Mailing listwrpc.nic.in/pcm/MoM_on_PSS_TUNING_ACTIVITY.pdf · 2017. 1. 24. · 1 SGTPS BRS I 210 MW...

19

Transcript of Mailing listwrpc.nic.in/pcm/MoM_on_PSS_TUNING_ACTIVITY.pdf · 2017. 1. 24. · 1 SGTPS BRS I 210 MW...

  • Mailing list:

    1 Chief Engineer (LD), MSETCL, Kalwa. Fax-022-27601769/65

    2 CE (W), MSEGCL, 3rd floor, Prakash gad, Mumbai.

    3 CE, SLDC, GETCO, Gotri, Vadodara, Fax.No. 0265-2352019/2356469.

    4 Chief Engineer (Gen), GSECL, H.O. Baroda. Fax-0265-5512129/2344537

    5 Chief Engineer (LD), MPPTCL, Jabalpur, Fax - 0761- 2664343 / 2970119.

    6 ED (Engg.) MPPGCL, Jabalpur Fax- 0761-2660063

    7 Chief Engineer (LD), CSPTCL, Raipur. Fax-0771 - 2574174

    8 EE (T), CSPGCL- Fax.No. 07789-226227

    9 D.G.M. (O.S.) , N.T.P.C., Mumbai, Fax- 28216692

    10 DGM, NTPC WR – II, Raipur, Fax: 0771 - 2544550

    11 D.G.M. (EM), KSTPS, NTPC, Korba Fax 07759-233088 (Tele fax: 232440) /237462

    12 DGM (EMD), VSTPS, NTPC, Vindhyachal Fax-07805-247713 /247711

    13 DGM (EM-I), NTPC, SIPAT Fax-07752-246506 (Tele fax: 246691)

    14 AGM (O&M), KGPP, Adityanagar, Surat Fax 0261-2861428/2861433

    15 Sr. Supdt. (EM), Gandhar, NTPC Fax-02642-87402 / 87450

    16 DGM (O.S.), WRLDC, Mumbai Fax-28235434

    17 DGM, WRTS-I, PGCIL, Nagpur, Fax- 0712- 2631051 / 641366

    18 AGM, WRTS-II, PGCIL, Baroda Fax-0265-2480952 (Tele fax: 2487542)

    19 AGM, O&M, WRTS – III, PGCIL, Raipur. Fax: 0771 - 2970450

    20 SME (E), TAPS-3&4,Tarapur Fax 02525-282001/282073

    21 Maintenance Superintendant, TAPS –1 & 2, Tarapur.Fax- 02525-282121

    22 SME(E), NPCIL , Kakrapara Fax 02626-234266

    23 GM (Maint.). TORRENT Power., Ahmedabad.Fax-079-27506679

    24 AGM (QAIT), TPC, Trombay. Fax –022-66687088

    25 Asst. VP, Dahanu TPS Fax- 952528-222576 / 222039

    26 GM (O & M), Reliance Infrastructure Limited, Mumbai Fax-30094488

    27 GM (Electrical), JPL, Raigarh, Fax. No. 7767-281995, 281993.

    28 AGM (OS), NSPCL, New Delhi . Fax.No.011 26717381/26717363/26717366

    29 Vice President, APL, Ahmedabad 079-25557176

    30 GM, RGPPL, Anjanwel, Guhagar, Ratnagiri, Fax.No. 02359 241071

    31 GM, JSW Energy Ltd., Jindal Mansion, Mumbai- Fax.No.022 23526400

    32 GM, CGPL, Mundra Fax.No. 02838 661188

    Copy to

    1. MD, CSPGCL, Danganiya, Raipur, Fax.No. 0771-2262741.

    2. MD, GSECL, race course, Vadodara, Fax.No. 0265-2344734.

    3. MD, MPPGCL, Rampur, Jabalpur, Fax.No. 0761-2665661.

    4. CMD, MSPGCL, Bandra(E), Mumbai, Fax.No. 022-26471060/26581400.

    5. Director(HR), NTPC Ltd., NTPC Bhawan, New Delhi, Fax.No. 011-24368417.

    6. Director(Finanace), NPCIL, Urja Bhawan, Mumbai, Fax.No. 022-25993332.

    7. GM, POSOCO, WRLDC, Andheri(E), Mumbai, Fax.No. 022-28202630.

    8. COO&ED, Tata Power Company Ltd., Mumbai, Fax.No. 022-66657966.

    9. MD, Rantnagiri Gas &power Pvt Ltd., Noida, Fax.No.0120-4148911/13/14.

    10. CED, NHDC Ltd., Shyamala Hills, Bhopal, Fax.No. 0755-4030003.

  • 11. ED, Torrent power Generation Ltd., Surat, Fax.No.02621-661151.

    12. COO, Adani Power Ltd., Ahmedabad, Gujarat, Fax.No. 079-25557176.

    13. MD, Dhariwal Infrastructure Ltd., Kolkata, Fax.No. 033-22256003.

    14. Director & CEO, JSW Energy Ltd., New Delhi, Fax.No. 011-48178740.

    15. CEO, Jindal Power Ltd., Gurgaon, Haryana, Fax.No. 0124-26739151.

    16. ED & CEO, Costal Gujarat Power Ltd., Gujarat, Fax.No. 02838-661181.

    17. Sr.vice President(o), Rattan India Power Ltd., Gurgaon, Haryana, Fax.No. 0124-6695868.

  • Minutes for the meeting on PSS Tuning held on 03.01.2017 Page 1

    Minutes for the meeting of PSS Tuning

    A meeting was held on 03.01.2017 at WRPC, Mumbai on PSS tuning with Excitation

    Engineers of various entities in WR to discuss the status of PSS covered in WR PSS Tuning

    Project, Status of PSS for all other remaining Generators in WR and tuning of all the generating

    units whose capacity is greater than 50MW as per IEGC. The list of participants is enclosed at

    Annexure – I.

    SE (Protection & Studies), WRPC welcomed Dr. A. M. Kulkarni from IIT-B and all

    the participants of meeting and briefed the members about the PSS tuning. A brief video was

    presented on the PSS tuning activity carried out in WR wherein PSS tuning of 23 units was

    taken up for which IIT-B was consultant. WRPC having a successful background in many

    aspects of PSS tuning further exercise can be taken up for tuning PSS in remaining

    generating units. Thereafter agenda items were taken up for discussion.

    Item No 1: Status of PSS covered in WR PSS Tuning Project

    As decided by WREB/WRPC in 114th WREB meeting, field tuning of PSS on

    generators was done by a group comprising IIT-B as consultant, BHEL and utility excitation

    groups. In all 23 units PSS were tuned. The status of these projects as of now was discussed

    and updated as follows.

    Sl.

    No

    Name of the

    Generating

    Station

    Details of

    Generating

    Units

    Capacity of

    each Unit in

    MW

    Type of Excitation

    System

    Present STATUS

    1. NTPC- Korba Units 2 & 3 210 Adaptive DVR Changed to DVR & PSS is Active

    2. Wanakbori Units 4 & 5 210 Static AVR Changed to DVR & PSS is Active

    3. Nasik Units 3 & 5 210 Static AVR Changed to DVR & PSS is Active

    4. Dahanu, RPL 2 units 250 Brushless AVR Changed to DVR & PSS is Active

    5. Korba West Units 1, 3 & 4 210 Static AVR Changed to DVR & PSS Not

    Enabled

    6. Satpura Units 8&9 210 Static AVR Changed to DVR & PSS is Active

    7. NTPC- Korba Units 4,5 & 6 500 Brushless AVR Changed to DVR & PSS is Active

    8. Parli, MSEB 3 units 210 Static AVR Changed to DVR & PSS is Active

    9. SGTPS, MP 4 units 210 Static AVR Units 1 &2 Changed to DVR &

    PSS is Active.

    Units 3 & 4 are with AVR & PSS

    is Disabled.

    Total: 23 Units

  • Minutes for the meeting on PSS Tuning held on 03.01.2017 Page 2

    Item No 2: Status of PSS for all other remaining Generators in WR:

    It was proposed to taken up the exercise of PSS tuning in WR, for which following

    information was sought from ISGS, State Generating Companies, IPP’s connected to CTU,

    and IPP’s connected to State having generating unit capacity more than 50 MW.

    Unit No, Rated Capacity, Type of Excitation System, whether PSS provided or not,

    whether PSS tuned or not, and manufacturer of excitation system. The data furnish by the

    entities is enclosed at Annexure-2.

    Item No 3: Proposal for Tuning:

    SE (Protection & Studies), WRPC informed that,

    i. As per IEGC Generators have to tune PSS. CTU/RPC can check the settings.

    ii. Tuning of PSS is recommended to enhance stability. WR can utilize the

    earlier experience and take up PSS tuning activity once again. However as

    compared to earlier phase, knowledge of frequency response and theoretical

    aspects must be spread to generators so that they can also participate in the

    exercise. Training is also necessary. Further since PSS tuning helps in

    enhancing Grid stability expenditure can be taken under PSDF.

    After discussion following was agreed;

    1) All the State owned Generating Companies would prepare a DPR for getting

    the PSS tuned by the OEM of their generating units. This DPR would be put

    up to the appraisal Committee for funding through PSDF with the

    recommendation of WRPC.

    2) The private generating companies shall get the PSS tuned from the

    manufacturer at their own cost.

    3) A detailed guideline on the adoption of the PSS settings and testing the PSS

    would be prepared by WRPC in consultation with IIT-B and the same may

    be referred by the generating companies during adopting PSS settings.

    4) A training program on the PSS tanning activity shall be organized by IIT-B

    for all the stake holders. The fees of the training program shall be borne by

    the individual organization.

    5) Software for checking the performance of PSS, analytically, would be

  • Minutes for the meeting on PSS Tuning held on 03.01.2017 Page 3

    developed by IIT-B after discussing the requirements with WRPC. The copies

    of the software then could be shared with the generating companies.

    6) Simulation software for exciter/PSS control system simulation shall be

    developed by IIT-B, which shall be made available to all the generating

    companies of WR for checking/simulating the frequency response of the PSS

    tuned system, so that they can select the settings.

    7) After carrying out the tuning of PSS, the parameters/constants set by the

    generating companies shall be communicated to WRPC for its verification.

    This would be verified by WRPC through the software developed by IIT-B at

    5) above.

    8) The cost of the software’s at 5 & 6 be funded through WRPC fund.

  • SerialNo.

    Station Name Unit No.Rated

    CapacityType of excitation

    systemAVR/DVR

    PSSprovided

    PSSenabled

    Manufacturer ofexcitation system

    1 CGPL Mundra Unit - 10 830 MW Static excitation DVR Yes Yes Toshiba Japan2 CGPL Mundra Unit - 20 830 MW Static excitation DVR Yes Yes Toshiba Japan3 CGPL Mundra Unit - 30 830 MW Static excitation DVR Yes Yes Toshiba Japan4 CGPL Mundra Unit - 40 830 MW Static excitation DVR Yes Yes Toshiba Japan5 CGPL Mundra Unit - 50 830 MW Static excitation DVR Yes Yes Toshiba Japan

    6Tata

    Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000

    7Tata

    Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080

    8Tata

    Power,Trombay Unit-8 250 MW Brushless DVR Yes Yes BHEL, DVR

    9Tata

    Power,Trombay Unit -7A 120 MW Static excitation DVR Yes Yes GE, Semipol

    10Tata

    Power,Trombay Unit -7B 60 MW Brushless DVR Yes Yes ABB, Unitrol 6080

    11 Tata Power, Bhira BPSU 150 MW Static excitation DVR Yes Yes ABB Unitrol 6080

    Information Regarding Excitation System At SGTPS Birsinghpur.

    1 SGTPS BRS I 210 MW Static DAVR YES YES BHEL2 SGTPS BRS II 210 MW Static DAVR YES YES BHEL3 SGTPS BRS III 210 MW Static AVR YES No BHEL4 SGTPS BRS IV 210 MW Static AVR YES No BHEL5 SGTPS BRS V 500MW Brushless DAVR YES YES BHEL

    KSK

    Sr No Station Name Unit No's Rated CapacityType of ExitationSystem AVR/DVR

    PSSprovidedYES/NO

    PSSEnabledYES/NO

    Manufacturer ofExitation system

    1 KMPCL 1 600 MW Static AVR AVR YES YES ABB (Unitrol5000)2 KMPCL 2 600 MW Static AVR AVR YES YES ABB (Unitrol5000)

    STPS, SARANIS.No. Station Name Unit No. Rated capacity Type of Excitation

    systemAVR/DVR PSS

    Provided(Yes / No)

    PSSEnabled

    (Yes / No)

    Manufacturer ofExcitation system

    Details of AVR of Tata Power in Western Region

    SL NO. Station Name Unit No. Rated CapacityType of Excitation

    System AVR/DVRPSS

    providedPSS

    EnabledManufacturer ofExcitation system

  • 1 SATPURA 6 235MVA Static ExitationSystem

    DVR Yes Yes BHEL

    2 SATPURA 7 247MVA Static ExitationSystem

    DVR Yes Yes BHEL

    3 SATPURA 8 247MVA Static ExitationSystem

    DVR Yes Yes BHEL

    4 SATPURA 9 247MVA Static ExitationSystem

    DVR Yes Yes BHEL

    5 SATPURA 10 294 MVA Brushless Exitationsystem

    DVR Yes Yes BHEL

    6 SATPURA 11 294 MVA Brushless Exitationsystem

    DVR Yes Yes BHEL

    Sr.No.

    Station Name Unit No Rated capacityType of excitation

    systemAVR /DVR

    PSSProvided Yes / No

    PSSEnabledYES / NO

    Manufaturer ofExcitation System.

    1 1 330 MW2 2 330 MW3 3 330 MW4 4 330 MW5 5 660 MW6 6 660 MW7 7 660 MW8 8 660 MW9 9 660 MW

    Sr.No.

    Station Name Unit No Rated capacityType of excitation

    systemAVR /DVR

    PSSProvided Yes / No

    PSSEnabledYES / NO

    Manufaturer ofExcitation System.

    1 Adani Power Tiroda 1,2,3,4&5 5*660 MW STATIC DVR YES YES ABB -UNITROL 5000

    Sl.No. Station Name Unit No

    RatedCapapcity

    Type of excitationsystem AVR/DVR

    PSSProvidedYes/No

    PSSEnabledYes/No

    Manufacturer ofExcitation System

    1 222 MW- GTG Static Exciation SEE Yes Yes BHEL, EDN2 129 Mw STG Rotary (Brushless)ExciatationDAVR Yes Yes BHEL, EDN3 222 MW- GTG Static Exciation SEE Yes Yes BHEL, EDN4 129 Mw STG Rotary (Brushless)ExciatationDAVR Yes Yes BHEL, EDN

    YESABB -

    UNITROL 5000

    PSS details for GPPC, Pipavav

    GPPC, 2 X 351MW1

    2

    Detail of Excitaion system at Adani Power Ltd. Mundra - Gujarat

    Adani PowerMundra

    Brushless DVR YES YES

    Beijing Jisi ElectricCo., Ltd.

    GEC make modelGEC 321

    Static DVR YES

    Gandhinagar Thermal Power station 210 MW x 3 Units

    Detail of Excitaion system at Adani Power Ltd. Mundra - Gujarat

  • 2 Gandhinagar T.P.S Unit-4 210 MWStatic Excitation

    SystemAVR Yes No

    3 Gandhinagar T.P.S Unit-5 210 MWStatic Excitation

    SystemAVR Yes NO

    Information Regarding the Status of PSS of MSPGCL Units as on 30/12/2016

    2 Thermal PowerStation, Nashik

    Eklahare4 210 MW

    Static ExcitationSystem

    DAVR Yes YesM/S Andritz

    Hydro Pvt. Ltd.Bhopal

    3 Thermal PowerStation, Nashik

    Eklahare5 210 MW

    Static ExcitationSystem

    DAVR Yes YesM/S Andritz

    Hydro Pvt. Ltd.Bhopal

    4 Thermal Power

    Station, ParliVaijnath

    3 210 MWStatic Excitation

    SystemDAVR Yes Yes M/s BHEL

    5 Thermal Power

    Station, ParliVaijnath

    4 210 MWStatic Excitation

    SystemDAVR Yes Yes M/s BHEL

    6 Thermal Power

    Station, ParliVaijnath

    5 210 MWStatic Excitation

    SystemDAVR Yes Yes M/s BHEL

    7 Thermal Power

    Station, ParliVaijnath

    6 250 MW

    Static ExcitationSystem, with

    Brushlessexcitation

    DAVR Yes Yes M/s BHEL

    8 Thermal Power

    Station, ParliVaijnath

    7 250 MW

    Static ExcitationSystem, with

    Brushlessexcitation

    DAVR Yes Yes M/s BHEL

    9 Thermal Power

    Station, ParliVaijnath

    8 250 MW

    Static ExcitationSystem, with

    Brushlessexcitation

    DAVR Yes Yes M/s BHEL

    10 Thermal Power

    Station,Khaperkheda

    1 210 MWStatic Excitation

    SystemDAVR Yes Yes M/s BHEL

    11 Thermal Power

    Station,Khaperkheda

    2 210 MWStatic Excitation

    SystemAVR Yes NO M/s BHEL

    12 Thermal Power

    Station,Khaperkheda

    3 210 MWStatic Excitation

    SystemDAVR Yes Yes M/s BHEL

    SL NO.

    Station Name Unit No. Rated CapacityType of Excitation

    System AVR/DVRPSS

    providedPSS

    EnabledManufacturer ofExcitation system

    PSSEnabled

    Manufacturer ofExcitation systemStation Name Unit No. Rated Capacity

    Type of ExcitationSystem AVR/DVR

    PSSprovided

    SL NO.

  • 13 Thermal Power

    Station,Khaperkheda

    4 210 MWStatic Excitation

    SystemDAVR Yes Yes M/s BHEL

    14 Thermal Power

    Station,Khaperkheda

    5 500 MW

    Static ExcitationSystem, with

    Brushlessexcitation

    DAVR Yes Yes M/s BHEL

    15 Thermal PowerStation, Paras

    3 250 MW

    Static ExcitationSystem, with

    Brushlessexcitation

    DAVR Yes Yes M/s BHEL

    16 Thermal PowerStation, Paras

    4 250 MW

    Static ExcitationSystem, with

    Brushlessexcitation

    DAVR Yes Yes M/s BHEL

    17 Thermal Power

    Station,Chandrapur

    3 210 MWStatic Excitation

    SystemDAVR Yes Yes M/s BHEL

    18 Thermal Power

    Station,Chandrapur

    4 210 MWStatic Excitation

    SystemAVR Yes NO M/s BHEL

    19 Thermal Power

    Station,Chandrapur

    5 500 MWStatic Excitation

    SystemAVR Yes NO M/s BHEL

    20 Thermal Power

    Station,Chandrapur

    6 500 MW

    Static ExcitationSystem, with

    Brushlessexcitation

    DAVR Yes Yes M/s BHEL

    21 Thermal Power

    Station,Chandrapur

    7 500 MW

    Static ExcitationSystem, with

    Brushlessexcitation

    DAVR Yes Yes M/s BHEL

    22 Thermal Power

    Station,Chandrapur

    8 500 MW

    Static ExcitationSystem, with

    Brushlessexcitation

    DAVR Yes Yes M/s BHEL

    23 Thermal Power

    Station,Chandrapur

    9 500 MW

    Static ExcitationSystem, with

    Brushlessexcitation

    DAVR Yes Yes M/s BHEL

    24 Thermal PowerStation,Koradi

    5 200 MWStatic Excitation

    System,DAVR Yes Yes

    M/S AndritzHydro Pvt. Ltd.

    Bhopal

    25 Thermal PowerStation,Koradi

    Under R&M6 228 MW

    Static ExcitationSystem,

    DAVR M/s BHEL

    26 Thermal PowerStation,Koradi

    7 210 MWStatic Excitation

    System,DAVR Yes Yes

    M/S AndritzHydro Pvt. Ltd.

    Bhopal

  • 27 Thermal PowerStation,Koradi

    8 660 MWStatic Excitation

    System,DAVR Yes Yes

    MITSUBISHIELECTRIC

    CORPORATION.MEC600 model

    28 Thermal PowerStation,Koradi

    9 660 MWStatic Excitation

    System,DAVR Yes Yes

    MITSUBISHIELECTRIC

    CORPORATION.MEC600 model

    29 Thermal PowerStation,Koradi

    10 660 MWStatic Excitation

    System,DAVR Yes Yes

    MITSUBISHIELECTRIC

    CORPORATION.MEC600 model

    30 Thermal Power

    Station, Bhusawal2 210 MW

    Static ExcitationSystem,

    DAVR Yes Yes M/S ABB

    31 Thermal Power

    Station, Bhusawal3 210 MW

    Static ExcitationSystem,

    DAVR Yes Yes M/s BHEL

    32 Thermal Power

    Station, Bhusawal4 500 MW

    Static ExcitationSystem, with

    Brushlessexcitation

    DAVR Yes Yes M/s BHEL

    33 Thermal Power

    Station, Bhusawal5 500 MW

    Static ExcitationSystem, with

    Brushlessexcitation

    DAVR Yes Yes M/s BHEL

    34Hydro PowerStation KGSC

    Stage 41 250 MW

    Static ExcitationSystem,

    DAVR Yes Yes M/S GEC Alsthom

    35Hydro PowerStation KGSC

    Stage 42 250 MW

    Static ExcitationSystem,

    DAVR Yes Yes M/S GEC Alsthom

    36Hydro PowerStation KGSC

    Stage 43 250 MW

    Static ExcitationSystem,

    DAVR Yes Yes M/S GEC Alsthom

    37Hydro PowerStation KGSC

    Stage 44 250 MW

    Static ExcitationSystem,

    DAVR Yes Yes M/S GEC Alsthom

    Sr.No.

    Power Station UnitRated

    Capacity

    Type ofexcitation system

    PSS Status

    GSECL POWER STATIONS – PSS STATUS

  • Static AVR /DVR

    1 210 MW2 210 MW3 210 MW4 210 MW5 210 MW6 210 MW7 210 MW3 200 MW4 200 MW5 210 MW6 500 MW3 210 MW4 210 MW5 210 MW1 120 MW DAVR Yes Yes BHEL2 120 MW Static AVR No No BHEL3 250 MW4 250 MW1 70 MW DAVR Yes No BHEL2 70 MW BHEL

    3 70 MWABBDOLMEL

    4 75 MW DAVR Yes Yes BHEL6 UGBPS 2 374 MW DAVR Yes Yes ALSTOM

    GTG1 67.85STG1 38.77GTG2 72.51STG2 39.94

    1 200 MW2 200 MW3 200 MW4 200 MW5 200 MW6 200 MW

    1 50 MW2 50 MW3 50 MW4 50 MW5 50 MW1 75 MW2 75 MW3 75 MW

    Manufacturer ofExcitation System

    1 Wanakbori DAVR Yes Yes BHEL

    Sr.No.

    Power Station UnitRated

    Capacity

    Type ofexcitation system PSS

    ProvidedYes/No

    PSSEnabledYes/No

    2 UkaiAVR No No SIEMENS

    DAVR Yes Yes BHEL

    4 SikkaDAVR Yes Yes BHEL

    3 Gandhinagar Static AVR Yes No BHEL

    5 KLTPS Static AVR No No

    7 DGBPS DAVR Yes Yes

    10 Ukai-Hydro AVR No No BHEL

    9 SSNNL-CHPH

    Static AVR Yes No BHEL

    DAVR Yes Yes BHEL

    BHEL

    8 SSNNL-RBPH DAVR Yes Yes TOSHIBA

  • 4 75 MW1 60 MW2 60 MW3 60 MW4 60 MW

    REMARKS:

    1 Sikka TPSUnit No.1, 3, 4

    BHEL is beingasked foronlinesetting.

    2 KLTPSUnit No.1

    BHEL is beingasked for PSScommissioning and onlinesetting.

    3 Kadana HydroUnit No.1, 2, 3,4

    BHEL is beingasked foronlinesetting.

    1

    VidharbhaIndustries power

    Ltd 2 2*300MW Brushless AVR AVR yes yes ABB (UNITROL-F)

    2

    DhariwalInfrastructure Ltd. ,Chandrapur(Maharashtra)

    1 & 2 2x300 MW Static ExcitationUnitrol5000

    yes No ABB

    3Maruti Clean Coalpower ltd 1 300MW Static AVR DVR

    yes NoBeijing Jisi Electricco. Ltd

    4 1 105MW Static DVR yes No BHEL5 2 105MW Static DVR yes No BHEL6 3 105MW Static DVR yes No BHEL7 Dahanu TPS 1 250MW Brushless DAVR yes yes BHEL8 Dahanu TPS 2 250MW Brushless DAVR yes yes BHEL

    9

    Lanco AmarkantakPower Limited,Patadi, Korba (C.G.)

    1 & 2 2x300 MWStatic Excitation

    SystemUnitrol5000

    Yes No ABB

    10

    Hindustan PowerProjects Pvt.Ltd.(Formely knownas MBPower),Anuppur(M.P.)

    1 & 2 2x600 MWStatic Excitation

    SystemUnitrol5000

    Yes No ABB

    11 SSHEP-RBPH 1 200MW Static AVR YES YES TOSHIBA

    SL NO. Station Name Unit No. Rated CapacityType of Excitation

    System AVR/DVRPSS

    providedPSS

    EnabledManufacturer ofExcitation system

    11 Kadana Hydro DAVR Yes No BHEL

    10 Ukai-Hydro AVR No No BHEL

    Tons Hydel Powerstation

  • 12 SSHEP-RBPH 2 200MW Static AVR YES YES TOSHIBA13 SSHEP-RBPH 3 200MW Static AVR YES YES TOSHIBA14 SSHEP-RBPH 4 200MW Static AVR YES YES TOSHIBA15 SSHEP-RBPH 5 200MW Static AVR YES YES TOSHIBA16 SSHEP-RBPH 6 200MW Static AVR YES YES TOSHIBA17 CCPP, GSEGL 2 222.43MW STATIC DVR YES yes BHEL

    18Rattan India PowerLtd

    1,2,3,4,&5 270 MW Brushless DAVR

    yes yesBHEL

    19 Jindal Power Ltd 1,2,3 & 4 4*250MW Brushless DVR yes yes BHEL20 Jindal Power Ltd 1,2,3 & 4 4*600MW Brushless DVR yes yes BHEL21 DB Power 1&2 2*600MW Brushless DAVR yes yes BHEL22 DGEN 51 400MW static DVR yes yes Siemens23 DGEN 52 400MW static DVR yes yes Siemens24 DGEN 53 400MW static DVR yes yes Siemens

    Sl.No.

    Station Name Unit No's RatedCapacity

    Type of ExcitationSystem

    AVR /DVR

    PSSprovidedYes / No

    PSSEnabledYes / No

    Manufacturer ofExcitation System

    1 1 210 MW Exciter with Brush DVR Yes Yes Electrosila+ABB

    2 2 210 MW Exciter with Brush DVR Yes Yes Electrosila+BHEL

    3 3 210 MW Exciter with Brush DVR Yes Yes Electrosila+ABB

    4 4 210 MW Exciter with Brush DVR Yes Yes Electrosila+BHEL

    5 5 210 MW Exciter with Brush DVR Yes Yes Electrosila+BHEL

    6 6 210 MW Static DVR Yes Yes Siemens7 7 500 MW Brushless with

    PMGDVR Yes Yes BHEL+ABB

    8 8 500 MW Brushless withPMG

    DVR Yes Yes BHEL+ABB

    9 9 500 MW Brushless withPMG

    DVR Yes Yes BHEL

    10 10 500 MW Brushless withPMG

    DVR Yes Yes BHEL

    11 11 500 MW Brushless withPMG

    DVR Yes Yes BHEL

    12 12 500 MW Brushless withPMG

    DVR Yes Yes BHEL

    13 13 500 MW Brushless withPMG

    DVR Yes Yes BHEL

    14 1 200 MW Static DVR Yes Yes ABB15 2 200 MW Static DVR Yes Yes BHEL16 3 200 MW Static DVR Yes Yes BHEL17 4 500 MW Brushless with

    PMGDVR Yes Yes BHEL+ABB

    18 5 500 MW Brushless withPMG

    DVR Yes Yes BHEL+ABB

    Vindhyachal

    Korba

    PSS data for NTPC Stations

  • 19 6 500 MW Brushless withPMG

    DVR Yes Yes BHEL+ABB

    20 7 500 MW Brushless withPMG

    DVR Yes Yes BHEL

    21 1 660 MW Brushless withPMG

    DVR Yes Yes Electrosila

    22 2 660 MW Brushless withPMG

    DVR Yes Yes Electrosila

    23 3 660 MW Brushless withPMG

    DVR Yes Yes Electrosila

    24 4 500 MW Brushless withPMG

    DVR Yes Yes BHEL

    25 5 500 MW Brushless withPMG

    DVR Yes Yes BHEL

    26 GT1 144.3 MW Static DVR Yes Yes Andritz27 GT2 144.3 MW Static DVR Yes Yes Andritz28 GT3 144.3 MW Static DVR Yes Yes Andritz29 STG 224.49 MW Static DVR Yes Yes Andritz30 GT1 106 MW Brushless DVR Yes Yes ABB31 GT2 106 MW Brushless DVR Yes Yes ABB32 STG1 116.1 MW Brushless DVR Yes Yes ABB33 GT3 106 MW Brushless AVR Yes Yes Alstom34 GT4 106 MW Brushless AVR Yes Yes Alstom35 STG2 116.1 MW Brushless AVR Yes Yes Alstom36 1 500 MW Brushless with

    PMGDVR Yes Yes BHEL

    37 2 500 MW Brushless withPMG

    DVR Yes Yes BHEL

    38 3 660 MW Brushless withPMG

    DVR Yes Yes BHEL

    Korba

    Sipat

    Ghadhar GPS

    Kawas

    Mouda

    MoM on PSS TUNING ACTIVITY TO BE CARRIED OUT IN WR.pdfpss final.pdfPSS tuning mailing list.pdfminutes of pss meeting on 03.01.2016 ms edited.pdfann 1.pdfann 2.pdf