Il bando EURATOM 2012
e anticipazioni sul 2013
(parte radioprotezione)
Mauro Belli Rappresentante italiano nel Comitato Consultivo
Programma Euratom - Fissione Nucleare
c/o Istituto Superiore di Sanità,
Dip.to Tecnologie e Salute, Roma
GIORNATA INFORMATIVA NAZIONALE
NELL’AMBITO DEL PROGRAMMA EURATOM
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
"Treaties of Rome"
Signed in Rome in March 1957:
– the creation of a generalised common market (European Economic Community, EEC) ;
– the creation of an atomic energy community (European Atomic Energy Community, Euratom)
The two treaties entered into force on 1 January 1958.
The European Commission acquired the status of a supranational regulatory authority in three areas:
– radiation protection,
– supply of nuclear fissile materials
– nuclear safeguards.
http://ec.europa.eu/energy/nuclear/legislation/euratom_en.htm
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
Euratom Treaty - tasks
a. promote research and ensure the dissemination of technical information;
b. establish uniform safety standards to protect the health of workers and of the general public and ensure that they are applied;
c. facilitate investment and ensure, particularly by encouraging ventures on the part of undertakings, the establishment of the basic installations necessary for the development of nuclear energy in the Community;
d. ensure that all users in the Community receive a regular and equitable supply of ores and nuclear fuels;
e. make certain, by appropriate supervision, that nuclear materials are not diverted to purposes other than those for which they are intended;
f. exercise the right of ownership conferred upon it with respect to special fissile materials;
g. ensure wide commercial outlets and access to the best technical facilities by the creation of a common market in specialized materials and equipment, by the free movement of capital for investment in the field of nuclear energy and by freedom of employment for specialists within the Community;
h. establish with other countries and international organizations such relations as will foster progress in the peaceful uses of nuclear energy.
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
Euratom Treaty - tasks
Article 4.1 of the Euratom Treaty
The EC is in charge of promoting and facilitating nuclear research activities in the MSs and to complement them through of a Community Research & Training programme Article 6d of the Euratom Treaty
To encourage the implementation of the (national) research programmes the EC can:
bring financial support to research contracts, provide to MSs, people or enterprises, facilities, equipments or
expert assistance, stimulate joint funding (from MSs, people, enterprises)
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
FP7+2 Euratom
• I Programmi Euratom sono limitati a 5 anni dal Trattato Euratom, mentre il Programma Quadro generale dura 7 anni.
• Il Programma Quadro Euratom FP7, chiuso alla fine del 2011, è stato esteso (decisione del Consiglio 14-12-2011) con un programma biennale 2012-13 (FP7+2) per allinearlo all’attuale ciclo finanziario dell’UE che termina nel 2013.
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
FP7+2 Euratom
DG-Ricerca
azioni indirette
Fusione
DG-Ricerca
azioni indirette
Fissione &
Radioprotezione (*)
CCR
azioni dirette
Attività nucleari
FP7 (2007-11) M€ 1947 FP7 (2007-11) M€ 287 FP7 (2007-11) M€ 517
FP7+2 (2012-13) M€ 2208
(M€ 1934 for ITER)
FP7+2 (2012-13) M€ 118 FP7+2 (2012-13) M€ 233
(*) fissione nucleare, sicurezza e radioprotezione, con l’obiettivo di potenziare la sicurezza della fissione nucleare e delle altre applicazioni delle radiazioni nell’industria, in medicina e in una migliore gestione dei rifiuti radioattivi.
FP7 (2007-2011) = M€ 2751
FP7+2 (2012-13) = M€ 2560
Per Fissione&RP: FP7+2 in continuità con FP7
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
FP7+2 Euratom
Radioprotezione
(Decisione del Consiglio 14 dicembre 2011)
Ricerca in particolare sui rischi connessi all'esposizione alle basse dosi, sugli usi a fini medici e sulla gestione
degli incidenti, al fine di fornire una base scientifica per un sistema di protezione solido, equo e socialmente
accettabile, che tenga altresì conto dei benefici delle radiazioni per usi industriali e sanitari.
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
Euratom Work Programme 2012
Il primo bando di FP7+2, collegato al WP
2012, è stato pubblicato il 17 gennaio 2012
Official Journal of the European Union 17.1.2012
– Call title: Nuclear Fission, Safety and Radiation Protection
– Call identifier: FP7-Fission-2012
– Deadline: 27 March 2012, at 17.00.00, Brussels local time
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
Work Programme 2012
Scope and other information
Content and calls
• (Fusion Energy) • Nuclear Fission, Safety and Radiation protection (Management of
Ultimate Radioactive Waste, Reactor Systems, Radiation protection, Infrastructures, Human Resources and Training, Cross-Cutting Actions, Co.operation with Third Countries)
Implementation of Programme and calls
• Call Information, Instruments, Time-table and Road-map
Budget
Indicative priorities for future WPs and calls
Annexes
• Eligibility, Evaluation criteria, Reimbursement rules
[http://ec.europa.eu/research/participants/portal/page/euratom?callIdentifier
=FP7-Fission-2012]
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
Work Programme 2012
Sono state introdotte varie semplificazioni. In particolare sono state abolite le differenze formali tra piccoli e grandi progetti e sono state incentivate le attività di coordinamento combinate con la ricerca, non essendo più previste attività di coordinamento separate dalla ricerca.
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
WP 2012 - Nuclear Fission, Safety
and Radiation Protection • Geological disposal 9 M€
• Safety & competitiveness of nuclear installation • Advanced nuclear systems for increased sustainability • Cross-cutting aspects
• Advanced systems for non-electrical uses (see cross-cutting)
20 M€
• Radiation protection 15 M€
• Research infrastructures • Training and mobility • Cross-cutting
9.25 M€
Grand Total 2012: 53.25 M€ (Call 2011: 41 M€)
Budgetary figures may vary by up 10%
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
WP 2012
Fission 3 (Radiation Protection)
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
WP 2012
Fission 4 - Infrastructures
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
WP 2012
Human Resource and Training,
Cross-cutting Actions
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
WP 2012
Other
M€
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
WP 2012
Fission 3 (Radiation Protection)
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
WP 2012
Fission 3 (Radiation Protection) II.2.3.1: Qualification of risks for low and protracted exposures
Topic: Fission-2012-3.1.1: Contribution to low-dose risk research in Europe. • In line with the HLEG vision report (www.hleg.de) and/or Strategic Research
Agenda (SRA) of MELODI (www.melodi-online.eu), ….focusing on those areas/directions identified and prioritised by MELODI.
• A multi-disciplinary and integrating approach will be required aiming to assess health effects through integration of radiobiological research and epidemiological studies ….. to better substantiate conceptual/computational modelling assumptions.
• It is essential to include interfaces with the broader (i.e. non-radiation) biological and epidemiological communities ….
• Proposals should avoid duplication of past and on-going research.
• Funding scheme: Coordinated Actions and/or Collaborative Projects and/or their
combination if appropriate.
• Expected impact: Significant optimisation of the protection …. as a result of
improvements to regulatory regimes following the resolution of one or more key
identified issues in radiation protection research on low-dose risk.
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
WP 2012
Fission 3 (Radiation Protection)
II.2.3.2: Medical uses of radiation
In this work programme, actions in this area are within scope of topic Fission-
2012-3.1.1. (risk assessment at low and protracted exposures)
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
WP 2012
Fission 3 (Radiation Protection) II.2.3.3: Emergency and post-accident management
Topic: Fission-2012-3.3.1:
Update of emergency management and rehabilitation strategies and expertise
in Europe.
• re-evaluate current European preparedness and expertise regarding emergency
management of events at nuclear installations or during the transport of
radioactive material, in particular in the light of the nuclear accident in Japan.
• multi-disciplinary, innovative and integrative thinking
• re-evaluating the interaction of technical experts with authorities in charge,
communication to the public and the training of key players.
• Cooperation with Japan is welcome.
• Funding scheme: Maximum of one Coordination and Support Action
(coordinating or
supporting) or Collaborative Project or their combination if appropriate.
• Expected impact: Improved robustness and efficient application of emergency
and postaccident management expertise, plans and related training in Europe.
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
FP7 Euratom – alcune statistiche
Fission-3.1
Fission-3.2
Fission-3.5
Fission-3.3
Quantification of risks for low and protracted exposures
Medical
uses of
radiation
Emergency
management
and rehabilitation Other topics
Distribuzione dei fondi EU per
tipo di attività
Sistemi nucleari (area Fi-2) 95 M€
Radioprotezione (area Fi-3) 59 M€
Gestione dei rifiuti radioattivi
(area Fi-1)
48 M€
Infrastrutture (area Fi-4) 10 M€
Training (area Fi-5)(*) 5 M€
Cross-cutting (area Fi-6) 18 M€
Cooperazione internazionale con i
Paesi terzi (area Fi-7)
5 M€
(*) anche se il training ha ricevuto basso finanziamento, l’area sarà ancora considerata in futuro data la sua importanza,
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
Work Programme 2013
Prime idee per la preparazione
Visione strategica della Commissione:
• WP 2013: continuità nelle aree d’intervento, ma transizione verso Horizon 2020 (finanziamento di “programmi” anziché di “progetti”).
• Programmazione basata su accorpamenti di grandi progetti e possibilmente con coordinamenti di programmi nazionali.
• Valorizzazione delle Piattaforme esistenti
• Progetti tipo bottom-up: non ritiene possano dare un sufficiente valore aggiunto al finanziamento UE. (Ma non sarebbe più lungimirante dare un certo spazio ad essi, purché all’interno degli obiettivi generali, per il loro potenziale contributo a progressi innovativi ?)
• L’elemento qualificante sarà l’inizio di processi d’integrazione dei programmi nazionali e di collegamento con altri organismi quali la Nuclear Energy Agency (NEA) dell’OCSE, con il supporto strategico della Commissione.
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
Work Programme 2013
Prime idee per la preparazione
Alcuni punti emersi nel CCE-Fission e nell’informal meeting con la
Commissione:
• WP 2013: “phase transition” verso Horizon 2020
• Valorizzazione delle attuali Piattaforme
– IGP (Geological Disposal),
– SNE-TP (Sustainable Nuclear Energy Technological Platform)
– MELODI (Multidisciplinary European Low Dose Iniziative).
• Nel settore Radioprotezione alcuni Paesi spingono verso la Radioprotezione in
campo medico
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
Work Programme 2013
Roadmap
• Il WP 2013 dovrà essere pronto per luglio 2012, con largo anticipo rispetto alla normale tempistica, per dare spazio alla preparazione di Horizon 2020.
• elaborazione del documento preparatorio (“non paper”) e sua distribuzione al CCE-Fission entro marzo 2012;
• riunione “informale” del CCE-Fission alla fine di marzo (tentativamente 28 o 29 marzo)
• riunione del CCE-Fission per l’approvazione del WP 2013 e relativo bando: 21 giugno.
M.Belli, Giornata d’informazione
Euratom,, Roma 17 feb 2012
Link al bando Euratom 2012
http://ec.europa.eu/research/participants/portal/page/euratom?