Annual Report 212

download Annual Report 212

of 216

Transcript of Annual Report 212

  • 8/12/2019 Annual Report 212

    1/216

  • 8/12/2019 Annual Report 212

    2/216

  • 8/12/2019 Annual Report 212

    3/216

  • 8/12/2019 Annual Report 212

    4/216

    Impresa Pizzarotti & C. S.p.A.via Anna Maria Adorni, 1 - 43121 Parma - ItalyTel. +39 0521 2021 - Fax +39 0521 [email protected]

    Progettazione e realizzazione a cura di:Designed and produced by:Immagica Comunicazione S.r.l.www.immagica.it

    Le foto sono state realizzate da:Photos by:Pietro Bertora

  • 8/12/2019 Annual Report 212

    5/216

    Fondata nel 1910 Founded in 1910

  • 8/12/2019 Annual Report 212

    6/216

  • 8/12/2019 Annual Report 212

    7/216

    Organi sociali Mipien S.p.A. e principali dati consolidati

    Members of the board Mipien S.p.A. and main consolidated figures

    Storia

    History

    Tabella Societ del Gruppo Pizzarotti

    List of companies of Pizzarotti Group

    Organi sociali Impresa Pizzarotti & C. S.p.A e Management

    Members of the board Impresa Pizzarotti & C. S.p.A and Management

    Galleria fotografica dei lavori in corso

    Photo gallery of work in progress

    Galleria fotografica prefabbricati

    Photo gallery of precast

    Galleria fotografica immobiliare

    Photo gallery of real estate

    Il nostro lavoro

    Our work

    Sicurezza

    Safety

    Relazione sulla Gestione

    Management Report

    Bilancio Consolidato

    Consolidated Financial Statements

    Note esplicative ai prospetti contabili consolidati

    Explanatory Notes to the consolidated financial statements

    Relazione della Societ di Revisione

    Auditors Report

    AttestazioniCertifications

    ANNUAL REPORT 2012

    Indice |Index

    9

    13

    19

    23

    27

    59

    67

    73

    77

    83

    113

    123

    197

    203

  • 8/12/2019 Annual Report 212

    8/216

    8

  • 8/12/2019 Annual Report 212

    9/216

    9

    Organi sociali Mipien S.p.A.e principali dati consolidati

    Members of the board Mipien S.p.A.and main consolidated figures

  • 8/12/2019 Annual Report 212

    10/216

    0

    Organi sociali Mipien S.p.A. e principali dati consolidati |Members of the board Mipien S.p.A. and main consolidated figures

    Organi sociali Mipien S.p.A.e principali dati consolidati

    Capitale sociale: 300.000.000

    Sede Legale:Via Anna Maria Adorni, 1 - 43121 Parma

    Consiglio di Amministrazione

    Presidente:Cav. Lav. Paolo Pizzarotti

    Consiglieri:Pietro PizzarottiMichele Pizzarotti

    Enrica Pizzarotti

    Collegio Sindacale

    Presidente:Sergio Cipelli

    Sindaci effettivi:

    Angelo AneddaPierluigi Pernis

    Societ di RevisionePricewaterhouseCoopers S.p.A.

    Members of the board Mipien S.p.A.and main consolidated figures

    Share Capital: 300.000.000

    Head Office:Via Anna Maria Adorni, 1 - 43121 Parma

    Board of Directors

    Chairman:Cav. Lav. Paolo Pizzarotti

    Members:Pietro PizzarottiMichele Pizzarotti

    Enrica Pizzarotti

    Board Statutory Auditors

    Chairman:Sergio Cipelli

    Standing statutory auditors:

    Angelo AneddaPierluigi Pernis

    Independent AuditorsPricewaterhouseCoopers S.p.A.

  • 8/12/2019 Annual Report 212

    11/216

    11

    Organi sociali Mipien S.p.A. e principali dati consolidati |Members of the board Mipien S.p.A. and main consolidated figures

    Principali dati consolidati

    La Mipien S.p.A. lholding che detiene il 95,4% dellImpresa

    Pizzarotti & C. S.p.A. La societ attiva nellambito di servizi

    di carattere generale rivolti alle societ del gruppo e gestisceuna serie di partecipazioni strategiche per lattivit del gruppo.

    La societ ha un capitale sociale di 300.000 migliaia di Euro ed

    un patrimonio netto di 380.959 migliaia di Euro.

    I principali dati consolidati di Mipen S.p.A. espressi in milioni

    di Euro sono i seguenti:

    Dati economici consolidati (in milioni di Euro):

    Main consolidated figures

    Mipien S.p.A. is the holding company of Impresa Pizzarotti &

    C. S.p.A. and holds 95,4% of its shares. It is a service company

    for the companies of the Group and holds investments thatare strategic for the Groups activity. The company has a share

    capital of 300,000 thousand, a net equity of 380,959

    thousand.

    The main consolidated figures of Mipien S.p.A., in millions of

    Euros, are the following:

    Consolidated income statement figures (in millions of Euros):

    Dati patrimoniali consolidati (in milioni di Euro): Consolidated balance sheet figures (in millions of Euros):

    Il Portafoglio ordini al 31 dicembre 2012 ammonta a 3.496

    milioni di Euro.

    The works backlog as at 31stDecember 2012 shows a value

    of 3,496 million.

    Descrizione |Description 2012 2011 2010

    Ricavi |Revenues 85 6, 8 1.086,5 95 5, 3

    Margine operativo lordo - Ebitda |Gross operating margin - Ebitda 63,3 69,6 60 ,0

    Ebitda % |Ebitda % 7,4% 6,4% 6,3%

    Margine operativo - Ebit |Operating margin - Ebit 37,0 47,8 38 ,6

    Ebit % |Ebit % 4,3% 4,4% 4,0%

    Risultato ante imposte |Result before taxes 25,3 11,9 18,4

    Risultato netto di periodo|Net result 11,8 11 ,0 18 ,9

    Descrizione |Description 2012 2011 2010

    Immobilizzazioni |Fixed assets 383,4 345,0 34 4, 0

    Capitale circolante netto |Net working capital 462,0 509,2 303,4

    Fondi rischi, Tfr e passivit nette a lungoRisk provisions, Employee severance pay and net long-term liabilities

    -214,2 -228,4 -174,5

    Capitale investito netto |Net invested capital 63 1, 2 62 5, 8 472,9

    Patrimonio netto |Equity 381,0 370,0 363,5

    Posizione Finanziaria Netta |Net Financial Position 250,2 25 5, 8 10 9, 4

    PFN/Equity |NFP/Equity 0,66 0,69 0,30

  • 8/12/2019 Annual Report 212

    12/216

    2

  • 8/12/2019 Annual Report 212

    13/216

    13

    Storia

    History

  • 8/12/2019 Annual Report 212

    14/216

    4

    Storia |History

    Storia

    LImpresa Pizzarotti & C. S.p.A. ha una storia lunga 100 anni.

    Fondata nel 1910 come ditta individuale da Gino Pizzarotti,

    da allora ha seguito una evoluzione continua, che non si mai fermata. Trasformata nel 1945 in Societ a responsabilit

    limitata per opera del geom. Pietro Pizzarotti, padre dellattuale

    Presidente Cav. Lav. Paolo Pizzarotti, nel 1961 diventata una

    Societ per azioni con un capitale sociale oggi pari a 250

    milioni di euro.

    Uno dei primi lavori che si ricordano con orgoglio la

    realizzazione della Chiesa della Cisa, avvenuta nel 1920.

    Nel 1966 la prematura scomparsa di Pietro Pizzarotti port

    ad un breve periodo di stasi per lattivit dellImpresa, che

    allepoca faceva registrare un fatturato pari a 1.040 milioni di

    Lire, grazie ai suoi 7 cantieri, localizzati sul territorio nazionale,

    e ai suoi 200 dipendenti.

    La ripresa, tuttavia, non tard ad arrivare, innestando un

    periodo di costante sviluppo nella realizzazione di opere civili

    per centrali termoelettriche e nucleari, infrastrutture stradali

    e autostradali, aeroporti civili e militari, opere di irrigazione

    e sistemazione idraulica, dighe, infrastrutture industriali,

    costruzioni ferroviarie, interventi di edilizia penitenziaria;cos come la ricostruzione nelle aree colpite dal terremoto

    dellIrpinia del 1980, dove si intervenne con la costruzione di

    alloggi, di scuole e di varie infrastrutture di supporto, per tutti i

    primi anni del decennio.

    a partire dalla fine degli anni cinquanta che lImpresa

    consolida la propria presenza nel settore delle costruzioni,

    collocandosi fra le pi importanti e qualificate imprese

    nazionali; questo grazie alla realizzazione di grandi opere

    pubbliche e infrastrutturali per conto sia di enti statali, che

    delle pi importanti societ private italiane.

    Poco pi tardi, gli anni Sessanta videro la nascita, accanto al

    settore delle Costruzioni Generali, di una divisione dedicata

    allindustrializzazione nel campo delle costruzioni, con

    la realizzazione di un primo impianto industriale nella

    provincia di Parma e, circa una decina di anni pi tardi, di uno

    stabilimento nella provincia di Arezzo. Un terzo stabilimento

    venne finalizzato nel 1984 in provincia di Potenza. Da allora,

    le tre unit produttive permettono alla divisione industriale

    dellImpresa di far fronte alle esigenze del mercato nazionale,

    raggiungendo una posizione leader in Italia per volume di

    produzione nel settore della prefabbricazione pesante.

    History

    Impresa Pizzarotti & C. S.p.A. has a history stretching back

    100 years to its founding by Gino Pizzarotti in 1910 as a

    sole trader company. Since then, it has developed constantlyand unceasingly. In 1945, it was turned into a limited liability

    company by Pietro Pizzarotti, father of the current company

    chairman, Mr. Paolo Pizzarotti, Cavaliere del Lavoro (a

    decoration awarded by the Italian government for services to

    industry). Then, in 1961, it became a public limited company

    with a share capital now amounting to 250 million.

    One of the first works that are recollected with pride is the

    construction of the Chiesa della Cisa (the Sanctuary in the Cisa

    Pass), completed in 1920.

    In 1966, Pietro Pizzarottis untimely death brought about a

    short period of stagnation for the Companys operations, which,

    at the time, recorded a turnover of Italian Liras 1,040 million,

    thanks to its 7 worksites, located on the Italian territory, and to

    its 200 employees.

    However, the Companys recovery was swift, triggering a

    constant development in the construction of civil works for

    thermal and nuclear power stations, road and motorway

    infrastructures, civilian and military airports, irrigation andwater system works, dams, industrial infrastructures, railway

    constructions, works on penitentiary premises; the Company

    was involved also in the reconstruction of the areas hit by

    the Irpinia earthquake in 1980, building housing, schools and

    various support infrastructures, continuing throughout the early

    1980s.

    Since the end of the 1950s, the Company has consolidated

    its presence in the building sector, ranking among the most

    important and qualified companies at national level; this

    was achieved thanks to the construction of large public and

    infrastructural works contracted out by both state bodies and

    the most important Italian private companies.

    Shortly afterwards, in the Sixties, beside the existing General

    Construction segment, a division specifically dedicated to

    industrialization in the building sector was created, with the

    completion of a first industrial plant in Parma district as well

    as, about ten years later, of a plant in Arezzo district. A third

    plant was completed in 1984 in Potenza district. Since then, the

    three production units have allowed the industrial division of

    the Company to meet the requirements of the national market,

    reaching a leading position in Italy in terms of production

    volume in the heavy prefabrication sector.

  • 8/12/2019 Annual Report 212

    15/216

    15

    Storia |History

    Limpegno e la capacit di realizzare progetti importanti

    hanno portato lImpresa ad affermarsi con successo anche

    allestero, dove opera dagli anni Settanta. A quel periodo

    risalgono loleodotto costruito tra Hassi Messaoud e In

    Amenas in Algeria, cos come il porto di Bandar Abbas inIran, mentre di pi recente realizzazione si possono ammirare

    il parco divertimenti di Euro Disney a Chessy vicino a Parigi,

    la centrale idroelettrica a Luzon nelle Filippine, il nuovo

    modulo di scambio tra Stazione Ferroviaria ad Alta Velocit

    e Rete Metropolitana Regionale presso lAeroporto Charles

    De Gaulle a Parigi, la discenderia sulla linea ferroviaria del

    Gottardo insieme alla stazione di Sedrun e a diversi chilometri

    di linea ferroviaria, solo per citarne alcuni.

    Il Gruppo Pizzarotti, che ha sempre mantenuto la propria sede

    principale a Parma, oggi conta diverse societ che operanoin piena sinergia nei settori delle infrastrutture, dellenergia

    e dellambiente, dellidraulica, dellaeroportuale civile e

    militare, delledilizia e dellimmobiliare.

    Fotografia storica della Ditta Pizzarotti Gino: risale allanno 1910, quando stata costituita lazienda. | Historical photo of the company

    Ditta Pizzarotti Gino, dating back to 1910, the year in which the company was founded.

    Its commitment and ability to realise important projects

    have lead the Company to be successful also abroad, where

    it has been operating since the Seventies. In that period

    an oil pipeline was built between Hassi Messaoud and In

    Amenas in Algeria, as well as the Bandar Abbas port in Iran;more recently the Euro Disney amusement park was built in

    Chessy near Paris, the hydroelectric power station in Luzon,

    Philippines, the new switch module between the High-Speed

    Rail Station and the Regional Metro Network at the Charles

    De Gaulle airport in Paris, the access tunnel along the

    Gotthard rail line, as well as the Sedrun station and several

    kilometres of the rail line, to mention only a few.

    The Pizzarotti Group has always kept its headquarters in

    Parma and today it numbers several companies working

    closely together in the sectors of infrastructure, energy

    and environment, hydraulics, civil and military airports,

    construction and property.

  • 8/12/2019 Annual Report 212

    16/216

    6

    Storia |History

    A questo nucleo importante di business si aggiungono anche realt

    diverse che si occupano del trasporto aereo e della produzione

    vitivinicola, realizzata attraverso lazienda Monte delle Vigne nata

    e sviluppata sulle colline parmigiane, che racchiude in s lamore

    per la perfezione tecnica e il forte radicamento nel territorio.

    In ogni punto della sua organizzazione sono sempre vivi i due

    principi intorno ai quali la Famiglia Pizzarotti ha improntato tutta la

    sua storia imprenditoriale, la ricerca incessante dellinnovazione e

    delleccellenza tecnologica e il senso di appartenenza allazienda

    che consente di far sentire ogni persona parte di ununica impresa.

    Qualit, sicurezza e ambiente rappresentano un continuum

    portante dellattivit del Gruppo Pizzarotti, ne testimonianza

    lessere stati fra i primi in Italia nel settore delle costruzioni

    ad ottenere nel 1996 la certificazione del proprio SistemaQualit, oggi conforme alla norma UNI EN ISO 9001/2008. A

    partire dal 2005 al Sistema Qualit, stata integrata la gestione

    dellambiente e della sicurezza sul lavoro, conseguendo le

    certificazioni di conformit del Sistema di gestione ambientale

    dellOrganizzazione alla norma UNI EN ISO 14001/2004 e del

    Sistema di Gestione Salute e Sicurezza dellOrganizzazione alla

    norma OHSAS 18001/2007.

    La societ si adoperata per ottenere il rinnovo dellattestazione

    di qualificazione alla esecuzione dei lavori pubblici ai sensi

    del D.P.R. 34/2000 con la Protos SOA S.p.A. che le permette

    di intervenire per le prestazioni di progettazione e costruzione

    fino alla VIII classifica, cosiddetta a importo illimitato, in

    27 categorie di opere, 19 delle quali per lappunto di importo

    illimitato tra opere generali e opere specialistiche.

    Ad inizio 2006, inoltre, nellambito della pratica per liscrizione

    al sistema di qualificazione a Contraente Generale, ai sensi del

    D.L. 10 gennaio 2005 n9, stata ottenuta lattestazione, da parte

    del Ministero delle Infrastrutture e dei Trasporti, per la classifica

    III, valida per importi oltre 700 milioni di euro, che consente lapartecipazione alle gare per General Contractor per qualsiasi

    importo.

    Nel 2010 lImpresa ha raggiunto limportante traguardo dei 100

    anni di attivit dalla sua fondazione e ha avuto il piacere di

    ricevere unimportante riconoscimento ottenendo il premio per

    le aziende centenarie conferito e consegnato da Confindustria.

    Il livello di espansione oggi raggiunto dal Gruppo colloca lImpresa

    Pizzarotti & C. S.p.A. ai vertici della specifica graduatoria delle

    Imprese di costruzione italiane con un numero di circa 3.000collaboratori.

    This vital business core is joined by various other undertakings in

    the fields of air transport and wine production. The latter is the

    work of the company Monte delle Vigne, founded and grown

    in the hills of Parma, which combines a passion for technical

    perfection with deep roots in the surrounding land.

    Its entire organization is imbued with the two principles on which

    the Pizzarotti Family has focussed all its entrepreneurial story;

    the never-ending research for innovation and for technological

    excellence and the sense of belonging to the company, which

    allows each person to feel part of a single enterprise.

    Quality, safety and environment represent a fundamental

    continuum for Pizzarotti Groups operations, and evidence of

    this is given by the fact that the Group was among the first in

    the Italian building sector to obtain, in 1996, the certification

    of its Quality Management System, which today complies with

    the UNI EN ISO 9001/2008 standard. Since 2005, the Quality

    Management System has been integrated with the Environment

    and Occupational Health and Safety Management, obtaining the

    certification of conformity of the Organizations Environmental

    Management System with the UNI EN ISO 14001/2004 standard

    and of the Organizations Health and Safety Management

    System with the OHSAS 18001/2007 standard.

    The Company has worked to obtain the renewal of the

    statement of its qualification to execute public works pursuant

    to Presidential Decree 34/2000 with Protos SOA S.p.A., which

    allows the Company to supply design and building services up

    to class VIII, the so-called unlimited amount class, in 27 work

    categories, 19 of which having no amount limit for both general

    and specialist works.

    Moreover, at the beginning of 2006 within the procedures for

    the registration with the system for the qualification as General

    Contractor, pursuant to Law Decree No. 9 of 10 January 2005,

    the statement, issued by the Italian Ministry of Infrastructuresand Transport, was obtained for class III, valid for amounts

    exceeding 700 million, which allows the Group to tender as

    General Contractor for any amount.

    In 2010, the Company reached the important result of 100 years

    since its foundation and was pleased by receiving an important

    award from Confindustria dedicated to century-old companies.

    The expansion reached by the Group places Impresa Pizzarotti

    & C. S.p.A. at the top of the specific list of Italian Building

    Companies, having about 3,000 collaborators.

  • 8/12/2019 Annual Report 212

    17/216

    17

    Storia |History

  • 8/12/2019 Annual Report 212

    18/216

    8

  • 8/12/2019 Annual Report 212

    19/216

    19

    Tabella Societ del Gruppo Pizzarotti

    List of Companies of Pizzarotti Group

  • 8/12/2019 Annual Report 212

    20/216

    0

    Tabella Societ Gruppo Pizzarotti |List of Companies of Pizzarotti Group

  • 8/12/2019 Annual Report 212

    21/216

    21

    Tabella Societ Gruppo Pizzarotti |List of Companies of Pizzarotti Group

    MIPIEN S.p.A.

    IMPRESA PIZZAROTTI & C. S.p.A.Italia |Italy

    ALIPARMA S.r.l.Italia |Italy

    PIZZAROTTI S.A.Svizzera |Switzerland

    PIZZAROTTICOTE DAZUR SAS

    Beausoleil, Francia |France

    PIZZAROTTI ENERGIAItalia |Italy

    FPMCMonaco

  • 8/12/2019 Annual Report 212

    22/216

    2

  • 8/12/2019 Annual Report 212

    23/216

    23

    Organi Sociali ImpresaPizzarotti & C. S.p.A. e Management

    Members of the Board ImpresaPizzarotti & C. S.p.A. and Management

  • 8/12/2019 Annual Report 212

    24/216

    4

    Organi Sociali e Management |Members of the Board and Management

    Members of the Board and Management

    Share Capital: 250.000.000

    Head Office:Via Anna Maria Adorni, 1 - 43121 (Parma)

    Board of Directors

    Chairman:Cav. Lav. Paolo Pizzarotti

    Deputy Chairman:Michele Pizzarotti

    Deputy Chairman:Luca Sassi

    Managing Directors:Corrado Bianchi

    Aldo Buttini

    Lidio Giordani

    Directors:

    Maurizio FratoniBruno Melardi

    Marco Tarantino

    Giorgio Cassina

    Statutory Auditors

    Chairman:Pierluigi Pernis

    Standing statutory auditors:

    Angelo Anedda

    Alberto Verderi

    Independent AuditorsPricewaterhouseCoopers S.p.A.

    Organi Sociali e Management

    Capitale sociale: 250.000.000

    Sede Legale:Via Anna Maria Adorni, 1 - 43121 (Parma)

    Consiglio di Amministrazione

    Presidente:Cav. Lav. Paolo Pizzarotti

    Vice PresidenteMichele Pizzarotti

    Vice Presidente:Luca Sassi

    Consiglieri Delegati:Corrado Bianchi

    Aldo Buttini

    Lidio Giordani

    Consiglieri:

    Maurizio FratoniBruno Melardi

    Marco Tarantino

    Giorgio Cassina

    Collegio Sindacale

    Presidente:Pierluigi Pernis

    Sindaci effettivi:Angelo Anedda

    Alberto Verderi

    Societ di RevisionePricewaterhouseCoopers S.p.A.

  • 8/12/2019 Annual Report 212

    25/216

    25

    Organi Sociali e Management |Members of the Board and Management

    Area amministrazione, finanza e controllo |Administration, finance and business control departmentMauro Pirondi

    Area Approvvigionamenti e attrezzature |Italy and foreign procurement and equipment department

    Virgil CuculescuLuca Ziveri

    Area Tecnica |Technical departmentPietro Mazzoli (servizio Ingegneria) |Engineering department

    Carlo Salomoni (servizio Pianificazione gare metodi) |Planning department

    Area qualit, sicurezza e ambiente |Quality, safety and environment departmentAndrea Bertuzzi

    Area Information tecnology |Information technology departmentAugusto Lambertino

    Area legale Italia|Italy legal departmentMarco Tarantino

    Area legale Estero |Foreign legal departmentPatrizio Coppola

    Area sviluppo e organizzazione risorse umane |Human Resources Development & Organisation departmentEnrica Pizzarotti

    Area gestione del personale |Human Resources departmentAntonio Ugolotti

    Area commerciale |Commercial departmentMaurizio Fratoni - Responsabile commerciale divisione Italia |Italy division

    Responsabili di progetto |Project managersMassimo Adossini

    Corrado Bianchi

    Francesco Bonici

    Mario BarbatiLuca Bondanelli

    Gianfilippo Brunori

    Paolo Cavatorta

    Diego Colucci

    Cristiano BonaniPiero Picari

    Massimo Concilia

    Sabino Del Balzo

    Stefano Soncini

    Ivan Vicenzi

  • 8/12/2019 Annual Report 212

    26/216

    6

  • 8/12/2019 Annual Report 212

    27/216

    27

    Galleria fotografica dei lavori in corso

    Photo gallery of work in progress

  • 8/12/2019 Annual Report 212

    28/216

    8

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    BreBeMi

    Treviglio (Italia). Costruzione Autostrada Brescia-

    Bergamo-Milano (BreBeMi). | Treviglio (Italy).

    Construction of Highway Brescia-Bergamo-Milano

    (BreBeMi).

  • 8/12/2019 Annual Report 212

    29/216

    29

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

  • 8/12/2019 Annual Report 212

    30/216

    0

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    BreBeMiTreviglio (Italia). Costruzione Autostrada Brescia-Bergamo-Milano

    (BreBeMi). |Treviglio (Italy). Construction of Highway Brescia-Bergamo-

    Milano (BreBeMi).

  • 8/12/2019 Annual Report 212

    31/216

    31

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

  • 8/12/2019 Annual Report 212

    32/216

    2

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    ArcoteemRealizzazione della Tangenziale Est Esterna di Milano (TEEM) da Melegnano

    (interconnessione A1 Milano-Bologna) ad Agrate (interconnessione A4

    Milano-Venezia) - Italia. |Construction of Milan ring road (TEEM) fromMelegnano (junction motorway A1 Milan-Bologna) to Agrate (junction

    motorway A4 Milan-Venice) - Italy.

  • 8/12/2019 Annual Report 212

    33/216

    33

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

  • 8/12/2019 Annual Report 212

    34/216

    4

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Pedelombarda

    Realizzazione del collegamento autostradale Dalmine-

    Como-Varese - Italia. | Construction of new slip road

    Dalmine-Como-Varese highway - Italy.

  • 8/12/2019 Annual Report 212

    35/216

    35

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

  • 8/12/2019 Annual Report 212

    36/216

    6

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    C

    epa

    v2

    Brescia (Italia). Realizzazione della linea ferroviaria ad Alta Velocit

    Milano-Verona. | Brescia (Italy). Construction of fast train railway

    Milan-Verona.

  • 8/12/2019 Annual Report 212

    37/216

    37

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Ro

    ma

    Roma (Italia). Realizzazione della Citt dello Sport

    presso la nuova sede dellUniversit Tor Vergata.

    Roma (Italy). Construction of the Sporting City for

    new Tor Vergata University campus.

  • 8/12/2019 Annual Report 212

    38/216

    8

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Napoli (Italia). Realizzazione della stazione Arco Mirelli

    sulla linea 6 e della stazione Garibaldi sulla linea 1 della

    Metropolitana di Napoli. |Naples (Italy). Construction of

    Arco Mirelli station on the line 6 and Garibaldi station on

    the line 1 of Naples subway.

    Napoli

  • 8/12/2019 Annual Report 212

    39/216

    39

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

  • 8/12/2019 Annual Report 212

    40/216

    0

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Salerno-Reggio Calabria

    Altilia (Italia). Costruzione dellAutostrada Salerno-Reggio

    Calabria. Tratta Altilia-Falerna. |Altilia (Italy). Construction of

    Salerno-Reggio Calabria Highway. Section: Altilia-Falerna.

  • 8/12/2019 Annual Report 212

    41/216

    41

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

  • 8/12/2019 Annual Report 212

    42/216

    2

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

  • 8/12/2019 Annual Report 212

    43/216

    43

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

  • 8/12/2019 Annual Report 212

    44/216

    4

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Salerno-Reggio Calabria

    Salerno (Italia). Costruzione dellAutostrada Salerno-Reggio Calabria.

    Tratta: Contursi-Sicignano. |Salerno (Italy). Construction of Salerno-

    Reggio Calabria Highway. Section: Contursi-Sicignano.

  • 8/12/2019 Annual Report 212

    45/216

    45

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Salerno (Italia). Costruzione dellAutostrada Salerno-

    Reggio Calabria. Tratta: Contursi-Sicignano. |Salerno

    (Italy). Construction of Salerno-Reggio Calabria

    Highway. Section: Contursi-Sicignano.

  • 8/12/2019 Annual Report 212

    46/216

    6

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Lucca (Italia). Costruzione del Nuovo Ospedale di Lucca.

    Lucca (Italy). Construction of New Hospital in Lucca.

    Ospedali

  • 8/12/2019 Annual Report 212

    47/216

    47

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Toscani

    Pistoia (Italia). Costruzione del Nuovo Ospedale di Pistoia.

    Pistoia (Italy). Construction of New Hospital in Pistoia.

  • 8/12/2019 Annual Report 212

    48/216

    8

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Prato (Italia). Costruzione del Nuovo Ospedale di Prato.

    Prato (Italy). Construction of New Hospital in Prato.

    Ospedali

  • 8/12/2019 Annual Report 212

    49/216

    49

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Massa (Italia). Costruzione del Nuovo Ospedale di Massa.

    Massa (Italy). Construction of New Hospital in Massa.

    Toscani

  • 8/12/2019 Annual Report 212

    50/216

    0

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Marsiglia (Francia). Costruzione dellOspedale La

    Timone. |Marseilles (France). Construction of La

    Timone Hospital.

    LaTim

    one

  • 8/12/2019 Annual Report 212

    51/216

    51

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

  • 8/12/2019 Annual Report 212

    52/216

    2

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    N

    izza

    Nizza (Francia). Costruzione di un parcheggio

    sotterraneo sul molo della Dogana di Nizza.

    Nice (France). Construction of underground

    parking in Nice Custom s wharf.

  • 8/12/2019 Annual Report 212

    53/216

    53

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Ticino Viadotto

    Bellinzona (Svizzera). Costruzione del viadotto

    ferroviario a V Lugano-Bellinzona. | Bellinzona

    (Switzerland). Construction of the V bridge

    along Lugano-Bellinzona railway.

  • 8/12/2019 Annual Report 212

    54/216

    4

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Bellinzona (Svizzera). Costruzione della galleria

    del Ceneri 853-Portale Vigana. | Bellinzona

    (Switzerland). Construction of the Ceneri tunnel

    853-Vigana Portal.

    Matrosud Ceneri

  • 8/12/2019 Annual Report 212

    55/216

    55

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    B

    ucar

    est

    Bucarest (Romania). Costruzione autostrada

    Bucarest-Brasov, settore Bucarest-Ploiesti. |Bucarest

    (Romania). Construction of Bucarest-Brasov

    Highway, sector Bucarest-Ploiesti.

  • 8/12/2019 Annual Report 212

    56/216

    6

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Constantine

    Constantine (Algeria). Costruzione della Tramway di

    Constantine. | Constantine (Algeria). Construction

    of Constantine Tramway.

  • 8/12/2019 Annual Report 212

    57/216

    57

    Galleria fotografica dei lavori in corso |Photo gallery of work in progress

    Medio Oriente

    Costruzione tunnel ferroviario Medio Oriente.

    Construction of railway tunnel Middle East.

  • 8/12/2019 Annual Report 212

    58/216

    8

  • 8/12/2019 Annual Report 212

    59/216

    59

    Galleria fotografica prefabbricati

    Photo gallery of precast

  • 8/12/2019 Annual Report 212

    60/216

    0

    Galleria fotografica prefabbricati |Photo gallery of precast

    Bormioli

    Fidenza (Italia). Realizzazione di nuovo edificio prefabbricato ad

    uso magazzino industriale presso podere Loghetto comparto A.

    Fidenza (Italy). Construction of new precast warehouse building at

    land loghetto section A.

  • 8/12/2019 Annual Report 212

    61/216

  • 8/12/2019 Annual Report 212

    62/216

    2

    Galleria fotografica prefabbricati |Photo gallery of precast

    Pedelombarda

    Varese (Italia). Realizzazione delle gallerie artificiali di

    Solbiate-Gorla-Cislago. | Varese (Italy). Construction

    of artificial tunnel in Solbiate-Gorla-Cislago.

  • 8/12/2019 Annual Report 212

    63/216

    63

    Galleria fotografica prefabbricati |Photo gallery of precast

    S.Miniato

    San Miniato (Italia). Costruzione di edifici industriali prefabbricati

    presso linterporto di San Miniato (PI). | San Miniato (Italy).

    Construction of precast buildings at san Miniato interport.

  • 8/12/2019 Annual Report 212

    64/216

    4

    Galleria fotografica prefabbricati |Photo gallery of precast

    ViareggioViareggio (Italia). Costruzione di un nuovo edificio prefabbricato

    presso la Darsena di Viareggio. |Viareggio (Italy). Construction

    of new precast building at Viareggio docks.

  • 8/12/2019 Annual Report 212

    65/216

    65

    Galleria fotografica prefabbricati |Photo gallery of precast

    Roma

    Roma (Italia). Costruzione di nuovo edificio prefabbricato ad

    uso archivio dellAgenzia delle Entrate di Roma. | Rome (Italy).

    Construction of precast building for Italian Tax Authorities to be used

    as archive.

  • 8/12/2019 Annual Report 212

    66/216

    6

  • 8/12/2019 Annual Report 212

    67/216

  • 8/12/2019 Annual Report 212

    68/216

  • 8/12/2019 Annual Report 212

    69/216

    69

    Galleria fotografica immobiliare |Photo gallery of real estate

    Parma Urban District

    Parma (Italia). Parma Urban District - Parco

    commerciale. | Parma (Italy). Parma Urban

    District - Shopping mall.

  • 8/12/2019 Annual Report 212

    70/216

  • 8/12/2019 Annual Report 212

    71/216

    71

    Galleria fotografica immobiliare |Photo gallery of real estate

  • 8/12/2019 Annual Report 212

    72/216

    2

  • 8/12/2019 Annual Report 212

    73/216

    73

    Il nostro lavoro

    Our work

  • 8/12/2019 Annual Report 212

    74/216

    4

    Il nostro lavoro |Our work

  • 8/12/2019 Annual Report 212

    75/216

    75

    Il nostro lavoro |Our work

  • 8/12/2019 Annual Report 212

    76/216

    6

  • 8/12/2019 Annual Report 212

    77/216

    77

    Sicurezza

    Safety

  • 8/12/2019 Annual Report 212

    78/216

    8

    Sicurezza |Safety

    Sicurezza

    LImpresa Pizzarotti & C. S.p.A., in aderenza alla misura generale

    di tutela della salute e della sicurezza sul lavoro che vede la

    programmazione della prevenzione come il complesso delleattivit che integrano in modo coerente, nella prevenzione,

    le condizioni tecniche produttive dellazienda, dal 2003,

    anticipando gli indirizzi sociali e normativi sviluppatisi negli

    anni successivi in particolare con lintroduzione del D.Lgs.

    81/2008, ha impostato le predette attivit con un approccio

    sistemico integrando il Sistema di Gestione della Qualit,

    con i requisiti indicati dalla linea guida, ora norma, BS OHSAS

    18001, ed estendendo, contemporaneamente, tale approccio

    anche alla tutela ambientale con lapplicazione dei requisiti di

    cui alla norma ISO 14001.

    Limpostazione ha successivamente ricevuto da parte

    dellICIC la relativa certificazione di sistema per le attivit

    che lImpresa Pizzarotti & C. S.p.A. svolge in regime di

    appalto nei settori: Estero, Edilizia, Infrastrutture e Servizi

    aziendali; certificazione che nei primi mesi 2012 stata

    rinnovata per il secondo triennio successivo.

    Inoltre, a novembre del 2010, anche il Settore Prefabbricati

    aziendale ha visto, con la certificazione da parte del ICMQ,

    il riconoscimento del Sistema di Gestione adottato nelrispetto delle medesime norme internazionali.

    Nel 2011, in perfetta aderenza agli obiettivi aziendali,

    la certificazione ottenuta da ICIC per i settori Estero,

    Edilizia, Infrastrutture e Servizi aziendali per le attivit

    svolte in regime di appalto stata estesa anche alle attivit

    che lImpresa Pizzarotti & C. S.p.A. svolge in regime di

    Contraente Generale.

    Limpresa Pizzarotti & C. S.p.A. ritenendo che levoluzione

    di un nuovo approccio alla cultura della sicurezza sullavoro non possa prescindere da una adeguata attivit

    di formazione dei propri collaboratori, continua il

    percorso formativo ritenuto necessario per sviluppare nel

    Management aziendale, dai Datori di lavoro fino ai preposti,

    la consapevolezza della nuova prospettiva di approccio

    sicuristico derivante dal ruolo di Affidatario, gi iniziato nel

    2010 e proseguito nel 2011; nel 2012 la societ ha altres

    implementato ulteriori 9 accademie professionali in tema.

    Safety

    Impresa Pizzarotti & C. S.p.A., according to the general

    measure of health and safety at work which considers

    the planning of prevention as the complex of activitiesthat integrates in a consistent manner in prevention the

    technical productive conditions of the company, since 2003,

    anticipating social and regulatory addresses developed in

    later years particularly with the introduction of Decree.

    81/2008, has set the above activities with a systemic

    approach by integrating the Quality Management System,

    with the requirements set by the guideline, rule BS OHSAS

    18001, and extending, at the same time, this approach also

    to environmental protection by applying the requirements

    of ISO 14001.

    ICIC has subsequently given to this formulation the relevant

    certification system for activities that Impresa Pizzarotti & C.

    S.p.A. performs as contractor in the following areas: Foreign

    Operations, Construction, Infrastructure and Corporate

    Services. Certification that in early 2012 has been renewed

    for the second three years period later.

    Furthermore, in November 2010, ICMQ has given also

    to Precast Department, through the certification, the

    recognition of the Management System adopted incompliance with international standards.

    In 2011, according with business goals, the certification

    given by ICIC for Foreign Operations, Construction,

    Infrastructure and Corporate Services for activities

    performed as contractor, has been extended to activities

    Pizzarotti & C. S.p.A. performs as General Contractor.

    Impresa Pizzarotti & C. considering that the evolution of a

    new approach to the culture of safety on work cannot be

    separated by an adequate training of its employees, carries

    on the necessary training to develop in the Companys

    Management, Supervisors and all Employers, the awareness

    of the new perspective of the approach to safety arising

    from the role of Contractor, begun in 2010 and continued

    in 2011. Precisely for this purpose the training program

    was implemented in 2012 with a further 9 professional

    academies on topic.

  • 8/12/2019 Annual Report 212

    79/216

    79

    Sicurezza |Safety

    Inoltre, lapprovazione avvenuta nel mese luglio 2012,

    in sede di Conferenza permanente tra Stato, Regioni e

    provincie autonome di Trento e Bolzano, dellaccordo relativo

    alladeguamento e linee guida applicative dellaccordo sancito

    nel dicembre 2011 sui contenuti minimi della formazione dibase ai sensi dellart. 37 del D.Lgs. 81/2008, ha consentito

    allazienda, in collaborazione con lente di formazione CISITA

    dellUnione Industriali di Parma e con i Comitati Paritetici

    Territoriali interessati, di estendere a tutti i ruoli aziendali

    lattivit formativa in ottica di approccio comportamentale

    alla salute e sicurezza sul lavoro, che gi nel corso del 2012 ha

    visto il coinvolgimento di 130 collaboratori operanti nella sede

    di Parma, e che verr poi proseguita nel 2013 in tutte le unit

    produttive in Italia e allestero.

    Limpegno profuso dallImpresa Pizzarotti & C. S.p.A. suitemi della tutela della salute e della sicurezza sul lavoro ha

    ottenuto il giusto riconoscimento da parte delle istituzioni

    locali dellarea napoletana che hanno scelto il cantiere relativo

    alle opere necessarie per la realizzazione della stazione di

    Piazza Garibaldi della linea 6 della Metropolitana di Napoli,

    quale cantiere sperimentale per il progetto SI.S.CA. (Sistema

    di sicurezza nei cantieri edili) realizzato dal CPT di Napoli in

    collaborazione con INAIL Campania e Universit Federico II.

    In addition, the approval in the month of July 2012, during

    the Standing Conference between the State, Regions and self-

    governing provinces of Trento and Bolzano, of the agreement

    on the adaptation and application guidelines as set out in

    the agreement in December 2011 on the minimum contentsof basic training pursuant to art. 37 of Legislative Decree

    no.81/2008, has enabled the company, in collaboration with

    the training organization CISITA of Industrial Union of Parma

    and the Regional Joint Committees concerned, to extend to

    all business roles training activities within a perspective of

    behavioral approach to health and safety at work, which has

    seen, in the course of 2012, the involvement of 130 employees

    working at the head office in Parma, and which will then be

    continued in 2013 in all production units in Italy and abroad.

    The efforts made by Impresa Pizzarotti & C. S.p.A. on issues

    of Health and Safety at work had the recognition of local

    institutions in the Naples area who have chosen the site

    for the construction of the station of Piazza Garibaldi in

    Naples metro line 6, as an experimental site for the project

    SI.S.CA. (System of safety on construction sites) realized by

    the CPT in Naples in collaboration with INAIL Campania

    and University Federico II.

  • 8/12/2019 Annual Report 212

    80/216

    0

    Sicurezza |Safety

  • 8/12/2019 Annual Report 212

    81/216

    81

    Sicurezza |Safety

  • 8/12/2019 Annual Report 212

    82/216

    2

  • 8/12/2019 Annual Report 212

    83/216

    83

    Relazione sulla Gestione

    Management Report

  • 8/12/2019 Annual Report 212

    84/216

    4

    Relazione sulla Gestione |Management Report

    Relazione sulla Gestione

    Bilancio Consolidato

    Il bilancio al 31 dicembre 2012 corredato dalla presenterelazione sulla gestione predisposta dal Consiglio di

    Amministrazione composto dai seguenti membri:

    Presidente:

    Cav. Lav. Paolo Pizzarotti

    Vice Presidente:Michele Pizzarotti

    Vice Presidente:Luca Sassi

    Consiglieri Delegati:Corrado Bianchi

    Aldo Buttini

    Lidio Giordani

    Consiglieri:Maurizio Fratoni

    Marco Tarantino

    Giorgio Cassina

    Bruno Melardi

    Il Consiglio di Amministrazione rester in carica fino

    allAssemblea di approvazione del presente bilancio.

    Vengono nel seguito rappresentati in sintesi i principali eventi

    che hanno contrassegnato la vita della Vostra societ nel

    passato esercizio finanziario.

    I principali dati economici e patrimoniali consolidati del

    Gruppo Pizzarotti sono riassunti nelle seguenti tabelle.

    Dati economici consolidatiMilioni di Euro

    Management Report

    Consolidated Financial Statements

    The Financial Statements as at 31 December 2012 areaccompanied by this Management Report prepared by the

    Board of Directors, which consists of the following members:

    Chairman:Cav. Lav. Paolo Pizzarotti

    Deputy Chairman:Michele Pizzarotti

    Deputy Chairman:Luca Sassi

    Managing Directors:Corrado Bianchi

    Aldo Buttini

    Lidio Giordani

    Directors:Maurizio Fratoni

    Marco Tarantino

    Giorgio Cassina

    Bruno Melardi

    The Board of Directors shall be in office until the Shareholders

    General Meeting convened for the approval of this Annual

    Report.

    Hereinafter the most significant events that have influenced

    your Company during the past financial year are summarized.

    The following tables show the consolidated income statement

    and statement of financial position highlights of the Pizzarotti

    Group.

    Reclassified income statementMillions of Euro

    Descrizione |Description 2012 2011 2010

    Ricavi |Revenue 856,1 1.085,9 954,9

    Margine operativo lordo - Ebitda |Gross operating profit - Ebitda 63,3 69,7 59,3

    Ebitda % |Ebitda % 7,4% 6,4% 6,2%

    Margine operativo - Ebit |Operating margin - Ebit 38,8 50,1 38,2

    Ebit % |Ebit % 4,5% 4,6% 4,0%

    Risultato ante imposte |Result before taxes 27,1 13,8 23,4

    Risultato netto di periodo |Net result 13,9 13,0 25,5

  • 8/12/2019 Annual Report 212

    85/216

    85

    Relazione sulla Gestione |Management Report

    Ebitda = definito come risultato operativo al lordo degli

    ammortamenti e svalutazioni. Poich lebitda non identificato

    come misura contabile, n nellambito dei principi contabili

    italiani n in quello dei principi contabili internazionali (IAS/

    IFRS), la determinazione quantitativa dello stesso potrebbe nonessere univoca.

    Ebit = corrisponde al Risultato Operativo evidenziato nel

    prospetto di conto economico di bilancio.

    Dati patrimoniali consolidati

    Milioni di Euro

    Ebitda = is defined as the operating profit gross of

    depreciation/amortization and write-downs. Since the Ebitda

    is not identified as a gaap, neither within Italian accounting

    standards nor International ones (IAS/IFRS), the quantitative

    measurement of the same could be more than one.Ebit = operating profit shown in the income statement.

    Consolidated Statement of Financial Position

    Millions of Euro

    Descrizione |Description 2012 2011 2010

    Immobilizzazioni |Fixed assets 376,2 336,6 343,5

    Capitale circolante netto |Net working capital 463,3 510,3 307,4Fondi rischi, Tfr e passivit nette a lungoRisk provisions, Employee severance pay and net long-term liabilities

    -212,0 -226,5 -174,0

    Capitale investito netto |Net invested capital 627,5 620,4 476,9

    Patrimonio netto |Equity 386,6 374,6 364,6

    Posizione Finanziaria Netta |Net Financial Position 240,9 245,8 112,3

    PFN/Equity |NFP/Equity 0,62 0,66 0,31

    Capitale circolante netto = totale attivit a breve termine meno

    passivit a breve termine.

    Il Portafoglio ordini di Gruppo al 31 dicembre 2012 ammonta

    a 3.496 milioni di Euro (3.668 milioni di euro al 31 dicembre

    2011); il portafoglio ordini relativo ad attivit in concessione,

    a fronte di convenzioni gi sottoscritte, valutato in termini

    di futuri ricavi, di cui beneficeranno le societ progetto

    partecipate, ammonta a complessivi 5.689 milioni di Euro.

    La suddivisione per settore ed area geografica la seguente:

    Milioni di Euro

    Net working capital = total short-term assets net of short-term

    liabilities

    As at 31 December 2012, the Group order backlog amounted

    to 3,496 million (3,668 million as at 31 December 2011);

    the order backlog relating to concession contracts, already

    signed, measured in terms of future revenues that will benefit

    of the special purpose vehicles in which stakes are held,

    totalled 5,689 million.

    The breakdown by segment and geographical area is the following:

    Millions of Euro

    2012 2011

    DescrizioneDescription

    ItaliaItaly

    EsteroForeign

    TotaleTotal

    ItaliaItaly

    EsteroForeign

    TotaleTotal

    Infrastrutture |Infrastructure 2.376,2 425,3 2.801,5 2.383,1 487,2 2.870,3

    Edilizia |Construction 97,6 59,8 157,4 158,0 100,2 258,2

    Immobiliare |Real estate 232,7 77,1 309,8 212,0 80,4 292,4

    Gestioni |Managements 201,1 - 201,1 202,9 - 202,9

    Prefabbricati |Precast 26,0 - 26,0 44,3 - 44,3

    Totale portafoglio | Total backlog 2.933,6 562,2 3.495,8 3.000,3 667,8 3.668,1

  • 8/12/2019 Annual Report 212

    86/216

    6

    Relazione sulla Gestione |Management Report

    Il Portafoglio ordini al 31 dicembre 2012 non include

    laggiudicazione intervenuta ad inizio 2013 della progettazione

    esecutiva ed esecuzione dei lavori relativi al cosiddetto

    Corridoio plurimodale Tirreno Brennero; trattasi del

    raccordo autostradale tra lAutostrada della Cisa Fontevivo(PR) e lAutostrada del Brennero Nogarole Rocca (VR) I

    Lotto, per un importo di circa 254 milioni di Euro.

    Registriamo inoltre il potenziale portafoglio, rispettivamente

    per 3.137 milioni di Euro per lesecuzione dei lavori e 12.627

    milioni di Euro per ricavi da gestione, legato agli auspicabili

    positivi sviluppi di iniziative, partecipate dalla Vostra Societ,

    nella veste di promotori designati con diritto di prelazione

    quali SI.TA.VE, Roma Metro D e Superstrada Valsugana

    Valbrenta.

    La ripartizione dei ricavi per settore e per mercato di seguito

    rappresentata.

    Milioni di Euro

    As at 31 December 2012, the Order backlog did not include

    the award obtained at the beginning of 2013 for the executive

    design and construction works relating to the so-called

    Tirreno Brennero multimodal corridor; it is the motorway

    junction between the Cisa Motorway Fontevivo (PR) and theBrennero Motorway Nogarole Rocca (VR) Lot I, amounting

    to approximately Euro 254 million.

    Moreover, the potential backlog was estimated as amounting to

    3,137 million for the execution of works and 12,627 million

    in revenues from management respectively, relating to the

    hoped-for favourable developments of contracts, in which your

    Company is a party and appointed promoter with pre-emption

    rights, such as SI.TA.VE, Roma Metro D and Valsugana

    Valbrenta Clearway projects.

    The breakdown of revenues by sector and market is given

    below.

    Millions of Euro

    2012 2011

    DescrizioneDescription

    ItaliaItaly

    EsteroForeign

    TotaleTotal

    ItaliaItaly

    EsteroForeign

    TotaleTotal

    Infrastrutture |Infrastructure 447,5 157,9 605,4 525,3 178,8 704,1

    Edilizia |Construction 106,8 48,6 155,4 117,4 47,7 165,1

    Immobiliare |Real estate 9,8 10,0 19,8 15,3 118,5 133,8

    Gestioni |Managements 30,4 0,8 31,2 29,0 0,7 29,7

    Prefabbricati |Precast 37,1 0,0 37,1 45,0 - 45,0

    Altro |Others 7,2 0,0 7,2 8,2 - 8,2

    Totale | Total 638,8 217,3 856,1 740,2 345,7 1.085,9

    Incidenza percentuale |Percentage 74,6% 25,4% 100,0% 68,2% 31,8% 100,0%

    La Societ ha consolidato nellesercizio 2012 i volumi di attivit

    raggiunti negli ultimi anni, confermandosi uno dei primari

    attori del settore. Tale risultato stato raggiunto nonostante la

    perdurante situazione di incertezza economica e finanziaria,

    sia a livello nazionale che a livello internazionale, che ha in

    parte condizionato lo sviluppo della produzione in particolare

    in relazione alle iniziative in project financing Brebemi e TEM.

    Per quanto riguarda Brebemi la sottoscrizione del finanziamento

    a medio e lungo termine su base project financing intervenuta nel marzo 2013 e le risorse finanziarie di cui ha

    potuto beneficiare nel 2012 la societ progetto per supportare

    In 2012, the Company consolidated the production volumes

    achieved in the last few years, confirming its ranking as

    one of the main players in its sector. This was achieved in

    spite of the ongoing economic and financial uncertainty,

    at a both national and international level, which partly

    affected the production development, especially with

    regard to the project financing initiatives Brebemi and TEM.

    With regard to Brebemi, the medium and long-term

    loan on a project financing basis was taken out in

    March 2013 and the financial resources available to the

    project company in 2012 for construction were ensured

  • 8/12/2019 Annual Report 212

    87/216

    87

    Relazione sulla Gestione |Management Report

    by subsequent capital contributions made by its Shareholders,

    as well as by another tranche of a bridge loan of Euro 196

    million granted by the pool of banks backing this initiative;

    these were limited resources to support regular continuation

    and expected performance of the works.The lowers actuals of production volumes for 2012 will be

    made up for in 2013/2014; the new time schedule of this

    initiative has set the completion of the works for this motorway

    section for April 2014.

    The same remarks can be made for the Milan East Outer Ring

    Road Project - TEM; also in this case a first bridge loan, which

    was supposed to provide the contractor company TE with the

    financial resources required to start the works was taken out as

    late as at the end of 2012 and paid out only in the first months

    of 2013.

    As for Brebemi, the volumes not achieved in 2012 will be

    made up for in the two following years; the lot awarded to

    Impresa Pizzarotti, the lead partner in a temporary association

    of enterprises, included the so-called Arcoteem, which is the

    part of the infrastructure allowing Brebemi traffic to access

    the city of Milan and the relevant time schedule sets, in all

    consistency and coordination, its completion in April 2014.

    The works for the construction of the AV-AC section of the

    Treviglio - Brescia line, which were contracted out by RFI (the

    owner of Italys rail network) to the Cepav due Consortium,

    also had discontinuance in production development due to the

    delay in the finalization of delivery of the second Construction

    Lot by the Customer, which was completed as late as the

    beginning of January 2013. The delays due to bureaucratic

    problems arisen in the contract awarding procedures made

    through a public calls for tenders referring to part of the civil

    works, which was provided for by the contract.

    These issues impacted on 2012, but they are no longer

    hindering the regular development of production.

    Finally, in Romania, the project for the construction of the Vintu

    de Jos-Coslariu railway section had a drastic downturn compared

    with expected production due to causes that can be attributed to

    the Romanian Railway Entity (CFR), in terms of both making the

    work areas available and of approval of the construction design.

    As at todays date, the problems are being finally solved and

    production has gone back to its regular schedule.

    With regard to the comparison with the previous year, 2011

    production volumes were weighted on by the real estate

    initiative started in Monte Carlo which, entailing the acquisition

    of a fine building for a price of Euro 114 million, had a weight

    of the same amount on expenses and revenues.

    la costruzione sono state assicurate da successive

    capitalizzazioni da parte dei Soci e da un ulteriore tranche di

    finanziamento ponte di 196 milioni di euro erogato dal pool di

    banche che assiste liniziativa; risorse a tutta evidenza limitate

    per supportare il proseguimento regolare ed atteso dei cantieri.I minori volumi di produzione consuntivati nel 2012 saranno

    recuperati negli esercizi 2013/2014; il nuovo cronoprogramma

    delliniziativa prevede infatti la fine dei lavori del tratto

    autostradale per il mese di aprile 2014.

    Per liniziativa Tangenziale Esterna Est di Milano - TEM -

    valgono le medesime considerazioni; anche in questo caso

    un primo finanziamento bridge, che doveva dotare la societ

    concessionaria TE delle risorse finanziarie necessarie allavvio

    dei lavori, stato sottoscritto solo a fine anno 2012 ed erogato

    nei primi mesi del 2013.

    Come per Brebemi i mancati volumi 2012 saranno recuperati

    nei due anni successivi; il lotto affidato ad Impresa Pizzarotti,

    mandataria di un raggruppamento di imprese, include infatti il

    cosiddetto Arcoteem che quella parte di infrastruttura che

    permetter al traffico di Brebemi di accedere a Milano ed i

    cui tempi di realizzazione prevedono in maniera congruente e

    coordinata la fine lavori per aprile 2014.

    Anche i lavori di costruzione della linea AV-AC della tratta

    Treviglio - Brescia affidati da RFI al consorzio Cepav due, hanno

    riscontrato discontinuit nello sviluppo della produzione

    causa il ritardato perfezionamento della consegna del secondo

    Lotto Costruttivo da parte del Committente, intervenuto solo

    nei primi giorni di gennaio 2013. Hanno inciso anche i ritardi

    legati alle problematiche di natura burocratica incontrate nel

    corso dellesperimento delle procedure di affidamento con gara

    pubblica di parte delle opere civili previsto contrattualmente.

    Vincoli che hanno gravato sul 2012 ma che ad oggi non

    rappresentano pi un ostacolo per uno sviluppo regolare della

    produzione.

    In Romania, infine, liniziativa relativa alla realizzazione del

    tronco ferroviario Vintu de Jos-Coslariu ha subito una drastica

    flessione della produzione attesa per cause imputabili allEnte

    Ferroviario rumeno CFR sia in termini di messa a disposizione

    delle aree di lavoro che di approvazione del progetto

    costruttivo. Allo stato le problematiche incontrate sono in via

    di definitiva soluzione e la produzione ripresa regolarmente.

    Nel confronto con lo scorso esercizio va segnalato che i volumi

    di produzione 2011 erano stati influenzati dalloperazioneimmobiliare avviata in Montecarlo che, avendo comportato

    lacquisizione di un prestigioso immobile per il controvalore di

    114 milioni di euro, ha inciso per pari importo sui costi e sui ricavi.

  • 8/12/2019 Annual Report 212

    88/216

    8

    Relazione sulla Gestione |Management Report

    Il clima di incertezza e instabilit sopra rappresentato non ha,

    peraltro, inciso sulla profittabilit media dei lavori in esecuzione

    la cui incidenza percentuale rispetto alla produzione si

    mantiene in linea con le previsioni. Le singole iniziative

    hanno registrato un andamento regolare senza imprevisti onegativit circa levoluzione dei costi, tali da compromettere

    le marginalit attese a vita intera.

    La marginalit risulta influenzata dalla risoluzione di alcuni

    contenziosi (31 bis o riconoscimento dellandamento anomalo

    dei prezzi dei materiali) relativi sia a commesse gi concluse

    che tuttora in corso; in continuit con il passato, i contenziosi

    vengono iscritti in bilancio se ne sussistono i presupposti per

    la ragionevole recuperabilit (lodi arbitrali, sentenze esecutive

    etc).

    La posizione finanziaria netta rappresentata nella seguente

    tabella:

    The above reported uncertainty and instability did not however

    impact on the average profitability of the works in progress,

    whose percentage weight on total production was in line with

    expectations. The single projects had a regular performance

    without unexpected events or problems regarding costs suchas to impact entire-life expected margins.

    Profit margins were affected by the settlement of some disputes

    (Article 31-bis of Law No. 109/1994 or acknowledgement of

    anomalous trends in the prices of materials) relating both to

    completed and underway jobs; as for the past, disputes are

    recognized in the financial statements if the conditions for

    reasonable recoverability exist (arbitrators awards, enforceable

    court decisions, etc.).

    The following table gives a breakdown of the net financial

    position:

    Descrizione |Description 2012 2011 2010

    Disponibilit liquide |Cash and cash equivalents 147,9 77,5 99,4

    Titoli HFT |Securities HFT 35,4 65,7 89,1

    Crediti finanziari |Financial assets 2,8 12,7 33,1

    Crediti finanziari per diritti da attivit in concessione |Financial assets for concession services 1,4 1,4 1,3Crediti/(Debiti) per derivati |Derivatives -9,7 -7,3 -2,3

    Debiti finanziari a breve termine |Short term financial liabilities -234,2 -193,9 -172,3

    Debiti finanziari a breve termine - no recourse |Short term financial liabilities - no recourse -1,5 -1,5 -0,6

    Debiti finanziari per locazioni finanziarie |Liabilities on financial leasing -3,5 -4,7 -6,9

    Posizione finanziaria netta a breve termine |Current financial position -61,3 -50,1 40,8

    Debiti finanziari a medio e lungo termine |Non current financial liabilities -112,8 -111,2 -182,6

    Debiti finanziari a medio e lungo termine - no recourse |Non current financial liabilities - no recourse -146,0 -157,0 -39,7

    Debiti finanziari per locazioni finanziarie |Liabilities on financial leasing -12,4 -15,1 -23,4

    Titoli AFS |Securities AFS 1,8 4,5 10,6

    Crediti finanziari |Financial assets 26,0 18,0 15,5

    Crediti finanziari per diritti da attivit in concessione |Financial assets for concession services 63,8 65,2 66,6

    Posizione finanziaria netta a medio/lungo termine |Non current financial position -179,6 -195,7 -153,1

    Posizione finanziaria netta |Net financial position -240,9 -245,8 -112,3

  • 8/12/2019 Annual Report 212

    89/216

    89

    Relazione sulla Gestione |Management Report

    DescrizioneDescription

    2012 2011Variazione

    Variation

    PFN - attivit ordinaria |NFP - current activities

    Disponibilit liquide |Cash and cash equivalents 147,9 77,5 70,4

    Titoli AFS ed HFT |Financial assets - AFS and HFT 37,3 70,1 -32,9

    Crediti finanziari e diritti da attivit in concessione |Financial assets for concession services 94,0 97,3 -3,3

    Derivati |Derivatives -3,9 -3,7 -0,2

    Debiti finanziari |Financial liabilities -345,7 -310,3 -35,4

    Locazioni finanziarie |Financial leasing -15,9 -19,8 3,9

    Sub totale |Sub total -86,3 -88,8 2,5

    PFN - iniziative 2012 e finanziamenti no recourse |NFP - activities 2012 and financing no recourse

    Finanziamento no recoursePizzarotti Energia |Financing no recourse Pizzarotti Energia -42,4 -45,9 3,5

    Finanziamento no recourseProtea Sam |Financing no recourse Protea Sam -103,7 -111,1 7,5

    Finanziamento Santa Teresa - consolidata dal 2012 |Financing Santa Teresa - consolidated since 2012 -8,6 0,0 -8,6

    Sub totale |Sub total -154,6 -157,0 2,4

    Posizione finanziaria netta |Net Financial Position -240,9 -245,8 4,9

    Al fine di una migliore rappresentazione della posizione

    finanziaria netta del Gruppo che evidenzi da un lato limpatto

    delle nuove iniziative 2012 e nel contempo le operazioni che

    hanno generato indebitamento no recourse sul Gruppo

    stata predisposta la tabella che segue.

    Milioni di euro

    The table below was designed to give a more effective

    description of the Group net financial position showing, on

    the one hand, the impact of the new 2012 initiatives and, in

    the meanwhile, the transactions that generated the Groups

    non-recourse liabilities.

    Millions of Euro

    Come sopra evidenziato una quota significativa dei debiti

    finanziari, pari ad un ammontare di 146 milioni di euro

    (157 milioni di euro nel 2011), sono relativi ad operazioni di

    finanziamento aventi caratteristiche no recourse.

    As reported above, a significant portion of the Companys

    financial liabilities, amounting to Euro 146 million (Euro

    157 million in 2011), referred to non-recourse financing

    transactions.

  • 8/12/2019 Annual Report 212

    90/216

    0

    Relazione sulla Gestione |Management Report

    These loans were taken out with reference to the projects of

    Pizzarotti Energia and FPMC (former Protea Sam) in Monte

    Carlo, whose actuals show a very good performance beyond

    expectations.

    Pizzarotti Energia is the project company that constructed a

    photovoltaic park in Sicily, which started operation in 2010

    and was backed by the non-recourse loan granted by a pool of

    lending entities; the production volumes of the first two years

    of full operation were largely higher than those expected in the

    economic-financial plan (EFP) (+21% in 2012 and +16% in

    2011) with a subsequent impact on profit margins.

    The real estate operation in Monte Carlo, which started at the

    end of 2011 with the acquisition of a building in the famous

    Carr dOr in Boulevard ds Moulins in the Casino square,

    is being carried out through the company FPMC (former

    Protea Sam) incorporated under the Monegasque Law; the

    Group holds a 42% equity investment in this company, but has

    control of it the shareholder with a 40% equity investment

    is an important Monaco family. The purchase transaction was

    carried out for a consideration of 109 million and was funded

    with a non-recourse mortgage loan backed by a bank with a

    leverage ratio of 70/30 this loan also envisages a VAT credit

    line and a credit line for the construction.

    The plot on which the building stands has an area of 1,030sm

    and the project envisages the demolition of the existing building

    and the construction of a new real estate complex. This new

    complex will have a total area of about 7,000sm with 8 floors

    above ground, each of which with an average surface of 550sm,

    and 4 underground floors, three of which for commercial

    use and the 4th for car park with 90 parking spaces. The

    design phase was completed, which entailed a competition

    of ideas involving some of the world leading architects that

    were selected by a special commission consisting of local VIPs,

    which led to select the design by Isay Weinfeld. In October2012, the construction permit was applied for and has already

    been given.

    The sale of the units started right away and, as at todays

    date, agreements have been signed for 5 of the 8 floors and

    negotiations are under way for the remaining 3, even though

    not yet finalized; this means that, as at todays date, promise

    to purchase agreements entailing purchase for a consideration

    have been signed for a total value amounting to approximately

    70% of the expected revenues as per the relevant budget, even

    though the construction works have not yet started. These

    agreements prove for payment during construction on the basis

    of milestones linked to the work progress.

    Questi sono stati accesi in relazione alle iniziative Pizzarotti

    Energia e FPMC (gi Protea Sam) in Montecarlo, che stanno

    consuntivando uno sviluppo ampiamente positivo e superiore

    alle aspettative.

    Pizzarotti Energia la societ progetto che ha realizzato un

    campo fotovoltaico in Sicilia entrato in funzione nel 2010 ed

    assistito da un finanziamento no recourseerogato da un pool

    di Istituti finanziatori; i volumi di produzione dei primi due

    anni di piena operativit sono risultati ampiamente superiori a

    quelli previsti nel PEF (+21% nel 2012 e +16% nel 2011) con

    un impatto conseguente sulla marginalit.

    Loperazione immobiliare in Montecarlo, avviata a fine 2011

    tramite lacquisizione di un immobile sito nel prestigioso

    Carr dOr in Boulevard ds Moulins sulla piazza delCasin, avvenuta per il tramite la societ FPMC (ex Protea

    Sam) di diritto monegasco nella quale il Gruppo vanta una

    partecipazione del 42% ma di cui detiene il controllo socio

    al 40% una importante famiglia monegasca. Loperazione

    di acquisto avvenuta per un controvalore di 109 milioni di

    euro ed assistita da un finanziamento ipotecario no recourse

    garantito da un istituto bancario con un rapporto di leva 70/30

    il finanziamento prevede anche una linea Iva ed una linea

    per la costruzione.

    Il terreno su cui insiste limmobile ha una superficie di 1.030

    mq e liniziativa prevede la demolizione delledificio esistente e

    la realizzazione di una nuova unit immobiliare di complessivi

    circa 7.000 mq da svilupparsi su n 8 piani fuori terra, ognuno

    dei quali in media di 550 mq, n 3 piani a destinazione

    commerciale e n4 piani di parcheggio interrato per un totale

    di circa 90 posti auto. E stata completata la fase progettuale

    per la quale sono stati coinvolti in un concorso di idee alcuni

    tra i principali architetti a livello mondiale selezionati da

    unapposita commissione costituita da personalit locali che

    ha portato alla scelta del progetto dellarchitetto Isay Weinfeld;nellottobre 2012 stato presentato il permesso di costruire ad

    oggi rilasciato.

    Parallelamente iniziata da subito la commercializzazione

    e ad oggi sono stati sottoscritti contratti per 5 degli 8 piani

    oggetto delliniziativa e per i restanti 3 vi sono trattative in

    corso anche se non ancora formalizzate; questo significa che

    ad oggi sono stati contrattualizzati impegni di acquisto onerosi

    per un controvalore pari a circa il 70% degli importi previsti

    a ricavo da budget pur non avendo ancora iniziato i lavori.

    Trattasi di contratti che prevedono pagamenti durante il periodo

    di costruzione basati su milestone legate allavanzamento delcantiere.

  • 8/12/2019 Annual Report 212

    91/216

    91

    Relazione sulla Gestione |Management Report

    This project is already safe also from a financial standpoint,

    since the value of the agreements signed is largely higher

    than the total expected expenses for both construction and

    sale.

    For the Shareholders of the Parent Company, the contributionof these projects in terms of Ebitda and net financial expenses

    and income came to +3.6 million (+2.3 million in 2011)

    and +0.1 million (1.4 million in 2011), respectively.

    Moreover, in 2012, the Group acquired the remaining 50%

    of Santa Teresa share capital, thus acquiring the total capital;

    this project, a real estate one, concerns the construction of

    a high-range residential complex right in the city centre.

    Since control over the investee company was acquired, this

    subsidiary was included for the first time in the consolidation

    scope and the net financial liabilities as at the end of 2012

    amounting to 8.6 million resulting from a mortgage loan

    taken out on the area weighed for the same amount on the

    Groups net financial position.

    In the year, significant investment were again made in

    preparation of the operations to be developed in the next few

    years; this includes the equity investments made in project

    financing initiatives or in projects where the Group is the

    General Contractor; these included the equity investments

    referring to Brebemi and its controlling company Autostrade

    Lombarde amounting to 32.5 million, to SAT Tuscany

    Hospitals amounting to 5 million and to Cispadana

    amounting to 2.6 million.

    As at the end of 2012, the total amount of the investments

    made came to approximately 78 million.

    The Company net financial position was also affected by the

    real estate projects, in particular proprietary ones - which,

    in terms of inventories at Group level, amounted to 204.5

    million, of which about 121.3 million for FPMC - as well as

    those managed with partners, through investee companies

    Consolidated shareholders equity came to 386,6 million

    (vs. 374.6 in 2011); the Company holds 1,444,800

    treasury shares having a nominal value of 1 each, for a

    total purchase value of 2,324,056.

    The revision of the multiyear business plan has confirmed

    the forecast of further increase in expected production,

    thanks to the start-up of important contracts in PPP in the

    infrastructure field, whose complex authorization procedures

    are expected to be completed.

    Liniziativa gi oggi in sicurezza anche dal punto di vista

    economico in quanto il valore dei contratti sottoscritti

    ampiamente superiore ai costi complessivi previsti per la

    costruzione e la commercializzazione.

    Il contributo a livello di Gruppo di queste iniziative in terminidi Ebitda ed oneri e proventi finanziari netti risultato pari

    rispettivamente a +3,6 milioni di euro (+2,3 milioni di euro

    nel 2011) e +0,1 milioni di euro (1,4 milioni di euro nel 2011).

    Il Gruppo ha inoltre acquisito nel 2012 la residua quota del 50%

    del capitale sociale di Santa Teresa arrivando cos a detenere la

    totalit delle quote; liniziativa, di natura immobiliare, riguarda

    la realizzazione di un complesso residenziale di pregio in

    pieno centro storico. Avendo assunto il controllo dalla societ,

    la stessa stata ricompresa per la prima volta nellarea di

    consolidamento e lindebitamento netto di fine esercizio pari a8,6 milioni di euro derivante da un finanziamento ipotecario

    acceso sullarea ha inciso di pari importo sulla posizione

    finanziaria netta di Gruppo.

    Nellesercizio sono proseguiti significativi investimenti

    propedeutici allattivit da svilupparsi nei prossimi anni; in tale

    ambito rientrano i versamenti di equityeffettuati in iniziative

    in project financingo iniziative ove il Gruppo opera come

    Contraente Generale; tra questi in particolare si segnalano

    gli investimenti in equity hanno riguardato Brebemi e la sua

    controllante Autostrade Lombarde per 32,5 milioni di euro,

    liniziativa SAT Ospedali Toscani per 5 milioni di euro e

    liniziativa Cispadana per 2,6 milioni di euro.

    A fine 2012 lammontare totale degli investimenti eseguiti

    ammonta complessivamente a circa 78 milioni di euro.

    Sulla posizione finanziaria netta incidono anche le iniziative

    del settore immobiliare ed in particolare sia quelle gestite

    in proprio- il cui valore in termini di rimanenze a livello

    di Gruppo pari a 204,5 milioni di euro di cui circa 121,3

    milioni di euro FPMC sia quelle gestite, con altri partner,tramite societ partecipate.

    Il patrimonio netto consolidato si attestato 386,6 milioni

    di euro (374,6 milioni di Euro nel 2011); la societ detiene

    n. 1.444.800 azioni proprie del valore nominale di 1 Euro

    ciascuna, per un valore complessivo di acquisto di Euro

    2.324.056.

    Laggiornamento del piano industriale pluriennale conferma la

    previsione di un ulteriore incremento della produzione attesa,

    grazie al previsto avvio di importanti commesse in PartenariatoPubblico - Privato in campo infrastrutturale, per le quali

    prevista la conclusione del complesso iter autorizzativo.

  • 8/12/2019 Annual Report 212

    92/216

    2

    Relazione sulla Gestione |Management Report

    Indeed, the Group has long identified the Concessions

    segment as one of the main drivers for its growth in terms of

    sizes and for the diversification of its production operations.

    In the last few years, the Group has succeeded in developing

    a significant business in this sector, acquiring shares in someimportant projects, whose actual start-up is always subject the

    structuring of a non-recourse loan.

    The timeframe for the financial closing by SPVs depends on the

    complex audit procedures required by the system; multiyear

    business plans are, therefore, rather uncertain. Moreover,

    once started, these contracts require strict compliance with

    the planned time schedule, which is rather unusual in Italy.

    Hereinafter the main events are described, which

    characterized 2012, for the various business areas in which

    your Company operates.

    The infrastructure segment in Italy

    The main projects under way are given below.

    BRE.BE.MI: Impresa Pizzarotti has a total shareholding of

    12.5%, including both a direct shareholding and an indirect

    one held through the parent company Autostrade Lombarde,

    in the concessionaire BREBEMI, which was awarded the

    contract for the final executive design, construction and

    management of the motorway link between the cities of

    Brescia, Bergamo and Milano. Impresa Pizzarotti also has

    a 50% shareholding in the BBM Consortium, which was

    selected as General Contractor for the construction of the

    motorway.

    The operations carried out in 2012, with the purpose of

    structuring the project financing sources, ended successfully

    with a medium- and long-term loan taken out on 25 March

    2013 on a project financing basis for a total of 1,818 million.

    The crisis of financial markets in the last few years has required

    a new and different structure of the loan to be defined, rather

    than the one planned, in order to allow the project bankability

    despite the significantly increased difficulties due to market

    conditions. The loan could be taken out thanks to BEI and

    SACE stepping in to join Cassa Depositi e Prestiti (an Italian

    Bank, 70% of which is held by the Italian Ministry of Economy

    and Finance) and a pool of Banks.

    Il Gruppo ha infatti da tempo individuato nel settore

    delle Concessioni uno dei principali driver per la crescita

    dimensionale e per la diversificazione dellattivit produttiva.

    Le attivit poste in essere negli ultimi anni hanno permesso al

    Gruppo di sviluppare una significativa presenza nel suddettosettore, acquisendo quote di partecipazione in alcune

    importanti iniziative il cui effettivo avvio sempre condizionato

    dalla strutturazione del finanziamento no recourse.

    I tempi per pervenire al closing finanziario da parte delle

    Societ Progetto sono condizionati dalle complesse procedure

    di verifica, richieste dal sistema; i piani di sviluppo pluriennali

    sono soggetti, di conseguenza, ad una certa aleatoriet. Per

    contro, una volta avviate, queste commesse richiedono il

    rigoroso rispetto dei tempi programmati, secondo una prassi

    non proprio usuale nel nostro Paese.

    Nel seguito vengono rappresentati i principali eventi, che

    hanno caratterizzato il passato esercizio, per le diverse aree di

    business in cui si articola lattivit della Vostra societ.

    Settore infrastrutture Italia

    Sono di seguito rappresentate le principali iniziative in corso;

    BRE.BE.MI: Impresa Pizzarotti partecipa con una quota del

    12,5% tra quota diretta ed indiretta detenuta per il tramite

    della controllante Autostrade Lombarde, nella concessionaria

    BREBEMI incaricata per la progettazione definitiva, esecutiva,

    costruzione e gestione del collegamento autostradale tra le

    citt di Brescia, Bergamo e Milano. Impresa Pizzarotti detiene

    inoltre una quota del 50% nel Consorzio BBM individuato

    come Contraente Generale per la costruzione dellautostrada.

    Lattivit svolta nel corso dellesercizio 2012, mirata a

    strutturare le fonti di finanziamento delliniziativa, si conclusa

    positivamente con la sottoscrizione in data 25 marzo 2013 diun finanziamento a medio e lungo termine su base project

    financing per il complessivo importo di 1.818 milioni di euro.

    La crisi dei mercati finanziari, intervenuta negli ultimi anni

    ha reso necessario definire una nuova e diversa struttura del

    finanziamento rispetto a quanto precedentemente ipotizzato

    tale da consentire, pur in presenza di condizioni di mercato

    notevolmente pi avverse, la bancabilit del progetto.

    Lintervenuta disponibilit di BEI e di SACE ad intervenire

    affiancando Cassa Depositi e Prestiti e un pool di Istituti bancari

    ha reso quindi possibile la sottoscrizione del finanziamento.

  • 8/12/2019 Annual Report 212

    93/216

    93

    Relazione sulla Gestione |Management Report

    Parallelamente si completata positivamente la capitalizzazione

    della concessionaria con lintegrale sottoscrizione dellequity

    prevista dal piano economico e finanziario pari a complessivi

    520 milioni di euro. In tale ambito Impresa Pizzarotti si

    fatta carico di sottoscrivere significative quote di inoptatoper lindisponibilit manifestata da alcuni soci di seguire

    gli aumenti mediotempore deliberati consentendo il buon

    fine delloperazione; lequity complessivamente sottoscritta

    ammonta complessivamente a circa 54 milioni di euro,

    interamente versati alla data odierna.

    La costruzione del tratto autostradale da parte del contraente

    generale proseguita nel 2012 e lavanzamento fisico ha

    raggiunto a fine anno circa il 60%; come precedentemente

    descritto la mancata disponibilit di adeguate risorse

    finanziarie, causa lo slittamento dei tempi per la sottoscrizionedel finanziamento senior, non ha consentito di procedere nella

    costruzione come programmato. Le disponibilit finanziarie

    sono state assicurate da un ulteriore finanziamento ponte

    dellimporto di 196 milioni di euro concesso ed erogato nel

    mese di agosto 2012 dalle Banche del pool e da successive

    capitalizzazioni e versamenti di equity da parte dei Soci; importi

    comunque limitati rispetto alle necessit originariamente

    previste anche in termini di tempistiche di erogazione.

    stato definito un nuovo cronoprogramma contrattuale che

    prevede lultimazione dei lavori dellasse autostradale entro la

    fine del mese di aprile 2014 che congruente con lapertura

    al traffico dellautostrada previsto nel secondo semestre 2014.

    Si segnala infine che Brebemi ha sottoscritto un contratto di

    gestione e manutenzione del tratto autostradale per lintero

    periodo concessorio con Argentea Gestioni Scpa, partecipata

    da Impresa Pizzarotti con una quota dell11,38%

    AUTOSTRADA SALERNO-REGGIO CALABRIA: i lavori

    autostradali afferenti al lotto denominato SARC 0 risultano

    completati con inaugurazione ufficiale e apertura al trafficogi nel 2011; a fine 2012 sono stati completati i residui lavori

    accessori e di ripristino delle aree dismesse.

    Relativamente al lotto denominato SARC 4 nel mese di agosto

    stato sottoscritto il 4 Atto Aggiuntivo che ha incrementato

    limporto complessivo dei lavori, allo stato pari a 335,2

    milioni di euro, contrattualizzando cos una perizia legata

    a lavori necessari per le modifiche alle difese spondali del

    fiume Savuto a seguito delle alluvioni intervenute; latto non

    ha modificato i tempi contrattuali. Si segnala che a luglio 2012

    era stata consegnata una prima parte di opera con emissionedel certificato di ultimazione dei lavori, mentre lultimazione

    completa dei lavori interverr entro il primo semestre 2013.

    In the meanwhile the capitalization of the concessionaire

    was successfully completed, with full subscription of the

    equity as set by the economic and financial plan, for a

    total of 520 million. In this regard, Impresa Pizzarotti

    subscribed significant portions of capital the rights on whichwere unopted due to non-availability of some shareholders

    to contribute to the share capital increases resolved in the

    meanwhile, thus leading to the transaction success; the equity

    subscribed came to a total of approximately 54 million, fully

    paid-up as at todays date.

    The construction of the motorway section by the General

    Contractor continued in 2012 and the physical progress

    came to approximately 60% as at the year end; as reported

    before, the non availability of adequate financial resources,

    due to the delay in taking out the senior loan, did not allow

    the construction to be carried out according to schedule.

    Financial resources were ensured through another bridge

    loan of 196 million granted and paid out in August 2012 by

    the pool Banks, as well as through subsequent capitalizations

    and equity contributions made by the Shareholders; the latter

    were however limited amounts compared with the financial

    requirements originally planned, also in terms of paying out

    times.

    A new contract time schedule was defined, which sets the

    completion of the motorway section works by the end of April

    2014, consistently with the motorway opening to traffic set for

    the second half of 2014.

    Finally, Brebemi signed a contract for the management and

    maintenance of the motorway section for the entire duration

    of the concession with Argentea Gestioni Scpa, in which

    Impresa Pizzarotti holds a 11.38% share.

    SALERNO-REGGIO CALABRIA MOTORWAY: the motorway

    works referring to lot SARC 0 were completed with subsequent

    inauguration and opening to traffic as early as in 2011; at theend of 2012, the remaining ancillary works were completed,

    as well as reclamation of disused areas.

    With regard to lot SARC 4, in August, the 4th Addition

    Agreement, which increased the total amount for the works,

    currently equal to 335.2 million, thus formalizing an expert

    opinion relating to works required for the changes to the

    riverside barriers along the Savuto river, subsequent to the

    floods; this did not change the contract time schedule. In July

    2012, the first part of the works was delivered and the works

    completion certificate was issued; final completion will be

    within the first half of 2013.

  • 8/12/2019 Annual Report 212

    94/216

  • 8/12/2019 Annual Report 212

    95/216

    95

    Relazione sulla Gestione |Management Report

    In October, the Addition Agreement No. 2 was signed with

    the customer Autostrada Pedemontana Lombarda S.p.A.

    (APL), by which various contract aspects were redefined,

    such as the amount that was set at 874 million, the standards

    for measurement, accounting and payment of the works, newdeadlines for the completion of the works for section A and

    the two ring roads.

    As at the year end, production progress came to 45%.

    The main problem of this job order concerned the financial

    resources available to the Customer APL, which also affected

    the General Contractors ability to fund with the banking

    system. APL managed to balance the different sources of

    funding public contribution and banking system which

    was required to allow the General Contractor to proceed with

    the works in compliance with the contract time schedule.

    TEEM: this is a project financing initiative concerning the

    design, construction and management of the East Outer Ring

    Road of Milan, which was awarded in concession, through a

    public call for tenders, to the project company Tangenziale

    Esterna S.p.A. (TE), of which Impresa Pizzarotti holds 10.2%.

    Impresa Pizzarotti also has a 23% shareholding in the builders

    consortium (CCT) that is con