baldini stato meg - Istituto Nazionale di Fisica Nucleare · ØDegrader + Collimator system ......

28
A. Baldini: Assisi 21 sett.2004 Stato dell’esperimento MEG e situazione del calorimetro a LXe

Transcript of baldini stato meg - Istituto Nazionale di Fisica Nucleare · ØDegrader + Collimator system ......

A. Baldini: Assisi 21 sett.2004

Stato dell’esperimento MEG e situazione del

calorimetro a LXe

A. Baldini: Assisi 21 sett.2004

INFN & Pisa University A. Baldini, C. Bemporad, F.Cei, S. Giurgola, M.Grassi, F. Morsani, D. Nicolo’, A. Papa, R. Pazzi, F. Raffaelli, F. Sergiampietri, G. Signorelli

ICEPP, University of Tokyo Y. Hisamatsu, T. Iwamoto, T. Mashimo, S. Mihara, T. Mori, H. Natori, H. Nishiguchi, W. Ootani, K. Ozone, R. Sawada, Y. Uchiyama, S. Yamada, S. Yamashita

KEK, Tsukuba T. Haruyama, A. Maki, Y. Makida, A. Yamamoto, K. YoshimuraWaseda University T. Doke, J. Kikuchi, H. Okada, S. Suzuki, K. Terasawa, M. Yamaguchi

Budker Institute, Novosibirsk L.M. Barkov, A.A. Grebenuk, D.G. Grigoriev, B, Khazin, N.M. Ryskulov

PSI, Villigen J. Egger, P. Kettle, M. Hildebrandt, S. Ritt, M. Schneebeli

INFN & Pavia University A.de Bari, P. Cattaneo, G. Cecchet, G. Nardo’, M. Rossella

INFN & Genova University S. Dussoni, F. Gatti, P. Ottonello, D. Pergolesi, R. Valle

INFN Roma I D. Zanello

INFN & Lecce University S. Spagnolo, C. Chiri, P. Creti, C. Gatto,G. Marsella, G. Palama’, M. Panareo, G. Tassielli

A. Baldini: Assisi 21 sett.2004

Novita’ di piu’ importanti da maggio

• Fascio: •Tripletti I and II pronti

• specifiche per il BTS inviate a Novosibirsk

•dimensioni della spot: 1 cm invece di 0.5 è simulazioni MC(Effetto sull’efficienza TC, trigger rate, efficienza delle camere a drift)

• Timing counter: (G. Cecchet)

•test di prototipi nel campo di COBRA

•considerazioni su APD (cercare soluzione con PSI fino a fine anno + eventuale riassegnazione 75 K€ nel 2005)

•gara PMT da 2’’

• Software: scelta della struttura (C. Gatto)

A. Baldini: Assisi 21 sett.2004

Ø Triplet IØWien Filter E^B SeparatorØ Triplet II

ØØ Triplet ITriplet IØØ WienWien Filter E^B SeparatorFilter E^B SeparatorØØ Triplet IITriplet II

ØCollimator systemØ Beam Transport Solenoid BTSØ Degrader + Collimator systemØ Target system + He-Bag System

ØØCollimator systemCollimator systemØØ Beam Transport Solenoid BTSBeam Transport Solenoid BTSØØ Degrader + Collimator systemDegrader + Collimator systemØØ Target system + HeTarget system + He--Bag SystemBag System

Elementi della linea di fascio

Pronti

In fase di disegno

Specifiche inviate a Novosibirsk

A. Baldini: Assisi 21 sett.2004

Dimensione della spot del fascio: effetto in condizioni pessimistiche

Differenza nellDifferenza nell’’efficienzaefficienza~3%~3%

Trigger rate (I=108 µ/s)

DC efficiencyNon tenendo conto del fatto che non ci serve una intensita’ elevata (vogliamo un fattore 3 sotto) e quindi il fascio si puo’ collimare

Allargamento spot sul TC

Risolvo peggio l’angolo del positrone

La traiettoria puo’ uscire dalle camere

A. Baldini: Assisi 21 sett.2004

Calorimetro a Xenon liquido

Costruzione : • 290 PMT Hamamatsu ordinati

• Testati anche nel campo magnetico di COBRA

• Gara per la costruzione del criostato iniziata

• Disegno della struttura di supporto quasi completo

• Numero di PMT

• Calibrazioni

A. Baldini: Assisi 21 sett.2004

I=4 µA

TB604

ZA1985

ZA1980

Plat

eau/

Peak

New 9288 (ZA1980 and ZA1985) compared to TB604 (in Ar gas and LXe)

A. Baldini: Assisi 21 sett.2004

Disegno finale della base

NEC RD68S

NEC RD82S

I PMT potrebbero dover funzionare a correnti anodiche elevateèAggiunta di diodi zener (comportamento provato a caldo)

A. Baldini: Assisi 21 sett.2004

Comportamento dei PMT nel c.m. Di COBRA

• Gain, effective QE of 2 PMTs were measured under the magnetic field.

Geometry definition

A. Baldini: Assisi 21 sett.2004

Gain&Eff.QE under mag. field of 62G

• Gain can be recovered with higher HV.• Effective QE (measured with LED light) is not recovered even when HV changed.• The magnetic field in the LXe region is well below 40G (20% loss of effective QE at max).

Gain curve Effective QE

No magnetic field62G data

A. Baldini: Assisi 21 sett.2004

Struttura di supporto dei PMT

• Basic ideas– PMTs are inserted in slabs (inner,

side, outer) and plates (front) in a clean condition.

– The slabs and plates are assembled into a shape in the cryostat.

– Supporting frames for the slabs and plates will be fixed to the cryostat with screws.

– Some other equipments will be attached on the supporting frames.

• Patch panel• Temperature sensor• Level meter

Inner

Outer

Side

Front (up)

Front (low)

840 PMT totali

A. Baldini: Assisi 21 sett.2004

Structure of slab/plate

Side Outer

Front

InnerPossible to divide into 6 slabs

A. Baldini: Assisi 21 sett.2004

B) Energy resolution B) Energy resolution vs vs number of number of PMTsPMTs

Various configurations:Various configurations:

-- 848 848 PMTsPMTs (reference)(reference)-- 768 768 PMTsPMTs (no covers)(no covers)-- 648 648 PMTsPMTs (lower PMT density on covers & sides)(lower PMT density on covers & sides)-- 608 608 PMTsPMTs (no sides)(no sides)-- 528 528 PMTsPMTs (no covers & sides)(no covers & sides)

A. Baldini: Assisi 21 sett.2004

ReferenceReference No coversNo covers

No sides & No sides & no coversno covers

A. Baldini: Assisi 21 sett.2004

No sidesNo sides

Lower PMT density Lower PMT density on sides and coverson sides and covers

A. Baldini: Assisi 21 sett.2004

Energy resolutionEnergy resolutionPRELIMINARE!!!

A. Baldini: Assisi 21 sett.2004

Situazione PMTAttualmente

• 290 ZA (Pisa)

• 110 TB + 4 ZA + 230 OLD (Tokyo)

Previsioni

• 40 ZA rimpiazzo OLD (Tokyo)

• 400 ZA nuovi (nuovo finanziamento giapponese)

Totali

• 840 ZA e TB: nessuno spare (110 ZA ?? = 170 K€)

A. Baldini: Assisi 21 sett.2004

Calibrazioni

• Spot di sorgenti alfa su filo (risposta in funzione della distanza, assorbimento e calibrazione PMT)

• Generatori di neutroni – Attivazione di Ni con produzione di fotoni

monocromatici da 9 MeV (risposta in energia)

• Photons-from-the-back (52 MeV)– Studio di fattibilita’ in corso

A. Baldini: Assisi 21 sett.2004

5 sources in LP

• 5 sources make a more symmetrical situation (same spacing as PMTs)

• Identification still possible at more than 3σ but worse than 3 sources

A. Baldini: Assisi 21 sett.2004

Wire presently mounted in “Large Prototype”

A. Baldini: Assisi 21 sett.2004

Commercially produced (widely used for the boron therapy, luggage screening, oil well logging, etc.)

D + 2H 3He + n Q = 3.27 MeVD + 3H 4He + n Q = 17.59 MeV• Intensities from 106 n/s to 108 n/s• Typical pulse rate and pulse width 10 Hz and 1 µ s• Time separation of direct from delayed reactions• Single pulse mode

Frequent calibration

Moderator:~ 10 cm of the polyethylene • 40% thermalized n• 10% n captured in moderator

? shield:~ 3 cm of tungsten or ~ 5 cm of lead

USE OF A PULSED NEUTRON GENERATOR

switchable on-off

A. Baldini: Assisi 21 sett.2004

Calibration from the back of the calorimeter

LXe

p - µ +

• Liquid hydrogen target permanently mounted close tothe Xenon calorimeter

• p -/µ + switching

Locally: same photocatode coverage as on the front face

NaILH2

? ?

?n

Normal beamBeam for calibration

Interesting possibility?

Possibility of introducingalso other particles (e-,e+ ,p +,µ + )

A. Baldini: Assisi 21 sett.2004

...ancora test per il calorimetro

• Test su neutroni iniziati; da continuare (utilizzo di sfere di Bonner, attivazione di bersagli)

• Nuovo test del calorimetro a Xenon

• nuovo test (settembre-ottobre) per la determinazione della risoluzione temporale (purtroppo senza la elettronica definitiva)

• + fili di calibrazione (punti di sorgenti alfa)

A. Baldini: Assisi 21 sett.2004

Xenon Delivery

0

200

400

600

800

1000

2002 2003 2004 2005 2006

Year

Rec

eive

d X

e [l

]

Japan

“pro

mise

d”

A. Baldini: Assisi 21 sett.2004

Schedule

2002 2003 2004 2005

Test MilestoneAssemblyDesign Manufacturing

Large Prototype Beam Test Beam Test

Cryostat Vessel

PMT

Refrigerator

Liq. Purification

AssemblyTest

Engineering runs

Heater replaced

Neutron background measurement

Base circuit design must be finalized

Crane problem

NeutronShield?

A. Baldini: Assisi 21 sett.2004

Pi- BeamTest

Liq.Purif.

PM + Src Inst

2004

Platf.

MEG

Prac

Neutr.BG

DNOSAJJMAMFJ

GottaMEGBeam Time

Prototype

Drift Chamber

TestDAQ

Trigger

Full Calorimeter

LPT

Mechan.Matching

TestTiming Counter

Commiss.Part 1

Beam Line

Calibration(Wed)

COBRA

A. Baldini: Assisi 21 sett.2004

BTSTest

Commiss.Part 2

BGTest

Inst

InstInst

AMD20062005FJNOSAJJMAMFJ

ShutdownMEGGotta?MEGShutdownBeam Time

Mounting &Testing

MountingDrift

Chamber

InstDC

Electr.DAQ

InstTrigger

TestStudies

(Wed + remote)Assembly

Crane+Tent

Cryo.Installation

Full Calorimeter

PMT testing + calibrationLPT

BGTest

Timing Counter

Full BeamLine Test

Beam Line

FieldMap

COBRA

A. Baldini: Assisi 21 sett.2004

LXenon

• PMT(300) (550)500 K€ -100K€

• Criostato 200 K€ (criostato)

200 K€ (supporto + finestre)

Trigger

• Prototipi 40 K€

• Sistema completo 100+330 K€

-130 K€

Timing counter

• APD + fibre (interno) (160) 130K€-30 K€

• PMT (100: esterno) (315) 135K€

-180 K€

• Scintillatore 50 K€

• Calibrazione 100 K€

• Meccanica 50 K€

Splitters

• Sistema completo 115 K€

TOTALE 1770 K€

Assegnato 1155 K€

Risparmio 440 K€

Previsto 2210 K€

Stime di costo aggiornateStime di costo aggiornatePrevisioni Assegnazioni Risparmi

Non previsti:

Software (40K€)

Calibrazioni (90 K€)