RELAZIONE IDROLOGICA IDRAULICA

32

Transcript of RELAZIONE IDROLOGICA IDRAULICA

RELAZIONE IDROLOGICA IDRAULICA

Pag. 1

SOMMARIO

1 PREMESSA .................................................................................................................. 3

2 LO STATO ATTUALE DELLA RETE DI DRENAGGIO ............................................... 3

3 LO STATO DI PROGETTO DELLA RETE DI DRENAGGIO ....................................... 5

4 DIMENSIONAMENTO IDROLOGICO E IDRAULICO .................................................. 6

4.1 Calcolo delle curve di possibilità pluviometrica ........................................................... 6

4.2 Calcolo dei contributi .................................................................................................. 8

4.3 Verifica dell’invarianza idraulica ................................................................................ 10

4.4 Accumuli acque meteoriche a fini irrigui .................................................................. 10

5 APPENDICE A Dimensionamento della rete ........................................................... 11

6 APPENDICE B Verifica dell’invarianza idraulica .................................................... 23

RELAZIONE IDROLOGICA IDRAULICA

Pag. 3

1 PREMESSA

La presente relazione è finalizzata a definire le opere di regimazione idraulica da prevedersi

nel Piano Attuativo.

Le opere sono state definite secondo i seguenti principi:

• minimizzazione dell’aggravio nelle aree di valle secondo il principio dell’invarianza

idraulica;

• separazione del sistema di drenaggio naturale presente nell’area dalla rete fognaria

mista in modo da non compromettere le capacità depurative dell’impianto di

depurazione con l’apporto di acque parassite;

• previsione di una rete fognaria di tipo separato.

2 LO STATO ATTUALE DELLA RETE DI DRENAGGIO

Attualmente l’area interessata dal Piano Attuativo è drenata da una rete fognaria di tipo

misto. Il bacino complessivamente afferente alla rete fognaria è di circa 70ha.

La rete fognaria di tipo misto nel tratto finale è costituita da una condotta di diametro 1500

mm che scarica in un laghetto collinare. Il gestore della fognatura, Publiacqua, sta

realizzando a valle un impianto di depurazione al quale verranno recapitate le acque nere

provenienti dalla fognatura mista una volta scolmate le acque di pioggia nel laghetto

collinare.

Si rileva che il drenaggio delle acque meteoriche dell’area industriale, posta lungo via

Cappello (Figura 1), è convogliato al borro di Ricavo,e attraversa la stessa Via Cappello ad

una quota superiore a quella della nuova condotta del DN1500 mm. Lo scarico di questo

tratto avviene, tramite la vecchia rete fognaria (DN 1000 mm) nel Borro di Ricavo (Figura

2). I fossi campestri provenienti dalla colina recapitano nella fognatura mista DN 1500 mm.

I fossi non fanno parte del reticolo idrografico ai sensi della L.R. 75/2012 a seguito della

revisione delle cartografie del dicembre 2016.

RELAZIONE IDROLOGICA IDRAULICA

Pag. 4

Figura 1 – Area afferente al Borro di Ricavo

Figura 2 – Recapito nel Borro di Ricavo

RELAZIONE IDROLOGICA IDRAULICA

Pag. 5

La rete fognaria e l’uso del suolo allo stato attuale relativi all’area del Piano Attuativo sono

riportati nelle seguenti tavole:

• 05-ID-02-01 Planimetria relativa all'uso del suolo - stato attuale

• 05-ID-02-03 Planimetria con reticolo - stato attuale

Il Piano Attuativo interferisce con il reticolo idrografico riportato nelle cartografie allegate

alla L.R. 79/2012 e ss.mm.ii. ma non facente parte del reticolo idrografico significativo di cui

alla medesima legge.

3 LO STATO DI PROGETTO DELLA RETE DI DRENAGGIO

Le reti nello stato di progetto sono riportate nella tavola 05-ID-03-01 Planimetria con rete

drenante di progetto.

In particolare si distinguono la rete di drenaggio delle acque meteoriche (AM), e la rete

fognaria che risulta di tipo separato e che quindi comprende la fognatura bianca (FB) e

quella nera (FN).

La rete delle acque meteoriche (AM) , costituite da canalizzazioni prevalentemente a cielo

aperto deputate a drenare le aree verdi interne e limitrofe a quella del Piano Attuativo e il

reticolo idrografico naturale sono state dimensionate con un tempo di ritorno pari a 200

anni.

E’ previsto che la rete fognaria che interessa l’area del Piano Attuativo sia di tipo separato

in modo impedire l’apporto di acque parassite all’impianto di depurazione e quindi

garantirne la capacità depurativa.

In particolare le fognature bianche (FB) sono deputate a drenare le acque meteoriche delle

strade, dei parcheggi, delle coperture e del verde urbano e sono state dimensionate con un

tempo di ritorno pari a 50 anni.

Le fognature nere dreneranno i reflui delle nuove edificazioni e la acque provenienti dalla

rete mista fino a una diluizione massima pari a 5 volte la portata nera media. A tale scopo

nei n.5 punti di immissione della attuale rete di drenaggio di tipo misto nella nuova rete di

tipo separato saranno realizzate delle opportune opere di sfioro (SF) in modo che le portata

fino a 5 volte la portata nera media saranno recapitate nella fognatura nera di progetto

mentre le portata eccedenti saranno recapitate nella fognatura bianca di progetto.

Sia la rete delle acque meteoriche (AM) che la rete fognaria bianca (FB) recapiteranno nel

borro Ricavo attraverso un nuovo scarico da realizzarsi con il Piano Attuativo (SB). Si

precisa che tale scarico manterrà il tracciato della vecchia condotta (DN 1000 mm).

RELAZIONE IDROLOGICA IDRAULICA

Pag. 6

Le acque nere saranno invece convogliate nella rete delle acque miste esistente (SN).

La compensazione dell’aggravio dovuto all’ aumentata impermeabilizzazione del suolo sarà

realizzata direttamente attraverso i volumi d’invaso della rete progettata senza dover

prevedere specifici volumi di compenso interrati.

Si riportano di seguito la tavole relative allo stato di progetto:

05-ID-02-02 Planimetria relativa all'uso del suolo - stato di progetto

05-ID-02-04 Planimetria con reticolo - stato di progetto

05-ID-03-01 Planimetria con rete drenante di progetto

4 DIMENSIONAMENTO IDROLOGICO E IDRAULICO

Le reti di smaltimento delle acque meteoriche (AM) e della fognatura bianca (FB) sono

state dimensionate con il metodo del volume di invaso.

Tale metodologia consente di tenere in conto sia il grado di impermeabilizzazione delle

diverse superfici che del volume invaso sulle stesse in corrispondenza dell'evento

meteorico.

La sollecitazione pluviometrica è stata valutata in funzione dei recenti studi condotti dalla

Università di Firenze per l'aggiornamento delle curve di possibilità pluviometrica.

Il calcolo è stato condotto con un tempo di ritorno di 200 anni per la rete delle acque

meteoriche e 50 anni per la rete di fognatura bianca.

4.1 Calcolo delle curve di possibilità pluviometrica

La curva di possibilità pluviometrica è stata stimata a partire dalle curve di possibilità

pluviometrica stimate dalla Regione Toscana in due studi successivi condotti per la

regionalizzazione delle portate di piena. Il primo studio utilizzava il dati pluviometrici fino al

2002 il secondo utilizza i dati pluviometrici al 2012.

La curva di possibilità pluviometrica può essere espressa nella forma generica:

h = a tn

dove:

h altezza di pioggia in [mm/h];

RELAZIONE IDROLOGICA IDRAULICA

Pag. 7

a coefficiente dipendente dal tempo di ritorno [mm/hn]; n esponente della curva di possibilità pluviometrica.

Approssimando la curva di crescita, che dipende dal modello probabilistico utilizzato per la

stima delle altezze di pioggia per le varie durate e per i vari tempi di ritorno, con un legge di

potenza la curva si possibilità pluviometrica può essere espressa nella forma:

h = a' tn Tm

dove:

a' coefficiente [mm/hn ym]; T tempo di ritorno in anni [y].

Di norma la curva di possibilità pluviometrica presenta due andamenti distinti per le durata

inferiori e superiori all'ora con differenti coefficienti.

La stazione di riferimento è quella del Ferrone. Nella Tabella 1 si riportano i valori dei

parametri della curva di possibilità pluviometrica aggiornata al 2002 per le durate inferiori e

superiori all'ora.

Aggiornamento: 2002 t > 1 ora t < 1 ora

codice stazione a n m a n m

1130 FERRONE 19.497 0.273 0.220 17.868 0.345 0.214

Tabella 1 - Curva di possibilità pluviometrica della stazione di Ferrone al 2002

I recenti studi di aggiornamento delle curve di possibilità al 2012 forniscono i valori di a e n

su una maglia di 1kmx1km su tutto il territorio regionale sono disponibili per i tempi di

ritorno di 2, 5, 10, 20, 30, 50, 100, 150, 200 e 500 anni.

Con una regressione multipla sui logaritmi sono stati ricavati i valori della curva di

possibilità pluviometrica relativa al sito in esame nella forma h = a' tn Tm per durate

superiori all'ora. Le durate critiche del sistema in esame risultano peraltro sicuramente

inferiori a un'ora. Pertanto per il parametro n è stato calcolato un valore corretto con la

seguente espressione:

20021

200212012

120121

ora

oraoraora n

nnn

I parametri utilizzati sono riportati nella Tabella 2.

RELAZIONE IDROLOGICA IDRAULICA

Pag. 8

a n m a' n' m' 25.620 0.274 0.184 25.620 0.346 0.184

Tabella 2 - Curva di possibilità pluviometrica per il sito in esame aggiornata al 2012 per durate superiori all'ora

La curva di possibilità pluviometrica per il sito in esame e il tempo di ritorno di 200 e 50 anni

è quella riportata nella tabella seguente:

Tempo di ritorno [anni] t > 1 ora t < 1 ora

a [mm/hn] n a' [mm/hn] n'

50 52.707 0.274 52.707 0.346

200 68.060 0.274 68.060 0.346

Tabella 3 - Curva di possibilità pluviometrica per il sito di interesse aggiornata al 2012

4.2 Calcolo dei contributi

Il calcolo è stato condotto utilizzando per la valutazione dei contributi il metodo dell’’invaso

secondo la seguente espressione:

11

1)(

n

naCu

dove:

- u contributo unitario in [l/s ha];

- C = 2168 n0;

- coefficiente di deflusso unitario;

- a coefficiente dalla CPP [m/hn];

- n esponente della CPP;

- invaso specifico [m].

Il coefficiente di deflusso unitario ѱ della formula del volume di invaso è dato dalla

seguente espressione:

RELAZIONE IDROLOGICA IDRAULICA

Pag. 9

ri

rii

A

A

Dove:

- Ai è l'area sottesa all'iesimo ramo;

- ѱi il coefficiente di deflusso unitario dell'area iesima.

L'invaso specifico v della formula del volume di invaso è dato dalla seguente espressione:

ri

ri

ri

rii

A

vr

A

vAv

0

dove

- Ai è l'area sottesa all'iesimo ramo;

- V0i il volume specifico dell'area iesima;

- Vri il volume invasato nell'iesimo ramo fognario;

Sono stato adottati i coefficienti di deflusso unitario e i volumi di invaso specifico unitario

riportati nella Tabella 4.

Tipo Vp [m]

Edifici 1.00 0.0025

Strade 1.00 0.0025

Semipermeabile 0.60 0.0050

Verde 0.40 0.0075

Verde urbano 0.50 0.0075

Marciapiede 1.00 0.0025

Tabella 4 – Volumi di invaso specifico e coefficienti di deflusso

I risultati di progetto della rete sono riportati in dettaglio nelle tabelle dell’APPENDICE A

Dimensionamento della rete.

RELAZIONE IDROLOGICA IDRAULICA

Pag. 10

4.3 Verifica dell’invarianza idraulica

La compensazione dell’aggravio dovuto all’ aumentata impermeabilizzazione del suolo sarà

realizzata direttamente attraverso i volumi d’invaso della rete progettata senza dover

prevedere specifici volumi di compenso interrati.

Come riportato nell’ APPENDICE B Verifica dell’invarianza idraulica è stato calcolato il

contributo del bacino di drenaggio che insiste nell’area del Piano Attuativo considerando la

fognatura esistente come un unico ramo avente un volume d’invaso pari al volume totale

della rete attuale che insiste nel bacino considerato. Tale ipotesi risulta a favore della

sicurezza in quanto in volume realmente invasato sarà comunque sempre inferiore (o al

massimo uguale) al valore complessivo del volume della rete.

La rete fognaria e l’uso del suolo allo stato attuale relativi all’area del Piano Attuativo sono

riportati nelle seguenti tavole:

• 05-ID-02-01 Planimetria relativa all'uso del suolo - stato attuale

• 05-ID-02-03 Planimetria con reticolo - stato attuale

Il contributo per unità di superficie in termini di coefficiente udometrico relativo allo stato

attuale è stato quindi confrontato con il contributo allo stato di progetto verificandone

l’invarianza idraulica. Anche in questo caso la rete di progetto è stata considerata come un

unico ramo avendo un volume d’invaso pari a quello calcolato nell’APPENDICE A

Dimensionamento della rete.

4.4 Accumuli acque meteoriche a fini irrigui

Il Piano Attuativo prevede la realizzazione di accumuli delle acque meteoriche da

riutilizzare prevalentemente per fini irrigui. Nelle presenti elaborazioni tali volumi , che

potrebbero portare un beneficio in termini di portate da smaltire, non sono stati considerati

in quanto potrebbero risultare già invasati in occasione dell’evento meteorico.

RELAZIONE IDROLOGICA IDRAULICA

Pag. 11

5 APPENDICE A Dimensionamento della rete

Tabella 5 - Verifica rami (parte 1 di 2) Ramo Ramo_m1 Ramo_m2 Ramo_m3 A [mm/h-n] N A' [mm/h-n] N' Area [mq] Phip Vp [m] Vr [mc] AreaT [mq] PhipT AreaT*PhiT AM01 68.06 0.274 68.06 0.346 310 0.400 0.0075 0.072 310 0.400 124 AM02 68.06 0.274 68.06 0.346 12,556 0.400 0.0075 3.560 12,556 0.400 5,022 AM03 AM01 AM02 68.06 0.274 68.06 0.346 732 0.523 0.0065 25.395 13,598 0.407 5,530 AM04 68.06 0.274 68.06 0.346 16,127 0.400 0.0075 4.721 16,127 0.400 6,451 AM05 AM03 AM04 68.06 0.274 68.06 0.346 248 0.400 0.0075 12.272 29,973 0.403 12,079 AM06 AM07 AM08 68.06 0.274 68.06 0.346 661 0.634 0.0056 31.977 74,014 0.412 30,484 AM07 68.06 0.274 68.06 0.346 22,282 0.400 0.0075 7.888 22,282 0.400 8,913 AM08 68.06 0.274 68.06 0.346 51,071 0.414 0.0074 266.707 51,071 0.414 21,152 AM09 68.06 0.274 68.06 0.346 10,261 0.404 0.0075 64.872 10,261 0.404 4,144 AM10 AM05 AM06 68.06 0.274 68.06 0.346 368 0.876 0.0037 53.431 104,355 0.411 42,886 AM11 AM10 FB10 68.06 0.274 68.06 0.346 0 0.000 0.0000 15.998 173,698 0.520 90,274 AM12 AM11 AM09 68.06 0.274 68.06 0.346 1,480 0.707 0.0051 133.608 185,439 0.515 95,464 AM13 AM12 FB25 68.06 0.274 68.06 0.346 0 0.000 0.0000 32.096 192,781 0.530 102,242 AM14 AM16 FB11 68.06 0.274 68.06 0.346 0 0.000 0.0000 172.650 203,266 0.550 111,761 AM15 AM13 FB12 68.06 0.274 68.06 0.346 0 0.000 0.0000 10.568 193,400 0.532 102,807 AM16 AM15 FB24 68.06 0.274 68.06 0.346 0 0.000 0.0000 13.627 198,973 0.542 107,815 FB01 52.71 0.274 52.71 0.346 21,881 0.567 0.0061 98.104 21,881 0.567 12,414 FB02 52.71 0.274 52.71 0.346 2,150 0.906 0.0033 15.503 2,150 0.906 1,948 FB03 FB01 FB02 52.71 0.274 52.71 0.346 2,398 0.592 0.0059 28.396 26,429 0.597 15,782 FB04 52.71 0.274 52.71 0.346 15,466 0.648 0.0054 118.406 15,466 0.648 10,030 FB05 FB04 FB03 52.71 0.274 52.71 0.346 1,359 0.904 0.0034 93.840 43,255 0.625 27,040 FB06 52.71 0.274 52.71 0.346 2,443 0.705 0.0054 8.664 2,443 0.705 1,722 FB07 FB06 FB05 52.71 0.274 52.71 0.346 818 0.861 0.0037 81.444 46,516 0.633 29,466 FB08 52.71 0.274 52.71 0.346 3,765 0.734 0.0050 23.576 3,765 0.734 2,765 FB09 FB08 FB07 52.71 0.274 52.71 0.346 349 0.843 0.0038 8.391 50,630 0.642 32,526 FB10 FB09 FB23 52.71 0.274 52.71 0.346 2,061 0.919 0.0032 198.249 69,343 0.683 47,388 FB11 52.71 0.274 52.71 0.346 4,293 0.919 0.0032 41.484 4,293 0.919 3,946 FB12 52.71 0.274 52.71 0.346 619 0.913 0.0033 1.557 619 0.913 565

RELAZIONE IDROLOGICA IDRAULICA

Pag. 12

Ramo Ramo_m1 Ramo_m2 Ramo_m3 A [mm/h-n] N A' [mm/h-n] N' Area [mq] Phip Vp [m] Vr [mc] AreaT [mq] PhipT AreaT*PhiT FB13 52.71 0.274 52.71 0.346 554 0.849 0.0040 2.552 554 0.849 470 FB14 52.71 0.274 52.71 0.346 3,398 0.642 0.0061 14.713 3,398 0.642 2,183 FB15 FB14 FB13 52.71 0.274 52.71 0.346 496 0.869 0.0038 5.214 4,449 0.693 3,085 FB16 52.71 0.274 52.71 0.346 717 0.628 0.0062 1.870 717 0.628 450 FB17 FB16 FB15 52.71 0.274 52.71 0.346 138 0.987 0.0026 4.297 5,303 0.692 3,671 FB18 52.71 0.274 52.71 0.346 1,391 0.689 0.0051 5.851 1,391 0.689 958 FB19 FB18 FB17 52.71 0.274 52.71 0.346 0 0.000 0.0000 3.053 6,694 0.692 4,629 FB20 52.71 0.274 52.71 0.346 3,463 0.791 0.0044 22.889 3,463 0.791 2,739 FB21 FB20 FB19 52.71 0.274 52.71 0.346 4,304 0.868 0.0037 78.996 14,461 0.768 11,105 FB22 52.71 0.274 52.71 0.346 2,191 0.850 0.0037 19.494 2,191 0.850 1,863 FB23 FB22 FB21 52.71 0.274 52.71 0.346 0 0.000 0.0000 72.649 16,652 0.779 12,968 FB24 52.71 0.274 52.71 0.346 5,573 0.899 0.0034 75.222 5,573 0.899 5,008 FB25 52.71 0.274 52.71 0.346 7,342 0.923 0.0031 104.683 7,342 0.923 6,778

Tabella 6 - Verifica rami (parte 2 di 2)

ViT[m] AreaT*ViT up [l/sha] Q [mc/s] L [m] phi/H H [m] Gr Ks [m1/3/s] D/A [m] B[m] I [m/m] N_tubi P A [mq] B [m] R [m] b[m] V [m/s] Q'[mc/s] Verificato Criticità

0.0077 2.40 220.10 0.007 2.99 0.046 0.046 0.065 45 0.5 0.5 0.466 1 0.003 0.024 0.601 0.040 0.543 0.287 0.007 SI NO

0.0078 97.73 217.29 0.273 13.13 0.128 0.128 0.092 45 1 1 0.466 2 0.010 0.136 1.282 0.106 1.119 1.006 0.273 SI NO

0.0096 130.26 153.98 0.273 54.48 0.146 0.146 0.106 45 1 1 0.466 3 0.003 0.155 1.321 0.118 1.136 0.592 0.276 SI NO

0.0078 125.67 216.81 0.350 11.68 0.097 0.097 0.069 45 1 1 0.466 4 0.010 0.101 1.213 0.083 1.090 0.858 0.347 SI NO

0.0090 270.06 168.44 0.505 14.94 0.153 0.153 0.112 45 1 1 0.466 5 0.003 0.164 1.338 0.123 1.143 0.609 0.500 SI NO

0.0115 854.42 112.34 0.831 38.69 0.130 0.130 0.094 45 1 1 0.466 6 0.010 0.138 1.287 0.107 1.121 1.015 0.839 SI NO

0.0079 175.00 213.62 0.476 13.07 0.083 0.083 0.059 45 1 1 0.466 7 0.010 0.086 1.183 0.073 1.077 0.785 0.474 SI NO

0.0126 643.72 96.71 0.494 406.47 0.079 0.079 0.056 45 1 1 0.466 8 0.010 0.082 1.175 0.070 1.074 0.763 0.501 SI NO

0.0138 141.56 75.84 0.078 324.34 0.027 0.027 0.024 45 0.8 0.8 0.466 9 0.010 0.022 0.860 0.026 0.826 0.393 0.079 SI NO

0.0113 1,179.28 116.21 1.213 29.6 0.103 0.103 0.083 60 1.25 1.75 0.000 10 0.003 0.181 1.956 0.092 1.750 0.671 1.211 SI NO

0.0142 2,462.87 149.16 2.591 5.07 0.143 0.143 0.115 60 1.25 2 0.000 11 0.003 0.287 2.287 0.125 2.000 0.824 2.599 SI NO

0.0148 2,745.58 133.74 2.591 36.95 0.190 0.190 0.091 45 1.5 1.5 0.466 12 0.003 0.301 1.919 0.157 1.677 0.717 2.594 SI NO

0.0151 2,905.26 140.96 2.717 9.21 0.134 0.134 0.089 60 1.5 2 0.000 13 0.003 0.268 2.268 0.118 2.000 0.791 2.758 SI NO

0.0160 3,254.93 139.50 2.931 45.02 0.137 0.137 0.091 60 1.5 2 0.000 14 0.003 0.274 2.274 0.120 2.000 0.802 3.074 SI NO

RELAZIONE IDROLOGICA IDRAULICA

Pag. 13

ViT[m] AreaT*ViT up [l/sha] Q [mc/s] L [m] phi/H H [m] Gr Ks [m1/3/s] D/A [m] B[m] I [m/m] N_tubi P A [mq] B [m] R [m] b[m] V [m/s] Q'[mc/s] Verificato Criticità

0.0151 2,919.40 141.46 2.736 2.88 0.122 0.122 0.082 60 1.5 2 0.000 15 0.003 0.245 2.245 0.109 2.000 0.750 2.751 SI NO

0.0152 3,027.01 147.32 2.931 3.4 0.125 0.125 0.083 60 1.5 2 0.000 16 0.003 0.250 2.250 0.111 2.000 0.760 3.048 SI NO

0.0106 231.04 160.21 0.351 205.58 1.466 0.089 0.075 80 0.69 0 0.000 17 0.004 0.028 0.506 0.055 0.462 0.736 0.351 SI NO

0.0106 22.68 620.60 0.133 65.18 1.347 0.058 0.059 80 0.533 0 0.000 18 0.004 0.013 0.359 0.037 0.332 0.560 0.133 SI NO

0.0112 296.27 165.90 0.438 49.24 1.508 0.094 0.081 80 0.69 0 0.000 19 0.004 0.030 0.520 0.058 0.472 0.761 0.439 SI NO

0.0131 202.38 157.22 0.243 305.55 1.285 0.069 0.052 80 0.69 0 0.000 20 0.004 0.019 0.443 0.044 0.413 0.628 0.243 SI NO

0.0138 597.06 127.85 0.553 130.57 1.353 0.094 0.060 80 0.853 0 0.000 21 0.004 0.034 0.577 0.059 0.534 0.770 0.553 SI NO

0.0089 21.74 414.07 0.101 42.89 1.386 0.049 0.064 80 0.427 0 0.000 22 0.004 0.009 0.296 0.031 0.273 0.500 0.101 SI NO

0.0151 703.24 111.87 0.553 110.23 1.323 0.090 0.056 80 0.853 0 0.000 23 0.004 0.032 0.564 0.057 0.524 0.749 0.553 SI NO

0.0113 42.48 297.84 0.112 114.29 1.354 0.047 0.060 80 0.427 0 0.000 24 0.005 0.009 0.289 0.030 0.267 0.543 0.112 SI NO

0.0149 755.44 119.42 0.605 10.4 1.325 0.090 0.056 80 0.853 0 0.000 25 0.004 0.032 0.565 0.057 0.525 0.750 0.605 SI NO

0.0183 1,267.59 97.30 0.675 217.62 1.198 0.089 0.042 80 1.025 0 0.000 26 0.004 0.035 0.614 0.057 0.578 0.750 0.683 SI NO

0.0129 55.27 444.17 0.191 116.15 1.124 0.053 0.035 80 0.69 0 0.000 27 0.004 0.013 0.388 0.034 0.368 0.532 0.190 SI NO

0.0058 3.57 1981.55 0.123 5.68 0.875 0.040 0.017 80 0.853 0 0.000 28 0.004 0.010 0.373 0.026 0.362 0.446 0.122 SI NO

0.0086 4.78 751.53 0.042 22.24 1.199 0.030 0.043 80 0.344 0 0.000 29 0.004 0.004 0.206 0.019 0.194 0.363 0.042 SI NO

0.0104 35.30 236.68 0.080 77.84 1.213 0.038 0.044 80 0.427 0 0.000 30 0.004 0.006 0.259 0.024 0.243 0.425 0.080 SI NO

0.0106 47.18 283.67 0.126 21.53 1.309 0.044 0.055 80 0.427 0 0.000 31 0.005 0.008 0.279 0.028 0.260 0.521 0.126 SI NO

0.0088 6.32 301.83 0.022 24.93 1.000 0.021 0.025 80 0.344 0 0.000 32 0.004 0.002 0.172 0.014 0.165 0.289 0.022 SI NO

0.0110 58.16 264.98 0.141 14.51 1.176 0.045 0.040 80 0.533 0 0.000 33 0.004 0.009 0.313 0.029 0.296 0.474 0.140 SI NO

0.0093 12.94 356.08 0.050 43.05 1.204 0.030 0.043 80 0.344 0 0.000 34 0.004 0.004 0.207 0.019 0.195 0.364 0.049 SI NO

0.0111 74.15 259.20 0.174 8.73 1.221 0.048 0.045 80 0.533 0 0.000 35 0.004 0.010 0.325 0.031 0.305 0.496 0.174 SI NO

0.0110 38.01 388.79 0.135 77.54 1.139 0.042 0.037 80 0.533 0 0.000 36 0.004 0.008 0.304 0.027 0.287 0.455 0.134 SI NO

0.0143 206.99 216.26 0.313 141.96 1.176 0.058 0.040 80 0.69 0 0.000 37 0.004 0.015 0.406 0.037 0.383 0.563 0.313 SI NO

0.0126 27.70 366.73 0.080 92.9 0.993 0.032 0.025 80 0.533 0 0.000 38 0.004 0.006 0.265 0.021 0.254 0.383 0.080 SI NO

0.0185 307.35 139.35 0.313 128.5 1.161 0.056 0.039 80 0.69 0 0.000 39 0.004 0.014 0.400 0.036 0.378 0.554 0.313 SI NO

0.0169 93.98 249.85 0.139 210.37 0.982 0.041 0.024 80 0.69 0 0.000 40 0.003 0.009 0.339 0.026 0.325 0.388 0.139 SI NO

0.0174 127.59 255.15 0.187 236.24 1.048 0.046 0.029 80 0.69 0 0.000 41 0.003 0.011 0.362 0.030 0.345 0.422 0.187 SI NO

RELAZIONE IDROLOGICA IDRAULICA

Pag. 14

Tabella 7 - Dati rami

CODICE LUNGHEZZA PENDENZA TIPO TUBO DIAMETRO CODICE_M1 CODICE_M2 Phip Vp [m] D/A [m] B[m] I [m/m] Ks [m1/3/s] phi/H verificato

AM01 2.99 0.003 Canale 0.50 0.4000 0.0075 0.500 0.500 0.466 45 0.4

AM02 13.13 0.01 Canale 1.00 0.4000 0.0075 1.000 1.000 0.466 45 0.8

AM03 54.48 0.003 Canale 1.00 AM01 AM02 0.5232 0.0065 1.000 1.000 0.466 45 0.8

AM04 11.68 0.01 Canale 1.00 0.4000 0.0075 1.000 1.000 0.466 45 0.8

AM05 14.94 0.003 Canale 1.00 AM03 AM04 0.4000 0.0075 1.000 1.000 0.466 45 0.8

AM06 38.69 0.01 Canale 1.00 AM07 AM08 0.6341 0.0056 1.000 1.000 0.466 45 0.8

AM07 13.07 0.01 Canale 1.00 0.4000 0.0075 1.000 1.000 0.466 45 0.8

AM08 406.47 0.01 Canale 1.00 0.4142 0.0074 1.000 1.000 0.466 45 0.8

AM09 324.34 0.01 Canale 0.80 0.4039 0.0075 0.800 0.800 0.466 45 0.64

AM10 29.6 0.003 Scatolare 1.25x1.75 AM05 AM06 0.8764 0.0037 1.250 1.750 0.000 60 1

AM11 5.07 0.003 Scatolare 1.25x2.00 AM10 FB10 0.0000 0.0000 1.250 2.000 0.000 60 1

AM12 36.95 0.003 Canale 1.50 AM11 AM09 0.7067 0.0051 1.500 1.500 0.466 45 1.2

AM13 9.21 0.003 Scatolare 1.50x2.00 AM12 FB25 0.0000 0.0000 1.500 2.000 0.000 60 1.2

AM14 45.02 0.003 Scatolare 1.50x2.00 AM16 FB11 0.0000 0.0000 1.500 2.000 0.000 60 1.2

AM15 2.88 0.003 Scatolare 1.50x2.00 AM13 FB12 0.0000 0.0000 1.500 2.000 0.000 60 1.200

AM16 3.4 0.003 Scatolare 1.50x2.00 AM15 FB24 0.0000 0.0000 1.500 2.000 0.000 60 1.200

FB01 205.58 0.004 PEAD corrugato 0.80 0.5673 0.0061 0.690 0.000 0.000 80 4.392

FB02 65.18 0.004 PEAD corrugato 0.63 0.9062 0.0033 0.533 0.000 0.000 80 4.392

FB03 49.24 0.004 PEAD corrugato 0.80 FB01 FB02 0.5921 0.0059 0.690 0.000 0.000 80 4.392

FB04 305.55 0.004 PEAD corrugato 0.80 0.6485 0.0054 0.690 0.000 0.000 80 4.392

FB05 130.57 0.004 PEAD corrugato 1.00 FB04 FB03 0.9042 0.0034 0.853 0.000 0.000 80 4.392

FB06 42.89 0.004 PEAD corrugato 0.50 0.7047 0.0054 0.427 0.000 0.000 80 4.392

FB07 110.23 0.004 PEAD corrugato 1.00 FB06 FB05 0.8609 0.0037 0.853 0.000 0.000 80 4.392

FB08 114.29 0.005 PEAD corrugato 0.50 0.7344 0.0050 0.427 0.000 0.000 80 4.392

FB09 10.4 0.004 PEAD corrugato 1.00 FB08 FB07 0.8432 0.0038 0.853 0.000 0.000 80 4.392

FB10 217.62 0.004 PEAD corrugato 1.20 FB09 FB23 0.9189 0.0032 1.025 0.000 0.000 80 4.392

FB11 116.15 0.004 PEAD corrugato 0.80 0.9193 0.0032 0.690 0.000 0.000 80 4.392

FB12 5.68 0.004 PEAD corrugato 1.00 0.9128 0.0033 0.853 0.000 0.000 80 4.392

RELAZIONE IDROLOGICA IDRAULICA

Pag. 15

CODICE LUNGHEZZA PENDENZA TIPO TUBO DIAMETRO CODICE_M1 CODICE_M2 Phip Vp [m] D/A [m] B[m] I [m/m] Ks [m1/3/s] phi/H verificato

FB13 22.24 0.004 PEAD corrugato 0.40 0.8485 0.0040 0.344 0.000 0.000 80 4.392

FB14 77.84 0.004 PEAD corrugato 0.50 0.6425 0.0061 0.427 0.000 0.000 80 4.392

FB15 21.53 0.005 PEAD corrugato 0.50 FB14 FB13 0.8690 0.0038 0.427 0.000 0.000 80 4.392

FB16 24.93 0.004 PEAD corrugato 0.40 0.6283 0.0062 0.344 0.000 0.000 80 4.392

FB17 14.51 0.004 PEAD corrugato 0.63 FB16 FB15 0.9873 0.0026 0.533 0.000 0.000 80 4.392

FB18 43.05 0.004 PEAD corrugato 0.40 0.6888 0.0051 0.344 0.000 0.000 80 4.392

FB19 8.73 0.004 PEAD corrugato 0.63 FB18 FB17 0.0000 0.0000 0.533 0.000 0.000 80 4.392

FB20 77.54 0.004 PEAD corrugato 0.63 0.7909 0.0044 0.533 0.000 0.000 80 4.392

FB21 141.96 0.004 PEAD corrugato 0.80 FB20 FB19 0.8683 0.0037 0.690 0.000 0.000 80 4.392

FB22 92.9 0.004 PEAD corrugato 0.63 0.8503 0.0037 0.533 0.000 0.000 80 4.392

FB23 128.5 0.004 PEAD corrugato 0.80 FB22 FB21 0.0000 0.0000 0.690 0.000 0.000 80 4.392

FB24 210.37 0.003 PEAD corrugato 0.80 0.8986 0.0034 0.690 0.000 0.000 80 4.392

FB25 236.24 0.003 PEAD corrugato 0.80 0.9231 0.0031 0.690 0.000 0.000 80 4.392 Tabella 8 - Dati aree

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

AM02 Verde 13.44 0.4 0.0075 5.38 0.1008

AM02 Verde 12,542.49 0.4 0.0075 5,016.99 94.0687

AM04 Verde 21.12 0.4 0.0075 8.45 0.1584

AM04 Verde 16,105.56 0.4 0.0075 6,442.22 120.7917

FB04 Edifici 1,610.88 1 0.0025 1,610.88 4.0272

FB04 Edifici 424.83 1 0.0025 424.83 1.0621

FB04 Edifici 384.42 1 0.0025 384.42 0.9611

FB04 Verde 958.40 0.4 0.0075 383.36 7.1880

FB04 Verde 8.26 0.4 0.0075 3.31 0.0620

FB04 Verde 3.25 0.4 0.0075 1.30 0.0244

FB04 Edifici 1,198.85 1 0.0025 1,198.85 2.9971

FB04 Edifici 0.08 1 0.0025 0.08 0.0002

FB04 Strade 5.30 1 0.0025 5.30 0.0133

FB04 Verde 8,091.14 0.4 0.0075 3,236.46 60.6836

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

FB04 Strade 2,763.65 1 0.0025 2,763.65 6.9091

FB04 Strade 17.13 1 0.0025 17.13 0.0428

FB01 Edifici 335.45 1 0.0025 335.45 0.8386

FB01 Edifici 113.40 1 0.0025 113.40 0.2835

FB01 Edifici 902.21 1 0.0025 902.21 2.2555

FB01 Edifici 68.07 1 0.0025 68.07 0.1702

FB01 Edifici 1,000.42 1 0.0025 1,000.42 2.5011

FB01 Edifici 400.69 1 0.0025 400.69 1.0017

FB01 Edifici 307.80 1 0.0025 307.80 0.7695

FB01 Edifici 261.22 1 0.0025 261.22 0.6531

FB01 Edifici 94.31 1 0.0025 94.31 0.2358

FB01 Edifici 50.81 1 0.0025 50.81 0.1270

FB01 Edifici 154.75 1 0.0025 154.75 0.3869

FB01 Verde 31.94 0.4 0.0075 12.78 0.2396

FB01 Semipermeabile 793.16 0.6 0.005 475.89 3.9658

RELAZIONE IDROLOGICA IDRAULICA

Pag. 16

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

FB01 Verde 303.77 0.4 0.0075 121.51 2.2783

FB01 Verde 10,168.53 0.4 0.0075 4,067.41 76.2640

FB01 Verde 1,758.08 0.4 0.0075 703.23 13.1856

FB01 Strade 2,148.57 1 0.0025 2,148.57 5.3714

FB01 Verde 2,988.31 0.4 0.0075 1,195.32 22.4123

FB02 Edifici 1.06 1 0.0025 1.06 0.0027

FB02 Semipermeabile 101.06 0.6 0.005 60.64 0.5053

FB02 Marciapiede 102.23 1 0.0025 102.23 0.2556

FB02 Verde urbano 83.99 0.5 0.0075 41.99 0.6299

FB02 Edifici 367.52 1 0.0025 367.52 0.9188

FB02 Strade 396.71 1 0.0025 396.71 0.9918

FB02 Marciapiede 20.82 1 0.0025 20.82 0.0521

FB02 Verde urbano 95.79 0.5 0.0075 47.89 0.7184

FB02 Verde urbano 5.80 0.5 0.0075 2.90 0.0435

FB02 Strade 443.16 1 0.0025 443.16 1.1079

FB02 Marciapiede 356.73 1 0.0025 356.73 0.8918

FB02 Verde urbano 63.65 0.5 0.0075 31.83 0.4774

FB02 Strade 50.36 1 0.0025 50.36 0.1259

FB02 Verde 60.85 0.4 0.0075 24.34 0.4564

FB16 Verde urbano 532.73 0.5 0.0075 266.36 3.9954

FB16 Strade 2.38 1 0.0025 2.38 0.0059

FB16 Edifici 181.54 1 0.0025 181.54 0.4538

FB22 Edifici 1,584.81 1 0.0025 1,584.81 3.9620

FB22 Verde 1.53 0.4 0.0075 0.61 0.0115

FB22 Marciapiede 0.02 1 0.0025 0.02 0.0000

FB22 Verde urbano 0.08 0.5 0.0075 0.04 0.0006

FB22 Strade 45.61 1 0.0025 45.61 0.1140

FB22 Verde 332.88 0.4 0.0075 133.15 2.4966

FB22 Verde 170.07 0.4 0.0075 68.03 1.2755

FB22 Verde 42.07 0.4 0.0075 16.83 0.3155

FB22 Edifici 13.79 1 0.0025 13.79 0.0345

FB18 Edifici 615.26 1 0.0025 615.26 1.5382

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

FB18 Marciapiede 0.00 1 0.0025 0.00 0.0000

FB18 Verde urbano 7.38 0.5 0.0075 3.69 0.0553

FB18 Strade 52.71 1 0.0025 52.71 0.1318

FB18 Verde 715.19 0.4 0.0075 286.08 5.3639

AM08 Edifici 280.60 1 0.0025 280.60 0.7015

AM08 Edifici 186.58 1 0.0025 186.58 0.4665

AM08 Edifici 43.15 1 0.0025 43.15 0.1079

AM08 Edifici 657.06 1 0.0025 657.06 1.6427

AM08 Edifici 15.11 1 0.0025 15.11 0.0378

AM08 Marciapiede 1.64 1 0.0025 1.64 0.0041

AM08 Marciapiede 5.88 1 0.0025 5.88 0.0147

AM08 Verde 31.00 0.4 0.0075 12.40 0.2325

AM08 Verde 49,834.94 0.4 0.0075 19,933.97 373.7620

AM08 Strade 0.00 1 0.0025 0.00 0.0000

AM08 Strade 15.38 1 0.0025 15.38 0.0384

FB21 Edifici 291.61 1 0.0025 291.61 0.7290

FB21 Edifici 496.69 1 0.0025 496.69 1.2417

FB21 Edifici 34.25 1 0.0025 34.25 0.0856

FB21 Edifici 12.59 1 0.0025 12.59 0.0315

FB21 Verde urbano 29.87 0.5 0.0075 14.94 0.2241

FB21 Marciapiede 1.03 1 0.0025 1.03 0.0026

FB21 Verde 79.30 0.4 0.0075 31.72 0.5948

FB21 Verde urbano 178.73 0.5 0.0075 89.36 1.3404

FB21 Verde urbano 15.22 0.5 0.0075 7.61 0.1141

FB21 Verde urbano 56.29 0.5 0.0075 28.15 0.4222

FB21 Edifici 866.40 1 0.0025 866.40 2.1660

FB21 Marciapiede 28.60 1 0.0025 28.60 0.0715

FB21 Strade 225.50 1 0.0025 225.50 0.5637

FB21 Strade 240.94 1 0.0025 240.94 0.6024

FB21 Marciapiede 2.25 1 0.0025 2.25 0.0056

FB21 Marciapiede 103.54 1 0.0025 103.54 0.2589

FB21 Verde urbano 140.95 0.5 0.0075 70.48 1.0571

RELAZIONE IDROLOGICA IDRAULICA

Pag. 17

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

FB21 Marciapiede 88.08 1 0.0025 88.08 0.2202

FB21 Strade 367.03 1 0.0025 367.03 0.9176

FB21 Strade 530.56 1 0.0025 530.56 1.3264

FB21 Verde 506.91 0.4 0.0075 202.76 3.8018

FB21 Verde 7.62 0.4 0.0075 3.05 0.0572

FB06 Semipermeabile 111.89 0.6 0.005 67.13 0.5594

FB06 Edifici 111.30 1 0.0025 111.30 0.2782

FB06 Edifici 27.81 1 0.0025 27.81 0.0695

FB06 Edifici 99.01 1 0.0025 99.01 0.2475

FB06 Edifici 111.29 1 0.0025 111.29 0.2782

FB06 Edifici 111.30 1 0.0025 111.30 0.2782

FB06 Verde urbano 2.39 0.5 0.0075 1.19 0.0179

FB06 Marciapiede 13.17 1 0.0025 13.17 0.0329

FB06 Marciapiede 12.68 1 0.0025 12.68 0.0317

FB06 Marciapiede 15.08 1 0.0025 15.08 0.0377

FB06 Edifici 18.24 1 0.0025 18.24 0.0456

FB06 Edifici 18.24 1 0.0025 18.24 0.0456

FB06 Edifici 20.52 1 0.0025 20.52 0.0513

FB06 Semipermeabile 52.30 0.6 0.005 31.38 0.2615

FB06 Marciapiede 4.12 1 0.0025 4.12 0.0103

FB06 Marciapiede 84.12 1 0.0025 84.12 0.2103

FB06 Marciapiede 25.26 1 0.0025 25.26 0.0632

FB06 Verde urbano 124.99 0.5 0.0075 62.50 0.9374

FB06 Verde urbano 0.58 0.5 0.0075 0.29 0.0044

FB06 Verde urbano 1.16 0.5 0.0075 0.58 0.0087

FB06 Verde urbano 1,179.26 0.5 0.0075 589.63 8.8445

FB06 Verde 2.23 0.4 0.0075 0.89 0.0167

FB06 Strade 295.64 1 0.0025 295.64 0.7391

FB06 Semipermeabile 0.38 0.6 0.005 0.23 0.0019

FB05 Marciapiede 20.34 1 0.0025 20.34 0.0508

FB05 Marciapiede 0.22 1 0.0025 0.22 0.0006

FB05 Verde urbano 5.09 0.5 0.0075 2.54 0.0381

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

FB05 Marciapiede 159.49 1 0.0025 159.49 0.3987

FB05 Verde urbano 107.10 0.5 0.0075 53.55 0.8033

FB05 Strade 93.44 1 0.0025 93.44 0.2336

FB05 Verde 123.46 0.4 0.0075 49.38 0.9260

FB05 Strade 850.06 1 0.0025 850.06 2.1251

FB07 Verde urbano 0.84 0.5 0.0075 0.42 0.0063

FB07 Verde 188.93 0.4 0.0075 75.57 1.4170

FB07 Strade 628.31 1 0.0025 628.31 1.5708

FB09 Marciapiede 17.65 1 0.0025 17.65 0.0441

FB09 Verde 91.26 0.4 0.0075 36.50 0.6844

FB09 Strade 240.28 1 0.0025 240.28 0.6007

AM06 Marciapiede 29.89 1 0.0025 29.89 0.0747

AM06 Marciapiede 53.60 1 0.0025 53.60 0.1340

AM06 Verde 201.93 0.4 0.0075 80.77 1.5145

AM06 Verde urbano 66.59 0.5 0.0075 33.29 0.4994

AM06 Verde 145.61 0.4 0.0075 58.24 1.0920

AM06 Strade 163.32 1 0.0025 163.32 0.4083

AM03 Verde 282.53 0.4 0.0075 113.01 2.1190

AM03 Edifici 150.40 1 0.0025 150.40 0.3760

AM03 Verde 299.48 0.4 0.0075 119.79 2.2461

AM01 Verde 12.10 0.4 0.0075 4.84 0.0908

AM01 Verde 297.92 0.4 0.0075 119.17 2.2344

FB11 Verde 48.58 0.4 0.0075 19.43 0.3643

FB11 Marciapiede 21.30 1 0.0025 21.30 0.0533

FB11 Verde 259.78 0.4 0.0075 103.91 1.9483

FB11 Marciapiede 32.32 1 0.0025 32.32 0.0808

FB11 Verde urbano 18.46 0.5 0.0075 9.23 0.1385

FB11 Marciapiede 82.20 1 0.0025 82.20 0.2055

FB11 Verde urbano 177.53 0.5 0.0075 88.77 1.3315

FB11 Edifici 1,480.91 1 0.0025 1,480.91 3.7023

FB11 Strade 1,035.31 1 0.0025 1,035.31 2.5883

FB11 Strade 166.97 1 0.0025 166.97 0.4174

RELAZIONE IDROLOGICA IDRAULICA

Pag. 18

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

FB11 Verde 105.68 0.4 0.0075 42.27 0.7926

FB11 Strade 863.84 1 0.0025 863.84 2.1596

FB15 Verde urbano 16.21 0.5 0.0075 8.11 0.1216

FB15 Edifici 1.97 1 0.0025 1.97 0.0049

FB15 Verde urbano 52.68 0.5 0.0075 26.34 0.3951

FB15 Marciapiede 15.86 1 0.0025 15.86 0.0397

FB15 Marciapiede 58.81 1 0.0025 58.81 0.1470

FB15 Marciapiede 140.33 1 0.0025 140.33 0.3508

FB15 Verde urbano 29.75 0.5 0.0075 14.88 0.2231

FB15 Verde urbano 30.24 0.5 0.0075 15.12 0.2268

FB15 Strade 149.48 1 0.0025 149.48 0.3737

FB15 Verde 0.96 0.4 0.0075 0.38 0.0072

FB17 Verde urbano 3.52 0.5 0.0075 1.76 0.0264

FB17 Strade 134.56 1 0.0025 134.56 0.3364

FB10 Marciapiede 1.96 1 0.0025 1.96 0.0049

FB10 Marciapiede 3.90 1 0.0025 3.90 0.0097

FB10 Marciapiede 2.08 1 0.0025 2.08 0.0052

FB10 Marciapiede 3.24 1 0.0025 3.24 0.0081

FB10 Marciapiede 3.29 1 0.0025 3.29 0.0082

FB10 Marciapiede 3.44 1 0.0025 3.44 0.0086

FB10 Marciapiede 212.45 1 0.0025 212.45 0.5311

FB10 Verde urbano 6.96 0.5 0.0075 3.48 0.0522

FB10 Verde 112.52 0.4 0.0075 45.01 0.8439

FB10 Verde 160.16 0.4 0.0075 64.06 1.2012

FB10 Strade 1.06 1 0.0025 1.06 0.0026

FB10 Strade 1,550.14 1 0.0025 1,550.14 3.8753

AM12 Semipermeabile 166.27 0.6 0.005 99.76 0.8314

AM12 Semipermeabile 161.72 0.6 0.005 97.03 0.8086

AM12 Verde urbano 598.71 0.5 0.0075 299.36 4.4903

AM12 Marciapiede 43.99 1 0.0025 43.99 0.1100

AM12 Verde 6.01 0.4 0.0075 2.41 0.0451

AM12 Strade 419.50 1 0.0025 419.50 1.0487

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

AM12 Strade 83.86 1 0.0025 83.86 0.2097

AM05 Verde 74.00 0.4 0.0075 29.60 0.5550

AM05 Verde 173.77 0.4 0.0075 69.51 1.3033

AM10 Marciapiede 10.90 1 0.0025 10.90 0.0273

AM10 Marciapiede 26.14 1 0.0025 26.14 0.0653

AM10 Verde 4.72 0.4 0.0075 1.89 0.0354

AM10 Verde urbano 85.41 0.5 0.0075 42.71 0.6406

AM10 Edifici 20.50 1 0.0025 20.50 0.0513

AM10 Strade 220.78 1 0.0025 220.78 0.5519

AM07 Verde 51.87 0.4 0.0075 20.75 0.3890

AM07 Verde 22,229.99 0.4 0.0075 8,892.00 166.7249

FB24 Semipermeabile 17.81 0.6 0.005 10.68 0.0890

FB24 Verde 4.17 0.4 0.0075 1.67 0.0313

FB24 Semipermeabile 1.96 0.6 0.005 1.17 0.0098

FB24 Verde 0.04 0.4 0.0075 0.02 0.0003

FB24 Strade 153.35 1 0.0025 153.35 0.3834

FB24 Strade 617.43 1 0.0025 617.43 1.5436

FB24 Verde urbano 1.53 0.5 0.0075 0.77 0.0115

FB24 Verde urbano 61.27 0.5 0.0075 30.63 0.4595

FB24 Verde urbano 19.36 0.5 0.0075 9.68 0.1452

FB24 Semipermeabile 175.00 0.6 0.005 105.00 0.8750

FB24 Edifici 701.87 1 0.0025 701.87 1.7547

FB24 Edifici 223.07 1 0.0025 223.07 0.5577

FB24 Verde urbano 205.20 0.5 0.0075 102.60 1.5390

FB24 Verde 51.86 0.4 0.0075 20.74 0.3889

FB24 Verde urbano 50.24 0.5 0.0075 25.12 0.3768

FB24 Marciapiede 835.40 1 0.0025 835.40 2.0885

FB24 Strade 878.41 1 0.0025 878.41 2.1960

FB24 Strade 0.88 1 0.0025 0.88 0.0022

FB24 Strade 260.95 1 0.0025 260.95 0.6524

FB24 Verde 474.47 0.4 0.0075 189.79 3.5585

FB24 Strade 584.89 1 0.0025 584.89 1.4622

RELAZIONE IDROLOGICA IDRAULICA

Pag. 19

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

FB12 Edifici 21.25 1 0.0025 21.25 0.0531

FB12 Verde 74.27 0.4 0.0075 29.71 0.5570

FB12 Verde urbano 18.78 0.5 0.0075 9.39 0.1408

FB12 Marciapiede 61.36 1 0.0025 61.36 0.1534

FB12 Strade 2.97 1 0.0025 2.97 0.0074

FB12 Strade 159.59 1 0.0025 159.59 0.3990

FB12 Strade 280.53 1 0.0025 280.53 0.7013

FB25 Strade 107.56 1 0.0025 107.56 0.2689

FB25 Marciapiede 101.89 1 0.0025 101.89 0.2547

FB25 Marciapiede 49.11 1 0.0025 49.11 0.1228

FB25 Verde urbano 99.10 0.5 0.0075 49.55 0.7432

FB25 Edifici 276.13 1 0.0025 276.13 0.6903

FB25 Edifici 277.79 1 0.0025 277.79 0.6945

FB25 Verde urbano 255.95 0.5 0.0075 127.97 1.9196

FB25 Marciapiede 80.29 1 0.0025 80.29 0.2007

FB25 Semipermeabile 4.72 0.6 0.005 2.83 0.0236

FB25 Verde urbano 0.42 0.5 0.0075 0.21 0.0031

FB25 Marciapiede 5.53 1 0.0025 5.53 0.0138

FB25 Verde 241.10 0.4 0.0075 96.44 1.8082

FB25 Semipermeabile 541.98 0.6 0.005 325.19 2.7099

FB25 Marciapiede 703.93 1 0.0025 703.93 1.7598

FB25 Edifici 1,243.54 1 0.0025 1,243.54 3.1089

FB25 Marciapiede 733.52 1 0.0025 733.52 1.8338

FB25 Strade 1,796.90 1 0.0025 1,796.90 4.4923

FB25 Verde 39.35 0.4 0.0075 15.74 0.2951

FB25 Strade 13.91 1 0.0025 13.91 0.0348

AM09 Marciapiede 0.63 1 0.0025 0.63 0.0016

AM09 Verde 220.46 0.4 0.0075 88.18 1.6535

AM09 Verde 2,577.61 0.4 0.0075 1,031.04 19.3321

AM09 Verde 2,446.12 0.4 0.0075 978.45 18.3459

AM09 Verde urbano 70.73 0.5 0.0075 35.36 0.5305

AM09 Verde 3,880.59 0.4 0.0075 1,552.24 29.1044

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

AM09 Verde urbano 9.29 0.5 0.0075 4.64 0.0697

AM09 Strade 0.50 1 0.0025 0.50 0.0013

AM09 Verde 1,002.44 0.4 0.0075 400.98 7.5183

AM09 Strade 0.00 1 0.0025 0.00 0.0000

AM09 Strade 22.42 1 0.0025 22.42 0.0560

AM09 Edifici 29.92 1 0.0025 29.92 0.0748

FB08 Edifici 2.68 1 0.0025 2.68 0.0067

FB08 Verde urbano 15.11 0.5 0.0075 7.56 0.1134

FB08 Verde urbano 11.73 0.5 0.0075 5.86 0.0880

FB08 Verde urbano 14.75 0.5 0.0075 7.37 0.1106

FB08 Verde urbano 12.10 0.5 0.0075 6.05 0.0907

FB08 Marciapiede 149.90 1 0.0025 149.90 0.3747

FB08 Edifici 91.49 1 0.0025 91.49 0.2287

FB08 Edifici 8.26 1 0.0025 8.26 0.0206

FB08 Edifici 91.49 1 0.0025 91.49 0.2287

FB08 Edifici 8.29 1 0.0025 8.29 0.0207

FB08 Edifici 8.31 1 0.0025 8.31 0.0208

FB08 Edifici 91.49 1 0.0025 91.49 0.2287

FB08 Edifici 91.48 1 0.0025 91.48 0.2287

FB08 Semipermeabile 77.54 0.6 0.005 46.52 0.3877

FB08 Verde urbano 6.62 0.5 0.0075 3.31 0.0497

FB08 Verde urbano 6.52 0.5 0.0075 3.26 0.0489

FB08 Edifici 8.31 1 0.0025 8.31 0.0208

FB08 Marciapiede 3.40 1 0.0025 3.40 0.0085

FB08 Edifici 8.29 1 0.0025 8.29 0.0207

FB08 Verde 13.80 0.4 0.0075 5.52 0.1035

FB08 Verde 3.38 0.4 0.0075 1.35 0.0253

FB08 Verde 0.04 0.4 0.0075 0.01 0.0003

FB08 Marciapiede 122.88 1 0.0025 122.88 0.3072

FB08 Marciapiede 121.62 1 0.0025 121.62 0.3041

FB08 Edifici 91.42 1 0.0025 91.42 0.2286

FB08 Edifici 76.67 1 0.0025 76.67 0.1917

RELAZIONE IDROLOGICA IDRAULICA

Pag. 20

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

FB08 Marciapiede 100.88 1 0.0025 100.88 0.2522

FB08 Semipermeabile 242.88 0.6 0.005 145.73 1.2144

FB08 Marciapiede 11.75 1 0.0025 11.75 0.0294

FB08 Edifici 8.29 1 0.0025 8.29 0.0207

FB08 Verde urbano 85.45 0.5 0.0075 42.73 0.6409

FB08 Verde urbano 1,340.38 0.5 0.0075 670.19 10.0529

FB08 Verde urbano 220.55 0.5 0.0075 110.27 1.6541

FB08 Verde 7.08 0.4 0.0075 2.83 0.0531

FB08 Verde 1.06 0.4 0.0075 0.42 0.0079

FB08 Strade 609.05 1 0.0025 609.05 1.5226

FB20 Verde urbano 44.60 0.5 0.0075 22.30 0.3345

FB20 Semipermeabile 25.00 0.6 0.005 15.00 0.1250

FB20 Marciapiede 2.95 1 0.0025 2.95 0.0074

FB20 Marciapiede 19.14 1 0.0025 19.14 0.0478

FB20 Marciapiede 10.45 1 0.0025 10.45 0.0261

FB20 Marciapiede 152.22 1 0.0025 152.22 0.3806

FB20 Verde urbano 120.40 0.5 0.0075 60.20 0.9030

FB20 Semipermeabile 92.15 0.6 0.005 55.29 0.4607

FB20 Marciapiede 16.34 1 0.0025 16.34 0.0409

FB20 Marciapiede 16.34 1 0.0025 16.34 0.0409

FB20 Marciapiede 2.95 1 0.0025 2.95 0.0074

FB20 Marciapiede 2.95 1 0.0025 2.95 0.0074

FB20 Marciapiede 2.95 1 0.0025 2.95 0.0074

FB20 Marciapiede 2.95 1 0.0025 2.95 0.0074

FB20 Verde urbano 13.44 0.5 0.0075 6.72 0.1008

FB20 Verde urbano 13.34 0.5 0.0075 6.67 0.1000

FB20 Verde urbano 18.89 0.5 0.0075 9.44 0.1416

FB20 Verde urbano 13.51 0.5 0.0075 6.76 0.1014

FB20 Verde urbano 13.51 0.5 0.0075 6.76 0.1014

FB20 Verde urbano 13.51 0.5 0.0075 6.76 0.1014

FB20 Marciapiede 6.48 1 0.0025 6.48 0.0162

FB20 Marciapiede 10.48 1 0.0025 10.48 0.0262

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

FB20 Marciapiede 10.45 1 0.0025 10.45 0.0261

FB20 Marciapiede 10.45 1 0.0025 10.45 0.0261

FB20 Marciapiede 2.95 1 0.0025 2.95 0.0074

FB20 Verde urbano 3.54 0.5 0.0075 1.77 0.0266

FB20 Edifici 252.59 1 0.0025 252.59 0.6315

FB20 Verde urbano 183.82 0.5 0.0075 91.91 1.3787

FB20 Verde urbano 95.84 0.5 0.0075 47.92 0.7188

FB20 Verde urbano 304.23 0.5 0.0075 152.12 2.2818

FB20 Marciapiede 15.84 1 0.0025 15.84 0.0396

FB20 Semipermeabile 55.67 0.6 0.005 33.40 0.2783

FB20 Verde urbano 32.98 0.5 0.0075 16.49 0.2473

FB20 Edifici 378.36 1 0.0025 378.36 0.9459

FB20 Semipermeabile 88.81 0.6 0.005 53.29 0.4441

FB20 Strade 873.25 1 0.0025 873.25 2.1831

FB20 Strade 0.02 1 0.0025 0.02 0.0001

FB20 Verde 242.69 0.4 0.0075 97.07 1.8202

FB03 Semipermeabile 6.49 0.6 0.005 3.89 0.0324

FB03 Marciapiede 66.88 1 0.0025 66.88 0.1672

FB03 Verde urbano 3.70 0.5 0.0075 1.85 0.0277

FB03 Marciapiede 0.15 1 0.0025 0.15 0.0004

FB03 Verde urbano 8.52 0.5 0.0075 4.26 0.0639

FB03 Marciapiede 29.24 1 0.0025 29.24 0.0731

FB03 Strade 68.96 1 0.0025 68.96 0.1724

FB03 Verde 1,615.77 0.4 0.0075 646.31 12.1182

FB03 Strade 593.54 1 0.0025 593.54 1.4838

FB03 Strade 4.76 1 0.0025 4.76 0.0119

FB14 Marciapiede 1.97 1 0.0025 1.97 0.0049

FB14 Marciapiede 9.89 1 0.0025 9.89 0.0247

FB14 Verde urbano 69.78 0.5 0.0075 34.89 0.5234

FB14 Edifici 84.00 1 0.0025 84.00 0.2100

FB14 Edifici 84.00 1 0.0025 84.00 0.2100

FB14 Edifici 84.00 1 0.0025 84.00 0.2100

RELAZIONE IDROLOGICA IDRAULICA

Pag. 21

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

FB14 Marciapiede 50.85 1 0.0025 50.85 0.1271

FB14 Edifici 6.46 1 0.0025 6.46 0.0162

FB14 Edifici 7.75 1 0.0025 7.75 0.0194

FB14 Edifici 81.00 1 0.0025 81.00 0.2025

FB14 Edifici 6.46 1 0.0025 6.46 0.0162

FB14 Edifici 7.75 1 0.0025 7.75 0.0194

FB14 Edifici 6.46 1 0.0025 6.46 0.0162

FB14 Edifici 7.75 1 0.0025 7.75 0.0194

FB14 Edifici 81.00 1 0.0025 81.00 0.2025

FB14 Edifici 81.00 1 0.0025 81.00 0.2025

FB14 Edifici 81.00 1 0.0025 81.00 0.2025

FB14 Edifici 81.00 1 0.0025 81.00 0.2025

FB14 Edifici 81.00 1 0.0025 81.00 0.2025

FB14 Marciapiede 8.24 1 0.0025 8.24 0.0206

FB14 Marciapiede 8.24 1 0.0025 8.24 0.0206

FB14 Marciapiede 8.24 1 0.0025 8.24 0.0206

FB14 Marciapiede 9.89 1 0.0025 9.89 0.0247

FB14 Marciapiede 9.89 1 0.0025 9.89 0.0247

FB14 Marciapiede 15.03 1 0.0025 15.03 0.0376

FB14 Marciapiede 15.08 1 0.0025 15.08 0.0377

FB14 Marciapiede 14.90 1 0.0025 14.90 0.0372

FB14 Marciapiede 15.02 1 0.0025 15.02 0.0376

FB14 Marciapiede 15.24 1 0.0025 15.24 0.0381

FB14 Marciapiede 15.09 1 0.0025 15.09 0.0377

FB14 Verde urbano 2,287.17 0.5 0.0075 1,143.59 17.1538

FB14 Strade 2.29 1 0.0025 2.29 0.0057

Ramo TIPO AREA [mq] Phip Vp [m] A*Phip A*Vp [m]

FB14 Verde 60.77 0.4 0.0075 24.31 0.4558

FB13 Marciapiede 17.06 1 0.0025 17.06 0.0427

FB13 Marciapiede 2.69 1 0.0025 2.69 0.0067

FB13 Marciapiede 0.01 1 0.0025 0.01 0.0000

FB13 Edifici 0.01 1 0.0025 0.01 0.0000

FB13 Marciapiede 16.06 1 0.0025 16.06 0.0402

FB13 Marciapiede 17.16 1 0.0025 17.16 0.0429

FB13 Marciapiede 71.97 1 0.0025 71.97 0.1799

FB13 Marciapiede 63.35 1 0.0025 63.35 0.1584

FB13 Verde urbano 3.41 0.5 0.0075 1.71 0.0256

FB13 Marciapiede 15.11 1 0.0025 15.11 0.0378

FB13 Verde urbano 23.26 0.5 0.0075 11.63 0.1745

FB13 Verde urbano 52.53 0.5 0.0075 26.27 0.3940

FB13 Verde urbano 88.64 0.5 0.0075 44.32 0.6648

FB13 Strade 175.35 1 0.0025 175.35 0.4384

FB13 Strade 7.46 1 0.0025 7.46 0.0187

FB20 Marciapiede 202.19 1 0.0025 202.19 0.5055

FB20 Semipermeabile 94.91 0.6 0.005 56.94 0.4745

FB_24 Edifici 541.82 1 0.0025 541.82 1.3545

FB24 Marciapiede 254.10 1 0.0025 254.10 0.6353

FB25 Marciapiede 225.61 1 0.0025 225.61 0.5640

FB25 Edifici 544.14 1 0.0025 544.14 1.3603

RELAZIONE IDROLOGICA IDRAULICA

Pag. 22

LEGENDA

TABELLE 5 e 6 VERIFICA RAMI

Ramo Codice ramo Ramo_m1 Codice ramo di monte n.1 Ramo_m2 Codice ramo di monte n.2 Ramo_m3 Codice ramo di monte n.3 A [mm/h-n] Paramentro a lspp >1h N Paramentro n lspp >1h A' [mm/h-n] Paramentro a lspp <1h N' Paramentro n lspp <1h Area [mq] Area afferente al ramo Phip Coefficiente di afflusso Vp [m] Volume piccoli invasi Vr [mc] Volume invasato nel ramo AreaT [mq] Totale area afferente PhipT Coefficiente di afflusso area afferente ViT[m] Volume di invaso specifico area afferente up [l/sha] Coefficiente udometrico Q [mc/s] Portata idrologica del ramo L [m] Lunghezza del ramo phi/H Angolo sotteso/altezza d'acqua H [m] Altezza d'acqua Gr Grado di riempimento Ks [m1/3/s] Scabrezza di GS D/A [m] Diametro/altezza B[m] Larghezza base I [m/m] Pendenza sponde N_tubi Numero condotte P Pendenza ramo A [mq] Area bagnata B [m] Perimetro bagnato

R [m] Raggio idraulico b[m] Larghezza pelo libero V [m/s] Velocità Q'[mc/s] Portata idraulica del ramo

TABELLA 7 DATI RAMI Ramo Codice ramo L [m] Lunghezza del ramo P Pendenza ramo Tipo tubo Tipo tubo DN [m] Diametro nominale Ramo_m1 Codice ramo di monte n.1 Ramo_m2 Codice ramo di monte n.2 Phip Coefficiente di afflusso Vp [m] Volume piccoli invasi D/A [m] Diametro/altezza B[m] Larghezza base I [m/m] Pendenza sponde Ks [m1/3/s] Scabrezza di GS phi/H verificato Angolo sotteso/altezza d'acqua verificato

TABELLA 8 DATI AREE Ramo Codice ramo Tipo Tipo di uso del suolo Area [mq] Area Phip Coefficiente di afflusso Vp [m] Volume piccoli invasi

RELAZIONE IDROLOGICA IDRAULICA

Pag. 23

6 APPENDICE B Verifica dell’invarianza idraulica

Tabella 9 - Verifica invarianza idraulica

Ramo A [mm/h-n] N A' [mm/h-n] N' Area [mq] Phip Vp [m] Vr [mc] AreaT [mq] PhipT AreaT*PhiT ViT[m] AreaT*ViT up [l/sha] Attuale 52.71 0.274 52.71 0.346 203˙808 0.503 0.0066 767.727 203˙818 0.503 102˙550 0.0104 2˙114.59 117.09 Progetto 52.71 0.274 52.71 0.346 203˙808 0.551 0.0063 1158.934 203˙808 0.551 112˙303 0.0120 2˙436.68 116.48

Tabella 10 – Dati aree

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Verde 13.44 0.4 0.0075 5.38 0.1008 Progetto Verde 12˙542.49 0.4 0.0075 5˙016.99 94.0687 Progetto Verde 21.12 0.4 0.0075 8.45 0.1584 Progetto Verde 16˙105.56 0.4 0.0075 6˙442.22 120.7917 Progetto Edifici 1˙610.88 1 0.0025 1˙610.88 4.0272 Progetto Edifici 424.83 1 0.0025 424.83 1.0621 Progetto Edifici 384.42 1 0.0025 384.42 0.9611 Progetto Verde 958.40 0.4 0.0075 383.36 7.1880 Progetto Verde 8.26 0.4 0.0075 3.31 0.0620 Progetto Verde 3.25 0.4 0.0075 1.30 0.0244 Progetto Edifici 1˙198.85 1 0.0025 1˙198.85 2.9971 Progetto Edifici 0.08 1 0.0025 0.08 0.0002 Progetto Strade 5.30 1 0.0025 5.30 0.0133 Progetto Verde 8˙091.14 0.4 0.0075 3˙236.46 60.6836 Progetto Strade 2˙763.65 1 0.0025 2˙763.65 6.9091 Progetto Strade 17.13 1 0.0025 17.13 0.0428 Progetto Edifici 335.45 1 0.0025 335.45 0.8386 Progetto Edifici 113.40 1 0.0025 113.40 0.2835 Progetto Edifici 902.21 1 0.0025 902.21 2.2555 Progetto Edifici 68.07 1 0.0025 68.07 0.1702

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Edifici 1˙000.42 1 0.0025 1˙000.42 2.5011 Progetto Edifici 400.69 1 0.0025 400.69 1.0017 Progetto Edifici 307.80 1 0.0025 307.80 0.7695 Progetto Edifici 261.22 1 0.0025 261.22 0.6531 Progetto Edifici 94.31 1 0.0025 94.31 0.2358 Progetto Edifici 50.81 1 0.0025 50.81 0.1270 Progetto Edifici 154.75 1 0.0025 154.75 0.3869 Progetto Verde 31.94 0.4 0.0075 12.78 0.2396 Progetto Semipermeabile 793.16 0.6 0.005 475.89 3.9658 Progetto Verde 303.77 0.4 0.0075 121.51 2.2783 Progetto Verde 10˙168.53 0.4 0.0075 4˙067.41 76.2640 Progetto Verde 1˙758.08 0.4 0.0075 703.23 13.1856 Progetto Strade 2˙148.57 1 0.0025 2˙148.57 5.3714 Progetto Verde 2˙988.31 0.4 0.0075 1˙195.32 22.4123 Progetto Edifici 1.06 1 0.0025 1.06 0.0027 Progetto Semipermeabile 101.06 0.6 0.005 60.64 0.5053 Progetto Marciapiede 102.23 1 0.0025 102.23 0.2556 Progetto Verde urbano 83.99 0.5 0.0075 41.99 0.6299 Progetto Edifici 367.52 1 0.0025 367.52 0.9188 Progetto Strade 396.71 1 0.0025 396.71 0.9918

RELAZIONE IDROLOGICA IDRAULICA

Pag. 24

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Marciapiede 20.82 1 0.0025 20.82 0.0521 Progetto Verde urbano 95.79 0.5 0.0075 47.89 0.7184 Progetto Verde urbano 5.80 0.5 0.0075 2.90 0.0435 Progetto Strade 443.16 1 0.0025 443.16 1.1079 Progetto Marciapiede 356.73 1 0.0025 356.73 0.8918 Progetto Verde urbano 63.65 0.5 0.0075 31.83 0.4774 Progetto Strade 50.36 1 0.0025 50.36 0.1259 Progetto Verde 60.85 0.4 0.0075 24.34 0.4564 Progetto Verde urbano 532.73 0.5 0.0075 266.36 3.9954 Progetto Strade 2.38 1 0.0025 2.38 0.0059 Progetto Edifici 181.54 1 0.0025 181.54 0.4538 Progetto Edifici 1˙584.81 1 0.0025 1˙584.81 3.9620 Progetto Verde 1.53 0.4 0.0075 0.61 0.0115 Progetto Marciapiede 0.02 1 0.0025 0.02 0.0000 Progetto Verde urbano 0.08 0.5 0.0075 0.04 0.0006 Progetto Strade 45.61 1 0.0025 45.61 0.1140 Progetto Verde 332.88 0.4 0.0075 133.15 2.4966 Progetto Verde 170.07 0.4 0.0075 68.03 1.2755 Progetto Verde 42.07 0.4 0.0075 16.83 0.3155 Progetto Edifici 13.79 1 0.0025 13.79 0.0345 Progetto Edifici 615.26 1 0.0025 615.26 1.5382 Progetto Marciapiede 0.00 1 0.0025 0.00 0.0000 Progetto Verde urbano 7.38 0.5 0.0075 3.69 0.0553 Progetto Strade 52.71 1 0.0025 52.71 0.1318 Progetto Verde 715.19 0.4 0.0075 286.08 5.3639 Progetto Edifici 280.60 1 0.0025 280.60 0.7015 Progetto Edifici 186.58 1 0.0025 186.58 0.4665 Progetto Edifici 43.15 1 0.0025 43.15 0.1079 Progetto Edifici 657.06 1 0.0025 657.06 1.6427 Progetto Edifici 15.11 1 0.0025 15.11 0.0378 Progetto Marciapiede 1.64 1 0.0025 1.64 0.0041 Progetto Marciapiede 5.88 1 0.0025 5.88 0.0147

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Verde 31.00 0.4 0.0075 12.40 0.2325 Progetto Verde 49˙834.94 0.4 0.0075 19˙933.97 373.7620 Progetto Strade 0.00 1 0.0025 0.00 0.0000 Progetto Strade 15.38 1 0.0025 15.38 0.0384 Progetto Edifici 291.61 1 0.0025 291.61 0.7290 Progetto Edifici 496.69 1 0.0025 496.69 1.2417 Progetto Edifici 34.25 1 0.0025 34.25 0.0856 Progetto Edifici 12.59 1 0.0025 12.59 0.0315 Progetto Verde urbano 29.87 0.5 0.0075 14.94 0.2241 Progetto Marciapiede 1.03 1 0.0025 1.03 0.0026 Progetto Verde 79.30 0.4 0.0075 31.72 0.5948 Progetto Verde urbano 178.73 0.5 0.0075 89.36 1.3404 Progetto Verde urbano 15.22 0.5 0.0075 7.61 0.1141 Progetto Verde urbano 56.29 0.5 0.0075 28.15 0.4222 Progetto Edifici 866.40 1 0.0025 866.40 2.1660 Progetto Marciapiede 28.60 1 0.0025 28.60 0.0715 Progetto Strade 225.50 1 0.0025 225.50 0.5637 Progetto Strade 240.94 1 0.0025 240.94 0.6024 Progetto Marciapiede 2.25 1 0.0025 2.25 0.0056 Progetto Marciapiede 103.54 1 0.0025 103.54 0.2589 Progetto Verde urbano 140.95 0.5 0.0075 70.48 1.0571 Progetto Marciapiede 88.08 1 0.0025 88.08 0.2202 Progetto Strade 367.03 1 0.0025 367.03 0.9176 Progetto Strade 530.56 1 0.0025 530.56 1.3264 Progetto Verde 506.91 0.4 0.0075 202.76 3.8018 Progetto Verde 7.62 0.4 0.0075 3.05 0.0572 Progetto Semipermeabile 111.89 0.6 0.005 67.13 0.5594 Progetto Edifici 111.30 1 0.0025 111.30 0.2782 Progetto Edifici 27.81 1 0.0025 27.81 0.0695 Progetto Edifici 99.01 1 0.0025 99.01 0.2475 Progetto Edifici 111.29 1 0.0025 111.29 0.2782 Progetto Edifici 111.30 1 0.0025 111.30 0.2782

RELAZIONE IDROLOGICA IDRAULICA

Pag. 25

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Verde urbano 2.39 0.5 0.0075 1.19 0.0179 Progetto Marciapiede 13.17 1 0.0025 13.17 0.0329 Progetto Marciapiede 12.68 1 0.0025 12.68 0.0317 Progetto Marciapiede 15.08 1 0.0025 15.08 0.0377 Progetto Edifici 18.24 1 0.0025 18.24 0.0456 Progetto Edifici 18.24 1 0.0025 18.24 0.0456 Progetto Edifici 20.52 1 0.0025 20.52 0.0513 Progetto Semipermeabile 52.30 0.6 0.005 31.38 0.2615 Progetto Marciapiede 4.12 1 0.0025 4.12 0.0103 Progetto Marciapiede 84.12 1 0.0025 84.12 0.2103 Progetto Marciapiede 25.26 1 0.0025 25.26 0.0632 Progetto Verde urbano 124.99 0.5 0.0075 62.50 0.9374 Progetto Verde urbano 0.58 0.5 0.0075 0.29 0.0044 Progetto Verde urbano 1.16 0.5 0.0075 0.58 0.0087 Progetto Verde urbano 1˙179.26 0.5 0.0075 589.63 8.8445 Progetto Verde 2.23 0.4 0.0075 0.89 0.0167 Progetto Strade 295.64 1 0.0025 295.64 0.7391 Progetto Semipermeabile 0.38 0.6 0.005 0.23 0.0019 Progetto Marciapiede 20.34 1 0.0025 20.34 0.0508 Progetto Marciapiede 0.22 1 0.0025 0.22 0.0006 Progetto Verde urbano 5.09 0.5 0.0075 2.54 0.0381 Progetto Marciapiede 159.49 1 0.0025 159.49 0.3987 Progetto Verde urbano 107.10 0.5 0.0075 53.55 0.8033 Progetto Strade 93.44 1 0.0025 93.44 0.2336 Progetto Verde 123.46 0.4 0.0075 49.38 0.9260 Progetto Strade 850.06 1 0.0025 850.06 2.1251 Progetto Verde urbano 0.84 0.5 0.0075 0.42 0.0063 Progetto Verde 188.93 0.4 0.0075 75.57 1.4170 Progetto Strade 628.31 1 0.0025 628.31 1.5708 Progetto Marciapiede 17.65 1 0.0025 17.65 0.0441 Progetto Verde 91.26 0.4 0.0075 36.50 0.6844 Progetto Strade 240.28 1 0.0025 240.28 0.6007

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Marciapiede 29.89 1 0.0025 29.89 0.0747 Progetto Marciapiede 53.60 1 0.0025 53.60 0.1340 Progetto Verde 201.93 0.4 0.0075 80.77 1.5145 Progetto Verde urbano 66.59 0.5 0.0075 33.29 0.4994 Progetto Verde 145.61 0.4 0.0075 58.24 1.0920 Progetto Strade 163.32 1 0.0025 163.32 0.4083 Progetto Verde 282.53 0.4 0.0075 113.01 2.1190 Progetto Edifici 150.40 1 0.0025 150.40 0.3760 Progetto Verde 299.48 0.4 0.0075 119.79 2.2461 Progetto Verde 12.10 0.4 0.0075 4.84 0.0908 Progetto Verde 297.92 0.4 0.0075 119.17 2.2344 Progetto Verde 48.58 0.4 0.0075 19.43 0.3643 Progetto Marciapiede 21.30 1 0.0025 21.30 0.0533 Progetto Verde 259.78 0.4 0.0075 103.91 1.9483 Progetto Marciapiede 32.32 1 0.0025 32.32 0.0808 Progetto Verde urbano 18.46 0.5 0.0075 9.23 0.1385 Progetto Marciapiede 82.20 1 0.0025 82.20 0.2055 Progetto Verde urbano 177.53 0.5 0.0075 88.77 1.3315 Progetto Edifici 1˙480.91 1 0.0025 1˙480.91 3.7023 Progetto Strade 1˙035.31 1 0.0025 1˙035.31 2.5883 Progetto Strade 166.97 1 0.0025 166.97 0.4174 Progetto Verde 105.68 0.4 0.0075 42.27 0.7926 Progetto Strade 863.84 1 0.0025 863.84 2.1596 Progetto Verde urbano 16.21 0.5 0.0075 8.11 0.1216 Progetto Edifici 1.97 1 0.0025 1.97 0.0049 Progetto Verde urbano 52.68 0.5 0.0075 26.34 0.3951 Progetto Marciapiede 15.86 1 0.0025 15.86 0.0397 Progetto Marciapiede 58.81 1 0.0025 58.81 0.1470 Progetto Marciapiede 140.33 1 0.0025 140.33 0.3508 Progetto Verde urbano 29.75 0.5 0.0075 14.88 0.2231 Progetto Verde urbano 30.24 0.5 0.0075 15.12 0.2268 Progetto Strade 149.48 1 0.0025 149.48 0.3737

RELAZIONE IDROLOGICA IDRAULICA

Pag. 26

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Verde 0.96 0.4 0.0075 0.38 0.0072 Progetto Verde urbano 3.52 0.5 0.0075 1.76 0.0264 Progetto Strade 134.56 1 0.0025 134.56 0.3364 Progetto Marciapiede 1.96 1 0.0025 1.96 0.0049 Progetto Marciapiede 3.90 1 0.0025 3.90 0.0097 Progetto Marciapiede 2.08 1 0.0025 2.08 0.0052 Progetto Marciapiede 3.24 1 0.0025 3.24 0.0081 Progetto Marciapiede 3.29 1 0.0025 3.29 0.0082 Progetto Marciapiede 3.44 1 0.0025 3.44 0.0086 Progetto Marciapiede 212.45 1 0.0025 212.45 0.5311 Progetto Verde urbano 6.96 0.5 0.0075 3.48 0.0522 Progetto Verde 112.52 0.4 0.0075 45.01 0.8439 Progetto Verde 160.16 0.4 0.0075 64.06 1.2012 Progetto Strade 1.06 1 0.0025 1.06 0.0026 Progetto Strade 1˙550.14 1 0.0025 1˙550.14 3.8753 Progetto Semipermeabile 166.27 0.6 0.005 99.76 0.8314 Progetto Semipermeabile 161.72 0.6 0.005 97.03 0.8086 Progetto Verde urbano 598.71 0.5 0.0075 299.36 4.4903 Progetto Marciapiede 43.99 1 0.0025 43.99 0.1100 Progetto Verde 6.01 0.4 0.0075 2.41 0.0451 Progetto Strade 419.50 1 0.0025 419.50 1.0487 Progetto Strade 83.86 1 0.0025 83.86 0.2097 Progetto Verde 74.00 0.4 0.0075 29.60 0.5550 Progetto Verde 173.77 0.4 0.0075 69.51 1.3033 Progetto Marciapiede 10.90 1 0.0025 10.90 0.0273 Progetto Marciapiede 26.14 1 0.0025 26.14 0.0653 Progetto Verde 4.72 0.4 0.0075 1.89 0.0354 Progetto Verde urbano 85.41 0.5 0.0075 42.71 0.6406 Progetto Edifici 20.50 1 0.0025 20.50 0.0513 Progetto Strade 220.78 1 0.0025 220.78 0.5519 Progetto Verde 51.87 0.4 0.0075 20.75 0.3890 Progetto Verde 22˙229.99 0.4 0.0075 8˙892.00 166.7249

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Semipermeabile 17.81 0.6 0.005 10.68 0.0890 Progetto Verde 4.17 0.4 0.0075 1.67 0.0313 Progetto Semipermeabile 1.96 0.6 0.005 1.17 0.0098 Progetto Verde 0.04 0.4 0.0075 0.02 0.0003 Progetto Strade 153.35 1 0.0025 153.35 0.3834 Progetto Strade 617.43 1 0.0025 617.43 1.5436 Progetto Verde urbano 1.53 0.5 0.0075 0.77 0.0115 Progetto Verde urbano 61.27 0.5 0.0075 30.63 0.4595 Progetto Verde urbano 19.36 0.5 0.0075 9.68 0.1452 Progetto Semipermeabile 175.00 0.6 0.005 105.00 0.8750 Progetto Edifici 701.87 1 0.0025 701.87 1.7547 Progetto Edifici 223.07 1 0.0025 223.07 0.5577 Progetto Verde urbano 205.20 0.5 0.0075 102.60 1.5390 Progetto Verde 51.86 0.4 0.0075 20.74 0.3889 Progetto Verde urbano 50.24 0.5 0.0075 25.12 0.3768 Progetto Marciapiede 835.40 1 0.0025 835.40 2.0885 Progetto Strade 878.41 1 0.0025 878.41 2.1960 Progetto Strade 0.88 1 0.0025 0.88 0.0022 Progetto Strade 260.95 1 0.0025 260.95 0.6524 Progetto Verde 474.47 0.4 0.0075 189.79 3.5585 Progetto Strade 584.89 1 0.0025 584.89 1.4622 Progetto Edifici 21.25 1 0.0025 21.25 0.0531 Progetto Verde 74.27 0.4 0.0075 29.71 0.5570 Progetto Verde urbano 18.78 0.5 0.0075 9.39 0.1408 Progetto Marciapiede 61.36 1 0.0025 61.36 0.1534 Progetto Strade 2.97 1 0.0025 2.97 0.0074 Progetto Strade 159.59 1 0.0025 159.59 0.3990 Progetto Strade 280.53 1 0.0025 280.53 0.7013 Progetto Strade 107.56 1 0.0025 107.56 0.2689 Progetto Marciapiede 101.89 1 0.0025 101.89 0.2547 Progetto Marciapiede 49.11 1 0.0025 49.11 0.1228 Progetto Verde urbano 99.10 0.5 0.0075 49.55 0.7432

RELAZIONE IDROLOGICA IDRAULICA

Pag. 27

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Edifici 276.13 1 0.0025 276.13 0.6903 Progetto Edifici 277.79 1 0.0025 277.79 0.6945 Progetto Verde urbano 255.95 0.5 0.0075 127.97 1.9196 Progetto Marciapiede 80.29 1 0.0025 80.29 0.2007 Progetto Semipermeabile 4.72 0.6 0.005 2.83 0.0236 Progetto Verde urbano 0.42 0.5 0.0075 0.21 0.0031 Progetto Marciapiede 5.53 1 0.0025 5.53 0.0138 Progetto Verde 241.10 0.4 0.0075 96.44 1.8082 Progetto Semipermeabile 541.98 0.6 0.005 325.19 2.7099 Progetto Marciapiede 703.93 1 0.0025 703.93 1.7598 Progetto Edifici 1˙243.54 1 0.0025 1˙243.54 3.1089 Progetto Marciapiede 733.52 1 0.0025 733.52 1.8338 Progetto Strade 1˙796.90 1 0.0025 1˙796.90 4.4923 Progetto Verde 39.35 0.4 0.0075 15.74 0.2951 Progetto Strade 13.91 1 0.0025 13.91 0.0348 Progetto Marciapiede 0.63 1 0.0025 0.63 0.0016 Progetto Verde 220.46 0.4 0.0075 88.18 1.6535 Progetto Verde 2˙577.61 0.4 0.0075 1˙031.04 19.3321 Progetto Verde 2˙446.12 0.4 0.0075 978.45 18.3459 Progetto Verde urbano 70.73 0.5 0.0075 35.36 0.5305 Progetto Verde 3˙880.59 0.4 0.0075 1˙552.24 29.1044 Progetto Verde urbano 9.29 0.5 0.0075 4.64 0.0697 Progetto Strade 0.50 1 0.0025 0.50 0.0013 Progetto Verde 1˙002.44 0.4 0.0075 400.98 7.5183 Progetto Strade 0.00 1 0.0025 0.00 0.0000 Progetto Strade 22.42 1 0.0025 22.42 0.0560 Progetto Edifici 29.92 1 0.0025 29.92 0.0748 Progetto Edifici 2.68 1 0.0025 2.68 0.0067 Progetto Verde urbano 15.11 0.5 0.0075 7.56 0.1134 Progetto Verde urbano 11.73 0.5 0.0075 5.86 0.0880 Progetto Verde urbano 14.75 0.5 0.0075 7.37 0.1106 Progetto Verde urbano 12.10 0.5 0.0075 6.05 0.0907

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Marciapiede 149.90 1 0.0025 149.90 0.3747 Progetto Edifici 91.49 1 0.0025 91.49 0.2287 Progetto Edifici 8.26 1 0.0025 8.26 0.0206 Progetto Edifici 91.49 1 0.0025 91.49 0.2287 Progetto Edifici 8.29 1 0.0025 8.29 0.0207 Progetto Edifici 8.31 1 0.0025 8.31 0.0208 Progetto Edifici 91.49 1 0.0025 91.49 0.2287 Progetto Edifici 91.48 1 0.0025 91.48 0.2287 Progetto Semipermeabile 77.54 0.6 0.005 46.52 0.3877 Progetto Verde urbano 6.62 0.5 0.0075 3.31 0.0497 Progetto Verde urbano 6.52 0.5 0.0075 3.26 0.0489 Progetto Edifici 8.31 1 0.0025 8.31 0.0208 Progetto Marciapiede 3.40 1 0.0025 3.40 0.0085 Progetto Edifici 8.29 1 0.0025 8.29 0.0207 Progetto Verde 13.80 0.4 0.0075 5.52 0.1035 Progetto Verde 3.38 0.4 0.0075 1.35 0.0253 Progetto Verde 0.04 0.4 0.0075 0.01 0.0003 Progetto Marciapiede 122.88 1 0.0025 122.88 0.3072 Progetto Marciapiede 121.62 1 0.0025 121.62 0.3041 Progetto Edifici 91.42 1 0.0025 91.42 0.2286 Progetto Edifici 76.67 1 0.0025 76.67 0.1917 Progetto Marciapiede 100.88 1 0.0025 100.88 0.2522 Progetto Semipermeabile 242.88 0.6 0.005 145.73 1.2144 Progetto Marciapiede 11.75 1 0.0025 11.75 0.0294 Progetto Edifici 8.29 1 0.0025 8.29 0.0207 Progetto Verde urbano 85.45 0.5 0.0075 42.73 0.6409 Progetto Verde urbano 1˙340.38 0.5 0.0075 670.19 10.0529 Progetto Verde urbano 220.55 0.5 0.0075 110.27 1.6541 Progetto Verde 7.08 0.4 0.0075 2.83 0.0531 Progetto Verde 1.06 0.4 0.0075 0.42 0.0079 Progetto Strade 609.05 1 0.0025 609.05 1.5226 Progetto Verde urbano 44.60 0.5 0.0075 22.30 0.3345

RELAZIONE IDROLOGICA IDRAULICA

Pag. 28

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Semipermeabile 25.00 0.6 0.005 15.00 0.1250 Progetto Marciapiede 2.95 1 0.0025 2.95 0.0074 Progetto Marciapiede 19.14 1 0.0025 19.14 0.0478 Progetto Marciapiede 10.45 1 0.0025 10.45 0.0261 Progetto Marciapiede 152.22 1 0.0025 152.22 0.3806 Progetto Verde urbano 120.40 0.5 0.0075 60.20 0.9030 Progetto Semipermeabile 92.15 0.6 0.005 55.29 0.4607 Progetto Marciapiede 16.34 1 0.0025 16.34 0.0409 Progetto Marciapiede 16.34 1 0.0025 16.34 0.0409 Progetto Marciapiede 2.95 1 0.0025 2.95 0.0074 Progetto Marciapiede 2.95 1 0.0025 2.95 0.0074 Progetto Marciapiede 2.95 1 0.0025 2.95 0.0074 Progetto Marciapiede 2.95 1 0.0025 2.95 0.0074 Progetto Verde urbano 13.44 0.5 0.0075 6.72 0.1008 Progetto Verde urbano 13.34 0.5 0.0075 6.67 0.1000 Progetto Verde urbano 18.89 0.5 0.0075 9.44 0.1416 Progetto Verde urbano 13.51 0.5 0.0075 6.76 0.1014 Progetto Verde urbano 13.51 0.5 0.0075 6.76 0.1014 Progetto Verde urbano 13.51 0.5 0.0075 6.76 0.1014 Progetto Marciapiede 6.48 1 0.0025 6.48 0.0162 Progetto Marciapiede 10.48 1 0.0025 10.48 0.0262 Progetto Marciapiede 10.45 1 0.0025 10.45 0.0261 Progetto Marciapiede 10.45 1 0.0025 10.45 0.0261 Progetto Marciapiede 2.95 1 0.0025 2.95 0.0074 Progetto Verde urbano 3.54 0.5 0.0075 1.77 0.0266 Progetto Edifici 252.59 1 0.0025 252.59 0.6315 Progetto Verde urbano 183.82 0.5 0.0075 91.91 1.3787 Progetto Verde urbano 95.84 0.5 0.0075 47.92 0.7188 Progetto Verde urbano 304.23 0.5 0.0075 152.12 2.2818 Progetto Marciapiede 15.84 1 0.0025 15.84 0.0396 Progetto Semipermeabile 55.67 0.6 0.005 33.40 0.2783 Progetto Verde urbano 32.98 0.5 0.0075 16.49 0.2473

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Edifici 378.36 1 0.0025 378.36 0.9459 Progetto Semipermeabile 88.81 0.6 0.005 53.29 0.4441 Progetto Strade 873.25 1 0.0025 873.25 2.1831 Progetto Strade 0.02 1 0.0025 0.02 0.0001 Progetto Verde 242.69 0.4 0.0075 97.07 1.8202 Progetto Semipermeabile 6.49 0.6 0.005 3.89 0.0324 Progetto Marciapiede 66.88 1 0.0025 66.88 0.1672 Progetto Verde urbano 3.70 0.5 0.0075 1.85 0.0277 Progetto Marciapiede 0.15 1 0.0025 0.15 0.0004 Progetto Verde urbano 8.52 0.5 0.0075 4.26 0.0639 Progetto Marciapiede 29.24 1 0.0025 29.24 0.0731 Progetto Strade 68.96 1 0.0025 68.96 0.1724 Progetto Verde 1˙615.77 0.4 0.0075 646.31 12.1182 Progetto Strade 593.54 1 0.0025 593.54 1.4838 Progetto Strade 4.76 1 0.0025 4.76 0.0119 Progetto Marciapiede 1.97 1 0.0025 1.97 0.0049 Progetto Marciapiede 9.89 1 0.0025 9.89 0.0247 Progetto Verde urbano 69.78 0.5 0.0075 34.89 0.5234 Progetto Edifici 84.00 1 0.0025 84.00 0.2100 Progetto Edifici 84.00 1 0.0025 84.00 0.2100 Progetto Edifici 84.00 1 0.0025 84.00 0.2100 Progetto Marciapiede 50.85 1 0.0025 50.85 0.1271 Progetto Edifici 6.46 1 0.0025 6.46 0.0162 Progetto Edifici 7.75 1 0.0025 7.75 0.0194 Progetto Edifici 81.00 1 0.0025 81.00 0.2025 Progetto Edifici 6.46 1 0.0025 6.46 0.0162 Progetto Edifici 7.75 1 0.0025 7.75 0.0194 Progetto Edifici 6.46 1 0.0025 6.46 0.0162 Progetto Edifici 7.75 1 0.0025 7.75 0.0194 Progetto Edifici 81.00 1 0.0025 81.00 0.2025 Progetto Edifici 81.00 1 0.0025 81.00 0.2025 Progetto Edifici 81.00 1 0.0025 81.00 0.2025

RELAZIONE IDROLOGICA IDRAULICA

Pag. 29

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Edifici 81.00 1 0.0025 81.00 0.2025 Progetto Edifici 81.00 1 0.0025 81.00 0.2025 Progetto Marciapiede 8.24 1 0.0025 8.24 0.0206 Progetto Marciapiede 8.24 1 0.0025 8.24 0.0206 Progetto Marciapiede 8.24 1 0.0025 8.24 0.0206 Progetto Marciapiede 9.89 1 0.0025 9.89 0.0247 Progetto Marciapiede 9.89 1 0.0025 9.89 0.0247 Progetto Marciapiede 15.03 1 0.0025 15.03 0.0376 Progetto Marciapiede 15.08 1 0.0025 15.08 0.0377 Progetto Marciapiede 14.90 1 0.0025 14.90 0.0372 Progetto Marciapiede 15.02 1 0.0025 15.02 0.0376 Progetto Marciapiede 15.24 1 0.0025 15.24 0.0381 Progetto Marciapiede 15.09 1 0.0025 15.09 0.0377 Progetto Verde urbano 2˙287.17 0.5 0.0075 1˙143.59 17.1538 Progetto Strade 2.29 1 0.0025 2.29 0.0057 Progetto Verde 60.77 0.4 0.0075 24.31 0.4558 Progetto Marciapiede 17.06 1 0.0025 17.06 0.0427 Progetto Marciapiede 2.69 1 0.0025 2.69 0.0067 Progetto Marciapiede 0.01 1 0.0025 0.01 0.0000 Progetto Edifici 0.01 1 0.0025 0.01 0.0000 Progetto Marciapiede 16.06 1 0.0025 16.06 0.0402 Progetto Marciapiede 17.16 1 0.0025 17.16 0.0429 Progetto Marciapiede 71.97 1 0.0025 71.97 0.1799 Progetto Marciapiede 63.35 1 0.0025 63.35 0.1584 Progetto Verde urbano 3.41 0.5 0.0075 1.71 0.0256 Progetto Marciapiede 15.11 1 0.0025 15.11 0.0378 Progetto Verde urbano 23.26 0.5 0.0075 11.63 0.1745 Progetto Verde urbano 52.53 0.5 0.0075 26.27 0.3940 Progetto Verde urbano 88.64 0.5 0.0075 44.32 0.6648 Progetto Strade 175.35 1 0.0025 175.35 0.4384 Progetto Strade 7.46 1 0.0025 7.46 0.0187 Progetto Marciapiede 202.19 1 0.0025 202.19 0.5055

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Progetto Semipermeabile 94.91 0.6 0.005 56.94 0.4745 Progetto Edifici 541.82 1 0.0025 541.82 1.3545 Progetto Marciapiede 254.10 1 0.0025 254.10 0.6353 Progetto Marciapiede 225.61 1 0.0025 225.61 0.5640 Progetto Edifici 544.14 1 0.0025 544.14 1.3603 Attuale Edifici 21.47 1 0.0025 21.47 0.0537 Attuale Edifici 291.61 1 0.0025 291.61 0.7290 Attuale Edifici 4˙795.86 1 0.0025 4˙795.86 11.9897 Attuale Edifici 10.91 1 0.0025 10.91 0.0273 Attuale Edifici 34.25 1 0.0025 34.25 0.0856 Attuale Edifici 12.59 1 0.0025 12.59 0.0315 Attuale Edifici 43.71 1 0.0025 43.71 0.1093 Attuale Edifici 2˙291.23 1 0.0025 2˙291.23 5.7281 Attuale Edifici 152.51 1 0.0025 152.51 0.3813 Attuale Edifici 94.41 1 0.0025 94.41 0.2360 Attuale Edifici 34.64 1 0.0025 34.64 0.0866 Attuale Edifici 97.83 1 0.0025 97.83 0.2446 Attuale Edifici 151.41 1 0.0025 151.41 0.3785 Attuale Edifici 1˙610.88 1 0.0025 1˙610.88 4.0272 Attuale Edifici 424.83 1 0.0025 424.83 1.0621 Attuale Edifici 384.42 1 0.0025 384.42 0.9611 Attuale Edifici 335.45 1 0.0025 335.45 0.8386 Attuale Edifici 113.40 1 0.0025 113.40 0.2835 Attuale Edifici 902.21 1 0.0025 902.21 2.2555 Attuale Edifici 104.42 1 0.0025 104.42 0.2611 Attuale Edifici 68.07 1 0.0025 68.07 0.1702 Attuale Edifici 1˙000.42 1 0.0025 1˙000.42 2.5011 Attuale Edifici 400.69 1 0.0025 400.69 1.0017 Attuale Edifici 307.80 1 0.0025 307.80 0.7695 Attuale Edifici 261.22 1 0.0025 261.22 0.6531 Attuale Edifici 94.31 1 0.0025 94.31 0.2358 Attuale Edifici 50.81 1 0.0025 50.81 0.1270

RELAZIONE IDROLOGICA IDRAULICA

Pag. 30

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Attuale Edifici 154.75 1 0.0025 154.75 0.3869 Attuale Edifici 280.60 1 0.0025 280.60 0.7015 Attuale Edifici 186.58 1 0.0025 186.58 0.4665 Attuale Edifici 43.15 1 0.0025 43.15 0.1079 Attuale Verde 958.40 0.4 0.0075 383.36 7.1880 Attuale Verde 31.94 0.4 0.0075 12.78 0.2396 Attuale Strade 3˙147.67 1 0.0025 3˙147.67 7.8692 Attuale Strade 6˙991.26 1 0.0025 6˙991.26 17.4782 Attuale Semipermeabile 2˙373.26 0.6 0.005 1˙423.96 11.8663 Attuale Semipermeabile 1˙200.99 0.6 0.005 720.59 6.0050 Attuale Semipermeabile 2˙455.78 0.6 0.005 1˙473.47 12.2789 Attuale Verde 303.77 0.4 0.0075 121.51 2.2783 Attuale Verde 10˙168.53 0.4 0.0075 4˙067.41 76.2640 Attuale Semipermeabile 0.22 0.6 0.005 0.13 0.0011 Attuale Semipermeabile 7.79 0.6 0.005 4.67 0.0389 Attuale Semipermeabile 9.80 0.6 0.005 5.88 0.0490 Attuale Verde 4.17 0.4 0.0075 1.67 0.0313 Attuale Semipermeabile 1˙838.86 0.6 0.005 1˙103.32 9.1943 Attuale Semipermeabile 1.96 0.6 0.005 1.17 0.0098 Attuale Edifici 5˙461.13 1 0.0025 5˙461.13 13.6528 Attuale Edifici 657.06 1 0.0025 657.06 1.6427

CODICE TIPO AREA Phip Vp [m] A*Phip A*Vp [m] Attuale Edifici 15.11 1 0.0025 15.11 0.0378 Attuale Verde 8.26 0.4 0.0075 3.31 0.0620 Attuale Verde 3.25 0.4 0.0075 1.30 0.0244 Attuale Edifici 1˙198.85 1 0.0025 1˙198.85 2.9971 Attuale Edifici 0.08 1 0.0025 0.08 0.0002 Attuale Verde 11.51 0.4 0.0075 4.60 0.0863 Attuale Verde 109.84 0.4 0.0075 43.94 0.8238 Attuale Verde 144˙610.97 0.4 0.0075 57˙844.39 1084.5823 Attuale Edifici 181.54 1 0.0025 181.54 0.4538 Attuale Verde 2˙996.72 0.4 0.0075 1˙198.69 22.4754 Attuale Verde 4˙305.04 0.4 0.0075 1˙722.02 32.2878 Attuale Verde 7.62 0.4 0.0075 3.05 0.0572

RELAZIONE IDROLOGICA IDRAULICA

Pag. 31

LEGENDA

TABELLA 9 VERIFICA INVARIANZA

Ramo Codice ramo Ramo_m1 Codice ramo di monte n.1 Ramo_m2 Codice ramo di monte n.2 Ramo_m3 Codice ramo di monte n.3 A [mm/h-n] Paramentro a lspp >1h N Paramentro n lspp >1h A' [mm/h-n] Paramentro a lspp <1h N' Paramentro n lspp <1h Area [mq] Area afferente al ramo Phip Coefficiente di afflusso Vp [m] Volume piccoli invasi Vr [mc] Volume invasato nel ramo

TABELLA 9 VERIFICA INVARIANZA AreaT [mq] Totale area afferente PhipT Coefficiente di afflusso area afferente ViT[m] Volume di invaso specifico area afferente up [l/sha] Coefficiente udometrico

TABELLA 10 DATI AREE Ramo Codice ramo Tipo Tipo di uso del suolo Area [mq] Area Phip Coefficiente di afflusso Vp [m] Volume piccoli invasi