Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE...

59
SMA Solar Technology AG – 7 maggio 2014 Impianti Commerciali e Industriali Sunny Days 2014

Transcript of Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE...

Page 1: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

SMA Solar Technology AG – 7 maggio 2014

Impianti Commerciali e Industriali

Sunny Days 2014

Page 2: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

SEU – Servizi Efficienti di Utenza

Page 3: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Sistemi Efficienti di Utenza (SEU) – Analisi e prospettive

Page 4: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

sistema efficiente di utenza (SEU): sistema in cui uno o più impianti di produzione di energia elettrica, con potenza complessivamente non superiore a 20 MWe e complessivamente installata sullo stesso sito, alimentati da fonti rinnovabili ovvero in assetto cogenerativo ad alto rendimento, gestiti dal medesimo produttore, eventualmente diverso dal cliente finale, sono direttamente connessi, per il tramite di un collegamento privato senza obbligo di connessione di terzi, all’unità di consumo di un solo cliente finale (persona fisica o giuridica) e sono realizzati all’interno di un’area, senza soluzione di continuità, al netto di strade, strade ferrate, corsi d’acqua e laghi, di proprietà o nella piena disponibilità del medesimo cliente e da questi, in parte, messa a disposizione del produttore o dei proprietari dei relativi impianti di produzione;

Cos’è un SEU?

Page 5: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

• L’energia che è autoprodotta in sito (non passa quindi per la rete pubblica) NON PAGA gli oneri di trasmissione, distribuzione e quindi gli oneri generali di sistema.

• QUESTI ONERI DI SISTEMA INCIDONO SULLA BOLLETTA ENERGETICA DI UN’AZIENDA, per almeno il 40% dell’importo in bolletta.

Qual è il vantaggio di costituire un SEU?

Page 6: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Esempio di bolletta di utente energivoro – 2.64 MW, 20 KV

Page 7: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20
Page 8: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20
Page 9: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

• Immaginiamo di considerare un caso reale con le seguenti caratteristiche:

• Impianto di produzione (fabbrica) situato in centro Italia

• Il produttore di energia ed il consumatore d’energia coincidono

• L’impianto è attivo a ciclo continuo (24h/day) con tre turni da 8 ore ciascuno

• Due turni vengono eseguiti di giorno (Peak) ed uno di notte (Off-Peak)

• Obiettivo: almeno il 70% di autoconsumo (potenza tipica richiesta 3.5 MW)

• Energy Yield = 1360 [kWh/kWp]

• Dati relativi all’esercizio dell’impianto nel 2013:

– Valore massimo mensile potenza di picco [kWp] richiesta dall’impianto: 5.072,00 [kWp]

– Valore minimo mensile potenza di picco [kWp] richiesta dall’impianto: 3.712,00 [kWp]

– Valore massimo mensile Energia [kWh] richiesta dall’impianto: 1.713.844,00 [kWh]

– Valore minimo mensile Energia [kWh] richiesta dall’impianto: 887.692,00 [kWh]

SEU: fabbrica nel centro Italia

Page 10: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

• Di seguito si trovano riassunti tutti i dati relativi all’esercizio dell’impianto nel 2013.

Dati di produzione (1)

Peak (KWh) Off-Peak (KWh) Peak (KW) Off-Peak (KW) Energia totale

Gennaio 758.368,00 494.032,00 4.656,00 4.512,00 1.252.400,00

Febbraio 757.372,00 483.548,00 5.072,00 4.268,00 1.240.920,00

Marzo 742.780,00 537.912,00 4.176,00 4.160,00 1.280.692,00

Aprile 711.520,00 536.104,00 4.832,00 4.272,00 1.247.624,00

Maggio 882.888,00 719.948,00 4.992,00 4.992,00 1.602.836,00

Giugno 739.052,00 646.168,00 4.960,00 4.960,00 1.385.220,00

Luglio 953.116,00 760.728,00 4.944,00 4.944,00 1.713.844,00

Agosto 719.656,00 670.520,00 4.944,00 4.944,00 1.390.176,00

Settembre 585.120,00 438.584,00 4.688,00 4.688,00 1.023.704,00

Ottobre 594.808,00 418.144,00 3.712,00 3.712,00 1.012.952,00

Novembre 594.536,00 413.976,00 4.144,00 4.144,00 1.008.512,00

Dicembre 508.756,00 378.936,00 4.160,00 4.160,00 887.692,00

Come si nota dalla tabella soprastante esistono due richieste di energia : Peak e Off-Peak

La fase off-Peak si svolge interamente nella fascia oraria (22:00 – 08:00)

La fase Peak si svolge interamente nella fascia oraria (08:00 – 22:00)

Page 11: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

• Sulla base delle considerazioni fatte prendiamo in esame solo i dati relativi alle fasce orarie Peak.

Dati di produzione (2)

Peak (KWh) Peak (KW)

Gennaio 758.368,00 4.656,00

Febbraio 757.372,00 5.072,00

Marzo 742.780,00 4.176,00

Aprile 711.520,00 4.832,00

Maggio 882.888,00 4.992,00

Giugno 739.052,00 4.960,00

Luglio 953.116,00 4.944,00

Agosto 719.656,00 4.944,00

Settembre 585.120,00 4.688,00

Ottobre 594.808,00 3.712,00

Novembre 594.536,00 4.144,00

Dicembre 508.756,00 4.160,00

Su base annua abbiamo i seguenti valori di Energia richiesta: 8.547.972,00 [kWh].

Page 12: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Impianto fotovoltaico da 2.7 MWp (1)

Page 13: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

• la produttività energetica Vs la richiesta (su base mensile)

Impianto fotovoltaico da 2.7 MWp (2)

Days Richiesta Peak (KWh) Disponibilità impianto FV (kWh)

Rapporto Offerta / Domanda

Gennaio 31,00 758.368,00 189.054,00 25%

Febbraio 28,00 757.372,00 215.036,00 28%

Marzo 31,00 742.780,00 303.506,00 41%

Aprile 30,00 711.520,00 342.021,00 48%

Maggio 31,00 882.888,00 397.325,00 45%

Giugno 30,00 739.052,00 401.624,00 54%

Luglio 31,00 953.116,00 446.085,00 47%

Agosto 31,00 719.656,00 411.882,00 57%

Settembre 30,00 585.120,00 335.137,00 57%

Ottobre 31,00 594.808,00 275.273,00 46%

Novembre 30,00 594.536,00 199.083,00 33%

Dicembre 31,00 508.756,00 159.766,00 31%

8.547.972,00 3.675.792,00 43%

Page 14: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

• la produttività energetica Vs la richiesta (su base mensile)

Impianto fotovoltaico da 2.7 MWp (3)

0,00

200.000,00

400.000,00

600.000,00

800.000,00

1.000.000,00

1.200.000,00

Gennaio Febbraio Marzo Aprile Maggio Giugno Luglio Agosto Settembre Ottobre Novembre Dicembre

Richiesta Peak (KWh) Disponibilità impianto FV (kWh)

Page 15: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

-1,50

-1,00

-0,50

0,00

0,50

1,00

1,50

2,00

2,50

3,00

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033

CFt2014

Σ CFt2014

Impianto fotovoltaico da 2.7 MWp (3)

La convenienza

Page 16: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Revamping

Page 17: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Bassa efficienza Alta efficienza

kWh

Inverter Ava

ilability

Working point

kWh vs. Inverter Availability vs. Inverter efficiency

Page 18: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Inverter Ava

ilability

Bassa efficienza Alta efficienza

kWh

kWh vs. Inverter Availability vs. Inverter efficiency

Page 19: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Inverter Ava

ilability

Issue on

Inverter

Availability

Bassa efficienza Alta efficienza

kWh

kWh vs. Inverter Availability vs. Inverter efficiency

Page 20: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Inverter Ava

ilability

Plant underperforming area

Bassa efficienza Alta efficienza

kWh

kWh vs. Inverter Availability vs. Inverter efficiency

Page 21: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Inverter Ava

ilability

Increase availability

Plant underperforming area

Bassa efficienza Alta efficienza

kWh

kWh vs. Inverter Availability vs. Inverter efficiency

Page 22: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Inverter Ava

ilability

Inverter Revamping Area

Plant underperforming area

Bassa efficienza Alta efficienza

kWh

kWh vs. Inverter Availability vs. Inverter efficiency

Page 23: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

SMA revamping Impianto industriale 6 MWp centro Italia

Produzione Reale 2012 [kWh]

gen-12 408.592,00

feb-12 319.998,00

mar-12 687.014,00

apr-12 670.280,00

mag-12 827.363,00

giu-12 984.967,00

lug-12 817.274,00

ago-12 985.104,00

set-12 668.341,30

ott-12 629.122,22

nov-12 350.049,26

dic-12 446.102,08

Totale 7.794.206,86

Produzione Reale 2013 [kWh]

gen-13 378.639,47

feb-13 439.919,04

mar-13 550.456,50

apr-13 870.920,11

mag-13 771.810,99

giu-13 942.648,38

lug-13 1.008.325,42

ago-13 895.904,44

set-13 798.668,27

ott-13 534.288,94

nov-13 293.284,21

dic-13 415.429,82

Totale 7.900.295,59

Page 24: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Iniziative commerciali: SMA revamping /Case Study (6)

Fase 4: Simulazione producibilità soluzione SMA (pv-syst)

Page 25: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

-1,50

-1,00

-0,50

0,00

0,50

1,00

1,50

2,00

2,50

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031

CFt2014

Σ CFt2014

Tasso attualizzazione 6%

Tariffa GSE [€/kWh] € 0,21

Ritiro dedicato [€/kWh] € 0,07

Delta Produzione SMA con surplus availability [kWh] 337.855,00

Delta O&M full SMA 0,11

Consumo Servizi ausiliari (Delta rispetto ad SMA) [KWh] 10000,00

Analisi finanziaria revamping

Page 26: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

SMA revamping

19.00 - Inverter SMA in sito

21.00 - Vecchio inverter rimosso

23.00 - SC 800CP posizionato

06.30 – Cablaggio

08.45 – Commissioning completato

09.00 – Inverter SMA produce

Page 27: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Inverter Sunny Tripower

Page 28: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

STP15000TL-10 STP17000TL-10

STP15000TLEE STP20000TLEE

STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20 STP12000TL-20

STP20000TL30 STP25000TL30

NUOVI SUNNY TRIPOWER – PRESENTATI AD INTERSOLAR

Page 29: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

STP 15 - 17 kW TL-40 > Grazie all’acquisizione della parte

fotovoltaica di Danfoss, la serie FLX 15 e 17 kW andrà a completare il catalogo prodotti SMA

NUOVI SUNNY TRIPOWER – PRESENTATI AD INTERSOLAR

STP 60 kW TL > Grazie all’acquisizione della parte

fotovoltaica di Danfoss, la nuova serie MLX da 60kW andrà a completare il catalogo prodotti SMA

Page 30: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Inverter modulare trifase, uscita AC: 3/N/PE, 230/400 V

Rendimento elevato: 98%

Tecnologia Multi-StringⓇ : due inseguitori MPP indipendenti e

asimmetrici

Tensione Vcc massima: 1000 V

Ampi range di tensione MPP

Multifunction relay integrato

Optitrac Global Peak: per la gestione degli ombreggiamenti

OptiCoolⓇ

Comunicazione Bluetooth e Webconnect di serie, RS485 opzionale

* Necessaria protezione d’interfaccia esterna in bt

Certificato CEI 0-16 per impianti fino a 400 KW

485BRD-10

STP 5000TL-20*/6000TL-20*/7000TL-20/8000TL-20/9000TL-20 10000TL-20/12000TL-20

Page 31: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Inverter modulare trifase, uscita AC: 3/N/PE, 230/400 V

Tecnologia Multi-StringⓇ : due inseguitori Mpp indipendenti e asimmetrici

Rendimento elevato: 98,1%

Tensione Vcc massima: 1000 V

Protezione da sovratensione lato DC (SPD di tipo II) integrabili

Optiprotect: Fusibile elettronico di stringa per la protezione delle stringhe da corrente inversa

Optitrac Global Peak: per la gestione degli ombreggiamenti

OptiCoolⓇ

Comunicazione BT di serie, Webconnect e RS-485 opzionali

Sunny Tripower TL-10: potenze da 15 a 17 kW

Page 32: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Economic Excellence (EE)

Inverter modulare trifase, uscita AC: 3/N/PE, 230/400 V

Rendimento elevato: 98,5%

Tensione Vcc massima: 1000 V

Controllo della potenza reattiva

DC switch meccanico integrato

– sostituisce ESS

Protezione da correnti inverse integrata (diodi)

OptiCoolⓇ

Comunicazione BT di serie, Webconnect e RS-485 opzionali

STP15000TLEE/20000TLEE

Certificato CEI 0-16 per tutte le classi di potenza

WEBCONDM-10 DM-485CB-10

Page 33: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

AC-Power (@ cos F = 1) 20/25 kVA

Max Efficienza 98.5%

MPP range (@Vac 400 V) 400 V – 800 V

MPP 2

Stringhe per MPP 3

Compatibilità moduli Molto elevata

DC Switch Interruttore meccanico

DC-SPD Overvoltage protection Type II Opzionale

Q(U) integrato Q on demand (24/7) OptiTrac Global Peak

Speedwire interface (Senza Display)

Technical Data

STP 20000/25000 TL-30 - NEW

WEBCONDM-10

Page 34: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Project Performance Package

Page 35: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Iniziative commerciali – Project performance package

Page 36: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Availability

Sicurezza investimento

99%

100%

SMA 100%

Page 37: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

SUNNY TRIPOWER 20000TLEE PROJECT

PROJECT e ORIENTATO AL ROI

> OTTIMIZZAZIONE DEI COSTI

Una sola versione, logistica ridotta, funzioni ottimizzate

> PRONTO PER IL FUTURO

Compatibile con tutti i grid requirements

> FLESSIBILE

Grazie al nuovo Sunny Design 3 è molto più semplice

progettare il tuo impianto con TLEE

Page 38: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Da pochi KW…

20 kV 400 V

MV-Substation

Speedwire SMA Data2+

1

2

75

Setpoints for active and

reactive power

SMA Services SMA Update Server

Sunny Portal

Plant Management

System

0…20 mA 0…10 V

Solar irradiation

Power quality monitoring

Distribution grid

Analog/ digital signals or Modbus

Router

LAN

Solar Power Plant

mA

V

Analog signals

Grid Control Center

Telecontrol device

Internet WAN

Remote access via web interface

Temperatures (Ambient/Module)

Page 39: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

…a decine di MW

Monitoring, Control & Service

SMA Speedwire

1

2

75

Cluster #2

SMA Speedwire

1

2

75

Cluster #N

LAN/WAN Internet

SMA Power Plant

Controller

Ethernet / LAN

1

2

75

Cluster #1

SMA Speedwire

Modbus UDP

Page 40: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Service: 99% Availability (uptime)

• I nostri servizi:

> Pagamento a compensazione per le perdite

che superano una availability del 99%

> Massima priorità service

> Generazione del report annuale

• I tuoi vantaggi:

> Rischio finanziario minimo, aumento della

produzione annuale

> Limitazione del rischio ridotta all’1%

Page 41: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

• I nostri servizi:

> Accesso remoto di impianto in tempo reale

(10 s)

> Immediata notifica via mail del guasto al responsabile di impianto

> Analisi dei guasti e proposte correttive entro 4 ore dall’evento

> Service report mensile

• I tuoi vantaggi:

> Il monitoraggio remoto attivo minimizza le perdite

> Riduce i costi OPEX del monitoraggio

Service: Remote Service

Page 42: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

• I nostri servizi:

> Ispezione iniziale dell’installazione dell’inverter (montaggio, cablaggi) da parte di SMA

> Setup comunicazione

> Aggiornamento firmware (se necessario)

• I tuoi vantaggi:

> Minimizzazione dei rischi per prevenire errori in fase di installazione

> Massimizzazione della produzione sin dalla connessione

Service: Commissioning

Page 43: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Inverter Sunny Central

Page 44: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Inverter SUNNY CENTRAL CP

Sunny Central – Gamma di potenza AC (kVA)

500 …..800

Soluzione MV

con un inverter

Soluzione MV

con due inverter

Inverter senza

trasformatore

da 500 kVA a 1.800 kVA

… 1.800 1.000

Max. AC Potenza (kW)

630

Page 45: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

> Piena potenza fino a temperature ambiente di

50 °C

> 10% di potenza in più fino a 25° C ambiente

> Protezione da ambienti chimicamente

aggressivi garantita

> Nessun costo di manutenzione, grazie alla

soluzione senza filtri per il raffreddamento

Il concetto di raffreddamento OptiCool®

Page 46: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Ingresso aria

Scambiatore aria-aria

Ventola principale

Radiatore stack

Bobina del filtro sinusoidale

Uscita aria

OptiCool ®

Page 47: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Inverter CP - Interno

Page 48: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Inverter CP – Connessione cavi

Page 49: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

MVPS: Medium Voltage Power Station

Page 50: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

MVPS – Layout

• Container layout per 2 Sunny Central CP XT

Page 51: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Struttura Sunny String-Monitor

Page 52: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Analisi impianti a tetto e a terra

Page 53: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Impianti commerciali – Analisi del tetto

Page 54: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Impianti commerciali – Analisi del tetto

Dimensionamento a Nord -41.6% nel Lazio con Tilt 30°

Page 55: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Impianti commerciali – Analisi del tetto

Dimensionamento a E/O -18% nel Lazio con Tilt 30° Dimensionamento TILT 10° -6% nel Lazio Azimut 0°

La scelta del tipo di inverter è fortemente influenzata dal tilt e azimut

Page 56: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Impianti industriali a terra – Analisi layout

Impianto da 1.86 MWp su doppia falda distinta

Page 57: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Impianti industriali a terra – Analisi layout

1. Analisi degli spazi e disposizione moduli (tipicamente ogni MW copre 1,5/2 ettari di superficie fotovoltaica) 2. Localizzazione delle linee elettriche e del punto di consegna ENEL 3. Scelta inverter, cabine e localizzazione platee 4. Disposizione moduli e strutture 5. Disposizione cassette di parallelo 6. Progettazione cavi e perdite perimetrali 7. Analisi del terreno e disposizione pozzetti di ispezioni per l’impianto di terra 8. Scelta DI e DG in cabina ENEL 9. Topologia di rete in media tensione 10. Progettazione comunicazione RS485/ETH/LWL/MODBUS

Page 58: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Grazie per l‘attenzione!

Page 59: Impianti Commerciali e Industriali - SMA Italia...STP15000TL-10 STP17000TL-10 STP15000TLEE STP20000TLEE STP5000TL-20 STP6000TL-20 STP7000TL-20 STP8000TL-20 STP9000TL-20 STP10000TL-20

Twitter

twitter.com/SMAItalia

Linkedin

linkedin.com/company/sma-italia

YouTube

go.sma.de/Youtube_SMA_Italia