GGOOVVEERRNNMMEENNTT OOFF...
Transcript of GGOOVVEERRNNMMEENNTT OOFF...
GGOOVVEERRNNMMEENNTT OOFF RRAAJJAASSTTHHAANN
RRUURRAALL DDEEVVEELLOOPPMMEENNTT && PPAANNCCHHYYAATTII RRAAJJ DDEEPPAARRTTMMEENNTT
WWAATTEERRSSHHEEDD DDEEVVEELLOOPPMMEENNTT && SSOOIILL CCOONNSSEERRVVAATTIIOONN DDEEPPAARRTTMMEENNTT
RRAAJJAASSTTHHAANN,, JJAAIIPPUURR
PIA- ASSISTANT ENGINEER PROJECT MANAGER,
W.D. & S.C., WCDC, W.D. & S.C.,
P.S.-LUNKARANSAR DISTRICT-BIKANER
DETAILED PROJECT REPORT
NAME OF WATERSHED : IWMP –BIKANER-44
PANCHAYAT SAMITI : LUNKARANSAR
MACRO : CLUSTER
MICRO : CLUSTER
TOTAL AREA : 3820 Hectare
NET AREA : 3720 Hectare
COST / HA : Rs. 15000/HA
TOTAL AMOUNT : 558.00 Lacs
D
DISTRICT : BIKANER
A-PDF Merger DEMO : Purchase from www.A-PDF.com to remove the watermark
CERTIFICATE
Certified that the undersigned have proposed the appropriate and need based activities
required in the watershed project area with active participation of beneficiaries along with
consultation of Watershed Committees (WCs). Approval of watershed project plan and DPR has
been obtained from WC, Gram Sabha. The plan and DPR document of IWMP BIKANER-44
project, at P.S.- LUNKARANSAR District BIKANER is technically sound, viable and appropriate
for implementation during the period 2012-13 to 2016-17.
We recommend that this plan be sanctioned and put to implementation.
Signature Signature Signature Signature Signature Signature
Chairman/ Secretary
WC
WDT members Junior
Engineer
P.S.-
Lunkaransar
Assistant Engineer
& PIA
P.S.-Lunkaransar
Project
Manager,WCDC
Distt.-Bikaner
1. Engg.
2. Ag.
3. Vet.
4. Social
GOVERNMENT OF RAJASTHAN
RURAL DEVELOPMENT & PANCHAYATI RAJ DEPARTMENT
(WATERSHED DEVELOPMENT & SOIL CONSERVATION)
NAME OF PROJECT: IWMP- BIKANER 44
EFFECTIVE AREA OF PROJECT: 3720 HA.
COST /HA - 15000.00
COST OF PROJEC: 558LAC.
BLOCK: LUNKARANSAR
DISTRICT: BIKANER
PIA – ASSISTANT ENGINEER
W.D. & S.C., P.S. - LUNKARANSAR
PROJECT MANAGER, WCDC
W.D. & S.C., DISTRICT - BIKANER
Detail of Project
1. Name of Project : IWMP Bikaner-44
2. Sanction No. & date of Project : F18(I-51)WDSC/IWMP/2011-12/4800-5087/05.08.11
3. Macro & Micro Nos : Cluster
4. Deviation from Project Sanctioned :
Items As per Project Sanctioned As proposed in DPR
Project Area 3720 ha. 3720 ha.
Macro/Micro No Cluster Cluster
Name of Gram Panchayats Hansera, Kujti, Dhirera Hansera, Kujti, Dhirera
Name of Villages Khari, Mehrana, Dhirera station,
Hansera, Dulmera station
Khari, Mehrana, Dhirera station,
Hansera, Dulmera station
Project Cost (Rs in Lakhs) 558 lakh 558 lakh
DPR TEMPLATE
Index
S.No Topics Page no.
1 Chapter
Location
General Features of watershed (Cost and Area details)
Climatic and Hydrological information
Other Development Schemes in the project area
Details of infrastructure in the project areas
Institutionnel arrangements (WCDC, PIA, WDT, WC)
Base line Survey Format for IWMP MIS Web site
2 Chapter Basic Data ,Analysis and Scope
2.1 Demography Details 2.2 Development Indicators 2.3 Land use 2.4 Agriculture status and Productivity Gap Analysis 2.5 Horticulture/Vegetable/Floriculture status 2.6 Land holding pattern 2.7 Livestock status With Per Capita Production 2.8 Fodder status 2.9 Farm Implements 2.10 NREGS Status 2.11 Migration details 2.12 Livelihood Details. 2.13 Existing SHG 2.14 Ground Water details 2.15 Drinking Water Status 2.16 Water use efficiency 2.17 Slope details 2.18 Water Budgeting 2.19 Soil Details 2.20 Soil erosion status
3 Chapter Proposed Development Plan
4 Chapter Activity wise Total Abstract of cost
5 Chapter Annual Action Plan
5.1 Project fund 5.2 Convergence Plan
6 Chapter Project outcomes
7 Technical designs and estimates for proposed activities
8 Enclosures
8 .1 Maps b. Location –District, block, village, watershed location map c. Map of Project with Watershed Boundary demarcation in cadastral map d. Land Use Land Cover map e. Existing water bodies, DLT f. PRA Map (along with photos & paper drawing) g. GIS based intervention map
h. Treatment map ie proposed works on revenue map
8.2 Documents of Agreements:
Proceedings of Gram Sabha for EPA approval
Proceedings of Gram Sabha Resolution for committee constitution
Documents related to PRA exercise
Proceedings of Gram Sabha for DPR approval
Proceedings of Panchayat Samiti General body for DPR approval
Proceedings of Zila Parishad Standing Committee for DPR approval
CHAPTER – I
INTRODUCTION
Location:
IWMP Bikaner-44 Project is located in Lunkaransar Block, of Bikaner district. The project area is
between the latitudes 28º29’29” -28º56’18” North & longitudes 72º26’15”-73º15’26”East. It is at a
distance of 11 km from its Block head quarters and 53 Km from the district head quarters. There
are 1471 no. of habitations in the Project area and other details are given below.
S. No. Name of Project(as per GOI) BKN – 44(IWMP)
(a) Name of Catchment KHari, Dhirera Station, Hansera,
Mehrana, Dulmera Station
(b) Name of watershed area(local name) BKN-44
(c) Gross Project Area 3820 Ha
(d) Net treatable Area 3720 Ha
(e) Cost of Project 558 Lacs
(f) Cost/hectare 15000 Rs.
(g) Year of Sanction 2011-12
(h) Watershed Code Cluster
(i) No. of Gram Panchayats in project area 3
(j) No. of villages in project area 5
(k) Type of Project Desert
(l) Elevation (metres) ------
(m) Major streams Nil
(n) Slope range (%) 0-3%
General features of watershed
The watershed falls in Agroclimatic Zone -IC. The soil texture is sandy. The average rainfall is
31.74cm. The temperatures in the area are in the range between 28º-49º centigrade during
summer and 2º-24º centigrade during winter. The major crops in the area are Guar, Bajra, Moth,
mooj, til etc. 86.94% land is under cultivation 19.99% land fallow, 1.6% land is wasteland. 0.0%
land is irrigated through cannel and tubewell.
235 No of households are BPL (17.32% households) 296 are landless households (21.54%
households) and 433 household are small and marginal farmers (31.51%household). Average
land holding in the area is 3.24ha. 100% area is single cropped area and 0.0% is double cropped.
The main source of irrigation is No exited. The average annual rainfall (5 years) in the area is
421.6 mm. The Major streams in the Watershed are Nil. The major festivals in the village are Holi,
Eid, Deepwali & Rakshabandhan. At present this village is having 9618 populations with
Communities like Jat, Rajput, Brahmaan, Meghwal, Kumbhar and Muslim.
Climatic and Hydrological information
1 Average Annual Rainfall(mm)
Year Average Annual Rainfall(mm)
1 2003 283
2 2004 103
3 2005 342
4 2006 207
5 2007 348
6 2008 387
7 2009 383
8 2010 783
9 2011 574
10 2012 475
2. Average Monthly rainfall (last ten years)
Month Rainfall(mm)
i) June 46.10
ii) July 108.40
iii) August 85.80
iv) September 48.90
3. Maximum rainfall intensity (mm)
Duration rainfall intensity(mm)
i) 15 minute duration 6.30
ii) 30 minute duration 12.60
iii) 60 minute duration 25.00
4. Temperature (Degree C)
Season Max Min
i) Summer Season (May-June) 49 28
ii) Winter Season (Dec- Jan.) 24 2
iii) Rainy Season (July-August) 38.50 28.30
5. Potential Evaporation Transpiration (PET) (mm/day)
Season PET
i) Summer (May2012) 26.60
ii) Winter (June2012) 14.26
iii) Rainy (August2012) 29.70
6. Runoff
i) Peak Rate (cum/hr) Nil
ii) Total run off volume of rainy season (ha.m.) 1.5mm
iii) Time of return of maximum flood 5 years 10 years In-Year
iv)Periodicity of Drought in village area
1 3 Occasionally
Other Development Schemes in the project area
S.No Scheme
Name of the department
Key interventions under the Scheme
Targeted Beneficiaries
Provisions under the Scheme
1. MNREGA Panchayatiraj Employment 1871 100days
2. JSY Medical & Health
Decrease the MMR
182 Rs 1700/Woman
3. SGSY Panchaytiraj SHG Development
273 Micro Enterprises
4. NRHM Health Dept. Health improvement
11350 Toilet subsidy, Free Dot kit for TB Patient & All type of medicines
Details of infrastructure in the project areas:-
Parameters Status
(i) No. of villages connected to the main road by an all-weather road
5
(ii) No. of villages provided with electricity 5
(iii) No. of households without access to drinking water 70
(iv) No. of educational institutions : (P) (S) (HS) (VI)
Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI) 6 2 3 Nil
(v) No. of villages with access to Primary Health Centre 5
(vi) No. of villages with access to Veterinary Dispensary 5
(vii) No. of villages with access to Post Office 5
(viii) No. of villages with access to Banks 5
(ix) No. of villages with access to Markets/ mandis Nil
(x) No. of villages with access to Agro-industries Nil
(xi) Total quantity of surplus milk 5261900Ltr.
(xii) No. of milk collection centres (U) (S) (PA) (O)
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
8 4 4 -
(xiii) No. of villages with access to Anganwadi Centre 6
(xiv) Any other facilities with no. of villages (please specify) Nil
(xv) Nearest KVK BIKANER
(xvi) cooperative society LUNKARANSAR
(xvii) NGOs Urmul Seva Sansthan, Swami keswanand yuvamandal
sansthan
(xviii) Credit institutions
(i) Bank SBBJ LUNKARANSAR
(ii) Cooperative Society LUNKARANSAR
(xix) Agro Service Centre's KVK BIKANER, ATC LUNKARNSAR
Institutional arrangements (SLNA,WCDC,PIA,WDT,WC, Secretary)
WCDC Details
PIA particulars
WDT Particulars:
1 2 3
S.No Particulars Details of WCDC
1. PM ,WCDC Sh. Ashok Sexana
2. Address with contact no., website Executive Engineer. (L.R.), ZP BIKANER
3. Telephone 0151-2200695
4. Fax 0151-2200695
5. E-mail [email protected]
1 2 3
S.No Particulars Details of PIA
1. Name of PIA Sh. Shivlal Verma
2. Designation Assistant Engineer
3. Address with contact no., website Panchayat Samiti Lunkaransar
4. Telephone 01528-271037
5. Fax 01528-271037
6. E-mail [email protected]
1 2 3 4 5 6 7 8
S.
No
Name of WDT
member
M/
F Age
Qualification
Experience in
watershed(Yrs)
Description of
professional
training
Role/
Function
1 Mr. Omprakash Jat M 22 Dip.(civil) 5 Month - Engg.
2 Mr. Kedar Mund M 24 B.Sc. (Ag.) 5 Month - Agriculture
3 Mr. Vikash Delu M 20 LSA (Dip.) 5 Month - Vet nary
4 Mrs. Anita Godara F 25 M.A. M.Fil
Net(Soc.)
5 Month - Social
Science
Details of Watershed Committees (WC)
S.N.
Name of WCs
Date of Gram Sabha for
WC Designation Name M/F SC/ST/OBC/General
Landless/MF/SF/ BF
Name of UG/SHG
Educational qualification
1. DHIRERA 13-04-13 President Sh. Ajit Singh Jayani M OBC
BF UG M.B.A.
Secretary Sh. Gangaram Meghwal M SC BF UG M.A
Member Sh. Manaram Jat M OBC MF UG Educate
Sh. Baluram Jat M OBC MF UG Educate
Sh. Purnaram Jat M OBC MF UG Educate
Sh. Maniram Jat M OBC SF UG Educate
Mrs. Lali Devi F OBC LL
SHG Educate
Mrs. Sunder Devi F SC SF
SHG Uneducate
Sh. Arjun Singh M Gen MF UG Educate
Sh. Bajrang Das M SC SF UG Educate
Sh. Laxmanram M SC SF UG Educate
Sh. Mohanram M OBC SF UG Educate
Mrs. Jasoda Devi F Gen SF
SHG Educate
Sh. Omprakash M Gen SF
UG Educate
Mrs. Santi Devi F OBC SF
SHG Educate
Sh. Sunder lal M OBC SF
UG Educate
Mrs. Radha Devi F Gen SF SHG Educate
Mrs. Kisturi Devi F OBC MF SHG Educate
S.N.
Name of WCs
Date of Gram Sabha for
WC Designation Name M/F SC/ST/OBC/General
Landless/MF/SF/ BF
Name of UG/SHG
Educational qualification
2. HANSERA 25-01-2012 President Sh. Kishanaram Ji mund M
OBC BF UG Educate
Secretary Sh. Ganesharam kadia M SC BF UG M.A., B.Ed.
Member Sh. Hukmaram jat M OBC BF UG Educate
Sh. Tulcharam jat M OBC MF UG Educate
Sh. Tulcharam Nai M OBC MF UG Educate
Sh. Hetaram Acharay M Gen BF UG Educate
Mrs. Santi Devi F Gen BF SHG Educate
Mrs. Raja Devi F OBC BF SHG Educate
Mrs. Kalawati Devi F Gen MF SHG Educate
Sh. Tulcharam Kumhar M OBC MF UG Educate
Mrs. Jeetun Devi F OBC MF SHG Educate
Sh. Prakash Jat M OBC BF UG Educate
Sh. Dannath Jat M OBC BF UG Educate
Sh. Laluram Nayak M SC BF UG Educate
Sh. Jagdish Swami M Gen MF UG Educate
Sh. Kanaram Jat M OBC BF UG Educate
Mrs. Balveer Kaur F Gen MF SHG Educate
Sh. Harikishan Modi M OBC BF UG Educate
Sarfat Khan M OBC MF UG Educate
Mrs. Chananna Devi
F OBC SF SHG UnEducate
S.N.
Name of WCs
Date of Gram Sabha for
WC Designation Name M/F
SC/ST/OBC/General
Landless/MF/SF/ BF
Name of UG/SHG
Educational qualification
3. KHARI 04-05-12
President Sh. Jaynarayan Ji mund M OBC BF UG Educate
Secretary Sh. Sharwan ji mund M SC BF UG M.A., B.Ed.
Member Sh. Sitaram Jat M OBC BF UG Educate
Sh. Rameswarram Jat M OBC MF UG Educate
Sh. Kojdas Beragi M OBC MF UG Educate
Sh. Mohanram Jat M Gen BF UG Educate
Mrs. Jeti Devi F Gen BF SHG Educate
Mrs. Kosalya Devi F OBC BF SHG Educate
Sh. Birbalram Jat M Gen MF UG Educate
Mrs. Jasoda Devi F OBC MF SHG Educate
Mrs. Susila Devi F OBC MF SHG Educate
Mrs. Mohani Devi F OBC BF SHG Educate
Sh. Chataram Meghwal M OBC BF UG Educate
Sh. Shivlal Jat M SC BF UG Educate
Sh. Narayanram Jat M Gen MF UG Educate
Mrs. Pushpa Devi F OBC BF SHG Educate
Sh. Sahiram Jat M Gen MF UG Educate
Sh. Maluaram Jat
M OBC BF UG Educate
Sh. Hariram jat M OBC MF UG Educate
Problems and scope of improvement in the project area
The socio economic conditions of the area can be improved through increased production which
can be achieved through expansion in cultivated area and productivity enhancement. 59.53 ha
land is arable wasteland and 424.82 ha is fallow can be brought under cultivation.
There is no irrigated area in the watershed and with efforts this can be increased to 5%. The
productivity gap of major crops in the area as compared with district and with areas in the same
agro climatic zones indicate potential to increase the productivity. The demonstration of improved
package of practices, improved varieties, increased irrigation facilities and soil conservation
measures under the project can bridge this gap. Due to desert area focus of the project would be
to collect the rainwater and diversification in agriculture (horticulture, vegetables, green houses
and Agro forestry and fodder crops) and diversification in Livelihoods (Agriculture, Animal
husbandry, self employment).
477Quintal fodder scarcity can be met out through Pasture development. Improved animal
Husbandry practices can increase the productivity of livestock. 5-10% no of persons migrate due
to drought and scarcity of fodder. This migration can be checked through creation of employment
opportunities and pasture development in the project area through increase in production and
diversification in agriculture and Livelihoods as mentioned above.
There is heavy erosion due to wind and sand dunes are shifted from one place to another.
There is small rainfall in the area therefore no excess water for drinking and irrigation.
There is low fertility of the land due to sandy soil and low water holding capacity.
There is no sufficient fodder for animals as compare to animal population.
Base Line Survey Format for IWMP MIS website Project Name Total Geographical Area of Project (Lakh Hectares) Treatable Area
Wasteland (Lakh Hectares) 0.0005933 Rainfed Agricultural Land (Lakh Hectares)
0.0263431
Total Cropped Area (Lakh Hectares)
0.0315116 Net Sown Area (Lakh Hactares)
0.0289916
Total no. of Water Storage Structure
11 Total no. of Water Extracting Units
Nil
Total storage capacity of water storage structures (cubic meters)
2000 11x2000 22000
No. of Household
SC 233 ST 0
Others (OBC) 810 General 331
Total Population of the project Area
9618 No. of Household of Landless people
296
Total no. of BPL Household 235
No. of person-days of Seasonal Migration
77400 No. of Marginal Farmer’s Household
677
Depth of Ground Water (meters) below Ground level
Pre- monsoon 91 Post-monsoon 90
No. of person-days of Seasonal Migration
77400
CHAPTER – II Socio economic Features, Problems and Scope
Table 2.1 Population & Household Details:
Total Population
Male Female Total SC ST OBC
4926 4692 9618 1631 0 5670
Household Details
BPL household
Land Less
Marginal Farmer
Small Farmer
Middle Farmer
Total household
SC household
ST household
235 296 142 291 386 1374 233 0
Table 2.2 Development indicators
S. No. Development Indicators State Project Area
1 Per capita income (Rs.) 16260 15900
2 Poverty ratio 0.22 0.27
3 Literacy (%) 60-64% 49%
4 Sex Ratio 921 952
5 infant mortality rate 4 5-6
6 Maternal mortality ratio 2 2
The above table indicates (poor, average, good) socio economic conditions.
Table 2.3 (a) Land Use
Land Use Total area in Ha.
Private Panchayat Government Community Total
Agriculture Land
3494.14 ------- 130.17 ------ 3624.31
Temporary fallow
454.23 ------- 16.92 ------- 471.15
Permanent Fallow
244.58 ------- 9.11 ------- 253.69
Cultivated Rainfed
2795.32 ------- 104.14 ------- 2899.46
Cultivated irrigated
------ ------- ------ ------- -------
Net Sown Area
2795.32 ------- 104.14 ------- 2899.46
Net Area sown more than once
------ ------- ------- ------- ------
Forest Land ------ ------- ------- ------- -------
Waste Land ----- ------- 59.33 ------- 59.33
Pastures ---- 137.36 ------- ------- 137.36
Others ----- ------- ------- ------- -------
Total 3494.14 137.36 189.5 ------- 3820
The project area has 59.53 ha of cultivable wasteland. 424.82 ha of fallow land (total 698.81 ha)
can be brought under cultivation if some irrigation source can be provided through Construction of
WHS like Khadin, Tanka, Farm ponds etc. and also through demonstration of rainfed varieties of
crops. Construction of WHS can also increase in area under irrigation which is only 0.0%
59.33ha. (1.55 of the project area) is under wastelands and can be brought under vegetative
cover, with reasonable effort. Activities like WHS (Johad) Afforestation of wastelands and Pasture
development will be taken up on these lands.
Pasture development the land use table shows that there is 137.36 hectare pasture land. This
emphasizes the need for taking up pastureland development works through sowing of promising
species of grasses and plantation.
Table 2.3 (b)
Cropping Status
S.No Season Crop
sown
Rain fed Irrigated Total
Varieties Area
(ha)
Production
(Ton)
Productivity
(kg/ha)
Varieties Area
(ha)
Production
(Ton)
Productivity
(kg/ha)
Area
(ha)
Production
(Ton)
1. Kharif Gaur Local 2146 450.66 210 - - - - 2146 450.66
Bajra Local 196 46.06 235 - - - - 196 46.06
Moth Sathi 557 114.18 205 - - - - 557 114.18
2. Rabi - - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
3. Zaid - - - - - - - - - - -
- - - - - - - - - - -
Total 2899 610.90 - - - - 2899 610.90
Table 2.4.a Agriculture and Horticulture status and fuel availability.
**Write for each crop: The farmers are using Local varieties of Bajra, whereas varieties like HHB-67 can increase the production.
Crop Rotation**will vary from project to project
Guar - Fallow Bajra - Fallow Moong - Fallow Til - Fallow Moth - Fallow Watermelon - Fallow
The table 2.4 shows that only 0.0 ha is (0.0%) is double cropped area. Also the crop rotation
shows that fallow lands are there. This indicates that there is scope for change in crop rotation in
fields where there are fallow lands through Soil and Water conservation measures, crop
demonstration and diversification in agriculture.
Soil and Water conservation measures besides putting fallow lands under cultivation can
change the area under single cropping to double and multiple cropping.
Table 2.4.b Abstract of cropped Area(ha)
Area under Single crop 2899.46
Area under Double crop Nil
Area under Multiple crop Nil
Table 2.4.c Productivity Gap Analysis (The table can also be given in bar chart form)
Analysis of the above table indicate that besides national gap there is wide gap in productivity
within state and even within same agro climatic zones.
The reasons for this variation are
The farmers are using Local varieties of Bajra whereas the recommended varieties like HHB-
67 provide 480 kg/ha yield.
The farmers are using Local varieties of Moth whereas the recommended varieties like RMO-
40 provide 450 kg/ha yield.
The farmers are using Local varieties of Gaur whereas the recommended varieties like RGC-
936 provide 460 kg/ha yield.
Lack of Availability of good quality seeds of desired crop and variety in adequate quantities
and time to the farmers.
Availability of water for cultivation (0.0% is irrigated table 2.3(b).
The productivity gap and reasons of it indicate potential to increase the productivity through crop
demonstration. Crop demonstrations would be carried out on improved crops/ varieties, improved
agronomic practices. INM, IPM, Mixed cropping, distribution of fodder seed mini kit. Demonstration
of improved methods and economics of fodder crops cultivation and also distribution foundation
seeds of Forage Crops for further multiplication, introduction of fodder crops in the existing crop
rotations.
Name of the crop
Productivity kg/ha
India
Highest Average in Rajasthan
Highest Average of Agro climatic zone District
Project Area
Gaur 300-350 230 250 240 210
Moth 270-300 225 350 230 205
BAJRA 450-510 450 300 240 235
Table 2.5 Existing area under horticulture/Vegetables/Floriculture (ha)
Activity Area Species Varieties Recommended varieties Production
Horticulture 0.5 Ber Desi Gola Ber 80-100 kg/plant
Anowla Desi Banarsi 50-100 kg/plant
Lamon Desi Kagji 40-50 kg/plant
Vegetables Nil Tometo Desi Pusa Gorav 200-500 Qt/ha
Brinjal Desi Pusa round 200-400 Qt/ha
Floriculture Nil
Medicinal Plants Nil Sonamukhi Desi - 8-10 Qt/ha
Table 2.6 Land holding Pattern in project area
Type of Farmer
Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
Irrigated (source)
Rainfed Total
General SC ST OBC
(i)Large farmer 259 - 1756.44 1756.44 593.90 360.60 - 854.94
(ii)Middle farmer 386 - 1158.50 1158.50 277.40 220.20 - 660.90
(ii) Small farmer 291 - 465.60 465.60 112.40 260.70 - 92.50
(iii) Marginal farmer
142 - 113.6 113.6 24.60 58.20 - 30.80
(iv) Landless person
296 - - - - - - -
(V)No. of BPL households
235 - 423.2 423.2 152.80 208.20 - 62..20
41.76% land holdings belong to small and marginal farmers who own 81.88% of total cultivated
area. Horticulture/vegetables could be more economical to Small and Marginal farmers with
irrigation source. For Large farmers with no irrigation facility Horticulture/vegetables will be
promoted in a part of land with farm pond/Tanka construction.
The following activities will be more beneficial for small land holdings and for diversification and
income for large farmers.
Horticulture plantation, Medicinal and Aromatic Crops, floriculture: As discussed earlier.
Horticulture/vegetables could be more economical to Small and marginal farmers with irrigation
source. Also the project area has good potential for medicinal & aromatic crops like Sonamukhi,
Isabgol, Ashwagandha, Khus, Mehandi etc.
Agro forestry plantation: To increase the income of farmers and also for shelter belt plantation
as wind velocity is high in the project area.
Setting of Vermi Compost Units - Keeping in view the side effect of residues of chemicals and
fertilizers on human health the emphasis would be on cultivation of organic produce through
motivating farmers and providing assistance for production of organic input, vermi compost.
Production and distribution of quality seed – There is need to ensure that good quality seed is
available for cultivators for which adequate seed production would be initiated in watershed areas
with the assistance of private sector and agriculture department technologies
Sprinklers and pipelines- for efficient water management practices emphasis on demonstration
of sprinklers with adequate financial support and convergence/private partnership.
Establishment of Green House - For growing off season vegetables seedlings and other
horticultural crops under controlled atmospheric conditions of green house.
Establishment of nurseries: Most of the planting material is procured from other parts of the
State/ country. The procurement of planting material from distant places causes damage to the
planting material and often results in untimely supply. Hence nursery development activity can be
promoted in the area.
Innovative hi-tech/ export oriented activities: innovative hi-tech/ export oriented projects like
mushroom cultivation, floriculture, etc which are in negligible existence at present, can be
implemented by individual farmers / private companies.
Drip irrigation- Drip irrigation will be promoted in all horticulture plantations, vegetables, green
houses and in nurseries for rational use of irrigation higher yields and quality produce.
Table 2.7 Livestock Status - animals/milk production / average yield.
S.No.
Description of animals
Population in No.
Yield(milk/mutton/Wool) Equ. cow
units
Dry matter requirement
per year (7Kg per animal.)
Total requirement
in M.T. Milk (Ltr) Mutton
(kg) Wool (kg)
1 Cows
Indigenous 7000 6300000 - - 7000 17885000 17885.00
Crossbreed - - - - - - -
2 Buffaloes 1000 1200000 - - 1500 3832500 3823.5
3 Goat 4200 17000 3500 population /2 5365500 5365.5
4 Sheep 3900 19500 1345 population /2 4982250 4982.25
5 Camel 321 - - - 642 1640310 1640.31
6 Poultry - - - - NA - -
7 Piggery - - - - NA - -
Total 16421 7517000 23000 1345 9412 33750560 33750.56
In spite of the large number of livestock, production is less hence increase in productivity
across all species, is a major challenge. To enhance production of unproductive cattle and
improve the productivity following activities will be taken up:-
Demonstration of improved methods of conservation and utilization of Forage crops are
proposed.
Table 2.8 Existing area under fodder (ha)
S.No Item Unit Area/Quantity
1 Existing Cultivable area under Fodder
Ha Nil
2 Production of Green fodder Tonns/year Nil
3 Production of Dry fodder Tonns/ Year 12578.9
4 Area under Pastures Ha 149.2
5 Production of fodder Tonns/year 447.6
6 Existing area under Fuel wood Ha 663
7 Supplementary feed Kgs/ day 549
8 Silage Pits No Nil
9 Availability of fodder Tonns 13026.5
10 Deficiency/excess of fodder
Tonns
20724.06
The table above shows there is fodder deficiency (Requirement is 33750.56 and
availability 13026.5)
To minimize the large and expanding gap between feed and fodder resource availability and
demand there is need for
Increase in area under fodder crops
Increase in productivity of fodder crops
Development of pastures
And reduction in large number of livestock production through replacement by few but
productive animals
Table 2.9 Agriculture implements
S. No Implements Nos.
1 Tractor 60
2 Sprayers-manual/ power 14
3 Cultivators/Harrows 24/57
4 Seed drill 20
5 Any Other 10
Farm mechanization and seed banks: As discussed earlier 579.20 ha land holdings belong
to small and marginal farmers who own only 16.57% of total cultivated area so owning of big
farm implements by individual farmers is not economical so SHG would be promoted to buy
farm implements and rent to farmer
Table 2.10 NREGA Status - No. of Card Holder, activities taken so far, employment
status.
Sr. no. Name of village
Total No .of job cards
Employment Status
Activity taken up so far
1 KHARI 700 691 MNREGA Employment
2 DHIRERA ST. 250 229 MNREGA Employment
3 MEHRANA 62 51 MNREGA Employment
4 HANSERA 525 493 MNREGA Employment
5 DULMERA ST. 280 265 MNREGA Employment
Total 1817 1729
Table 2.11 Migration Details
Name of village
No. of persons migrating
No. of days per year of
migration Major reason(s)
for migrating
Distance of destination of
migration from the
village (km)
Occupation during
migration
Income from such occupation (Rs. in lakh)
KHARI 62 180 Unemployment & animal grazing
200 Labour & animal grazing
6.74
DHIRERA ST.
39 180 Unemployment & animal grazing
200 Labour & animal grazing
3.41
MEHRANA 23 180 Unemployment & animal grazing
200 Labour & animal grazing
2.25
HANSERA 63 180 Unemployment & animal grazing
200 Labour & animal grazing
6.78
DULMERA ST.
19 180 Unemployment & animal grazing
200 Labour & animal grazing
1.98
The migration can be check by creation of employment opportunities, enhancing farm level economy, increases the income of the people engaged in animal husbandry by dairy, poultry and marketing and value addition. (As discussed earlier) and diversification in livelihoods.
The existing livelihoods activities are given below
Table 2.12 (a)Major activities (On Farm)
Name of activity No of House holds Average annual income (Lakh)
Cultivators 324 194.40
Dairying 127 76.20
Poultry Nil -
Piggery Nil -
Goatry 84 36.00
Landless Agri. Labourers 18 16.20
Others 146 87.60
Table 2.12(b)Major activities (Off Farm)
Name of activity Households/individuals Average annual income (Lakh)
Artisans Nil Nil
Carpenter 47 24.60
Blacksmith 8 4.2
Leather Craft 00 00.00
Porter 82 57.40
Mason 90 114.23
Others specify (Cycle Repair ,STD,Craft etc)
8 9.6
Others Nil Nil
The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals Table 2.13( a ) Status of Existing SHG
S.No Name of SHG Members Activity involved
Monthly income
Fund available
Assistance available
Source of assistance
Training received
1. Jay Bhawani 10 Saving 100 24000 Yes PS LKS Nil
2. Pragati 12 Saving 100 4747 Yes PS LKS Nil
3. Jay Ma Bhawani 10 Saving 50 80000 Yes PS LKS Nil
4. Baba Ramdev 11 Saving 100 7700 Yes PS LKS Nil
5. Imla 10 Saving 10 7100 Yes PS LKS Nil
6. Lichama 13 Saving 20 260 Yes PS LKS Nil
7. Mahila SHG 15 Saving 25 7320 Yes PS LKS Nil
8. Mata Ji 10 Saving 100 - Yes PS LKS Nil
9. Kanya 10 Saving 100 - Yes PS LKS Nil
The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance
II. Technical Features Table 2.14 Ground Water
S.No Source No. Functional
depth Dry Area
irrigated
Water availability
(days)
i) Dug wells Nil - - - -
ii) Shallow tube wells 10 250-300 - - 250-300
iii) Pumping sets 3 - - - 300-320
iv) Deep Tube Wells 9 300-900 - - 200-250
Total 22 - -
Table 2.15 Availability of drinking water
S.No Name of
the village
Drinking water
requirement Ltrs/day
Present availability of drinking
water Ltrs/day
No. of drinking water
sources available
No. functional
No. requires repairs
No. defunct
1. KHARI 11236 12300 5 5 Nil Nil
2. DHIRERA ST.
7304 10000 4 4 Nil Nil
3. MEHRANA 4060 5400 2 2 Nil Nil
4. HANSERA 15496 7000 3 3 Nil Nil
5. DULMERA ST.
8520 5500 2 2 Nil Nil
Total 46616 40200 16 16
Table 2.16 Water Use effiency
Name of major crop
Area (Hectare)
through water saving devices(Drip/Sprinkl
ers)
through water
conserving agronomic practices#
Any other (pl. specify)
Total
Nil Nil Nil Nil Nil
The tables above indicate need for judicious use of available Water.
Encouraging optimum use of water through installation of sprinklers on every operational wells
Table 2.17 Slope details.
Slope of Watershed
S.No. Slope percentage
Area in hectares
1 0 to 3% 3720
2 3 to 8% Na
3 8 to 25% Na
4 > 25% Na
Table 2.18 Soil details
Soil Profile
S.No. Major Soil Classes Area in hectares
1 Sandy 3720
2
Soil Depth :
B Depth (Cms.) Area in hectares
1 0.00 to 7.50 -
2 7.50 to 45.00 -
3 > 45.00 3720
C Soil fertility Status Kg/ha Recommended
N (Low) 17-18 25-30
P (Medium) 25.4 35-40
K (Sufficient) 170-180 150-200
Micronutrients PPM -
Zn 30 50 ppm
Fe 28 50 ppm
Mn 56 50 ppm
Cu 14 50 ppm
The analysis of table shows need to improve and maintain soil fertility. Soil health card to every
farmer every crop season will be provided, which will include the recommendation for Application
micro nutrient and fertilizers
Table 2.20 Erosion details
Erosion status in project Area
Cause Type of erosion
Area affected
(ha) Run off(mm/
year) Average soil loss
(Tonnes/ ha/ year)
Water erosion
a Sheet Nil - - Nil
b Rill - - - -
c Gully - - - -
Sub-Total - - -
Wind erosion Siltation/suspension 3720 150-180
Total for project 3720
The need is:
To check land degradation
To reduce excessive biotic pressure by containing the number and increase of livestock
To check cultivation on sloping lands without adequate precautions of soil and water conservation measures
To discourage cultivation along susceptible nallah beds
To check Faulty agriculture techniques
To check Uncontrolled grazing and developed cattle tracks
To check Deforestation of steep slopes
(For delineated watershed projects) To check erosive velocity of runoff, store Runoff, to arrest silt carried by runoff and to recharge Ground Water structures life Earthen check dams, gully plugs, Bank Stabilisation, Loose stone check Dams, Gabions, Earthen embankment (Nadi) and Anicuts would be taken up.
For Flat lands & cluster projects appropriate intervention shall be mentioned.
CHAPTER - III Proposed Development Plan:
The Activities are indicative addition /deletion in activities will be as per local conditions
A) Preparatory phase activities Capacity Building Trainings and EPA
The IEC activities like Kalajathas, Group meetings, door to door campaign, slogans and
wall writings etc. were carried out in all the habitations of Khari, Mehrana, Dhirera
Station, Dulmera Station, Hansera Micro Watershed. A series of meetings were
conducted with GP members, community and discussed about the implementation of
IWMP programme. User groups were also formed.
Grama Sabhas were conducted for approval of EPA (Village), for selecting the
watershed committee and approval of DPR.
S.no Name of the Gram Panchayat Date on which Grama
Sabha approved EPA
1 KUJTI(KAHRI) 17-08-2012
2 HANSERA 25-01-2012
3 DHIRERA 18-04-2013
1 4 5 6 7 8 9 10 11
S. No.
Names of village Amount
earmarked for EPA
Entry Point Activities planned
Estimated cost
Expenditure incurred
Balance Expected outcome
Actual outcome
1 KUJTI(KAHRI) 7.29 lacs 2 7.29 lacs 6.10 lacs 1.19 lacs Drinking water facility
Drinking water facility
2 HANSERA 6.00 lacs 4 6.00 lacs 2.35 lacs 3.65 lacs Drinking water facility
Drinking water facility
3 DULMERA St. 2.10 lacs 2 2.10 lacs 0.00 lacs 2.10 lacs Drinking water facility
-
4 DHIRERA St. 3.33 lacs 2 3.33 lacs 0.00 lacs 3.33 lacs Drinking water facility
-
5 MEHRANA 3.60 lacs 4 3.60 lacs 0.00 lacs 3.60 lacs Drinking water facility
-
The PRA exercise was carried out in all the villages on the dates shown below:
S.no Name of the village/Habitation Date on which PRA conducted
1 KAHRI 09-01-2013 to 13-01-2013
2 HANSERA, DULMERA STATION 14-01-2013 to 21-01-2013
3 DHIRERA STATION, MEHRANA 15-02-2013 to 21-02-2013
Transact walk were carried out involving the community for Social mapping, Resource
mapping. Detailed discussions and deliberations with all the primary stakeholders were carried
out. Socio-economic survey was carried out during 07-12-2012 to 25-03-2013(dates) period
covering all the households and primary data on demography, Land holdings, Employment
status, Community activities etc. was collected as mentioned in chapter 2.
CAPACITY BUILDING Table- List of approved Training Institutes@ for Capacity Building in the project area
1 2 3 4 5 6 7 8
S.
No.
Name of
Stakeholders
Name of the
Training Institute
Full Address with contact
no., website & e-mail
Name & Designation of
the Head of Institute
Type of Institute# Area(s) of speciali-
zation$
Accredita-tion
details
1 PIAs 1. IGPRS Jaipur Coordinator Rural Development Rural Development DPR Preparation
2. CTAE Udaipur Dean Engg. Engg. Protocol
2 WDTs 1. IGPRS Jaipur Coordinator Rural Development Rural Development DPR Preparation
2. CTAE Udaipur Dean Engg. Engg. Protocol
3. KVK & RAU/ATC Bikaner/Lunkaransar
senior sci./Dean/major
sci.
Agri. Soil and water conservation
Agri. Soil and water conservation
Agri. activity
3 UGs 1. KVK & RAU/ATC
Bikaner/Lunk
aransar
senior
sci./Dean/major sci.
Agri. Soil and water
conservation
Agri. Soil and water
conservation
Agri./livelihood
activity
2. NABRAD
Jodhpur Manager of bank
SHG Development SHG Development Life improvement & livelihood
4 SHGs 1. KVK & RAU/ATC
Bikaner/Lunkaransar
senior sci./Dean/major sci.
Agri. Soil and water conservation
Agri. Soil and water conservation
Agri./livelihood activity
2. NABRAD
Jodhpur Manager of bank
SHG Development SHG Development Life improvement & livelihood
5 WCs 1. PIA Lunkaransar AEn. Record Keeping & register maintain
Record Keeping & Register maintain
Watershed activity
6 GPs 1. PIA Lunkaransar AEn. Supervision & maintain
Supervision & maintain
Watershed activity
7 Community 1. PIA/NGO Lunkaransar AEn./ NGO Trainers
W/S related activity W/S related activity Life improvement & livelihood
8 PM/SLNA 1. DWU Bikaner XLR (XEn.) Supervision & Evolution
Supervision & Evolution
Watershed activity
2. SRAC Jodhpur Coordinator Thematic map formation
Thematic map formation
Watershed activity
Table- Capacity Building activities in the project (PHYSICAL & FINANCIAL) *4% OF TOTAL PROJECT COST.
1 2 3 5 6 7
S.
No.
Project
Stakeholders
Total
no. of
persons
No. of persons to be trained during
project period
No. of Training to be organized during
project period
No. of person days to be trained during
project period
I
year
II
year
III
year
IV
year
V
year Total
I
year
II
year
III
year
IV
year
V
year Total
I
year
II
year
III
year
IV
year
V
year Total
1 PIAs 97 24 22 21 16 14 97 8 8 7 7 6 36 28 28 26 24 24 130
2 WDTs 146 35 34 30 25 22 146 9 9 9 9 9 45 94 94 94 94 94 470
3 UGs 73 18 18 14 12 12 73 4 4 3 3 2 16 594 594 592 590 586 2956
4 SHGs 82 24 24 12 12 10 82 10 10 9 9 8 46 552 552 551 551 550 2756
5 WCs 59 15 12 12 10 10 59 4 4 4 4 4 20 435 435 435 435 435 2175
6 GPs 24 6 5 5 4 4 24 1 1 1 1 1 5 16 16 16 16 16 80
7 Community 75 19 18 13 13 12 75 8 8 8 8 8 40 385 385 385 385 385 1925
8 EXPOSURE
TOUR
(INTER
STATE) 200 100 100 - - - 200 1 1 - - - 2 600 600 - - - 1200
9 EXPOSURE
TOUR
(INTRA
STATE) 50 - 50 - - - 50 - 1 - - - 1 - 750 - - - 750
10 PM/SLNA 56 21 20 15 - - 56 7 7 6 - - 20 31 31 30 - - 92
Table-, Education & Communication (IEC) activities in the project area (1% of total Project cost.)
1 2 3 4 5 6
S. No. Activity Executing
agency
Allocation
out of 1%
of total
Project cost
Allocation in lacs Expected
Outcome (may
quantify,
wherever
possible)
I year
II year
III year
IV year
V year
Total
1 ekWMy #QVkWi okVj gkjosZfVx LVªDplZ
¼iapk;r lfefr, jktho xkW/kh lsok dsUnz
;k vU; iapk;r lfefr Lrjh; utnhdh
ljdkjh Hkou ½A
PIA 0.20 0.07 0.07 0.06 0.20
2 tyxzg.k {ks= xfrfof/k;kas dks n’kkZrk
gqvk POP / CLAY / WOOD / PLASTIC
ls cuk gqvk ekWMyA
PIA 0.10
0.04 0.03 0.03
0.10
3 MhLiys cksMZs@IysxDlh cksMZ@
4 okWy isfUVax&tyxzg.k xfrfof/k;ksa] y{;ks
o izkfIr vkfn dks n’kkZrh gqbZ A
PIA 0.25 0.09 0.08 0.08 0.25
5 tyxzg.k fodkl laca/kh eqfnzr
iEiysVl@fyQ
ysVl@pkVZ@iksLVj@vkfnA
PIA
6 Ukkjk ys[ku PIA
7 lQyrk dh dgkuh;ksa dh
ohfM;ksaxzkQh@QksVksxzkQh@ y?kqfQYe ,oa
d`"kdks ls lk{kjkrdkj @ okrkZ A
PIA 0.15
0.05
0.05 0.05 0.15
8 fucU/k o okn&fookn izfr;ksfxrk PIA
9 jsfM;ksa@nwjn’kZu ij okrkZ o foKkiu
PIA
10 lkaLd`frd R;kSgkj @ esys vkfn ds
volj ij iznZ’kuh
PIA 0.10 0.04 0.03 0.03 0.10
11 uqDdM+ ukVd PIA
12 dViqryh izn’kZu PIA
13 jkf= xks"Bh PIA 0.20 0.07 0.07 0.06 0.20
14 Hkw laj{k.k lIrkg PIA
15 psruk jSyh PIA
16 tyxzg.k fodkl dk lans’k nsus okys
lkaLd`frd dk;ZØe
PIA
17 d`"kd fnol dk vk;kstu ,oa {ks= Hkze.k
fnol dk vk;kstu bR;kfn
PIA
18 dqy 1.00 0.36 0.33 0.31 1.00
State Remote Sensing Application Centre was assigned the work of preparing various thematic
layers using Cartosat-1 and LISS-3 imageries for Creation, development and management of
geo-spatial database depicting present conditions of land (terrain), water and vegetation with
respect to watershed under different ownerships at village level
Various thematic layers provided by SRSAC are :
Delineation of Macro/Micro watershed boundaries.
Digitised Khasara maps of the villages falling in project area.
Network of Drainage lines, existing water bodies, falling in the project area.
Base maps (transport network, village/boundaries, and settlements).
Land Use / Land cover map.
Contours at 1 meter interval, slope map ( in delineated watershed projects)
Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as
discussed in chapter 2) final Treatment plan on revenue map for implementation has been
framed. Thus each intervention identified has been marked on revenue map (map enclosed
in DPR as annexure------).The GIS based intervention map, PRA based intervention map are
annexed as ------.
B)Livelihood Action Plan (LAP):
An awareness programme has been undertaken at Gram Sabha for communication &
sensitization of the target beneficiaries. Livelihood Action Plan is a pre requisite for availing the
funds under the livelihood component. LAP has been prepared by the PIA in consultation with
WDT, WC & the members of SHG,SC/ST, women, landless/ assetless households. Details of
funds available & their utilisation is as under :
(i) Total project cost Rs. 558.00Lacs.
(ii) Funds available under livelihood component is 9% of total project cost= Rs. 50.22Lacs.
(a) Seed money for SHGs as revolving fund = Rs. 30.132 Lacs.
(minimum 60% of livelihood component)
- - No. Of SHG to be formed 121 Nos.
--- No of persons (members) in SHGs 1452 Nos.
(b) Seed money for enterprising individuals = Rs. 5.022Lacs
(maximum 10% of livelihood component)
-- No of persons identified as enterprising individuals 8Nos.
Proposed Activities (On Farm)*
Name of activity* No of SHGs Revolving fund
Fisheries - -
Dairying 48 12.00
Poultry 5 1.25
Piggery - -
Goatry 26 6.50
Bee keeping - -
Sericulture - -
Nursery - -
Maize dehusker - -
Dal mill - -
Oil mill - -
Others (specify) - -
Total 79 19.75
Proposed Major activities (Off Farm)**
Name of activity* No of SHGs Revolving fund
Artisans - -
Carpenter 5 1.25
Blacksmith 1 0.25
Leather Craft - -
Porter 10 2.50
Mason 9 2.25
Eco tourism - -
Agro processing - -
Candle making - -
Dona Pattal - -
Sewing / Knitting 12 3.00
Tea Stall 1 0.25
General Store 2 0.50
Mobile repair 1 0.25
Mechanic / Misc. shop 1 0.25
Others (specify) - -
Total 42 10.50
List of persons & Proposed Activities. ( 10% of (9%)
S.
No.
Name of
gram
panchyat
Activity
Proposed
Name of Person Category
SC /ST
/Others
Project fund
Revolving
Contribution
1 Kujati Dairy Rewantram Other 0.25 lac
Pana devi Other 0.25 lac
Sunder devi Other 0.25 lac
Flour Mill Savitri devi Other 0.25 lac
Sarwan mund Other 0.25 lac
2 Hansera Dairy Richpal Other 0.25 lac
Chhaganlal Other 0.25 lac
Jetharam Other 0.25 lac
Prakash Other 0.25 lac
Flour Mill Muli devi Other 0.25 lac
Sukhi devi Other 0.25 lac
3 Dhirera st. Dairy Ramnarayan jyani Other 0.25 lac
Kisturi devi Other 0.25 lac
Pillar
construstion
Omprakash jyani Other 0.25 lac
Mangilal Other 0.25 lac
Rekharam Other 0.25 lac
4 5 Persons to be
identified
All 1.022 lacs
TOTAL 5.022 lacs
(c) Funds for Enterprising SHG/Federations of SHG
(Maximum 30 % of livelihood activities)= Rs. 15.066Lacs
The funding for major livelihood activities will enable the enterprising SHGs/SHG federation to
avail a composite loan for undertaking major livelihood activities or to upscale activities as
recommended by the WC & approved by WCDC in consultation with line departments.
Details of enterprising SHG/federation is given below :
S.No. Name of SHG/ SHG
federation
Project Name Project Cost
in lacs
Grant in aid 50% of
project cost or 2 lacs
whichever is less
Bank loan
1. Jay Bhawani Dairy 5.00 2.00 3.00
2. Pragati Dairy 5.00 2.00 3.00
3. Jay Ma Bhawani Dairy 5.00 2.00 3.00
4. Baba Ramdev Dairy 5.00 2.00 3.00
5. Imla Poultry 5.00 2.00 3.00
6. Lichama Poultry 5.00 2.00 3.00
7. Mahila SHG Goatry 5.00 1.533 3.467
8. Mata Ji Goatry 5.00 1.533 3.467
TOTAL 40.00 15.066 24.934
* Details of project activities can be prepared in coming years after formation of SHG federation or
as the case may be.
C) Production Plan:
An awareness programme has been undertaken at Gram Sabha for communication &
sensitization of the target beneficiaries. Production System & micro enterprises Action Plan is pre-
requisite for availing the funds under the Production System & micro enterprises component.
Production plan has been prepared by the PIA in consultation with WDT, WC & the members of
Users Group. Details of funds available & their utilisation is as under :
(iii) Total project cost Rs. 558.00Lacs.
(iv) Funds available under Production System & Micro enterprises component is 10% of total
project cost= Rs. 55.80 Lac.
Proposed Activities for production system & Micro enterprises
Name of activity* No. of house holds Cost of activity (lac)
WDF
A Production System
1 Fisheries - - -
2 Dairying - - -
3 Poultry - - -
4 Piggery - - -
5 Goatry - - -
6 Bee keeping - - -
7 Sericulture - - -
8 Bio fuel , Medicinal
plantation
40 2.00 -
B Others
1 Crop Demontration
A Integrated Nutrient
Management
- - -
B Integrated
PestManagement
- - -
C Distribution of seed / Mini
kit of HYV
800 16.00 -
2 Introduction of Innovative
Agril Activities
- - -
3 Distribution of Seed cum
ferti drill
13 7.21 -
4 Distribution of other
Agricultural & plant
protection equipment
345 3.53 -
5 Fodder production 100 1.00 -
6 Agro forestry - - -
7 Agro Horticulture - - -
8 Floriculture - - -
9 Vegetable cultivation 1000 4.00 -
10 Organic farming (Green
Manuaring,
Vermicompost, Nadep
Compost)
21 3.15 -
11 Green House - - -
12 Shed net - - -
13 Nursery - - -
Others (specify) - - -
C Microenterprises
1 Agro processing - - -
2 Value Addition - - -
3 Fruit preservation
( Chatni, Achar,
Murabba, Jam, Jelly,
Etc.)
31 7.75 -
4 Flour Mill - - -
5 Dal mill - - -
6 Oil mill - - -
7 Maize dehusker - - -
8 Para Vetnery services -
A Bull distribution 4 2.08 -
B Castration - - -
C Demo. Urea Molasis - - -
9 Manger 200 4.00 -
10 Animal Shed 16 3.16 -
Animal health camp 8 1.92 -
G. Total 55.80
Awareness Programme
-Slogan Wall Painting,
Scientific Animal Husbandry Practices ; Seminars / Debates / Pamphlet distribution/ Stickers/ Chetana Rally
Broadcasting / Telecasting Film Show
Visit- intra/ inter/ out of State/ Abroad
Fortnightly Meetings with Livestock keeper to discuss and decide all breedable females to be covered.
Creation Of Disease Free Zone: Livestock’s health coverage
Establishment of Pashudhan Seva Kendra (PSK) (Convergence with peer department)
Deworming to reduce worm load and enhance disease resistance. (Convergence with peer department)
Distribution of mineral mixture. (Convergence with peer department)
Free of Cost Vaccination in IWMP area Livestock for H.S., B.Q., F.M.D., PPR, ETV and Sheep Pox.
Ensure Hygenic measures to check Zonosis.(DAH/ IWMP)
Construction of Animal Sheds with Manger and Portable Manger With accessories
Provision of Cattle Water Troughs.
Infertility Management: To ensure Livestock’s Productivity
Expansion of AI Coverage/ reduction in no.of infertile females.
PCPD+ COMBAT INFERTILITY+ CAMPS INFERTILITY RLDB+ CAMPS INFERTILITY SC COMPONENT
Breed Improvment: To ensure Livestock’s Productivity enhancement
A.I. (Convergence with peer department)
Incentive based Mass Castration at Door Step of Scrub Bulls to Check ND Recycling.
Registration of bulls (Convergence with peer department)
Bull / Buck Distribution for NS-.Gir, Murrah And Sirohi /Jamunapari Breed Bulls/ Bucks Should Be Distributed For 3yrs 6 (3 In Each Iwmp Area, Where Ever A.I. Facility Is Not Available Round’s O Clock. On 100% Subsidized Rate To WC.
Financial Incentive to the Inseminator for Calf Borns.
Convergence with peer Department/DAH/Agriculture/ATMA/ Board/ Trust/ Goseva
An Assistance to control Malnutrition: Protein Supplementation
Feed & fodder production enhancement.
ANNUAL ACTION PLAN: PIA will prepare annual action plan in the month of January indicating
outgoing liabilities as well as new projects which they wish to take during next financial years & will
submit to PM(WCDC). These plans will be placed for approval at P.S. (Standing Committee of
Production and Agriculture) & Z.P. (Standing Committee of Production) level every year. While
preparing Annual Action Plan (AAP) if rates of labour or material in DPR increased or decreased
changed rates will be applicable for preparing AAP & the effect of same can be met by converging
the remaining works with other schemes.
PROJECT NAME : BIKANER 44 IWMP-2011-12 BLOCK: LUNKARANSAR DISTRICT : BIKANER COST OF PROJECT : 558.00 Lacs
ANNUAL ACTION PLAN THROUGH PROJECT FUND DURATION 2011-2012 TO 2016-17
(A)
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Fin
Admn. 10 55.80 - - - 11.16 - 11.16 - 11.16 - 11.16 - 11.16 55.80
Monitoring 1 5.58 - - - 1.12 - 1.12 - 1.12 - 1.12 - 1.12 5.58
Evaluation 1 5.58 - - - 1.12 - 1.12 - 1.12 - 1.12 - 1.12 5.58
EPA 4 15 22.32 - - 14 22.32 - - - - - - - - 22.32
I & CB 5 122 27.90 - - 26 8.37 24 8.37 24 5.58 24 2.79 24 2.79 27.90
DPR 1 1 5.58 - - 1 5.58 5.58
Total (A) 22% 122.76 - - 49.66 21.76 18.97 16.18 16.18 122.76
(B)
Conservation measures for
arable land (Activity)
Construction of private Tanka 'A'55 0.45 24.75 - - 0 0.00 13 5.85 15 6.75 15 6.75 12 5.40 55 24.75
Construction of private Tanka 'B'203 0.80 162.40 - - 0 0.00 28 22.40 50 40.00 59 47.20 66 52.80 203 162.40
Construction of private Tanka 'C'35 0.81 28.35 0 0.00 8 6.48 10 8.10 10 8.10 7 5.67 35 28.35
Construction of private Tanka 'D'42 0.88 36.96 0 0.00 10 8.80 10 8.80 10 8.80 12 10.56 42 36.96
Construction of Public Tanka 17 1.60 27.20 - - 0 0.00 7 11.20 7 11.20 3 4.80 0.00 17 27.20
Sand dunes stablization 11.2 0.05 0.56 11.2 0.56 11.2 0.56
Diggy 1 15.66 15.66 - - 0 0.00 1 15.66 0.00 0.00 0.00 1 15.66
Repair of existing W.H.S. 1 1.45 1.45 - - 0 0.00 1 1.45 0.00 0.00 1 1.45
Total 297.33 - - 0.00 70.39 76.86 75.65 74.43 297.33
Conservation and production
measures for non-arable
land(Activity)
Pasture development (Hac.) 15 15.15 - - 0 15 5.15 4.15 3.54 2.31 15.15
Total 15.15 - - 15 5.15 4.15 3.54 2.31 15.15
Grant total 312.48 - - 75.54 81.01 79.19 76.74 312.48
Total (B)
-
-
-
Conservation measures for arable & nonarable land
Natural resource management(56%)
Phy
4th year Total 1st year 3nd year
24
-
CHAPTER -V (A)
Preparatory phase activities capacity building trainings & EPA
Activity Unit % Quantity
Unit
Cost Total cost
2nd year 5th year 6th year
CHAPTER -V (A)
( C ) 19%
Revolving Fund to
enterprising individual (10 %
maximum ) 5.022 0.50 1.50 1.50 1.522 5.022
Grant in aid to enterprising
SHG or Federation of SHGs
individual (30 % maximum ) 15.066 1.50 4.50 4.50 4.566 15.066
LIVELIHOOD ACTIVIVITIES
FOR ASSET LESS PERSON
(Karigar, Tailoring, white Wash
& Paint, Masala Udoyg, Bicycle,
Mobile, Pottery, Ara Tari,
Computer etc.) 30.132 2.00 10.00 10.00 8.132 30.132
LIVESTOCK MANAGEMENT
(A.I./ CAMP/OTHER) 11.16 2.00 6.00 3.16 11.16
PRODUCTION SYSTEM &
MICROENTERPRISES (For
Kharif, Rabi Season and for
Horticulture Plantation etc.) 44.64 9.40 13.15 13.15 8.94 44.64
Total (C) 106.02 - - 15.4 35.15 32.31 23.16 106.02
(D) Consolidation 16.74 - - 16.74 16.74
Grand Total 558.00 - - 49.66 112.70 135.13 127.68 132.82 558.00
% Targets NA NA NA NA NA
WD&SC.Distt.-Bikaner
Assistant Engineer, PIA
WD&SC P.S. Lunkaransar
100
Production System (10%) & livelihood microenterprises (9%)
Project Manager, WCDC
Annual Action Plan (Through Convergence)
NAME OF PROJECT : BIKANER 44 IWMP- 2011-12 BLOCK : LUNKARANSAR DISTT. : BIKANER COST OF PROJECT : 558 Lacs
(A)
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. 10%
Monitoring 1%
Evaluation 1%
EPA 4%
I & CB 5%
DPR 1%
Total (A)
(B)
Construction of private
Tanka 'A'
Construction of private
Tanka 'B'
Construction of private
Tanka 'C'
Construction of private
Tanka 'D'
Construction of Public
Tanka
Sand dunes stablization
Diggy
Repair of existing
W.H.S.
Total
Pasture development
(Hac.)
Total
Total (B)
NA
3rd year 4th year2nd year
Conservation measures for arable land
Natural resource management(56%)
CHAPTER-V(B)
5th year
Preparatory phase activities capacity building trainings & EPA
Activity Unit
Quantit
y
Unit
Cost
Total
cost
1st year Total
NA
NA
Conservation measures for non arable land
CHAPTER-V(B)( C )
Horticulture plantation
Sprinklers and Drip
irrigation
Floriculture
Vermi compost
Crop Demonstration
Revolving Fund to
SHG ( minImun 60 %
amt. )
Revolving Fund to
enterprising individual
(maximum 10 %
amount)
Grant in aid to
enterprising SHG or
Federation of SHG
individual (maximum
30 % amount)
Grand Total
% Targets NA NA NA NA NA NA
Project Manager, WCDC
Livelihood System 9%
NA
NA
Production measures for arable land
(D) Consolidation 3%
Total Livelihood System
WD&SC.Distt.- Bikaner
Assistant Engineer, PIA
WD&SC P.S. Lunkaransar
Total Production System
Production System (10%)
(A) Preparatory phase activities
Quantity Total Cost
Cost from
Project Fund
Convergence
Fund
Beneficiary
ContributionAdmn. 10% 55.80 55.80 0.00
Monitoring 1% 5.58 5.58 0.00
Evaluation 1% 5.58 5.58 0.00
EPA 14 4% 14 22.32 22.32 0.00 0
I & CB 122 5% 122 27.90 27.90 0.00
DPR 1 1% 1 5.58 5.58 0.00
Total (A) 122.76 122.76 0.00
(B) Natural resource management (56%)
Construction of private
Tanka 'A'No. 0.45 55 24.75 24.75 0.00
Construction of private
Tanka 'B'No. 0.80 203 162.40 162.40 0.00
Construction of private
Tanka 'C'No. 0.81 35 28.35
Construction of private
Tanka 'D'No. 0.88 42 36.96
Construction of Public TankaNo. 1.60 17 27.20 27.20 0.00 0
Sand dunes stablization hac. 0.05 11.2 0.56Diggy No. 15.66 1 15.66 15.66 0.00 0
Repair of existing W.H.S. No. 1.45 1 1.45 1.45 0.00 0
TotalNo 297.33 297.33 0.00 0
Conservation and production
measures for non-arable
land(Activity)
0.00 0.00 0
Pasture development Ha 15.00 15.15 15.15 0
Total 15.15 15.15 0.00 0
Grant totalNo 312.48 312.48 0.00 0
Total (B) 312.48 312.48 0.00
Total
Note : enclose capacity building plan
5-10% towards
WDF
Proposed Development Plan
Unit Unit Cost
Conservation measures for arable land (Activity)
Activity
( C ) Production System (10%)
Horticulture plantation No. 0.00 0.00
Sprinklers and Drip irrigation No. 0.00
Vegetables mini kits No. 0.04 1000 4.00 4.00 0.00
Bio fule & Medicinal plants No. 0.05 40 2.00 2.00 0.00
Vermi compost No. 0.15 21 3.15 3.15 0.00
Fodder demonstration No. 1000 100 1.00 1.00 0.00
Crop Demonstration No. 2000 800 16.00 16.00 0.00
seed drill No. 0.586 13 7.21 7.21 0.00
agri &plant protection equipment No. 0.0107 345 3.53 3.53 0.00
Micro enterprizes No. 0.25 31 7.75 7.75 0.00
other 0.00 0.00
Live stock management 11.16 11.16 0.00
55.80 55.80 0.00
(D) Livelihood System 9 %Revolving Fund to SHG (60 %
minimum )30.132 30.132 0.000
Revolving Fund to enterprising
individual (10 % maximum )
5.022 5.022 0.000
Grant in aid to enterprising SHG
or Federation of SHGs individual
(30 % maximum )
15.066 15.066 0.000
Total Livelihood 50.22 50.22 0.00
Total (D) 50.22 50.22 0.00
(E) Consolidation 3% 16.74 16.74 0.00
Grand Total 558.00 558.00 0.00
10-20% towards
project cost
Assistant Engineer, PIA
WD&SC P.S. Lunkaransar
Total Production System
Project Manager, WCDC
WD&SC.Distt.- Bikaner
Production measures for arable land
PROJECT NAME : IWMP - BIKANER 44 BLOCK : LUNKARANSAR DISTT. BIKANER
COST OF PROJECT : 900558 Lacs
Activity Unit Qty Unit
cost
Total
cost
Converg
ence
Fund
Beneficiary
Contribution*
Labour material Total
I. ADMINISTRATIVE
COST (10%)55.80 55.80 55.80 0.00 0.00
II MONITORING (1%) 5.58 5.58 5.58 0.00 0.00
III EVALUATION (1 %) 5.58 5.58 5.58 0.00 0.00
66.96 66.96 66.96 0.00 0.00
W/S PREPARATORY
PHASE
IV ENTRY POINT
ACTIVITY (4 %)22.32 6.70 15.62 22.32 0.00 0.00
V TRAININGS &
CAPACITY
BUILDING (ICB) 5 %27.90 27.90 27.90 0.00 0.00
VIDETAILED PROJECT
REPORT (1 %)5.58 5.58 5.58 0.00 0.00
55.80 6.70 49.10 55.80 0.00 0.00
WATERSHED WORK
PHASE
VII
NATURAL RESOURCE
MANAGEMENT (NRM)
(56 %)
Conservation
measures for arable
land (Activity)
i.Construction of Private
Tanka 'A'No. 55 0.45 24.75 7.43 17.33 24.75 0.00 1.86
ii.Construction of Private
Tanka 'B'No. 203 0.80 162.40 48.72 113.68 162.40 0.00 12.18
Construction of Private
Tanka 'C'35 0.81 28.35 8.51 19.85 28.35 0.00 2.13
Construction of Private
Tanka 'D'42 0.88 36.96 11.09 25.87 36.96 0.00 2.77
iii.Construction of Public
Tanka 'A'No. 17 1.60 27.20 8.16 19.04 27.20 0.00 0.00
Sand dunes stablization11.2 0.05 0.56 0.17 0.39 0.56 0.00 0.00
iv Diggy No. 1 15.66 15.66 4.70 10.96 15.66 0.00 0.00
vRepair of existing W.H.S.
No. 1 1.45 1.45 0.44 1.02 1.45 0.00 0.00
vi
TotalNo 297.33 89.20 208.13 297.33 0.00 18.93
Activity wise Total Abstract of cost
CHAPTER-IV
Cost from Project Fund
SUB TOTAL (I+II+III)
SUB TOTAL (IV+V+VI)
Conservation and
production measures
for non-arable
land(Activity)
i. Pasture development Ha 15 15.15 9.09 6.06 15.15 0.00 0.00
Total15.15 9.09 6.06 15.15 0.00 0.00
Grant totalNo 312.48 98.29 214.19 312.48 0.00 18.93
312.48 98.29 214.19 312.48 0.00 18.93
VIII LIVELIHOOD
ACTIVIVITIES FOR ASSET
LESS PERSON (9%)
Revolving Fund to SHG (60 %
minimum ) 30.13 0.00 30.13 30.13 0.00 0.00
Revolving Fund to enterprising
individual (10 % maximum )5.02 0.00 5.02 5.02 0.00 0.00
Grant in aid to enterprising
SHG or Federation of SHGs
individual (30 % maximum )15.07 0.00 15.07 15.07 0.00 0.00
50.22 0.00 50.22 50.22 0.00 0.00
IX PRODUCTION SYSTEM
&
MICROENTERPRISES
(10%)
44.64 4.46 40.18 44.64 0.00 0.00
Horticulture plantation No.
Sprinklers and Drip irrigation No.
Vegetables mini kits No. 1000 0.04 4.00 0.00 4.00 4.00 0.00 0.60
Bio fule & Medicinal plants No. 40 0.05 2.00 0.00 2.00 2.00 0.00 0.30
Vermi compost No. 21 0.15 3.15 0.94 2.21 3.15 0.00 0.47
Fodder demonstration No. 100 1000 1.00 0.00 1.00 1.00 0.00 0.15
Crop Demonstration No. 800 2000 16.00 0.00 16.00 16.00 0.00 2.40
seed drill No. 13 0.586 7.21 0.00 7.21 7.21 0.00 1.08
agri &plant protection equipmentNo. 345 0.011 3.53 0.00 3.53 3.53 0.00 0.53
Micro enterprizes No. 31 0.25 7.75 0.00 7.75 7.75 0.00 1.16
other
Live stock activity 11.16 1.12 10.44 11.16
SUB TOTAL 55.80 2.06 54.14 55.80 0.00 6.70
XCONSOLIDATED
PHASE (3 %)16.74 0.00 16.74 16.74 0.00 0.00
GRAND TOTAL 558.00 110.57 447.83 558.00 0.00 25.63
WD&SC P.S. Lunkaransar
Project Manager, WCDC
WD&SC.Distt.-Bikaner
SUB TOTAL
Assistant Engineer, PIA
SUB TOTAL (Natural
Format -1
Name of Project : Bikaner -44 Block: Lunkaransar Distt.: Bikaner
2012-13 2013-14 2014-15 2015-16 2016-17
1.Watershed Development
Works
Conservation measures
for arable land (Activity) ha
Construction of Jalkund / Tanka A 55 nos 0 13 15 15 12
Construction of Jalkund / Tanka B 203 nos 0 28 50 59 66
Construction of Jalkund / Tanka C 35 nos 0 8 10 10 7
Construction of Jalkund / Tanka D 42 nos 0 10 10 10 12
Construction of Public Jalkund /
Tanka 17 nos0 7 7 3 0
Sand dune stablization #
#ha 0 0 11.2 0 0
Diggy 1 nos 0 1 0 0 0
Repair of existing W.H.S. 1Cubic
meter 0 0 1 0 0
Total
Conservation and
production measures
for non-arable
land(Activity)
Pasture development 15 ha 0 15 0 0 0
Total ha
Grant total
2.EPA2.1 No. of EPA
activities14 nos 14 0 0 0 0
2.2 No. of water
extracting unit
created
0 nos 0 -
3.Institution & Capacity
Building
3.1 SHG Formation
(Newly created)3.1.1 No. of SHG 15 nos 5 5 5
3.1.2 Total No. of SHGs
members225 nos 75 75 75
3.2.1 No. of SHG assisted 15 nos 5 5 5
3.2.2 Total No. of SHGs
members225 nos 75 75 75
3.3 UG Formation 3.3.1 No. of UG 15 nos 15
3.3.2 Total No. of members of
UGs150 nos 150
3.4 Formation of
Federation3.4.1 No. of Federation 3 nos 3
3.4.2 Total No. of members of
Federation30 nos 30
3.5 Capacity
building3.5.1 No. of Training 175 nos 35 35 35 35 35
3.5.2 No. of Persons trained #
#nos 1516 1516 1516 1516 1516
4.Livelihood activities for
the asset-less persons4.1 No. of activities 15 nos 5 5 5
4.2 No. of
Beneficiaries150 nos 50 50 50
5.Production system µ-
enterprises5.1 Goatry 5.1.1 No. of activities 2 nos 2
5.1.2 No. of Beneficiaries 30 nos 30
5.2 Dairy 5.2.1 No. of activities 8 nos 4 4
5.2.2 No. of Beneficiaries 120 nos 60 60
5.3 Poultry 5.3.1 No. of activities 2 nos 2
5.3.2 No. of Beneficiaries 20 nos 20
5.4 Fisheries 5.4.1 No. of activities nos
5.4.2 No. of Beneficiaries nos
5.5 Bio-fuel
Plantation5.5.1 Area Covered 125 ha 75 50
5.5.2 No. of Beneficiaries 45 nos 30 15
5.6 Others 5.6.1 No. of activities 13 nos 13
5.6.2 No. of Beneficiaries 185 nos 185
Physical Target (Watershed Works)
Financial yearwise Physical Target Unit
(ha/nos/Rmt
/Cubic
meter)
Total
Target
(Quantity
)
Name of Head Name of Activity Name of Subactivity
Format -2
Name of Project : Bikaner -44 Block: Lunkaransar Distt.: Bikaner
2012-13 2013-14 2014-15 2015-16 2016-17
1.Watershed
Development Works
Conservation measures for
arable land (Activity)
Construction of Jalkund /
Tanka A 24.75 0.00 5.85 6.75 6.75 5.40
Construction of Jalkund /
Tanka B 162.40 0.00 22.40 40.00 47.20 52.80
Construction of Jalkund /
Tanka C 28.35 0.00 6.48 8.10 8.10 5.67
Construction of Jalkund /
Tanka D 36.96 0.00 8.80 8.80 8.80 10.56
Construction of Public
Jalkund / Tanka 27.20 0.00 11.20 11.20 4.80 0.00
Sand dune stablization 0.56 0.00 0.00 0.56 0.00 0.00
Diggy 15.66 0.00 15.66 0.00 0.00 0.00
Repair of existing W.H.S. 1.45 0.00 1.45 0.00 0.00
Total 297.33 0.00 70.39 76.86 75.65 74.43
Conservation and
production measures for
non-arable land(Activity)
Pasture development 15.15 0.00 5.15 4.15 3.54 2.31
Total 15.15 0.00 5.15 4.15 3.54 2.31
Grant total 312.48 0.00 75.54 81.01 79.19 76.74
2.Administrative Cost 2.1 Salary 25.40 5.08 5.08 5.08 5.08 5.08
2.2 Others 30.40 6.08 6.08 6.08 6.08 6.08
3.Monitoring3.1 Monitoring of
Projects5.58 1.12 1.12 1.12 1.12 1.12
4.Entry Point Activity 4.1 Plan for EPA 22.32 22.32 0.00 0.00 0.00 0.00
5.Institution &
Capacity Building5.1 SHG Formation
5.2 UG Formation
5.3 Formation of
Federation
5.4 Capacity building
5.5 Others
6.DPR 6.1 Preparation Of DPR 5.58 5.58 0.00 0.00 0.00 0.00
7.Livelihood activities
for the asset-less
persons
7.1 Plan for Livelihood
activities50.22 0.00 4.00 16.00 16.00 14.22
8.Production system
& micro-enterprises8.1 Sericulture
8.2 Beekeeping
8.3 Poultry
8.4 Fisheries
8.5 Bio-fuel Plantation
8.6 Live stock
8.7 Others
55.80 0.00 11.40 19.15 16.31 8.94
27.90 5.58 5.58 5.58 5.58 5.58
Financial Target (Watershed works)
Name of HeadName of SubactivityName of Activity
Total
Target Financial year
Amount (Rs. In lakh)
Format-3
Name of Project : Bikaner -44
To be entered at PIA Level Financial Target Projectwise
2012-13 2013-14 2014-15 2015-16 2016-17
1 Administrative 7.812 7.812 7.812 7.812 7.812
2 Capacity building 4.0734 4.0734 4.0734 4.0734 4.0734
3 Monitoring 0.6696 0.6696 0.6696 0.6696 0.6696
4 Preparation Of DPR 5.58 - - - -
5 EPA - - - - -
6 Any Other(consolidated) - - - - 1.116
FINANCIAL PIA
Amount (Rs. in Lakh)
Financial yearHeadNo.
Format-4
Name of Project : Bikaner -44
To be entered at WCDC Level Financial Target Projectwise
2012-13 2013-14 2014-15 2015-16 2016-17
1 Administrative 0 0 0 0 0
2 Capacity building 1.4508 1.4508 1.4508 1.4508 1.4508
3 Monitoring 0.2232 0.2232 0.2232 0.2232 0.2232
4 Preparation Of DPR - - - - -
5 Any Other(consolidated) - - - - 0.558
FINANCIAL WCDC
No. Head
Amount (Rs. in Lakh)
Financial year
Format-5
Capacity building plan (PIA level)Name of Project : Bikaner -44 Block: Lunkaransar
2012-13 2013-14 2014-15 2015-16 2016-17
1 No of trainings planned 30 30 30 30 30
2 No of persons to be trained 1500 1500 1500 1500 1500
Financial yearNo. Head
District : Bikaner
Format-6
Name of Project : Bikaner -44 Capacity building plan (WCDC)
Projectwise
2012-13 2013-14 2014-15 2015-16 2016-17
1 No of trainings planned 5 5 5 5 5
2 No of persons to be trained 16 16 16 16 16
No. Head
Amount (Rs. in Lakh)
Financial year
CHAPTER – VI EXPECTED OUT COMES
1 2 3 4 5 6
S. No. Item Unit of
measurement Pre-project
Status Expected Post-project Status
Remarks
1. Status of water table (Depth to Ground water level)
Meters 90-95 metres Not applicable Desert Area
2. Ground water structures repaired/ rejuvenated
No. - 3
3. Quality of drinking water Description Salty potable Portable
4. Availability of drinking water Description 86% 94%
5. Change in irrigated Area Ha 0 27
6. Change in cropping/ land use pattern Description - -
7. Area under agricultural crop Ha - -
I Area under single crop Ha 2899.46 3323.00
Ii Area under double crop Ha 0.00 80 ha
Iii Area under multiple crop Ha 0.00 0.00
8. Change in cultivated Area Ha - -
9. yield of major crops of area
Yield of Bajra q/ha 2.35 2.80
Yield of guar q/ha 2.10 2.90
Yield of moth q/ha 2.05 3.10
Yield of Mustard q/ha - -
10. production of major crops of area
Production of Bajra ton 46.06 54.88
Production of guar ton 450.66 622.34
Production of moth ton 114.18 172.67
11. Area under vegetation Ha 0.00 15
12. Area under horticulture Ha 0.00 30
13. Area under fuel Ha 65.00 115
14. Area under Fodder Ha 76 136
15. Fodder production tons 13026.5 15500
16. Milk production Litres/day 20595 23600
17. SHGs Active No. 9 121
18. No. of enterprising individuals No. - 21
19. Income Rs. in la - -
20. Migration No. 206 90
21. SHG Federations formed No. - 8
Critical Assumption
No severe droughts/ unexpected floods/ natural disasters
Adequate funds are allocated for the same and released on time.
There is no significant pest/ disease attack, and if so, then it will have been contained before
irreversible damage is done.
Adverse market conditions do not persist long.
Sound macro-economic and growth conditions continue and the benefits are widely distributed
particularly in the rural areas.
Facilitating agencies and resource providers have the required competent staff so that timely
and appropriate technical advice and services are provided to farmers whenever required.
The Capacity Building Plan is implemented, monitored and modified to address evolving needs
and feedback from participants.
Means of Verification of indicators
Baseline surveys like household income ,expenditure, health and nutrition etc at the beginning,
mid-term and end of the project period
Annual participatory assessment by communities during project period.
Regular project monitoring reports prepared by project monitoring teams/ agencies.
Membership and other Records, Minutes of Meetings maintained by the SHGs, WCs/
Individual beneficiaries/project-related village and local bodies/PRIs.
External review missions
Data maintained by Government department (Revenue, Agriculture, Groundwater, Irrigation,
Animal Husbandry
CHAPTER VII TECHNICAL DESIGNS AND ESTIMATES
Technical designs and estimates for proposed activities.
For Estimates GKN of the districts should be used. For Production System activities, rates
provided by the Department is to be used & if not vailable than rates of Agriculture/Horticulture/
Animal Husbandry should be used.
For Livelihood activities, project norms provided by the Department is to be used & if not available
than cost norms of NABARD, NRLM etc can be used.
dk;Z dk uke%fuft dqq.M , tydq.M fuekZ.k dk;Z
tyxzg.k {ks+= % chdkusj 44 ;kstuk % vkbZ-MCY;w-,e-ih-
dzl dk;Z dk fooj.k la[;k yEckbZ pkSMkbZ xgjkbZ ekrzk bZdkbZ nj Je jkf'k dqy jkf'k
1 uho][kkbZ]ijukyk esa 1-5eh xgjkbZ dq.M 0.79 2.85 2.85 2.60 16.58 99.00 1641.22 1641.22
rd feVVh dh [kqnkbZ djuk]ry dks 99.00
dwVuk]ikuh Mkyuk]cxy dks lokjuk
rFkk cph feVVh dkss 50eh nwjh rd
fuLrkj.k djukA 16.58 ?k-eh-
l[r feV~Vh esa
2 lhesaV dadhV 1 lhesaV 4 ctjh rFkk dq.M 0.79 2.85 2.85 0.15 0.96 2110.00 347.29 2018.06
8 fxVVh bZV dh 40 feeh ukHkh; 363.11
eki dh uho esa Mkyuk]dqVkbZ o rjkbZ
djukA 0.96 ?k-eh-
3 uhao rFkk dqlhZ esa izFke Js.kh bZaVksa dh dq.M 3.14 2.62 0.23 3.10 5.87 3063.00 2797.94 17966.66
fpukbZ lhesaV&ctjh 1%6 elkys esa] 477.00
5.87 ?k-eh-
4 50fe-eh- eksVkbZ esa lhesaV dadzhV 1%2%4 dq.M 0.79 2.40 2.40 4.52 265.00 492.85 1198.22
ftlesa 1lhesaV 2ctjh 4 iRFkj dh 12 109.00
fe-eh- ukHkh; fxVVh ds lkFk feykdj
Mkyuk] dwVuk] rjkbZ vkfn lesr A 4.52 o-eh-
5 iRFkj ds fljny ¼fyVay 7-5 ls-eh dq.M 2.00 2.70 0.30 1.62 687.00 349.92 1112.94
eksVkbZ½ dh vkiwfrZ dj] fpukbZ es 216.00
mi;ksx dh xbZ elkys es mls yxkukA 1.62 o-eh-
6 vOoy ntsZ dh iRFkj dh ifê;ksa dh dq.M 0.79 2.85 2.85 6.38 1225.00 2205.23 7562.74
Nr Mkyuk] Åij rFkk uhps ls tksMksa es <Ddu 0.45 0.45 0.20 357.20
iRFkj dh phi ds lkFk 1%4 vuqikr esa
lhesaV elkys ls HkjukA ¼2 eh rd½ 6.17 o-eh-
7 iDds bZaV ds VqdMs ;k iRFkj ds NksVs 220.00 283.99 1358.21
dkrys es lhesaV elkyk 1%4 es Hkaofj;k 6.17 o-eh- 46.00
Mkyuk] iêh Nr ds Åij rFkk vkiwfÙkZ
djukA
8 lhesaV IykLVj nhokj ij 1%4 vuqikr es dq.M iSank 0.79 2.40 2.40 4.52 128.00 2110.09 5046.56
lhesaV&ctjh feykdj dj tksMksa dks dq.M nhokj 3.14 2.40 3.10 23.36 53.52
dqjsnus rFkk rjkbZ lfgr 20 fe-eh- dq.M ckgj 3.14 2.85 0.60 5.37
dq.M Nr 6.17
39.43 o-eh-
9 Dosjh jfol ftles 40 izfr'kr iRFkj ds ik;rku 0.79 9.00 9.00 0.15 9.54 410.00 910.91 3518.34
Liky gks ;k dØaj ;k ?kkaM+yk dks dq.M 0.79 2.85 2.85 0.15 0.96 106.15
fcNkuk rFkk vkiwfÙkZ djuk] ikuh
fNM+duk rFkk nqjeqV ls dwVukA 8.58 ?k-eh-
10 <Ddu 1 la[;k 0.00 800.00
11 yhM pktZ o-eh-
ctjh 20.00 3.65 ?k-eh- 3.00 0.00
105 fxzV 20.00 0.20 ?k-eh- 4.00 0.00
bZV 20.00 2.77 gtkj 0.00 0.00
Dosjh jfol 20.00 10.30 ?k-eh- 3.00 0.00
12 fjgSMfyax pktZ 500.00 2000.00
11639.45 44222.96
vkdfLed O;;A 360.55 777.04
egk;ksx 12000.00 45000.00
Note %& mDr njsa iapk;r lfefr ywudj.klj chdkusj dh ch,lvkj (01-04-13 ls ykxw½ ls yh xbZ gSaA
dk;Z dk foLrr fooj.k
dk;Z dk rdehuk
dk;Z dk uke%fuft dqq.M , tydq.M fuekZ.k dk;Z
tyxzg.k {ks+= % chdkusj 44 ;kstuk % vkbZ-MCY;w-,e-ih-
dz l vk-la[;k vkbVe ekrzk bZdkbZ lhesaV ctjh 20feeh bZV ifV~V;k xzsoy fljny bZV fxV~Vh
1 2 lh-lh-1%4%8 0.96 ?k-eh- 3.06 0.43 0.86
2 3 bZaVksa dh fpukb 5.87 ?k-eh- 6.39 1.36 2774.5
3 4 lh-lh-1%2%4 4.52 fdyks 1.41 0.10 0.20
4 5 fljny 1.62 o-eh- 0.50 0.10 1.62
5 6 ifê;kW 6.17 o-eh- 0.42 0.56 6.79
6 7 bZaV ds Hkofj;k 6.17 o-eh- 2.22 0.15 0.31
7 8 IykLVj 1%4 39.43 o-eh- 6.69 0.95
8 9 Dosjh jfol 8.58 ?k-eh- 10.30
9 10 <Ddu 1
dqy 20.70 3.65 0.20 2774 6.79 10.30 1.62 1.17
cSx ?k-eh- ?k-eh- la[;k o-eh- ?k-eh- o-eh- ?k-eh-
lkexzh dh vko';drk
dk;Z dk uke%fuft dqq.M ch tydq.M fuekZ.k dk;Z
tyxzg.k {ks+= % chdkusj 44 ;kstuk % vkbZ-MCY;w-,e-ih-
dzl dk;Z dk fooj.k la[;k yEckbZ pkSMkbZ xgjkbZ ekrzk bZdkbZ nj Je jkf'k dqy jkf'k
1 uho][kkbZ]ijukyk esa 1-5eh xgjkbZ dq.M 0.79 3.15 3.15 3.60 28.04 99.00 3059.33 3059.33
rd feVVh dh [kqnkbZ djuk]ry dks ik;rku nhokj 3.14 13.50 0.45 0.15 2.86 99.00
dwVuk]ikuh Mkyuk]cxy dks lokjuk
rFkk cph feVVh dkss 50eh nwjh rd
fuLrkj.k djukA 30.90 ?k-eh-
l[r feV~Vh esa
2 lhesaV dadhV 1 lhesaV 4 ctjh rFkk dq.M 0.79 3.15 3.15 0.20 1.56 2110.00 565.66 3287.03
8 fxVVh bZV dh 40 feeh ukHkh; 363.11
eki dh uho esa Mkyuk]dqVkbZ o rjkbZ
djukA 1.56 ?k-eh-
3 uhao rFkk dqlhZ esa izFke Js.kh bZaVksa dh dq.M 3.14 2.92 0.23 4.00 8.44 3063.00 5976.89 38379.91
fpukbZ lhesaV&ctjh 1%6 elkys esa] 3.14 13.50 0.23 0.42 4.09 477.00
12.53 ?k-eh-
4 50fe-eh- eksVkbZ esa lhesaV dadzhV 1%2%4 dq.M 0.79 2.70 2.70 5.72 265.00 623.77 1516.50
ftlesa 1lhesaV 2ctjh 4 iRFkj dh 12 109.00
fe-eh- ukHkh; fxVVh ds lkFk feykdj
Mkyuk] dwVuk] rjkbZ vkfn lesr A 5.72 o-eh-
5 iRFkj ds fljny ¼fyVay 7-5 ls-eh dq.M 2 3.15 0.30 1.89 687.00 408.24 1298.43
eksVkbZ½ dh vkiwfrZ dj] fpukbZ es 216.00
mi;ksx dh xbZ elkys es mls yxkukA 1.89 o-eh-
6 vOoy ntsZ dh iRFkj dh ifê;ksa dh dq.M 0.79 3.15 3.15 7.79 1225.00 2709.96 9293.66
Nr Mkyuk] Åij rFkk uhps ls tksMksa es <Ddu 0.45 0.45 0.20 357.20
iRFkj dh phi ds lkFk 1%4 vuqikr esa
lhesaV elkys ls HkjukA ¼2 eh rd½ 7.59 o-eh-
7 iDds bZaV ds VqdMs ;k iRFkj ds NksVs 220.00 348.99 1669.07
dkrys es lhesaV elkyk 1%4 es Hkaofj;k 7.59 o-eh- 46.00
Mkyuk] iêh Nr ds Åij rFkk vkiwfÙkZ
djukA
8 lhesaV IykLVj nhokj ij 1%4 vuqikr es dq.M iSank 0.79 2.70 2.70 5.72 128.00 3820.45 9137.10
lhesaV&ctjh feykdj dj tksMksa dks dq.M nhokj 3.14 2.70 3.90 33.06 53.52
dqjsnus rFkk rjkbZ lfgr 12 fe-eh- dq.M ckgj 3.14 3.15 0.60 5.93
dq.M Nr 7.59
ik;rku nhokj 3.14 13.50 0.45 19.08
71.38 o-eh-
10 Dosjh jfol ftles 40 izfr'kr iRFkj ds ik;rku 0.79 13.25 13.25 0.15 20.67 410.00 2070.36 7996.69
Liky gks ;k dØaj ;k ?kkaM+yk dks dq.M 0.79 3.15 3.15 0.15 1.17 106.15
fcNkuk rFkk vkiwfÙkZ djuk] ikuh
fNM+duk rFkk nqjeqV ls dwVukA 19.50 ?k-eh-
11 <Ddu 1 la[;k 0.00 800.00
12 yhM pktZ o-eh-
ctjh 20.00 6.42 ?k-eh- 3.00 0.00
105 fxzV 20.00 0.26 ?k-eh- 4.00 0.00
bZV 20.00 5.93 gtkj 0.00 0.00
Dosjh jfol 20.00 23.40 ?k-eh- 3.00 0.00
13 fjgSMfyax pktZ 500.00 2000.00
20083.65 78437.71
vkdfLed O;;A 916.35 1562.29
egk;ksx 21000.00 80000.00
Note %& mDr njsa iapk;r lfefr ywudj.klj chdkusj dh ch,lvkj (01-04-13 ls ykxw½ ls yh xbZ gSaA
dk;Z dk rdehuk
dk;Z dk foLrr fooj.k
dk;Z dk uke%fuft dqq.M ch tydq.M fuekZ.k dk;Z
tyxzg.k {ks+= % chdkusj 44 ;kstuk % vkbZ-MCY;w-,e-ih-
dz l vk-la[;k vkbVe ekrzk bZdkbZ lhesaV ctjh 20feeh bZV ifV~V;k xzsoy fljny bZV fxV~Vh
1 2 lh-lh-1%4%8 1.56 ?k-eh- 4.99 0.70 1.40
2 3 bZaVksa dh fpukb 12.53 ?k-eh- 13.66 2.91 5926.8
3 4 lh-lh-1%2%4 5.72 fdyks 1.79 0.13 0.26
4 5 fljny 1.89 o-eh- 0.50 0.10 1.89
5 6 ifê;kW 7.59 o-eh- 0.52 0.68 8.35
6 7 bZaV ds Hkofj;k 7.59 o-eh- 2.73 0.19 0.38
7 8 IykLVj 1%4 71.38 o-eh- 12.11 1.71
8 9
9 10 Dosjh jfol 19.50 ?k-eh- 23.40
10 11 <Ddu 1
dqy 36 6.42 0.26 5927 8.35 23.40 1.89 1.78
cSx ?k-eh- ?k-eh- la[;k o-eh- ?k-eh- o-eh- ?k-eh-
lkexzh dh vko';drk
dk;Z dk uke% lkoZtfud tydq.M dk fuekZ.k dk;Z
tyxzg.k {ks+= % chdkusj 44 ;kstuk % vkbZ-MCY;w-,e-ih-
dzl dk;Z dk fooj.k la[;k yEckbZ pkSMkbZ xgjkbZ ekrzk bZdkbZ nj Je jkf'k dqy jkf'k
1 uho][kkbZ]ijukyk esa 1-5eh xgjkbZ dq.M 0.79 4.05 4.05 3.30 42.49 99.00 4598.26 4598.26
rd feVVh dh [kqnkbZ djuk]ry dks ik;rku nhokj 3.14 14.00 0.45 0.20 3.96 99.00
dwVuk]ikuh Mkyuk]cxy dks lokjuk
rFkk cph feVVh dkss 50eh nwjh rd
fuLrkj.k djukA 46.45 ?k-eh-
l[r feV~Vh esa
2 lhesaV dadhV 1 lhesaV 4 ctjh rFkk dq.M 0.79 4.05 4.05 0.20 2.58 2110.00 935.08 5433.66
8 fxVVh bZV dh 40 feeh ukHkh; 363.11
eki dh uho esa Mkyuk]dqVkbZ o rjkbZ
djukA 2.58 ?k-eh-
3 uhao rFkk dqlhZ esa izFke Js.kh bZaVksa dh dq.M 3.14 3.70 0.35 3.70 15.05 3063.00 9202.21 59090.92
fpukbZ lhesaV&ctjh 1%6 elkys esa] ik;rku nhokj 3.14 14.00 0.23 0.42 4.25 477.00
19.29 ?k-eh-
4 50fe-eh- eksVkbZ esa lhesaV dadzhV 1%2%4 dq.M 0.79 3.35 3.35 8.81 265.00 960.25 2334.56
ftlesa 1lhesaV 2ctjh 4 iRFkj dh 12 109.00
fe-eh- ukHkh; fxVVh ds lkFk feykdj
Mkyuk] dwVuk] rjkbZ vkfn lesr A 8.81 o-eh-
5 iRFkj ds fljny ¼fyVay 7-5 ls-eh dq.M 4 3.00 0.30 3.60 687.00 777.60 2473.20
eksVkbZ½ dh vkiwfrZ dj] fpukbZ es 216.00
mi;ksx dh xbZ elkys es mls yxkukA 3.60 o-eh-
6 vOoy ntsZ dh iRFkj dh ifê;ksa dh dq.M 0.79 4.05 4.05 12.88 1225.00 4526.96 15524.99
Nr Mkyuk] Åij rFkk uhps ls tksMksa es <Ddu 0.45 0.45 0.20 357.20
iRFkj dh phi ds lkFk 1%4 vuqikr esa
lhesaV elkys ls HkjukA ¼2 eh rd½ 12.67 o-eh-
7 iDds bZaV ds VqdMs ;k iRFkj ds NksVs 220.00 582.98 2788.16
dkrys es lhesaV elkyk 1%4 es Hkaofj;k 12.67 o-eh- 46.00
Mkyuk] iêh Nr ds Åij rFkk vkiwfÙkZ
djukA
8 lhesaV IykLVj nhokj ij 1%4 vuqikr es dq.M iSank 0.79 3.35 3.35 8.81 128.00 3641.16 8708.30
lhesaV&ctjh feykdj dj tksMksa dks dq.M nhokj 3.14 3.35 3.70 38.92 53.52
dqjsnus rFkk rjkbZ lfgr 20 fe-eh- dq.M ckgj 3.14 4.05 0.60 7.63
dq.M Nr 12.67
68.03 o-eh-
9 lhesaV IykLVj nhokj ij 1%4 vuqikr es ik- nhokj 3.14 14.00 0.40 17.58 102.00 8195.09 15618.45
lhesaV&ctjh feykdj tksMksa dks dqjsnus ik;rku 0.79 13.75 13.75 148.41 53.52
rFkk rjkbZ lfgr 12 fe-eh-A 166.00
?kVkb;s dq.M 12.88
153.12 o-eh-
10 izFke Js.kh dh lw[kh iV~V bZaV d.kZdkj ik;rku 0.79 13.75 13.75 148.41 292 12062.89 39577.13
esa Q'kZ 12 eh-eh- eksVs eM elkys ds dq.M 0.79 4.05 4.05 12.88 89.00
Åij yxkuk rFkk tksM+ksa esa HkjdjÅij
ls likVVhi lhesaVelkys 1%3 esa HkjukA 135.54 o-eh-
11 <Ddu 1 la[;k 0.00 800.00
12 yhM pktZ o-eh-
10 ctjh 20.00 13.57 ?k-eh- 3.00 0.00
105 fxzV 20.00 0.40 ?k-eh- 4.00 0.00
bZV 20.00 14.55 gtkj 0.00 0.00
45482.49 156947.64
fjgSMfyax 2000.00
45482.49 158947.64
vkdfLed O;;A 517.51 1052.36
12 egk;ksx 46000.00 160000.00
Note %& mDr njsa ftyk ifj"kn~ ¼xkzeh.k fodkl izdks"B½ chdkusj dh ¼ch,lvkj 01-04-13½ ls yh xbZ gSaA
dk;Z dk rdehuk
dk;Z dk foLrr fooj.k
dk;Z dk uke% lkoZtfud tydq.M dk fuekZ.k dk;Z
tyxzg.k {ks+= % chdkusj 44 ;kstuk % vkbZ-MCY;w-,e-ih-
dz l vk-la[;k vkbVe ekrzk bZdkbZ lhesaV ctjh 20feeh bZV ifV~V;k fljny bZV fxV~Vh
1 2 lh-lh-1%4%8 2.58 ?k-eh- 8.24 1.16 2.32
2 3 bZaVksa dh fpukb 19.29 ?k-eh- 21.03 4.48 9125
3 4 lh-lh-1%2%4 8.81 fdyks 2.75 0.19 0.40
4 5 fljny 3.60 o-eh- 0.50 0.10 3.60
5 6 ifê;kW 12.67 o-eh- 0.87 1.14 13.941
6 7 bZaV ds Hkofj;k 12.67 o-eh- 4.56 0.32 0.63
7 8 IykLVj 1%4 68.03 o-eh- 11.54 1.63
8 9 IykLVj 1%4 153.12 o-eh- 15.62 2.14
9 10 bZV [kajtk 135.54 o-eh- 3.55 2.41 5422
10 11 <Ddu 1
dqy 68.65 13.57 0.40 14547 13.94 3.60 2.95
cSx ?k-eh- ?k-eh- la[;k o-eh- o-eh- ?k-eh-
lkexzh dh vko';drk
dk;Z dk uke% fMXxh fuek.kZ dk;Z
tyxzg.k {ks+= % chdkusj 44 ;kstuk % vkbZ-MCY;w-,e-ih-
yEckbZ 19.5 pkSMkbZ 37.5 xgjkbZ 3
dzl dk;Z dk fooj.k la[;k yEckbZ pkSMkbZ xgjkbZ ekrzk bZdkbZ nj Je jkf'k dqy jkf'k
1(1) uho][kkbZ]ijukyk esa 1-5eh xgjkbZ rykbZ ryk 1 28.50 28.50 3.00 2436.75 135.75 353341.71 353341.71
rd feVVh dh [kqnkbZ djuk]ry dks 1 19.50 19.50 0.10 38.03 135.75
dwVuk]ikuh Mkyuk]cxy dks lokjuk nhokjs 4 19.05 0.45 0.45 15.43
rFkk cph feVVh dkss 50eh nwjh rd 4 38.10 0.60 0.75 68.58
fuLrkj.k djukA 4 28.50 0.45 0.35 17.96
l[r feV~Vh esa e; ,d yhM 12 9.50 0.45 0.35 17.96
4 13.00 0.45 0.35 8.19
2602.89 ?k-eh-
1(2) fyQ~V izfr'kr dqy feV~Vh dk;Z dk 1 24.00 24.00 1.50 864.00 ?k-eh- 12.00 10824.30 10824.30
38.03 12.00
902.03
2 lhesaV dadhV 1 lhesaV 4 ctjh rFkk rykbZ ryk 1 19.15 19.15 0.10 36.67 2478.00 13316.06 90873.84
8 fxVVh bZV dh 40 feeh ukHkh; 363.11
eki dh uho esa Mkyuk]dqVkbZ o rjkbZ
djukA 36.67 ?k-eh-
3 lhesaV dkØhaV 1%2-4 feJ.k dh izofyr lhesaV 1 19.50 19.50 0.07 26.62 3584.07 9956.81 95398.98
dkØhaV esa Mkyuk rFkk vkiwfÙkZ djuk] Nr dh 374.07
Lysc] NTts] che] fyVay vkfn esa] nckuk] 26.62 ?k-eh-
rjkbZ djuk rFkk lrg dks 1%3 lhesaV elkys
ls lery djuk
4 uhao rFkk dqlhZ esa izFke Js.kh bZaVksa dh LVsi 1 4 19.15 0.35 0.45 12.06 3063.00 62617.94 402093.79
fpukbZ lhesaV&ctjh 1%6 elkys esa] 4 28.50 0.35 0.35 13.97 477.00
4 37.95 0.45 0.70 47.82
12 9.50 0.35 0.35 13.97
4 13.00 0.35 0.35 6.37
LVsi 2 4 37.85 0.35 0.70 37.09
131.27 ?k-eh-
5 ,yMhih fQYe 250 ekbdzksu 4 28.50 10.50 1197.00 57.20 4788.00 68468.40
0.00 4.00
0.00
1197.00 o-eh-
6 izFke Js.kh dh iVV bZaV d.kZdkj slanted 4 28.50 9.50 1083.00 292 96387.00 316236.00
esa Q'kZ 12 eh-eh- eksVs eM elkys ds 89.00
Åij yxkuk rFkk tksM+ksa esa HkjdjÅij 1083.00 o-eh-
ls likVVhi lhesaVelkys 1%3 esa HkjukA
8 lhesaV IykLVj nhokj ij 1%4 vuqikr es 4 28.50 9.50 1083.00 128.00 57962.16 138624.00
lhesaV&ctjhfeykdj tksMksa dks dqjsnus 1 0.00 0.00 0.00 53.52
rFkk rjkbZ lfgr 20 fe-eh-A 1083.00 o-eh-
9 lhesaV IykLVj nhokj ij 1%4 vuqikr es 4 37.95 1.50 227.70 102.00 32537.48 62010.90
lhesaV&ctjh feykdj tksMksa dks dqjsnus ryk 1 19.50 19.50 380.25 53.52
rFkk rjkbZ lfgr 12 fe-eh-A
607.95 o-eh-
dk;Z dk rdehuk
dk;Z dk foLrr fooj.k
10 yhM pktZ
1) ctjh 20.00 fdeh 111.65 ?k-eh- 3.00 0.00
fxzV 20.00 fdeh 54.83 ?k-eh- 4.00 0.00
bZV 20.00 fdeh 105.41 gtkj 5.00 0.00
;ksx 641731.46 1537871.9
1537871.9
12 vkdfLed O;;A 8268.54 28128.1
egk;ksx 650000 1566000
Note %& mDr njsa iapk;r lfefr ywudjulj ¼xzkeh.k ch,lvkj 01-04-13½ ls yh xbZ gSaA
dk;Z dk uke% fMXxh fuek.kZ dk;Z
tyxzg.k {ks+= % chdkusj 44 ;kstuk % vkbZ-MCY;w-,e-ih-
dz l vk-la[;k vkbVe ekrzk bZdkbZ lhesaV ctjh 20feeh 40feeh bZV ,yMhih fQYe
1 2 lh-lh-1%4%8 36.67 ?k-eh- 117.35 16.50 33.01 250 ekbdzksu
2 3 lh-lh-1:2:4 26.62 ?k-eh- 163.43 10.91 21.83
3 4 izFke Js.kh bZaVksa dh fpukb 1%6 esa 131.27 ?k-eh- 143.09 30.46 62093
4 5 ,yMhih fQYe 250 ekbdzksu 1197.00 o-eh- 1316.7
5 6 [kajtk iVV 1083.00 o-eh- 28.37 19.28 43320
6 7 [kMh bZV dk [kajtk o-eh- 0.00 0.00 0
7 8 IykLVj 1%4 esa 20 feeh 1083.00 o-eh- 183.68 25.99
8 9 IykLVj 1%4 esa 12 feeh 607.95 o-eh- 62.01 8.51
dqy ek=k 697.93 111.65 21.83 33.01 105413 1316.70
cSx ?k-eh- ?k-eh- ?k-eh- la[;k o-eh-
lkexzh dh vko';drk
CHAPTER - VIII Enclosures -
a. Location –District, block, village, watershed location map
b. Map of Bikaner -44 IWMP Project (Watershed Boundary demarcation in cadastral &
Topo Sheet)
c. PRA Map (along with photos & paper drawing)
d. Treatment map (Indicate proposed works)
e. Cadastral Map on watershed boundary
f. Information on Soils, Soil fertility, Land capability, Soil chemical problems like
salinity, alkalinity
g. Land Use Land Cover map
h. Information on existing water harvesting structures & well inventory along with GPS
co-ordinates.
i. High resolution, latest Remote Sensing Satellite data
Documents of Agreements: Proceedings of gram sabha for EPA approval
Proceedings of gram sabha Resolution for committee constitution
Proceedings of gram sabha for DPR approval
Proceeding of Standing Committee of P.S. for DPR approval.
Proceeding of Standing Committee of Z.P. for DPR approval.
Assistant Engineer, PIA
WD&SC P.S.- Lunkaransar
Project Manager, WCDC
WD&SC.Distt.- Bikaner
• Insert thematic Base map
VILLAGE MAP - IWMP BIKANER -44
Panchayat Samiti Lunkaransar Map
Khari
Hanseran
Dhhirera
Dulamera
Uttamdesar
Meharana
89
149
100
96
40
17
215
144
19
47
95
224
5
8
231
1
195
99
127
50
230
37
163
9
8
39
126
196
2
95
167
41
93
1
38
83
59
246
3
92
106/176
57
52
48
232
12
52
24
61
81
107
18
46
125
31
98
28
66
25
51
97
90
254
9
202
82
122
6
140
123
49
171
9
56
37
55
110
111
63
20
110
87
69
19
11
108
69
10
95
60
66
237
143
71
146
30
170
63
15
101
106/64
73
115
80
120
122
106
239
13
59
20
66
119
1
53
58
216
172
76
32
80
76
1
72
13
53
118
105
79
219
59
39
54
76
243
234
36
77
35
106/12
44
161
45
139
42
108
77
103
253
210
187
25
212
12
122
208
238
28
109
2
80
235
113
134
7
83
49
255
129
89
186
118
70
69
61
58
57
83
25
87
157
160
96
84
186
73
236
185/3
132
78
113
67
169
6
27
81
117
52
218
51
80
142
104
68
158
168
44
93
142
99
229
44
92
18
7
15
158
56
17
102
171
22
147
73
151
103/2
22
72
71
119
86
209
70
141
7
22
192
106/11
168
145
126
9974
44
175
88
157
227
208
240
155
112
111/17
87
65
105
85
70
84
250
126
168
97
193/2
139
75
61
7923
71
99
36
29
115
242
26
67
59
42
209
129
178
135
106/28
65
211
82
125
55
106/30
165
203
152
134
127
47
47/1
29
79
72
62
98
19
119
150
167/5
166
106/5
122/1
191
175
94
262
179
153
75
155
57
154
21
173
121
182184
206
58
133
55/273
109
166
56
202/103
66
49
13
199
124
169
149/1
112
41
123
82
228
24
32
120
54
128
134/3
106
216
191
165
54
83
111/6
37
34/1
144
225
133/5
198
233
106/61
149/2
252
39
204
110
14
79
75
20
221/1
120
131
115
163/6
32
11
146/1
241/44
189
50
53
102
101
43
141
23
50/1
98
256
106/34
121
172
195/2
50
221/2
137
190
38
51
201
263
240/1
86/1
133
142/1
136/1
72
47
124
116
60
33
149/4
62
169
60
74
91
84
208
156
142
149/1
70
128
101
52/1
39
26
86
150
111/18
121
167/3
162
53/1
218
44
152
117
57/1
299/183
154
110
78
105
53
19/180
156
151/1
116/2
133
297/183
103/15
160
106/35
119
45
134/2
109
164
200
148
193
24
34
196
88/1
106/15
117
116
151/4
241/1
74
48
100
64
41/2
64
112
147
251
31/2
118
104
217
106/32
26
73
111/5
175
16
251/1
106/1
31/1
167/7
56/1/1
319/243
127
128
222
87
58/176
5
192
156
201
114/1
292/183
138
77
106/43
102
162
68
81
50/1
116/4
58
29/203
113
143
124
43
132
100
205
210
78
161
167/1
106/6
106/55
136/2
25/2
260
114/2
44
217 38
33
103/20
103/11
103/8
43
193/3
120
172107
106/42
35
58/247
188
171
30
242/1
65/1
137
194
106/23
74
55
129
261
41/2
228/197/270
116/3
96/277
34
106/50
133
48
134/4
107
177
185/1
152
85/2
71
52/217
75
163/4
55
131
106/47
107
67
111
188
64
106/36
4
170
213/2
5/1
16
154157
108
119/1
17
124
111/14
223
199
170/85
130
165
197
131
130
211
241
109
4
226
137
26/195
157
121
149/4
144
125
123
141
140
49
159
368/114
21
25/154
88/2106/26
213
117/1
68
169/85
44/1
18
174
98
154/1
85/1
105/9
133/7
70/1
104
103
175/1
200207
68
155
140
46
175
155
21/188
114/1
156
103/18
131
33/3
106/174
134
143
35/1
204
5
190
132
33/2
160
153/3
18
139
211/1
135
189
148
33/4
114
112
300/185
101
176
224/1
85
94/1
87/226
19/243
153/1
111/2
98/275
19/183
22/1
151
52/218/1
173/237
94/4
35
152
14
94/3
88
87/222
130
81
164
149/3
45
116/1
105
141
69
29/1
94/2
145
341/258
103/23
34/276
21/189
106/3
125
118
61
71/1/2
184
123
106/66
142/6
149/3
237/44
15
78/1
132
54
198
26/197
210/2
203
27
47
132
261/1
152/1
102
29/2
58/177
33/1
103/17
92
82/281
35/1
82
59/1
90
222/1
133/14
150
56/1/2
3
27
51/2
156
42
77/1
146
151/3
136
86
87/221
67/280
333/258
167/2
153
138
104/1
210/3
163
28
26/198
334/258/2
220/2
174/106
133/15
317/35
168/40
106/41
163
104
111/16
73
167/40
106/53
331/258
97
126
210/1
176
73/238
115
252/95
245
103
151/2
4
19/181
19/179
135
103/18
118/1
43/2
130
205
45/1
19/182
133
103
144/2
69/1
52
106/29
321/258
140
336/259
146
21/190/2
51
108
179
148
122
42/214
40/2
87/225
45
312/212
335/259
106
73/239
117/2 220/1
147
19
214
62
154
166
30
149
116
40
40/209
34/2/2
352/195
337/259
162
42/212
113
34/2/3
157/275
323/249/1
193/1
158
94
170
26/196
71/1/1
26/199
301/183/3
46
206
167
76
129
136
15
153 34/2/1
78/1
353/195
153/2
354/195
301/183/2
87/224
301/183/1
41
90 223/1
334/258/1
133/6
91
128
106
117/2
94
114/264
92
114/2
40/210
6
200/1
165/5
426/207
322/249
12
427/207
202
50
143
10
133/13
248
21/190/1
197
65
16
91
65
145
257
194
84
247
23
106/175
214
145
148
244
249/2
146
116/5
41/2
147
144
322/67
314/221
284/167
100
56
45/2
73/239
215
150
212
197/103
29/200
57
142
88
320/243
91
180
36
96
122/1
31/3
178
35/1
196/103
127
332/258
149
322/249
37/268
90
180177
159
251/95
174/178
89
181
219
89
2
323/249/1
14
95
96
173
62
149/266
44H11
Khari
Dhhirera
Hansera Dulamera
Meharana
STATE REMOTE SENSING APPLICATION CENTERDepartment of Science & Technology
JODHPUR
µ1:13,000
GEOREFERENCED KHASRA MAPPANCHAYAT SAMITI - LUNKARANSAR
DISTRICT - BIKANERWATERSHED - 39 (IWMP)
LEGENDRAILROADKHASRAWATERBODYSETTLEMENTSOI BOUNDARYVILLAGE BOUNDARYWATERSHED BOUNDARY
WATERSHED 2011-12S.NO. 41
Khari
Hanseran
Dhhirera
Dulamera
Uttamdesar
Meharana
89
149
100
96
40
17
215
144
19
47
95
224
5
8
231
1
195
99
127
50
230
37
163
9
8
39
126
196
2
95
167
41
93
1
38
83
59
246
3
92
106/176
57
52
48
232
12
52
24
61
81
107
18
46
125
31
98
28
66
25
51
97
90
254
9
202
82
122
6
140
123
49
171
9
56
37
55
110
111
63
20
110
87
69
19
11
108
69
10
95
60
66
237
143
71
146
30
170
63
15
101
106/64
73
115
80
120
122
106
239
13
59
20
66
119
1
53
58
216
172
76
32
80
76
1
72
13
53
118
105
79
219
59
39
54
76
243
234
36
77
35
106/12
44
161
45
139
42
108
77
103
253
210
187
25
212
12
122
208
238
28
109
2
80
235
113
134
7
83
49
255
129
89
186
118
70
69
61
58
57
83
25
87
157
160
96
84
186
73
236
185/3
132
78
113
67
169
6
27
81
117
52
218
51
80
142
104
68
158
168
44
93
142
99
229
44
92
18
7
15
158
56
17
102
171
22
147
73
151
103/2
22
72
71
119
86
209
70
141
7
22
192
106/11
168
145
126
9974
44
175
88
157
227
208
240
155
112
111/17
87
65
105
85
70
84
250
126
168
97
193/2
139
75
61
7923
71
99
36
29
115
242
26
67
59
42
209
129
178
135
106/28
65
211
82
125
55
106/30
165
203
152
134
127
47
47/1
29
79
72
62
98
19
119
150
167/5
166
106/5
122/1
191
175
94
262
179
153
75
155
57
154
21
173
121
182184
206
58
133
55/273
109
166
56
202/103
66
49
13
199
124
169
149/1
112
41
123
82
228
24
32
120
54
128
134/3
106
216
191
165
54
83
111/6
37
34/1
144
225
133/5
198
233
106/61
149/2
252
39
204
110
14
79
75
20
221/1
120
131
115
163/6
32
11
146/1
241/44
189
50
53
102
101
43
141
23
50/1
98
256
106/34
121
172
195/2
50
221/2
137
190
38
51
201
263
240/1
86/1
133
142/1
136/1
72
47
124
116
60
33
149/4
62
169
60
74
91
84
208
156
142
149/1
70
128
101
52/1
39
26
86
150
111/18
121
167/3
162
53/1
218
44
152
117
57/1
299/183
154
110
78
105
53
19/180
156
151/1
116/2
133
297/183
103/15
160
106/35
119
45
134/2
109
164
200
148
193
24
34
196
88/1
106/15
117
116
151/4
241/1
74
48
100
64
41/2
64
112
147
251
31/2
118
104
217
106/32
26
73
111/5
175
16
251/1
106/1
31/1
167/7
56/1/1
319/243
127
128
222
87
58/176
5
192
156
201
114/1
292/183
138
77
106/43
102
162
68
81
50/1
116/4
58
29/203
113
143
124
43
132
100
205
210
78
161
167/1
106/6
106/55
136/2
25/2
260
114/2
44
217 38
33
103/20
103/11
103/8
43
193/3
120
172107
106/42
35
58/247
188
171
30
242/1
65/1
137
194
106/23
74
55
129
261
41/2
228/197/270
116/3
96/277
34
106/50
133
48
134/4
107
177
185/1
152
85/2
71
52/217
75
163/4
55
131
106/47
107
67
111
188
64
106/36
4
170
213/2
5/1
16
154157
108
119/1
17
124
111/14
223
199
170/85
130
165
197
131
130
211
241
109
4
226
137
26/195
157
121
149/4
144
125
123
141
140
49
159
368/114
21
25/154
88/2106/26
213
117/1
68
169/85
44/1
18
174
98
154/1
85/1
105/9
133/7
70/1
104
103
175/1
200207
68
155
140
46
175
155
21/188
114/1
156
103/18
131
33/3
106/174
134
143
35/1
204
5
190
132
33/2
160
153/3
18
139
211/1
135
189
148
33/4
114
112
300/185
101
176
224/1
85
94/1
87/226
19/243
153/1
111/2
98/275
19/183
22/1
151
52/218/1
173/237
94/4
35
152
14
94/3
88
87/222
130
81
164
149/3
45
116/1
105
141
69
29/1
94/2
145
341/258
103/23
34/276
21/189
106/3
125
118
61
71/1/2
184
123
106/66
142/6
149/3
237/44
15
78/1
132
54
198
26/197
210/2
203
27
47
132
261/1
152/1
102
29/2
58/177
33/1
103/17
92
82/281
35/1
82
59/1
90
222/1
133/14
150
56/1/2
3
27
51/2
156
42
77/1
146
151/3
136
86
87/221
67/280
333/258
167/2
153
138
104/1
210/3
163
28
26/198
334/258/2
220/2
174/106
133/15
317/35
168/40
106/41
163
104
111/16
73
167/40
106/53
331/258
97
126
210/1
176
73/238
115
252/95
245
103
151/2
4
19/181
19/179
135
103/18
118/1
43/2
130
205
45/1
19/182
133
103
144/2
69/1
52
106/29
321/258
140
336/259
146
21/190/2
51
108
179
148
122
42/214
40/2
87/225
45
312/212
335/259
106
73/239
117/2 220/1
147
19
214
62
154
166
30
149
116
40
40/209
34/2/2
352/195
337/259
162
42/212
113
34/2/3
157/275
323/249/1
193/1
158
94
170
26/196
71/1/1
26/199
301/183/3
46
206
167
76
129
136
15
153 34/2/1
78/1
353/195
153/2
354/195
301/183/2
87/224
301/183/1
41
90 223/1
334/258/1
133/6
91
128
106
117/2
94
114/264
92
114/2
40/210
6
200/1
165/5
426/207
322/249
12
427/207
202
50
143
10
133/13
248
21/190/1
197
65
16
91
65
145
257
194
84
247
23
106/175
214
145
148
244
249/2
146
116/5
41/2
147
144
322/67
314/221
284/167
100
56
45/2
73/239
215
150
212
197/103
29/200
57
142
88
320/243
91
180
36
96
122/1
31/3
178
35/1
196/103
127
332/258
149
322/249
37/268
90
180177
159
251/95
174/178
89
181
219
89
2
323/249/1
14
95
96
173
62
149/266
44H11
Khari
Dhhirera
Hansera Dulamera
Meharana
STATE REMOTE SENSING APPLICATION CENTERDepartment of Science & Technology
JODHPUR
µ1:13,000
DUNE
AGRICULTURELAND WITH SCRUB
LEGENDRAILROAD
KHASRAWATERBODYSETTLEMENT
SOI BOUNDARYVILLAGE BOUNDARYWATERSHED BOUNDARY
WATERSHED 2011-12S.NO. 41
LAND USE/ LAND COVER MAP
DISTRICT- BIKANER
WATERSHED - BIKANER - 39 (IWMP)PANCHAYAT SAMITI - LUNKARANSAR
PRA MAP IWMP Bikaner-44
PRA MAP IWMP Bikaner-44
PRA MAP IWMP Bikaner-44
PRA MAP IWMP Bikaner-44
PRA MAP IWMP Bikaner-44
PRA MAP IWMP Bikaner-44
dz-la-[kkrksuh
u-d`"kd dk uke e; firk tkfr [kljk ua- {kS=Qy
tydq.M la-
99/1 1.16
101/1 24.09
103/14 20.00
103/19 14.18
104/1 16.00
106/1 54.07
106/70 10.17
127/1 24.16
134/1 0.12
140/1 3.00
151/1 32.10
92 7.12
97 68.01
98 61.07
93 0.05
94 3.00
95 0.12
96 0.07
2 2
v.kph iRuh Lo- xkseUnjke 1@48 fg- ukuq
iq= ykyw 1@16 fg- psukjke] rksykjke]
lhrkjke fi- xkseUnjke 21@192 fg- pkoyh
iRuh Lo- gqdekjke ] :ikjke] xaxk] ikjk iq=
iqf=;ka gqDekjke 7@192
es?koky 155/3 15.05 1
3 4 vfurk iq=h txekykjke tkV 159/106 25.00 1
4 6 vklkjke] dqEHkkjke] eksgujke firk Hkksekjke tkV 102/2 25.01 1
5 9 bZek nsoh iRuh 'kadjyky tkV 174/106 21.00
6 13 vkse izdk'k iq= vknqnkl tkV 177/106 8.00
7 15 dkukjke iq= lq[knsok jke tkV 196/103 4.15
[kkjh (IWMP-BKN-44)
xzke iapk;r dqtVh xzke [kkjh ds ykHkkfFkZ;ksa dh lwph
1 1
vjkthjkt
flok; pd ukekfcy dk'r tksgM+ ik;ru
flok; pd ukekfcy 'elku
8 16
dkukjke] lksgujke] lqjtkjke] lksuk]
fdluk] rhtka] cyh] feJk] equh iq=&iqf=;ka
x.kirjke
ckojh;k 106/33 40.00
Page No.1
9 19 dkywjke @ fd'kukjke tkV 103/10 18.00
10 20 dkywjke @ gtkjhjke tkV 151/2 45.00 1
11 21
dkywjke @ fd'kukjke 1@3 fg- ukjk;.kjke
iq= fd'kukjke 12@39 fg- ekejkt iq=
fujk.kkjke 12@32 fg- ds'kjkjke iq=
ukjk;.kjke 1@39 ewykjke] cnzhjke fi-
ekejkt
tkV 106/4 40.00 1
12 23ds'kj iRuh Lo- lqxukjke] xksikyjke]
jkedj.k] lqjtkjke fi- lqxukjketkV 102/1 25.02 1
13 24 ds'kj oYn vejkjke es?koky 103/11 39.00 1
14 25
dsljnsoh iRuh vtZujke 1@5 fg- rqyNh
nsoh iRuh iRuh Hkkxwjke 2@5 fg- pqUuh nsoh
iRuh gjhjke 1@5 fg- xksikynkl iq=
gtkjhnkl 1@5 fg-
tkV
Lokeha103/18 45.00
15 30dkstkjke] ykywjke] eksMkjke] vkSeizdk'k]
Hkojh] lqjtk] nqxZ fi- iqjkjkeuk;d 103/24 25.00 1
16 31 [ksehnsoh iRuh isekjke tkV 179/106 2.00
17 34x.ks'kkjke] lqjrkjke] eksgujke] firk
xqekukjkees?koky 155/2 15.05 1
18 36fxj/kkjh] 'kSjk] x.kS'kk] cUuk fi- lsmjke]
rqyNM+h] pquh ds'kj iqf=;k lsmjkeuk;d 127/4 40.00 1
19 40
xksikykjke] ijekjke] ykHkwjke] gssrjke]
Hkkstkjke] bejrkjke fi- Mqaxjjke] tsBh] 'kkarh
fi- Mqaxjjke
tkV 130 13.12 1
20 41 xksikykjke @ psrujke es?koky 106/5 60.00 1
21 42 xksikykjke @ lqxukjke tkV 103/12 26.13 1
22 43 xkserhnsoh] thts] rqyNkjke] tkV 121 27.16
23 46 pqukjke @ ckywjke tkV 123/1 49.05 1
106/26 30.00 1
106/26 16.16
25 48 pqukjke] 'ksjkjke] ys[kjke] fi- gaasekjke tkV 103/20 39.16 1
26 51 pasrujke @ fyEckjke tkV 106/6 34.15 1
27 53
pSuk iRuh Lo- Qqlkjke] gM+ekukjke]
fd'kukjke] lhrkjke] txnh'kjke] firk
Qwlkjke
lqukj 103/13 34.16 1
28 54
pSuk iRuh Lo- Qqlkjke] gM+ekukjke]
fd'kukjke] lhrkjke] txnh'kjke] firk
Qwlkjke
lqukj 125 12.19 1
47 tkVpqUUkhnsoh @ gjhjke24
Page No.2
29 56 t;fd'ku oYn uFkwjke tkV 134/2 20.00
30 58 tSlkjke @ vejkjke es?koky 106/8 30.00 1
31 59 tksxhnkl @ ew.knkl Lokeha 176/106 1.05
32 60 tksxhnkl @ ewMnkl cSjkxh 138 10.06 1
33 61 Mkywjke] lkywjke] ykywjke fi- HkSjkjke lkalh 106/60 20.00 1
34 66fryksdkjke @ lq[kjke 1@2 fg- Hkaojyky
@ pUn:jke
ckojh
es?koky106/10 40.00
35 68 rqyNhnasoh thts jsoUrjke tkV 149/5 25.00 1
36 69 rksyhnsoh iRuh Jhjke tkV 126/5 12.05
37 72 nqxkZjke @ /kqM+kjke tkV 186/106 0.13
38 73nqykjke] gqDekjke] Hkh;kajke] gjhjke] fi-
iqjkjketkV 106 20.00 1
39 77
/kkiq iRuh Lo- cq/kkjke] jkes'ojyky]
nkukjke] enuyky] izHkwjke fi- cw/kkjke tsBh
iq=h cw/kkjke
tkV 123/2 49.05 1
40 78 /kkiq iRuh Lo- cq/kkjke tkV 181/106 0.15
41 79
/kkiq iRuh Lo- vknwnkl dkstnkl]
Hkxokunkl] vkSenkl] iq"ik] eqqyh] dkyh fi-
vknwnkl 1@4 fg- x.ks'k nkl iqjk fi-
thounkl 1@2 fg- fjN iRuh Lo- [kwenkl]
vklwnkl] cw/kjnkl] rqyNhnkl ] iq"ik]
fyNek] isek] xqM~Mh fi- [kwwenkl 1@4 fg-
cSjkxh 103/22 20.00 1
42 80
/kkiq iRuh Lo- vknwnkl dkstnkl]
Hkxokunkl] vkSenkl] iq"ik] eqqyh] dkyh fi-
vknwnkl 1@4 fg- x.ks'k nkl iqjk fi-
thounkl 1@2 fg- fjN iRuh Lo- [kwenkl]
vklwnkl] cw/kjnkl] rqyNhnkl ] iq"ik]
fyNek] isek] xqM~Mh fi- [kwwenkl 1@4 fg-
cSjkxh 154 31.08
43 83 /kwM+kjke @ iqj[kkjke tkV 106/65 30.00 1
44 84 uFkwjke @ lknhjke tkV 134/5 20.00
122/2 30.03
122/4 25.12
46 87 ujlkjke @ lq[k nsokjke tkV 197/103 4.15 1
47 88ukuw iRuh Lo- rqyNkjke] lghjke] fyNek
iq=h rqyNkjketkV 142 51.14 1
48 90
ukuw iRuh [kqekukjke] fy[kekjke] xksfoUnjke]
gjhjke] lghjke] eq[kjke txnh'k] rqyNkjke
iq= [kqek.Mk] eksguh iq- [kqek.Mk
tkV 106/15 50.00 1
49 91
ukuw iRuh [kqekukjke] fy[kekjke] xksfoUnjke]
gjhjke] lghjke] eq[kjke txnh'k] rqyNkjke
iq= [kqek.Mk] eksguh iq- [kqek.Mk
tkV 106/38 56.00 1
50 93 ukuw iRuh ykyw es?koky 103/21 25.00
45 85 jgu fcyk dCtk ,ethch xzkeh.k cSad
Page No.3
51 95
ukuwjke] ekejkt] rkasykjke] iq- xqjn;ky ]
lksuk ] vukjh] fyNek] vaxwjh] gq.krjke iq-
xqjn;ky
ckojh 106/49 50.00
52 96 ukjk;.k @ fd'kuk tkV 103/1 15.00 1
53 97 usarjke @ gtkjhjke tkV 103/2 32.00 1
54 98ukSjk iRuh fuEckjke ] psrujke Hkkxwjke]
ekseUnjke] ikjk] ekSyk iq- fuEckjketkV 103/15 47.19 1
55 99 ukSjka iRuh Lo- Hkwjkjke tkV157
158
57.1
6.111
56 101 ijekjke @ Mqaxjjke tkV 187/106 0.15
57 102 iwuepUn @ galjkt tkV 202 / 103 35.00 1
58 106 iw.kZnkl @ e?knkl csjkxh 106/39 45.00 1
59 107 iw.kZjke @ ewykjke tkV 133 25.09 1
60 108iw.kZjke ] Jo.kjke] @ xksfoUnjke pEik]
th;k @ xksfoUnjke126/3 40.00 1
61 110 iw.kZjke @ Hkwjkjke tkV 106/3 25.00 1
62 115 iksdj @ nqyk tkV 103/3 37.00 1
63 116 Qqlkjke @ fd'kukjke dqEgkj 173/106 20.00
64 117 ctjaxyky @ HkhelSu tkV 203/103 35.00 1
65 118 ctjaxyky @ gM+ekukjke tkV 183/106 1.00
66 123 cq/kk] rksykjke ukbZ 135 38.16
67 127 Hkaojh nsoh @ijrk jke tkV 149/4 25.00 1
67 129 Hkxokunkl @ vknwnkl Lokeha 175/106 4.07
68 130 Hkkxw @ chjcy tkV 106/17 30.00 1
132/1 11.08 1
153/2 5.06
70 132 Hkkxwjke @ Mqaxjjke tkV 185/106 0.12
71 133 Hkkoh @ es?kk tkV 106/18 34.00 1
72 134Hkkuhjke 1@5 fg- chjcyjke 1@5 fg-
Hkh;kajke ] ijrkjke 3@5 fg- fi- es?kkjketkV
105
105/1
72
22.121
73 135 Hkh;kajke @ iqjk tkV 106/19 50.00 1
74 136 Hkhao.kh iRuh gsrjke tkV 204/99 29.00 1
106/22 19.00 1
134/3 58.07
76 139
Hkhejke @ ckywjke ] xkserh] Hkho.kh] jkeh]
fyNek] iq=h ckywjke 5@6 fg- esgh ] lqxuh
] iRuh Lo- jkeyky
tkV106/59
120
12
28.181
75 138 Hkkstjkt @ ckywjke tkV
es?kokyHkkxw @ vklw13169
Page No.4
77 141dkywjke @ dkywjke 1@6 fg- enuyky @
iw.kZjketkV 180/106 2.00
78 143
euksgjh iRuh Lo- jkepUn ] iIiqjke]
dkstkjke] iquepUn] f'koyky iq- jkepUn ]
dkyh] fQjku] jkepUn
tkV 106/43 50.00 1
79 144 euksgjh iRuh Lo- Mqaxjjke tkV 126/2 34.14 1
100 67.17 1
131 22.09
143 15.11
81 149 ek.kdjke @ Hkkstkjke tkV 103/17 20.08
82 150 ekejkt @ fd'kukjke tkV 106/41 18.00 1
83 151 ekejkt @ es?kkjke tkV 103/16 34.00
84 154eqUuhjke ] phekjke @ [ksrkjke eksghuh iRuh
Lo- [ksrkjkeuk;d
106/23
171/152
25.00
19.051
85 156 esgh iRuh jkeyky tkV134/4
136
30.00
38.011
86 158 eksgu @ xqekuk es?koky 106/25 61.10 1
87 159eksgujke] vtZujke] ukuwjke] iq- fd'kukjke]
inek] iqjk] ikuh] 'kkfUr] iq=h fd'kukjketkV
103/34
106/13
47.18
29.001
88 161 ekasgujke @ chjcyjke tkV 182/106 2.00 1
89 163 eksgujke @ Nksxkjke lqukj 126/4 18.04 1
90 164eksguh iRuh Lo- iukjke ] Jo.k ] jkes'oj ]
gjhjke] Hkaojh] lkm] jeh iq- iukjkelqFkkj 106/24 20.00 1
91 166 jktdqekj ] cq/kjke] @ rkywjke ckojh 106/21 25.00 1
92 173 jkejko] jkeizrki] 'kadjyky @ mekjke tkV 127/3 82.00 1
93 174 jkejko @ mekjko tkV 127/5 21.00 1
94 175 jkeyky @ /kwM+jke tkV 184/106 0.13
95 176 jkeyky @ tsBk 1@2 dwekjke isekjke lqFkkj 139 31.16 1
96 177 jkeyky @ tasBkjke lqFkkj 106/44 30.00 1
97 179
jkes'oj] pqukjke] lqjth] deyk] xqM~dh @
ghjkjke 35@36 fg- euksgj iq=h ghjkjke
1@36
tkV
144
147
148
156
17.11
7.13
7.06
25.18
1
98 180 jkes'ojyky ] pqukjke @ ghjkjke tkV106/68
149/1
25
78.121
99 183:[kek IkRuh Lo- tsBkjke] eksgujke] es?kkjke
@ tasBkjke] fdjkuh iq= tsBkjketkV 106/27 16.00 1
efUnj Jh Bkdqj th80 145
Page No.5
100 187 yknw @ cha>kjke ckojh 126/1 50.00
101 189 ykynkl @ ewM+nkl cSjkxh 141 31.15 1
102 191 ykywjke @ iqjkjke uk;d 106/16 40.00 1
103 193 fy[kek @ [kqek.kk tkV 106/46 50.00 1
104 194 fyNek @ ckywjke tkV 99/3 55.02 1
105 195 ywukjke @ rk:jke uk;d 172/152 19.05 1
106 196 ywukjke @ rk:jke uk;d 106/55 40.00 1
107 201 'ksjkjke oYn Hksjkjke 1@2 oxSj tkV 104 60.05 1
108 204 Jhjke @ ekukjke tkV 145 14.06 1
109 202 ';ksdj.k @ iw.kZjke tkV 178/106 1.00
110 205 Jhjke @ ljnkjkjke tkV 106/47 35.00 1
111 203 Jhjke oYn vejkjke es?koky 149/3 20.00
122/3 25.13 1
122/1 30.04
113 208ltuk iRuh Lo- gjthjke ] pkoyh] tsBh iqq-
gjthjketkV 101 30.13 1
114 210
lyhe eksgEen @ gSnj vyh 1@2 fg-
1@2 fg- teuk iRuh nsohyky ] ltuk
iRuh equhjke ] ijek iRuh pUnqjke 1@2
eqlyeku
tkV106/48 50.00 1
115 211 lghjke @ isekjke tkV 103/5 40.03 1
116 212 lghjke oYn Hkha;kjke tkV 161/106 25.00
117 213lkaor] Jhjke] ds'k'k tSl @ vejk 4@15
fg- Jo.k] v[kk @ bZ'kc 1@15es?koky 155/1 15.04 1
118 214 lkaorjke @ gq.krkjke tkV 103/23 20.00 1
119 216 flerk nsoh thts ykynkl Lokeha103/6
106/63
15
251
120 218 lqxuk @ gtkjh tkV 103/8 28.10 1
121 219 lqxuh @ jkeyky tkV 205/99 25.00
122 220lqxuh iRuh Lo- lsok xh/kk 'ksjk x.ks'k ]
cuk] lqUnj] ds'kj] pquh] rqyNh] NksVh] lsokuk;d
128
129
4.16
6.01
123 221 lqHkk"k @ jkeyky tkV
106/67
136/1
137
140/2
18.10
40
21.05
5
112 206
Jxkjh iRuh chjcyjke ] Hkkxwjke] eksgujke]
nqqykjke] dkukjke] ys[kjke] iquekjke]
jkeI;kjh] Hkxokuh] iq- chjcyjke
tkV
Page No.6
124 222 lqeu @ txekykjke tkV 160/106 25.00 1
125 223 lqjt ] Hkkxwnkl] dqEHknkl @ pSunkl cSjkxh 151/3 15.00 1
126 224 lqjtknkl @ psrunkl cSjkxh 151/4 38.00 1
127 225ljtka iRuh Lo- isekjke lghjke] eq[kjke ]
xkseUnjke ] eksgujke oxSjktkV
103
106/29
40
151
128 228 slqjtkjke @ vklwjke es?koky132/2
153/1
11.08
5.071
129 232 galjkt @ chjcy tkV 162/106 19.10 1
130 230 lqjtkjke] lkaojyky] inek @ tsBkjke tkV 195/103 9.10
131 233 guqeku] gjhjke @ Hkkstkjke tkV146
149/2
11.19
501
132 237 gjhjke @ iqjkjke uk;d 106/30 65.00 1
133 238 gjhjke @ isekjke es?koky 150 10.11 1
134 239 g:jke @ iqjkjke uk;d 106/51 35.00 1
135 241 gqdekjke @ iqjkqjke tkV 101/2 25.00 1
136 245 gsrjke @ /kksadyjke tkV 99/4 25.00 1
137 246 gsekjke @ eksMwjke tkV 127/2 25.00 1
138 247 gsekjke] lqxuk @ eksMwjke tkV106/66
124
25
25.13
Total:- 4858.14 100
ch?kk
Page No.7
dz-la- [kkrksuh u- d`"kd dk uke e; firk tkfr [kljk ua- {kS=Qy tydq.M la-
114/1 4.00
353/55 8.00
361/66 10.08
369/93 2.00
370/93 3.16
371/93 5.10
376/96 4.00
377/96 1.00
379/106 2.19
381/114 2.10
50 2.00
62 0.10
76/2 0.08
2 3 vklkjke firk rqyNkjke tkV 93/2 25.00 1
3 7 deyknsoh /keZiRuh fd'kuflag jktiwr 48/1 22.00 1
367/93 13.10 1
382/116 19.08
5 10 dkukjke firk tkywjke tkV 354/57 23.00 1
357/63 3.07 1
63/1 24.04
63/2 4.16
63/2 17.13
69/1 25.00 1
69/3 6.00
60/1 33.02 1
69/2 25.00
71/1 15.00 1
71/2 9.14
80 41.00
109/1 2.04 1
109/2 17.05
61/1 37.02
61/2 3.10
11 16 xksxkjke] xh/kkjke firk vknw oxSjk tkV 351/55 40.00 1
12 17 xksxkjke] xh/kkjke firk vknw oxSjk tkV 55 66.18 1
324/67 10.00 1
67 21.00
14 19 xh/kkjke firk vknwjke tkV 352/55 14.12 1
15 20 xqM~Mh iRuh ukuwjke uk;d 79/2 15.05 1
16 24 xksfoUnk] nqyk firk Hkk: 115/1 3.17
17 25pkoyh iRuh ckywjke 1@2 fg- J`xkjh iRuh
Lo- ckywjketkV 115/3 3.17
18 27 pqukjke firk tSlkjke tkV 320/81 22.14 1
66/354 2.00
64 15.14
66/1 15.16
20 32 tkyqjke firk jkmjke tkV 365/93 10.00
349/52 21.09 1
47/1 3.16
47/2 4.00
/khjsjk LVs'ku (IWMP-BKN-44)
xzke /khsjsjk LVs'ku ds ykHkkfFkZ;ksa dh lwph
1 1 vjkthjkt
4 8ekuk] pUnk] /kuq] lq[kk] iw.kZ] iqj[kk] o vejh]
xkserh fi- eq- o rhtk oXkSjk tkV
6 11 fdLrqjh ifr rktwjke tkV
7 12ds'kjkjke] nqxkZjke] fyNe.kjke] dqEHkkjke
firk pksykjke[kkrh
8 13 ds'kjkjke firk pksykjke [kkrh
9 14 ds'kjkjke firk eksVkjke tkV
10 15[ksrq iRuh Lo- HkSjkjke 1@10 fg- xksikykjke ]
Hkwjkjke] /keZjke] jkeyky] firk HkSjkjke oxSjktkV
13 18 x.kir firk ds'kjkjke tkV
19 29 pSukjke firk ykywjke [kkrh
21 33 thojkt firk gjhflag jktiwr
Page No.1
22 35 rk:jke firk rqyNkjke tkV 377/106 25.00 1
23 36 rhtk iRuh ijekjke oxSjk tkV 111 86.05 1
24 37 rhtk iRuh Lo- ewyk tkV 59/4 10.05
25 39 rhtk nsoh iRuh ijekjke tkV 72 51.13 1
368/93 1.04
93/4 9.16
106/1 5.00 1
106/3 7.00
378/106 3.00
321/81 6.00 1
362/81 12.06
81/1 25.00
81/2 20.00
104/1 20.09 1
104/2 3.04
77/1 3.16
77/2 4.08
77/3 32.00
77/4 5.02
77/5 2.00
30 47ukjk;.k oYn fgjkt 1@2 fg- izHkwjke oYn
ukjk;.kes?koa'kh 117/1 7.16
31 48 usrkjke oYn rqyNkjke tkV 366/93 25.00 1
113/1 4.00
113/2 1.19
51 22.03
75/1 25.00 1
75/2 3.12
34 54iznhi dqekj firk veryky] ljyknsoh iRuh
verykyvksloky 380/114 37.03
35 59c[rkojh ifr ekukjke] lqxukjke]
jkes'ojyky tkafxM+ 59/2 30.16
53/1 17.17
53/2 3.16
37 64 Hkkuh oYn ch?kk tkV 58 38.17 1
38 65 Hkhaoflag firk x.kir flag jktiwr 48/2 59.00
355/57 17.16
57/2 4.16
40 67euksgjh iRuh uFkkjke] inek] irk] chjcy
firk uFkkjketkafxM+ 59/5 10.60
322/67 9.00
68 11.00
42 72 eqykjke oYn e?kkjke tkV 280/67 20.00 1
108/1 60.02 1
108/2 3.00
70 4.00
44 74 jrukjke firk yk/kwjke tkV 281/82 20.00 1
103/1 6.13
103/2 1.14
46 76 jkedj.k firk tkywjke tkV 356/57 23.00 1
56/1 24.08 1
56/2 4.02
48 79jkes'oj] lksguyky] izrkijke] psrujke firk
tkywjketkV 78/2 8.00
26 43 nhikjke firk ghjkjke tkV
27 44 /kuh /keZiRuh jsoUrjke uk;d
28 45
/kekZjke] xqukjke] 'kkfUr] jkeI;kjh] uksjk firk
pSukjke o fyNek iRuh Lo- pSukjke c-fg-c-
cjkcj
tkV
29 46
uFkw] :[keh firk [kwek 1@2 fg- ljLorh
iRuh Lo- [kwek 1@4 fg- o jkeLo:Ik ]
dkstkjke] firk ukjk;.k o ds'kj iRuh Lo-
ukjk;.k c-fg-c- cjkcj
tkV
32 50
ikuk iRuh Lo- usrkjke] Hkqukjke] /kukjke]
gjhjke fi- usrkjke] Qqyk] gseh] dyh] ewyh
iqf=;k usrkjke ⅓ fg- o vejkjke] ekejkt]
fc'kukjke] chjek] dkyh] Qqlh fi- vklwjke o
tkV
33 53 iksdjjke firk pqukjke tkV
36 61csxkjke] xksikyjke] lhrkjke] Jo.k] chjcy]
enuyky firk yk/kwjkeiquh;k
39 66 e?kkjke oYn Hkaojyky tkV
41 70 ekuhnsoh iRuh cq/kkjke tkV
43 73eksVkjke] galjkt] xksikyjke] vkSeizdk'k firk
[kha;kjketkV
45 75jktwjke] ekaxhyky] Jo.kjke] usekjke] Hkaojh
firk vklwjkeukbZ
47 77jkedkSjh iRuh jke lq[kjke] nsohyky] eywjke]
vkseizdk'k] jsoUrjke oxSjtkV
Page No.2
107 17.16 1
78/1 30.00
105/1 4.01 1
105/2 1.16
372/94 4.06
94/2 4.08
96/1 6.16 1
96/2 28.04
102/1 11.00
112 24.02
275/96 14.00
374/96 16.00
54 88 fyNe.k firk pksykjke [kkrh 60/2 22.00 1
55 90 fyNe.knsoh /keZiRuh jke/ku uk;d 82 28.00 1
74/1 5.04 1
74/2 27.07
118/1 5.18 1
49/1 31.10
110/1 3.08 1
110/2 80.05
110/3 5.00
54/1 1.15
54/2 6.15
73/1 8.10
73/2 8.02
59 97 lq[kk iRuh rqyNkjke tkV 115/4 3.16
350/52 56.11
52/2 3.08
61 99 lqxuh iRuh Lo- fd'ku tkV 115/2 3.16
62 100 lqxuh iRuh Lo- lq[kkjke oxSjk tkV 79/1 40.00 1
360/66 33.10 1
59/1 30.17
64 103 lksguyky firk ujlkjke uk;d 76/1 50.00 1
65 105 ghjk iRuh uUnk tkafxM+ 59/3 10.06
358/63 6.18 1
63/5 17.00
63/6 8.10
71/3 2.12
68 107 gsekjke oYn ykHkwjke tkV 373/94 14.10
Total :- 2195.75 42
ch?kk
49 80jkes'oj] lksguyky] izrkijke] psrujke firk
tkywjketkV
50 82 :ijke] [kha;kjke firk vukjke tkV
51 83 yk/kwjke firk 'ksjkjke tkV
52 84 yk/kw] vksek] :[kh] ukuw iRuh 'ksjk tkV
53 85 yk/kwjke oYn 'ksjkjke tkV
56 91 yw.kk firk vklk uk;d
57 94 ohjsUnz dqekj firk gqDekjke oXkSjk es?koky
58 95 ljnkjh iRuh lnklq[k] ckcwyky] deyk oxSjk tkV
60 98 lqxuflag firk gjhflag jktiwr
63 102 lqjtkjke firk ykyqjke [kkrh
67 106 gjhjke firk uUnqjke [kkrh
Page No.3
dz-la-[kkrksuh
u-d`"kd dk uke e; firk tkfr [kljk ua- {kS=Qy
tydq.M la-
flok; pd ukdkfcy dk'r tksgM+ ik;ru 6 1.11
flok; pd ukdkfcy 'elku 5 9.02
73/241 32.09
78/1 45.00
10 2.00
13/1 29.00
4 7.02
2 0.06
7 14.12
14 9.02
16 8.14
19/185 20.00
19/186 25.00
19/246 55.12
66 82.15
68 12.04
71 13.18
73/240/1 10.00
18/1 30.00
254/9 57.17
1/1 4.06
29/1 2.03
31 1.05
58 3.15
87 0.03
104/1 0.02
111 2.05
136/1 8.17
140/1 0.02
148/1 0.02
150 4.03
160/1 0.03
170 1.06
174/178 4.07
250/58 6.05
23 21.05 1
52/1 18.05
84 18.05 1
22 14.00
54 8.05
4 6 vkseizdk'k oYn ekywjke tkV 29/203/2 15.00
5 7 dj.kkjke oYn ghjkjke tkV 160/2 16.00
6 9 fd'kukjke oYn dkywjke lkalh 58/249 25.00
7 10 fd'kukjke oYn iUukjke tkV 153/1 24.00
42/212 8.00
58/247 21.10
87/223 8.10
8 12 ds'kjkjke oYn Hkkstkjke tkV
2 4 vknwjke oYn tSlkjke tkV
3 5 mnk oYn :ik tkV
esgjk.kk (IWMP-BKN-44)
xzke esgjk.kk ds ykHkkfFkZ;ksa dh lwph
1 1
flok; pd ukdkfcy dk'r xkspj
vkxkSj
flok; pd dkfcy dk'r
9 13 dkS'ky dqekj iq= 'kadjykYk es?koky 251/95 3.08
51 4.19
52/217 11.15
85/1 17.00
96 1.14
11 15 xaxkjke oYn Hkwjkjke 148/2 6.00
36 27.18 1
113/2 32.01
76 3.02
79 22.16
14 19 Nksxkjke oYn eq[kjke xqokjh;k 87/222 30.00 1
15 20txnh'k] dsljnsoh] nkuh nsoh] ewyh nsoh] eksguh
nsoh fi- ujlkjke tkV 58/248 25.00 1
16 21 thojkt flag oYn gjhflag jktiwr 174 18.00
48/1 0.15
48/2 16.00
117/1 9.00
18 23 Vhdwjke oYn pqukjke tkV 95/229/4 30.00 1
38 17.10 1
44 15.15
47 19.19
49/1 1.09
49/2 22.03
87/200 24.00
95/228 15.00
130 19.18
145 6.04
25/1 25.00
26/197 18.00
28 6.00
29/200 7.00
80 21.07
103 8.13
107 19.03 1
21 26
Mkywjke oYn ukuwjke o lwjtkjke] ckywjke]
euhjke] vklwjke] Hkaojh] xkserh] xqM~Mh] galw fi-
Mkywjke]
tkV 31/206 10.00
21/189 15.00
21/250 5.00 1
23 29 nkukjke oyn mnkjke tkV 35/2 3.03
24 31
/kuh iRuh Lo- es?kkjke ekypUn] ';ksirjke]
pkSFkwjke] bejrh] Qqlh] lwxuh] jkeI;kjh fi-
es?kkjke
tkV 59 17.04
88 10.00
90 2.17
92 3.11
162 8.01
26 33 usrk oYn tSlk jke tkV 143 2.00
24 17.15 1
119/1 18.00
125 10.11
28 35 uSrkjke oYn tSlkjke tkV 120 22.08 1
29 36 ikapkjke oYn 'ksjkjke xqokjh;k 19/242 25.00 1
25 32 ujlkjke oYn gjpUn tkV
27 34 usrkjke oYn tSlkjke tkV
20 25 Mkywjke oYn ukuwjke tkV
22 28 nkukjke oYn mnkjke tkV
17 22 tsBkjke oYn pqukjke tkV
19 24Vhdwjke ] Qqlkjke] tsBkjke] vUukjke]
vtZujke] fi- pwukjketkV
12 17xkserh iRuh lqjs'k dqekj tkV 1@2 fg- lk- nsg
o eYywjke iq= pqukjke 1@2 fgtkV
13 18 psrujke fi- eq- dkukjke o ikjk iq=h dkukjke ukbZ
10 14 f[kjktjke oYn psrujke tkV
87/225 15.00 1
147 4.08
31 38 iksdj Hkkxww fi- Qjlkjke tkV 74/1 6.18
20 20.19 1
42/215 16.09
73/238 15.00
132/1 9.09
132/2 16.09
146 4.17
33 43Hkaojyky] vkseizdk'k fi- [ksekjke o rqylh
iRuh Lo- [ksekjketkV 74/2 6.18
43/2 9.10
117/2 10.02
35 45 Hkaojyky mQZ ckcwyky] vkseizdk'k fi- [ksekjke tkV 75 20.00 1
170/2 4.05
173/235 10.00 1
173/236 14.03
104/2 8.10
95/2 11.14
38 49 Hkkxwjke oYn Qjlkjke tkV 97 27.11 1
87/221 18.00 1
113/1 27.00
149 2.10
114/2 6.01
138 12.16
41 53 Hkwjk oYn izsejkt tkV 55 11.15
42 54 Hkwjk oYn izsejkt tkV 131/2 15.00 1
94 3.18
124 17.18
41 3.14
50 18.19
127 17.19
156 15.17
65 1.08
153/3 8.18
154/2 6.12
155 15.00
123 13.18
144 4.07
30 15.10 1
126 12.16 1
137/1 9.19
137/2 9.01
48 61
ekuk nsoh iRuh Lo- vejkjke] ea'kkjke]
eksgujke] jkeyky] 'kkfUrnsoh] foeyk fi-
vejkjke
es?koa'kh 19/245 25.00
49 63 ekywjke oYn vklwjke uk;d 19/244 25.00 1
50 65 eksVkjke oYn psrukjkEk tkV 119/2 7.03
51 67 eksgujke oYn psrukjke tkV 85/2 22.04 1
52 70 eksgjknsoh iRuh Hkkuhjke tkV 26/253 20.00 1
53 71 jktwjke iq= Hkkxwjke tkV 163 10.17
54 73 jkeknsoh iRuh e?kkjke es?koky 252/95 21.12
55 74 jkes'ojyky iq= iUUkkjke tkV 154/1 24.00
56 75 js[kk] lkoark] Hktuk] firk rqyNkjke tkV 116 27.06
46 59 eywjke oYn Hkhjktjke tkV
47 60 ekaxhyky] v.knhyky fi- Hksjkjke tkV
tkV
44 57 ewykjke] ds'kjkjke fi- Hkhjktjke tkV
45 58 eywjke oYn pwukjke tkV
40 52 Hkh[khnsoh csok ghjkjke] dj.khjke ] xksikyjke
43 56ewykjke] dsljkjke fi- Hkhjktjke 1@2 fg- iwuk
oYn jkejru 1@2 fg-
37 48 Hkkxwjke oYn Qjlkjke tkV
39 50Hkh[kh iRuh Lo- ghjkjke dj.khjke] xksikyjke]
lR;ukjk;.k oa dk'khjke] ewykjke fi- ghjkjketkV
34 44 Hkaojyky oYn eywjke tkV
36 46 Hktukjke oYn rqyNkjke tkV
30 37 iw.kkZjke oYn Hkwjkjke tkV
32 42Hkaojyky] vkseizdk'k fi- [ksekjke o rqylh
csokg [ksekjketkV
37 33.07 1
45/1 2.11
19/243 25.00 1
136/2 2.05
139 15.15
171/232 30.00 1
172 22.14
60 81 ykyhnsoh iRuh jkeukjk;.k tkV 122/1 6.00
61 82 fyNe.kjke oYn lkaorjke tkV 73/240/2 16.04 1
62 83 fyNekjke iRuh Lo- ykypUn dqEgkj 87/226 10.00
63 86 foeyknsoh iRuh vk'kkjke tkV 240/199 10.00
64 88 foeyknsoh iRuh enuyky czkg~E.k 95/229/2 30.00
65 89 'kkfUr nsoh iRuh 'kSrkuflag tkV 254/153 12.00
66 91 'kkjnk nsoh iRuh nsofd'ku tkV 253/153 12.00
86 7.09
87/224 24.06
95/1 15.00
33 13.16 1
238/53 4.00
239/54 9.09 1
19/180 18.00 1
19/181 15.00
19/182 15.00
73/239/1 14.19
82 6.14
83/1 16.11 1
72 97 lkaorkjke oYn iSekjke tkV 83/2 1.07
73 99 lq[kjke oYn mnkjke tkV 25/194 30.00 1
73/239/2 7.07
108 8.01
115 9.02
75 103 lqjtkjke oYn Mkywjke tkV 25/2 14.13
26/196 10.00
29/201 14.00
112 12.05 1
134 17.11
157 17.03
159 0.10
78 107 gsrjke oYn psrukjke tkV 118/3 23.05
79 109ljnkjh iRuh Lo- lnklq[k ] ckcwyky] deyk
iq=&iq=h lnklq[ktkV 175 19.12 1
80 110 lkaorkjke oYn iSekjke tkV 56 2.05
81 111 lkseizzdk'k oyn Hkxokukjke egktu 31/205 30.00
82 112 [ksy dk eSnku izk- ikB'kkyk esgjk.kk 255/9 3.04
Total:- 2667.07
ch?kk 35
76 104lqjtkjke ] 'kSrkukjke] x.ks'kkjke] vkSeizdk'k ]
vklwjke fi- fgEerjke] rhtka iRuh Lo-
fgerkjke
tkV
77 105 lqjs'k dqekj oYn pqqqqukjke tkV
71 96 lkaorkjke oYn isekjke tkV
74 100 lqq[kjke oYn mnkjke tkV
69 94 lfjrk nsoh iRuh vkseizdk'k tkV
70 95 lkaorkjke oYn rqyNkjke tkV
59 78jsoUrh iRuh Lo- iksdjjke Qqlh] ykyh] eqUuhjke]
>qaek] xhrk] ekaxhyky fi- iksadjjke ⅞ fg-
deyk iRuh Lo- 'kSrkujke o jk/kkfd'ku]
tkV
67 92 Jh tSu I;km [kkrsnkj
57 76 js[kkjke oYn rqyNkjke tkV
58 77 jsoUrjke oYn pkSFkkjke uk;d
dz-la-[kkrksuh
u-d`"kd dk uke e; firk tkfr [kljk ua- {kS=Qy
tydq.M la-
180 2.03
268/149 0.05
272/163 12.03
289/169 7.15
295/208 3.19
298/209 2.00
flok; pd ukdkfcy dk'r tksgM+
ik;ru 203 24.16
Hkfea tks tqrkbZ ds fy;s vuqiyC/k 166 47.10
flok; pd ukdkfcy dk'r 'elku 273/163 5.00
flok; pd ukdkfcy dk'r dfczLrku 146 8.12
165 11.18
186 52.06
269/149 27.15
2 2
vCnqy 'kdqj oYn ekSyk cD'k 25½ fg-
o lqxjk iRuh eksgEen lnhd eksgEEkn
gqlSu ] eksgEEkn guhQ] eks- jtkd] eks-
glu] eks- jks'ku] tehyk ckuksa] tScquk
ckuksa fi- eks- lnhd ½ fg-
eqlyeku 161/5 17.00 2
162/1 7.03 1
162/2 25.02
4 5 vkehu eqerkt 'kksdr fi- :dunhu eqlyeku 277/163 30.00 3
5 7 behyky iq= Vhdwjke czkg~E.k 284/167 40.00 1
167/2 15.10 1
293/182 20.10
208/2 15.00 3
209/3 20.10
209/6 10.00
8 12
dsljnsoh iRuh Lo- fxj/kkjhjke jken;ky
tsBkjke usehpUn] ykypUn] iqj[kkjke]
jkeh] xhrk] :[kek fi- fxj/kkjhjke o
Hkaojyky] dUgS;kyky] izHkwn;ky fi-
fxj/kkjhjke
lqFkkj 184 17.16 2
208/3 20.00 2
294/208 10.00
10 23 ftrsUnz dqekj oYn dsljh pUn cksFkjk 342/149 1.00
283/167 41.16 1
343/167 10.11
12 28nhuk] jsoUrh] /kkiw] lkjdh] fi-
vYykcD'k eqlyeku 161 23.07 1
13 29nqxkZjke ] ykywjke] lqjtkjke fi-
rkukjke /kwM+h iRuh Lo- rstkjketkV 170 20.15 2
288/168 12.07 1
291/169 6.08
15 32 }kjdk izlkn iq= Jhjke czkg~E.k 342/167 2.00 1
297/208 20.00 2
299/209 7.00
nqyesjk LVs'ku (IWMP-BKN-44)
xzke nqyesjk LVs'ku ds ykHkkfFkZ;ksa dh lwph
1 1
vjkthjkt
xSj eqefdu vkcknh
3 3vCnqy 'kdqj lnhd fi- eksyk cD'k o
Qkrek iRuh Lo- eksyk cD'k eqlyeku
6 8 dkuk oYn tkyw tkV
7 10
dkywjke] 'kadjyky] HkkxhjFk] xkserh]
lksirM+h] foeyk] ykydh] lhrk] lkseyh
fi- nkukjke
lkalh
9 15x.ks'kkjke ] xksikyjke] fi- eksgujke o
nkek iRuh Lo- eksgujke es?koky
11 27 nyhi dqekj iq= Vhdwjke czkg~E.k
14 30 nqxkZjke oYn dsljhpUn egktu
16 36ujlkjke ] lksgujke] fi- gsekjke] ikuk
iRuh Lo- gsekjketkV
Page No.1
17 38 usehpUn oYn t;pUn yky egktu 270/149 40.00 1
18 41 iquepUn oYn vejPkUn egktu 271/149 48.18 1
163/6 40.00 1
285/167 6.13
20 48 cqykdhpUn oYn Qwljkt egktu 338/175 20.18 1
296/208 5.00 2
302/212 25.17
22 52 Hkhaojkt eksguyky fi- ekaxhyky eksnh 287/168 37.05 1
23 53 Hkhojkt eksguyky fi- ekaxhyky eksnh 290/169 12.07 1
24 54 Hkksekjke] eaxykjke fi- ess?kkjke uk;d 274/163 30.00 1
171 21.16 1
175 24.12
175/1 25.15
26 58
ehjka iRuh Lo- e?kkjke] ekukjke]
nkukjke] ekejkt] euQqy] Hkh[kh]
jkes'ojh] lwjtka fi- e?kkjke
uk;d 300/209 20.00 1
27 59ehjka iRuh Lo- yk/kwwjke] chjcyjke] dksyw
] deka] /kkiw] mekjke fi- yk/kwjkeuk;d 275/163 50.00 2
28 61 ewykjke oYn [kh;kajke uk;d 278/163 26.00 1
30 64 eksguyky] oYn Qwljkt egktu 339/175 20.17 1
31 68 jkej[k oYn ghjkjke czkg~E.k 209/4 29.06 1
173 0.18 3
179 11.06
33 70jkorkjke] jkes'ojyky] xaxkfc'ku]
iwuepUn] uUnfd'kksj fi- HkksekjkeukbZ 286/167 15.00 1
34 74 lsokjke oYn f'koukFk jke tkV 301/209 42.00 1
35 77 'ksjkjke oYn gM+ekukjke czkg~E.k 303/212 48.00 1
36 80
lqxuh nsoh iRuh Lo- ekaxhyky 1@2 fg-
ljkst] Hkaojh] iqf=;kWa ekaxhyky] 1@2 fg-
c-fg-c-
es?koky 308/215 54.00 2
167/4 34.16 2
282/167 5.04
167/1 29.00 1
276/163 11.04
279/163 50.00 3
280/163 25.00
40 89 fgesUnz flag iq= lqjsUnz flag vksloky 281/167 32.00 1
172 34.02 1
176 12.00
178 2.05
Total:- 1399 55
ch?kk
19 43 izseukFk oYn nsoukFk fl)
21 51Hkaojyky] v'kksd fi- fjNiky 1@9 fg-
c- fg- c- dkukjke jfrjke fi- iw.kZ
2@9fg- c- fg- c- lw[kh o cksxh iRuh
rkjx
25 55 eaxypUn oYn gjlq[k nkl egktu
32 69jkes'oj] 'kadj jru fi- fdluk o dslj
ykyh] e?kh iq=h;k fdluk uk;d
37 86
gkth eksgeen]eksgEEkn lnhd] guhQ
eksgEEkn] fi- eksgEEn cD'k Qkrek iRuh
Lo- eksgEen cD'k
eqlyeku
41 90 gqDek oYn
38 87 gkth eksgEen oYn bczkfge [kka eqlyeku
39 88gkth eksgEen] guhQ eksgEen] vCnqy
lrkj] xqykc uch] eqerkt eksgEen fi-
bczkfge [kka o tSrqu iRuh Lo- bczkfge
eqlyeku
Page No.2
dz-la- [kkrksuh u- d`"kd dk uke e; firk tkfr [kljk ua- {kS=Qytydq.M
la-
133 8.01
14 1.10
140 13.18
142 35.01
19/1 12.11
20 4.03
211/1 4.08
27 7.02
29/1 1.06
296/87 15.00
302/113 0.16
303/114 15.04
311/129 0.10
330/144 19.05
338/149 31.03
35/1 9.19
47 0.15
48 5.00
59 10.09
87 1.01
144 3.00
275/41 4.00
79 28.06 1
81/1 4.05
4 3 vD[kspUn oYn ewypun cqpk 149/1 43.00 1
5 4v.kph iRuh Lo- Hkh;kaukFk txnh'k] gqDekjke] jkeizrki]
lwjtkjke] gq.krkjke] fi- Hkh;kaukFk] iseh iq=h Hkha;kukFkfl) 124/3 11.07 1
6 6 vtZu oYn mnkjke fl) 124/2 11.06 1
7 7 vtqzunkl iq= yD[khjke tkfr vxzoky xks;y 105 12.13
8 10 vYykj[k oYn vYykcD'k eqlyeku 157 48.12 1
9 11vyyk cD'k] vglku] g'ku [kka] fi- xqykej[k lqzxjh iq=h
xqyke jlwyeqlyeku 149/8 41.00 1
10 12 vkehu eqEerkt 'kksdr fi- :denhu eqlyeku 339/149 30.00
11 13 vk'kkjke oYn dkywjke dkSe fl) 73/2 16.07 1
12 15 bykghcD'k oYn ekSyk cD'k eqlyeku 123 16.07 1
149/5 26.00 1
149/6 7.16
149/7 13.16
14 17 vkSadkjukFk oYn jkorukFk fl) 159 12.18 1
15 19 dYyw [kka oYn jetku [kka eqlyeku 346/149 20.00 1
16 21 dkUrknsoh iRuh gjhjke ¾ :dek iq=h tkSjkjke fNEik 155 14.05 1
86 17.13 1
94/1 16.05
94/2 16.04
17 22 dkywjke oYn ghjkjke dqEgkj
2 flok; pd ukdkfcy dk'r 'e'kku
3 2 vD[kkjke nRrd iq= ghjkjke es?koky
galsjk (IWMP-BKN-44)
xzke galsjk ds ykHkkfFkZ;ksa dh lwph
1 1 vjkthjkt
13 16 bLekby [kka oYn dkyw [kka eqlyeku
Page No.1
18 23 dkywjke] lUrjke fi- gjhjke dqEgkj 297/93 4.05
19 24
fdluyky] eksrhyky] f[koajkt] vD[kspUn fi- ewypUn] ⅘
c-fg-c- jruyky] v'kksd dqekj] fi- /keZpUn o Lo- iRuh
/keZpUn
egktu 67 13.01 1
20 29 dqu.kkjke iq= iUukjke lqFkkj 360/114 20.00 1
21 30 dq'kyk oYn mnkjke fl) 124/1 11.06 1
130 9.09 1
131 18.02
23 33 ds'kjk oYn vk'kk es?koky 149/3 12.00 1
24 34 ds'kqjke oYn vk'kq es?koky 133/9 17.12
25 35 f[kaojkt oYn vejpUn cksFkjk 152 25.00 1
26 36 f[k;akjke oYn Jhjke tkV 288/66 11.15 1
27 40 xksiky oYn fd'ku tkV 332/144 10.00 1
101 15.00 1
355/114 27.06
29 44 xksiky oYn ukjk;.kjke tkV 95 35.18 1
30 45 pEikyky oYn eksguyky tkfr ½ fg- ukuq iq=h rhtka es?koky 70 21.09 1
31 46 pkoyh nsoh iRuh gjhjke dqEgkj 91 19.02 1
32 47 pqUuhnsoh iRuh gjthjke tkV 154 26.12 1
33 49 pSuk oYn cUuk dqEgkj 333/144 36.00 1
149/4 25.06 1
152/1 15.00
114/4 29.00 1
133/6 8.00
36 55 tsBkjke] pqukjke] fi- [ksrkjke tkV 122/1 29.08 1
37 56 MkbZ iRuh Lo- ft;kjke ywgkj 68 15.06
114/264 8.10
363/93 8.03
39 58 fryksd oYn cUukjke dqEgkj 152/5 43.12 1
40 59 frtkansoh fi- csxkjke tkV 291/78 6.00 1
41 60 rqyNkjke] :ikjke] gsrjke fi- Qqlk tkV 122/2 29.08 2
42 61 rksykjke iq= fiFkkjke tkV 355/84 10.00 1
43 63 nqxkZyky oYn dsljhpUn egktu 324/140 25.00 1
149/25 7.00 1
149/26 36.00
45 65ukFkwjke ] fdLrqjkjke] fdjrkjke fi- ukuwjke] js'keh] iRuh
Lo- ukuwjke es?kokyes?koky 144/4 15.07 1
46 66 ukuwjke oYn f[kolhjke czkg~E.k 71 31.06 1
47 68 ukjk;.k] ukuw] fi- jkew tkV 142/4 20.00 1
48 69 ukjk;.k oYn jkewjke tkV 72/2 18.03 1
49 71 ijlkjke iq= vklwjke tkV 367/53 16.08 1
50 72 izoh.k iq= vkRekjke czkg~E.k 368/114 15.00.
51 73
ihjcD'k ekSgEen gqlSu] fldUnj vyh] eqddnjvyh] fi-
Qd:nhu] tqoSnk iRuh Lo- Qd:nhu] ½ fg- bdcky
eksgEen oYn futkeqÌhu o dylqe iruh Lo- futkeqnhu
½ fg-
eqlyeku 158 47.12 2
52 74 iFohjkt ] xksihjke fi- euhjke dqEgkj 114/6 21.05
343/149 22.16 1
53 75 isekukFk oYn nsoukFk dkSe fl)
38 57 frydjkt 'kekZ iq= Jh pUn 'kekZ czkg~E.k
44 64 uRFkqjke oYn csxkjke dqEgkj
34 51 txnh'k oYn fVdqjke fNEik
35 52 t;fd'ku oYn ukjk;.kjke tkV
22 31 ds'kjnsoh iRuh b'kjjke tkV
28 42 xksiky oYn eksVkjke czkg~E.k
Page No.2
118/1 11.03
54 76
isek iRuh Lo- tkywjke] chjcyjke] gjthjke] jsoUrjke]
vknwjke] dkukjke] ekejkt] inekjke] fi- tkywjke] ekfguh
eksyka ] fyNek iqqf=;ka tkywjke
tkV 125 16.18 1
55 80 cDrkjke oYn eqdukjke tkV 129 9.00 1
128 35.11 1
211 15.09
57 82
cDrkojh iRuh Lo- x.kirnkl lghjke ] vk'kkjke] rksykjke]
x.ks'kkjke] iw.kkZjke] vkseizdk'k Hkaaojh] ykyh] nqxkZ] ewyh fi-
x.kirnkl ¼ fg- ckynkl] lUrnkl] dsljnkl fi-
xksdynkl ¾ fg-
Lokeh 354/211 14.11 1
58 83 cldjh iq=h jkes'ojyky czkg~E.k 371/32 15.00 1
137 1.10
138 22.05
271/38 25.00
272/38 50.00
273/39 1.09
274/39 29.15
30 6.06
320/138 1.07
36 2.12
38 71.05
60 86 ckywjke oYn eksVkjke czkg~E.k 356/114 28.09 1
61 88 cq/kkjke oYn Jhjke tkV 69/1 21.09 1
62 90 Hkaojyky oYn fxj/kkjh lwFkkj 142/1 24.00 1
129/1 20.12
132/2 8.04
133/4 9.00
319/133 1.04 1
142/5 1.16
144/7 34.04 1
65 93 HkkxhjFk] tsBkjke fi- lqjtkjke tkV 352/152 16.14 1
149/12 6.12
347/149 7.08
369/149 2.13 1
142/3 19.16
329/142 26.05
113 20.12
369/114 35.00
72/1 18.02 1
69 97 Hkh;ka oYn lktu fl) 336/144 20.00 1
70 99 Hkh;kajke oYn dqEHkkjke tkV 359/299 17.10 1
153 22.14 1
71 101 Hkh;kajke oYn fd'kukjke tkV
67 95 Hkk:jke] ukuwjke] ukjk;.k fi- jkew tkV
68 96 Hkk:jke oYn jkewjke tkV
64 92Hkaojh nsoh iRuh Lo- fd'kuyky] izdk'kpUn ] nhipUn]
dUgS;kyky] ljkst fi- fd'kuykyegktu
66 94 HkkxhjFk iq= Qqlkjke uk;d
59 84 ckM+h th tlukFk th egkjkt
63 91 Hkaojyky oyn cDrkjke tkV
53 75 isekukFk oYn nsoukFk dkSe fl)
56 81
cDrkojh iRuh Lo- x.kirnkl lghjke] vk'knkl] rksykjke]
x.ks'kkjke] iw.kZjke] vkseizdk'k] Hkaojh] ykyh] nqxkZ] ewyh] fi-
x.kirnkl ⅛ fg- ckynkl] lUrnkl] dsljnkl fi-
xksdynkl ⅜ fg- lksgunkl] meknsoh] xhrk nsoh fi-
dkunkl ½ fg-
Lokeh
Page No.3
350/152 6.03
111 18.04 1
126 9.18
144/12 30.00 1
334/144 9.10
74 104 e?kk oYn cDrk tkV 149/15 29.09 1
75 106 enu oYn Vhdw fNEik 132/1 12.01 1
76 107 enujke iq= fiFkkjke tkV 357/84 9.19 1
77 109 efUnj Jh Bkdwj th egkjkt 1 54.03
78 110
eywjke] dsljkjke] fyNe.kjke] pks[kkjke] gtkjhjke fi-
vklwjke o ghjk iq=h vk'kkjke o jkedaojh iRuh Lo-
vklwjke
es?koky 75 7.06 1
82 6.14
94/4 16.04
114/5 44.15 1
306/114 30.00
370/114 1.05
81 115 ekejkt iq= Qwlkjke fl) 365/149 13.07
82 116 ekejkt iq= Qwlkjke uk;d 371/149 16.13 1
144/1 22.00 2
144/2 15.10
84 119 es?kukFk oYn rstukFk fl) 322/140 40.00 1
85 120 eg:] uh'kk iRuh vYyknhu] tSrqu iTuh eksgEEkn jQhd eqlyeku 328/142 18.00 1
149/20 8.03 1
149/21 18.11
144/9 16.15 1
337/144 4.00
359/144 5.00
144/10 5.00 1
144/5 8.08
144/6 9.08
144/8 5.13
89 125 eksgujke oYn ukuwjke tkV 294/85 3.13
300/96 30.00
85 25.05
91 128 jruyky] v'kksd dqekj fi- /keZpUn egktu 120/1 8.01
305/114 7.00 1
308/114 5.10
93 130
jktcgknwj] egsUnz dqekj fi- gjhjke dqEgkj] ½ fg- iznhi
dqekj oYn jktcgknwj weksgujke] eksgujke lUrjke fi-
ghjkjke
dqEgkj 293/82 13.04
94 131jktcgknwj] egsUnz dqekj ] eksgujke] dkywjke] lEirjke] fi-
gjhjke ] txnh'k izlkn oYn uUnjke 90 6.02
95 133 jktcgknwj] egsUnz dqekj lUrjke fi- gjhjke dqEgkj 89 39.14
96 134 jktcgknwj oYn gjhjke dqEgkj 292/82 6.14
92 129 jkds'kukFk] iqueukFk fi- lksguukFk fl)
88 124 eksrh oYn ruw rkjax
90 126 eksgujke oYn gjhjke dqEgkj
86 121 eksMk oYn mnk pekj
87 123 eksrh oYn Mkyw tkV
80 114 ekukjke oYn lktujke fl)
83 118ewyh iRuh Lo- ckywjke] eksMwjke] ykywjke] Hkksekjke] fyNek]
deka] /kekZ fi- ckywjkees?koky
73 103 exrqjke oYn nqnkjke czkg~E.k
79 111 egsUnz dqekj oYn gjhjke dqEgkj
71 101 Hkh;kajke oYn fd'kukjke tkV
72 102 Hkh;kajke oYn jkewjke tkV
Page No.4
97 136 jk/kkd".k oYn tsBkjke o xqekuh nqDrj tsBkjke rkjax 83 39.08 1
98 139 jkepUn oYn 'ksjkjke dqEgkj 80 41.14 1
99 140 jkeukjk;.k iq= fiFkkjke tkV 356/84 10.00 1
100 142 jkej[k oYn ghjkjke czkg~E.k 144/13 20.14 1
351/152 14.07 1
353/153 14.10
102 144 jkeknsoh iRuh x.ks'kkjke es?koky 348/149 10.00
103 146 jkes'oj oYn yk/kwjke es?koky 317/133 30.16 1
132 15.08
315/133 3.00
318/133 13.00
105 148jkorjke jkes'ojyky] xaxkfc'ku iquepUn uUnfd'kksj fi-
HkksekjkeukbZ 70/1 18.05 1
106 151 jsoUrukFk oYn dkywukFk fl) 114/7 12.10 1
107 152 jsoUrjke iq= Qqlkjke fl) 363/149 13.06
149/2 18.02
345/149 18.00
73/1 16.07
109 156 yk/kwnsoh] jkes'ojh] 'kkfUr iqf=;k esokjke mQZ eghjke fNEik 295/86 1.08
110 157fy[kekjke] csxkjke] ds'kjkjke]] Mqaxjjke] eksgujke] mnkjke]
'kkfURk ] fd'kuh] dslj] fon~;k fi- jktwjketkV 344/149 50.00 1
111 158 fyNe.k oYn vklq es?koky 140/3 30.00 1
112 160 fyNek iq=h dqu.kk iRuh Lo- ijekuun es?koa'kh 156 23.05 1
113 162fyPNhjke oYn Hkksekjke ½ fg- tsBk] es?kk] Vhdq fi- ykcw ½
fg- czkg~E.k 7 19.19
133/13 5.04 1
133/14 21.16
115 164 f'kodqekj iq= NksVw yky iqjksfgr czkg~E.k 314/133 50.00 1
116 165f'kodqekj iq= NksVwyky] iquepUn fxjhjkt] fouksn ] vktkn
fi- f'kodqekj ] fdj.k iq=h f'kodqekj iqjksfgrczkg~E.k 316/133 40.00 1
117 166 Jo.kjke iq= Qqlkjke fl) 364/149 13.07
118 167 Jo.kjke oYn eq[kjke tkV 301/96 0.10
149 21.12 1
349/149 23.04
76 21.15
94/3 16.05
65 27.15 1
81/2 4.17
122 174 lkgcjke] Jo.kjke] fi- euhjke dqEgkj 307/114 23.00
123 175 flaxkjke] cfj;kejke] I;kjkjke] dkdwjke ckthxj 74 12.10
124 176 lqxuk oYn Jhjke tkV 69/2 21.08 1
125 177 lqxukjke oYn Jhjke tkV 66 11.10
120 169 lUrjke oYn gjhjke dqEgkj
121 172 lghjke] Hkaoj] 'kadj] eulk fi- ewyk euksgjh iRuh Lo- ewyk es?koky
114 163 'kkfUrnsoh iRuh xksihjke] ljLorh nsoh iRuh 'kadjyky tkV
119 168 lUrqjke o Jo.kjke fi- ds'kqjke uk;d
104 147 jkorjke iq= nqykjke tkV
108 154 jsoUrjke oYn dkywjke fl)
101 143 jkeyky oYn Hkwjkjke tkV
Page No.5
147 50.07 1
148 24.12
127 181 lksgujke] tkywjke] fi- dkukjke es?koky 160 52.06 1
110 28.19 1
116 6.15
129 185 ghjk iRuh Qqlkjke uk;d 370/149 16.14 1
130 186 ghjknsoh iRuh lksgujke tkV 341/149 50.00 1
131 187 gqdekjke] e?kkjke fi- iqj[kkjke] iseh iRuh Lo- iqj[kkjke tkV 149/9 26.00 1
112 14.00 1
127 4.02 1
133 189 pquh iRuh Lo- jkepUnz lksuh 335/144 20.00 1
134 190ikSr ifjogu lM+d ifjogu o jkt ekxZ ea=ky; Hkkjr
ljdkj 97 15.11
Total:- 3973.02 103
ch?kk
132 188gqlSu [kka oYn teky [kka ½ fg- eqlyeku ] jrhukFk iq=
rk:ukFk fl)
126 180lqjtkjke] jrhjke] [;kyhjke] jkeI;kjh] ewyh] Hkwjh] ukuwM+h
fi- rk:jke] mnh iRuh Lo- rk:jke ½ fg- tho.kjke fl)
128 184 gjthjke] eksrhjke] jsoUrjke firk Mkywjke
Page No.6