Transcript of Encie Ecc Report
-
8/11/2019 Encie Ecc Report
1/22
Environmental
Compliance
Certificate
-
8/11/2019 Encie Ecc Report
2/22
ECC is a certificate issued by DENR/EnvironmentalManagement Board EMB after a positive review of theECC application. This certifies that based on the
application of the proponent, the proposed project orundertaking will not cause a significant negativeimpact on the Philippines environment. The ECC'scontain specific measures and conditions that must be
met by the project proponent before and during theoperation of the project. In some cases, conditions arelisted to be pre-formed during the projectsabandonment phase to lessen identified potentialenvironmental impacts.
-
8/11/2019 Encie Ecc Report
3/22
The ECC's also certify that the proponent hascomplied with all the requirements of the
Environmental Impact Statement (EIS)System and has committed to implement itsapproved Environmental Management Planin the Philippines.
-
8/11/2019 Encie Ecc Report
4/22
Must Document Requirements:
Environmental Impact Statement (EIS) Report Accountability Statement from EIS Consultant
and Project Proponent DA Certificate of Viability for Conversion (if in
agricultural land and conversion is necessary) Land Title/Proof of Land Jurisdiction/Ownership PAWB Endorsement (if within protected area) SEC Registration
-
8/11/2019 Encie Ecc Report
5/22
NWRB Water Use Permit/Certificate of WaterAvailability
Review Fund Electronic File of the EIS Environmental Tract Record (for expansion
projects)
Photocopy of TCT/OCT/CLT Zoning/Certificate of Locational Viability Barangay or Municipal of City Council
Resolution/Proof of consultation with LGUs
-
8/11/2019 Encie Ecc Report
6/22
Category A1 (for new co-located projects)
Requirements:
-Programmatic Environmental PerformanceReport and Management
Plan (new co-located project)
-
8/11/2019 Encie Ecc Report
7/22
Category A2(for expansion projects)
Requirements: -Programmatic Environmental Performance
Report and Management Plan (co-located projects) Environmental Performance Report and
Management Plan (single project)
-
8/11/2019 Encie Ecc Report
8/22
Category A3 (for existing projects withoutECC)
Requirements: -Programmatic Environmental Performance
Report and Management Plan (co-located projects) -Environmental Performance Report &
Management Plan (single project)
-
8/11/2019 Encie Ecc Report
9/22
Category B.
Projects that are not categorized as ECPs, butwhich may cause negative environmentalimpacts because they are located inEnvironmentally Critical Areas (ECA's)
-
8/11/2019 Encie Ecc Report
10/22
Category C. Projects intended to directlyenhance environmental quality or address
existing environmental problems not fallingunder Category A or B.
Category D. Projects unlikely to cause adverseenvironmental impacts.
-
8/11/2019 Encie Ecc Report
11/22
1. Proponent consults EMB (EIAD) re: his project.
(screening)
2. EIAD schedules scoping meeting.2.1. Assigns case handler2.2. Determines and notifies members of EIARC2.3. Meets proponent, case handler and
members of EIRC for project scoping orrequirements checklist2.4. Second level scoping Public consultation
-
8/11/2019 Encie Ecc Report
12/22
3. Proponent conducts EIA and prepares EISbased on the scoping or requirements
checklist and second level scoping.
3.1. Deposits EIA review fund with NRDC3.2. EIAD Case Handler determinescompleteness of documents.
-
8/11/2019 Encie Ecc Report
13/22
4. Proponent pays filing and processing fee with EMBCashier.4.1. Proponent submits complete, procedurally screenedEIS together with supporting documents to EMB record
and forwards to EIAD.4.2. EIAD schedules RC meeting
.5. EIARC meets to review EIS (Several meetings).
5.1. May request for additional information (up to 2 times)
5.2. Conducts site inspection5.3. Conducts public hearing5.4. Prepares and submit final report andrecommendation to EMB Director thru EIA Division Chief
-
8/11/2019 Encie Ecc Report
14/22
6. EMB Director reviews final report andrecommendation.6.1. If not OK, returns it to EIARC thru EIADC
6.2. If OK;6.2.1. Signs / Approves ECC or6.2.2. Recommends ECC to the Secretary
7. Secretary either approves or denies ECC within
15 days.
Note: Processing time will be 120 working days
-
8/11/2019 Encie Ecc Report
15/22
A. Application for ECC1. Category A-1 (Co-located Projects)
total : P10,000.000
Procedural Screening Fee -1,500.00 Database Management Fee -3,000.00 Processing Fee - 5,500.00
-
8/11/2019 Encie Ecc Report
16/22
2. Category A-1(Single project), Category A-3(Co-located Project)
total: P 6,000.00
Procedural Screening Fee 600.00 Database Management Fee 2,000.00 Processing Fee 3,400.00
-
8/11/2019 Encie Ecc Report
17/22
3. Category A-2, and B-1Total: P4,000.00
Procedural Screening Fee 300.00 Database Management Fee 1,000.00 Processing Fee 2,700.00
-
8/11/2019 Encie Ecc Report
18/22
4. Category B-2 and B-3
Total: P3,000.00
Procedural Screening Fee 300.00 Database Management Fee 1,000.00 Processing Fee 1,800.00
-
8/11/2019 Encie Ecc Report
19/22
B. Certification of Non-Coverage1. Category D P 100.002. Category C 600.00
C. Post ECC Processing Services1. Request for minor ECC Amendment P 300.00/
application(Article II, sec. 3-B item 2.1)
2. Request for major ECC AmendmentP1,200.00/application
(Article II, sec. 3-B item 2.2)
-
8/11/2019 Encie Ecc Report
20/22
D. Other Services1. Request for miscellaneous certifications P
50.00/certification2. Request for certified true/photocopy25.00/document
-
8/11/2019 Encie Ecc Report
21/22
DENR-Department of Environment and NationalResources
ECC- Environmental Compliance Certificate
EIS- Environmental Impact StatementEMB-Environmental Management BureauPAWB-Protected Areas and Wildlife BureauNWRB-National Water Resources BoardEIAD-Environmental Impact Assessment DivisionEIARC-Environmental Impact Assessment Review
CommitteeEIA-Environmental Impact AssessmentNRDCNatural Resources Development Corporation
-
8/11/2019 Encie Ecc Report
22/22
MARAMING SALAMAT PO