Outline:
Dettaglio Richieste 2009 per Sezioni Totale Richieste 2009 per RPC BARREL e confronto con Luglio 2008 Proposta Distribuzione Servizi MoA per RPC BARREL Dettaglio richieste MOF-B Richieste aggiuntive 2008 Piano di intervento e spare Closed Loop @ P5 GIF
1Roma 21/7/2008 CMS Referees
Dettaglio richieste 2009BARI
2Roma 21/7/2008 CMS Referees
Dettaglio richieste 2009FRASCATI
3Roma 21/7/2008 CMS Referees
Dettaglio richieste 2009NAPOLI
4Roma 21/7/2008 CMS Referees
Dettaglio richieste 2009PAVIA
5Roma 21/7/2008 CMS Referees
Riassunto richieste 2009 e confronto con il 2008 (Luglio)
n.b. Il confronto è fatto a Luglio 2008 6
Roma 21/7/2008 CMS Referees
- Distribuzione Servizi MoA per sezione - Rapporto servizi Italia/CERN
7Roma 21/7/2008 CMS Referees
Da Tabella RPC documento ufficiale MoA da cui è stato estratto solo il BARREL
8Roma 21/7/2008 CMS Referees
Dettaglio richieste MOF-B 2009
9Roma 21/7/2008 CMS Referees
RPC BARRELRichieste aggiuntive 2008
10Roma 21/7/2008 CMS Referees
Wheel sec
chamber problem spare severity access
W-2 7 Rb1in-right Leak broken output T-connector
No avail Medium , Can operate
To be removed and repaired on place
W-1 12 RB4/2000-rightID266-357
Leak External connections? 0.02mbar/min.
No avail Low , Can operate
First check connection on wheel. Otherwise to be removed and need spare
6 RB3 rightID 1, 12
Leak External connections?0.04mbar/min.
1 spare with serv.avail
Low, Can operate
First check connection on wheel. Otherwise to be removed and need one spare
10 RB4/2500 rightID 124,128
Leak, External connections?0.2 mbar/min
No avail Medium, Can operate
First check connection on wheel. Otherwise to be removed and need spare
6 RB4-1500 right without service
LV digital cable in short No need
High, not in operation
To be removed and repaired on place
8 W-1/RB3+ Distribution board. FEB threshold control
ok Low, in operation
To be pulled out to replace the board
W0 8 RB3 left ID 6,2
Leak no pressure No avail Medium in operation in gas ricirculation
To be removed. Need spare
1 RB1out leftID 408
Leak 0.05 mbar/min avail Low, in operation, in gas ricirculation
To be removed .
2 RB3 right ID 24, 287
Leak 0.250 mbar/min 1 spare with service avail
Medium, in operation , in gas ricirculation
To be removed.Need one spare
8 RB2out Distribution board, FEB Threshold control
ok Low in operation
To be pulled out to replace the board
W+2 8 RB4+ rightID 150
Leak broken input T-connector
No avail High, not in operation
To be removed and repaired on place
5 RB1out Distribution board. FEB threshold control
ok Low, in operation
To be pulled outto replace board
Piano di intervento e Spare