15
VGR 2016 ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 1 IL PROBLEMA DELL’ AGEING NEGLI STABILIMENTI RIR: CRITICITA’, CASI PRATICI E IL RUOLO PUBBLICO NELLA PROMOZIONE DEL MIGLIORAMENTO CONTINUO

Transcript of IL PROBLEMA DELL’ AGEING NEGLI STABILIMENTI RIR...

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 1

IL PROBLEMA DELL’ AGEING NEGLI STABILIMENTI RIR: CRITICITA’, CASI PRATICI E IL RUOLO PUBBLICO NELLA PROMOZIONE DEL MIGLIORAMENTO CONTINUO

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 2

AGEING

“the MARS data provides the most appropriate basis to assess the significance of ageing. The study has determined that approximately 60% of incidents are related to technical integrity and, of those, 50% have ageing as a contributory factor.”

“Plant Ageing Study HSE RR823”

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 3

DIFETTI DI ORIGINE USURA

API 581

40 ANNI

Da quanti anni

esistono alcuni

Stabilimenti RIR

in ITALIA ?

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 4

Corrosione atmosferica e CUI (Corrosion

under insulation)PERDITA DA SUPPORTO

SALDATO

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 5

Corrosione atmosferica e CUI (Corrosion

under insulation)

PERDITA DA LINEA DIDRENAGGIO

•Linea tracciata con vapore

•Coibentata

•PN 250 DN 15 SPn 3,73 mm

•Poco esercita

•Zone residuali a 0,5 mm

•ETA’ circa 45 anni

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 6

Corrosione atmosferica e CUI (Corrosion

under insulation)

•Anni di servizio: le apparecchiature, e le linee non sono eterne;

•Mancata verniciatura esterna: alcune aree esposte a corrosione

atmosferica per la loro posizione o temperatura non sono

verniciabili;

•Zone di difficile ispezionabilità: alcune aree non sono

raggiungibili facilmente;

•Zone di ristagno d’acqua: le coibentazioni possono comportare

l’accumulo d’acqua piovana e quindi possibili situazioni di

bagno asciuga.

CRITICITA’

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 7

Corrosione Erosione

Evento 2001 presso la raffineria Conocophillips

Humber Refinery (UK)

•linea di testa di una colonna

de-etanatrice

•P: 27 bar T: 50°C SPn: 7 mm

75 t di liquidi infiammabili e 110

t di vapori e gas infiammabili.

UVCE e FIREBALL

Immagini HSE

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 8

DIFFICILE

ISPEZIONABILITA’

TEMPI, COSTI

TENSIONE ISP-PROD

Nella pianificazione dell’intervento ispettivo, la scelta e la

responsabilità di evitare il controllo di alcune zone ritenute

critiche dalla struttura aziendale Ispezioni/Manutenzioni sia

condivisa anche con la Produzione, e che in caso di

divergenze, la prima abbia maggiore potere decisionale

CRITICITA’ GESTIONALE

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 9

HTHA (High Temperature Hydrogen Attack)

Evento 2010 presso la Raffineria Tesoro Anacortes (USA)

Scambiatore in Hydrotreater

T: profilo termico attorno 250 °C

P: 40 bar

Immagini CSB

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 10

HTHA (High Temperature Hydrogen Attack)

CURVE DI NELSON

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 11

HTHA (High Temperature Hydrogen Attack)CURVE DI NELSON - API 581 – ANNI DI SERVIZIO

basso legato 1,25 Cr 0,5 Mo a 45 bar e 430 °C Acciaio al carbonio a 45 bar e 230° C

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 12

SCC (STRESS CORROSION CRACKING)

CRITICITA’ PIPELINE “Public Inquiry Concerning Stress

Corrosion Cracking on Canadian Oil

and Gas Pipelines National Energy

Board, CANADA”

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 13

AGEING RISPETTO A NUOVI REQUISITI DI SICUREZZA

E SALVAGUARDIA AMBIENTALE

� L’utilizzo di strumentazione di sicurezza certificata

� L’utilizzo e l’incremento dei sistemi fissi di protezione con eventuale asservimento ai sistemi di rilevazione.� Simulation and modelling of water spray in the 3D explosion

simulation program FLACS, Elin Kristin, Dale 2004, The Universityof Bergen

� Fire, Explosion and Risk Assessment Topic Guidance” HazardInstallations Directorate Offshore Division HSE (UK)

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 14

� Parchi serbatoi atmosferici� Inserimento di sistemi ridondanti di controllo e blocco di livello al fine di

ridurre il rischio di sovra-riempimenti, si ricordi l’evento accaduto presso il deposito petrolifero di Buncefield Hemel Hempstead, Hertfordshire(UK), l’11 dicembre 2005;

� Protezione al fuoco e motorizzazione delle valvole radice: la loro manovrabilità da zona sicura e la resistenza al fuoco riducono la magnitudo degli scenari

� Realizzazione di doppi fondi: misura di tutela ambientale presente ormai nella maggior parte delle autorizzazioni integrate ambientali.

� Valutazione delle portate di raffreddamento

AGEING RISPETTO A NUOVI REQUISITI DI SICUREZZA E SALVAGUARDIA AMBIENTALE

VGR 2016ING. ZIRON MARCO (ARPAV) ING. FRANCESCO PILO (VVF) 15

PA PROMOTRICE DI NUOVI REQUISITI DI

SICUREZZA E SALVAGUARDIA AMBIENTALE

EVITARE LEVITARE L’’EFFETTO RISVEGLIOEFFETTO RISVEGLIO

Situazione nella quale uno stabilimento, non Situazione nella quale uno stabilimento, non

seguito e migliorato nel tempo, dopo decenni seguito e migliorato nel tempo, dopo decenni

si trova con un gap non colmabile rispetto ai si trova con un gap non colmabile rispetto ai

requisiti di sicurezza requisiti di sicurezza –– ambientali richiesti dal ambientali richiesti dal

contesto territoriale.contesto territoriale.