CEA/DRT/DTEN/SCSE/GENEC CIRED 2003 Barcelona May13th N°1999/12442c INVESTIRE Investigation on Storage Technologies for Intermittent Renewable Energies Power supply Load profile Increased value of energy higher buy-back rates for predictable energy sources Increased penetration of RES store power when in excess for later use

description

Power supply. Load profile. Increased penetration of RES store power when in excess for later use. Increased value of energy higher buy-back rates for predictable energy sources. INVESTIRE. Investigation on Storage Technologies for Intermittent Renewable Energies. Environment. - PowerPoint PPT Presentation

Transcript of INVESTIRE

Page 1: INVESTIRE

CEA/DRT/DTEN/SCSE/GENEC CIRED 2003 Barcelona May13thN°1999/12442c

INVESTIRE

Investigation on Storage Technologies for Intermittent Renewable Energies

Power supply

Load profile

Increased value of energy higher buy-back rates for predictable energy sources

Increased penetration of RES store power when in excess for later use

Page 2: INVESTIRE

CEA/DRT/DTEN/SCSE/GENEC CIRED 2003 Barcelona May13thN°1999/12442c

INVESTIRE Description of the project

Thematic network (data gathering but no R&D work)

33 Partners

0.8 M€

30 month duration (finished in October 2003)

9 technologies addressed

Lead-acid batteries

Lithium batteries

Double layer capacitors

Nickel based batteries

Electrolyser, H2 storage, fuel cell

Flywheels

Redox-flow batteries

Compressed air

Metal/air batteries

Page 3: INVESTIRE

CEA/DRT/DTEN/SCSE/GENEC CIRED 2003 Barcelona May13thN°1999/12442c

INVESTIRE Objectives

To propose technology neutral evaluation criteria that are suited for the renewables applications

Technical ( lifetime, energy efficiency, self discharge …) Economical (investment cost, operating cost, cost of delivered kWh …) Environmental (use of scarce resources, recycling …)

To determine the needs in R&D Based on the various applications For each storage technology For the storage systems (possible hybridation …)

Page 4: INVESTIRE

CEA/DRT/DTEN/SCSE/GENEC CIRED 2003 Barcelona May13thN°1999/12442c

INVESTIRE Technical criteria

Requirements on the storage function based on questionnaires about existing and future applications (mostly stand-alone)

Clustering is technology neutral

1,E+01

1,E+02

1,E+03

1,E+04

1,E+05

1,E+00 1,E+01 1,E+02 1,E+03 1,E+04 1,E+05 1,E+06

Energy Wh

Fu

ll e

qu

iva

len

t cy

cle

s /

yea

r

Category 4: High currentsPower quality

Category 2: power station, mini grids

Category 1: Sensors, data loggers, communication

Category 3: Load levelling, energy shifting

Page 5: INVESTIRE

CEA/DRT/DTEN/SCSE/GENEC CIRED 2003 Barcelona May13thN°1999/12442c

INVESTIRE Self discharge

40

50

60

70

80

90

100

110

0 1 2 3 4Self discharge time at 25°C / Months

Rem

aini

ng c

apac

ity /

%

of in

itial

Compressed air, Redox flowElectolyser/hydrogen storage/fuel cell

Flywheel

Lead-acid

Lithium

Supercaps

Metal/airNickel

Large dispersion of the self discharge values Technologies decoupling power and energy are suited for long term storage

Page 6: INVESTIRE

CEA/DRT/DTEN/SCSE/GENEC CIRED 2003 Barcelona May13thN°1999/12442c

INVESTIRE Energy efficiency

0

10

20

30

40

50

60

70

80

90

100

Lead-acid Lithium Supercaps Nickel Fuel cell Flywheel Redox-flow Compressed air Metal/air

– Large dispersion of the energy efficiency values

– Low efficiency technologies suited only for seasonal storage in stand-alone applications

Page 7: INVESTIRE

CEA/DRT/DTEN/SCSE/GENEC CIRED 2003 Barcelona May13thN°1999/12442c

INVESTIRE Economics

Investment cost of the only installed technology (no periphery)

1,E+02

1,E+03

1,E+04

1,E+05

1,E+06In

vest

men

t co

st f

or

inst

alle

d c

apac

ity

€/kW

h

Lead-acid Lithium Supercaps Nickel ElectrolyserstorageFuel-cell

Flywheel Redox-flowCompressedair

Metal-air

Page 8: INVESTIRE

CEA/DRT/DTEN/SCSE/GENEC CIRED 2003 Barcelona May13thN°1999/12442c

INVESTIRE Further work and Conclusions

Further work: Finalisation of publishable technology reports Transversal analysis and further data gathering Definition of an R&D roadmap Finalisation of a mapping of centres of excellence

Information on www.investire-network.com

Conclusions: INVESTIRE allows the gathering of manufacturers,

research structures and professional associations Lack of validated data for emerging technologies