Eco Present

download Eco Present

of 24

Transcript of Eco Present

  • 7/31/2019 Eco Present

    1/24

    Click to edit Master subtitle style

    5/13/12

    GROUP MEMBERS

    NOR HAFIZAH MHD AYOB2010436064

    NUR KAIYIESSATINA JAMALUDIN2009938925

    NURUL HANANI MOHD SALLEH2010424582

    NURUL SHUHADA HAMAT SHAFIE2010627476

  • 7/31/2019 Eco Present

    2/24

    5/13/12

    IntroductionRedevelopment is an important as an effort to change physical

    structure for the urban area to overcome problem of social,

    physical, economy and environment decay for achieve highest

    and best use to the land efficiently and effectively.

    The main purpose of the redevelopment process is to generateincome and profits. Redevelopment will surely increase the

    aesthetic value of that area in terms of the scenery and

    attraction vast number of people to that place

    Urban redevelopment or urban renewal is defined as a process of

    further improvement of a city and surrounding areas, because

    there are areas in the city of subdued to the role

  • 7/31/2019 Eco Present

    3/24

    5/13/12

    Land Use

    land use is "the total ofarrangements, activities, and inputsthat people undertake in a certainland cover type

    Land-uses include the modificationor management of land foragriculture, settlements, forestry andother uses including those thatexclude humans from land, as in the

    designation of nature reserves for

  • 7/31/2019 Eco Present

    4/24

    5/13/12

    Land Use

    Land-use change is always causedby multiple interacting factors. Oneof the factor that influence the landuse change is by Institutional

    Factors.

    Land-use changes are influenceddirectly by political, legal, economic,and traditional institutions and bytheir interactions with individual

    decision making.

  • 7/31/2019 Eco Present

    5/24

    5/13/12

    Local Plan

    Usually local plan is suing in trems ofurban redevelopment in order tomake a development zoning. For thiscase study, the local plan has been

    described as follows:-

    1. Planning Zone

    2. Density Development

    - Population Density

    - Density Housing Component

    - Density Commercial Component

    http://var/www/apps/conversion/current/tmp/scratch15491/Planning%20zone.docxhttp://var/www/apps/conversion/current/tmp/scratch15491/Planning%20zone.docx
  • 7/31/2019 Eco Present

    6/24

    5/13/12

    Case Study

    Project Title

    Background of Project

    Project BriefDevelopment Concept

    Consideration Factor

    Original VS Current

    Challenges

    Conclusion

  • 7/31/2019 Eco Present

    7/24

    5/13/12

    Project Title

    Cadangan Meroboh Bangunan SediaAda Dan Membina 1 Blok Pejabat 27Tingkat, 3 Blok Pejabat/ Institusi Antara 22Hingga 37 Tingkat, 2 Blok Hotel 22 Tingkat

    Dan 2 Blok Service Appartment 22 Tingkat( 352 Unit) Di Atas 6 Tingkat PodiumPerniagaan/Tempat Letak Kereta Dan 4 1/2Tingkat Basement Tempat Letak Kereta Di

    Atas Lot 8 Dan 12 Seksyen 52, BandarPetaling Jaya , Daerah Petaling, SelangorDarul Ehsan.

  • 7/31/2019 Eco Present

    8/24

    5/13/12

    BACKGROUND OF PROJECT

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    9/24

    5/13/12

    Project Brief

    The new development at PJSection 52 will consist of four (4)phases which are:-

    I. Phase I

    Office Tower 1 and infrastructure at

    Lot 8.

    II. Phase II

    Podium for retail and restaurants,

    Office Tower 2, 3 and 4 as well as

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    10/24

    5/13/12

    Project Brief (Contd)

    Aim of development

    an urban regeneration program forPetaling Jaya as envisaged by the State

    Authority

    It undertakes the 3R concepts :-

    i. Redevelopment - involves demolition

    of old development and redevelops thearea with new development.

    ii. Revitalise which transform the areainto a new image

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    11/24

    5/13/12

    Development Concept

    The initial goal of the cityconstruction and planning, focusedon resettling squatters, was laterchanged to focus on theimprovement of the quality of living

    Based on the redevelopmentconcept, Petaling Jaya had evolvedfrom one zone to another accordinglywith time.

    several theories that we can apply toadapt it with the PJ development and

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    12/24

    5/13/12

    The Broad Pattern of Urban Land Use byJack Harvey

    At the beginning of the openingPJ is a twilight zone but notanymore as time goes by;

    there exist a transition zoneembraces so-called grey-area

    is typified by mixed land use,

    ageing structures, generalinstability, and change, and by awide range in type and quality of

    functions

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    13/24

    5/13/12

    The Broad Pattern of Urban LandUse by Jack Harvey

    Central Business

    DistrictZone of TransitionSuburban zoneRural-urban fringe

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    14/24

    5/13/12

    Alonso Model (1960) & Von ThunenModel

    stated urban use prefers to be nearthe centre of the town because of itsaccessibility

    the economic at the certain area canbe trigger by the density of populationat the area, the level and distributionof income and the job opportunity

    The construction of PJ Sentral is veryon the same wave length to theredevelopment of PJ

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    15/24

    5/13/12

    The concentric zone theory

    quite similar to the Jack Harveytheory

    cities grow outwards from the

    CBD in a series of concentricrings of land-use

    The oldest part of the city is at

    the centre and the newest parton the outer edge.

    The quality and size of housing

    increases with distance from the

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    16/24

    5/13/12

    Hoyt Sector Model

    quite similar to the concentric zonetheory

    the difference is only that in Hoyt

    Sector Model, modified on thedevelopment of public transport

    transport and physical features wereimportant, with industrial areas

    developing outwards in sectors alongmain transport route and housinggrowing up around these.

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    17/24

    5/13/12

    Consideration Factor

    1. AMENITIES

    .The proposed development willhave 4.65 acres of greenery

    allocation

    .The proposed development willalso undergo a gruelling LEED

    certification for neighbourhoodassessment process to staymorally relevant to its

    communitys social and economic

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    18/24

    5/13/12

    Consideration Factor

    3. ACCESIBILITY. the accessibility is located toundergo the traffic problem when

    the redevelopment is underconstruction and complete.

    . PJ Sentral Garden City is

    strategically located to facilitatebetter business connections as it iswithin easy reach of major hubs likeKuala Lumpur, Northern Petaling

    Jaya, Sunway, Subang Jaya,

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    19/24

    5/13/12

    Consideration Factor

    5. ECONOMY

    . As well as the redevelopment is complete, it willincrease economic condition there because thearea will be recognised as Central BusinessDistrict (CDB).

    . The economic factors is the mainly focus and themain factors to be considered when designing theproposed redevelopment

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    20/24

    5/13/12

    Original VS Current Development

    The arrangement of thebuilding is better

    eventhough commercial andresidential buildings aremixed, but the identificationof both type of buildings areclearer

    Accessibility Accessibility throughouteach and every componentswithin the development iseasier and simpler

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    21/24

    5/13/12

    Challenges

    Traffic The development will later cause up to 11,000

    vehicle movements thorough the area dailywhich resulting an extension (length) of thetraffic jam at all direction (as the currentcondition of the traffic jam is actually criticalenough to be experienced)

    Parking

    There will be a shortfall of about 6,000 parkingspaces within the area since the spaces will beadjusted within the area which alreadycongested.

    Roadworks

    The current roadwork system covered in thearea is already to up the minimum requirementof bye-laws. Moreover, the new road networksproposed i.e. road expansion, flyovers,extensions, etc. will require the residential

    neighbourhoods to be destroyed

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    22/24

    5/13/12

    Challenges

    Costs The developer is not taking the responsibility

    for much of the resulting infrastructure costsnor for much of the on-going maintenance ofinfrastructure and access ways resulting tohigher local rate payer

    Benefit

    Since the proposed redevelopment is an profit-oriented project, there will be less or none ofthe benefit enjoyed by the residence but theymight share a sum of unreasonable cost toprovide necessary infrastructures to supportthe development

    Pollution

    Witt the reduction of green area and incrementof the construction works, the pollution indexwill be risen up. This will tear apart of thesocial fabric of an established community

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    23/24

    5/13/12

    Conclusion

    urban renewal plays an importantrole in the history anddemographics of cities as well asinvolving relocation of businesses, thedemolition of structures, the relocationof people, and the use of eminentdomain

    The advantages of reusing previouslydeveloped land, the residents of thesenew dwellin s are seekin to avoid

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx
  • 7/31/2019 Eco Present

    24/24

    5/13/12

    THANK YOU

    http://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docxhttp://c/Users/win7/Desktop/KAIYIES/ECO/BACKGROUND%20OF%20PROJECT.docx