Cooperative trail stewardship since 2011 2011€¦ · Cooperative trail stewardship since 2011 2011...

5
Cooperative trail stewardship since 2011 2011 2013 2017

Transcript of Cooperative trail stewardship since 2011 2011€¦ · Cooperative trail stewardship since 2011 2011...

Page 1: Cooperative trail stewardship since 2011 2011€¦ · Cooperative trail stewardship since 2011 2011 2013 2017. ... 2018 Annual Meeting Presentation Created Date: 11/9/2018 2:47:40

Cooperative trail stewardship since 2011

2011

2013

2017

Page 2: Cooperative trail stewardship since 2011 2011€¦ · Cooperative trail stewardship since 2011 2011 2013 2017. ... 2018 Annual Meeting Presentation Created Date: 11/9/2018 2:47:40
Page 3: Cooperative trail stewardship since 2011 2011€¦ · Cooperative trail stewardship since 2011 2011 2013 2017. ... 2018 Annual Meeting Presentation Created Date: 11/9/2018 2:47:40

2011 compared to 2017

Page 4: Cooperative trail stewardship since 2011 2011€¦ · Cooperative trail stewardship since 2011 2011 2013 2017. ... 2018 Annual Meeting Presentation Created Date: 11/9/2018 2:47:40

� 2017 Mayor requests/receives CPA funds for design � Pare Corp: design, public engagement, bidding documents

• Border to border surveyed• Phase 1 is 3 miles of inner segment, leaving a gap in connections with

Belmont and Weston; those segments planned for later phases

� public engagement@25% design, feedback� Con Commission order of conditions in Sept

� Traffic Commission approval of crossings

� Recent walk identifying historic elements

Page 5: Cooperative trail stewardship since 2011 2011€¦ · Cooperative trail stewardship since 2011 2011 2013 2017. ... 2018 Annual Meeting Presentation Created Date: 11/9/2018 2:47:40

� Pare is finalizing the bid documentation for the split packages (demolition & construction)

� Demolition phase to be advertised shortly

� Construction planned for 2019