13 Luglio 2007 Consiglio di Sezione 1 Diameter 25 m Barrel toroid length 26 m End-cap end-wall chamber span 46 m Overall weight 7000 Tons L’esperimento ATLAS ad LHC LAS superimposed to e 5 floors of building 40 2007->aprile 2008: Fine Installazione e Commissioning dei rivelatori con i raggi cosmici Maggio-Luglio 2007: Prime Collisioni ad LHC, inizio presa dati Huge experiment

description

L’esperimento ATLAS ad LHC. 2007->aprile 2008 : Fine Installazione e Commissioning dei rivelatori con i raggi cosmici Maggio-Luglio 2007 : Prime Collisioni ad LHC, inizio presa dati. ATLAS superimposed to the 5 floors of building 40. Diameter25 m Barrel toroid length26 m - PowerPoint PPT Presentation

Transcript of Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

Page 1: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

1

Diameter 25 mBarrel toroid length 26 mEnd-cap end-wall chamber span 46 mOverall weight 7000 Tons

L’esperimento ATLAS ad LHC

ATLAS superimposed tothe 5 floors of building 40

2007->aprile 2008: Fine Installazione e Commissioning dei rivelatori con i raggi cosmici

Maggio-Luglio 2007: Prime Collisioni ad LHC, inizio presa dati

2007->aprile 2008: Fine Installazione e Commissioning dei rivelatori con i raggi cosmici

Maggio-Luglio 2007: Prime Collisioni ad LHC, inizio presa dati

Huge experiment

Page 2: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

2

A Toroidal LHC AppartuS (ATLAS) DETECTOR

EM Calorimeters

/E 10%/E(GeV) 0.7%

Inner Detector: Si Pixel and strips (SCT) &

Transition radiation tracker (TRT)

/pT 5 10-4 pT (GeV) 0.001

Good impact parameter res.

(d0)=15m@20GeV

4 Magnets: solenoid (Inner Detector) 2T, 3 air-core toroids (Muon Spectrometer) ~0.5T

Full coverage for ||<2.5

35

Stand-alone Muon Spectrometer,

/pT 10% at 1 TeV/c

Hadron Calorimeters,

/E 50% / E(GeV) 3%

Page 3: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

3

ATLAS : dal disegno Virtuale....380 Stazioni a muoni MDT/RPC380 Stazioni a muoni MDT/RPC

RPC

MDT

Barrel Toroid:8 separate coils

......Alla realta’!!!---

Page 4: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

4

2007: ATLAS side A (with the calorimeter end-cap fully retracted)

Barrel Toroid+Calorimetry+Inner detector

Forward Calorimetry

Page 5: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

5

June 28:installation of the pixel detector with central beam-pipe

Page 6: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

6

Pixel detector

Page 7: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

7

One forward toroid installed in june, second these days

Page 8: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

8

ATLAS main control roomThe control room is operational and used during the cosmic ray commissioning runs

Page 9: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

9

Overview of the detector installation

Inner DetectorCompleted since june 2007

Calorimeter e.m. and hadronicCompleted and cooled at 88 K

Muon chambersBarrel stations completed Forward muon chambers:

completition by the end of 2007

MagnetsBarrel solenoid installed and tested at 7.7KA(2T field) in

August 2006Barrel Toroid installed in 2005, cooled and finally tested at

20.5kA nominal current in November 20062 Forward Toroids : one already installated in June, second

in July 2007

Most of the detector already in place Ready for physics for 2008!

15 years from LOI to construction!!

Page 10: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

10

2007-spring 2008 :Detector commissioning using cosmic rays

Commissioning:from “just installed” to “ready for physics” using cosmic raysmake the detector running:

from low-level (finding dead/hot channels, mapping mistakes, cabling problems) to high-level (integration of sub-detectors into global ATLAS DAQ)

understand the detector:from alignment and

calibration to debugging offline reconstruction software and simulation

Page 11: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

11

Anagrafica ATLAS 2007__> sostituire con la nuva

Page 12: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

12

Richieste ATLAS

Page 13: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

13

Attivita’ Gruppo Roma2 nel 2007

Nel 2008 il gruppo di Roma2 sara' impegnato nelle seguenti attivita'

Completamento dell’installazione sistema di potenza RPC (HV+LV+DCS)

Commissioning degli RPC in caverna con i cosmici (1116 rivelatori) Analisi dei primi dati raccolti

Iniziata collaborazione con i nostri teorici su ricerca di particelle supersimmetriche e segnali di extradimensions (Z’,etc)

Attivita’ di R&D per LHC alta luminosita’ (SLHC)

Goal di fisica di ATLAS per il 2008-2009 (ci si aspetta una luminosita integrata tra 1fb-1 -10fb-1)

Migliore comprenzione della calibrazione dei rivelatori attraverso misure di processi di Standard Model noti

Zll,W->lv,ttbar

Ricerca di risonanze ad alte masse invarianti (Z’ leptoni) Previste da molti modelli di nuova fisica Facili da identificare poiche’ privi di fondo

Page 14: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

7 Luglio 2006 Consiglio di Sezione Anna Di Ciaccio

14

Farm INFN-GRID ROMA Tor Vergata

L`architettura della Farm è quella di un cluster di macchine eterogenee:

1 Computing Node: Dual Xeon 2.4Ghz, 512Mb Ram, 36Gb Linux Raid 1 SCSI 1 Storage Node: Dual Xeon 2.4 Ghz, 512Mb Ram, 36Gb Linux Raid 1 SCSI 1 Worker Node: Dual Xeon 2.4 Ghz, 512Mb Ram, 100Gb Linux Raid 0 SCSI 5 Worker Nodes: Dual Xeon 2.4 Ghz, 1000Mb Ram, 110Gb SCSI 5 Worker Nodes: Dual Xeon 3.2 Ghz, 4000Mb Ram, 180Gb SATA 1 Worker Node: Dual Xeon 3.0 Ghz, 2000Mb Ram, 140Gb SATA 1 Worker Node: Opteron 2.4 Ghz, 3000Mb Ram, 160Gb SATA 1 Worker Node: WoodCrest 2.0 Ghz, 4000Mb Ram, 150Gb SATA 1 Network Attached Storage Opteron: 1,9TB Raid5 with Spare 2 Gigabit switch, ZyXEL, 16 ports + 1 Gigabit switch, D-Link, 8 ports, No

Rack Mount ( tot:40 ports Gigabit ). 3 KVM switch 8 ports: ( tot: 24 ports ) D-Link. 5 UPS APC Smart-UPS 750 Rack Mount for Power Supply Protection.

Totale di “core” ( 1 Node ~ 4 core ) per calcolo = 54 Totale della capacità disco sicuro =1.9 TB.

Nel 2007 e’ stato integrato nella farm il software di LHCb-Roma2

Nel 2008 si chiedono altri 3 biprocessori e 2TB di spazio disco

Page 15: Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m

13 Luglio 2007 Consiglio di Sezione Anna Di Ciaccio

15

INFN-Roma2-GRID