24 18-20 23-25 19-21 16-18 21-23 6.500.000

11 RELIABILITY CENTERED MAINTENANCE & RISK BASED INSPECTION 5 27-31 03-07 16-20 20-24 04-08 08-12 20-24 03-07 21-25 05-09 02-06 30-04 9.750.000

12 ROOT CAUSE ANALYSIS 4 06-09 11-14 03-06 27-30 11-14 02-05 27-30 11-14 28-01 13-16 10-13 21-24 8.500.00013 Rotating Machine Maintenance 4 13-16 03-06 03-06 20-23 04-07 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.00014 Spare Part Management 4 14-17 18-21 09-12 30-02 04-07 16-19 29-02 18-21 31-03 20-23 17-20 28-31 8.500.000

Page 108: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

Manajemen1 ACCOUNTING AND FINANCE FOR NON-FINANCIAL MANAGERS 3 27-29 24-26 02-04 13-15 04-06 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.0002 ACCOUNTING, FINANCE, AND TAX FOR MINING COMPANY 3 27-29 03-05 02-04 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.0003 Administrasi Pertanahan Desa 2 02-03 03-04 23-24 20-21 11-12 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.0004 AIR AND SEA CARGO HANDLING 3 13-15 03-05 09-11 13-15 18-20 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.750.0005 AIR CARGO 2 02-03 12-13 23-24 16-17 19-20 10-11 16-17 12-13 17-18 14-15 11-12 17-18 4.500.0006 Air cargo Terminal Business Development 2 02-03 27-28 23-24 29-30 18-19 25-26 29-30 27-28 01-02 29-30 26-27 30-31 4.500.000

7ALTERNATIVE DISPUTE RESOLUTION (ADR) ALTERNATIVEPENYELESAIAN SENGKETA (APS )

2 02-03 10-11 23-24 13-14 18-19 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000

8 ANALISA JABATAN 3 27-29 03-05 09-11 27-29 18-20 02-04 27-29 03-05 28-30 05-07 02-04 28-30 6.500.0009 ANALISA LAPORAN KEUANGAN 2 02-03 17-18 23-24 30-31 18-19 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000

10 ANALISA LAPORAN KEUANGAN DASAR 2 02-03 05-06 23-24 06-07 19-20 04-05 06-07 05-06 07-08 07-08 04-05 07-08 4.500.00011 Analisis Beban Kerja 2 02-03 24-25 23-24 06-07 11-12 22-23 06-07 24-25 07-08 26-27 23-24 07-08 5.500.000

12APPLIED FACILITY SECURITY RISK ASSESSMENT WITH SOFTWAREFASRIM

2 02-03 24-25 23-24 13-14 04-05 22-23 13-14 24-25 14-15 26-27 23-24 14-15 4.500.000

13APPLIED PROCESS SECURITY RISK ASSESSMENT (FAILURE MODE ANDEFFECT ANALYSIS)

2 02-03 03-04 23-24 20-21 11-12 02-03 20-21 03-04 21-22 05-06 02-03 21-22 4.500.000

14APPLIED SECURITY ANALYSIS (CRIME TREND, ROOT-CAUSE, COST-BENEFIT) UTILIZING SOFTWARE SYSCAT

2 02-03 10-11 23-24 27-28 18-19 08-09 27-28 10-11 28-29 12-13 09-10 28-29 6.950.000

15 ASPEK LEGAL LEMBAGA KEUANGAN SYARIAH 3 13-15 17-19 16-18 13-15 11-13 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.00016 ASPEK LEGAL PERBANKAN SYARIAH 3 20-22 24-26 02-04 20-22 18-20 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.00017 AUDIT HASIL PEKERJAAN KONSTRUKSI 4 27-30 03-06 02-05 20-23 04-07 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.00018 Audit Internal dan MR 3 13-15 17-19 16-18 06-08 11-13 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.00019 AUDIT OPERASIONAL KINERJA 3 08-10 12-14 02-04 06-08 04-06 10-12 06-08 12-14 07-09 14-16 11-13 07-09 6.500.000

20Audit Sosial Dan Corporate Social Performance (CSP) Bagi ManajerDan Pengelola Perusahaan

3 22-24 19-21 04-06 07-09 11-13 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.500.000

21 Aviation & Airport Operations 2 02-03 06-07 23-24 06-07 18-19 04-05 06-07 06-07 07-08 08-09 05-06 07-08 4.500.00022 Balance Scorecard 3 20-22 24-26 16-18 27-29 11-13 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.00023 Balanced Scorecard 2 02-03 03-04 23-24 13-14 18-19 02-03 13-14 03-04 14-15 05-06 02-03 14-15 5.500.00024 BANKING FRAUD AND PREVENTIONS 2 02-03 24-25 23-24 06-07 19-20 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.00025 BASIC ACCOUNTING 3 06-08 03-05 09-11 20-22 11-13 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.00026 Basic Operation of Retail Business 3 20-22 17-19 16-18 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

27 BIMBINGAN TEKNIS MEMBUAT PERENCANAAN STRATEGIS SEKOLAH 2 02-03 27-28 23-24 20-21 14-15 25-26 20-21 27-28 21-22 29-30 26-27 21-22 4.500.000

28 BISNIS PELAYARAN 3 06-08 03-05 02-04 30-01 04-06 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.00029 Bisnis Pelayaran 3 20-22 24-26 02-04 01-03 11-13 22-24 01-03 24-26 02-04 26-28 23-25 02-04 6.500.00030 BRANDING STRATEGY FOR RETAIL BANKING 2 02-03 03-04 23-24 13-14 18-19 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.00031 BREAKTHROUGH LEADERSHIP AND DRIVING CHANGE 3 06-08 24-26 02-04 13-15 11-13 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.00032 BUILDING AND MANAGING HIGH PERFORMANCE TEAMS 3 13-15 03-05 11-13 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.00033 BUILDING GREAT TEAMWORK 2 02-03 10-11 09-10 30-31 11-12 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.000

34 BUILDING SUPERVISION AND QUALITY CONTROL OF CIVIL WORK 4 13-16 17-20 17-20 30-02 05-08 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.000

Page 109: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga35 BUSINESS LEGAL CONTRACT DRAFTING 3 20-22 03-05 02-04 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.00036 BUSINESS PROCESS AND PROJECT MANAGEMENT 3 22-24 12-14 18-20 27-29 06-08 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.00037 BUSINESS PROFILING 2 02-03 10-11 23-24 20-21 04-05 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.00038 CAPACITY BUILDING 3 13-15 17-19 16-18 06-08 04-06 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.00039 CARA EFEKTIF MELAKUKAN PROSES PENAGIHAN HUTANG 2 27-28 10-11 09-10 27-28 04-05 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.00040 Career Management 2 02-03 17-18 23-24 27-28 13-14 15-16 27-28 18-19 28-29 19-20 16-17 28-29 5.500.00041 COMMERCIAL FINANCIAL AWARENESS 3 29-31 19-21 04-06 01-03 13-15 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.00042 COMMUNICATION SKILLS FOR SALES 3 27-29 17-19 16-18 06-08 11-13 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.00043 Community Development 2 02-03 26-27 23-24 30-31 19-20 24-25 29-30 26-27 31-01 28-29 25-26 30-01 5.500.00044 COMPENSATION & BENEFIT SYSTEM 3 06-08 10-12 16-18 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.00045 COMPETENCIES MAPPING & DEVELOPMENT 4 06-09 03-06 16-19 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.00046 COMPLAINT HANDLING MANAGEMENT 3 13-15 03-05 09-11 20-22 04-06 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.00047 Continous Improvement And Creativity 3 20-22 12-14 09-11 01-03 06-08 10-12 01-03 12-14 02-04 14-16 11-13 02-04 6.500.00048 CONTRACT ADMINISTRATION & NEGOTIATION 3 13-15 24-26 02-04 13-15 06-08 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.00049 CONTRACT MANAGEMENT 3 20-22 17-19 09-11 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.00050 CONTRACT MANAGEMENT 3 20-22 24-26 16-18 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

51CONTRACT MANAGEMENT, STRATEGY AND ADMINISTRATION FOROIL AND GAS COMPANY

3 27-29 03-05 02-04 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

52 CORPORATE SOCIAL RESPONSBILITY (COMMUNITY DEVELOPMENT) 3 20-22 24-26 02-04 20-22 04-06 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.000

53 Corporate Social Responsibility 2 02-03 05-06 23-24 08-09 06-07 04-05 08-09 05-06 09-10 07-08 04-05 09-10 5.500.00054 CREATIVE PROBLEM SOLVING 3 20-22 10-12 18-20 27-29 13-15 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.00055 CSR Communication 3 22-24 10-12 18-20 30-01 11-13 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.00056 CSR COMMUNITY DEVELOPMENT 3 13-15 10-12 16-18 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.00057 CUSTOM CLEARANCE 3 06-08 10-12 02-04 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

58 CUSTOM PROCEDURE, SHIPPING & EXPORT-IMPORT DOCUMENT 3 13-15 17-19 11-13 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

59 DECISION MAKING BY USING STRATEGIC THINKING 2 02-03 24-25 23-24 06-07 11-12 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.00060 DECISION MAKING BY USING STRATEGIC THINKING 2 02-03 24-25 23-24 06-07 07-08 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.00061 DESAIN CSR DAN PENGUKURAN KINERJANYA 3 27-29 03-05 09-11 13-15 18-20 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.500.000

62DESIGNING COST EFFECTIVE SECURITY SYSTEM (BENEFIT-COSTANALYSIS METHOD)

2 02-03 17-18 23-24 30-31 06-07 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000

63DESIGNING KPI FOR SECURITY DEPARTMENT AND SECURITY WORKPLAN PROPOSAL

2 02-03 26-27 23-24 06-07 13-14 24-25 06-07 26-27 07-08 28-29 25-26 07-08 4.500.000

64 DETEKSI DAN PENCEGAHAN KECURANGAN (FRAUD) 2 06-07 10-11 23-24 06-07 18-19 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.00065 DEVELOPING EXECUTIVE LEADERSHIP SKILLS 3 08-10 26-28 09-11 07-09 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.00066 DIGITAL MARKETING CONSULTANT 2 27-28 24-25 23-24 27-28 04-05 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.00067 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 02-03 05-06 23-24 01-02 18-19 04-05 01-02 05-06 02-03 07-08 04-05 02-03 4.500.00068 EFFECTIVE BUSINESS WHITER (WHITE PAPER) 3 27-29 03-05 11-13 27-29 13-15 02-04 27-29 03-05 28-30 05-07 02-04 28-30 6.500.00069 EFFECTIVE COACHING SKILLS 2 02-03 10-11 23-24 27-28 11-12 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.00070 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 02-03 17-18 23-24 27-28 18-19 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.00071 EFFECTIVE LEADERSHIP 3 29-31 19-21 04-06 30-01 18-20 17-19 29-01 19-21 31-02 21-23 18-20 30-02 6.500.00072 EFFECTIVE MANAGEMENT SKILLS FOR MIDDLE MANAGEMENT 3 15-17 05-07 16-18 15-17 04-06 03-05 15-17 05-07 16-18 07-09 04-06 16-18 6.500.000

Page 110: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga73 EFFECTIVE MANAGEMENT USING FINANCIAL PERFORMANCE 3 20-22 10-12 02-04 22-24 11-13 08-10 22-24 10-12 23-25 12-14 09-11 22-24 6.500.00074 EFFECTIVE PR CAMPAIGN TECHNIQUE 3 08-10 12-14 18-20 30-01 18-20 10-12 29-01 12-14 31-02 14-16 11-13 30-02 6.500.00075 Effective Training Management 3 06-08 10-12 16-18 27-29 11-13 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

76ELECTRONIC FILING IMPLEMENTATION WITH RMS & EFS METHODBASED ON DOCUMENT REGULATION

3 15-17 19-21 11-13 13-15 13-15 17-19 13-15 19-21 14-16 21-23 18-20 14-16 6.500.000

77 EMPLOYEE ENGAGEMENT 2 02-03 03-04 23-24 30-31 11-12 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.00078 EQUIPMENT MATERIALS SPECIFICATION 3 06-08 10-12 16-18 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.00079 ESSENTIAL MANAGEMENT SKILLS 3 06-08 24-26 18-20 30-01 06-08 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

80ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATIONPROFESSIONAL

2 02-03 17-18 23-24 30-31 18-19 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.000

81 Etika Bisnis Untuk UKM 2 02-03 17-18 23-24 30-31 18-19 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.00082 EXCELLENT SUPERVISORY SKILLS 2 20-21 05-06 23-24 20-21 13-14 04-05 20-21 05-06 21-22 07-08 04-05 21-22 4.500.00083 FINANCIAL MODELLING AND DECISION MAKING 3 13-15 03-05 04-06 06-08 13-15 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.00084 FINANCIAL RISK MANAGEMENT 3 22-24 12-14 09-11 13-15 18-20 10-12 13-15 12-14 14-16 14-16 11-13 14-16 6.500.00085 FINANCIAL STATEMENT ANALYSIS 3 13-15 10-12 16-18 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.00086 FLIGHT OPERATION MANAGEMENT 3 20-22 17-19 16-18 27-29 18-20 15-17 27-29 18-20 28-30 19-21 16-18 28-30 6.750.00087 FORMULATING CORPORATE STRATEGY 3 29-31 19-21 16-18 20-22 04-06 17-19 20-22 19-21 21-23 21-23 18-20 21-23 6.500.00088 FRAUD INVESTIGATIONS & STRATEGY 2 27-28 19-20 23-24 27-28 11-12 17-18 27-28 20-21 28-29 21-22 18-19 28-29 4.500.00089 FRAUD MANAGEMENT 3 13-15 24-26 04-06 06-08 18-20 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.500.00090 FRAUD PREVENTION AND DETECTION 2 02-03 03-04 23-24 13-14 11-12 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.00091 FUNDAMENTALS OF SUPPLY CHAIN MANAGEMENT 3 08-10 26-28 02-04 27-29 11-13 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.00092 General Affair (GA) 2 02-03 12-13 23-24 15-16 14-15 10-11 15-16 12-13 16-17 14-15 11-12 16-17 5.500.00093 GENERAL AFFAIR MANAGEMENT DEVELOPMENT 3 15-17 19-21 04-06 07-09 06-08 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.500.00094 General Affairs Management System 3 13-15 12-14 02-04 06-08 13-15 10-12 06-08 12-14 07-09 14-16 11-13 07-09 6.500.00095 GENERAL CHARTER CONDITION (GENCON) 3 27-29 03-05 11-13 07-09 18-20 02-04 08-10 03-05 09-11 05-07 02-04 09-11 6.500.00096 GOOD CORPORATE GOVERNANCE (GCG) 3 06-08 10-12 09-11 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.00097 GREAT TEAMWORK AND SYNERGY 3 08-10 26-28 11-13 07-09 06-08 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.00098 GREEN BUILDING CONCEPT 4 28-31 04-07 10-13 14-17 04-07 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.00099 HARMONY BUILDING TRAINING 2 02-03 27-28 23-24 06-07 04-05 25-26 06-07 27-28 07-08 29-30 26-27 07-08 4.500.000

100 Housekeeping Management 4 27-30 03-06 16-19 27-30 11-14 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

101HOW TO MANAGE CHANGE, CONFLICT AND DIFFICULT EMPLOYEE TOCREATE PRODUCTIVITY

3 22-24 26-28 09-11 15-17 11-13 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000

102 Hubungan Industrial 2 02-03 06-07 23-24 01-02 11-12 02-03 01-02 06-07 02-03 08-09 05-06 02-03 5.500.000103 HUBUNGAN INDUSTRIAL DAN HUKUM KETENAGAKERJAAN 3 29-31 24-26 04-06 27-29 13-15 22-24 27-29 24-26 30-02 26-28 23-25 28-30 6.500.000104 Hukum Perkapalan 3 06-08 10-12 18-20 13-15 06-08 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000105 Humas 2 02-03 27-28 23-24 20-21 18-19 25-26 20-21 27-28 21-22 29-30 26-27 21-22 4.500.000106 INCOTERM DALAM EKSPOR-IMPOR 3 27-29 03-05 16-18 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.000107 INFORMASI, DOKUMENTASI DAN PERPUSTAKAAN 5 20-24 24-28 16-20 13-17 04-08 22-26 06-10 24-28 07-11 26-30 23-27 07-11 9.500.000108 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 27-30 24-27 02-05 27-30 05-08 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

109 INOVASI DAN KREATIFITAS MENUJU ORGANISASI PEMBELAJARAN 2 02-03 10-11 23-24 20-21 07-08 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.000

110 INSPIRATIONAL LEADERSHIP AND CHANGE 3 15-17 05-07 11-13 01-03 18-20 03-05 01-03 05-07 02-04 07-09 04-06 02-04 6.500.000111 INSPIRATIONAL LEADERSHIP AND CREATIVITY 3 20-22 10-12 18-20 07-09 06-08 08-10 08-10 10-12 09-11 12-14 09-11 09-11 6.500.000

Page 111: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

112INTERACTION AND TELEPHONE COURTESY (IMPROVE TELEPHONESKILL CALL CENTER)

3 29-31 05-07 16-18 22-24 18-20 03-05 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000

113 INTERNAL CONTROL OVER FINANCIAL STATEMENT 2 02-03 26-27 23-24 29-30 18-19 24-25 29-30 26-27 30-01 28-29 25-26 30-31 4.500.000114 INTERNET MARKETING MEMBANGUN BISNIS ONLINE SHOP 2 02-03 03-04 23-24 30-31 11-12 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000115 INTRAPRENEURSHIP (CORPORATE ENTREPRENEURSHIP) 4 13-16 24-27 09-12 27-30 04-07 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000116 INTRODUCTION AVIATION & AIRPORT OPERATIONS 3 27-29 24-26 02-04 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.750.000117 Introduction for Mooring Master 3 27-29 03-05 18-20 27-29 18-20 02-04 27-29 03-05 30-02 05-07 02-04 28-30 6.500.000118 INVENTORY AND WAREHOUSE MANAGEMENT 3 27-29 24-26 16-18 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000119 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 06-08 03-05 11-13 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000120 INVENTORY REDUCTION 3 13-15 17-19 02-04 06-08 11-13 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000121 ISM CODE 4 07-10 11-14 16-19 06-09 11-14 09-12 06-09 11-14 07-10 13-16 10-13 07-10 8.500.000122 ISPS CODE 4 06-09 10-13 16-19 27-30 04-07 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000123 IT AUDIT PRACTICES 3 15-17 12-14 18-20 06-08 13-15 10-12 06-08 12-14 07-09 14-16 11-13 07-09 6.500.000124 IT HELPDESK 3 22-24 19-21 04-06 15-17 18-20 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000125 IT MANAJEMEN ESSENTIAL 3 06-08 10-12 02-04 30-01 04-06 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000126 JETTY OPERATION 3 13-15 17-19 02-04 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000127 Job Hunting For Beginner 2 02-03 24-25 23-24 23-24 13-14 22-23 23-24 24-25 24-25 26-27 23-24 21-22 5.500.000128 JOURNALISM TRAINING 2 02-03 10-11 23-24 06-07 04-05 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.000129 Kalkulasi Perhitungan Tunjangan Hari Raya (THR) 2 02-03 10-11 23-24 02-03 06-07 08-09 02-03 10-11 03-04 12-13 09-10 03-04 5.500.000

130 KELUHAN (GRIEVANCES) SUMBER DAYA MANUSIA DI ERA TERKINI 4 27-30 24-27 09-12 30-02 11-14 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.500.000

131KEPEMIMPINAN TRANSFORMASIONAL DALAM PROSES PERUBAHANORGANISASI

2 02-03 26-27 23-24 01-02 19-20 24-25 01-02 26-27 02-03 28-29 25-26 02-03 4.500.000

132KEPEMIMPINAN TRANSFORMATIF BERBASIS GOOD CORPORATEGOVERNANCE BAGI SUPERVISOR & MANAGER

2 06-07 05-06 23-24 08-09 06-07 04-05 08-09 05-06 09-10 07-08 04-05 09-10 4.500.000

133 KESELAMATAN PELAYARAN 3 22-24 26-28 18-20 06-08 18-20 24-26 06-08 26-28 07-09 28-30 25-27 07-09 6.500.000134 Key Perfomance Indicator (KPI) 2 02-03 17-18 23-24 08-09 14-15 15-16 06-07 20-21 07-08 19-20 16-17 07-08 5.500.000135 KEY PERFORMANCE INDICATOR 2 02-03 10-11 23-24 20-21 18-19 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.000136 KREDIT BERMASALAH 2 02-03 17-18 23-24 20-21 11-12 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

137 Kurasi Digital Upaya Meningkatkan Nilai Guna Koleksi Digital 2 02-03 24-25 23-24 30-31 18-19 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000

138 LAYANAN PERPUSTAKAAN BERBASIS TI 3 27-29 03-05 02-04 06-08 11-13 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.500.000139 Leadership 2 02-03 26-27 23-24 13-14 19-20 24-25 13-14 26-27 14-15 28-29 25-26 14-15 5.500.000140 LEADERSHIP AGILITY SKILLS 2 16-17 10-11 12-13 15-16 07-08 08-09 15-16 10-11 16-17 12-13 09-10 16-17 4.500.000141 LEADERSHIP AND DEVELOPMENT OF TALENT 3 27-29 17-19 04-06 15-17 13-15 15-17 15-17 18-20 16-18 19-21 16-18 16-18 6.500.000142 LEADERSHIP FOR QUALITY MANAGEMENT 3 06-08 03-05 04-06 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.000143 LEADERSHIP SKILLS 2 29-30 12-13 11-12 29-30 19-20 10-11 29-30 12-13 30-01 14-15 11-12 30-31 4.500.000144 LEADERSHIP SKILLS FOR SUPERVISORS 3 06-08 24-26 09-11 22-24 18-20 22-24 22-24 24-26 23-25 26-28 23-25 22-24 6.500.000145 LEADERSHIP WITH NLP 2 15-16 19-20 18-19 15-16 06-07 17-18 15-16 18-19 16-17 21-22 18-19 16-17 4.500.000146 LEGAL ASPECT IN OIL & GAS INDUSTRIES 3 13-15 17-19 18-20 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000147 LEGAL AUDIT & LEGAL OPINION DRAFTING 3 06-08 12-14 11-13 07-09 18-20 10-12 06-08 12-14 07-09 14-16 11-13 07-09 6.500.000148 LEGAL DRAFTING AND WRITING 3 22-24 05-07 11-13 13-15 06-08 03-05 13-15 05-07 14-16 07-09 04-06 14-16 6.500.000149 LEMBAGA KEUANGAN MIKRO SYARIAH 3 27-29 10-12 02-04 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

Page 112: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga150 LIFE CYCLE COSTING AND SUSTAINABILITY MANUFACTURING 3 06-08 19-21 16-18 27-29 13-15 17-19 27-29 19-21 28-30 21-23 18-20 28-30 6.500.000

151Literasi Informasi dan Pengelolaan Informasi Digital dalamMenyongsong Gerakan Literasi Sekolah

2 02-03 03-04 23-24 06-07 06-07 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

152 LOADING AND UPLOADING 4 20-23 24-27 10-13 06-09 12-15 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.500.000153 Loading Master 4 13-16 17-20 09-12 06-09 05-08 15-18 07-10 18-21 08-11 19-22 16-19 08-11 8.500.000154 LOADING UNLOADING pelabuhan curah kering 4 21-24 25-28 10-13 21-24 12-15 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.000155 LOGISTIC INTERNAL SUPPLY CHAIN MANAGEMENT 3 20-22 24-26 09-11 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000156 LOGISTIC OPERATION 3 08-10 12-14 04-06 27-29 13-15 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.000157 LOSS PRVENTION AND MODERN SECURITY 2 02-03 17-18 23-24 13-14 18-19 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000158 MANAGEMENT MASTERCLASS 3 13-15 03-05 16-18 28-30 04-06 02-04 28-30 03-05 30-02 05-07 02-04 29-31 6.500.000

159 MANAJEMEN ARSIP DINAMIS DAN PERPUSTAKAAN BERBASIS TI 2 02-03 10-11 23-24 20-21 04-05 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.000

160 MANAJEMEN GEDUNG DAN KANTOR 3 13-15 26-28 04-06 01-03 18-20 24-26 01-03 26-28 02-04 28-30 25-27 02-04 6.500.000161 MANAJEMEN KEARSIPAN DAN TATA KELOLA KANTOR 3 13-15 17-19 11-13 01-03 13-15 15-17 01-03 18-20 02-04 19-21 16-18 02-04 6.500.000162 Manajemen Pengadaan Tanah Untuk Kepentingan Umum 3 06-08 24-26 16-18 13-15 04-06 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000163 MANAJEMEN PENGEMBANGAN PRODUK PERBANKAN 4 13-16 10-13 02-05 06-09 04-07 08-11 06-09 10-13 07-10 12-15 09-12 07-10 8.500.000164 MANAJEMEN PERPUSTAKAAN 3 27-29 03-05 02-04 27-29 18-20 02-04 27-29 03-05 28-30 05-07 02-04 28-30 6.500.000165 MANAJEMEN PERPUSTAKAAN 3 06-08 10-12 09-11 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.500.000166 MANAJEMEN PERUSAHAAN 2 02-03 19-20 18-19 01-02 04-05 17-18 01-02 20-21 02-03 21-22 18-19 02-03 4.500.000167 MANAJEMEN PROYEK KONSTRUKSI 3 06-08 10-12 02-04 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000168 MANAJEMEN PROYEK KONSTRUKSI 4 07-10 11-14 16-19 21-24 12-15 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.000

169MANAJEMEN RANTAI PASOKAN (SUPPLY CHAIN MANAGEMENT) DANRANTAI NILAI (VALUE CHAINS) BAGI KELOMPOK TANI DAN UMKM

2 02-03 06-07 23-24 13-14 11-12 02-03 13-14 06-07 14-15 08-09 05-06 14-15 4.500.000

170 Manajemen Rekam Medis dan Informasi Kesehatan 3 06-08 24-26 16-18 30-01 04-06 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000171 MANAJEMEN RISIKO 2 02-03 17-18 23-24 27-28 04-05 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.000172 MANAJEMEN RISIKO DALAM ORGANISASI 2 13-14 17-18 23-24 13-14 04-05 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000173 MANAJEMEN STRATEGI 2 02-03 12-13 23-24 15-16 06-07 10-11 15-16 12-13 16-17 14-15 11-12 16-17 4.500.000174 Manajemen Sumber Daya Manusia 2 27-28 12-13 23-24 29-30 11-12 10-11 29-30 12-13 28-29 14-15 11-12 30-31 5.500.000175 Manajemen Transportasi 3 06-08 10-12 16-18 27-29 04-06 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000176 MARINE AND TERMINAL OPERATION 4 28-31 04-07 17-20 13-16 05-08 02-05 13-16 04-07 14-17 06-09 03-06 14-17 8.500.000177 MARINE SURVEYOR TRAINING 4 14-17 18-21 09-12 27-30 04-07 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.500.000178 Maritime And Shipping Law 3 15-17 19-21 16-18 28-30 04-06 17-19 28-30 19-21 30-02 21-23 18-20 29-31 6.500.000

179MARKETING INTELLIGENCE FOR ENHANCING CUSTOMER RELATIONSIN RETAIL BANKING SERVICES

2 13-14 12-13 23-24 15-16 13-14 10-11 15-16 12-13 16-17 14-15 11-12 16-17 4.500.000

180 MARKETING THINK GLOBAL BUT ACTION LOCAL 3 20-22 24-26 18-20 06-08 18-20 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.500.000181 Mastering Your Health For Best Performance 3 06-08 10-12 09-11 06-08 04-06 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

182MEKANISME PENYUSUNAN PERJANJIAN DAN PEMBUATAN DOKUMENHUKUM DALAM MENANGANI KREDIT MACET OLEH PERUSAHAAN

2 02-03 12-13 23-24 23-24 14-15 10-11 23-24 12-13 24-25 14-15 11-12 23-24 4.500.000

183MEMBANGUN ALIANSI STRATEGIS ANTAR PELAKU UMKM MELALUIPENYADARAN DAN PENGORGANISASIAN MODAL SOSIAL

2 20-21 13-14 23-24 20-21 19-20 11-12 20-21 13-14 21-22 15-16 12-13 21-22 4.500.000

Page 113: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

184Membuat Model Customer Development (MCD) (ModelPengembangan Pelanggan)

2 27-28 19-20 23-24 27-28 06-07 17-18 27-28 20-21 01-02 21-22 18-19 28-29 4.500.000

185MEMPERKUAT STRATEGI PENGANGGARAN DAN MENGEKSPLORASIPERAMALAN, PENGENDALIAN BIAYA DAN MASALAH PERILAKU

2 08-09 27-28 23-24 08-09 14-15 25-26 08-09 27-28 09-10 29-30 26-27 09-10 4.500.000

186 MENATA OUTSOURCING SESUAI SURAT EDARAN MENAKERTRANS RI 2 02-03 24-25 23-24 27-28 19-20 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

187MENDAPATKAN KETERAMPILAN, WAWASAN DAN KOMPETENSI YANGDIBUTUHKAN DALAM MEMENANGKAN NEGOSIASI MELALUI WIN-WIN SOLUTION

2 16-17 06-07 05-06 16-17 18-19 02-03 16-17 06-07 17-18 08-09 05-06 17-18 4.500.000

188 MENGELOLA PERUBAHAN DALAM ORGANISASI 2 20-21 24-25 23-24 20-21 11-12 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.000189 MENGEMBANGKAN EKOSISTEM INOVASI ORGANISASI 2 22-23 20-21 19-20 22-23 14-15 18-19 22-23 18-19 23-24 22-23 19-20 23-24 4.500.000

190Mengembangkan Elemen-Elemen Strategis Unik Bagi UpayaMeningkatkan Kinerja Competitive Advantage UKM

3 29-31 24-26 09-11 15-17 18-20 22-24 15-17 24-26 16-18 26-28 23-25 16-18 6.500.000

191 MENGEMBANGKAN KAPABILITAS EKSEKUSI DI DALAM ORGANISASI 2 29-30 26-27 23-24 29-30 19-20 24-25 29-30 26-27 28-29 28-29 25-26 30-31 4.500.000

192Meningkatkan Kemampuan Modal Sosial UKM Sebagai UpayaMeningkatkan Kinerja Bisnis

3 08-10 03-05 16-18 22-24 06-08 03-05 22-24 03-05 23-25 05-07 02-04 22-24 6.500.000

193 Mewujudkan Harmonisasi Organisasi 3 13-15 10-12 02-04 28-30 13-15 08-10 28-30 10-12 28-30 12-14 09-11 29-31 6.500.000

194 MINI BUSINESS & ADMINISTRATIONS FOR OIL AND GAS INDUSTRY 3 22-24 26-28 04-06 27-29 18-20 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.000

195MONITORING DAN EVALUASI PROGRAM CSR DAN COMMUNITYDEVELOPMENT

3 20-22 17-19 02-04 13-15 18-20 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.000

196NEED ASSESMENT DAN READINESS ASSESMENT AKREDITASIPUSKESMAS

3 27-29 17-19 18-20 20-22 06-08 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

197 Office Automation 2 02-03 17-18 23-24 08-09 18-19 15-16 09-10 18-19 10-11 19-20 16-17 10-11 4.500.000198 OFFICE COMMUNICATION AND BEHAVIOR ETHIC 2 02-03 17-18 23-24 08-09 19-20 15-16 09-10 18-19 10-11 19-20 16-17 10-11 4.500.000199 OFFICE MANAGEMENT (MANAJEMEN KEARSIPAN) 3 15-17 19-21 16-18 27-29 18-20 17-19 27-29 19-21 28-30 21-23 18-20 28-30 6.500.000200 OIL TANKERS AND TERMINALS SAFETY 4 14-17 18-21 02-05 13-16 04-07 16-19 13-16 18-21 14-17 20-23 17-20 14-17 8.500.000201 Operasi Marine 3 06-08 10-12 04-06 01-03 18-20 08-10 01-03 10-12 02-04 12-14 09-11 02-04 6.500.000202 ORGANIZATIONAL CHANGE 2 02-03 24-25 23-24 30-31 13-14 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000203 ORGANIZATIONAL DEVELOPMENT 3 22-24 12-14 02-04 30-01 11-13 10-12 29-01 12-14 31-02 14-16 11-13 30-02 6.500.000204 OTOMASI PERPUSTAKAAN BERBASIS SLIMS 3 20-22 17-19 09-11 27-29 11-13 15-17 27-29 18-20 28-30 19-21 16-18 28-30 6.500.000205 PAJAK PENGHASILAN 3 27-29 03-05 09-11 13-15 04-06 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.500.000206 PDCA (Planning, Doing, Checking, Acting) 3 08-10 05-07 09-11 15-17 18-20 03-05 15-17 05-07 16-18 07-09 04-06 16-18 6.500.000207 PELAKSANAAN KONTRAK 2 29-30 20-21 19-20 29-30 18-19 18-19 29-30 20-21 30-01 22-23 19-20 30-31 4.500.000208 PEMBELAJARAN AKUNTANSI IFRS 2 02-03 19-20 23-24 22-23 14-15 17-18 22-23 20-21 23-24 21-22 18-19 23-24 4.500.000209 PEMETAAN STAKEHOLDER DAN PERENCANAAN PROGRAM CSR 3 06-08 03-05 18-20 27-29 18-20 02-04 27-29 03-05 28-30 05-07 02-04 28-30 6.500.000210 PENERAPAN ISPS CODE DAN ISM CODE DALAM PELAYARAN 3 20-22 24-26 09-11 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

211PENERAPAN PTK 007 Rev. 3 SEBAGAI PEDOMAN PENGADAANBARANG DAN JASA INDUSTRI HULU MIGAS

3 06-08 03-05 16-18 28-30 04-06 02-04 28-30 03-05 30-02 05-07 02-04 29-31 6.500.000

212 Pengadaan Tanah Untuk Pembangunan Bagi Kepentingan Umum 3 13-15 10-12 02-04 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

Page 114: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga213 PENGAMANAN MELEKAT (CLOSE PROTECTION GUARD) 2 02-03 24-25 23-24 20-21 04-05 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.000214 Pengembangan Produk Layak Minimal 2 02-03 24-25 23-24 01-02 13-14 22-23 01-02 24-25 02-03 26-27 23-24 02-03 4.500.000215 PENGENDALIAN INTERN INSTANSI PEMERINTAH 2 02-03 13-14 23-24 08-09 11-12 11-12 08-09 13-14 09-10 15-16 12-13 09-10 4.500.000216 PENILAIAN RISIKO DI INSTANSI PEMERINTAH 2 02-03 20-21 23-24 16-17 19-20 18-19 16-17 18-19 17-18 22-23 19-20 17-18 4.500.000

217PENYUSUNAN ANGGARAN PERAWATAN BANGUNAN GEDUNG DANFASILITAS

4 14-17 18-21 02-05 27-30 05-08 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.500.000

218Penyusunan Dokumen Perencanaan Pengadaan Tanah UntukKepetingan Umum (DP2TUP)

3 20-22 17-19 09-11 30-01 06-08 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

219PENYUSUNAN KONTRAK BISNIS, NEGOSIASI DAN NYELESAIANSENGKETA

3 08-10 03-05 02-04 07-09 11-13 02-04 08-10 03-05 09-11 05-07 02-04 09-11 6.500.000

220PENYUSUNAN PERENCANAAN STRATEGIK DAN EVALUASI KINERJADENGAN MENGGUNAKAN ANALISA SWOT BSC

3 27-29 17-19 09-11 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

221 PENYUSUNAN RENSTRA DESA 2 02-03 06-07 23-24 27-28 18-19 02-03 27-28 06-07 01-02 08-09 05-06 28-29 4.500.000222 Penyusunan Renstra SI-TI di Rumah Sakit 3 13-15 03-05 02-04 06-08 11-13 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

223PENYUSUNAN STANDAR KOMPETENSI JABATAN PEGAWAI NEGERISIPIL

2 06-07 03-04 23-24 06-07 18-19 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

224 PEOPLE EQUITY 3 06-08 17-19 11-13 13-15 06-08 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.000

225PERANCANGAN PEMBUATAN PERATURAN PERUNDANG-UNDANGAN(LEGAL DRAFTING)

3 15-17 12-14 09-11 15-17 18-20 10-12 15-17 12-14 16-18 14-16 11-13 16-18 6.500.000

226 PERFORMANCE GOALS SETTING 2 22-23 13-14 12-13 22-23 06-07 11-12 22-23 13-14 23-24 15-16 12-13 23-24 4.500.000227 Perhitungan Unit Cost 3 06-08 24-26 16-18 27-29 04-06 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.000228 PERPUSTAKAAN DIGITAL 2 02-03 17-18 23-24 27-28 04-05 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.000229 PERSELISIHAN HUBUNGAN INDUSTRIAL 2 02-03 03-04 23-24 30-31 04-05 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000230 Persiapan Masa Pensiun Orientasi Pendirian Usaha Baru 2 02-03 17-18 23-24 20-21 04-05 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

231Persiapan Memasuki Masa Purnabakti - TEKNIK BUDIDAYAPETERNAKAN

3 20-22 24-26 02-04 30-01 04-06 22-24 29-01 24-26 31-02 26-28 23-25 30-02 7.500.000

232 PERSIAPAN PENSIUN (PRE-RETIREMENT TRAINING) 4 20-23 03-06 16-19 30-02 11-14 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.000233 Persiapan Purnabhakti 4 14-17 11-14 17-20 31-03 04-07 09-12 30-03 11-14 01-04 13-16 10-13 01-04 8.500.000234 PERSUASIVE SELLING SKILLS WORKSHOP 2 02-03 03-04 23-24 06-07 13-14 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000235 PERSUASIVE-SELLING SKILLS WORKSHOP 2 02-03 10-11 23-24 08-09 07-08 08-09 08-09 10-11 09-10 12-13 09-10 09-10 4.500.000236 PILOT, JETTY AND LOADING MASTER 4 28-31 04-07 09-12 30-02 05-08 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.000237 PORT MANAGEMENT 3 29-31 05-07 04-06 15-17 18-20 03-05 15-17 05-07 16-18 07-09 04-06 16-18 6.500.000238 PORT MANAGEMENT 4 27-30 03-06 02-05 06-09 05-08 02-05 07-10 03-06 08-11 05-08 02-05 08-11 8.500.000239 PR STRATEGY PR FOR EXCELLENT SECRETARYADMINISTRATION 3 22-24 26-28 02-04 30-01 04-06 24-26 29-01 26-28 31-02 28-30 25-27 30-02 6.500.000240 PROBLEM SOLVING & DECISION MAKING 3 20-22 24-26 11-13 13-15 13-15 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000241 PROBLEM SOLVING AND DECISION MAKING 2 02-03 24-25 23-24 02-03 19-20 22-23 02-03 24-25 03-04 26-27 23-24 03-04 4.500.000242 PROFESSIONAL CALL CENTER OFFICER 2 13-14 03-04 23-24 13-14 13-14 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.000243 PROFESSIONAL RECEPTIONIST & OPERATOR 2 20-21 12-13 23-24 20-21 19-20 10-11 20-21 12-13 21-22 14-15 11-12 21-22 4.500.000244 PROFESSIONAL SALESMANSHIP 2 02-03 17-18 23-24 13-14 18-19 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.000245 PROFESSIONAL SECRETARY SKILLS 2 27-28 19-20 23-24 29-30 06-07 17-18 29-30 20-21 30-01 21-22 18-19 30-31 4.500.000246 PROFITABLE SELLING SKILLS 2 09-10 03-04 02-03 06-07 07-08 04-05 09-10 03-04 10-11 05-06 02-03 10-11 4.500.000247 Project Cost Management 4 20-23 24-27 09-12 31-03 11-14 22-25 30-03 24-27 01-04 26-29 23-26 01-04 8.500.000248 PROJECT FEASIBILITY STUDY 3 20-22 24-26 02-04 13-15 11-13 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

Page 115: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga249 PROJECT MANAGEMENT 3 20-22 17-19 04-06 28-30 18-20 15-17 28-30 18-20 30-02 19-21 16-18 29-31 6.500.000250 PROJECT MANAGEMENT 4 06-09 10-13 03-06 13-16 12-15 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.000251 PROJECT MANAGEMENT DENGAN MICROSOFT PROJECT 4 27-30 03-06 17-20 06-09 04-07 02-05 07-10 03-06 08-11 05-08 02-05 08-11 8.500.000252 PROJECT MANAGEMENT DENGAN PRIMAVERA 4 20-23 24-27 16-19 13-16 11-14 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.000253 PROJECT MANAGEMENT FOR OIL AND GAS INDUSTRY 3 22-24 26-28 04-06 06-08 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.950.000254 PROJECT MONITORING AND EVALUATION 4 13-16 17-20 10-13 20-23 05-08 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000255 Project Scheduling 4 21-24 25-28 16-19 27-30 11-14 23-26 27-30 25-28 28-01 27-30 24-27 28-31 8.500.000256 PUBLIC SERVICE AND MARKETING 2 13-14 10-11 09-10 13-14 13-14 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000257 QUALITY CUSTOMER SERVICE (SERVICE EXCELLENT) 3 06-08 10-12 18-20 15-17 18-20 08-10 15-17 10-12 16-18 12-14 09-11 16-18 6.500.000258 QUANTITY SURVEYOR 4 28-31 04-07 02-05 30-02 04-07 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.000259 QUANTUM LEADERSHIP SKILLS WORKSHOP 3 06-08 19-21 02-04 15-17 11-13 17-19 15-17 18-20 16-18 21-23 18-20 16-18 6.500.000260 Quantum Teaching 3 13-15 17-19 16-18 13-15 11-13 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.000

261REDESAIN KOMPETENSI SDM DAN PENGEMBANGAN KNOWLEDGEMANAJEMEN

3 22-24 05-07 11-13 07-09 04-06 03-05 08-10 05-07 09-11 07-09 04-06 09-11 6.500.000

262 REDUCTION COST DENGAN ACTIVITY BASED COST (ABC) SYSTEM 3 20-22 10-12 02-04 13-15 11-13 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

263 Regulasi Ketenagakerjaan 2 08-09 03-04 23-24 08-09 18-19 02-03 09-10 03-04 10-11 05-06 02-03 10-11 5.500.000264 Regulasi Ketenagakerjaan Di Sektor Pertambangan 2 02-03 24-25 23-24 01-02 14-15 22-23 01-02 24-25 02-03 26-27 23-24 02-03 5.500.000265 Rencana Anggaran Biaya Konstruksi 4 07-10 11-14 09-12 06-09 12-15 09-12 06-09 11-14 07-10 13-16 10-13 07-10 8.500.000266 Research Skill bagi Pustakawan 2 02-03 12-13 23-24 13-14 14-15 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.000267 RISK MANAGEMENT 3 27-29 24-26 11-13 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000268 RISK MANAGEMENT AND DRIVING CHANGE 3 29-31 19-21 11-13 06-08 18-20 17-19 06-08 19-21 07-09 21-23 18-20 07-09 6.500.000269 Risk Management Expect 4 06-09 24-27 17-20 13-16 12-15 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.000

270SECURITY AWARENESS PROGRAM AND PROMOTING IMAGE FORSECURITY

2 02-03 05-06 23-24 15-16 19-20 04-05 15-16 05-06 16-17 07-08 04-05 16-17 4.500.000

271 SELF MANAGEMENT MANAGEMENT BY OBJECTIVE 2 02-03 17-18 23-24 29-30 04-05 15-16 29-30 18-19 01-02 19-20 16-17 30-31 4.500.000272 SERVICE EXCELLENCE 2 23-24 17-18 16-17 23-24 18-19 15-16 23-24 20-21 24-25 19-20 16-17 21-22 4.500.000273 SERVICE EXCELLENCE 2 02-03 26-27 23-24 01-02 14-15 24-25 01-02 26-27 02-03 28-29 25-26 02-03 4.500.000274 SERVICE EXCELLENT with NLP 2 02-03 06-07 23-24 27-28 04-05 02-03 27-28 06-07 01-02 08-09 05-06 28-29 4.500.000275 Seven Habbits 2 15-16 10-11 23-24 16-17 07-08 08-09 16-17 10-11 17-18 12-13 09-10 17-18 5.500.000276 SHIP’S SECURITY OFFICER 3 08-10 12-14 18-20 01-03 18-20 10-12 01-03 12-14 02-04 14-16 11-13 02-04 6.500.000277 SHIPPING AGENCY 3 08-10 12-14 09-11 22-24 18-20 10-12 22-24 12-14 23-25 14-16 11-13 22-24 6.500.000278 Shipping Management 3 13-15 17-19 04-06 20-22 13-15 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000279 SHIPPING MANAGEMENT 4 06-09 10-13 10-13 14-17 11-14 08-11 14-17 10-13 15-18 12-15 09-12 15-18 8.500.000280 SHIPPING REPORTING SYSTEMS 4 13-16 17-20 17-20 20-23 04-07 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.000281 SISTEM AKUNTABILITAS KINERJA INSTANSI PEMERINTAH 2 02-03 27-28 23-24 23-24 04-05 25-26 23-24 27-28 24-25 29-30 26-27 21-22 4.500.000282 SISTEM INFORMASI MANAJEMEN RUMAH SAKIT (SIM-RS) 3 20-22 10-12 09-11 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

283SISTEM MANAGEMENT MUTU ISO 9001 2008 UNTUKPERPUSTAKAAN

3 06-08 10-12 09-11 30-01 04-06 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

284SISTEMATIKA DAN STRATEGI PENANGANAN KREDIT BERMASALAHDENGAN KONSEP ORIENTASI PADA PROFIT

3 20-22 10-12 09-11 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

285 STAKEHOLDER MAPPING DALAM CSR THROUGH TEAM BUILDING 3 27-29 24-26 09-11 20-22 18-20 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.000

Page 116: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga286 Strategi Manajemen Risiko Yang Efektif 2 06-07 03-04 23-24 08-09 18-19 04-05 08-09 03-04 09-10 05-06 02-03 09-10 4.500.000287 STRATEGIC BRAND MANAGEMENT 2 02-03 24-25 23-24 20-21 13-14 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.000288 STRATEGIC DECISION MAKING 3 08-10 26-28 18-20 13-15 06-08 24-26 13-15 26-28 14-16 28-30 25-27 14-16 6.500.000289 STRATEGIC FINANCIAL MANAGEMENT 3 15-17 05-07 04-06 20-22 13-15 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.000290 Strategic Internal Auditing 2 02-03 03-04 23-24 27-28 13-14 04-05 27-28 03-04 01-02 05-06 02-03 28-29 4.500.000

291 STRATEGIC PEOPLE MANAGEMENT FOR IMPROVED PERFORMANCE 3 20-22 10-12 09-11 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

292 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 3 22-24 26-28 16-18 06-08 18-20 24-26 06-08 26-28 07-09 28-30 25-27 07-09 6.500.000293 STRATEGIC PUBLIC RELATION 2 02-03 05-06 23-24 27-28 19-20 04-05 27-28 05-06 28-29 07-08 04-05 28-29 4.500.000294 SUCCESSFUL PERFORMANCE MANAGEMENT 3 27-29 17-19 16-18 01-03 04-06 15-17 01-03 18-20 02-04 19-21 16-18 02-04 6.500.000295 SUCCESSFUL PROJECT MANAGEMENT 3 06-08 24-26 02-04 07-09 11-13 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.000296 SUCCESSFUL STRATEGIC MANAGEMENT 3 13-15 03-05 11-13 15-17 18-20 02-04 15-17 03-05 16-18 05-07 02-04 16-18 6.500.000297 SUCCESSFUL SUPERVISORY SKILLS FOR TEAM LEADERS 3 22-24 12-14 18-20 22-24 06-08 10-12 22-24 12-14 23-25 14-16 11-13 22-24 6.500.000298 SUPERVISI PROYEK BANGUNAN GEDUNG 3 20-22 24-26 02-04 13-15 04-06 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000299 SUPERVISION AND LEADERSHIP OF CIVIL WORK 4 14-17 18-21 17-20 14-17 05-08 16-19 14-17 18-21 15-18 20-23 17-20 15-18 8.500.000300 SUPERVISORY LEADERSHIP 3 27-29 19-21 11-13 07-09 18-20 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.500.000301 SUPERVISORY MANAGEMENT 3 06-08 03-05 18-20 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000302 SUPPLY CHAIN MANAGEMENT 3 15-17 12-14 02-04 13-15 18-20 10-12 13-15 12-14 14-16 14-16 11-13 14-16 6.500.000303 SUPPLY CHAIN MANAGEMENT (SCM) 3 27-29 03-05 09-11 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.000304 SUPPLY MARKET ANALYSIS 4 27-30 03-06 02-05 14-17 12-15 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.500.000305 TANKER OPERATION 4 20-23 24-27 03-06 27-30 12-15 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

306TATACARA BERACARA PERKARA PERSELISIHAN HUBUNGANINDUSTRIAL DI PENGADILAN HUBUNGAN INDUSTRIAL

2 20-21 17-18 16-17 20-21 06-07 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

307TEKNIK PEMERIKSAAN (INVESTIGASI) DAN PRESENTASIPENGUNGKAPAN KASUS

2 02-03 03-04 23-24 27-28 11-12 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000

308 TEKNIK PENINGKATAN PRODUKTIVITAS KERJA 3 08-10 17-19 02-04 22-24 18-20 15-17 22-24 18-20 23-25 19-21 16-18 22-24 6.500.000309 TEKNIK PENULISAN LAPORAN YANG EFEKTIF 3 06-08 03-05 09-11 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.000310 TEKNIK PENYUSUNAN ANGGARAN PROYEK 4 20-23 24-27 03-06 21-24 11-14 22-25 21-24 24-27 22-25 26-29 23-26 21-24 8.500.000311 Teknik Penyusunan PKWT, PP & PKB 2 30-31 26-27 23-24 29-30 19-20 24-25 29-30 26-27 01-02 28-29 25-26 30-31 5.500.000

312TEKNIK PENYUSUNAN PROSEDUR DAN KEBIJAKAN PENCEGAHANKECURANGAN DAN PENYELEWENGAN

2 27-28 26-27 23-24 29-30 04-05 24-25 29-30 26-27 28-29 28-29 25-26 30-31 4.500.000

313 Teknik Penyusunan Silabus Dan Rencana Pelaksanaan Pelatihan (RPP) 2 02-03 05-06 23-24 02-03 04-05 04-05 02-03 05-06 03-04 07-08 04-05 03-04 5.500.000

314 TERM OF REFFERENCE PENYUSUNAN HOSPITAL DISASTER PLAN 5 20-24 17-21 09-13 13-17 04-08 15-19 13-17 24-28 14-18 19-23 16-20 14-18 9.500.000

315 THE ADVANCED MANAGEMENT PROGRAMME 3 29-31 19-21 04-06 28-30 13-15 17-19 28-30 19-21 30-02 21-23 18-20 29-31 6.500.000316 THE LOYALIST MEMBANGUN MENTAL LOYALITAS KARYAWAN 3 13-15 17-19 04-06 22-24 06-08 15-17 22-24 18-20 23-25 19-21 16-18 22-24 6.500.000317 THE SENIOR MANAGEMENT PROGRAMME 3 08-10 26-28 09-11 30-01 18-20 24-26 29-01 26-28 31-02 28-30 25-27 30-02 6.500.000318 TIME MANAGEMENT 3 27-29 03-05 16-18 01-03 18-20 02-04 01-03 03-05 02-04 05-07 02-04 02-04 6.500.000319 Time Management 3 13-15 17-19 04-06 30-01 13-15 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000320 TOTAL COST OF OWNERSHIP ANALYSIS 3 13-15 17-19 18-20 27-29 18-20 15-17 27-29 18-20 30-02 19-21 16-18 28-30 6.500.000321 Training & Development Management 2 09-10 12-13 23-24 06-07 13-14 10-11 06-07 12-13 07-08 14-15 11-12 07-08 5.500.000322 Training Need Analysis 2 16-17 19-20 23-24 13-14 18-19 17-18 13-14 20-21 14-15 21-22 18-19 14-15 5.500.000

Page 117: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

323 TRANSFORMATIONAL LEADERSHIP AND STRATEGY FORMULATION 3 15-17 05-07 16-18 06-08 04-06 03-05 06-08 05-07 07-09 07-09 04-06 07-09 6.500.000

324 TRANSPORTATION MANAGEMENT 3 08-10 05-07 04-06 01-03 18-20 03-05 01-03 05-07 02-04 07-09 04-06 02-04 6.500.000325 WAREHOUSING 3 27-29 03-05 18-20 20-22 04-06 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.000326 WORKSHOP MENULIS BAGI GURU DAN PUSTAKAWAN 2 02-03 20-21 23-24 22-23 19-20 18-19 22-23 20-21 23-24 22-23 19-20 23-24 4.500.000

327Workshop Pengelolaan Dokumen (arsip) Desa Berbasis TeknologiInformasi

2 02-03 26-27 23-24 29-30 07-08 24-25 29-30 26-27 01-02 28-29 25-26 30-31 4.500.000

Measurement/Pengukuran - Instrumentasi -Otomasi Industri

1 ALARM AND PROTECTIVE DEVICES 4 06-09 17-20 09-12 06-09 04-07 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.0002 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 13-15 17-19 18-20 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.0003 DASAR TEKNIK KENDALI UNTUK INDUSTRI 4 27-30 03-06 02-05 27-30 04-07 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

4 DISTRIBUTION SYSTEM FUZZY LOGIC & METERING LOAD CONTROL 4 28-31 04-07 10-13 14-17 12-15 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.000

5 FUNDAMENTAL CONTROLLER AND VALVE 4 20-23 24-27 09-12 27-30 04-07 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.0006 HYDRAULICS AND PNEUMATICS 3 27-29 03-05 02-04 22-24 04-06 02-04 22-24 03-05 23-25 05-07 02-04 21-23 6.500.0007 HYDRAULLIC ANALYSIS FOR PIPING AND PIPELINE NETWORK 4 13-16 17-20 09-12 06-09 04-07 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.0008 INDUSTRIAL AUTOMATION & CONTROL 4 28-31 11-14 16-19 21-24 12-15 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.0009 INDUSTRIAL CONTROL SYSTEMS 4 27-30 03-06 10-13 21-24 11-14 02-05 21-24 03-06 22-25 05-08 02-05 21-24 8.500.000

10 INDUSTRIAL PROCESS CONTROL & INSTRUMENTATION 3 08-10 12-14 09-11 06-08 18-20 10-12 06-08 12-14 07-09 14-16 11-13 07-09 6.500.00011 Infrared Thermography 4 20-23 24-27 03-06 13-16 12-15 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.00012 INSTRUMENT CONTROL AND SAFETY 4 13-16 03-06 10-13 30-02 04-07 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.000

13INSTRUMENTASI PENGUKURAN LANJUT (ADVANCEINSTRUMENTATION)

4 06-09 17-20 02-05 27-30 04-07 15-18 27-30 18-21 29-02 19-22 16-19 28-31 8.500.000

14 INSTRUMENTASI, ALAT UKUR DAN PENGUKURAN 4 20-23 03-06 09-12 27-30 05-08 02-05 27-30 03-06 29-02 05-08 02-05 28-31 8.500.00015 INSTRUMENTATION AND CALIBRATION 4 14-17 18-21 17-20 14-17 04-07 16-19 14-17 18-21 15-18 20-23 17-20 15-18 8.500.00016 INSTRUMENTATION AND CONTROL SYSTEMS 4 20-23 24-27 02-05 20-23 11-14 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.500.00017 Instrumentation Electric and Control System 4 27-30 03-06 10-13 20-23 05-08 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.00018 Kalibrasi 4 20-23 10-13 17-20 06-09 11-14 08-11 07-10 10-13 08-11 12-15 09-12 08-11 8.500.00019 LABVIEW (PROGRAMMING AND INTERFACING) 3 15-17 19-21 11-13 27-29 18-20 17-19 27-29 18-20 30-02 21-23 18-20 28-30 6.950.00020 Pengambilan Data dan Kontrol Kualitas 4 07-10 25-28 09-12 21-24 12-15 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.00021 PNEUMATIC AND HYDRAULIC SYSTEMS 4 27-30 03-06 09-12 27-30 04-07 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.000

22POTENSI KESALAHAN PADA SISTEM PENGUKURAN, SENSOR, DANINSTRUMENTASI PENGUKURAN

4 07-10 18-21 09-12 20-23 04-07 16-19 20-23 18-21 21-24 20-23 17-20 21-24 8.500.000

23 PRESSURE TRANSMITTER 4 20-23 24-27 09-12 27-30 12-15 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.00024 PROCESS CONTROL INSTRUMENTATION 4 14-17 25-28 16-19 27-30 11-14 23-26 27-30 25-28 28-01 27-30 24-27 28-31 8.500.00025 SISTEM PENGUKURAN DAN KALIBRASI 4 06-09 17-20 17-20 14-17 04-07 15-18 14-17 18-21 15-18 19-22 16-19 15-18 8.500.00026 SUBSTATION EQUIPMENT & CONTROL RELAY 4 28-31 04-07 03-06 27-30 11-14 02-05 27-30 04-07 29-02 06-09 03-06 28-31 8.500.000

Mechanical1 AC AND REFRIGERATION SAFETY AND CONTROL SYSTEM 4 27-30 03-06 09-12 30-02 11-14 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.000

Page 118: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga2 AC CONTROLLING SYSTEM 3 06-08 10-12 16-18 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.0003 Alignment 4 07-10 18-21 02-05 06-09 04-07 16-19 06-09 18-21 07-10 20-23 17-20 07-10 8.500.000

4ALIGNMENT PRESISI, ALAT UKUR DAN ALAT BANTUPENGUKURANNYA

4 27-30 10-13 16-19 31-03 12-15 08-11 30-03 10-13 01-04 12-15 09-12 01-04 8.500.000

5 ANTI SURGE CENTRIFUGAL COMPRESSOR 4 14-17 25-28 10-13 13-16 11-14 23-26 13-16 25-28 14-17 27-30 24-27 14-17 8.500.0006 API 650 3 13-15 17-19 09-11 06-08 11-13 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.0007 APLIKASI CAD CAM LANJUT PADA JEWELRY I 2 02-03 06-07 23-24 20-21 18-19 02-03 20-21 06-07 21-22 08-09 05-06 21-22 5.500.0008 APLIKASI CAD CAM LANJUT PADA JEWELRY II 3 22-24 12-14 18-20 27-29 18-20 10-12 27-29 12-14 28-30 14-16 11-13 28-30 7.500.0009 ASME VIII div.1 Pressure Vessel 3 20-22 24-26 16-18 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.000

10 BALANCING AND TOTAL ALIGNMENT 4 28-31 17-20 03-06 30-02 05-08 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.00011 BASIC ENERGY CONVERSION 4 06-09 24-27 09-12 06-09 12-15 22-25 07-10 24-27 08-11 26-29 23-26 08-11 8.500.00012 BASIC GAS COMPRESSOR OPERATION & MAINTENANCE 3 13-15 17-19 02-04 13-15 04-06 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.00013 BASIC MACHINERY VIBRATION 4 13-16 24-27 16-19 13-16 11-14 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.00014 BASIC MECHANICAL 4 20-23 24-27 10-13 20-23 12-15 22-25 20-23 24-27 21-24 26-29 23-26 21-24 8.500.00015 BASIC PIPELINE ENGINEERING 4 28-31 04-07 17-20 27-30 05-08 02-05 27-30 04-07 28-01 06-09 03-06 28-31 8.500.00016 BASIC REFRIGERATION 4 07-10 11-14 03-06 31-03 11-14 09-12 30-03 11-14 01-04 13-16 10-13 01-04 8.500.00017 BASIC VIBRATION ANALYSIS 4 20-23 03-06 02-05 20-23 05-08 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.00018 BEARING TECHNOLOGY AND ENGINE LUBRICATION SYSTEM 3 15-17 19-21 09-11 07-09 18-20 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.500.00019 Boiler combustion analysis and optimizing 4 13-16 03-06 16-19 14-17 04-07 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.500.000

20CENTRIFUGAL COMPRESSOR PERFORMANCE & CONDITIONEVALUATION

4 27-30 10-13 10-13 27-30 12-15 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

21 Coating and Corrosion Protection 4 20-23 10-13 02-05 21-24 11-14 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.500.000

22 COMPRESSOR OPERATION, MAINTENANCE & TROUBLESHOOTING 4 07-10 18-21 17-20 30-02 04-07 16-19 29-02 18-21 31-03 20-23 17-20 30-03 8.500.000

23 CORROSION AND SCALING PREVENTION 4 27-30 18-21 10-13 27-30 05-08 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.500.00024 Dasar-dasar Aplikasi CAD CAM pada Jewelry 4 14-17 04-07 03-06 06-09 04-07 02-05 06-09 04-07 07-10 06-09 03-06 07-10 8.500.00025 DASAR-DASAR APLIKASI CAD CAM PADA JEWELRY II 4 07-10 25-28 17-20 31-03 12-15 23-26 30-03 25-28 01-04 27-30 24-27 01-04 8.500.00026 FAILURE MODE AND EFFECT ANALYSIS (FMEA) 4 28-31 17-20 16-19 20-23 05-08 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.00027 FAILURE MODE AND EFFECT ANALYSIS (FMEA) 3 22-24 26-28 16-18 15-17 18-20 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.00028 FLANGE AND JOINT INTEGRITY 4 21-24 04-07 09-12 14-17 05-08 02-05 14-17 04-07 15-18 06-09 03-06 15-18 8.500.00029 Gas Turbine Operation, Maintenace & Control System 4 06-09 24-27 02-05 27-30 12-15 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

30HEAT EXCHANGERS STANDARD DESIGN, MAINTENANACE ANDINSPECTION

4 14-17 25-28 03-06 27-30 11-14 23-26 27-30 25-28 28-01 27-30 24-27 28-31 8.500.000

31 HYDRAULICS AND PNEUMATICS 3 27-29 03-05 02-04 22-24 04-06 02-04 22-24 03-05 23-25 05-07 02-04 21-23 6.500.00032 HYDRAULLIC ANALYSIS FOR PIPING AND PIPELINE NETWORK 4 13-16 17-20 09-12 06-09 04-07 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

33 INTEGRATED PIPELINE DESIGN, OPERATION DAN MAINTENANCE 4 06-09 10-13 10-13 27-30 12-15 08-11 27-30 10-13 29-02 12-15 09-12 28-31 8.500.000

34 MACHINERY VIBRATION ANALYSIS 4 13-16 24-27 10-13 31-03 11-14 22-25 30-03 24-27 01-04 26-29 23-26 01-04 8.500.00035 MECHANICAL SEAL 4 27-30 18-21 03-06 14-17 05-08 16-19 14-17 18-21 15-18 20-23 17-20 15-18 8.500.00036 METALLURGY IN WELDING 3 13-15 17-19 18-20 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.00037 OPERASI DAN PERAWATAN SISTEM POMPA SENTRIFUGAL 4 07-10 11-14 16-19 20-23 04-07 09-12 20-23 11-14 21-24 13-16 10-13 21-24 8.500.00038 PIPELINE FOR NON PIPELINE 4 14-17 18-21 02-05 27-30 12-15 16-19 27-30 18-21 28-01 20-23 17-20 28-31 8.500.00039 PIPELINE INSPECTOR 4 21-24 25-28 10-13 31-03 05-08 23-26 30-03 25-28 01-04 27-30 24-27 01-04 8.500.000

Page 119: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga40 PIPESTRESS ANALYSIS USING SOFTWARE CAESAR II 4 27-30 10-13 03-06 13-16 12-15 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.00041 PNEUMATIC AND HYDRAULIC SYSTEMS 4 27-30 03-06 09-12 27-30 04-07 02-05 27-30 03-06 28-01 05-08 02-05 28-31 8.500.00042 PRESSURE VESSEL 4 21-24 11-14 02-05 31-03 11-14 09-12 30-03 11-14 01-04 13-16 10-13 01-04 8.500.00043 PRESSURE VESSEL 3 27-29 03-05 02-04 20-22 04-06 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.00044 PROCESS PIPING & PIPELINE SYSTEM 4 28-31 17-20 10-13 06-09 05-08 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.00045 PROCESS PIPING & PIPELINE SYSTEM 4 27-30 03-06 17-20 06-09 11-14 02-05 07-10 03-06 08-11 05-08 02-05 08-11 8.500.00046 PUMP OPERATION, MAINTENANCE & TROUBLESHOOTING 4 13-16 24-27 09-12 21-24 11-14 22-25 21-24 24-27 22-25 26-29 23-26 21-24 8.500.00047 RECIPROCATING COMPRESSOR 3 06-08 10-12 04-06 15-17 18-20 08-10 15-17 10-12 16-18 12-14 09-11 16-18 6.500.00048 REFRIGERATION_OPERATION AND MAINTENANCE 4 28-31 04-07 02-05 30-02 04-07 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.00049 TEORI DAN APLIKASI BELT CONVEYOR 4 13-16 24-27 03-06 21-24 11-14 22-25 21-24 24-27 22-25 26-29 23-26 21-24 8.500.00050 TROUBLESHOOTING AC SPLIT DUCT 4 07-10 11-14 10-13 06-09 12-15 09-12 06-09 11-14 07-10 13-16 10-13 07-10 8.500.00051 VIBRATION ANALYSIS 3 20-22 24-26 16-18 27-29 18-20 22-24 27-29 24-26 30-02 26-28 23-25 28-30 6.500.00052 Vibration and Alignment 4 07-10 25-28 02-05 06-09 12-15 23-26 07-10 25-28 08-11 27-30 24-27 08-11 8.500.000

Minyak & Gas Bumi (Migas)1

CONTRACT MANAGEMENT, STRATEGY AND ADMINISTRATION FOROIL AND GAS COMPANY

3 27-29 03-05 02-04 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

2COST CONTROL AND FINANCIAL REPORTING OF THE UPSTREAMOPERATION OF OIL AND GAS UNDER INDONESIA PSC

3 06-08 24-26 02-04 30-01 18-20 22-24 29-01 24-26 31-02 26-28 23-25 30-02 6.500.000

3 DRILLING ENGINEERING FOR NON- DRILLING ENGINEERS 2 02-03 03-04 23-24 06-07 18-19 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.0004 GEOTHERMAL RESERVOIR ENGINEERING 5 06-10 24-28 09-13 20-24 04-08 22-26 20-24 24-28 21-25 26-30 23-27 30-04 9.500.0005 LEGAL ASPECT IN OIL & GAS INDUSTRIES 3 13-15 17-19 18-20 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.000

6 MINI BUSINESS & ADMINISTRATIONS FOR OIL AND GAS INDUSTRY 3 22-24 26-28 04-06 27-29 18-20 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.000

7 OFFSHORE WELLHEAD PLATFORM OPERATION 3 13-15 10-12 09-11 06-08 04-06 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

8 OIL AND GAS CONTRACT MANAGEMENT PRINCIPLES AND PRACTICES 3 13-15 10-12 09-11 13-15 18-20 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.000

9 OIL AND GAS PROCESSING PLANT DESIGN AND OPERATIONS 4 28-31 11-14 16-19 06-09 12-15 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.500.00010 OIL AND WATER HANDLING FACILITIES 4 07-10 18-21 02-05 14-17 05-08 16-19 14-17 18-21 15-18 20-23 17-20 15-18 8.500.00011 PEMODELAN RESERVOIR PANAS BUMI 4 13-16 03-06 16-19 27-30 11-14 02-05 27-30 03-06 28-01 05-08 02-05 21-24 8.500.000

12PENERAPAN PTK 007 Rev. 3 SEBAGAI PEDOMAN PENGADAANBARANG DAN JASA INDUSTRI HULU MIGAS

3 06-08 03-05 16-18 28-30 04-06 02-04 28-30 03-05 30-02 05-07 02-04 29-31 6.500.000

13PENERAPAN PTK 007 REVISI 2 DAN TKDN SBG PEDOMANPENGADAAN BARANG & JASA INDUSTRI HULU MIGAS

3 22-24 19-21 02-04 15-17 13-15 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

14 PETROLEUM ECONOMICS, RISK & FISCAL ANALYSIS 3 20-22 17-19 16-18 20-22 04-06 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.00015 PIGGING OPERATIONS 2 02-03 17-18 23-24 13-14 11-12 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.00016 PLACED INTO SERVICES (PIS) 3 27-29 26-28 04-06 27-29 11-13 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.00017 POD, WP&B, AFE 3 08-10 05-07 11-13 01-03 18-20 03-05 01-03 05-07 02-04 07-09 04-06 02-04 6.500.00018 PROJECT MANAGEMENT FOR OIL AND GAS INDUSTRY 3 22-24 26-28 04-06 06-08 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.950.000

19PTK 041 2011 PEMELIHARAAN FASILITAS PRODUKSI MINYAK DANGAS BUMI

3 15-17 12-14 18-20 07-09 06-08 10-12 08-10 12-14 09-11 14-16 11-13 09-11 6.500.000

20 PTK007 Revisi 4 tahun 2017 3 13-15 10-12 04-06 30-01 11-13 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

Page 120: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga21 SISTEM DAN TEKNOLOGI GEOTHERMAL 4 20-23 10-13 02-05 30-02 04-07 08-11 29-02 10-13 31-03 12-15 09-12 28-31 8.500.00022 TEKNIK PEMBORAN PANAS BUMI 4 27-30 17-20 09-12 06-09 12-15 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.00023 TEKNIK PRODUKSI PANAS BUMI 4 06-09 24-27 17-20 13-16 05-08 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.00024 TEKNIK RESERVOIR PANAS BUMI 4 14-17 04-07 03-06 20-23 11-14 02-05 20-23 04-07 21-24 06-09 03-06 21-24 8.500.000

25UPSTREAM OIL & GAS PROJECT_PETROECONOMIC EVALUATION ANDANALYSIS

3 29-31 24-26 09-11 22-24 18-20 22-24 22-24 24-26 23-25 26-28 23-25 22-24 6.500.000

Motivasi & Personal Development1 ACHIEVEMENT MOTIVATION 2 27-28 03-04 23-24 27-28 04-05 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.0002 ACHIEVEMENT MOTIVATION TRAINING 2 02-03 10-11 23-24 30-31 18-19 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.0003 BASIC – ADVANCE CLINICAL HYPNOTHERAPY WORKSHOP 3 27-29 12-14 16-18 13-15 18-20 10-12 13-15 12-14 14-16 14-16 11-13 14-16 6.500.0004 BECOMING AN INSPIRING & INFLUENCE TEACHER 2 02-03 19-20 23-24 22-23 06-07 17-18 22-23 20-21 23-24 21-22 18-19 23-24 4.500.0005 BUILDING AND MANAGING HIGH PERFORMANCE TEAMS 3 13-15 03-05 11-13 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.0006 CAPACITY BUILDING 3 13-15 17-19 16-18 06-08 04-06 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.0007 CHARACTER BUILDING 3 06-08 10-12 09-11 06-08 11-13 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.0008 CHARACTER BUILDING FOR PEAK PERFORMANCE 2 02-03 24-25 23-24 20-21 18-19 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.0009 COMMUNICATION SKILL 3 13-15 17-19 16-18 13-15 18-20 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.000

10 COMMUNICATION SKILLS 2 02-03 06-07 23-24 27-28 07-08 04-05 27-28 06-07 28-29 08-09 05-06 28-29 4.500.00011 COMMUNICATION SKILLS 2 06-07 17-18 16-17 06-07 18-19 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.00012 COMMUNICATION SKILLS 3 06-08 24-26 02-04 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.00013 COMMUNICATION SKILLS FOR SALES 3 27-29 17-19 16-18 06-08 11-13 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

14 DEVELOPING POSITIVE PERSONAL CHARACTER IN PROBLEM SOLVING 2 02-03 03-04 23-24 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

15 EFFECTIVE COMMUNICATION SKILLS WITH NLP 2 02-03 26-27 23-24 29-30 14-15 24-25 29-30 26-27 30-01 28-29 25-26 30-31 4.500.00016 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 02-03 05-06 23-24 01-02 18-19 04-05 01-02 05-06 02-03 07-08 04-05 02-03 4.500.00017 EFFECTIVE COACHING SKILLS 2 02-03 10-11 23-24 27-28 11-12 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.00018 EFFECTIVE COMMUNICATION SKILLS WITH NLP 2 02-03 10-11 23-24 20-21 11-12 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.00019 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 02-03 17-18 23-24 27-28 18-19 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.00020 EFFECTIVE PRESENTATION SKILLS 3 27-29 03-05 09-11 20-22 04-06 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.00021 Effective Presentation Skills 3 06-08 10-12 02-04 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.000

22 EMOTIONAL FREEDOM TECHNIQUE (EFT) FOR PEAK PERFORMANCE 2 02-03 03-04 23-24 27-28 07-08 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000

23 GRAFONOMI 2 06-07 24-25 23-24 06-07 04-05 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.00024 GREAT TEAMWORK AND SYNERGY 3 08-10 26-28 11-13 07-09 06-08 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.00025 INSPIRATIONAL PRESENTATION WITH NLP TECHNIQUES 2 02-03 24-25 23-24 30-31 04-05 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.00026 Job Hunting For Beginner 2 02-03 24-25 23-24 23-24 13-14 22-23 23-24 24-25 24-25 26-27 23-24 21-22 5.500.00027 LIFE QUALITY IMPROVEMENT CAMP 3 20-22 12-14 02-04 30-01 13-15 10-12 29-01 12-14 31-02 14-16 11-13 30-02 6.950.00028 LOBBY & NEGOTIATION SKILL 3 06-08 10-12 02-04 28-30 04-06 08-10 28-30 10-12 30-02 12-14 09-11 29-31 6.500.00029 Mastering Your Health For Best Performance 3 06-08 10-12 09-11 06-08 04-06 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

30MEMBANGUN PROFESSIONAL BEHAVIOR DENGAN KECERDASANEMOSI DAN KECERDASAN SPIRITUAL

2 02-03 10-11 23-24 20-21 11-12 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.000

31 MIND MAPPING AND HYPNOSIS FOR PROFESIONAL 3 27-29 03-05 04-06 13-15 06-08 02-04 13-15 03-05 14-16 05-07 02-04 14-16 6.500.000

Page 121: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

32 MOTIVATION YOUR SELF (ACHIEVEMENT MOTIVATION TRAINING) 3 08-10 12-14 09-11 20-22 11-13 10-12 20-22 12-14 21-23 14-16 11-13 21-23 6.500.000

33 NEGOTIATION SKILL 3 29-31 26-28 02-04 07-09 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.00034 OFFICE COMMUNICATION AND BEHAVIOR ETHIC 2 02-03 17-18 23-24 08-09 19-20 15-16 09-10 18-19 10-11 19-20 16-17 10-11 4.500.00035 OPTIMALISASI PENGELOLAAN TALENTA 3 13-15 17-19 02-04 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

36Pencarian Minat, Bakat, dan Kecerdasan Dasar melalui Analisis SidikJari bagi Pekerja & Profesional

2 06-07 27-28 23-24 06-07 04-05 25-26 08-09 27-28 09-10 29-30 26-27 09-10 5.500.000

37Pencarian Minat, Bakat, dan Kecerdasan Dasar melalui Analisis SidikJari bagi Pelajar & Mahasiswa

2 13-14 06-07 23-24 15-16 13-14 04-05 15-16 06-07 16-17 08-09 05-06 16-17 5.500.000

38 PERFORMANCE GOALS SETTING 2 22-23 13-14 12-13 22-23 06-07 11-12 22-23 13-14 23-24 15-16 12-13 23-24 4.500.00039 POWERFULL PRESENTATION (basic) 3 15-17 05-07 16-18 15-17 11-13 03-05 15-17 05-07 16-18 07-09 04-06 16-18 6.500.00040 PRESENTATION SKILL FOR THE BEGINNERS 3 20-22 24-26 16-18 20-22 18-20 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.00041 PRESENTATION SKILLS 2 30-31 20-21 19-20 27-28 11-12 18-19 27-28 18-19 01-02 22-23 19-20 28-29 4.500.00042 PROFESSIONAL PUBLIC SPEAKING 3 29-31 05-07 11-13 07-09 13-15 03-05 08-10 05-07 09-11 07-09 04-06 09-11 6.500.00043 SELF MANAGEMENT EMOTION AND STRESS 3 22-24 12-14 02-04 22-24 18-20 10-12 22-24 12-14 23-25 14-16 11-13 22-24 6.500.00044 SELF-TRANSFORMATION MANAGEMENT WORKSHOP 2 02-03 27-28 23-24 23-24 19-20 25-26 23-24 27-28 24-25 29-30 26-27 21-22 4.500.00045 SERVICE EXCELLENT with NLP 2 02-03 06-07 23-24 27-28 04-05 02-03 27-28 06-07 01-02 08-09 05-06 28-29 4.500.00046 Seven Habbits 2 15-16 10-11 23-24 16-17 07-08 08-09 16-17 10-11 17-18 12-13 09-10 17-18 5.500.00047 THE PARENTING NOBLE 2 02-03 12-13 23-24 02-03 14-15 10-11 02-03 12-13 03-04 14-15 11-12 03-04 4.500.00048 THE POWER OF POSITIVE MIND 3 20-22 24-26 09-11 28-30 11-13 22-24 28-30 24-26 30-02 26-28 23-25 29-31 6.500.00049 THE POWER OF SELF HEALING 2 02-03 17-18 23-24 27-28 18-19 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.00050 TOT (TRAINING OF TRAINER) 2 02-03 05-06 04-05 30-31 14-15 02-03 29-30 05-06 31-01 07-08 04-05 30-01 4.500.00051 Training of Trainer 3 22-24 19-21 09-11 20-22 04-06 17-19 20-22 19-21 21-23 21-23 18-20 21-23 6.500.00052 Training Of Trainer (TOT) 2 23-24 27-28 23-24 20-21 06-07 25-26 20-21 27-28 21-22 29-30 26-27 21-22 5.500.000

PLC - DCS - Microcontroller1 DISTRIBUTED CONTROL SYSTEM (DCS) PRINCIPLES AND APPLICATION 4 21-24 25-28 03-06 06-09 04-07 23-26 06-09 25-28 07-10 27-30 24-27 07-10 8.500.000

2 Distributed Control Systems (DCS), Operation, and Maintenance 4 21-24 11-14 09-12 13-16 11-14 09-12 13-16 11-14 14-17 13-16 10-13 14-17 8.500.000

3 LABVIEW (PROGRAMMING AND INTERFACING) 3 15-17 19-21 11-13 27-29 18-20 17-19 27-29 18-20 30-02 21-23 18-20 28-30 6.950.0004 MEKATRONIKA 4 27-30 03-06 10-13 27-30 12-15 02-05 27-30 03-06 29-02 05-08 02-05 28-31 8.500.0005 MICROCONTROLLER APPLICATION IN INDUSTRIAL PLANTS 3 06-08 10-12 16-18 01-03 18-20 08-10 01-03 10-12 02-04 12-14 09-11 02-04 6.500.0006 PROCESS CONTROL AND LOOP 4 20-23 24-27 16-19 06-09 04-07 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.500.000

7PROGRAMMABLE LOGIC CONTROLLER (PLC) ADVANCED ANDAPPLICATED

4 27-30 03-06 02-05 14-17 12-15 02-05 14-17 03-06 15-18 05-08 02-05 15-18 8.500.000

8PROGRAMMABLE LOGIC CONTROLLER (PLC) PRINCIPLES, HARDWAREAND SOFTWARE, DIAGNOSTICS AND TROUBLESHOOTING

4 06-09 10-13 09-12 21-24 05-08 08-11 21-24 10-13 22-25 12-15 09-12 21-24 8.500.000

9 SCADA 4 20-23 10-13 09-12 27-30 11-14 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.00010 SCADA UNTUK ENGINEER 4 21-24 04-07 02-05 30-02 05-08 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.00011 SCADA UNTUK OPERATOR & TEKNISI 4 28-31 11-14 10-13 06-09 12-15 09-12 07-10 11-14 08-11 13-16 10-13 08-11 8.500.000

Page 122: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

12 SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA) 4 13-16 17-20 17-20 27-30 11-14 15-18 27-30 18-21 29-02 19-22 16-19 28-31 8.500.000

Port/Pelabuhan - Marine -Pelayaran/Shipping

1 BISNIS PELAYARAN 3 06-08 03-05 02-04 30-01 04-06 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.0002 Bisnis Pelayaran 3 20-22 24-26 02-04 01-03 11-13 22-24 01-03 24-26 02-04 26-28 23-25 02-04 6.500.000

3 CUSTOM PROCEDURE, SHIPPING & EXPORT-IMPORT DOCUMENT 3 13-15 17-19 11-13 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

4 DRAUGHT SURVEY 3 27-29 03-05 09-11 20-22 11-13 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.950.0005 GENERAL CHARTER CONDITION (GENCON) 3 27-29 03-05 11-13 07-09 18-20 02-04 08-10 03-05 09-11 05-07 02-04 09-11 6.500.0006 Hukum Perkapalan 3 06-08 10-12 18-20 13-15 06-08 08-10 13-15 10-12 14-16 12-14 09-11 14-16 6.500.0007 Introduction for Mooring Master 3 27-29 03-05 18-20 27-29 18-20 02-04 27-29 03-05 30-02 05-07 02-04 28-30 6.500.0008 ISM CODE 4 07-10 11-14 16-19 06-09 11-14 09-12 06-09 11-14 07-10 13-16 10-13 07-10 8.500.0009 ISPS CODE 4 06-09 10-13 16-19 27-30 04-07 08-11 27-30 10-13 28-01 12-15 09-12 28-31 8.500.000

10 JETTY OPERATION 3 13-15 17-19 02-04 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.00011 KESELAMATAN PELAYARAN 3 22-24 26-28 18-20 06-08 18-20 24-26 06-08 26-28 07-09 28-30 25-27 07-09 6.500.00012 LOADING AND UPLOADING 4 20-23 24-27 10-13 06-09 12-15 22-25 06-09 24-27 07-10 26-29 23-26 07-10 8.500.00013 Loading Master 4 13-16 17-20 09-12 06-09 05-08 15-18 07-10 18-21 08-11 19-22 16-19 08-11 8.500.00014 LOADING UNLOADING pelabuhan curah kering 4 21-24 25-28 10-13 21-24 12-15 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.00015 MARINE AND TERMINAL OPERATION 4 28-31 04-07 17-20 13-16 05-08 02-05 13-16 04-07 14-17 06-09 03-06 14-17 8.500.00016 MARINE SAFETY MANAGEMENT 4 07-10 11-14 03-06 21-24 11-14 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.00017 MARINE SURVEYOR TRAINING 4 14-17 18-21 09-12 27-30 04-07 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.500.00018 Maritime And Shipping Law 3 15-17 19-21 16-18 28-30 04-06 17-19 28-30 19-21 30-02 21-23 18-20 29-31 6.500.00019 OIL TANKERS AND TERMINALS SAFETY 4 14-17 18-21 02-05 13-16 04-07 16-19 13-16 18-21 14-17 20-23 17-20 14-17 8.500.00020 Operasi Marine 3 06-08 10-12 04-06 01-03 18-20 08-10 01-03 10-12 02-04 12-14 09-11 02-04 6.500.00021 PENERAPAN ISPS CODE DAN ISM CODE DALAM PELAYARAN 3 20-22 24-26 09-11 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.00022 PERSONAL TRANSFER SAFETY 2 02-03 10-11 09-10 06-07 11-12 08-09 06-07 10-11 07-08 12-13 09-10 07-08 4.500.00023 PILOT, JETTY AND LOADING MASTER 4 28-31 04-07 09-12 30-02 05-08 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.00024 PORT MANAGEMENT 3 29-31 05-07 04-06 15-17 18-20 03-05 15-17 05-07 16-18 07-09 04-06 16-18 6.500.00025 PORT MANAGEMENT 4 27-30 03-06 02-05 06-09 05-08 02-05 07-10 03-06 08-11 05-08 02-05 08-11 8.500.00026 SAFE FUEL TRANSFER 3 13-15 17-19 16-18 13-15 18-20 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.00027 SAFE NAVIGATION LESSON & ENGINE ROOM SAFETY 3 20-22 24-26 04-06 20-22 06-08 22-24 20-22 24-26 21-23 26-28 23-25 21-23 6.500.00028 SHIP’S HANDLING 3 27-29 05-07 11-13 27-29 13-15 03-05 27-29 05-07 28-30 07-09 04-06 28-30 6.500.00029 SHIP’S SECURITY OFFICER 3 08-10 12-14 18-20 01-03 18-20 10-12 01-03 12-14 02-04 14-16 11-13 02-04 6.500.00030 SHIP’S STORAGE AND SAFE STORAGE 2 02-03 20-21 23-24 08-09 04-05 18-19 08-09 20-21 09-10 22-23 19-20 09-10 4.500.00031 SHIPPING AGENCY 3 08-10 12-14 09-11 22-24 18-20 10-12 22-24 12-14 23-25 14-16 11-13 22-24 6.500.00032 Shipping Management 3 13-15 17-19 04-06 20-22 13-15 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.00033 SHIPPING MANAGEMENT 4 06-09 10-13 10-13 14-17 11-14 08-11 14-17 10-13 15-18 12-15 09-12 15-18 8.500.00034 SHIPPING REPORTING SYSTEMS 4 13-16 17-20 17-20 20-23 04-07 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.00035 TANKER OPERATION 4 20-23 24-27 03-06 27-30 12-15 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.00036 WORKING ALOFT AND WORKING OVER SIDE 2 16-17 27-28 23-24 16-17 11-12 25-26 16-17 27-28 17-18 29-30 26-27 17-18 4.500.000

Page 123: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des HargaPrapurnabakti - Prapensiun

1 PERSIAPAN PENSIUN (PRE-RETIREMENT TRAINING) 4 20-23 03-06 16-19 30-02 11-14 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.0002 Persiapan Purnabhakti 4 14-17 11-14 17-20 31-03 04-07 09-12 30-03 11-14 01-04 13-16 10-13 01-04 8.500.0003 Persiapan Masa Pensiun Orientasi Pendirian Usaha Baru 2 02-03 17-18 23-24 20-21 04-05 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

4Persiapan Memasuki Masa Purnabakti - TEKNIK BUDIDAYAPETERNAKAN

3 20-22 24-26 02-04 30-01 04-06 22-24 29-01 24-26 31-02 26-28 23-25 30-02 7.500.000

Procurement/Pengadaan Barang & Jasa1 ASPEK HUKUM DAN OE PENGADAAN BARANG JASA PEMERINTAH 3 20-22 17-19 02-04 30-01 04-06 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.000

2 Basic Procurement & Purchasing 3 15-17 19-21 11-13 01-03 18-20 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.0003 BEST PRACTICES IN MANAGING PROCUREMENT 3 20-22 10-12 09-11 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.0004 BID AND TENDERING MANAGEMENT LEADING TO CONTRACT 3 27-29 17-19 16-18 06-08 04-06 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.0005 CONTRACT AND PROCUREMENT FRAUD IDENTIFICATION 3 06-08 17-19 16-18 30-01 11-13 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.0006 EFFECTIVE PROJECT PROCUREMENT MANAGEMENT 3 27-29 17-19 11-13 28-30 18-20 15-17 28-30 18-20 30-02 19-21 16-18 29-31 6.500.0007 E-PROCUREMENT (E-Proc) 3 20-22 17-19 16-18 20-22 11-13 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.0008 METODA PENYUSUNAN HPS PERUSAHAAN 3 22-24 19-21 18-20 01-03 18-20 17-19 01-03 19-21 02-04 21-23 18-20 02-04 6.500.000

9PEMBUATAN DELIK HUKUM PENGADAAN BARANG JASAPERUSAHAAN

2 02-03 27-28 23-24 02-03 04-05 25-26 02-03 27-28 03-04 29-30 26-27 03-04 4.500.000

10PENERAPAN PTK 007 REVISI 2 DAN TKDN SBG PEDOMANPENGADAAN BARANG & JASA INDUSTRI HULU MIGAS

3 22-24 19-21 02-04 15-17 13-15 17-19 15-17 19-21 16-18 21-23 18-20 16-18 6.500.000

11 PENGADAAN BARANG DAN JASA 2 27-28 03-04 23-24 27-28 19-20 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000

12PENGELOLAAN BARANG MILIK NEGARA DAN STOCK OPNAMEPERSEDIAAN

2 02-03 06-07 23-24 01-02 07-08 02-03 01-02 06-07 02-03 08-09 05-06 02-03 4.500.000

13 PROCUREMENT AND CONTRACT MONITORING 3 13-15 10-12 16-18 22-24 18-20 08-10 22-24 10-12 23-25 12-14 09-11 22-24 6.500.00014 PTK007 Revisi 4 tahun 2017 3 13-15 10-12 04-06 30-01 11-13 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.00015 TEKNIK HARGA PERHITUNGAN SENDIRI (HPS) 3 08-10 10-12 11-13 20-22 18-20 08-10 20-22 10-12 21-23 12-14 09-11 21-23 6.500.00016 TEKNIK OWNER ESTIMATE DAN PENGADAAN BARANG JASA 4 28-31 11-14 17-20 14-17 11-14 09-12 14-17 11-14 15-18 13-16 10-13 15-18 8.500.00017 TINGKAT KOMPONEN DALAM NEGERI (TKDN) 2 02-03 17-18 23-24 06-07 18-19 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.000

Project Management (PM)1 BUILDING SUPERVISION AND QUALITY CONTROL OF CIVIL WORK 4 13-16 17-20 17-20 30-02 05-08 15-18 29-02 18-21 31-03 19-22 16-19 30-03 8.500.000

2 BUSINESS PROCESS AND PROJECT MANAGEMENT 3 22-24 12-14 18-20 27-29 06-08 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.000

3 CONSTRUCTION METHODS AND CONSTRUCTION MANAGEMENT 4 21-24 25-28 03-06 06-09 11-14 23-26 06-09 25-28 07-10 27-30 24-27 07-10 8.500.000

4 EFFECTIVE PROJECT PROCUREMENT MANAGEMENT 3 27-29 17-19 11-13 28-30 18-20 15-17 28-30 18-20 30-02 19-21 16-18 29-31 6.500.0005 ESTIMASI PROYEK KELISTRIKAN 4 06-09 10-13 03-06 13-16 12-15 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.0006 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 27-30 24-27 02-05 27-30 05-08 22-25 27-30 24-27 28-01 26-29 23-26 28-31 8.500.000

7KESELAMATAN DAN KESEHATAN KERJA PADA PELAKSANAAN PROYEKKONSTRUKSI

3 13-15 17-19 16-18 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.000

8 MANAJEMEN PROYEK KONSTRUKSI 3 06-08 10-12 02-04 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.000

Page 124: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga9 MANAJEMEN PROYEK KONSTRUKSI 4 07-10 11-14 16-19 21-24 12-15 09-12 21-24 11-14 22-25 13-16 10-13 21-24 8.500.000

10PENYUSUNAN ANGGARAN PERAWATAN BANGUNAN GEDUNG DANFASILITAS

4 14-17 18-21 02-05 27-30 05-08 16-19 27-30 18-21 29-02 20-23 17-20 28-31 8.500.000

11 Project Cost Management 4 20-23 24-27 09-12 31-03 11-14 22-25 30-03 24-27 01-04 26-29 23-26 01-04 8.500.00012 PROJECT FEASIBILITY STUDY 3 20-22 24-26 02-04 13-15 11-13 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.00013 PROJECT MANAGEMENT 3 20-22 17-19 04-06 28-30 18-20 15-17 28-30 18-20 30-02 19-21 16-18 29-31 6.500.00014 PROJECT MANAGEMENT 4 06-09 10-13 03-06 13-16 12-15 08-11 13-16 10-13 14-17 12-15 09-12 14-17 8.500.00015 PROJECT MANAGEMENT DENGAN MICROSOFT PROJECT 4 27-30 03-06 17-20 06-09 04-07 02-05 07-10 03-06 08-11 05-08 02-05 08-11 8.500.00016 PROJECT MANAGEMENT DENGAN PRIMAVERA 4 20-23 24-27 16-19 13-16 11-14 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.00017 PROJECT MANAGEMENT FOR OIL AND GAS INDUSTRY 3 22-24 26-28 04-06 06-08 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.950.00018 PROJECT MONITORING AND EVALUATION 4 13-16 17-20 10-13 20-23 05-08 15-18 20-23 18-21 21-24 19-22 16-19 21-24 8.500.00019 Project Scheduling 4 21-24 25-28 16-19 27-30 11-14 23-26 27-30 25-28 28-01 27-30 24-27 28-31 8.500.00020 QUANTITY SURVEYOR 4 28-31 04-07 02-05 30-02 04-07 02-05 29-02 04-07 31-03 06-09 03-06 30-03 8.500.00021 Rencana Anggaran Biaya Konstruksi 4 07-10 11-14 09-12 06-09 12-15 09-12 06-09 11-14 07-10 13-16 10-13 07-10 8.500.00022 SUCCESSFUL PROJECT MANAGEMENT 3 06-08 24-26 02-04 07-09 11-13 22-24 08-10 24-26 09-11 26-28 23-25 09-11 6.500.00023 SUPERVISI PROYEK BANGUNAN GEDUNG 3 20-22 24-26 02-04 13-15 04-06 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.00024 SUPERVISION AND LEADERSHIP OF CIVIL WORK 4 14-17 18-21 17-20 14-17 05-08 16-19 14-17 18-21 15-18 20-23 17-20 15-18 8.500.00025 TEKNIK PENYUSUNAN ANGGARAN PROYEK 4 20-23 24-27 03-06 21-24 11-14 22-25 21-24 24-27 22-25 26-29 23-26 21-24 8.500.000

Sales - Marketing/Pemasaran - Bisnis1 Basic Operation of Retail Business 3 20-22 17-19 16-18 20-22 18-20 15-17 20-22 18-20 21-23 19-21 16-18 21-23 6.500.0002 BRANDING STRATEGY FOR RETAIL BANKING 2 02-03 03-04 23-24 13-14 18-19 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.0003 BUSINESS LEGAL CONTRACT DRAFTING 3 20-22 03-05 02-04 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.0004 BUSINESS PROFILING 2 02-03 10-11 23-24 20-21 04-05 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.0005 COMMUNICATION SKILLS FOR SALES 3 27-29 17-19 16-18 06-08 11-13 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.0006 DIGITAL MARKETING CONSULTANT 2 27-28 24-25 23-24 27-28 04-05 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.0007 Etika Bisnis Untuk UKM 2 02-03 17-18 23-24 30-31 18-19 15-16 29-30 18-19 31-01 19-20 16-17 30-01 4.500.0008 HARMONY BUILDING TRAINING 2 02-03 27-28 23-24 06-07 04-05 25-26 06-07 27-28 07-08 29-30 26-27 07-08 4.500.0009 INTERNET MARKETING MEMBANGUN BISNIS ONLINE SHOP 2 02-03 03-04 23-24 30-31 11-12 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

10MARKETING INTELLIGENCE FOR ENHANCING CUSTOMER RELATIONSIN RETAIL BANKING SERVICES

2 13-14 12-13 23-24 15-16 13-14 10-11 15-16 12-13 16-17 14-15 11-12 16-17 4.500.000

11 MARKETING THINK GLOBAL BUT ACTION LOCAL 3 20-22 24-26 18-20 06-08 18-20 22-24 06-08 24-26 07-09 26-28 23-25 07-09 6.500.000

12MEMBANGUN ALIANSI STRATEGIS ANTAR PELAKU UMKM MELALUIPENYADARAN DAN PENGORGANISASIAN MODAL SOSIAL

2 20-21 13-14 23-24 20-21 19-20 11-12 20-21 13-14 21-22 15-16 12-13 21-22 4.500.000

13Membuat Model Customer Development (MCD) (ModelPengembangan Pelanggan)

2 27-28 19-20 23-24 27-28 06-07 17-18 27-28 20-21 01-02 21-22 18-19 28-29 4.500.000

14 Pengembangan Produk Layak Minimal 2 02-03 24-25 23-24 01-02 13-14 22-23 01-02 24-25 02-03 26-27 23-24 02-03 4.500.00015 PERSUASIVE SELLING SKILLS WORKSHOP 2 02-03 03-04 23-24 06-07 13-14 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.00016 PERSUASIVE-SELLING SKILLS WORKSHOP 2 02-03 10-11 23-24 08-09 07-08 08-09 08-09 10-11 09-10 12-13 09-10 09-10 4.500.00017 PROFESSIONAL SALESMANSHIP 2 02-03 17-18 23-24 13-14 18-19 15-16 13-14 18-19 14-15 19-20 16-17 14-15 4.500.00018 PROFITABLE SELLING SKILLS 2 09-10 03-04 02-03 06-07 07-08 04-05 09-10 03-04 10-11 05-06 02-03 10-11 4.500.00019 PUBLIC SERVICE AND MARKETING 2 13-14 10-11 09-10 13-14 13-14 08-09 13-14 10-11 14-15 12-13 09-10 14-15 4.500.000

Page 125: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga20 QUALITY CUSTOMER SERVICE (SERVICE EXCELLENT) 3 06-08 10-12 18-20 15-17 18-20 08-10 15-17 10-12 16-18 12-14 09-11 16-18 6.500.00021 STRATEGIC BRAND MANAGEMENT 2 02-03 24-25 23-24 20-21 13-14 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.000

SDM - HRD - GA1 ACHIEVEMENT MOTIVATION 2 27-28 03-04 23-24 27-28 04-05 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.0002 ACHIEVEMENT MOTIVATION TRAINING 2 02-03 10-11 23-24 30-31 18-19 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.0003 ANALISA JABATAN 3 27-29 03-05 09-11 27-29 18-20 02-04 27-29 03-05 28-30 05-07 02-04 28-30 6.500.0004 Analisis Beban Kerja 2 02-03 24-25 23-24 06-07 11-12 22-23 06-07 24-25 07-08 26-27 23-24 07-08 5.500.0005 AUDIT OPERASIONAL KINERJA 3 08-10 12-14 02-04 06-08 04-06 10-12 06-08 12-14 07-09 14-16 11-13 07-09 6.500.0006 BUILDING AND MANAGING HIGH PERFORMANCE TEAMS 3 13-15 03-05 11-13 20-22 18-20 02-04 20-22 03-05 21-23 05-07 02-04 21-23 6.500.0007 BUILDING GREAT TEAMWORK 2 02-03 10-11 09-10 30-31 11-12 08-09 29-30 10-11 31-01 12-13 09-10 30-01 4.500.0008 CAPACITY BUILDING 3 13-15 17-19 16-18 06-08 04-06 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.0009 Career Management 2 02-03 17-18 23-24 27-28 13-14 15-16 27-28 18-19 28-29 19-20 16-17 28-29 5.500.000

10 CHARACTER BUILDING 3 06-08 10-12 09-11 06-08 11-13 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.00011 CHARACTER BUILDING FOR PEAK PERFORMANCE 2 02-03 24-25 23-24 20-21 18-19 22-23 20-21 24-25 21-22 26-27 23-24 21-22 4.500.00012 COMMUNICATION SKILL 3 13-15 17-19 16-18 13-15 18-20 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.00013 COMMUNICATION SKILLS 2 02-03 06-07 23-24 27-28 07-08 04-05 27-28 06-07 28-29 08-09 05-06 28-29 4.500.00014 COMMUNICATION SKILLS 2 06-07 17-18 16-17 06-07 18-19 15-16 06-07 18-19 07-08 19-20 16-17 07-08 4.500.00015 COMMUNICATION SKILLS 3 06-08 24-26 02-04 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.00016 COMPENSATION & BENEFIT SYSTEM 3 06-08 10-12 16-18 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 6.500.00017 COMPETENCIES MAPPING & DEVELOPMENT 4 06-09 03-06 16-19 06-09 04-07 02-05 06-09 03-06 07-10 05-08 02-05 07-10 8.500.00018 CREATIVE PROBLEM SOLVING 3 20-22 10-12 18-20 27-29 13-15 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.00019 DECISION MAKING BY USING STRATEGIC THINKING 2 02-03 24-25 23-24 06-07 07-08 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.000

20 DEVELOPING POSITIVE PERSONAL CHARACTER IN PROBLEM SOLVING 2 02-03 03-04 23-24 30-31 18-19 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.000

21 EFFECTIVE COMMUNICATION SKILLS WITH NLP 2 02-03 26-27 23-24 29-30 14-15 24-25 29-30 26-27 30-01 28-29 25-26 30-31 4.500.00022 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 02-03 05-06 23-24 01-02 18-19 04-05 01-02 05-06 02-03 07-08 04-05 02-03 4.500.00023 EFFECTIVE COACHING SKILLS 2 02-03 10-11 23-24 27-28 11-12 08-09 27-28 10-11 28-29 12-13 09-10 28-29 4.500.00024 EFFECTIVE COMMUNICATION SKILLS WITH NLP 2 02-03 10-11 23-24 20-21 11-12 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.00025 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 02-03 17-18 23-24 27-28 18-19 15-16 27-28 18-19 28-29 19-20 16-17 28-29 4.500.00026 EFFECTIVE MANAGEMENT SKILLS FOR MIDDLE MANAGEMENT 3 15-17 05-07 16-18 15-17 04-06 03-05 15-17 05-07 16-18 07-09 04-06 16-18 6.500.00027 Effective Training Management 3 06-08 10-12 16-18 27-29 11-13 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

28 EMOTIONAL FREEDOM TECHNIQUE (EFT) FOR PEAK PERFORMANCE 2 02-03 03-04 23-24 27-28 07-08 02-03 27-28 03-04 28-29 05-06 02-03 28-29 4.500.000

29 EMPLOYEE ENGAGEMENT 2 02-03 03-04 23-24 30-31 11-12 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.00030 EXCELLENT SUPERVISORY SKILLS 2 20-21 05-06 23-24 20-21 13-14 04-05 20-21 05-06 21-22 07-08 04-05 21-22 4.500.00031 General Affair (GA) 2 02-03 12-13 23-24 15-16 14-15 10-11 15-16 12-13 16-17 14-15 11-12 16-17 5.500.00032 GENERAL AFFAIR MANAGEMENT DEVELOPMENT 3 15-17 19-21 04-06 07-09 06-08 17-19 08-10 19-21 09-11 21-23 18-20 09-11 6.500.00033 General Affairs Management System 3 13-15 12-14 02-04 06-08 13-15 10-12 06-08 12-14 07-09 14-16 11-13 07-09 6.500.00034 GRAFONOMI 2 06-07 24-25 23-24 06-07 04-05 22-23 06-07 24-25 07-08 26-27 23-24 07-08 4.500.00035 GREAT TEAMWORK AND SYNERGY 3 08-10 26-28 11-13 07-09 06-08 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.000

36HOW TO MANAGE CHANGE, CONFLICT AND DIFFICULT EMPLOYEE TOCREATE PRODUCTIVITY

3 22-24 26-28 09-11 15-17 11-13 24-26 15-17 26-28 16-18 28-30 25-27 16-18 6.500.000

Page 126: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga37 Hubungan Industrial 2 02-03 06-07 23-24 01-02 11-12 02-03 01-02 06-07 02-03 08-09 05-06 02-03 5.500.00038 HUBUNGAN INDUSTRIAL DAN HUKUM KETENAGAKERJAAN 3 29-31 24-26 04-06 27-29 13-15 22-24 27-29 24-26 30-02 26-28 23-25 28-30 6.500.000

39 INOVASI DAN KREATIFITAS MENUJU ORGANISASI PEMBELAJARAN 2 02-03 10-11 23-24 20-21 07-08 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.000

40 Kalkulasi Perhitungan Tunjangan Hari Raya (THR) 2 02-03 10-11 23-24 02-03 06-07 08-09 02-03 10-11 03-04 12-13 09-10 03-04 5.500.000

41 KELUHAN (GRIEVANCES) SUMBER DAYA MANUSIA DI ERA TERKINI 4 27-30 24-27 09-12 30-02 11-14 22-25 29-02 24-27 31-03 26-29 23-26 30-03 8.500.000

42 Key Perfomance Indicator (KPI) 2 02-03 17-18 23-24 08-09 14-15 15-16 06-07 20-21 07-08 19-20 16-17 07-08 5.500.00043 KEY PERFORMANCE INDICATOR 2 02-03 10-11 23-24 20-21 18-19 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.00044 LIFE QUALITY IMPROVEMENT CAMP 3 20-22 12-14 02-04 30-01 13-15 10-12 29-01 12-14 31-02 14-16 11-13 30-02 6.950.000

45Literasi Informasi dan Pengelolaan Informasi Digital dalamMenyongsong Gerakan Literasi Sekolah

2 02-03 03-04 23-24 06-07 06-07 02-03 06-07 03-04 07-08 05-06 02-03 07-08 4.500.000

46 LOBBY & NEGOTIATION SKILL 3 06-08 10-12 02-04 28-30 04-06 08-10 28-30 10-12 30-02 12-14 09-11 29-31 6.500.00047 Maintenance Strategic Planning 4 28-31 25-28 09-12 21-24 04-07 23-26 21-24 25-28 22-25 27-30 24-27 21-24 8.500.00048 MANAJEMEN STRATEGI 2 02-03 12-13 23-24 15-16 06-07 10-11 15-16 12-13 16-17 14-15 11-12 16-17 4.500.00049 Manajemen Sumber Daya Manusia 2 27-28 12-13 23-24 29-30 11-12 10-11 29-30 12-13 28-29 14-15 11-12 30-31 5.500.000

50MEMBANGUN PROFESSIONAL BEHAVIOR DENGAN KECERDASANEMOSI DAN KECERDASAN SPIRITUAL

2 02-03 10-11 23-24 20-21 11-12 08-09 20-21 10-11 21-22 12-13 09-10 21-22 4.500.000

51 MENATA OUTSOURCING SESUAI SURAT EDARAN MENAKERTRANS RI 2 02-03 24-25 23-24 27-28 19-20 22-23 27-28 24-25 28-29 26-27 23-24 28-29 4.500.000

52MENDAPATKAN KETERAMPILAN, WAWASAN DAN KOMPETENSI YANGDIBUTUHKAN DALAM MEMENANGKAN NEGOSIASI MELALUI WIN-WIN SOLUTION

2 16-17 06-07 05-06 16-17 18-19 02-03 16-17 06-07 17-18 08-09 05-06 17-18 4.500.000

53 MOTIVATION YOUR SELF (ACHIEVEMENT MOTIVATION TRAINING) 3 08-10 12-14 09-11 20-22 11-13 10-12 20-22 12-14 21-23 14-16 11-13 21-23 6.500.000

54 NEGOTIATION SKILL 3 29-31 26-28 02-04 07-09 18-20 24-26 08-10 26-28 09-11 28-30 25-27 09-11 6.500.00055 OPTIMALISASI PENGELOLAAN TALENTA 3 13-15 17-19 02-04 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.00056 ORGANIZATIONAL CHANGE 2 02-03 24-25 23-24 30-31 13-14 22-23 29-30 24-25 31-01 26-27 23-24 30-01 4.500.000

57Pencarian Minat, Bakat, dan Kecerdasan Dasar melalui Analisis SidikJari bagi Pekerja & Profesional

2 06-07 27-28 23-24 06-07 04-05 25-26 08-09 27-28 09-10 29-30 26-27 09-10 5.500.000

58Pencarian Minat, Bakat, dan Kecerdasan Dasar melalui Analisis SidikJari bagi Pelajar & Mahasiswa

2 13-14 06-07 23-24 15-16 13-14 04-05 15-16 06-07 16-17 08-09 05-06 16-17 5.500.000

59 PEOPLE EQUITY 3 06-08 17-19 11-13 13-15 06-08 15-17 13-15 18-20 14-16 19-21 16-18 14-16 6.500.00060 PERFORMANCE GOALS SETTING 2 22-23 13-14 12-13 22-23 06-07 11-12 22-23 13-14 23-24 15-16 12-13 23-24 4.500.00061 PERSELISIHAN HUBUNGAN INDUSTRIAL 2 02-03 03-04 23-24 30-31 04-05 02-03 29-30 03-04 31-01 05-06 02-03 30-01 4.500.00062 PROBLEM SOLVING & DECISION MAKING 3 20-22 24-26 11-13 13-15 13-15 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.00063 PROBLEM SOLVING AND DECISION MAKING 2 02-03 24-25 23-24 02-03 19-20 22-23 02-03 24-25 03-04 26-27 23-24 03-04 4.500.00064 PROFESSIONAL CALL CENTER OFFICER 2 13-14 03-04 23-24 13-14 13-14 02-03 13-14 03-04 14-15 05-06 02-03 14-15 4.500.00065 PROFESSIONAL RECEPTIONIST & OPERATOR 2 20-21 12-13 23-24 20-21 19-20 10-11 20-21 12-13 21-22 14-15 11-12 21-22 4.500.000

66REDESAIN KOMPETENSI SDM DAN PENGEMBANGAN KNOWLEDGEMANAJEMEN

3 22-24 05-07 11-13 07-09 04-06 03-05 08-10 05-07 09-11 07-09 04-06 09-11 6.500.000

67 Regulasi Ketenagakerjaan 2 08-09 03-04 23-24 08-09 18-19 02-03 09-10 03-04 10-11 05-06 02-03 10-11 5.500.00068 Research Skill bagi Pustakawan 2 02-03 12-13 23-24 13-14 14-15 10-11 13-14 12-13 14-15 14-15 11-12 14-15 4.500.000

Page 127: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga69 SELF MANAGEMENT EMOTION AND STRESS 3 22-24 12-14 02-04 22-24 18-20 10-12 22-24 12-14 23-25 14-16 11-13 22-24 6.500.00070 Seven Habbits 2 15-16 10-11 23-24 16-17 07-08 08-09 16-17 10-11 17-18 12-13 09-10 17-18 5.500.00071 SISTEM AKUNTABILITAS KINERJA INSTANSI PEMERINTAH 2 02-03 27-28 23-24 23-24 04-05 25-26 23-24 27-28 24-25 29-30 26-27 21-22 4.500.00072 STRATEGIC DECISION MAKING 3 08-10 26-28 18-20 13-15 06-08 24-26 13-15 26-28 14-16 28-30 25-27 14-16 6.500.00073 Strategic Internal Auditing 2 02-03 03-04 23-24 27-28 13-14 04-05 27-28 03-04 01-02 05-06 02-03 28-29 4.500.000

74 STRATEGIC PEOPLE MANAGEMENT FOR IMPROVED PERFORMANCE 3 20-22 10-12 09-11 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.500.000

75 SUCCESSFUL PERFORMANCE MANAGEMENT 3 27-29 17-19 16-18 01-03 04-06 15-17 01-03 18-20 02-04 19-21 16-18 02-04 6.500.00076 SUCCESSFUL STRATEGIC MANAGEMENT 3 13-15 03-05 11-13 15-17 18-20 02-04 15-17 03-05 16-18 05-07 02-04 16-18 6.500.00077 SUPERVISORY MANAGEMENT 3 06-08 03-05 18-20 06-08 18-20 02-04 06-08 03-05 07-09 05-07 02-04 07-09 6.500.000

78TATACARA BERACARA PERKARA PERSELISIHAN HUBUNGANINDUSTRIAL DI PENGADILAN HUBUNGAN INDUSTRIAL

2 20-21 17-18 16-17 20-21 06-07 15-16 20-21 18-19 21-22 19-20 16-17 21-22 4.500.000

79 TEKNIK PENINGKATAN PRODUKTIVITAS KERJA 3 08-10 17-19 02-04 22-24 18-20 15-17 22-24 18-20 23-25 19-21 16-18 22-24 6.500.00080 Teknik Penyusunan PKWT, PP & PKB 2 30-31 26-27 23-24 29-30 19-20 24-25 29-30 26-27 01-02 28-29 25-26 30-31 5.500.000

81 Teknik Penyusunan Silabus Dan Rencana Pelaksanaan Pelatihan (RPP) 2 02-03 05-06 23-24 02-03 04-05 04-05 02-03 05-06 03-04 07-08 04-05 03-04 5.500.000

82 THE LOYALIST MEMBANGUN MENTAL LOYALITAS KARYAWAN 3 13-15 17-19 04-06 22-24 06-08 15-17 22-24 18-20 23-25 19-21 16-18 22-24 6.500.00083 THE POWER OF POSITIVE MIND 3 20-22 24-26 09-11 28-30 11-13 22-24 28-30 24-26 30-02 26-28 23-25 29-31 6.500.00084 TIME MANAGEMENT 3 27-29 03-05 16-18 01-03 18-20 02-04 01-03 03-05 02-04 05-07 02-04 02-04 6.500.00085 Time Management 3 13-15 17-19 04-06 30-01 13-15 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.00086 TOT (TRAINING OF TRAINER) 2 02-03 05-06 04-05 30-31 14-15 02-03 29-30 05-06 31-01 07-08 04-05 30-01 4.500.00087 TRAINING OF TRAINERS SAFETY 3 29-31 26-28 16-18 27-29 11-13 24-26 27-29 26-28 28-30 28-30 25-27 28-30 6.500.00088 Training & Development Management 2 09-10 12-13 23-24 06-07 13-14 10-11 06-07 12-13 07-08 14-15 11-12 07-08 5.500.00089 Training Need Analysis 2 16-17 19-20 23-24 13-14 18-19 17-18 13-14 20-21 14-15 21-22 18-19 14-15 5.500.00090 Training of Trainer 3 22-24 19-21 09-11 20-22 04-06 17-19 20-22 19-21 21-23 21-23 18-20 21-23 6.500.00091 Training Of Trainer (TOT) 2 23-24 27-28 23-24 20-21 06-07 25-26 20-21 27-28 21-22 29-30 26-27 21-22 5.500.00092 WORKSHOP MENULIS BAGI GURU DAN PUSTAKAWAN 2 02-03 20-21 23-24 22-23 19-20 18-19 22-23 20-21 23-24 22-23 19-20 23-24 4.500.000

Mining/Tambang - Mineral - Batubara1 ACCOUNTING, FINANCE, AND TAX FOR MINING COMPANY 3 27-29 03-05 02-04 30-01 18-20 02-04 29-01 03-05 31-02 05-07 02-04 30-02 6.500.0002 APPLIED MINING GEOSTATISTICS 3 27-29 24-26 16-18 20-22 18-20 22-24 20-22 18-20 21-23 26-28 23-25 21-23 7.500.0003 BASIC COAL MINING 3 08-10 05-07 02-04 06-08 11-13 03-05 06-08 05-07 07-09 07-09 04-06 07-09 7.500.0004 BASIC OF GEOLOGY MAPPING AND MINING EXPLORATION 3 06-08 03-05 02-04 27-29 11-13 02-04 27-29 03-05 28-30 05-07 02-04 28-30 7.500.0005 COAL AND MINERAL MINING LAW 3 13-15 10-12 09-11 30-01 18-20 08-10 29-01 10-12 31-02 12-14 09-11 30-02 7.500.0006 COAL HANDLING 3 15-17 12-14 09-11 13-15 18-20 10-12 13-15 12-14 14-16 14-16 11-13 14-16 7.500.0007 COALBED METHANE 3 13-15 17-19 02-04 06-08 18-20 15-17 06-08 18-20 07-09 19-21 16-18 07-09 6.500.0008 Dasar-Dasar Teknik Eksplorasi dan Pemetaan Air tanah 3 20-22 17-19 18-20 06-08 04-06 15-17 06-08 19-21 07-09 19-21 16-18 07-09 7.500.0009 DEWATERING 3 06-08 10-12 11-13 27-29 18-20 08-10 27-29 10-12 28-30 12-14 09-11 28-30 6.950.000

10 Genesa Mineral dan Batubara 3 29-31 26-28 04-06 13-15 13-15 24-26 13-15 24-26 14-16 28-30 25-27 14-16 7.500.00011 GEOTEKNIK DALAM TAMBANG TERBUKA 4 20-23 24-27 16-19 13-16 11-14 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.00012 Geoteknik Terapan Untuk Perencanaan Lereng 4 13-16 17-20 09-12 06-09 04-07 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.000

13Geoteknik untuk Perancangan Lereng Penambangan (Best Practiceand Case Study)

3 08-10 05-07 11-13 22-24 18-20 03-05 22-24 05-07 23-25 07-09 04-06 22-24 7.500.000

Page 128: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga14 GEOTHERMAL RESERVOIR ENGINEERING 5 06-10 24-28 09-13 20-24 04-08 22-26 20-24 24-28 21-25 26-30 23-27 30-04 9.500.00015 Geothermal System and Technology 3 22-24 19-21 02-04 01-03 11-13 17-19 01-03 18-20 02-04 21-23 18-20 02-04 7.500.00016 GIS ANALISIS 3 06-08 24-26 02-04 27-29 11-13 22-24 27-29 24-26 28-30 26-28 23-25 28-30 6.500.00017 GIS MapInfo 4 13-16 03-06 09-12 30-02 04-07 02-05 29-02 03-06 31-03 05-08 02-05 30-03 8.500.00018 GIS OPERATOR 3 20-22 10-12 16-18 06-08 18-20 08-10 06-08 10-12 07-09 12-14 09-11 07-09 6.500.00019 Implementasi K3 Di Sektor Pertambangan 2 02-03 13-14 23-24 06-07 19-20 11-12 09-10 13-14 10-11 15-16 12-13 10-11 5.500.00020 KUALITAS BATUBARA DAN STOCKPILE MANAGEMENT 3 13-15 10-12 04-06 20-22 13-15 08-10 20-22 10-12 21-23 12-14 09-11 21-23 7.500.00021 Manajemen Eksplorasi 3 15-17 12-14 16-18 28-30 06-08 10-12 28-30 12-14 30-02 14-16 11-13 29-31 7.500.00022 MINE PLANNING AND RESERVE ESTIMATION 3 15-17 19-21 18-20 30-01 13-15 17-19 29-01 18-20 31-02 21-23 18-20 30-02 6.950.00023 MINING TRAINING - BEST PRACTICE MANAGEMENT EXPLORASI 3 20-22 17-19 11-13 27-29 18-20 15-17 27-29 19-21 28-30 19-21 16-18 28-30 7.500.00024 Monitoring Kestabilan Lereng 3 27-29 24-26 09-11 07-09 18-20 22-24 08-10 26-28 09-11 26-28 23-25 09-11 7.500.00025 PEMODELAN RESERVOIR PANAS BUMI 4 13-16 03-06 16-19 27-30 11-14 02-05 27-30 03-06 28-01 05-08 02-05 21-24 8.500.00026 PENGOLAHAN EMAS 3 06-08 03-05 18-20 15-17 04-06 02-04 15-17 03-05 16-18 05-07 02-04 16-18 7.500.00027 PERENCANAAN DALAM TAMBANG TERBUKA 4 27-30 03-06 02-05 20-23 05-08 02-05 20-23 03-06 21-24 05-08 02-05 21-24 8.500.00028 Regulasi Keselamatan Kerja Di Sektor Pertambangan 2 20-21 13-14 23-24 22-23 19-20 11-12 22-23 13-14 23-24 15-16 12-13 21-22 5.500.00029 Regulasi Ketenagakerjaan Di Sektor Pertambangan 2 02-03 24-25 23-24 01-02 14-15 22-23 01-02 24-25 02-03 26-27 23-24 02-03 5.500.00030 SIG Training 4 27-30 17-20 03-06 13-16 12-15 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.00031 SISTEM DAN TEKNOLOGI GEOTHERMAL 4 20-23 10-13 02-05 30-02 04-07 08-11 29-02 10-13 31-03 12-15 09-12 28-31 8.500.00032 STUDY KELAYAKAN INVESTASI PERTAMBANGAN 3 29-31 26-28 16-18 30-01 06-08 24-26 29-01 24-26 31-02 28-30 25-27 30-02 7.500.00033 TEKNIK PEMBORAN PANAS BUMI 4 27-30 17-20 09-12 06-09 12-15 15-18 06-09 18-21 07-10 19-22 16-19 07-10 8.500.00034 TEKNIK PRODUKSI PANAS BUMI 4 06-09 24-27 17-20 13-16 05-08 22-25 13-16 24-27 14-17 26-29 23-26 14-17 8.500.00035 TEKNIK REKLAMASI LAHAN PASCA PENAMBANGAN 4 27-30 10-13 02-05 30-02 11-14 08-11 29-02 10-13 31-03 12-15 09-12 30-03 8.500.00036 TEKNIK RESERVOIR PANAS BUMI 4 14-17 04-07 03-06 20-23 11-14 02-05 20-23 04-07 21-24 06-09 03-06 21-24 8.500.000

Welding/Las1 METALLURGY IN WELDING 3 13-15 17-19 18-20 30-01 18-20 15-17 29-01 18-20 31-02 19-21 16-18 30-02 6.500.0002 PREVENTIVE DAN PERBAIKAN MESIN LAS LISTRIK 4 13-16 17-20 10-13 13-16 12-15 15-18 13-16 18-21 14-17 19-22 16-19 14-17 8.500.000

Page 129: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

PUBLIC TRAINING SCHEDULE 2020 SERTIFIKASI K3

KEMNAKER RI & BNSP RI DAN SERTIFIKASI ESDM

DI 3 KOTA:  BANDUNG / JAKARTA / YOGYAKARTA 

Page 130: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des HargaSERTIFIKASI KEMNAKER RI: diBdg/Jkt/Yogya

1 Ahli K3 Kimia 12 06-18 03-15 02-14 13-25 04-16 08-20 06-18 03-15 07-19 05-17 02-14 07-19 10.950.0002 Ahli K3 Listrik 17 06-24 03-21 02-20 11-30 02-20 08-26 06-24 03-22 07-25 05-23 02-20 01-19 16.500.0003 Ahli K3 Umum 12 06-18 03-15 02-14 13-25 04-16 08-20 06-18 03-15 07-19 05-17 02-14 07-19 9.500.0004 Auditor SMK3 4 27-30 24-27 02-05 06-09 11-14 02-05 20-23 18-21 21-24 26-29 23-26 21-24 7.500.0005 Petugas K3 Kimia 6 06-11 03-08 09-14 13-18 04-09 08-13 06-11 03-08 14-19 05-10 02-07 07-12 7.950.0006 Petugas K3 Madya Ruang Terbatas (Confined Space) 3 13-15 10-12 16-18 27-29 18-20 02-04 27-29 10-12 31-02 12-14 09-11 28-30 6.500.0007 Petugas K3 Utama Ruang Terbatas (Confined Space) 5 20-24 17-21 02-06 13-17 11-15 15-19 06-10 24-28 07-11 19-23 16-20 07-11 7.500.0008 Petugas Penyelamat (Rescuer) Ruang Terbatas 3 29-31 26-28 09-11 06-08 18-20 22-24 13-15 18-20 14-16 28-30 25-27 14-16 6.500.0009 Teknisi K3 Deteksi Gas 2 02-03 03-04 23-24 20-21 18-19 04-05 23-24 03-04 24-25 05-06 02-03 21-22 4.500.000

10 Teknisi K3 Listrik 6 06-11 10-15 16-21 13-18 04-09 08-13 06-11 10-15 14-19 12-17 09-14 07-12 8.500.00011 Ahli K3 Pesawat Angkat dan Angkut 25 02-31 01-29 02-31 01-30 02-30 01-29 01-31 01-29 01-29 02-30 01-30 25.000.00012 Ahli K3 Pesawat Tenaga dan Produksi 25 02-31 01-29 02-31 01-30 02-30 01-29 01-31 01-29 01-29 02-30 01-30 25.000.00013 Ahli K3 Pesawat uap dan bejana tekan 25 02-31 01-29 02-31 01-30 02-30 01-29 01-31 01-29 01-29 02-30 01-30 25.000.00014 juru ikat (rigger) 3 06-08 10-12 02-04 28-30 18-20 02-04 28-30 19-21 21-23 12-14 09-11 29-31 3.950.00015 operator pita transport (conveyor) 3 13-15 17-19 09-11 07-09 18-20 15-17 27-29 18-20 28-30 19-21 16-18 22-24 4.500.00016 TENAGA KERJA PADA KETINGGIAN (TKPK) TINGKAT 1 5 20-24 24-28 16-20 13-17 04-08 22-26 29-03 24-28 31-04 26-30 23-27 07-11 8.500.00017 TENAGA KERJA PADA KETINGGIAN (TKPK) TINGKAT 2 5 27-31 03-07 02-06 20-24 11-15 08-12 06-10 03-07 07-11 05-09 02-06 14-18 8.500.00018 TENAGA KERJA PADA KETINGGIAN (TKPK) TINGKAT 3 5 06-10 10-14 09-13 30-03 04-08 15-19 13-17 10-14 14-18 12-16 09-13 30-04 8.500.00019 TENAGA KERJA BANGUNAN TINGGI (TKBT) TINGKAT 2 3 15-17 19-21 16-18 27-29 18-20 03-05 20-22 19-21 23-25 21-23 18-20 28-30 5.750.00020 operator forklift 3 20-22 24-26 02-04 06-08 11-13 22-24 28-30 24-26 30-02 26-28 23-25 21-23 3.950.00021 operator gondola 3 27-29 03-05 09-11 28-30 18-20 02-04 29-01 03-05 31-02 05-07 02-04 29-31 5.950.00022 operator crane 4 06-09 10-13 17-20 06-09 04-07 08-11 06-09 10-13 07-10 12-15 09-12 07-10 6.500.00023 operator genset 4 13-16 17-20 03-06 13-16 12-15 15-18 13-16 18-21 14-17 19-22 16-19 14-17 6.950.00024 operator alat berat 4 21-24 25-28 10-13 20-23 05-08 23-26 21-24 25-28 21-24 27-30 24-27 21-24 7.500.00025 operator boiler kelas 1 6 13-18 17-22 16-21 13-18 04-09 08-13 13-18 03-08 07-12 05-10 02-07 07-12 6.950.00026 operator boiler kelas 2 4 13-16 17-20 16-19 13-16 04-07 08-11 13-16 03-06 07-10 05-08 02-05 07-10 5.750.00027 Ahli Muda K3 Lingkungan Kerja 6 13-18 17-22 16-21 13-18 04-09 08-13 13-18 03-08 07-12 05-10 02-07 07-12 9.500.00028 AHLI MUDA K3 KONSTRUKSI - sertifikasi Kemnaker RI 5 20-24 24-28 16-20 20-24 04-08 22-26 13-17 03-07 14-18 26-30 23-27 14-18 8.500.00029 AHLI MADYA K3 KONSTRUKSI - sertifikasi Kemnaker RI 9 06-15 03-12 02-11 13-22 04-13 08-17 06-15 03-12 14-23 05-14 02-11 07-16 9.750.00030 AHLI UTAMA K3 KONSTRUKSI - sertifikasi Kemnaker RI 10 06-16 03-13 02-12 13-23 04-14 08-18 06-16 03-13 14-24 05-15 02-12 07-17 at proposal31 TEKNISI K3 PERANCAH (SCAFFOLDER) - sertifikasi Kemnaker RI 4 13-16 17-20 16-19 06-09 11-14 02-05 27-30 18-21 31-03 19-22 16-19 21-24 6.500.00032 SUPERVISI K3 PERANCAH (SCAFFOLDER) - sertifikasi Kemnaker RI 5 20-24 24-28 02-06 20-24 04-08 22-26 06-10 03-07 07-11 26-30 23-27 14-18 7.500.00033 FOOD HYGIENE SANITATION & MONITORING - sertifikasi Kemnaker RI 3 27-29 03-05 09-11 27-29 18-20 02-04 13-15 18-20 14-16 05-07 02-04 28-30 at proposal34 Health Risk Assessment - sertifikasi Kemnaker RI 3 06-08 10-12 18-20 06-08 18-20 08-10 20-22 10-12 21-23 12-14 09-11 21-23 at proposal

35HIGIENE SANITASI MAKANAN DI TEMPAT KERJA BAGI PETUGASPENJAMAH MAKANAN - sertifikasi Kemnaker RI

3 15-17 19-21 02-04 28-30 18-20 15-17 27-29 19-21 28-30 21-23 18-20 29-31 at proposal

36HIPERKES DAN KESELAMATAN KERJA BAGI DOKTER PERUSAHAAN -sertifikasi Kemnaker RI

6 13-18 17-22 16-21 13-18 04-09 08-13 13-18 03-08 07-12 05-10 02-07 07-12 at proposal

PUBLIC TRAINING SCHEDULE 2020 SERTIFIKASI K3 & ESDM DI 3 KOTA : BANDUNG/JAKARTA/YOGYAKARTA

Page 131: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga

37HIPERKES DAN KESELAMATAN KERJA BAGI PARAMEDIS - sertifikasiKemnaker RI

5 27-31 03-07 16-20 13-17 04-08 08-12 06-10 03-07 07-11 05-09 02-06 07-11 at proposal

38Keselamatan dan Kesehatan Kerja di Rumah Sakit - sertifikasiKemnaker RI

3 08-10 12-14 04-06 07-09 18-20 03-05 15-17 12-14 16-18 14-16 11-13 14-16 at proposal

39Penyakit Akibat Kerja di Perusahaan Tambang Batu Bara - sertifikasiKemnaker RI

2 02-03 17-18 23-24 20-21 18-19 18-19 23-24 18-19 24-25 19-20 16-17 23-24 at proposal

40 PETUGAS P3K - sertifikasi Kemnaker RI 3 13-15 24-26 09-11 27-29 18-20 22-24 28-30 24-26 30-02 26-28 23-25 28-30 at proposal

41PROGRAM PENCEGAHAN GANGGUAN PENDENGARAN DI TEMPATKERJA - sertifikasi Kemnaker RI

2 02-03 03-04 23-24 30-31 11-12 02-03 29-30 03-04 31-01 05-06 02-03 30-01 at proposal

42 SPIROMETRI DAN AUDIOMETRI - sertifikasi Kemnaker RI 2 02-03 10-11 23-24 06-07 18-19 08-09 06-07 10-11 07-08 12-13 09-10 07-08 at proposal43 Ahli K3 Kebakaran Kelas A 6 27-01 24-29 23-30 21-27 22-27 20-25 21-27 21-26 19-24 23-28 17-23 at proposal44 Koordinator Kebakaran Kelas B 6 13-18 17-22 16-21 14-20 15-20 13-18 13-20 14-19 12-17 16-21 10-16 at proposal45 Regu Pemadam Kebakaran Kelas C 6 06-11 10-15 09-14 06-13 08-13 06-11 06-12 07-12 05-10 09-14 03-09 at proposal46 Petugas Kebakaran Kelas D 3 02-04 06-08 05-07 02-04 04-06 02-04 03-05 03-05 01-03 05-07 30-02 at proposal

SERTIFIKASI BNSP RI: di Bdg/Jkt/Yogya1 Ahli K3 Umum Madya 5 20-24 17-21 02-06 13-17 11-15 15-19 06-10 24-28 07-11 19-23 16-20 14-18 8.750.0002 Ahli K3 Umum Muda 4 27-30 24-27 09-12 06-09 04-07 22-25 13-16 18-21 14-17 26-29 23-26 28-31 7.950.0003 Ahli K3 Umum Utama 6 06-11 03-08 16-21 20-25 11-16 08-13 20-25 03-08 21-26 05-10 02-07 07-12 9.500.0004 HAZARD Operability Study (HAZOP) 4 13-16 10-13 02-05 27-30 05-08 02-05 27-30 10-13 28-01 12-15 09-12 21-24 7.950.0005 Operator Migas 4 20-23 17-20 10-13 30-02 11-14 15-18 29-02 18-21 31-03 19-22 16-19 28-31 7.950.0006 Pengawas K3 Migas 6 06-11 24-29 16-21 13-18 04-09 22-27 06-11 24-29 07-12 05-10 09-14 07-12 9.250.0007 Pengawas Utama K3 Migas 6 06-11 03-08 02-07 20-25 11-16 08-13 13-18 03-08 14-19 05-10 09-14 07-12 9.500.0008 Safety Inspector 4 14-17 11-14 09-12 06-09 04-07 02-05 20-23 11-14 21-24 13-16 10-13 21-24 7.950.0009 Investigasi Insiden 4 21-24 18-21 16-19 27-30 11-14 16-19 27-30 18-21 29-02 20-23 17-20 28-31 7.950.000

10 Operator Gas Tester 4 27-30 24-27 02-05 31-03 05-08 22-25 30-03 24-27 01-04 26-29 23-26 30-03 7.950.00011 Auditor SMK3 4 06-09 03-06 10-13 06-09 12-15 02-05 06-09 03-06 07-10 05-08 02-05 07-10 7.950.00012 Petugas K3 Laboratorium 4 13-16 10-13 17-20 13-16 04-07 08-11 13-16 10-13 14-17 12-15 09-12 14-17 7.950.00013 FIREMAN 1 2 06-07 17-18 02-03 20-21 04-05 08-09 06-07 03-04 07-08 19-20 09-10 07-08 5.750.00014 FIREMAN 2 3 06-08 17-19 02-04 20-22 04-06 08-10 06-08 03-05 07-09 19-21 09-11 07-09 6.750.00015 FIRE OFFICER 4 06-09 17-20 02-05 20-23 04-07 08-11 06-09 03-06 07-10 19-22 09-12 01-04 7.950.00016 HIMA 5 06-10 10-14 16-20 13-17 04-08 08-12 06-10 10-14 07-11 12-16 09-13 07-11 8.500.00017 HIMU 4 14-17 18-21 02-05 06-09 12-15 16-19 14-17 18-21 15-18 20-23 17-20 15-18 7.950.00018 HIU 5 20-24 24-28 09-13 20-24 04-08 22-26 20-24 24-28 21-25 26-30 23-27 30-04 8.950.00019 Internal Auditor SMK3 3 27-29 03-05 16-18 28-30 18-20 02-04 28-30 03-05 30-02 05-07 02-04 22-24 5.950.00020 Pengawas SMK3 Kontraktor (CSMS) 4 06-09 10-13 03-06 31-03 11-14 08-11 30-03 10-13 01-04 12-15 09-12 28-31 7.950.00021 PETUGAS K3 FASILITAS KESEHATAN 4 13-16 17-20 09-12 06-09 04-07 15-18 06-09 18-21 07-10 19-22 16-19 07-10 7.950.00022 Petugas Penanganan Bahaya Gas H2S 3 20-22 24-26 18-20 13-15 18-20 22-24 13-15 24-26 14-16 26-28 23-25 14-16 6.500.00023 SAFETYMAN MIGAS 3 29-31 05-07 02-04 20-22 18-20 03-05 20-22 05-07 21-23 07-09 04-06 21-23 6.500.00024 SAFETYMAN UMUM 3 08-10 12-14 11-13 27-29 18-20 10-12 27-29 12-14 28-30 14-16 11-13 28-30 6.500.00025 Petugas P3K 3 15-17 19-21 16-18 30-01 18-20 17-19 29-01 18-20 31-02 21-23 18-20 30-02 6.500.00026 Ahli Muda K3 Konstruksi 4 21-24 25-28 03-06 06-09 12-15 23-26 07-10 25-28 08-11 27-30 24-27 08-11 7.950.00027 Ahli Madya K3 Konstruksi 5 27-31 03-07 09-13 13-17 04-08 08-12 13-17 03-07 14-18 05-09 02-06 14-18 8.500.000

Page 132: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Agus Sep Okt Nov Des Harga28 Ahli Utama K3 Konstruksi 5 06-10 10-14 16-20 20-24 11-15 15-19 20-24 10-14 21-25 12-16 09-13 30-04 8.500.00029 Supervisor K3 Konstruksi 4 13-16 17-20 02-05 27-30 04-07 02-05 27-30 18-21 29-02 19-22 16-19 21-24 7.950.000

SERTIFIKASI ESDM: di Bandung1 JURU BOR PELEDAKAN TAMBANG TERBUKA - sertifikasi ESDM (BNSP) 6 13-18 24-29 09-14 13-18 04-09 22-27 06-11 03-08 07-12 12-17 09-14 07-12 8.000.000

2PELAKSANA PELEDAKAN (JURU LEDAK KELAS II) - sertifikasi ESDM(BNSP)

10 06-16 03-13 02-12 13-23 04-14 08-18 06-16 03-13 07-17 05-15 02-12 07-17 11.000.000

3PEMETAAN DI TAMBANG TERBUKA (JURU UKUR TAMBANG) -sertifikasi ESDM (BNSP)

14 06-21 03-18 02-17 13-28 04-19 08-23 06-21 03-19 07-22 05-20 02-17 07-22 15.000.000

4 JURU PENGEBORAN AIR TANAH - sertifikasi ESDM (BNSP) 7 13-19 17-23 09-15 13-19 04-10 22-28 20-26 24-30 21-27 19-25 16-22 07-13 12.000.000

5PENGAWAS OPERASIONAL PERTAMA (POP) PADA PERTAMBANGAN -sertifikasi ESDM (BNSP)

6 06-11 03-08 02-07 30-04 04-09 08-13 06-11 03-08 07-12 05-10 02-07 30-05 11.000.000

6PENGAWAS OPERASIONAL MADYA (POM) PADA PERTAMBANGAN -sertifikasi ESDM (BNSP)

6 13-18 10-15 09-14 13-18 04-09 15-20 13-18 10-15 14-19 12-17 09-14 07-12 13.000.000

7PENGAWAS OPERASIONAL UTAMA (POU) PADA PERTAMBANGAN -sertifikasi ESDM (BNSP)

6 27-01 17-22 16-21 20-25 11-16 22-27 20-25 24-29 21-26 19-24 16-21 14-19 15.000.000

SERTIFIKASI ESDM: di Jakarta/Yogyakarta1

PENGAWAS OPERASIONAL PERTAMA (POP) PADA PERTAMBANGAN -sertifikasi ESDM (BNSP)

6 06-11 03-08 02-07 30-04 04-09 08-13 06-11 03-08 07-12 05-10 02-07 30-05 at proposal

2PENGAWAS OPERASIONAL MADYA (POM) PADA PERTAMBANGAN -sertifikasi ESDM (BNSP)

6 13-18 10-15 09-14 13-18 04-09 15-20 13-18 10-15 14-19 12-17 09-14 07-12 at proposal

3PENGAWAS OPERASIONAL UTAMA (POU) PADA PERTAMBANGAN -sertifikasi ESDM (BNSP)

6 27-01 17-22 16-21 20-25 11-16 22-27 20-25 24-29 21-26 19-24 16-21 14-19 at proposal

Page 133: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

WEBSITE DAN MEDIA SOSIAL

www.pelatihan-indonesia.id

mairodi.trainingconsulting

@mairoditraining mairoditraining

mairoditraining

Page 134: PT. MAIRODI MANDIRI SEJAHTERA...35 finance for non finance manager 3 22-24 05-07 09-11 22-24 11-13 02-04 22-24 05-07 23-25 07-09 04-06 22-24 6.500.000 36 Financial Planning and Budgeting

END