ROAD CLOSED TO THROUGH TRAFFIC USE ALTERNATE ENTRANCE TO ACCESS CORE CAMPUS
drgolde
Rectangle
drgolde
Rectangle
drgolde
Rectangle
drgolde
Rectangle
drgolde
Text Box
PAVING RESTORATION Roadways will be closed in the Quad Loop for the restoration of paving previously disturbed by the installation of hot water pipes. DAY 1: 8/31/2021 COMPLETE DAY 2: 9/1/2021 COMPLETE DAY 3: 9/2/2021 COMPLETE DAY 4: 9/3/2021 6AM - 6PM Paving at Cal Ave, North Quad Surface preparation at West Quad, Kerr Hall Parking, Young Hall, North Hall DAY 5: 9/7/2021 6AM - 6PM Paving at West Quad, Kerr Hall Parking, Young Hall, North Hall
PAVING RESTORATION Roadways will be closed in the Quad Loop for the restoration of paving previously disturbed by the installation of hot water pipes. DAY 1: 8/31/2021 COMPLETE DAY 2: 9/1/2021 COMPLETE DAY 3: 9/2/2021 COMPLETE DAY 4: 9/3/2021 6AM - 6PM Paving at Cal Ave, North Quad Surface preparation at West Quad, Kerr Hall Parking, Young Hall, North Hall DAY 5: 9/7/2021 6AM - 6PM Paving at West Quad, Kerr Hall Parking, Young Hall, North Hall Pipeline installation - Hutchison Drive at Shields Library will be closed for pipe installation.