Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

13
Milano 25-11-2008, Riunione CNI Scopo Controllo, regolazione F/P – V/Q , Montoraggio. Congestion management, strategie per l’emergenza , riaccensione, interazione tra Sistemi di trasmissione e centrali, Short term operation planning and coordination bench-marking prestazioni dei Sistemi Elettrici. Impatto sull’esercizio dei nuovi assetti istituzionali (TSO or ISO), della regolazione, dei meccanismi di Trading e del comportamento dei fornitori di servizi di rete. Formazione degli operatori di sala (simulatori, indici di valutazione). Security assessment, analisi di rete. SC C2 – System Operation and Control Membership 32 Paesi rappresentati 24 membri nazionali regolari + 12 membri nazionali osservatori Utilities (25), Universities/Institutes (5), Regolatori (3) Altri (3). Europe (20), Asia/Oceania (8), South/North America (5) and Africa (3). Presidente: Michel Armstrong (CA) Segretario: Ben – Li (CA) SC website: www.cigre- c2.org

description

SC C2 – System Operation and Control. SC website: www.cigre-c2.org. Presidente: Michel Armstrong (CA) Segretario: Ben – Li (CA). Scopo Controllo, regolazione F/P – V/Q , Montoraggio. - PowerPoint PPT Presentation

Transcript of Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Page 1: Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Milano 25-11-2008, Riunione CNI

Scopo Controllo, regolazione F/P – V/Q , Montoraggio.Congestion management, strategie per l’emergenza , riaccensione, interazione tra Sistemi di trasmissione e centrali, Short term operation planning and coordination bench-marking prestazioni dei Sistemi Elettrici.

Impatto sull’esercizio dei nuovi assetti istituzionali (TSO or ISO), della regolazione, dei meccanismi di Trading e del comportamento dei fornitori di servizi di rete.

Formazione degli operatori di sala (simulatori, indici di valutazione). Security assessment, analisi di rete.

SC C2 – System Operation and Control

Membership 32 Paesi rappresentati 24 membri nazionali regolari + 12 membri nazionali osservatori Utilities (25), Universities/Institutes (5), Regolatori (3) Altri (3). Europe (20), Asia/Oceania (8), South/North America (5) and Africa (3). Membro italiano: C. Sabelli ([email protected])

Presidente: Michel Armstrong (CA) Segretario: Ben – Li (CA)

SC website: www.cigre-c2.org

Page 2: Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Milano 25-11-2008, Riunione CNI

SC 2 – Risultati principali Parigi 2008 Large Disturbances• 4 novembre “brown out in Europe”. Descrizione senza

approfondimento delle cause di fondo (regolazione, disciplina degli scambi transfrontalieri, ecc.)

• “Ice in Cina”. Descrizione • Florida: interessante per conseguenze di errori di gestione delle

protezioni• Sud Africa: mancanza di margini (PESSE)• Terremoto in GiapponeDecisione di istituire un Gruppo “Lezioni Imparate” e Q&A SessionPoster Session• Principali Soggetti:

•WAMS•Training Simulators•Restoration•Wind production integration

• Riscontri: interesse per tutti gli argomenti, specialmente WAMS e Restoration

Page 3: Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Milano 25-11-2008, Riunione CNI

SC 2 – Risultati principali Parigi 2008 PS1: New applications in system operation and

control for detection and mitigation of system conditions

• WAMS. Tecnologia matura. Distribuzione dei PMU. Attività Terna e CESI riconosciute di livello

• Security Assessment: riduzione del gap tra operation planning e real time control (stessi tool)

• Selfhealing: nuovo approccio verso il rafforzamento della capacità di reazione dei sistemi elettrici, anche in considerazione della riduzione dei margini.PS2: Evolution of operation reliability standards in the context of open markets and reduced security margins

• Eolico: principale elemento da considerare in regime normale ed in emergenza

• Formazione degli operatori: elemento ricorrente da ampliare in collaborazione con i Distributori ed i Produttori. Nuovi spunti per la gestione delle crisi.PS3:Impact on system operation and control of the integration

of large wind generation • Focus sui metodi di previsione• Inportanza dei codici di rete in cui si richiede un maggior rigore nella

specificazione di caratteristiche di ride throuh fault, regolazione , ecc.

Page 4: Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Milano 25-11-2008, Riunione CNI

SC 2 - Working Group attiviType [1]

Number [2]

Title [3] Convener [4] Created[5] Disb [6]

AG C2.1 Real time system operation and control N. Singh (CH) 2007AG C2.2 System operational planning and

performance analysisE. Johnson (ZA) 2007

AG C2.3 Control centre infrastructure and human resources

H. Jones (EI) 2007

WG C2.11 System control in light of recent developments in Substation control (IEC standards).

M. Power (EI) 2007 2008

WG C2.13 Voltage and VAR support in System Operation 

R. Pestana ( PT) 2007 2009

WG C2.31 Joint and coordinated development of operators in control centres

U. Spanel (DE) 2007 2008

WG C2.32 Emergency organisation in control centres crisis management in system operation

Ch. Fontaine (BE)

2007 2008

JWG C2/C5.05 Developments and changes in the Business of System Operators O. Gjerde (NO)

2000 2010[1] Type : Working Group (WG), Task Force (TF), Advisory Group (AG), Co-operation Group (CG), Joint Working Group (JWG), Joint Task Force (JTF), …[2] Number : identification number[3] Title : full title in English[4] Name : Initials NAME (2 letters for nationality)[5] Created : year of creation[6] Disbanded : scheduled year of disbanding

Page 5: Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Milano 25-11-2008, Riunione CNI

SC C2 - Argomenti per nuove attività e futuri Working Groups

JWG C1/C2/C6 Coping with Limits for High Penetration of Renewable Energy [Hugh Jones] Varato a di recente. Prima riunione a giugno 2008 per discutere il ToR.

TC Project: Smart Grid WG che probabilmente riferirà direttamente al TC in quanto molti degli argomenti correlati interesseranno molti comitati.C2 si è reso disponibile alla partecipazione attiva.

Page 6: Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Milano 25-11-2008, Riunione CNI

SC C2 – Pubblicazioni più recenti

Page 7: Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Milano 25-11-2008, Riunione CNI

SC C2 – Prossime riunioni ed Eventi d’interesse

C1/C2/C5: Operation and Development of Power Systems in the New Context Guilin City - Guangxi Province, China. 28 - 30 October 2009

A CIGRE/IEE PES Symposium - Integration of wide-scale renewable resources into Power delivery system, will be held July 29-31, 2009 in Calgary, Canada. C2 WG are invited to have their meetings during this event.

SC B4 will hold a Colloquium on June 11-12, 2009 in Bergen, Norway International Symposium on expansion and operational planning in 2009

in Brazil. Mr. Gomes (ONS) riferimento per ulteriori dettagli. An International Workshop on Electric Power Control Centers will be

held in Dublin, Ireland on June 14-17, 2009 International Conference on Deregulated Electricity Market Issues in South-

Eastern Europe a September 17-18, 2009 in Belgrado, Serbia. As usual, the CIGRE bi-annual Session will be held in Paris in 2010. C2 2011 annual meeting –Malaysia, Indonesia and Brazil. Forse Brasile.

Page 8: Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Milano 25-11-2008, Riunione CNI

Principali conclusioniCooperazioni principali. Con B2 e D2Connotato. Comitato “di Sistema” d’interesse del

dispacciamento. Elevato contenuto specialistico. Scarsa interazione con i Costruttori. Limitata platea di potenziali membri.

Azioni. Ancora lente. Difficilmente al passo con i cambiamenti e con la regolazione.

Page 9: Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Milano 25-11-2008, Riunione CNI

SC C2 -Soggetti preferenziali per la Sessione 2010a. Enhancement of Operating Reliability,

including:• Impact of dynamic security assessment and dynamic ratings on real

time system operations• Decision making tools and methods, system visibility; common format

and quality of data for wide area modeling and assessment• Balancing resources within transmission constraint, including

distributed generation• Impact of wind farm generation on transmission system Grid code b. Consistency and Coordination of System Control

and Operation, including:

• Challenges/experiences/trends of coordinated operation among TSOs for interconnected system

• Formulation and harmonization of operational reliability standards (criteria, performance indicators, compliance measures)

• Impact of cross-border reliability regulatory aspects on system operation; issues on shared responsibilities in system operation and control between real time actors

Page 10: Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Milano 25-11-2008, Riunione CNI

BACK UP

Page 11: Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Milano 25-11-2008, Riunione CNI

Page 12: Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Milano 25-11-2008, Riunione CNI

Page 13: Scopo Controllo, regolazione F/P – V/Q , Montoraggio.

Milano 25-11-2008, Riunione CNI