Stato del progetto RPC
Trieste 6 Luglio 2005
Riunione CSN1R. Santonico
Certificazione volumi di gas
0
500
1000
1500
2000
2500
3000
3500
4000
2002_03_15 2002_07_04 2002_10_23 2003_02_11 2003_06_02 2003_09_21 2004_01_10 2004_04_30 2004_08_19 2004_12_08 2005_03_29 2005_07_18
Ac
ce
pte
d g
as v
olu
me
s (
inc
lud
ing
sp
are
on
es
)
Goal: 3704 accepted
Produzione pannelli di read-out
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
2001_04_01 2001_10_18 2002_05_06 2002_11_22 2003_06_10 2003_12_27 2004_07_14 2005_01_30 2005_08_18
Pa
nn
ell
i S
tan
da
rd
0
100
200
300
400
500
600
700
800
900
Pa
nn
ell
i S
pe
cia
li
8016 pannelli standard
528 pannelli speciali
Pannelli di supporto
• A seguito dei problemi di delaminazione trovati sui batch prodotti a Protvino nel 2004 la produzione è stata completamente riorganizzata
• I pannelli tipo BOS#1 e BOL#3 sono prodotti industrialmente sotto il controllo di Lecce
• La produzione dei pannelli BOL#1, realizzati con adesivi di elevata qualità, continua regolarmente a Protvino, sotto il controllo del cern (B. Di Girolamo)
• I nuovi pannelli di supporto mostrano un livello di qualità completamente soddisfacente >>> problema della delaminazione risolto. Assemblaggio ripartito
RPC production
Correnti di leakage sulle prime unità RPC di produzione
• The problem concerns the first 129 units (accidentally BMLd), assembled before April 2003, out of 1004 standard + 112 special units
• In April 2003 we decided to improve the isolation of the gas volumes edges with a “C” shaped FET profile 190 m thick which proved to be very effective for suppressing the leak currents
• This profile became a standard element of the RPC construction. Moreover all gas volumes already delivered in Lecce and not yet utilized for the RPC assembly were sent back to General Tecnica for the application of the PET protection.
Current leaks before edge protection (Napoli test-stand)
Average leak current of 4 gas volumes measured with the old CAEN supply (low accuracy and some uncalibration in the current measurement)
Present current leak distribution (Lecce test-stand)
Stazioni BMLd integrate con RPC di “vecchio tipo”
• The first 129 RPC units that had been already assembled remained without the PET edge protection
• Since the beginning of the muon station integration at BB5, 31 BMLd stations were integrated
• The BMLd CR test at BB5 was postponed to give priority to other more urgent types (BMS/F, BOF/G) and the problem was only “discovered” at the end of May, when the first BMLd was tested)
Effect of the ageing on the current leaks
• 3 BMLd units still under ageing test at the GIF, built at the beginning of the production, do not have the edge protection and can therefore be used to study the increase of the leaks vs time
• The test concerns 6 gas volumes continuously powered that can be compared with other 6 gas volumes normally kept with the HV off
• We observed a substantial increase of the leaks during about 2 years of work at the GIF. In order to normalize to 10 Atlas years we have to multiply the observed increase by a factor of about 2 (in this case the ageing acceleration due to the 137Cs source cannot be counted)
• As a result the test indicates that current leaks of a few microAmps should gradually increase by a factor of about 10 in the course of 10 years in Atlas
• It should be stressed that even the maximum leak observed at the GIF, 16 μA, has no effect in the proper working of the chamber
Effect of the ageing on the current leaks
Current leaks: aged vs. non aged gaps
0
1
2
3
4
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Altro
Leak current (uA)
Leak gas volumesDown
Leak gas volumesUP
Strategia di sostituzione camere ad alta corrente di perdita
• Le correnti di leak sono localizzate all’estarno delle camere e non hanno u n impatto diretto sul funzionamento del rivelatore. Possono tuttavia produrre un rumore elevato sulle strisce al bordo riducendo la selettività del trigger. In casi estremi possono produrre corti circuiti
• Per 5 stazioni BMLd da installare ora nel settore 13, 10 unità con correnti di leak particolarmente elevate sono state sostituite con altrettante a bassa corrente
• Per quanto riguarda le rimanenti stazioni si sta procedendo alla misura sistematica di tutte le correnti di leak (richiesta autorizzazionbe all’uso di i-C4H10 per le stazionoi immagazzinate fuori di BB5)
• La decisione sulla soglia di accettazione verrà presa discutendo pro e contro con la commissione Atlas che segue l’installazione a BB5
Piano di installazione V7.01(il nuovo piano V7.03 prevede uno shift di 1 mese
Chamber installation, Version 7.01
0
20
40
60
80
100
120
1-Jan-05 2-Apr-05 2-Jul-05 1-Oct-05 31-Dec-05 1-Apr-06
Ch
am
be
rs
BMS
BML
BOS
BOL
Muon assembly status
8-10 planes/week stably reached in 2005 with a team of 8 tech. + 1 coord. physicist
BML: 82%
BMS/BMF: 90%
BOL: 3%
BOS/BOF/BOG: 9%
Percentage of Integrated Barrel Stations
2004 2005
Richieste Finanziarie
• Ulteriore produzione di pannelli di strisce
20 kE (Na costruzione apparati)
----------------------------------------------------------
• Lettera di Disponibilità di 167 kE per l’acquisto degli alimentatori sui fondi della Commissione del 2006
Dettaglio extra produzione pannelli di strisceeta phi costo un. costo tot.
BMS-A 16 16 37,2 1190,4
BOS-B 32 52 41,76 3507,84
BOL-B 92 112 52,61 10732,44
Cu-Tape 1000 1000
16430,68
Iva 3286,136
Totale 140 180 19716,82