Scopo della presentazione
• Far vedere gli aspetti piu’ generali dellaprogettazione strutturale antincendio:
Complessita’ del problema;
Approccio sistemico;
Natura accidentale dell’azione incendio;
Progettazione prestazionale/prescrittiva;
Aspetti specifici delle gallerie stradali.
www.francobontempi.org
Stro N
GER
3
4
OGGETTOCaratteristiche delle gallerie
Geometrie
Impianti
1w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
4
5
GEOMETRIE
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
5
6
Tipo A - autostradew
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
6
7
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
7
8
Tipo B – extraurbane principaliw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
8
9
Tipo C – extraurbane secondariew
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
9
10
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
10
11
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
11
12
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
12
13
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
13
14
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
14
15
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
15
16
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
16
17
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
17
18
Sistema vs Strutturaw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
OperaMorta
OperaViva
18
19
IMPIANTI VENTILAZIONE
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
19
20
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
20
21
Piston effect
• Is the result of natural induced draft caused by free-flowing traffic (> 50 km/h) in uni-directional tunnel thus providing natural ventilation.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
21
22
Mechanical ventilation
• “forced” ventilation is required where piston effect is not sufficient such as in
– congested traffic situations;
– bi-directional tunnels (piston effect is neutralized by flow of traffic in two opposite directions);
– long tunnels with high traffic volumes.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
22
23
TUNNEL VENTILATION SYSTEMS
• Road Tunnel Ventilation Systems have two modes of operation:
• Normal ventilation, for control of air quality inside tunnels due to vehicle exhaust emissions: – in any possible traffic situation, tunnel users and staff must not suffer
any damage to their health regardless the duration of their stay in the tunnel;
– the necessary visual range must be maintained to allow for safe stopping.
• Emergency ventilation in case of fire, for smoke control: – the escape routes must be kept free from smoke to allow for self-
rescue; – the activities of emergency services must be supported by providing
the best possible conditions over a sufficient time period ;– the extent of damage and injuries (to people, vehicles and the tunnel
structure itself) must be kept to a minimum.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
23
24
Longitudinal ventilation system
• employs jet fans suspended under tunnel roof; in normal operation fresh air is introduced via tunnel entering portal and polluted air is discharged from tunnel leaving portal.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
24
25
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
25
26
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
26
27
Semi-transverse ventilation system
• employs ceiling plenum connected to central fan room equipped with axial fans; in normal operation fresh air is introduced along the tunnel trough openings in the ventilation plenum while polluted air is discharged via tunnel portals.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
27
28
Transverse ventilation system
• employs double supply and exhaust plenums connected to central fan rooms equipped with axial fans; in normal operation fresh air is introduced and exhausted via openings in double ventilation plenums.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
28
29
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
29
30
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
30
31
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
31
32
Attachments
• Dispersion stack and fan room combined with longitudinal ventilation: may be required in order to reduce adverse effect on environment of discharge of polluted air from tunnel, where buildings are located in proximity (< 100m) to tunnel leaving portal.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
32
33
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
33
34
Ventilation unitAir extraction
Ventilation unitSupply of fresh air
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
34
35
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
35
36
COMPLESSITA’Approccio prestazionale
Modellazione
Sicurezza
2w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
36
37
LOO
SE
co
up
lings
TIG
HT
LINEAR interactions NONLINEAR
System Complexity (Perrow)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
37
38
APPROCCIO PRESTAZIONALE
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
38
39
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
39
40
Prescrittivo (1)
APPROCCIOPRESCRITTIVO
1) BASI DEL PROGETTO, 2) LIVELLI DI SCUREZZA, 3) PRESTAZIONI ATTESE
NON ESPLICITATI
1) REGOLE DI CALCOLO E
2) COMPONENTI MATERIALI
SPECIFICATI E DETTAGLIATI
QUALITA' ED AFFIDABILITA' STRUTTURALI
ASSICURATI IN MODO INDIRETTO
GARANZIA DIRETTA DELLE PRESTAZIONI E DELLA SICUREZZA STRUTURALI
INSIEME DI STRUMENTI
LOGICI E MATERIALI #3
INSIEME DI STRUMENTI
LOGICI E MATERIALI #1
INSIEME DI STRUMENTI
LOGICI E MATERIALI #2
OBIETTIVI PRESTAZIONALI E
LIVELLI DI SICUREZZA ESPLICITATI
APPROCCIOPRESTAZIONALE
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
40
41
Req
uis
iti
Req
uis
iti
Elementi CostituentiElementi Costituenti
Elementi CostituentiElementi Costituenti
Elementi CostituentiElementi Costituenti
Req
uis
iti
Req
uisi
ti
Elementi CostituentiElementi Costituenti
Elementi CostituentiElementi Costituenti
prescrittivo
pre
stazi
onale
Req
uis
iti
Req
uis
iti
Elementi CostituentiElementi Costituenti
Req
uis
iti
Req
uis
iti
Elementi CostituentiElementi CostituentiElementi CostituentiElementi Costituenti
Elementi CostituentiElementi CostituentiElementi CostituentiElementi Costituenti
Elementi CostituentiElementi CostituentiElementi CostituentiElementi Costituenti
Req
uis
iti
Req
uisi
ti
Elementi CostituentiElementi CostituentiElementi CostituentiElementi Costituenti
Elementi CostituentiElementi CostituentiElementi CostituentiElementi Costituenti
prescrittivo
pre
stazi
onale
Prescrittivo (2)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
41
42
Prestazionale (1)
APPROCCIOPRESCRITTIVO
1) BASI DEL PROGETTO, 2) LIVELLI DI SCUREZZA, 3) PRESTAZIONI ATTESE
NON ESPLICITATI
1) REGOLE DI CALCOLO E
2) COMPONENTI MATERIALI
SPECIFICATI E DETTAGLIATI
QUALITA' ED AFFIDABILITA' STRUTTURALI
ASSICURATI IN MODO INDIRETTO
GARANZIA DIRETTA DELLE PRESTAZIONI E DELLA SICUREZZA STRUTURALI
INSIEME DI STRUMENTI
LOGICI E MATERIALI #3
INSIEME DI STRUMENTI
LOGICI E MATERIALI #1
INSIEME DI STRUMENTI
LOGICI E MATERIALI #2
OBIETTIVI PRESTAZIONALI E
LIVELLI DI SICUREZZA ESPLICITATI
APPROCCIOPRESTAZIONALE
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
42
43
Prestazionale (2)R
equ
isit
iR
equ
isit
i
Elementi CostituentiElementi Costituenti
Elementi CostituentiElementi Costituenti
Elementi CostituentiElementi Costituenti
Req
uis
iti
Req
uisi
ti
Elementi CostituentiElementi Costituenti
Elementi CostituentiElementi Costituenti
prescrittivo
pre
stazi
onale
Req
uis
iti
Req
uis
iti
Elementi CostituentiElementi Costituenti
Req
uis
iti
Req
uis
iti
Elementi CostituentiElementi CostituentiElementi CostituentiElementi Costituenti
Elementi CostituentiElementi CostituentiElementi CostituentiElementi Costituenti
Elementi CostituentiElementi CostituentiElementi CostituentiElementi Costituenti
Req
uis
iti
Req
uisi
ti
Elementi CostituentiElementi CostituentiElementi CostituentiElementi Costituenti
Elementi CostituentiElementi CostituentiElementi CostituentiElementi Costituenti
prescrittivo
pre
stazi
onale
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
43
44
START
END
DEFINIZIONE E DISANIMADEGLI OBIETTIVI
INDIVIDUAZIONE DELLE
SOLUZIONI ATTE A
RAGGIUNGERE GLI OBIETTIVI
ATTIVITA' DI
MODELLAZIONE E MISURA
GIUDIZIO DELLE
PRESTAZIONI
RISULTANTI
No
Yes
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
44
45
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
45
46
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
46
47
MODELLINUMERICI
MODELLIFISICI
RISPETTO DIPRESCRIZIONI
livello 1
OBIETTIVI
livello 3
DEFINIZIONE DELLA
SOLUZIONE STRUTTURALE
livello 4
VERIFICA DELLE
CAPACITA'PRESTAZIONALI
LIMITI DELLAPERFORMANCE i-esima
CRITERIO (QUANTITA') CHE MISURA
LA PERFORMANCE i-esima
DEFINIZIONE DELLAPERFORMANCE i-esima
livello 2
ESPLICITAZIONE DEGLI OBIETTIVI ATTRAVERSO L'INDIVIDUAZIONE DI n
PRESTAZIONI;ordinatamente, per ciascuna di
esse, i =1,..n:
ESITO
NO
SI'
A
C
B
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
47
48
MODELLINUMERICI
MODELLIFISICI
RISPETTO DIPRESCRIZIONI
livello 1
OBIETTIVI
livello 3
DEFINIZIONE DELLA
SOLUZIONE STRUTTURALE
livello 4
VERIFICA DELLE
CAPACITA'PRESTAZIONALI
LIMITI DELLAPERFORMANCE i-esima
CRITERIO (QUANTITA') CHE MISURA
LA PERFORMANCE i-esima
DEFINIZIONE DELLAPERFORMANCE i-esima
livello 2
ESPLICITAZIONE DEGLI OBIETTIVI ATTRAVERSO L'INDIVIDUAZIONE DI n
PRESTAZIONI;ordinatamente, per ciascuna di
esse, i =1,..n:
ESITO
NO
SI'
A
C
B
www.francobontempi.org
Stro N
GER
48
49
MODELLAZIONE
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
49
5050
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
50
51
Analysis Strategy #1: Sensitivity governance of priorities
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
51
52
Analysis Strategy #2: Bounding behavior governance
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
52
53
Analysis Strategy #3: Redundancy Governance
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
53
54
NUMERICALMODELING
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
54
55
Factors for Coupling
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
INFORMATIONFLOW DIRECTION
timetK
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
55
56
Fully Coupled Scheme
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
56
57
Staggered Coupled Scheme
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
57
58
Temperature Driven Scheme
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
58
59
Scheme With No Memory
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
timetK
TERMALSTATE
(Temperature Fieldand Termic Related
Properties)
MECHANICALSTATE
(Strain and Stress Fields and
Mechanical related Properties)
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
59
6060
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
6161
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
6262
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
6363
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
64
SICUREZZA
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
64
65
ATTRIBUTES
THREATS
MEANS
RELIABILITY
FAILURE
ERROR
FAULT
FAULT TOLERANT DESIGN
FAULT DETECTION
FAULT DIAGNOSIS
FAULT MANAGING
DEPENDABILITYof
STRUCTURALSYSTEMS
AVAILABILITY
SAFETY
MAINTAINABILITY
permanent interruption of a system ability
to perform a required function
under specified operating conditions
the system is in an incorrect state:
it may or may not cause failure
it is a defect and represents a
potential cause of error, active or dormant
INTEGRITY
ways to increase
the dependability of a system
An understanding of the things
that can affect the dependability
of a system
A way to assess
the dependability of a system
the trustworthiness
of a system which allows
reliance to be justifiably placed
on the service it delivers
SECURITY
High level / activeperformance
Low level / passiveperformance
Visions, I., Laprie, J.C., Randell,
B.,
Dependability and its threats:
a taxonomy,
18th IFIP
World Computer Congress,
Toulouse (France) 2004.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
65
66
ATTRIBUTES
RELIABILITY
AVAILABILITY
SAFETY
MAINTAINABILITY
INTEGRITY
SECURITY
FAILURE
ERROR
FAULT
permanent interruption of a system ability
to perform a required function
under specified operating conditions
the system is in an incorrect state:
it may or may not cause failure
it is a defect and represents a
potential cause of error, active or dormant
THREATS
Structural Robustness (1)
66
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
66
67
Structural Robustness (2)
• Capacity of a construction to show a regular decrease of its structural quality due to negative causes. It implies:
a) some smoothness of the decrease of structural performance due to negative events (intensive feature);
b) some limited spatial spread of the rupture (extensive feature).
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
67
68
Levels of Structural Crisis
Us
ual
UL
S &
SL
SV
eri
fica
tio
nF
orm
at
Structural RobustnessAssessment
1st level:Material
Point
2nd level:ElementSection
3rd level:StructuralElement
4th level:StructuralSystem
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
68
69
Bad vs Good Collapses
STRUCTURE& LOADS
CollapseMechanism
NO SWAY
“IMPLOSION”OF THE
STRUCTURE
“EXPLOSION”OF THE
STRUCTURE
is a process in which objects are destroyed by collapsing on themselves
is a processNOT CONFINED
SWAY
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
69
70
Design Strategy #1: Continuityw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
70
71
Design Strategy #2: Segmentationw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
71
72
Esempio di valutazionedi roubustezza strutturale
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
7373
Esempio: edificio altow
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
74
Analisi di un componente tipico
D0
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
75D1 D2
Scenari (1-2)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
76D3 D4
Scenari (3-4)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
77
Modalità di collasso (1-2)
D1 D2
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
78
Modalità di collasso (3-4)
D3 D4
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
79
Sintesi dei risultati: elemento critico
0
4
Lo scenario D4è quello più cattivo:
l’elemento strutturalecritico individuato è lacolonna più esterna!
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
80
Modellazione edificio alto
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
81
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
82
Scenario 1
(1 asta eliminata)
Scenario 2
(3 aste eliminate)
Scenario 3
(5 aste eliminate)
Scenario 4
(7 aste eliminate)
Scenari di danneggiamentow
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
83
Collasso secondo scenario 1w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
84
Collasso secondo scenario 2w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
85
Collasso secondo scenario 3w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
86
Collasso secondo scenario 4w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
87
Moltiplicatore Ultimo e sua variazione
4,053,57
3,192,64 2,40
0,480,86
1,41 1,65
0,00
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
D0 D1 D2 D3 D4
Scenario di danneggiamento
u Delta F
F
Sintesi dei risultati
Δ u
u
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
88
AZIONENatura dell’azione incendio
Carattere accidentaleCarattere estensivoCarattere intensivo
3w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
88
89
Aspetti caratteristici dell’incendio
• Carattere estensivo
(diffusione nello spazio):1.wildfire
2.urbanfire
3.all’esterno di una costruzione
4.all’interno di una costruzione
• Carattere intensivo
(andamento nel tempo).
• Natura accidentale.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
89
90
Carattere intensivo
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
90
91
ISO 13387: Example of Design Firew
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
91
92
Andamento nel tempo potenza termicaw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
92
93
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
93
94
flash
ove
rSTRATEGIE
ATTIVE(approcciosistemico)
STRATEGIEPASSIVE(approcciostrutturale)
Tempo t
Te
mpera
tura
T(t
)
andamento di T(t) aseguito del successodelle strategie attive
flash
ove
rSTRATEGIE
ATTIVE(approcciosistemico)
STRATEGIEPASSIVE(approcciostrutturale)
Tempo t
Te
mpera
tura
T(t
)
andamento di T(t) aseguito del successodelle strategie attive
Strategiew
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
94
95
FLASHOVER
passive
Create fire compartments
Prevent damage in the elements
Prevent loss of functionality in the building
active
Detection measures(smoke, heat, flame detectors)
Suppression measures (sprinklers, fire extinguisher, standpipes, firemen)
Smoke and heat evacuation system
prevention protection robustness
Limit ignitionsources
Limit hazardous human behavior
Emergency procedure and evacuation
Prevent the propagation of collapse, once local damages occurred (e.g. redundancy)
Fire Safety Strategies
systemic structural
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
95
96
activeprotection
passiveprotection
no failures
doesn’t trigger
Y
N
Y
N
spreads
extinguishes
damages
Y
Nrobustness
no collapse
collapse
Y
N
triggers
prevention1 42 3
Fire Safety Strategies
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
96
97
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
97
98
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
98
99
SnakeFighterw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
99
100
Carattere estensivo
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
100
101
The Great Fire of Chicago, Oct. 7-10, 1871w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
101
102
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
102
103
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
103
104
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
104
105
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
105
106
Windsor Hotel Madridw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
106
107
Natura accidentale
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
107
108
Situazioni HPLC
High Probability Low Consequences
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
108
109
LPHC events
Low Probability High Consequences
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
109
110
HPLCHigh Probability
Low Consequences
LPHCLow Probability
High Consequences
release of energy SMALL LARGE
numbers of breakdown SMALL LARGE
people involved FEW MANY
nonlinearity WEAK STRONG
interactions WEAK STRONG
uncertainty WEAK STRONG
decomposability HIGH LOW
course predictability HIGH LOW
HPLC vs LPHC events
110
111
Approcci di analisi
HPLCEventi Frequenti con
Conseguenze Limitate
LPHCEventi Rari con
Conseguenze Elevate
Complessità:Aspetti non lineari e
Meccanismi di interazioni
Impostazionedel problema:
DETERMINISTICA
STOCASTICA
ANALISIQUALITATIVA
DETERMINISTICA
ANALISIQUANTITATIVAPROBABILISTICA
ANALISIPRAGMATICACON SCENARI
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
111
112
CAPITOLO 2:SICUREZZA
EPRESTAZONI
ATTESE
QUALITA’
CAPITOLO 3:AZIONI
AMBIENTALI
CAPITOLO 6:AZIONI
ANTROPICHE
CAPITOLO 4:AZIONI
ACCIDENTALI
DOMANDA
CAPITOLO 5:NORMESULLE
COSTRUZIONI
CAPITOLO 7:NORME PER LE
OPEREINTERAGENTI
CON I TERRENI ECON LE ROCCE,
PER GLIINTERVENTI NEITERRENI E PERLA SICUREZZA
DEI PENDII
CAPITOLO 9:NORMESULLE
COSTRUZIONIESISTENTI
PRODOTTO
CAPITOLO 11:MATERIALI
EPRODOTTIPER USO
STRUTTURALE
CAPITOLO 10:NORME PER LAREDAZIONI DEI
PROGETTIESECUTIVI
CAPITOLO 8:COLLAUDO
STATICO
CONTROLLO
Italian Code for ConstructionsD.M. 14 settembre 2005
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
112
113
Il Progettista, a seguito della classificazione e della caratterizzazione delle azioni,
deve individuare le possibili situazioni contingenti in cui le azioni possono
cimentare l’opera stessa. A tal fine, è definito:
lo scenario: un insieme organizzato e realistico di situazioni in cui l’opera
potrà trovarsi durante la vita utile di progetto;
lo scenario di carico: un insieme organizzato e realistico di azioni che
cimentano la struttura;
lo scenario di contingenza: l’identificazione di uno stato plausibile e
coerente per l’opera, in cui un insieme di azioni (scenario di carico) è
applicato su una configurazione strutturale.
Per ciascuno stato limite considerato devono essere individuati scenari di carico
(ovvero insiemi organizzati e coerenti nello spazio e nel tempo di azioni) che
rappresentino le combinazioni delle azioni realisticamente possibili e
verosimilmente più restrittive.
Scenari (D.M. 14 settembre 2005)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
113
114
Determine geometry, construction and use of the building
Establish maximum likely fuel loads
Estimate maximum likely number of occupants
and their locations
Assume certain fire protection
features
Carry out fire engineering analysis
Acceptable performance
Accept design
Modify fire protection
features
Establish performance requirements
No Yes
Bu
chanan,
200
2
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
114
115
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
115
116
SVILUPPODinamica degli incendi in galleria
Effetti della ventilazione
4w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
116
117
FIRE DYNAMICS IN TUNNELS
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
117
118
Tunnel Fires vs Compartment Fires (0)
118
119
Tunnel Fires Progression (1)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
119
120
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
120
121
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
121
122
Tunnel Fires Progression (2)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
122
123
Effects of ventilationw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
123
124
Temperature developmentw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
124
125
Smoke development
• A smoke layer may be created in tunnels at the early stages of a fire with essentially no longitudinal ventilation. However,the smoke layer will gradually descend further from the fire.
• If the tunnel is very long, the smoke layer may descend to the tunnel surface at a specific distance from the fire depending on the fire size, tunnel type, and the perimeter and height of the tunnel cross section.
• When the longitudinal ventilation is gradually increased, the stratified layer will gradually dissolve.
• A backlayering of smoke is created on the upstream side of the fire.
• Downstream from the fire there is a degree of stratification of the smoke that is governed by the heat losses to the surrounding walls and by the turbulent mixing between the buoyant smoke layers and the normally opposite moving cold layer.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
125
126
Backlayeringw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
126
127
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
127
128
Maximum gas temperatures in the ceiling area of the tunnel during tests with road vehicles
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
128
129
Maximum gas temperatures in the ceiling area of the tunnel during tests with road vehicles
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
129
130
Maximum gas temperatures in the cross sectionof the tunnel during tests with road vehicles
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
130
131
EMERGENCY VENTILATION
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
131
132
Smoke stratification w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
132
133
Natural smoke venting
• It can be sufficient in short, level tunnels where smoke stratification allows for escape in clear/tenable conditions.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
133
134
Smoke filling long tunnel w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
134
135
Emergency ventilation with longitudinal system
• It can be employed in unidirectional, medium length tunnels, with free flowing traffic conditions. Smoke is mechanically exhausted in direction of traffic circulation, clear tenable conditions for escape are obtained on upstream side of fire.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
135
136
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
136
137
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
137
138
k size factor for HGV firew
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
138
139
k size factor for small pool firew
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
139
140
Emergency ventilation with semi-transverse “point extraction” system
• Smoke is mechanically exhausted from single ceiling opening (reverse mode) leaving clear tenable escape conditions on both sides of fire.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
140
141
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
141
142
Observation: goal
• The purpose of controlling the spread of smoke is to keep people as long as possible in a smoke-free environment.
• This means that the smoke stratification must be kept intact, leaving a more or less clear and breathable air underneath the smoke layer.
• The stratified smoke is taken out of the tunnel through exhaust openings located in the ceiling or at the top of the sidewalls.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
142
143
Observation: longitudinal velocity
• With practically zero longitudinal air velocity, the smoke layer expands to both sides of the fire. The smoke spreads in a stratified way for up to 10 min.
• After this initial phase, smoke begins to mix over the entire cross section, unless by this time the extraction is in full operation.
• The longitudinal velocity of the tunnel air must be below 2 m/s in the vicinity of the fire incidence zone. With higher velocities, the vertical turbulence in the shear layer between smoke and fresh air quickly cools the upper layer and the smoke then mixes over the entire cross section.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
143
144
Observations: turbulence
• With an air velocity of around 2 m/s, most of the smoke of a medium-size fire spreads to one side of the fire (limited backlayering) and starts mixing over the whole cross section at a distance of 400 to 600 m downstream of the fire site. This mixing over the cross section can also be prevented if the smoke extraction is activated early enough.
• Vehicles standing in the longitudinal air flow increase strongly the vertical turbulence and encourage the vertical mixing of the smoke.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
144
145
Observation: fresh air
• In a transverse ventilation system, the fresh air jets entering the tunnel at the floor level induce a rotation of the longitudinal airflow, which tends to bring the smoke layer down to the road.
• No fresh air is to be injected from the ceiling in a zone with smoke because this increases the amount of smoke and tends to suppress the stratification.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
145
146
Observation: smoke extraction
• In reversible semi-transverse ventilation with the duct at the ceiling, the fresh air is added through ceiling openings in normal ventilation operation.
• If a fire occurs, as long as fresh air is supplied through ceiling openings, the smoke quantity increases by this amount and strong jets tend to bring the smoke down to the road surface. The conversion of the duct from supply to extraction must be done as quickly as possible.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
146
147
Observation: traffic conditions
• For a tunnel with one-way traffic, designed for queues (an urban area), the ventilation design must take into consideration that cars can likely stand to both sides of the fire because of the traffic. In urban areas it is usual to find stop-and-go traffic situations.
• For a tunnel with two-way traffic, where the vehicles run in both directions, it must be taken into consideration that in the event of a fire vehicles will generally be trapped on both sides of the fire.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
147
148
Strategies
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
148
149
Smoke extraction
• Continuous extraction into a return air duct is needed to remove a stratified smoke layer out of the tunnel without disturbing the stratification.
• The traditional way to extract smoke is to use small ceiling openings distributed at short intervals throughout the tunnel.
• Another efficient way to remove smoke quickly out of the traffic space is to install large openings with remotely controlled dampers. They are normally in an open position where equal extraction is taking place over the whole tunnel length.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
149
150
Tunnel with a single-point extraction system
The usual way to control the longitudinal velocity is to provide several independent ventilation sections. When a tunnel has several ventilation sections, a certain longitudinal velocity in the fire section can be maintained by a suitable operation of the individual air ducts. By reversing the fan operation in the exhaust air duct, this duct can be used to supply air and vice versa.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
150
151
FIRE MODELING
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
151
152
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
152
153
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
153
Levels
154
1Dw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
154
155
1Dw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
155
156
2D (zone model)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
156
157
2D (zone model)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
157
158
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
158
159
FDS Simulation3D (ventilation)
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
159
160
FDS Simulation3D (fire)
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
160
161
3D (traffic)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
161
162
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
162
163
Multiscalew
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
163
164
Multiscale (ventilation)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
164
165
Multiscale (fire)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
165
166
Multiscale (structural)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
166
167
Multiscale (structural)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
167
168
PROGETTOBasis
Failure path
Risk
5w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
168
169
BASIS
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
169
170
Design Process - ISO 13387
A. Design constraints and possibilities (blue),
B. Action definition and development
(red),
C. Passive system and active response(yellow),
D. Safety and performance
(purple).
3/22/2011
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
170
171
SS0a
PRESCRIBEDDESIGN
PARAMETERS
SS0bESTIMATED
DESIGN
PARAMETERS
SS1initiation and
developmentof fire and
fire efluent
SS2movement of
fire effluent
SS3
structural response and fire spread
beyond enclosureof origin
SS4
detection,
activitation andsuppression
SS5
life safety:occupant behavior,
location andcondition
SS6
propertyloss
SS7business
interruption
SS8contamination
of
environment
SS9
destruction
ofheritage
(0)
DESIGNCONSTRAINTS
AND
POSSIBILITIES
(1+2)ACTION
DEFINITION
ANDDEVELOPMENT
(3+4)
SYSTEMPASSIVE
AND ACTIVERESPONSE
BU
S O
F I
NF
OR
MA
TIO
N
RESULTS
DESIGN
ACTION
SA
FE
TY
& P
ER
FO
RM
AN
CE
FSEw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
171
DESIGN
RESPONSE
172
STRUCTURAL
CONCEPTION
STRUCTURAL TOPOLOGY
&
GEOMETRY
threats
No
Yes
threats
STRUCTURALMATERIAL
& PARTS
No
Yespassive structural
characteristics
threats
FIRE DETECTION
& SUPPRESSION
No
Yes
active structural
characteristics
threats
ORGANIZATION &
FIREFIGHTERS
No
Yes
threats
MAINTENANCE& USE
No
Yes
threats
No
alivestructural
characteristics
Yes
STRUCTURAL SYSTEM
CHARACTERISTICS
STRUCTURALSYSTEM
WEAKNESS
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
172
173
STRUCTURAL
CONCEPTION
STRUCTURAL TOPOLOGY
&
GEOMETRY
threats
No
Yes
threats
STRUCTURALMATERIAL
& PARTS
No
Yespassive structural
characteristics
threats
No
Yes
STRUCTURAL CONCEPTION
STRUCTURAL TOPOLOGY
&
GEOMETRY
threats
No
Yes
threats
STRUCTURALMATERIAL
& PARTS
No
Yespassive
structural
characteristics
threats
FIRE DETECTION
& SUPPRESSION
No
Yes
active
structural characteristics
threats
ORGANIZATION & FIREFIGHTERS
No
Yes
threats
MAINTENANCE
& USE
No
Yes
threats
No
alivestructural
characteristics
Yes
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
173
174
FIRE DETECTION
& SUPPRESSION
No
active structural
characteristics
threats
ORGANIZATION &
FIREFIGHTERS
No
Yes
threats
MAINTENANCE& USE
No
Yes
threats
No
alivestructural
characteristics
Yes
STRUCTURAL CONCEPTION
STRUCTURAL TOPOLOGY
&
GEOMETRY
threats
No
Yes
threats
STRUCTURALMATERIAL
& PARTS
No
Yespassive
structural
characteristics
threats
FIRE DETECTION
& SUPPRESSION
No
Yes
active
structural characteristics
threats
ORGANIZATION & FIREFIGHTERS
No
Yes
threats
MAINTENANCE
& USE
No
Yes
threats
No
alivestructural
characteristics
Yes
3/22/2011 174PROGETTAZIONE STRUTTURALE
ANTINCENDIO
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
174
175
Fire fighting timeline w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
175
176
STRUCTURAL
CONCEPTION
STRUCTURAL
TOPOLOGY&
GEOMETRY
STRUCTURAL
MATERIAL& PARTS
FIRE DETECTION& SUPPRESSION
ORGANIZATION & FIREFIGHTERS
MAINTENANCE
& USE
CRISIS
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
176
177IN
-DEPTH
DEFE
NCE
FAILURE PATHw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
177
178
Controlled vs. Uncontrolled Eventsw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
178
179
Controlled vs. Uncontrolled Eventsw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
179
180
Fire safety concepts tree (NFPA)1
2
3
4
5
6
7
8
9
Bu
chanan,
200
2
Strategie perla gestione
dell'incendio
1
Prevenzione
2
Gestionedell'evento
3
Gestionedell'incendio
4Gestione delle
persone edei beni
15
Difesa sul posto16
Spostamento17
Disposibilitàdelle vie di fuga
18
Far avvenireil deflusso
19
Controllo della quantità
di combustibile
5
Soppressione
dell'incendio
10Controllo
dell'incendio
attraverso ilprogetto
13
Automatica11
Manuale12
Controllo deimateriali
presenti
6Controllo
del movimento
dell'incendio
7Resistenza e
stabilità
strutturale
14
Contenimento9
Ventilazione8
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
180
181
1
2
3
4
5
6
7
8
9
Strategie perla gestione
dell'incendio
1
Prevenzione
2
Gestionedell'evento
3
Gestionedell'incendio
4Gestione delle
persone edei beni
15
Difesa sul posto16
Spostamento17
Disposibilitàdelle vie di fuga
18
Far avvenireil deflusso
19
Controllo della quantità
di combustibile
5
Soppressione
dell'incendio
10Controllo
dell'incendio
attraverso ilprogetto
13
Automatica11
Manuale12
Controllo deimateriali
presenti
6Controllo
del movimento
dell'incendio
7Resistenza e
stabilità
strutturale
14
Contenimento9
Ventilazione8
Fire safety concepts tree (NFPA)
Bu
chanan,
200
2
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
181
182
Basis of tunnel fire safety design
• The first priority identified in the literature for fire design of all tunnels is to ensure:1. Prevention of critical events that may endanger
human life, the environment, and the tunnel structure and installations.
2. Self-rescue of people present in the tunnel at time of the fire.
3. Effective action by the rescue forces.
4. Protection of the environment.
5. Limitation of the material and structural damage.
• Furthermore, part of the objective is to reduce the consequences and minimize the economic loss caused by fires.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
182
183
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
183
184
RISK CONCERN
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
184
185
Risk treatment
Option 1 :
RISK AVOIDANCE
Option 2 :
RISK REDUCTION
Option 3 :RISK
TRANSFER
Option 4 :RISK
ACCEPTANCE
START
STOP
No
No
No
Yes
Yes
Yes
No
100 %
50 %
50 %
30 %
20 %
25 %
5 %
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
185
186
Option 1 Risk avoidance, which usually means not proceeding to continue with the system; this is not always a feasible option, but may be the only course of action if the hazard or their probability of occurrence or both are particularly serious;
Option 2 Risk reduction, either through (a) reducing the probability of occurrence of some events, or (b) through reduction in the severity of the consequences, such as downsizing the system, or (c) putting in place control measures;
Option 3 Risk transfer, where insurance or other financial mechanisms can be put in place to share or completely transfer the financial risk to other parties; this is not a feasible option where the primary consequences are not financial;
Option 4 Risk acceptance, even when it exceeds the criteria, but perhaps only for a limited time until other measures can be taken.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
186
187
Quantitative Risk Analysis
Luur,
200
2
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
187
188
Risk Analysis, Assessment, Management (IEC 1995)
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
188
189
RISK CONCERNS
DEFINE CONTEXT
(social, individual, political, organizational,
technological)
RSK ANALYSIS
(for the system are defined organization, scenarios, and consequences of
occurences)
RISK ASSESSMENT(compare risks
against criteria)
RISK TREATMENT
option 1 - avoidance option 2 - reduction
option 3 - transfer
option 4 - acceptance
MONITORAND
REVIEW
RISKMANAGEMENT
RISKANALYSIS
RISKASSESSMENT
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
189
190
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
190
191
SCENARIOS
DEFINE SYSTEM
(the system is usually decomposed into a number of smaller subsystems and/or
components)
HAZARD SCENARIO ANALYSIS
(what can go wrong?
how can it happen?waht controls exist?)
ESTIMATE
CONSEQUENCES(magnitude)
ESTIMATE
PROBABILITIES(of occurrences)
DEFINE RISK SCENARIOS
SENSITIVITY ANALYSIS
RISKANALYSIS
FIREEVENT
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
191
192
ISHIKAWA DIAGRAMw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
192
193
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
193
194
EVENT TREE
Triggering event
Fireignition
1. Fireextinguished by personnel
2. Intrusion of fire fighters
Arson
Explosion
Short circuit
Cigarette fire
YES (P1)
NO (1-P1)YES (P2)
NO (1-P2)
Scenario
Other
A1
A2
A3
A4
A5
3. Fire suppression
YES (P3)NO (1-P3)
YES (P3)NO (1-P3)
Firelocation
AREA A(PA)
YES (P1)
NO (1-P1) YES (P2)
NO (1-P2)
B1
B2
B3
B4
B5
YES (P3)NO (1-P3)
YES (P3)NO (1-P3)
AREA B(PB)
YES (P1)
NO (1-P1) YES (P2)
NO (1-P2)
C1
C2
C3
C4
C5
YES (P3)NO (1-P3)
YES (P3)NO (1-P3)
AREA C(PC)
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
194
PREPARAZIONE EVOLUZIONE
195
DEFINE SYSTEM
(the system is usually decomposed into a number of smaller subsystems and/or
components)
HAZARD SCENARIO ANALYSIS
(what can go wrong?
how can it happen?waht controls exist?)
ESTIMATE
CONSEQUENCES(magnitude)
ESTIMATE
PROBABILITIES(of occurrences)
DEFINE RISK SCENARIOS
SENSITIVITY ANALYSIS
RISKANALYSIS
NUMERICALMODELING
SIMULATIONSw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
195
196
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
196
197
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
197
198
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
198
199
F (frequency) – N (number of fatalities) curve
• An F–N curve is an alternative way of describing the risk associated with loss of lives.
• An F–N curve shows the frequency (i.e. the expected number) of accident events with at least N fatalities, where the axes normally are logarithmic.
• The F–N curve describes risk related to large-scale accidents, and is thus especially suited for characterizing societal risk.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
199
200
FN-curves UK Road Rail Aviation Transport, 67-01w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
200
201
Persson, M. Quantitative Risk Analysis Procedure for the Fire Evacuation of a Road Tunnel - An Illustrative
Example. Lund, 2002
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
201
202
Risk acceptance – ALARP (1)
RISK MAGNITUDE
INTOLERABLEREGION
AsLowAsReasonablyPracticable
BROADLY ACCEPTABLEREGION
Risk cannot be justified in any circumstances
Tolerable only if risk reduction is impracticable or if its cost is greatly disproportionate to the improvement gained
Tolerable if cost of reduction would exceed the improvements gained
Necessary to maintain assurance that the risk remains at this level
AsLowAsReasonablyAchievable
RISK MAGNITUDE
INTOLERABLEREGION
AsLowAsReasonablyPracticable
BROADLY ACCEPTABLEREGION
Risk cannot be justified in any circumstances
Tolerable only if risk reduction is impracticable or if its cost is greatly disproportionate to the improvement gained
Tolerable if cost of reduction would exceed the improvements gained
Necessary to maintain assurance that the risk remains at this level
AsLowAsReasonablyAchievable
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
202
203
Risk acceptance – ALARP (2)w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
203
204
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
204
205
Risk reduction by designw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
205
206
Monetary values – cost of human life (!)
What is the maximum amount the society (or the decisionmaker) is willing to pay to reduce the expected number of fatalities by 1?
Typical numbers for the value of a statistical life used in cost-benefit analysis are 1–10 million euros.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
206
207
RESISTENZA
6w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
207
208
The burnt out interior of the Mont Blanc Tunnel
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
208
209
Curve temperatura - tempo
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
209
210
Types of fire exposure for tunnel analysis
0
200
400
600
800
1000
1200
1400
0 30 60 90 120 150 180
Tem
per
atu
re (
°C)
Time (min.)
Cellulosic Hydrocarbon Hydrocarbon modified
RABT-ZTV train RABT-ZTV car RWS
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
210
211
Cellulosic curve
• Defined in various national standards, e.g. ISO 834, BS 476: part 20, DIN 4102, AS 1530 etc.
• This curve is the lowest used in normal practice.
• It is based on the burning rate of the materials found in general building materials.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
211
212
Hydrocarbon (HC) curve
• Although the cellulosic curve has been in use for many years, it soon became apparent that the burning rates for certain materials e.g. petrol gas, chemicalsetc, were well in excess of the rate at which for instance, timber would burn.
• The hydrocarbon curve is applicable where small petroleum fires might occur, i.e. car fuel tanks, petrol or oil tankers, certain chemical tankers etc.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
212
213
Hydrocarbon mod. (HCM) curve
• Increased version of the hydrocarbon curve, prescribed by the French regulations.
• The maximum temperature of the HCM curve is 1300ºC instead of the 1100ºC, standard HC curve.
• However, the temperature gradient in the first few minutes of the HCM fire is as severe as all hydrocarbon based fires possibly causing a temperature shock to the surrounding concrete structure and concrete spalling as a result of it.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
213
214
RABT ZTV curves
• The RABT curve was developed in Germany as a result of a series of test programs such as the EUREKA project. In the RABT curve, the temperature rise is very rapid up to 1200°C within 5 minutes.
• The failure criteria for specimens exposed to the RABT-ZTV time-temperature curve is that the temperature of the reinforcement should not exceed 300°C. There is no requirement for a maximum interface temperature.
RABT-ZTV (train)Time (minutes) T (°C)
0 155 120060 1200
170 15RABT-ZTV (car)
Time (minutes) T (°C)
0 155 120030 1200
140 15
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
214
215
RWS (Rijkswaterstaat) curve
• The RWS curve was developed by the Ministry of Transport in the Netherlands. This curve is based on the assumption that in a worst case scenario, a 50 m³ fuel, oil or petrol, tanker fire with a fire load of 300MW could occur, lasting up to 120 minutes.
• The failure criteria for specimens is that the temperature of the interface between the concrete and the fire protective lining should not exceed 380°C and the temperature on the reinforcement should not exceed 250°C.
RWS, RijksWaterStaatTime
(minutes) T
(°C) 0 203 8905 1140
10 120030 130060 135090 1300120 1200180 1200
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
215
216
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
216
217
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
217
218
Lönnermark, A. and Ingason, H., “Large Scale Fire Tests in the Runehamartunnel – gas temperature and Radiation”,
Proceedings of the International Seminar on Catastrophic Tunnel Fires, Borås, Sweden, 20-21 November 2003.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
218
219
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
219
220
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
220
221
Fire Scenario Recommendationw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
221
222
Verifiche
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
222
223
Mechanical Analysis
• The mechanical analysis shall be performed for the same duration as used in the temperature analysis.
• Verification of fire resistance should be in:– in the strength domain: Rfi,d,t ≥ Efi,requ,t
(resistance at time t ≥ load effects at time t);– in the time domain: tfi,d ≥ tfi,requ
(design value of time fire resistance ≥time required)
– In the temperature domain: Td ≤ Tcr
(design value of the material temperature ≤critical material temperature);
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
223
224
Verification of fire resistance (3D)
R = structural resistance
T = temperature
t = time
T=T(t)
R=R(t,T)=R(t,T(t))=R(t)
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
224
225
Verification of fire resistance (R-safe)
R = structural resistance
T = temperature
t = time
Rfi,d,t
Efi,requ,t
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
225
226
Verification of fire resistance (R-fail)
R = structural resistance
T = temperature
t = time
Efi,requ,t
Rfi,d,t
Failure !ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
226
227
Verification of fire resistance (t)
R = structural resistance
T = temperature
t = time
Efi,requ,t Rfi,d,t
Failure !
tfi,d ≥ tfi,requ
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
227
228
Verification of fire resistance (T)
R = structural resistance
T = temperature
t = time
Efi,requ,t
Rfi,d,t
Failure !
Td ≤ Tcr
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
228
229
Verification of fire resistance (T)
R = structural resistance
T = temperature
t = time
Efi,requ,t
Rfi,d,t
Failure !
Td ≤ Tcr
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
229
230
Comportamenti termo-meccanici
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
231
Trasformazione del calcestruzzo alle alte temperature
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
232
Parametri per la relazione tensioni-deformazioni
per il calcestruzzo ad elevate temperature.
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
233
Calcestruzzo ad aggregato siliceo in condizioni di compressione uniassiale ad elevate temperature
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
234
Variazione del coefficiente di riduzione della resistenza a compressione del calcestruzzo ad
aggregato siliceo con la temperatura
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
235
Relazioni tensioni-deformazioni per acciai da calcestruzzo armato ordinario
laminati a caldo ad elevate temperature
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
236
Parametri per la relazione tensioni-deformazioni per acciai da calcestruzzo armato ordinario
laminati a caldo, a temperature elevate
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
237
Spalling
Spalling is an umbrella term, covering different damage phenomena that may occur to a concrete structure during fire. These phenomena are caused by different mechanisms:
•Pore pressure rises due to evaporating water when the temperature rises;
•Compression of the heated surface due to a thermal gradient in the cross section;
•Internal cracking due to difference in thermal expansion between aggregate and cement paste;
•Cracking due to difference in thermal expansion/deformation between concrete and reinforcement bars;
•Strength loss due to chemical transitions during heating.
www.francobontempi.org
Stro N
GER
238
• Explosive spalling occurs during the first 20-30 minutes of the standard cellulosic and hydrocarbon fire curves.
• After the 2nd minute of a typical hydrocarbon exposure, spalling can occur in high strength concretes with polypropylene fibres and in concretes with high moisture content independent of the type of standard curve. Also, concretes with high moisture content can suffer spalling after the 3rd minute of exposure.
• External temperature increments between 20-30ºC/min are typical in the occurrence of explosive spalling.
• Temperature increments of more than 3ºC/min are enough for the occurrence of explosive spalling.
• Concrete external layers can be released from concrete members when these reach temperatures between 250 - 420ºC; 375 - 425ºC.
Spalling criteria (literature review)
www.francobontempi.org
Stro N
GER
239
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
239
240
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
240
241
CONCLUSIONIConceptual design
Resilience
7w
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
241
242
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
243
Conceptual Designw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
243
244
Conceptual Design
MULTI-HAZARD
BLACK-SWAN
DISASTER CHAIN
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
244
245
Flow chart
Tabella dotazioni Frejùs
Forensic Engineeringw
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
246246
Resiliencew
ww
.fra
nco
bo
nte
mp
i.o
rg
Stro N
GER
247
Resilience
• Resilience is defined as
“the positive ability of a system or company to adapt itself to the consequences of a catastrophic failure caused by power outage, a fire, a bomb or similar event”
or as
"the ability of a system to cope with change".
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
247
248
RESILIENCE
www.francobontempi.org
Stro N
GER
248
249
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
249
250
ACKNOWLEDGEMENTS
• Dr. Konstantinos GKOUMAS – Uniroma1
• Dr. Francesco PETRINI – Uniroma1
• Ing. Alessandra LO CANE – MIT
• Dr. Filippo GENTILI – Coimbra (PT)
• Mr. Tiziano BARONCELLI – Uniroma1
ww
w.f
ran
co
bo
nte
mp
i.o
rg
Stro N
GER
250
251251
251
Stro N
GERwww.stronger2012.com
251
252
StroNGER S.r.l. Research Spin-off for Structures of the Next Generation:
Energy Harvesting and Resilience
Roma – Milano – Terni – Atene - Nice Cote Azur
Sede operativa: Via Giacomo Peroni 442-444, Tecnopolo Tiburtino, 00131 Roma (ITALY) - [email protected]
Stro N
GERwww.stronger2012.com
252
Top Related