Pisa: Settembre 2003F. Bedeschi, INFN-Pisa 1 CDF: Prospettive e upgrades Stato Tevatron e CDF ...
-
Upload
theodore-cross -
Category
Documents
-
view
217 -
download
0
Transcript of Pisa: Settembre 2003F. Bedeschi, INFN-Pisa 1 CDF: Prospettive e upgrades Stato Tevatron e CDF ...
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
1
CDF: Prospettive e upgrades
Stato Tevatron e CDF Risultati recenti e prospettive Run IIB:
Situazione generale Stato progetti a partecipazione italiana L’upgrade del CPR (v. presentazione S. Lami)
L’upgrade di SVT (v. presentazione di P. Giannetti) Calcolo (v. presentazione S. Belforte) Sommario richieste finanziarie
SOMMARIOINFN - Riunione della
CSN 1
Lecce
24 Settembre 2003
Franco BedeschiINFN-Pisa
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
2
TeV Luminosity(current situation)
Peak luminosity Best 5.2x1031
Delivered/on tape330/260 pb-1
Delivered
On tape
5x1031
Luminosity
Integrated
Initial
instantaneous
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
3
Tev 2003 Luminosity
Goals for 2003 Base goals:
200 pb-1 in FY 200310 pb-1/wk end of 2003
5.4x1031 typical
Stretch goals: 320 pb-1 in FY 200315 pb-1/wk end of 2003
7.6x1031 typical (~max achievable without Recycler)
Integrated luminosity goal achieved, but …
Half of shutdown in FY04Avg. lum. lower than predicted
FY04: Double data set
~150 pb-1
As of 5/6/03
~250 pb-1
As of 9/3/03
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
4
CDF operations
All CDF operating reliably Silicon stable
Data taking efficiency high 80-90% typical
Some limitations in L1 trigger output rate < 20 kHz achieved ~ 50 kHz design
Force prescale of B physicsProblem gets worse at higher luminosity (more in Paola’s talk)
Requires work on DAQ/L2 Massive Italian effort on SVT L00 aligned and improving resolution
Now
Hadronic Bs trigger
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
5
SVT trigger improvements in 2003 (at 0 cost)
Whatever could be done with no upgrade has already been done! 4/5 : 1.5x efficiency, more uniform coverage, avoid efficiency change while
single SVX ladder are out of DAQ for a few days - Carosi 3/3 : recover another SVX wedge/barrel - Carosi AMS firmware optimization : saves 700nsec – Belforte Avoid fitting tracks 1.5<Pt<2 : 30% less to fit – Belforte Skip events that do not require SVT al L2 (hight Pt jets, MET and leptons):
saves 1 microsec (more as L increases) – Belforte, Rescigno Road Warrior: removes duplicate fit combination for 4/5, saves 30% of time
Algorithm, timing studies, simulation, proof of feasibility - Annovi, Belforte, Catastini, Cerri
Firmware – Spinella (this fall)
Money (~60k$) - Fermilab
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
6
Results from L00
Clear D resolution improvements with L00Most gain at low pt and in areas with much materialStill room for improvement of alignment
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
7
Physics Results
Data used for summer conferences 2003Data set collected February 02 – May 03230 pb-1 delivered, 170 pb -1 on tape, <140 pb -1 used for analysis
now 330 pb-1 delivered, 260 pb-1 on tapeSome preliminary results available at higher statistics
Much progress since May 03 Italian group is giving key contributionsWill cover only highlights with emphasis on Italian work
Top quark
EWK
B physicsDiscuss Bs mixing reach as example of trigger issues
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
8
Italian group contributions
B/charm physics Topics: Bhh (ACP, BR), bp search, BsDs & lDs (preparatory to Bs
mixing), Bs BdK*, BK (ACP, BR), D0hh (BR, ACP) Groups involved: Padova, Pisa, Roma, Trieste
High pt physics Topics: Zbb, Higgs searches, top physics, hadronic top, top backgrounds,
b-tagging, W+jets, forward W’s Groups involved: Bologna, Padova (Trento), Pisa, Roma
Responsibilities: Conveners of B physics subgroups Convener of top group Members of important review committees (eg. Higgs reach)
Most work in close cooperation with other non-Italian groups Most work in close cooperation among the Italian groups
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
9
Top (di-leptons)
2 high pT leptons (e,iso track)
2 central jetsLarge Missing ET
HT: scalar sum of all the measured
“objects” ET’s (leptons,jets)
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
10
Top (l+jets)
1 high pT lepton(e,)
3 central jets
Large Missing ET
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
11
Top x-section
(syst)(stat)7.6 1.51.9
3.83.1
1.7(syst)3.4(stat)7.3
0.9(syst)1.9(stat)5.3
2.1(syst)1.8(stat)5.1
0.9(lum)(syst)(stat)8.7 2.72.0
6.44.7
0.8(lum)(syst)(stat)8.1 1.61.4
2.22.0
0.5(lum)(syst)(stat)4.6 2.12.0
3.12.7
1.1(lum)(syst)(stat)11.4 2.01.8
4.13.5
0.8(lum)(syst)(stat)8.0 1.71.5
2.42.1
0.7(lum)(syst)(stat)7.4 2.11.8
4.43.6
1.1(lum)(syst)(stat)10.8 2.12.0
4.94.0
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
12
Top mass
212.79.4 GeV/c 7.1(syst)(stat)177.5
Mass in lepton+jets channelwith a b-tagged jet Mass in dilepton
channel217.4
16.9 GeV/c 7.9(syst)(stat)175.0
CDF RunII preliminary, 108 pb-1CDF RunII preliminary, 126 pb-1
6 events
Data 22 evts
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
13
Hadronic top
Work in progress!Top mass distribution
with 165 pb-1 of double tagged multi-jet events
Background from 0 tag sample
Main goals:Top x-section in hadronic channel
Top mass measurement in hadronic channel
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
14
Zbb
Work in progress~70 pb-1Update soon with
>x2 statisticsGood
understanding of sample composition
Trigger updatedCritical signal for:
Top mass accuracy Improving bb di-jet
mass resolution
2 tags2 tagssubtracted
1 tag 1 tagsubtracted
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
15
Forward W’s
Current blessed result with ~70 pb-1
Update soonWorking on cross
section systematicsGoals:
Measure x-section in forward region
W = 2.81±0.39 nb
Include forward W’s in top and other high pt analyses
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
16
3870
narrow resonance at ~ 3870 MeV reported by Belle at Lepton-Photon 34.4±6.5 events May be an L=2 cc state
CDF has searched for this state in its large sample of (>2M) and found it too! 8.5 effect Hint seen in run 1 data
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
17
B lifetimes
Complete set of lifetime measurements with exclusive B statesBu, Bd show reliabilityBs already better than WASpecies Bu Bd Bs
b
CDF (ps) 1.63±0.050±0.04 1.51±0.060±0.02 1.33±0.14±0.02 1.25±0.260±0.10HFAG (ps) 1.65±0.014 1.53±0.013 1.44±0.17 1.23±0.077
Bu Bs
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
18
Bs lDs
Collecting the high statistics samples of B lepton + Charm Still working on lifetime
systematics This sample can be used also for Bs
mixing
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
19
Hadronic B’s (2 body) Yields doubled
Trigger work! 871 events in peak! Now eff ~ 6 pb
Measurements with 68 pb-1 only: Will update for winter
conferences
Simulation
BdKBsKK
Bd
BsK
= 5.252(2) GeV/c2
= 41.1(1.9) MeV/c2
M()
L~180 pb-1
Tight cuts871 eventsLoose cuts1766 events
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
20
Hadronic B’s (two body)
Current measurements and projections (68 pb-1) fs BR(BsKK)/fd BR(BdK) = 0.74±0.2±0.22
First measurement! CDF only
Expect 10% error by next summer
BR(Bd)/BR(BdK) = 0.26±0.11±0.06
Belle/BaBar errors: 0.033/0.035 LP2003
Could reach above accuracy by fall 2004
ACP(BdK) = 0.02 ± 0.15 ± 0.017
Belle error: 0.035 LP2003
ACP(Bd) :
need ~2 fb-1 for measurement to 10o
10o is still statistics limited
Expect ~x2 error reduction with current statistics (180 pb-1) Systematic too with better dE/dx
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
21
BR(B± K±) at CDF
First time at CDF : B± K±
BR( B± K± ) ———————— = 0.0068 ± 0.0021(stat.) ± 0.0007(syst.) BR( B± J/K± )
23 ± 7 events 120 pb-1
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
22
Hadronic B’s (many bodies)
Understanding backgrounds and yields with large MC samples
B+
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
23
Hadronic B’s (many bodies)
Understand hadronic Bs yield. Measure BR: NEW! BR(BsDs) = (4.8±1.2(stat)±1.8(BR)±0.8(sys)±0.6 (fs/fd))x10-3
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
24
Bs mixing expectations
Expectations extrapolating from current data Still large uncertainties on:
Final event yield (depends on upgrades)
Max lifetime resolution achievable
Max D2 (tagging power) achievable
Make very conservative assumptions!
Sensitivity = ms/ 2 sensitivity for = 15 ps-1 with ~0.5 fb-1
Surpass current world limit
5 sensitivity for = 18 ps-1 with 1.7 fb-1
5 sensitivity for = 24 ps-1 with 3.2 fb-1
Current constraints: Lower limit LEP+SLD: ms >15 ps-1 WA
Constraints from global fits: ms = 21 ± 4 ps-1 (Durham 2003)
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
25
Bs yield
At higher luminosity need more L1 BW to preserve current yield
Expect ~2000 ev/fb-1 using additional Ds decay modes
Current performance
4x1031 6x1031
8x1031
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
26
Tev goals beyond 2003
Fermilab has scaled down its plans for luminosity in June 2003 Silicon upgrade canceled!
No long shutdown in 2005 Design plan max luminosity: 2.94x1032
No recycler ~ base plan
Year Base plan luminosity/yr (fb-1)
Design plan
Luminosity/yr (fb-1)
FY02 0.08 0.08
FY03 0.20 0.22
FY04 0.31 0.38
FY05 0.39 0.67
FY06 0.50 0.89
FY07 0.63 1.53
FY08 1.14 2.37
FY09 1.16 2.42
Total 4.41 8.56
0
1
2
3
4
5
6
7
8
9
0 1 2 3 4 5 6 7 8 9 10
End FY
fb-1
Base plan
Design plan
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
27
Impact on Higgs reach
Reach for SM Higgs and other “new” physics searches affected by factor 2-3 reduction in expected total integrated luminosity (relative to 15 fb-1)
4.41 fb-1 base plan
8.56 fb-1 design plan
Sensitivity re-evaluated in June 2003Slightly better
Retain sensitivity to a low mass SM Higgs
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
28
Impact on physics program
Even 2 fb-1 represents x20 more luminosity than run 1Major CDF/D0/Tevatron upgrade was fully justified by this
expected integrated luminosity
We will get more than 2 fb-1, but not 15 fb-1 as the lab made us hope for some time
Important to make best of available luminosityAll other upgrades needed for this
CDF is re-evaluating physics priorities and role of upgrades
Full support from Witherell, P5 and PAC on all other upgrades
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
29
Upgrade del rivelatore al Silicio per CDF Run IIb
•Il progetto e’ stato cancellato in fase di Preproduzione:Tutte le parti gia’ a SiDet in quantita’ (~15% del totale)Sensori da HPK al terzo mese di produzione (~350 a SiDet)“On schedule” per finire a Maggio ‘05 (18 mesi di anticipo rispetto alla data ufficiale di Nov ‘06).Ottimi risultati su svx4 chip e ibridi
Costi stimati ridotti notevolmente
•Progetto di chiusura:Costruire 15 staves => installare nel prototipo di Barrel => el./mech. testsCostruire 5 moduli di L0 => installare nel CF support structure => el./mech. tests Installare L0 nel Barrel => e./mech. TestsCirca 6 mesi con costi minimi (quasi tutto labor cost)
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
30
Summary of upgrade projects
Calorimetry upgrades New central preradiator (CPR2) (see talk by Stefano Lami) (*) Add timing to EM calorimeters (*)
Tracking upgrades Full replacement of all silicon systems inside ISL (*)
Trigger upgrades Improve resolution of L1 track trigger Rebuild global L2 Increase event builder throughput SVT upgrade (RW & associative memories) (see talk by P. Giannetti) (*New)
DAQ upgrades TDC upgrade (speed up chamber readout) Double SRC (speed up silicon readout) CSL upgrade (double data logging bandwidth)
(*) Activities with contributions from Italian group
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
31
Requests for upgrades
Silicon NONE Save 130 kEuro in 2003 + 150 kEuro in 2004! Save 100 kEuro for additional SVT merger boards
CEM timing NONE Funding complete
CPR2 (see Lami’s talk): 100 kEuro in 2003 from SJ (Pisa) 82 kEuro in 2004 (Pisa)
SVT ass. Mem. Board upgrade (NEW see Giannetti’s talk) 120 kEuro in 2004 (Ferrara) 60 kEuro in 2004 (Pisa) 150 kEuro in 2005
Total cost 330 kEuro
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
32
Group composition
CDF Italian group has grown by 20% relative to last yearGood to have data!Future activities important to keep the group together
2004 2004 2003 2003 2002 2002Fisici Tecnol. Totale Totale Totale Totale Totale Totale
Sezione Numero FTE Numero FTE numero FTE numero FTE numero FTEBologna 8 6.7 1 0.5 9 7.2 9 7.4 9 7.3CDF1-LNF 1 1 0 0 1 1 1 1 1 1Ferrara 3 0.7 1 0.1 4 0.8LNF 6 4 1 0.4 7 4.4 6 3.7 6 4.4Padova 15 11.3 0 0 15 11.3 13 9.2 14 9Pavia 1 1 0 0 1 1 1 0.7 1 1Pisa 32 26.9 11 6.6 43 33.5 33 25.4 28 20.6Roma1 11 9.5 2 1.5 13 11 13 11.1 12 10.1Trieste 5 3.6 0 0 5 3.6 5 3.7 3 2.1Udine 3 2.3 1 0.5 4 2.8 3 1.8 3 1.8Totale 04 85 67 17 9.6 102 76.6Totale 03 73 58.5 11 5.5 84 64.00Totale 02 68 52.2 9 5.1 77 57.3
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
33
FY 2003 missioni/consumi
Sezione MI ME ConsumiNuovi fin. Nuovi fin. Sblocchi Sblocchi
BO 17 10LNF 16LNF-dot 7PD 35PV-dotPI 5 50 100RM1 40TSUD 1 25
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
34
MOF
No developments since last meeting of IFC in AprilNew IFC meeting deferred to end of October (maybe)
Propose to fund as last year (250 kEuro)20% increase in size of CDF Italian group overcompensates change in dollar exchange rate
There may be a need for adjustment after the October IFC meeting if some agreement is found
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
35
Summary of 2004 requests
Missioni Interne Missioni Estere Consumi Inventario Costruzione apparatiTotaliSEZ. Richieste Assegn. Richieste Assegn. Richieste Assegn. Richieste Assegn. Richieste Assegn. Richieste Assegn.
2004 2003 2004 2003 2004 2003 2004 2003 2004 2003 2004 2003BO 7.2 7 134.2 113.5 30.8 30 0 15 15 11 187.2 176.5FE-DOT 2 5 0 0 120 127 0LNF 4.4 4 100.6 91 11.6 7 5 4 0 120 121.6 226LNF-DOT 2 1 40 39 10 1.5 0 0 0 0 52 41.5PD 11.5 10 214.7 196 22.2 25 11 5.5 0 0 260.4 239PI 30 20 624.5 525 290 290 46 11.5 142 110 1137.5 958.5PV-DOT 2 2 27 8 2 1 0 0 0 0 31 11RM 13 6 308 233 60 18 20.5 12 0 0 401.5 269TS 6 4 100.5 61.5 11.5 7 291.5 267.5 0 0 413.5 340UD 6 3 97 88 8 4 6 1 0 10 119 106TOTALE 84.1 57 1651.5 1355 446.1 383.5 380 316.5 277 251 2850.7 2367.5
Includes all adjustments made after presentation of estimates in July 2003
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
37
TeV Luminosity(old slide May 13, 2003)
Peak luminosity still low but improvingBest 4.2x1031
Delivered/on tape230/170 pb-1
Delivered
On tape
4x1031
LuminosityIntegrated
Initial
instantaneous
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
39
Tev goals beyond 2003
Fermilab long range plan (M.Witherell P5 presentation – March 26, 2003)
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
40
Status of CDF
Detector: All systems commissioned and taking good quality data
ISL: more cooling lines opened during the January shutdown!
Only 1 cooling line (4% of total) remains plugged
Silicon (hardware/trigger) in general much more stable and reliable~90 % of all silicon systems currently taking dataL1 accept rate limitation removedSome unrecoverable damage is piling up
• % powered
• % good
• % bad
• % error rate
January 03
shutdown
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
42
Status of CDF
Early June 2002 March 2003
Silicon trigger coverage
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
43
Status of CDF
SVX electronics very delicate Still learning how to
protect it from further damage
Understand now much better sources of damage
Some concern about possible continuous degradation over long periods of time
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
44
L1 trigger
Require trigger deadtime < 5% B triggers ~ 80% of L1, 50% L2/3
Fake rates higher than predictions
Level 1 Predictions
0
5
10
15
20
25
30
35
40
45
50
0 10 20 30 40 50 60 70 80 90 100
Luminosity (e30)
Ra
te (
kH
z)
Predicted L1 rateVs luminosity
CurrentMax. lum
~18 kHz
18 kHz
4/4
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
45
Bs trigger efficiency
Hard work has improved yields significantly
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
47
Measuring ms
Ingredients:S = signal yieldS/B = signal/Backgroundt = proper lifetime resolution
D2 = flavor tagging power = flavor tagging efficiency
D = flavor tagging dilution = 1-2w (w = flavor mistagging probability)
22
2
2
s tmS D SSignificance e
S B
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
48
Bs mixing
Lifetime resolution67 fs NOW50 fs with event by event vertex and L00
Flavor tagging studies in progressLarge errors still on D2 measurementsTotal ~ 6% in Run 1 sin(2) analysisNow we have kaon tagging, but much more materialNN like techniques could help tooAssume (very conservatively!):
D2 = 4% now (only SST, jet charge, lepton tags)
D2 = 5% later after including kaon tags
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
49
Bs mixing
5 measurement Feasible with moderate improvements in 2 fb-1
Can beat current world limit with 500 pb-1 and “current” performance
Harder than expected: needs lot of work and luminosity/detector upgrades
0
5
10
15
20
25
30
35
0 500 1000 1500 2000
Moderate improvements
SM central value
Now
xs
pb-1
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
50
Tevatron goals beyond 2003
During the June PAC review the issue of the usefulness of the silicon upgrade was seriously considered, but deferred to after the July accelerator reviewOther upgrades regarded as “…already desirable at
considerably lower luminosities.”July DOE review of accelerator (Lehman) found the
design goals ambitious and the base goals rather safeOn September 3rd Witherell cancels silicon upgrade, but
Run II will still have highest priority. Resources recovered will be spent to improve Tevatron
Committed “…to complete the non-silicon parts of the CDF and D0 upgrades.”
Pisa: Settembre 2003 F. Bedeschi, INFN-Pisa
51
Impact of new luminosity expectations
Impact of smaller luminosity expectations can be reduced by appropriate upgradesMost run IIb upgrades also help to make the best use of
available luminosityTrigger/DAQ upgrades:
Reduce fakes and therefore prescales for all B physics triggers
Increase bandwidth gaining effective cross-section for prescaled triggers
CEM timing and CPR upgrade:Improve S/N allow reduced trigger/analysis thresholds for high pt
CDF and the laboratory fully support all the non-silicon upgrades