Cooperative trail stewardship since 2011

2011

2013

2017

2011 compared to 2017

� 2017 Mayor requests/receives CPA funds for design � Pare Corp: design, public engagement, bidding documents

• Border to border surveyed• Phase 1 is 3 miles of inner segment, leaving a gap in connections with

Belmont and Weston; those segments planned for later phases

� public engagement@25% design, feedback� Con Commission order of conditions in Sept

� Traffic Commission approval of crossings

� Recent walk identifying historic elements

� Pare is finalizing the bid documentation for the split packages (demolition & construction)

� Demolition phase to be advertised shortly

� Construction planned for 2019