GNL-3Z PROJECT: Realizzazione dell’impianto world class per la liquefazione di gas naturale ad Arzew, Algeria Milan, July 2014 Anton Marco Fantolini - LNG Technology Manager

Transcript of GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

Page 1: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z PROJECT:Realizzazione dell’impianto world class per la liquefazione di gas naturale ad Arzew, Algeria

Milan, July 2014

Anton Marco Fantolini - LNG Technology Manager

Page 2: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Main Contents

Project Overview Client Targets EPCC execution challenges

2

Page 3: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Project Overview

Bid competition with extensive FEED rework

EPCC LSTK Contract award on December 2008

Peak LNG capacity: 5.1 MTPA RATED @ 21ºC, 330 d/y

Cost Effective Design: < 900 $/tpa

Design responsive to Client’s Bid targets

1 LNG train: 4.7 MTPA, APCI C3-SPLIT MRTM

Provisions for future 2nd LNG Train

Grass Root complex inclusive of Infrastructures, Storages, Utilities

CLIENT: SONATRACH

CONTRACTOR: JV BETWEEN SAIPEM (LEADER) AND CHIYODA

WORLD LARGEST TRAINUSING C3-MR TECHNOLOGY

WORLD LARGEST TRAINUSING C3-MR TECHNOLOGY

3

Page 4: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Project Overview: EPCC Scope of Work

COMPLETE INDUSTRIAL FACILITY FROM GRASS ROOT TO OPERATION

4

Page 5: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Project Overview: EPCC Scope of Work

COMPLETE INDUSTRIAL FACILITY FROM GRASS ROOT TO OPERATION

Process Facilities Area

Inlet

Utilities

Power Generation

5

Page 6: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Project Overview: EPCC Scope of Work

COMPLETE INDUSTRIAL FACILITY FROM GRASS ROOT TO OPERATION

LNG Production Train Area

Gas Pretreatment

Liquefaction

NGL Recovery

NGL Fractionation

FUTURE TRAIN AREA

6

Page 7: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Project Overview: EPCC Scope of Work

COMPLETE INDUSTRIAL FACILITY FROM GRASS ROOT TO OPERATION

Building Area

Main Control Room,

Warehouse,

Workshop, Safety,

Administration

7

Page 8: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Project Overview: EPCC Scope of Work

COMPLETE INDUSTRIAL FACILITY FROM GRASS ROOT TO OPERATION

Cryogenic Tanks Area

LNG (2x160,000 m3)

Propane (56,000 m3)

Butane (12,000 m3)

BOG Recovery

8

Page 9: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Project Overview: EPCC Scope of Work

COMPLETE INDUSTRIAL FACILITY FROM GRASS ROOT TO OPERATION

Marine Works Area

Breakwater

Jetty

Near-shore Flares

9

Page 10: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Project Overview: Plot Area

Offshore flares Liquefaction/Fractionation split Full containment tanks

LIMITED PLOT SPACE (54 Ha)

GNL-3Z - up to 9.4 MTPA

6 Ha/MTPA

0.9 x 0.6 km

Bonny NLNG - up to 30 MTPA

11 Ha/MTPA

2.8 x 1.2 km

Qatar Gas - Ras Gas - 77 MTPA

17 Ha/MTPA

5.5 x 2.4 km

10

Page 11: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Project Overview: Novated Items

Main Cryogenic Heat Exchanger (APCI)

Gas Turbines (GE - Nuovo Pignone) Power Generation: n.3 Frame 6 MR/PR drivers: n.2 Frame 7 Helper motors: 17 MW (Siemens)

ITEMS PARTIALLY FABRICATED BASED ON ORIGINAL FEED

IMPOSED TO EPC CONTRACTOR

ITEMS PARTIALLY FABRICATED BASED ON ORIGINAL FEED

IMPOSED TO EPC CONTRACTOR

11

Page 12: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Chiyoda, Yokohama

ADVISORY ROLE:Consultancy, Review,Selected experiencedpersonnel supply

Management Challenges: Effective Multi-center Project Execution

Saipem India

Detailed design forStorage, Utilities and Offsites

Engineering Mhrs

Milan

Paris

Chennai

Yokohama

Algèrie

Saipem Algèrie

Logistics support, SubcontractsSite: Construction Supervision,Field Engineering, Commissioning

Saipem Paris

Marine facilities designStorage/loading design

Saipem Milan

OVERALL PROJECT LEADERSHIPLNG Train design Utilities design Procurement

12

Page 13: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Management Challenges: Workforce at Site

Company Expats Algerians

Saipem 38% 62%

International SubContractors 30% 70%

AlgerianSubContractors -- 100%

Project Average 27% 73%

PROJECT TARGET: LOCAL CONTENT MAXIMIZATION

7 OUT OF 10LOCAL WORKERS

7 OUT OF 10LOCAL WORKERS

MOBILIZATION: PEAK IN MARCH 2012

Total 11,830

13

Page 14: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Engineering Challenges: LNG Capacity Increase

BID COMPETITION TARGET: MAXIMIZE LNG PRODUCTIONABOVE ORIGINAL 4.0 MTPA,USING PRE-COMMITTED EQUIPMENT

MCHE Operating pressure increase MCHE bypass EFG cold energy recovery

Refrigeration Cycles MR composition optimization MR/PR power balance Compressors curves re-design

Additional Items Liquid expanders Auxiliary Propane Cycle EFG system n.1 GTG

TRAIN PEAK NOMINAL CAPACITY WAS INCREASED TO 5.1 MTPA (NOMINAL 4.7 MTPA)

CLOSE COOPERATION WITH GE AND APCI

CLOSE COOPERATION WITH GE AND APCI

14

Page 15: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Engineering Challenges: Safety in design

Safety LNG/LPG spillage handling LNG/LPG far from GT’s, furnace and incinerator LPG air coolers emergency isolation in two halves

Environment DLN/DLE for all Gas Turbines Waste Heat Recovery

BID COMPETITION TARGET: IMPROVE HSE DESIGN, REDUCE AUTO-CONSUMPTION

FEED DESIGN EXTENSIVELY REVISED IMPROVING PLANT HSE FEATURES

15

Page 16: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Engineering Challenges: Saipem Compact Design Solutions

PROPANE KETTLES ARRANGEMENT

TYPICAL ARRANGEMENT

GNL-3Z SAIPEM COMPACT DESIGN PRO’S

Compact layout, KO drums close to kettles

Maintainability, Accessibility

Material selection: LTCS on HHP-HP kettles

LPG spillage handling

16

Page 17: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Procurement Challenges – GNL-3Z Arzew

USAMCHE Liquid Expanders2 Frame 7 GTCsCryogenic Pumps

GERMANYBOG CompressorsCold BoxesActivated Amine

FRANCE4 Frame 6 GTGsMolecular SievesActivated Carbon

ITALYMain Compressors3 Frame 5 GTCsSpecial On-Off ValvesPiping

JAPANEnd Flash CompressorsSpecial Cryogenic Valves

S. KOREAAir Coolers S&T ExchangersBig Size VesselsBig Size Columns

MIDDLE EASTSteel Structures

Main Bulk & Equipment Quantities

UoM TOTAL

Steel Structures T 43,000

Piping T 23,000

E&I Cables km 3,000

Equipment T 26,000

ARZEW,ALGERIA

17

Page 18: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Construction Challenges: HSE Performances

THE SAFER, THE BETTER

CONSTANT FOCUS ON HSE LEAD TO A CONTINUOS PERFORMANCE IMPROVEMENT

PERFORMANCE ACHIEVED

2009 2010 2011 2012 2013

2,5

2

1,5

1

0,5

0

TRIFR*

2,19

1,45

1,14

0,82

0,28

Average = 0.89

WORKED MANHOURS

* TRIFR = Total Recordable Injury Frequency Rate

CURRENT MHRS NO LTI> 19,900,000CURRENT MHRS NO LTI> 19,900,000

HSE TRAINING> 230,000 HOURSHSE TRAINING> 230,000 HOURS

18

Page 19: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Construction Challenges: Air Coolers Installation Sequence

LIFTING SLIDINGRAIL POSITIONING

19

Page 20: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Construction Challenges: De-Ethanizer Column Heavy Lifts

Tower Bridge Operation:

Heaviest Lift

Weight 1150 tons

Tower Bridge Operation:

Heaviest Lift

Weight 1150 tons

20

Page 21: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Construction Challenges: Cryogenic Storage and Marine Works

21

Page 22: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Construction Challenges: Cryogenic Storage and Marine Works

LNG TANKS

H=50m, OD=85mCapacity=160,000 m3

22

Page 23: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Construction Challenges: Cryogenic Storage and Marine Works

HP FLARES

H=140mCapacity:Cold 2400 Tons/hWarm 1300 Tons/hCauseway = 250 m

23

Page 24: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Construction Challenges: Cryogenic Storage and Marine Works

JETTY CAUSEWAY

L=400mRubble Mounded

24

Page 25: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Construction Challenges: Cryogenic Storage and Marine Works

JETTY TRESTLE

L=500mCaissons

25

Page 26: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Construction Challenges: Cryogenic Storage and Marine Works

BREAKWATER

L=760mCaissons

26

Page 27: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Construction Challenges: Cryogenic Storage and Marine Works

TEMPORARY DOCK

L=250m

RECLAIMED AREA

27

Page 28: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Commissioning Challenges: from Construction to Operation

SET UP OF COMPLETE TEAM TO DELIVER AN EFFECTIVE PLANT START UP

Management 12 Operation 80 Process 8Mechanical 33Instrumentation 50 Electrical 27

TOTAL: 210

28

Page 29: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Commissioning Challenges: Client Team Training

Training Areas Engineering - 30 trainees Operation - 139 trainees Maintenance - 62 trainees Fire Fighting - 13 trainees

Trainees Assessment Initial Assessment On-going Assessment Final Assessment

BUILD UP OF COMMISSIONING, OPERATION & MAINTENANCE INTEGRATED TEAM

CLIENT TRAINING24,000 HOURSCLIENT TRAINING24,000 HOURS

29

Page 30: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Commissioning Challenges: Achievements and Way Forward

LNG Storage and Loading systems

First LNG Ship

Increase production at rated capacity

Performance Test

Utilities & Power Generation

Gas Turbines & Compressors Commissioning

Gas Treatment (Warm End)

Defrost of Cryogenic Sections

Propane Import - Auxiliary Propane Cycle

NGL Recovery and Fractionation

Ethane import - Refrigerant Cycles Start Up

Propane/Butane Production, Storage and export

Liquefaction and End Flash

Oct 2013

Nov 2013

Dec 2013

Mid Jan 2014

Jan 2014

Mid Feb 2014

Mar 2014

Jun 2014

Jun 2014

PLANT IS RUNNING SMOOTHLY AT REDUCED CAPACITY

FIRST LNG SHIP IN JULY 2014

FIRST LNG SHIP IN JULY 2014

30

Page 31: GNL-3Z PROJECT: Realizzazione dell'impianto world class per la ...

GNL-3Z Project in Algeria

Conclusions

SAIPEM, as a JV leader, with the technological support of CHIYODA: have executed the EPC portion of the LSTK Project GNL-3Z are now completing the Commissioning and Start-up Phase

delivering to SONATRACH their largest LNG Production Train.