Proposta per un Laboratorio di compositiC. Gemme, INFN Genova
• Upgrade del rivelatore tracciante di ATLAS nel 2025• Impegno di ATLAS Italia• Interessi di ATLAS Genova à Strutture composite
• Laboratorio di compositi • Che cosa e’• Apparecchiature necessarie
High Luminosity LHC
22
2010 (data): 2 vertici per evento
2012 (data):25 vertici per evento 2027 (simulazione):
200 vertici per evento
~15 cm
Layout del nuovo tracciatore - ITk
3
Strip
Gen
eral
ITk
Attuale HL_LHC
Superficie Pixel[m2] 1.9 ~14
STRIP
Pixel
Layout del nuovo tracciatore - ITk
4
Strip
Pixel
Gen
eral
ITk
Attuale HL_LHC
Superficie Pixel[m2] 1.9 ~14(~2.2ineachEC)
STRIP
Pixel
End cap End cap
Innermost
Outer barrel
ATLAS ITkü La collaborazione si sta
allargando.
ü Genova continua a restare ilgruppo leader dellacollaborazione italiana con importanti responsabilita’ in ATLAS.
5
UDINETRENTO
MILANOBOLOGNA
GENOVA
FRASCATI
LECCE
COSENZA
Pixel 1998
Pixel 2012
ITK 2017
Supporti per l’end-cap
6
2 set di 3 mezzicilindri concentrici
Ogni mezzo cilindro con una decina di half-ring
Half ring
Sugli half-ring si montanoi moduli a pixel Gli half ring sono
sandwich di fibra di carbonio e carbon-foam con in mezzo un circuito elettrico e un tubo di raffreddamento (Ti).
Tre tipi di half ring con raggi di circa 25,30,35 cm, ~ 60 pezzi.
Costruzione degli half ring in Italia
ü Non ci sono laboratori in grado di lavorare compositi nelle Sezioni in cui sono presenti gruppi ATLAS.
ü Gli half ring di ATLAS potrebbero essere fabbricati in industria ad un costo comparabile con la messa in opera di un laboratorio di compositi, per esempio a Genova dove c’e’ comunque un’esperienzapregressa (ATLAS Pixel 2002-2005). • Quindi il problema che si pone e' quello di vedere se c'e' un interesse in
Sezione per altre possibili applicazioni, ora o in prospettiva.• à Nel caso, si puo’ valutare se possibile utilizzare il finanziamento
ATLAS per aumentare le competenze in Sezione piuttosto che pagareuna ditta esterna.
ü La proposta attuale (vedi i tempi indicati a pag 10) e' definita sulleesigenze di ATLAS, possibili ampliamenti o ottimizzazioni possonoessere inclusi una volta che altri interessi saranno chiariti.
7
Laboratorio per compositi
8
Applicazioni tipiche: aerospaziale, aeronautico, automobilistico, navale, difesa, sport, biomedica, …
Vantaggi materiali compositi:- Leggerezza- Alta conducibilità termica- Resistenza meccanica- Resistenza a radiazioni- Resistenza a stress termici- Applicaz per vuoto- …
Materiali compositi = matrice + fibreMatrice = resine epossidiche, poliuretaniche, poliammidiche, fenoliche Fibre = carbonio, vetro , kevlar, boro, berillio
Generalmente per le applicazioni di fisica vengono utilizzate fibre di carbonio in resine epossidiche.
Equipaggiamento per costruzione HR
9
SPAZI NECESSARI:• SALA DI LAMINAZIONE
• La camera deve essere grigia o pulita, deve contenere un tavolo per la preparazione del lay-up, pompa a vuoto, sacche a vuoto, …
• SALA PER L’ELABORAZIONE DEI COMPOSITI• È la sala in cui viene fatta la cottura dei compositi. Deve essere dotata di
un’autoclave (Tmax = 200°C. pmax = 10 bar) e possibilmente anche di un piccolo forno
ULTERIORI CONSIDERAZIONI:ü WORKSHOP
• Per la lavorazione dei compositi, è possibile adattare alcune delle macchinedell’officina (soluzione utilizzata in passato, ma non ottimale). Certi compositipossono semplicemente essere segati, in alternativa si considera l’utilizzo di unawaterjet cutting machine
ü STORAGE MATERIALE• Il materiale va conservato a -18°C, non è necessario che l’area di storage sia
all’interno delle altre due sale
Time scaleü Verificare interesse in Sezione à Adesso
ü Preparare una proposta concreta di equipaggiamento/spazi/budget à Aprile/Maggio
ü Incontro ATLAS con referee e CSN1 à 4/12 Maggio
ü Discussione fattibilita’ in CdS con un piano da definire a seconda deipartner interessati à Inizio Luglio
10
Spare
11
Inner Tracker Detector Phase-IIü Inner Detector
• Disegnato per operare per 10 anni a L= 1x1034 cm-2 s-1 con <u> =23, @ 25ns, L1= 100 kHz
ü Fattori limitanti a HL-LHC per l’attuale tracciatore• Saturazione della banda (Pixel, SCT)• Occupanze troppo elevate (TRT, SCT)• Danno da radiazione (Pixels (SCT) designed for 400 (700) fb-1)
16/01/2014C.Gemme– R&DTracker,AtlasItalia 12
Forward pixel
Barrel Strips Forward Strips
Barrel pixel
LoI layout new (all Si) ATLAS Inner Tracker (ITK) for HL-LHC.
8.2 m2 with 638 MpixelBarrel in z longerPixels cover |η| < 2.7
Altri layout considerati.
80à 638 Mpixels6 à74 Mstrips
Overview of the Phase-II Pixel upgradeü The project is now accelerating significantly given the schedule for the
Pixel TDR (Dec 2017).
13
• Possibility tohavetwoFEsubmissions isincluded intheschedule.Moduleoptimizationcanstartwithfirstchip.
• Module productionandloading:~27-33months
ü The project is now accelerating significantly given the schedule for the Pixel TDR (Dec 2017).
Overview of the Phase-II Pixel upgrade
14
Zoom in 2017:• Layout definition will allows groups to take
commitments on parts of detector. • and preliminary design of the local supports.
• RD53-A will be submitted in spring 2017àtechnological demonstrator of the 65 nm technology and module prototypes with small pixel size.
• Bump bonding marker survey. • Sensors: identify the baseline designs to be used in
the detector. A preliminary design of the data transmission and power distribution scheme will be included in the TDR.
• Start of ATLAS chip design.
Feb. 6, 2017G.-F. Dalla Betta 15
Riassunto FTE 2017
Sez. RD_FASE2
HVR_CCPD
CHIPIX65
AIDA2020
BO 1.00 0.40 - -
CS 0.80 - - -
GE 3.70 1.20 - 0.15
MI 2.12 1.20 1.50 0.35
TN 3.30 - - 1.00
UD 1.30 - - -
Total
12.22 2.80 1.50 1.50
Sezione First+Name Family+Name Ruolo RD_FASE2+ HVR_CCPD CHIPIX65 AIDA2020BO Federica Fabbri PhD 0,20 1 1 1BO Davide3 Falchieri Tecn.3Cat.3D 0,20 1 1 1BO Alessandro3 Gabrielli RU 0,20 1 1 1BO Carla Sbarra RIC 1 0,20 1 1BO Antonio Sidoti RIC 0,20 0,20 1 1BO Maximiliano Sioli PA 0,20 1 1 1CS Anna Mastroberardino RU 0,50 1 1 1CS Daniela Salvatore Assegnista 0,30 1 1 1GE Giovanni Darbo DR 0,60 0,30 1 1GE Andrea Favareto Assegnista 0,30 1 1 1GE Andrea Gaudiello PhD 0,50 0,30 1 1GE Claudia Gemme RIC 0,20 0,10 1 0,15GE Silvia Miglioranzi Assegnista 0,20 1 1 1GE Paolo Morettini 11RIC 0,60 0,20 1 1GE Hideyuki Oide Borsa 0,40 1 1 1GE Leonardo Rossi DR 0,20 0,10 1 1GE Cecilia Rossi Tecn. 0,30 1 1 1GE Mario3 Sannino PA 0,40 0,20 1 1MI Gianluca Alimonti RIC 0,50 1 1 0,20MI Attilio Andreazza PA 1 0,30 1 1MI Mauro Citterio D1TEC 1 0,10 1 1MI Simone Coelli Tecn. 0,40 1 1 1MI Luca Frontini PhD 1 1 0,60 1MI Danilo Giugni P1TEC 0,50 1 1 1MI Valentino Liberali PA 1 0,20 0,40 1MI Chiara Meroni DR 0,25 0,30 1 0,15MI Francesco Ragusa PO 0,10 0,30 1 1MI Seyedruhollah Shojali Assegnista 1 1 0,50 1MI Clara Troncon 11RIC 0,37 1 1 1TN Maurizio Boscardin RIC 0,10 1 1 1TN Gian1Franco Dalla3Betta PO 0,50 1 1 1TN Mostafa El3Khatib PhD 0,50 1 1 1TN Roberto Iuppa RTD1A 0,10 1 1 1TN David Macii PA 0,70 1 1 1TN Roberto Mendicino PhD 1 1 1 1,00TN D3M3S Sultan PhD 0,70 1 1 1TN Giovanni Verzellesi PO 0,70 1 1 1UD Mario3Paolo Giordani RU 0,30 1 1 1UD Gilberto Giugliarelli RU 1,00 1 1 1
Total 39 12,22 2,80 1,50 1,50
Total for the 4 R&D of interest for ITk- 39 persons (same as in 2016)- 18 FTE (was 16.2 in 2016)
Lecce e Frascati hanno dimostrato serio interesse a partecipare; altri laboratori potrebbero aumentare il loro contributo à FTE>25 nei prossimi anni
Surfaces
Una Endcap à 3.3 m2 ma in processo di ottimizzazione, si potrebbe ridurredel 30% Il Pixel detector oggi e’ 1.9 m2
Gen
eral
ITk
Half rings costruzione e materiali
17
Steps in making a half-ring
02Feb2017J.Pater- RingConstruction,ManufactureandQA
18
ü produce cooling pipe (no photo)• cut, bend to shape, attach electrical breaks
and pressure fittings• bending the long smooth curve is more art
than science!ü machine carbon foam “wafers”
• 3mm thick slices, trapezoid shape• tricky part is holding the foam still
ü machine one side of wafers flatü affix foam to Cfibre
• using vacuum jig (top photo)• in past have cured Cfibre as facesheets, then
glued foam• uses a lot of glue• suspect not a good bond –
delamination seen• now experimenting with co-curing (bottom
photo)
ring gluing jig
J.Freestone
P.Cooke,T.Jones
Steps in making a half-ring, p2
ü machine foam faces of half-sandwiches flat and to desired thickness (2.4mm)
ü machine grooves for cooling pipe, bus tapes, locators, closeouts
ü glue tapes in place• glue applied to tapes with
roller• approx 50u thick
02Feb2017J.Pater- RingConstruction,ManufactureandQA
19
J.Freestone
Steps in making a half-ring, p.3• apply glue over foam
and tapes• roller application –
controlled thickness• apply glue to pipe
using custom applicator (bottom picture)
• brush glue onto mounting lugs
• assemble halves, cure in vacuum press
02Feb2017 J.Pater- RingConstruction,ManufactureandQA
20
J.Freestone
Steps in making a half-ring, p.4
02Feb2017J.Pater- RingConstruction,ManufactureandQA
21
Glue in pipe-support closeouts and carbon-fibreedging strips
A finished ring à
Four middle rings in production
• now through summer:• TFM• QC development• electrical tests
J.Freestone