Revisione n° Data revisione
Grosseto lì 22/08/2016
PERIZIA N° 081
N° CUP: B64H16001000007
INTERVENTI DI RIPRISTINO E DIFESA SPONDALE SUL TORRENTE
ARBIA IN LOC. RENACCIO TAVERNE D’ARBIA – COMUNE DI
SIENA.
PROGETTO DEFINITIVO - ESECUTIVO
Nota di revisione
IMPORTO COMPLESSIVO
€ 120.000,00
IL PROGETTISTA IL RESPONSABILE UNICO DEL PROCEDIMENTO
(Ing. Roberto TASSELLI) (Geom. Francesco CORRIDORI)
IL TECNICO
(Ing. Andrea RUGGERO)
RELAZIONE IDROLOGICO IDRAULICAALL.
B.1
CONSORZIO 6 TOSCANA SUD
-Area Studi e Progettazione -
Via Ximenes n° 3 Grosseto Tel. 0564-22189 E-Mail: [email protected]
C
ONSORZI
O6 TOSC
ANASUD
SEZIONE A
Settori
Civ
ilee
ambientale, industriale, dell'in
form
azi
one
OR
DIN
EIN
GEGNERI PROV. GR
OSS
ET
O
SEZIONE A
SettoriCivile e ambientale
OR
DIN
EIN
GEGNERI PROV. GR
OSS
ET
O
Perizia n. 081 – Relazione idrologica idraulica
1
Sommario PREMESSA.............................................................................................................................................................................. 2
Generalità dell’intervento .................................................................................................................................................... 2
Inquadramento territoriale .................................................................................................................................................. 2
Riferimenti normativi ........................................................................................................................................................... 3
ANALISI IDROLOGICO IDRAULICA ........................................................................................................................ 3
Analisi idrologica ....................................................................................................................................................................... 3
Modello idraulico ....................................................................................................................................................................... 5
Caratterizzazione geometrica delle sezioni e delle opere esistenti ................................................................................ 5
Definizioni delle condizioni al contorno e delle caratteristiche delle sezioni ............................................................. 5
Verifiche idrauliche ............................................................................................................................................................... 6
PROGETTAZIONE DELLA MASSICCIATA ......................................................................................................... 10
Dinamica dei processi erosivi sul corso d’acqua ............................................................................................................... 10
Dimensionamento della struttura in materiale sciolto ...................................................................................................... 11
Metodo I.............................................................................................................................................................................. 11
Metodo II ............................................................................................................................................................................ 13
Risultati ................................................................................................................................................................................ 13
ALLEGATO 1 – Verifiche idrauliche – Portata Tr 200 anni
ALLEGATO 2 – Verifiche idrauliche – Portata Q tensioni massime = 327 mc/s
ALLEGATO 3 – Sezioni interessate dall’intervento
Perizia n. 081 – Relazione idrologica idraulica
2
PREMESSA
Generalità dell’intervento
La presente relazione si riferisce a lavori di ripristino e difesa spondale sul torrente Arbia, in località Renaccio
Taverne d' Arbia, nel comune di Siena (SI), destinati al miglioramento della dinamica d'alveo attraverso interventi
di regolazione e modellazione del trasporto solido, di difesa integrata di sponde ed alveo del corso d'acqua.
L'intervento prevede, nel torrente Arbia, in località Renaccio Taverne d' Arbia, la realizzazione di una scogliera in
massi ciclopici di pietrame a protezione della sponda destra del corso d'acqua e un intervento di regolarizzazione
sempre della sponda destra. Il torrente Arbia rientra nel comprensorio del Consorzio 6 Toscana Sud ai sensi della
L.R. 79/2012; esso interessa il bacino idrografico dell'Ombrone, nel territorio del Comune di Siena (Si).
Il torrente Arbia è un corso d'acqua iscritto nell'elenco principale delle Acque Pubbliche della Provincia di Siena al
n°145. E' uno degli affluenti di sinistra del fiume Ombrone, che attraversa la località Renaccio, da Taverne d 'Arbia,
arrivando poi a Ponte d 'Arbia per immettersi nel fiume Ombrone nei pressi del comune di Buonconvento, sempre
nel comune di Siena.
Inquadramento territoriale
Il tronco del torrente Arbia, oggetto di intervento, è localizzato a sud del ponte della ferrovia Empoli, Siena, Chiusi:
più precisamente l'intervento interessa un tratto di circa 90,00 m in località Renaccio, Taverne d' Arbia. La zona di
intervento è caratterizzata da erosioni spondali molto accentuate, con esondazioni frequenti che alterano il
percorso dello stesso torrente Arbia.
4444
Figura 1 - Localizzazione intervento sul torrente Arbia su immagine satellitare
Perizia n. 081 – Relazione idrologica idraulica
3
Figura 2 - Localizzazione intervento sul torrente Arbia su Carta Tecnica Regionale
Nell’ambito del presente studio sono stati acquisiti i seguenti dati territoriali:
• Cartografia di base della Carta Tecnica Regionale scala 1:10.000, fornita dalla Regione Toscana;
• Modello digitale del terreno (DTM) 10x10m fornita dalla Regione Toscana;
• Rilievo Lidar con passo 1x1m e 2x2m fornito dalla Regione Toscana;
• Ortofoto;
• Sezioni topografiche derivanti dai rilievi effettuati nello studio commissionato dalla Regione Toscana nell’anno
1999 (rilievi IRTEF) e comprendenti un totale di 548 sezioni fluviali relative all’asta principale del fiume Ombrone
e dei suoi principali affluenti
Riferimenti normativi
La presente relazione è redatta in conformità al Regio Decreto 25 luglio 1904 n. 523, Legge Regionale 21 maggio
2012 n. 21, D.P.G.R. 25 ottobre 2011 n. 53/R, Legge Regionale 10 novembre 2014 n.65, Legge Regionale 28
dicembre 2015 n. 80 e infine la Deliberazione del Consiglio Comunale n. 11 del 23-03-2012 del comune di
Castiglion d’Orcia (Regolamento Urbanistico).
ANALISI IDROLOGICO IDRAULICA
Analisi idrologica Tutti i calcoli idraulici che seguono sono stati eseguiti a partire dai dati pubblicati nello studio "Verifica idrologica
e idraulica del bacino del fiume Ombrone e ricostruzione degli eventi del 29/10/01 e 04/12/04" a cura del Prof.
Ing. E. Paris. Le sezioni interessate dal tratto di intervento sono quelle che partono dalla AR2033 alla AR1050; in
particolare la sezione AR1038 risulta trovarsi in corrispondenza dell’area di intervento (figura 3) e pertanto tali
valori relativi a geometria e idrometria sono stati utilizzati come riferimento nell’analisi idraulica.
Perizia n. 081 – Relazione idrologica idraulica
4
Figura 3 - Planimetria da tav_3_4 planimetria sezioni OM_buonconvento_sorgente & arbia
In allegato si riportano i risultati dello studio soprascritto per le sezioni interessate dal tratto in esame, per i tempi
di ritorno di 30, 100 e 200 anni; per semplicità nella seguente tabella si riportano soltanto i valori di portata per la
sezione AR2033, utilizzata come valore di input per la modellazione idraulica.
Tabella 1 – Portate in corrispondenza della sezione AR2033 secondo lo studio Paris
Tempo di ritorno [anni] Portata [m3/s]
30 318.48
100 444.14
200 517.75
Come si nota dalle verifiche idrauliche condotte dal Prof. Paris il valore più elevato della velocità media sulla
sezione AR1038 è pari a 1.40 m/s (vedasi ALLEGATO 3 – Sezioni interessate dall’intervento) appare non
rappresentativo delle condizioni di deflusso in prossimità della sponda in erosione; si ritiene dunque indispensabile
valutare con un modello idraulico accurato le reali condizioni.
Perizia n. 081 – Relazione idrologica idraulica
5
Modello idraulico Lo studio idraulico, per la previsione dei livelli di piena, è stato eseguito considerando il moto permanente tramite
il software HEC-RAS 5.0.1 (Hydrologic Engineering Center’s River Analysis System), prodotto e reso disponibile
gratuitamente dall’USACE (United States Army Corps of Engineering). L’implementazione di questo modello
necessita della conoscenza di una serie di dati per poter simulare correttamente, grazie all’apposito codice di calcolo,
il comportamento del corso d’acqua al verificarsi di particolari eventi idrologici.
Le fasi operative che si sono susseguite nel lavoro sono le seguenti:
1) Caratterizzazione geometrica delle sezioni e delle opere esistenti;
2) Definizioni delle condizioni al contorno e delle caratteristiche delle sezioni;
3) Avvio delle simulazioni e risultati.
Caratterizzazione geometrica delle sezioni e delle opere esistenti
Per la costruzione del modello geometrico è stato fatto uso del plug-in “q-ras” elaborato da Gfosservices SA; esso
permette di estrarre in formato compatibile con HEC-RAS le sezioni desiderate e tracciate direttamente sul
modello digitale del terreno.
Dunque una volta posizionato sulla planimetria ctr il corso dell’Arbia nella forma di shapefile polilinea, è stato
possibile disegnare le sezioni desiderate come shapefile di tipo lineare. Nella scelta della lunghezza e della frequenza
di tali sezioni è stata posta attenzione alla localizzazione dell’intervento, per assicurare almeno una sezione
immediatamente a monte e a valle di esso (così come indicato nelle linee guida del manuale HEC-RAS), e al Lidar,
per evitare di considerare porzioni troppo estese di terreno o tratti non attivamente interessati dalle dinamiche di
deflusso idraulico; tutto ciò con l’aiuto del plug-in “Terrain Profile” il quale restituisce in tempo reale il profilo di
una generica retta tracciata sul Lidar (figura 4).
Figura 4 – Il plug-in Terrain Profile in qGIS
Definizioni delle condizioni al contorno e delle caratteristiche delle sezioni
I parametri in ingresso alla modellistica idraulica, oltre agli input idrologici, sono costituiti essenzialmente da tre
tipologie di condizioni al contorno:
1) Scabrezza, parametro di resistenza al moto per la valutazione delle perdite di carico distribuite;
2) Coefficienti di espansione/contrazione, necessari per la valutazione di perdite di carico effettivo indotte
da variazioni di sezione quali allargamenti o restringimenti;
Perizia n. 081 – Relazione idrologica idraulica
6
3) Condizione al contorno di monte e di valle, costituita dall’altezza di moto uniforme calcolata sulla base
della pendenza media dell’alveo.
Il valore di scabrezza utilizzato nel modello è pari a 0.033 m-1/3s di Manning per l’alveo attivo e 0.055 m-1/3s per
le aree golenali, compatibile con i dati presenti in letteratura e con la situazione rilevata durante i sopralluoghi.
Tabella 2 - Coefficienti di Manning.
Verifiche idrauliche
Scopo della presente modellazione idraulica è quello di individuare le condizioni di flusso maggiormente
sfavorevoli sull’azione erosiva e di trascinamento della sponda in sinistra idraulica in corrispondenza dell’area di
intervento (sezione 2222.21); tale situazione è risultata essere non quella relativa alla portata massima (con tempo
di ritorno 200 anni) ma bensì la portata tale che non comporta esondazioni al di là dei levee imposti, e che quindi
concentra il flusso entro il main channel, con conseguenti alte velocità della corrente, pari a 2.23 m/s, e forti azioni
tangenziali sulle sponde. Tale verifica è stata effettuata inserendo le ineffective flow areas ovvero le aree della sezione
non attive ai fini del deflusso, dove la corrente ristagna (la velocità nella direzione della corrente è nulla o prossima
a zero).
Tramite il comando velocity distibuition nella finestra cross section è stato possibile plottare la distribuzione delle velocità
della corrente lungo la sezione, ed individuare perciò la dinamica che origina le tensioni tangenziali sulla sponda
maggiori.
Perizia n. 081 – Relazione idrologica idraulica
7
Figura 5 - Profilo del tratto simulato con la portata duecentennale
Di seguito si riportano i risultati grafici e tabellari della sezione 2222.21 con la portata con tempo di ritorno di 200
anni (Q = 517.75 m3/s) e con la portata che determina le velocità maggiori nell’alveo principale (Q = 325 m3/s)
Tabella 3 - Dati output per la sezione 2222.21 con Q duecentennale
Plan: Plan 03 arbia arbia RS: 2222.21 Profile: PF 1
E.G. Elev (m) 177.52 Element Left OB Channel Right OB
Vel Head (m) 0.23 Wt. n-Val. 0.055 0.033 0.055
W.S. Elev (m) 177.29 Reach Len. (m) 338.5 338.5 338.5
Crit W.S. (m) 175.79 Flow Area (m2) 23.15 133.44 10.02
E.G. Slope (m/m) 0.001099 Area (m2) 23.15 133.44 119.2
Q Total (m3/s) 325 Flow (m3/s) 20.98 297.44 6.57
Top Width (m) 119.57 Top Width (m) 11.83 39.2 68.54
Vel Total (m/s) 1.95 Avg. Vel. (m/s) 0.91 2.23 0.66
Max Chl Dpth (m) 4.44 Hydr. Depth (m) 1.96 3.4 1.21
Conv. Total (m3/s) 9801.7 Conv. (m3/s) 632.8 8970.7 198.3
Length Wtd. (m) 338.5 Wetted Per. (m) 12.56 40.39 8.83
Min Ch El (m) 172.85 Shear (N/m2) 19.87 35.62 12.24
Alpha 1.21 Stream Power (N/m s) 18.01 79.4 8.03
Frctn Loss (m) 0.57 Cum Volume (1000 m3) 85.17 155.42 50.5
C & E Loss (m) 0.03 Cum SA (1000 m2) 55.59 48.78 28.67
Perizia n. 081 – Relazione idrologica idraulica
8
Figura 6 - Sezione 2222.21 con portata duecentennale
Tabella 4 - Dati output per la sezione 2222.21 con Q = 325 m3/s
Plan: Plan 03 arbia arbia RS: 2222.21 Profile: PF 1
E.G. Elev (m) 177.52 Element Left OB Channel Right OB
Vel Head (m) 0.23 Wt. n-Val. 0.055 0.033 0.055
W.S. Elev (m) 177.29 Reach Len. (m) 338.50 338.50 338.50
Crit W.S. (m) 175.79 Flow Area (m2) 23.15 133.44 10.02
E.G. Slope (m/m) 0.001099 Area (m2) 23.15 133.44 119.20
Q Total (m3/s) 325 Flow (m3/s) 20.98 297.44 6.57
Top Width (m) 119.57 Top Width (m) 11.83 39.20 68.54
Vel Total (m/s) 1.95 Avg. Vel. (m/s) 0.91 2.23 0.66
Max Chl Dpth (m) 4.44 Hydr. Depth (m) 1.96 3.40 1.21
Conv. Total (m3/s) 9801.7 Conv. (m3/s) 632.8 8970.7 198.3
Length Wtd. (m) 338.5 Wetted Per. (m) 12.56 40.39 8.83
Min Ch El (m) 172.85 Shear (N/m2) 19.87 35.62 12.24
Alpha 1.21 Stream Power (N/m s) 18.01 79.40 8.03
Frctn Loss (m) 0.57 Cum Volume (1000 m3) 85.17 155.42 50.50
C & E Loss (m) 0.03 Cum SA (1000 m2) 55.59 48.78 28.67
Perizia n. 081 – Relazione idrologica idraulica
9
Figura 7 - Sezione 2222.21 con Q = 325 mc/s
Per i dettagli si rimanda all’ALLEGATO 1 – Q Tr 200 anni e all’ALLEGATO 2 – Q tensioni massime. In ciascun
allegato è presente il seguente ordine di visualizzazione di viste e tabelle:
1. Planimetria
2. Viste 3d
3. Profilo
4. Sezioni
5. Tabella dettagli output alle sezioni
Perizia n. 081 – Relazione idrologica idraulica
10
PROGETTAZIONE DELLA MASSICCIATA
Dinamica dei processi erosivi sul corso d’acqua L’azione radente delle correnti sulle sponde di un corso d’acqua può provocare la loro erosione: il processo,
potenzialmente dannoso per i terreni circostanti, che possono venire asportati, può dar luogo a variazioni
irreversibili del tracciato del fiume ed eventuali condizionamenti per l’uso del territorio.
L’opera che si intende realizzare rientra tra le tipologie di difesa longitudinale in materiale sciolto; si tratta di difese
realizzate mediante massi, naturali o artificiali, di adeguate dimensioni e gettati alla rinfusa oppure sistemati. Esse
presentano il vantaggio di essere permeabili e di riuscire ad adeguarsi alle deformazioni ed agli assestamenti del
terreno senza subire danni.
La difesa con scogliera è realizzata con massi di varia pezzatura e peso. La scelta delle dimensioni degli elementi
che formano i rivestimenti in materiale sciolto deve essere fatta in funzione delle sollecitazioni meccaniche a cui
vengono sottoposte in esercizio:
- Sforzi di trascinamento dovuti alla corrente;
- Sottopressioni idrauliche.
Le dimensioni degli elementi lapidei devono comunque essere maggiori rispetto a quelli che la corrente è in grado
di trascinare in occasione di piene caratterizzate da portate con adeguato tempo di ritorno (maggiori di 20 anni),
con misure che raramente superano il metro di diametro (massi di circa 1-1.5 t).
I blocchi che si impiegano sono classificati per categoria:
- Tout-venant: tra 0 e 0.1 t; - 1° categoria: tra 0.1 e 1 t; - 2° categoria: tra 1 e 3 t; - 3° categoria: tra 3 e 7 t; - 4° categoria: tra 7 e 15 t.
Le scogliere vengono costruite con massi provenienti da cave o prelevati dai torrenti. I massi movimentati con
l’escavatore, vengono addossati in maniera regolare alla sponda in maniera da formare un rivestimento stabile e
ben assestato. La massicciata di progetto (figura 8) ha un angolo di inclinazione della sponda di 32°, spessore di 2
metri e lunghezza di 70+10+10 metri.
Figura 8 - Massicciata di progetto per la perizia 081
Perizia n. 081 – Relazione idrologica idraulica
11
Figura 9 - Rappresentazione di scogliera tipo per la difesa spondale
Dimensionamento della struttura in materiale sciolto I parametri idraulici ottenuti dalle simulazioni effettuate al variare delle condizioni al contorno, consentono di
calcolare le tensioni tangenziali agenti sulla sponda dell’alveo e stabilire la condizione più gravosa ai fini della loro
verifica. Tali tensioni rappresentative delle sollecitazioni cui saranno sottoposti i massi costituenti le opere di difesa,
sono state valutate considerando inizialmente come portata di progetto quella relativa all’evento con tempo di
ritorno pari a 200 anni e adottando due metodi distinti per il calcolo dello sforzo tangenziale massimo sulla sponda.
Metodo I
Si calcola il valore della tensione tangenziale sollecitante tramite la formula seguente:
𝜏𝑠 = 𝑅𝑡 𝛾 ℎ 𝐽 [N/m2]
dove h è la profondità della corrente in moto permanente, 𝛾 è il peso specifico dell’acqua, J rappresenta la pendenza
della linea dei carichi e 𝑅𝑡 è un coefficiente adimensionale dipendente dalla forma della sezione, dal suo rapporto
d’aspetto L/h, dove L è la larghezza del fondo e h il tirante idraulico, e dalla zona di interesse (sponda, fondo). Ad
esempio il valore di 𝑅𝑡 per il calcolo delle massime tensioni di sponda può essere ricavato dal grafico riportato in
figura:
Perizia n. 081 – Relazione idrologica idraulica
12
Figura 10 - Diagramma per la determinazione del coefficiente Rt
Nel caso di sponde ad elevata inclinazione (pari a 1/2, 1/3) è necessario considerare anche la forza di gravità, come
forza destabilizzante sul masso, o sulla porzione di area sistemata. Per tenere conto di ciò è quindi necessario
dividere il primo termine dell’uguaglianza dell’espressione precedente per il fattore correttivo μ espresso dalla:
𝜇 = cos 𝜗 √1 −tan 𝜗2
tan 𝜑2
dove 𝜗 (in radianti) è l’angolo di inclinazione della sponda, 𝜑 (in radianti) è l’angolo di attrito del materiale di cui è
costituita la sponda.
La verifica della determinazione del diametro minimo dei massi costituenti l’opera di protezione, che garantisca la
stabilità della stessa è risolta adottando il metodo delle tensioni di trascinamento. Questo procedimento si basa sul
confronto tra tensioni tangenziali massime che nascono nel punto di verifica prescelto, in questo caso sponde, e
quelle massime ammissibili per il materiale ivi presente.
La resistenza al trascinamento, definita come la massima tensione critica 𝜏𝑐𝑟 superata la quale il materiale al fondo
e/o sulla sponda inizia a muoversi, viene valutata attraverso la relazione fornita da E. Lane (1953), ottenuta
modificando l’espressione proposta da Shields per tener conto dell’inclinazione 𝜗 della sponda e dell’angolo di
attrito 𝜑 del materiale:
𝜏𝑐𝑟 = (𝛾𝑠 − 𝛾) 𝑑 Φ (cos 𝜗 √1 −tan 𝜗2
tan 𝜑2)
Dove Φ è il parametro critico di Shields funzione del numero di Reynolds relativo alla velocità di attrito u*.
Affinché la verifica sia soddisfatta deve risultare, per un punto sulla sponda:
𝜏𝑐𝑟 ≥ 𝜏𝑠
Nelle verifiche è stato utilizzato come parametro critico di Shields il valore di 0.047, consigliato in letteratura per
il pietrame sciolto (rip-rap). Per quanto riguarda l’angolo di attrito del materiale costituente il rivestimento della
scogliera è stato assunto un valore pari a 33°. Tale scelta è giustificata sulla base di due considerazioni geotecniche:
- La sponda sulla quale viene appoggiato il pietrame viene profilata con inclinazione di 32°;
Perizia n. 081 – Relazione idrologica idraulica
13
- L’angolo di attrito del materiale non è stato assunto pari all’angolo di attrito interno del rivestimento; questo perché tale valore perde di significato per materiali rocciosi, risultando troppo cautelativo ai fini della sicurezza. Per tale ragione ai fini del calcolo è stato assunto un angolo di attrito corrispondente all’angolo di equilibrio tra i grani, dove i blocchi di cava vengono assimilati alla componente litoide di un materiale a grana grossa.
Metodo II
Tramite i parametri idraulici ottenuti in base all’utilizzo del comando di Hec-Ras, Flow Distribution Locations, che
consente di specificare le sezioni in cui si desidera che il programma calcoli, e fornisca in output, la distribuzione
del flusso. Tale opzione permette di suddividere in più parti la golena sinistra, l’alveo principale e la golena destra,
allo scopo di ottenere, durante i calcoli dei profili e per ogni sezione trasversale dove è richiesta la distribuzione
del flusso, in ogni parte in cui la sezione è stata suddivisa:
- la percentuale di portata - l’area bagnata - il contorno bagnato - la velocità media
Nella striscia relativa alla sponda in studio si applicano le seguenti equazioni, con ovvio significato dei simboli, per
il calcolo della tensione tangenziale locale:
Coefficiente adimensionale di Chezy: 𝐶 = 𝑅1/6
𝑛∙√𝑔,
Velocità di attrito locale: 𝑢∗ = 𝑈
𝐶,
Tensione tangenziale: 𝜏𝑠 = 𝜌 ∙ 𝑢∗2.
Anche in questo, utilizzando le formule analoghe al metodo I sopradescritto per il calcolo del diametro minimo,
caso deve risultare
𝜏𝑐𝑟 ≥ 𝜏𝑠.
Risultati
Di seguito si riportano le tabelle contenenti i risultati ottenuti per il dimensionamento dei massi relativamente ai
due metodi utilizzati per il calcolo delle tensioni sollecitanti. La portata di progetto è pari a 325 m3/s, in quanto
dalla modellazione idraulica è risultata essere quella che sviluppa velocità del flusso maggiori.
Tabella 5 - Calcolo delle tensioni sollecitanti
METODO I Main channel
Coefficiente correttivo Rt - 0.75
Peso specifico dell’acqua γ N/m3 9810
Tirante idrico h m 3.4
Pendenza della linea dei carichi J m/m 0.0011
Tensione sollecitante τs N/m2 27.89
METODO II
Area bagnata A m2 133.44
Perimetro bagnato P m 40.39
Profondità della corrente h m 3.4
Velocità della corrente U m/s 2.23
Raggio idraulico R m 3.30
Perizia n. 081 – Relazione idrologica idraulica
14
Coefficiente di Manning n m-1/3s 0.033
Coefficiente di Chezy - 11.81
Velocità di attrito locale u* m/s 0.1897
Tensione sollecitante τs N/m2 35.99
Come è evidenziato dalla tabella seguente i risultati ottenuti suggeriscono di adottare, nella situazione più gravosa
dal punto di vista delle tensioni tangenziali, un diametro di progetto non inferiore a 1 m. Tale scelta appare
giustificata anche in considerazione del fatto che il diametro calcolato è rappresentativo delle dimensioni medie del
materiale costituente la parte più esposta all’azione della corrente, essendo la più esterna.
Tabella 6 - Calcolo del diametro di progetto
METODO I Main channel
Tensione sollecitante τs N/m2 27.89
Peso specifico dell’acqua γ N/m3 9810
Peso specifico del materiale γS N/m3 25000
Tirante idrico h m 3.4
Parametro critico di Shields Ф - 0.047
Angolo di inclinazione della sponda 𝜑 ° 32
Angolo di inclinazione del materiale 𝜗 ° 33
Diametro minimo del materiale d m 0.17
Diametro di progetto DI m 1
Tensione critica τc N/m2 164.86
Volume medio masso isolato m3 0.52
Peso medio del masso isolato kg 1309
METODO II Main channel
Tensione sollecitante τs N/m2 35.99
Peso specifico dell’acqua γ N/m3 9810
Peso specifico del materiale γS N/m3 25000
Tirante idrico h m 3.4
Parametro critico di Shields Ф - 0.047
Angolo di inclinazione della sponda 𝜑 ° 32
Angolo di inclinazione del materiale 𝜗 ° 33
Diametro minimo del materiale d m 0.22
Diametro di progetto DI m 1
Tensione critica τc N/m2 227.96
Volume medio masso isolato m3 0.52
Peso medio del masso isolato kg 1309
Il peso così individuato non tiene conto che la scogliera dovrà essere realizzata riducendo l'indice dei vuoti
mediante intasamento con materiali di granulometria inferiore aventi pesi inferiori a quello calcolato: essi dovranno
essere posti come strato inferiore rispetto a quelli calcolati i quali costituiranno la cosiddetta "mantellata" e
proteggeranno gli strati inferiori. Per questo motivo è buona norma sovradimensionare il peso dei massi della
mantellata per prevenire eventuali instabilità locali di strato e per avere un minimo coefficiente di sicurezza rispetto
ai valori calcolati analiticamente.
Resta da verificare la velocità del fluido in corrispondenza dell'interfaccia tra il rivestimento e la sponda sottostante
secondo la formula:
𝑣𝑏 = 1
𝑛𝑏∙ (
𝐷50
2)
2/3
∙ 𝑖1/2
Perizia n. 081 – Relazione idrologica idraulica
15
Dove:
• 𝑛𝑏= 0,02 coeff. di scabrezza caratteristico del materiale di base;
• 𝐷50= 1,00 m diametro medio minimo della protezione spondale;
• 𝑖 = 0,00284 pendenza di fondo del tronco fluviale.
Si prende cautelativamente il valore di 𝑛𝑏= 0,02 che fornisce il valore di 𝑣𝑏 maggiore ed il 𝐷50 calcolato perché
comunque rappresentativo della miscela minima necessaria da porre in opera nella difesa spondale ottenendo un
valore di 𝑣𝑏 pari a 1.67 m/s.
Se confrontato con la velocità media fornita dallo studio del prof. Paris si ha:
∆𝑉 = 𝑣 − 𝑣𝑏 = 2.24 − 1.67 = 0.57 m/s
Il valore di V b = 1.67 m/s è compatibile con il materiale presente sulle sponde avendo cura di effettuare un
riempimento alle spalle della difesa spondale con materiale reperibile in loco avente granulometria compresa tra la
ghiaia grossolana e la ghiaia fine.
Grosseto, lì 22/08/2016 IL TECNICO
Ing. Andrea Ruggiero
SEZIONE A
SettoriCivile e ambientale
OR
DIN
EIN
GEGNERI PROV. GR
OSS
ET
O
Perizia n. 081 – Relazione idrologica idraulica
16
Riferimenti
D. Flaccovio, GIS open source per geologia e ambiente. Analisi e gestione di dati territoriali e ambientali con
QGIS (GIS);
U.S. Army Corps of Engineers “Hec-Ras River Analysis System. Hydraulic Reference Manual” 1995;
Geoportale GEOscopio Regione ToscanaToscana;
C. Bertolini, Analisi di alcuni interventi di difesa idraulica e protezione spondale nell’Ombrone Grossetano (L.
Solari, R. Ricciardi, R. Tasselli), Tesi di Laurea Università degli Studi di Firenze, anno accademico 2007-2008.
V. Ferro, La sistemazione dei bacini idrografici, McGraw-Hill.
Perizia n. 081 – Relazione idrologica idraulica
Verifiche idrauliche
ALLEGATO 1 – Portata Tr 200 anni
17
arbia
5821.81
5318.14
4310.02
3918.46
3584.67
2981.752222.21
1883.71
1442.94
1004.96
613.76
arbia
18
5821.81
5318.14
4310.02
3918.46
3584.67
2981.75
2687.55 2222.21
1883.71
1442.94
1004.96
613.76 327.11
P081 Plan: Plan 04 2016-08-19 Legend
WS PF 1
Ground
Levee
Bank Sta
Ineff
19
0 1000 2000 3000 4000 5000 6000165
170
175
180
185
190
P081 Plan: Plan 04 2016-08-19
Main Channel Distance (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
Ground
Left Levee
Right Levee
arbia arbia
20
0 100 200 300 400 500 600182
184
186
188
190
192
194
196
198
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
Ground
Levee
Bank Sta
.055 .033 .055
21
0 100 200 300 400 500 600180
182
184
186
188
190
192
194
196
198
200
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
Ground
Levee
Bank Sta
.055 .033 .055
22
0 100 200 300 400 500 600176
178
180
182
184
186
188
190
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
4.0 m/s
4.5 m/s
Ground
Levee
Bank Sta
.055 .033 .055
23
0 100 200 300 400 500177
178
179
180
181
182
183
184
185
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
4.0 m/s
Ground
Levee
Bank Sta
.055 .033
.055
24
0 100 200 300 400 500174
176
178
180
182
184
186
188
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
Ground
Levee
Bank Sta
.055 .033 .055
25
0 100 200 300 400 500 600 700170
175
180
185
190
195
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0 m/s
1 m/s
2 m/s
3 m/s
4 m/s
Ground
Levee
Bank Sta
.055 .033 .055
26
0 100 200 300 400 500 600172
174
176
178
180
182
184
186
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
4.0 m/s
Ground
Levee
Ineff
Bank Sta
.055 .033
.055
27
0 100 200 300 400 500 600 700 800172
173
174
175
176
177
178
179
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.0 m/s
0.2 m/s
0.4 m/s
0.6 m/s
0.8 m/s
1.0 m/s
Ground
Levee
Ineff
Bank Sta
.055 .033 .055
28
0 100 200 300 400 500 600 700170
172
174
176
178
180
182
184
186
188
190
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0 m/s
1 m/s
2 m/s
3 m/s
4 m/s
5 m/s
6 m/s
Ground
Levee
Bank Sta
.055 .033 .055
29
0 100 200 300 400 500 600170
175
180
185
190
195
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.4 m/s
0.6 m/s
0.8 m/s
1.0 m/s
1.2 m/s
1.4 m/s
1.6 m/s
1.8 m/s
Ground
Levee
Bank Sta
.055 .033
.055
30
0 100 200 300 400 500168
170
172
174
176
178
180
182
184
186
188
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
1 m/s
2 m/s
3 m/s
4 m/s
5 m/s
6 m/s
Ground
Levee
Bank Sta
.055 .033 .055
31
0 100 200 300 400168
169
170
171
172
173
174
175
176
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
Ground
Levee
Bank Sta
.055 .033 .055
32
0 100 200 300 400167
168
169
170
171
172
173
174
175
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
Ground
Levee
Bank Sta
.055 .033 .055
33
Plan: Plan 04 arbia arbia RS: 5821.81 Profile: PF 1 E.G. Elev (m) 187.47 Element Left OB Channel Right OB Vel Head (m) 0.23 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 187.24 Reach Len. (m) 503.66 503.66 503.66 Crit W.S. (m) 187.20 Flow Area (m2) 54.68 78.41 262.81 E.G. Slope (m/m) 0.002828 Area (m2) 54.68 78.41 262.81 Q Total (m3/s) 517.75 Flow (m3/s) 56.65 234.60 226.49 Top Width (m) 418.94 Top Width (m) 48.84 29.70 340.40 Vel Total (m/s) 1.31 Avg. Vel. (m/s) 1.04 2.99 0.86 Max Chl Dpth (m) 3.81 Hydr. Depth (m) 1.12 2.64 0.77 Conv. Total (m3/s) 9735.8 Conv. (m3/s) 1065.3 4411.5 4259.0 Length Wtd. (m) 503.66 Wetted Per. (m) 49.29 31.00 341.88 Min Ch El (m) 183.43 Shear (N/m2) 30.77 70.16 21.32 Alpha 2.63 Stream Power (N/m s) 31.88 209.90 18.37 Frctn Loss (m) 1.29 Cum Volume (1000 m3) 804.75 471.36 1018.05 C & E Loss (m) 0.02 Cum SA (1000 m2) 598.34 131.84 675.45
Plan: Plan 04 arbia arbia RS: 5318.14 Profile: PF 1 E.G. Elev (m) 186.16 Element Left OB Channel Right OB Vel Head (m) 0.41 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 185.75 Reach Len. (m) 1008.12 1008.12 1008.12 Crit W.S. (m) 185.08 Flow Area (m2) 150.15 95.90 47.47 E.G. Slope (m/m) 0.002326 Area (m2) 150.15 95.90 47.47 Q Total (m3/s) 517.75 Flow (m3/s) 122.44 331.17 64.14 Top Width (m) 216.06 Top Width (m) 166.84 24.95 24.28 Vel Total (m/s) 1.76 Avg. Vel. (m/s) 0.82 3.45 1.35 Max Chl Dpth (m) 4.87 Hydr. Depth (m) 0.90 3.84 1.96 Conv. Total (m3/s) 10736.1 Conv. (m3/s) 2538.8 6867.2 1330.1 Length Wtd. (m) 1008.12 Wetted Per. (m) 167.44 26.40 24.81 Min Ch El (m) 180.88 Shear (N/m2) 20.45 82.85 43.63 Alpha 2.57 Stream Power (N/m s) 16.68 286.11 58.96 Frctn Loss (m) 3.07 Cum Volume (1000 m3) 753.17 427.47 939.91 C & E Loss (m) 0.02 Cum SA (1000 m2) 544.03 118.08 583.61
Plan: Plan 04 arbia arbia RS: 4310.02 Profile: PF 1 E.G. Elev (m) 183.07 Element Left OB Channel Right OB Vel Head (m) 0.63 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 182.44 Reach Len. (m) 391.57 391.57 391.57 Crit W.S. (m) 182.31 Flow Area (m2) 45.25 73.77 90.08 E.G. Slope (m/m) 0.004158 Area (m2) 45.25 73.77 90.08 Q Total (m3/s) 517.75 Flow (m3/s) 65.06 318.16 134.54 Top Width (m) 114.84 Top Width (m) 32.91 20.20 61.73 Vel Total (m/s) 2.48 Avg. Vel. (m/s) 1.44 4.31 1.49 Max Chl Dpth (m) 4.79 Hydr. Depth (m) 1.37 3.65 1.46 Conv. Total (m3/s) 8029.7 Conv. (m3/s) 1009.0 4934.2 2086.5 Length Wtd. (m) 391.57 Wetted Per. (m) 33.31 22.50 62.64 Min Ch El (m) 177.65 Shear (N/m2) 55.38 133.69 58.63 Alpha 2.00 Stream Power (N/m s) 79.62 576.56 87.57 Frctn Loss (m) 1.46 Cum Volume (1000 m3) 654.68 341.94 870.58 C & E Loss (m) 0.10 Cum SA (1000 m2) 443.34 95.32 540.26
Plan: Plan 04 arbia arbia RS: 3918.46 Profile: PF 1 E.G. Elev (m) 181.51 Element Left OB Channel Right OB Vel Head (m) 0.28 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 181.23 Reach Len. (m) 333.79 333.79 333.79 Crit W.S. (m) 181.13 Flow Area (m2) 84.20 52.51 242.99 E.G. Slope (m/m) 0.003354 Area (m2) 84.20 52.51 242.99 Q Total (m3/s) 517.75 Flow (m3/s) 59.14 188.92 269.68
34
Plan: Plan 04 arbia arbia RS: 3918.46 Profile: PF 1 (Continued) Top Width (m) 391.33 Top Width (m) 153.86 15.44 222.03 Vel Total (m/s) 1.36 Avg. Vel. (m/s) 0.70 3.60 1.11 Max Chl Dpth (m) 4.01 Hydr. Depth (m) 0.55 3.40 1.09 Conv. Total (m3/s) 8940.6 Conv. (m3/s) 1021.3 3262.4 4657.0 Length Wtd. (m) 333.79 Wetted Per. (m) 154.51 17.89 224.72 Min Ch El (m) 177.22 Shear (N/m2) 17.92 96.55 35.56 Alpha 2.92 Stream Power (N/m s) 12.59 347.38 39.47 Frctn Loss (m) 0.74 Cum Volume (1000 m3) 629.33 317.22 805.37 C & E Loss (m) 0.02 Cum SA (1000 m2) 406.77 88.34 484.70
Plan: Plan 04 arbia arbia RS: 3584.67 Profile: PF 1 E.G. Elev (m) 180.74 Element Left OB Channel Right OB Vel Head (m) 0.21 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 180.54 Reach Len. (m) 602.91 602.91 602.91 Crit W.S. (m) 180.21 Flow Area (m2) 289.10 78.99 46.09 E.G. Slope (m/m) 0.001579 Area (m2) 289.10 78.99 46.09 Q Total (m3/s) 517.75 Flow (m3/s) 236.19 227.47 54.10 Top Width (m) 281.88 Top Width (m) 240.01 20.19 21.68 Vel Total (m/s) 1.25 Avg. Vel. (m/s) 0.82 2.88 1.17 Max Chl Dpth (m) 4.59 Hydr. Depth (m) 1.20 3.91 2.13 Conv. Total (m3/s) 13031.1 Conv. (m3/s) 5944.5 5725.1 1361.5 Length Wtd. (m) 602.91 Wetted Per. (m) 241.66 21.35 22.26 Min Ch El (m) 175.94 Shear (N/m2) 18.52 57.27 32.06 Alpha 2.62 Stream Power (N/m s) 15.13 164.91 37.62 Frctn Loss (m) 1.39 Cum Volume (1000 m3) 567.03 295.27 757.12 C & E Loss (m) 0.03 Cum SA (1000 m2) 341.04 82.40 444.03
Plan: Plan 04 arbia arbia RS: 2981.75 Profile: PF 1 E.G. Elev (m) 179.32 Element Left OB Channel Right OB Vel Head (m) 0.53 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 178.79 Reach Len. (m) 294.20 294.20 294.20 Crit W.S. (m) 178.35 Flow Area (m2) 31.58 82.42 150.03 E.G. Slope (m/m) 0.003697 Area (m2) 31.58 82.42 150.03 Q Total (m3/s) 517.75 Flow (m3/s) 46.97 327.57 143.21 Top Width (m) 240.14 Top Width (m) 19.84 24.95 195.35 Vel Total (m/s) 1.96 Avg. Vel. (m/s) 1.49 3.97 0.95 Max Chl Dpth (m) 4.42 Hydr. Depth (m) 1.59 3.30 0.77 Conv. Total (m3/s) 8515.4 Conv. (m3/s) 772.5 5387.5 2355.4 Length Wtd. (m) 294.20 Wetted Per. (m) 20.23 26.01 197.94 Min Ch El (m) 174.37 Shear (N/m2) 56.58 114.86 27.48 Alpha 2.72 Stream Power (N/m s) 84.15 456.52 26.23 Frctn Loss (m) 1.04 Cum Volume (1000 m3) 470.36 246.61 698.00 C & E Loss (m) 0.04 Cum SA (1000 m2) 262.70 68.79 378.60
Plan: Plan 04 arbia arbia RS: 2687.55 Profile: PF 1 E.G. Elev (m) 178.24 Element Left OB Channel Right OB Vel Head (m) 0.39 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 177.85 Reach Len. (m) 465.35 465.35 465.35 Crit W.S. (m) 177.66 Flow Area (m2) 33.91 64.04 187.74 E.G. Slope (m/m) 0.003373 Area (m2) 33.91 64.04 187.74 Q Total (m3/s) 517.75 Flow (m3/s) 47.99 243.50 226.26 Top Width (m) 192.09 Top Width (m) 21.02 19.01 152.06 Vel Total (m/s) 1.81 Avg. Vel. (m/s) 1.42 3.80 1.21 Max Chl Dpth (m) 4.22 Hydr. Depth (m) 1.61 3.37 1.23 Conv. Total (m3/s) 8915.4 Conv. (m3/s) 826.4 4193.0 3896.0 Length Wtd. (m) 465.35 Wetted Per. (m) 21.86 20.16 154.20 Min Ch El (m) 173.63 Shear (N/m2) 51.32 105.05 40.27
35
Plan: Plan 04 arbia arbia RS: 2687.55 Profile: PF 1 (Continued) Alpha 2.32 Stream Power (N/m s) 72.62 399.45 48.53 Frctn Loss (m) 0.10 Cum Volume (1000 m3) 460.73 225.07 648.31 C & E Loss (m) 0.11 Cum SA (1000 m2) 256.69 62.32 327.50
Plan: Plan 04 arbia arbia RS: 2222.21 Profile: PF 1 E.G. Elev (m) 178.02 Element Left OB Channel Right OB Vel Head (m) 0.01 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 178.02 Reach Len. (m) 338.50 338.50 338.50 Crit W.S. (m) 176.46 Flow Area (m2) 835.98 162.15 726.63 E.G. Slope (m/m) 0.000071 Area (m2) 835.98 162.15 726.63 Q Total (m3/s) 517.75 Flow (m3/s) 195.79 104.36 217.60 Top Width (m) 738.23 Top Width (m) 438.35 39.20 260.68 Vel Total (m/s) 0.30 Avg. Vel. (m/s) 0.23 0.64 0.30 Max Chl Dpth (m) 5.17 Hydr. Depth (m) 1.91 4.14 2.79 Conv. Total (m3/s) 61579.6 Conv. (m3/s) 23286.7 12412.2 25880.6 Length Wtd. (m) 338.50 Wetted Per. (m) 440.85 40.39 265.02 Min Ch El (m) 172.85 Shear (N/m2) 1.31 2.78 1.90 Alpha 1.57 Stream Power (N/m s) 0.31 1.79 0.57 Frctn Loss (m) 0.08 Cum Volume (1000 m3) 258.33 172.44 435.56 C & E Loss (m) 0.14 Cum SA (1000 m2) 149.81 48.78 231.47
Plan: Plan 04 arbia arbia RS: 1883.71 Profile: PF 1 E.G. Elev (m) 177.80 Element Left OB Channel Right OB Vel Head (m) 1.45 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 176.34 Reach Len. (m) 440.77 440.77 440.77 Crit W.S. (m) 176.34 Flow Area (m2) 0.55 96.64 0.76 E.G. Slope (m/m) 0.008037 Area (m2) 0.55 96.64 0.76 Q Total (m3/s) 517.75 Flow (m3/s) 0.40 516.73 0.62 Top Width (m) 35.77 Top Width (m) 1.72 32.07 1.98 Vel Total (m/s) 5.29 Avg. Vel. (m/s) 0.73 5.35 0.82 Max Chl Dpth (m) 4.88 Hydr. Depth (m) 0.32 3.01 0.38 Conv. Total (m3/s) 5775.4 Conv. (m3/s) 4.5 5764.0 7.0 Length Wtd. (m) 440.77 Wetted Per. (m) 1.84 35.00 2.11 Min Ch El (m) 171.47 Shear (N/m2) 23.51 217.62 28.29 Alpha 1.02 Stream Power (N/m s) 17.11 1163.61 23.29 Frctn Loss (m) 0.59 Cum Volume (1000 m3) 116.75 128.64 312.45 C & E Loss (m) 0.42 Cum SA (1000 m2) 75.33 36.72 187.01
Plan: Plan 04 arbia arbia RS: 1442.94 Profile: PF 1 E.G. Elev (m) 175.39 Element Left OB Channel Right OB Vel Head (m) 0.04 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 175.34 Reach Len. (m) 437.98 437.98 437.98 Crit W.S. (m) 175.11 Flow Area (m2) 75.48 54.93 636.74 E.G. Slope (m/m) 0.000527 Area (m2) 75.48 54.93 636.74 Q Total (m3/s) 517.75 Flow (m3/s) 56.40 93.20 368.15 Top Width (m) 427.16 Top Width (m) 30.36 13.07 383.74 Vel Total (m/s) 0.67 Avg. Vel. (m/s) 0.75 1.70 0.58 Max Chl Dpth (m) 4.58 Hydr. Depth (m) 2.49 4.20 1.66 Conv. Total (m3/s) 22563.5 Conv. (m3/s) 2458.0 4061.6 16043.9 Length Wtd. (m) 437.98 Wetted Per. (m) 31.49 14.41 390.30 Min Ch El (m) 170.76 Shear (N/m2) 12.38 19.68 8.42 Alpha 1.79 Stream Power (N/m s) 9.25 33.39 4.87 Frctn Loss (m) 0.55 Cum Volume (1000 m3) 99.99 95.24 171.96 C & E Loss (m) 0.12 Cum SA (1000 m2) 68.26 26.77 102.01
36
Plan: Plan 04 arbia arbia RS: 1004.96 Profile: PF 1 E.G. Elev (m) 174.72 Element Left OB Channel Right OB Vel Head (m) 1.24 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 173.47 Reach Len. (m) 391.20 391.20 391.20 Crit W.S. (m) 173.47 Flow Area (m2) 19.47 87.83 18.38 E.G. Slope (m/m) 0.005900 Area (m2) 19.47 87.83 18.38 Q Total (m3/s) 517.75 Flow (m3/s) 33.56 458.35 25.84 Top Width (m) 56.35 Top Width (m) 13.58 24.95 17.82 Vel Total (m/s) 4.12 Avg. Vel. (m/s) 1.72 5.22 1.41 Max Chl Dpth (m) 4.23 Hydr. Depth (m) 1.43 3.52 1.03 Conv. Total (m3/s) 6740.5 Conv. (m3/s) 437.0 5967.2 336.3 Length Wtd. (m) 391.20 Wetted Per. (m) 14.20 26.17 18.21 Min Ch El (m) 169.24 Shear (N/m2) 79.34 194.22 58.41 Alpha 1.44 Stream Power (N/m s) 136.75 1013.51 82.09 Frctn Loss (m) 1.14 Cum Volume (1000 m3) 79.20 63.97 28.49 C & E Loss (m) 0.30 Cum SA (1000 m2) 58.63 18.44 14.07
Plan: Plan 04 arbia arbia RS: 613.76 Profile: PF 1 E.G. Elev (m) 172.95 Element Left OB Channel Right OB Vel Head (m) 0.25 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 172.70 Reach Len. (m) 286.65 286.65 286.65 Crit W.S. (m) 171.99 Flow Area (m2) 157.48 91.94 72.48 E.G. Slope (m/m) 0.001729 Area (m2) 157.48 91.94 72.48 Q Total (m3/s) 517.75 Flow (m3/s) 155.19 265.28 97.28 Top Width (m) 159.20 Top Width (m) 104.95 24.95 29.30 Vel Total (m/s) 1.61 Avg. Vel. (m/s) 0.99 2.89 1.34 Max Chl Dpth (m) 4.01 Hydr. Depth (m) 1.50 3.69 2.47 Conv. Total (m3/s) 12450.4 Conv. (m3/s) 3731.9 6379.3 2339.2 Length Wtd. (m) 286.65 Wetted Per. (m) 105.82 26.53 30.65 Min Ch El (m) 168.68 Shear (N/m2) 25.24 58.76 40.10 Alpha 1.89 Stream Power (N/m s) 24.87 169.55 53.82 Frctn Loss (m) 0.63 Cum Volume (1000 m3) 44.58 28.81 10.72 C & E Loss (m) 0.02 Cum SA (1000 m2) 35.45 8.68 4.86
Plan: Plan 04 arbia arbia RS: 327.11 Profile: PF 1 E.G. Elev (m) 172.30 Element Left OB Channel Right OB Vel Head (m) 0.40 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 171.90 Reach Len. (m) Crit W.S. (m) 171.66 Flow Area (m2) 153.60 109.08 2.29 E.G. Slope (m/m) 0.002835 Area (m2) 153.60 109.08 2.29 Q Total (m3/s) 517.75 Flow (m3/s) 155.49 360.89 1.37 Top Width (m) 182.59 Top Width (m) 142.37 35.64 4.58 Vel Total (m/s) 1.95 Avg. Vel. (m/s) 1.01 3.31 0.60 Max Chl Dpth (m) 4.04 Hydr. Depth (m) 1.08 3.06 0.50 Conv. Total (m3/s) 9723.2 Conv. (m3/s) 2920.0 6777.5 25.7 Length Wtd. (m) Wetted Per. (m) 147.28 37.15 4.74 Min Ch El (m) 167.86 Shear (N/m2) 29.00 81.64 13.47 Alpha 2.08 Stream Power (N/m s) 29.36 270.10 8.04 Frctn Loss (m) Cum Volume (1000 m3) C & E Loss (m) Cum SA (1000 m2)
37
Plan: Plan 04 arbia arbia RS: 5821.81 Profile: PF 1Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power
(m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)1 LOB 93.85 56.65 54.68 49.29 10.94 1.12 1.04 30.77 31.882 Chan 93.85 123.55 234.60 78.41 31.00 45.31 2.64 2.99 70.16 209.903 ROB 123.55 226.49 262.81 341.88 43.75 0.77 0.86 21.32 18.37
Plan: Plan 04 arbia arbia RS: 5318.14 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 281.54 122.44 150.15 167.44 23.65 0.90 0.82 20.45 16.682 Chan 281.54 306.49 331.17 95.90 26.40 63.96 3.84 3.45 82.85 286.113 ROB 306.49 64.14 47.47 24.81 12.39 1.96 1.35 43.63 58.96
Plan: Plan 04 arbia arbia RS: 4310.02 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 346.88 65.06 45.25 33.31 12.57 1.37 1.44 55.38 79.622 Chan 346.88 367.07 318.16 73.77 22.50 61.45 3.65 4.31 133.69 576.563 ROB 367.07 134.54 90.08 62.64 25.98 1.46 1.49 58.63 87.57
Plan: Plan 04 arbia arbia RS: 3918.46 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 166.31 59.14 84.20 154.51 11.42 0.55 0.70 17.92 12.592 Chan 166.31 181.76 188.92 52.51 17.89 36.49 3.40 3.60 96.55 347.383 ROB 181.76 269.68 242.99 224.72 52.09 1.09 1.11 35.56 39.47
Plan: Plan 04 arbia arbia RS: 3584.67 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 311.24 236.19 289.10 241.66 45.62 1.20 0.82 18.52 15.132 Chan 311.24 331.44 227.47 78.99 21.35 43.93 3.91 2.88 57.27 164.913 ROB 331.44 54.10 46.09 22.26 10.45 2.13 1.17 32.06 37.62
Plan: Plan 04 arbia arbia RS: 2981.75 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 363.51 46.97 31.58 20.23 9.07 1.59 1.49 56.58 84.152 Chan 363.51 388.46 327.57 82.42 26.01 63.27 3.30 3.97 114.86 456.523 ROB 388.46 143.21 150.03 197.94 27.66 0.77 0.95 27.48 26.23
Plan: Plan 04 arbia arbia RS: 2687.55 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 361.13 47.99 33.91 21.86 9.27 1.61 1.42 51.32 72.622 Chan 361.13 380.14 243.50 64.04 20.16 47.03 3.37 3.80 105.05 399.453 ROB 380.14 226.26 187.74 154.20 43.70 1.23 1.21 40.27 48.53
Plan: Plan 04 arbia arbia RS: 2222.21 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 438.35 195.79 835.98 440.85 37.82 1.91 0.23 1.31 0.312 Chan 438.35 477.55 104.36 162.15 40.39 20.16 4.14 0.64 2.78 1.793 ROB 477.55 217.60 726.63 265.02 42.03 2.79 0.30 1.90 0.57
Plan: Plan 04 arbia arbia RS: 1883.71 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 42.77 0.40 0.55 1.84 0.08 0.32 0.73 23.51 17.112 Chan 42.77 74.84 516.73 96.64 35.00 99.80 3.01 5.35 217.62 1163.613 ROB 74.84 0.62 0.76 2.11 0.12 0.38 0.82 28.29 23.29
Plan: Plan 04 arbia arbia RS: 1442.94 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 174.63 56.40 75.48 31.49 10.89 2.49 0.75 12.38 9.252 Chan 174.63 187.69 93.20 54.93 14.41 18.00 4.20 1.70 19.68 33.393 ROB 187.69 368.15 636.74 390.30 71.11 1.66 0.58 8.42 4.87
38
Plan: Plan 04 arbia arbia RS: 1004.96 Profile: PF 1Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power
(m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)1 LOB 177.00 33.56 19.47 14.20 6.48 1.43 1.72 79.34 136.752 Chan 177.00 201.95 458.35 87.83 26.17 88.53 3.52 5.22 194.22 1013.513 ROB 201.95 25.84 18.38 18.21 4.99 1.03 1.41 58.41 82.09
Plan: Plan 04 arbia arbia RS: 613.76 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 191.26 155.19 157.48 105.82 29.97 1.50 0.99 25.24 24.872 Chan 191.26 216.21 265.28 91.94 26.53 51.24 3.69 2.89 58.76 169.553 ROB 216.21 97.28 72.48 30.65 18.79 2.47 1.34 40.10 53.82
Plan: Plan 04 arbia arbia RS: 327.11 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 156.81 155.49 153.60 147.28 30.03 1.08 1.01 29.00 29.362 Chan 156.81 192.45 360.89 109.08 37.15 69.70 3.06 3.31 81.64 270.103 ROB 192.45 1.37 2.29 4.74 0.26 0.50 0.60 13.47 8.04
39
Perizia n. 081 – Relazione idrologica idraulica
Verifiche idrauliche
ALLEGATO 2 – Portata Q tensioni massime = 327 mc/s
40
arbia
5821.81
5318.14
4310.02
3918.46
3584.67
2981.752222.21
1883.71
1442.94
1004.96
613.76
arbia
41
5821.81
5318.14
4310.02
3918.46
3584.67
2981.75
2687.55 2222.21
1883.71
1442.94
1004.96
613.76 327.11
P081 Plan: Plan 04 2016-08-19 Legend
WS PF 1
Ground
Levee
Bank Sta
Ineff
42
0 1000 2000 3000 4000 5000 6000165
170
175
180
185
190
P081 Plan: Plan 04 2016-08-19
Main Channel Distance (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
Ground
Left Levee
Right Levee
arbia arbia
43
0 100 200 300 400 500 600182
184
186
188
190
192
194
196
198
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0 m/s
1 m/s
2 m/s
3 m/s
4 m/s
5 m/s
Ground
Levee
Bank Sta
.055 .033 .055
44
0 100 200 300 400 500 600180
182
184
186
188
190
192
194
196
198
200
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
Ground
Levee
Bank Sta
.055 .033 .055
45
0 100 200 300 400 500 600176
178
180
182
184
186
188
190
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
4.0 m/s
Ground
Levee
Bank Sta
.055 .033 .055
46
0 100 200 300 400 500177
178
179
180
181
182
183
184
185
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.0 m/s
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
Ground
Levee
Bank Sta
.055 .033
.055
47
0 100 200 300 400 500174
176
178
180
182
184
186
188
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
Ground
Levee
Bank Sta
.055 .033 .055
48
0 100 200 300 400 500 600 700170
175
180
185
190
195
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
4.0 m/s
Ground
Levee
Bank Sta
.055 .033 .055
49
0 100 200 300 400 500 600172
174
176
178
180
182
184
186
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
Ground
Levee
Ineff
Bank Sta
.055 .033
.055
50
0 100 200 300 400 500 600 700 800172
173
174
175
176
177
178
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
Ground
Levee
Ineff
Bank Sta
.055 .033 .055
51
0 100 200 300 400 500 600 700170
172
174
176
178
180
182
184
186
188
190
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.0 m/s
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
Ground
Levee
Bank Sta
.055 .033 .055
52
0 100 200 300 400 500 600170
175
180
185
190
195
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
4.0 m/s
Ground
Levee
Bank Sta
.055 .033
.055
53
0 100 200 300 400 500168
170
172
174
176
178
180
182
184
186
188
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
1 m/s
2 m/s
3 m/s
4 m/s
5 m/s
Ground
Levee
Bank Sta
.055 .033 .055
54
0 100 200 300 400168
169
170
171
172
173
174
175
176
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.6 m/s
0.8 m/s
1.0 m/s
1.2 m/s
1.4 m/s
1.6 m/s
1.8 m/s
2.0 m/s
Ground
Levee
Bank Sta
.055 .033 .055
55
0 100 200 300 400167
168
169
170
171
172
173
174
175
P081 Plan: Plan 04 2016-08-19
Station (m)
Elev
atio
n (m
)
Legend
EG PF 1
WS PF 1
Crit PF 1
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
Ground
Levee
Bank Sta
.055 .033 .055
56
Plan: Plan 04 arbia arbia RS: 5821.81 Profile: PF 1 E.G. Elev (m) 187.59 Element Left OB Channel Right OB Vel Head (m) 0.80 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 186.79 Reach Len. (m) 503.66 503.66 503.66 Crit W.S. (m) 186.71 Flow Area (m2) 34.35 65.11 1.44 E.G. Slope (m/m) 0.007329 Area (m2) 34.35 65.11 1.44 Q Total (m3/s) 325.00 Flow (m3/s) 46.93 277.02 1.05 Top Width (m) 75.49 Top Width (m) 41.34 29.70 4.45 Vel Total (m/s) 3.22 Avg. Vel. (m/s) 1.37 4.25 0.73 Max Chl Dpth (m) 3.36 Hydr. Depth (m) 0.83 2.19 0.32 Conv. Total (m3/s) 3796.3 Conv. (m3/s) 548.2 3235.8 12.2 Length Wtd. (m) 503.66 Wetted Per. (m) 41.75 31.00 4.52 Min Ch El (m) 183.43 Shear (N/m2) 59.12 150.96 22.93 Alpha 1.51 Stream Power (N/m s) 80.79 642.30 16.66 Frctn Loss (m) 1.90 Cum Volume (1000 m3) 230.99 415.55 336.24 C & E Loss (m) 0.12 Cum SA (1000 m2) 273.44 131.84 264.39
Plan: Plan 04 arbia arbia RS: 5318.14 Profile: PF 1 E.G. Elev (m) 185.56 Element Left OB Channel Right OB Vel Head (m) 0.38 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 185.18 Reach Len. (m) 1008.12 1008.12 1008.12 Crit W.S. (m) 184.51 Flow Area (m2) 63.97 81.60 33.88 E.G. Slope (m/m) 0.002297 Area (m2) 63.97 81.60 33.88 Q Total (m3/s) 325.00 Flow (m3/s) 35.39 251.47 38.13 Top Width (m) 173.53 Top Width (m) 125.91 24.95 22.67 Vel Total (m/s) 1.81 Avg. Vel. (m/s) 0.55 3.08 1.13 Max Chl Dpth (m) 4.30 Hydr. Depth (m) 0.51 3.27 1.49 Conv. Total (m3/s) 6781.0 Conv. (m3/s) 738.5 5246.9 795.6 Length Wtd. (m) 1008.12 Wetted Per. (m) 126.42 26.40 23.08 Min Ch El (m) 180.88 Shear (N/m2) 11.40 69.63 33.07 Alpha 2.30 Stream Power (N/m s) 6.31 214.59 37.22 Frctn Loss (m) 3.11 Cum Volume (1000 m3) 206.23 378.61 327.34 C & E Loss (m) 0.02 Cum SA (1000 m2) 231.32 118.08 257.56
Plan: Plan 04 arbia arbia RS: 4310.02 Profile: PF 1 E.G. Elev (m) 182.43 Element Left OB Channel Right OB Vel Head (m) 0.59 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 181.84 Reach Len. (m) 391.57 391.57 391.57 Crit W.S. (m) 181.84 Flow Area (m2) 25.68 61.60 53.06 E.G. Slope (m/m) 0.004352 Area (m2) 25.68 61.60 53.06 Q Total (m3/s) 325.00 Flow (m3/s) 26.49 241.01 57.50 Top Width (m) 113.27 Top Width (m) 31.97 20.20 61.11 Vel Total (m/s) 2.32 Avg. Vel. (m/s) 1.03 3.91 1.08 Max Chl Dpth (m) 4.19 Hydr. Depth (m) 0.80 3.05 0.87 Conv. Total (m3/s) 4926.8 Conv. (m3/s) 401.6 3653.5 871.7 Length Wtd. (m) 391.56 Wetted Per. (m) 32.19 22.50 61.78 Min Ch El (m) 177.65 Shear (N/m2) 34.04 116.84 36.65 Alpha 2.17 Stream Power (N/m s) 35.12 457.12 39.72 Frctn Loss (m) 0.90 Cum Volume (1000 m3) 161.05 306.43 283.52 C & E Loss (m) 0.14 Cum SA (1000 m2) 151.74 95.32 215.33
Plan: Plan 04 arbia arbia RS: 3918.46 Profile: PF 1 E.G. Elev (m) 181.32 Element Left OB Channel Right OB Vel Head (m) 0.12 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 181.20 Reach Len. (m) 333.79 333.79 333.79 Crit W.S. (m) 180.84 Flow Area (m2) 80.09 52.10 237.06 E.G. Slope (m/m) 0.001418 Area (m2) 80.09 52.10 237.06 Q Total (m3/s) 325.00 Flow (m3/s) 35.41 121.23 168.36
57
Plan: Plan 04 arbia arbia RS: 3918.46 Profile: PF 1 (Continued) Top Width (m) 390.93 Top Width (m) 153.62 15.44 221.87 Vel Total (m/s) 0.88 Avg. Vel. (m/s) 0.44 2.33 0.71 Max Chl Dpth (m) 3.98 Hydr. Depth (m) 0.52 3.37 1.07 Conv. Total (m3/s) 8631.9 Conv. (m3/s) 940.6 3219.8 4471.5 Length Wtd. (m) 333.79 Wetted Per. (m) 154.27 17.89 224.55 Min Ch El (m) 177.22 Shear (N/m2) 7.22 40.49 14.68 Alpha 2.97 Stream Power (N/m s) 3.19 94.22 10.42 Frctn Loss (m) 0.63 Cum Volume (1000 m3) 140.34 284.17 226.72 C & E Loss (m) 0.04 Cum SA (1000 m2) 115.41 88.34 159.93
Plan: Plan 04 arbia arbia RS: 3584.67 Profile: PF 1 E.G. Elev (m) 180.65 Element Left OB Channel Right OB Vel Head (m) 0.49 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 180.16 Reach Len. (m) 602.91 602.91 602.91 Crit W.S. (m) 179.42 Flow Area (m2) 28.63 71.43 38.15 E.G. Slope (m/m) 0.002642 Area (m2) 28.63 71.43 38.15 Q Total (m3/s) 325.00 Flow (m3/s) 23.70 248.85 52.45 Top Width (m) 75.32 Top Width (m) 34.23 20.19 20.89 Vel Total (m/s) 2.35 Avg. Vel. (m/s) 0.83 3.48 1.37 Max Chl Dpth (m) 4.22 Hydr. Depth (m) 0.84 3.54 1.83 Conv. Total (m3/s) 6322.8 Conv. (m3/s) 461.2 4841.3 1020.4 Length Wtd. (m) 602.91 Wetted Per. (m) 34.35 21.35 21.38 Min Ch El (m) 175.94 Shear (N/m2) 21.60 86.67 46.23 Alpha 1.74 Stream Power (N/m s) 17.88 301.96 63.55 Frctn Loss (m) 1.90 Cum Volume (1000 m3) 122.19 263.55 180.79 C & E Loss (m) 0.00 Cum SA (1000 m2) 84.06 82.40 119.41
Plan: Plan 04 arbia arbia RS: 2981.75 Profile: PF 1 E.G. Elev (m) 178.75 Element Left OB Channel Right OB Vel Head (m) 0.52 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 178.23 Reach Len. (m) 294.20 294.20 294.20 Crit W.S. (m) 177.82 Flow Area (m2) 21.31 68.47 34.73 E.G. Slope (m/m) 0.003840 Area (m2) 21.31 68.47 34.73 Q Total (m3/s) 325.00 Flow (m3/s) 28.23 245.12 51.65 Top Width (m) 63.66 Top Width (m) 16.41 24.95 22.30 Vel Total (m/s) 2.61 Avg. Vel. (m/s) 1.33 3.58 1.49 Max Chl Dpth (m) 3.86 Hydr. Depth (m) 1.30 2.74 1.56 Conv. Total (m3/s) 5244.9 Conv. (m3/s) 455.6 3955.8 833.5 Length Wtd. (m) 294.20 Wetted Per. (m) 16.70 26.01 22.91 Min Ch El (m) 174.37 Shear (N/m2) 48.03 99.12 57.09 Alpha 1.49 Stream Power (N/m s) 63.64 354.81 84.89 Frctn Loss (m) 0.57 Cum Volume (1000 m3) 107.14 221.38 158.82 C & E Loss (m) 0.11 Cum SA (1000 m2) 68.79 68.79 106.39
Plan: Plan 04 arbia arbia RS: 2687.55 Profile: PF 1 E.G. Elev (m) 178.06 Element Left OB Channel Right OB Vel Head (m) 0.14 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 177.92 Reach Len. (m) 465.35 465.35 465.35 Crit W.S. (m) 177.16 Flow Area (m2) 35.42 65.40 198.74 E.G. Slope (m/m) 0.001177 Area (m2) 35.42 65.40 198.74 Q Total (m3/s) 325.00 Flow (m3/s) 30.35 148.96 145.69 Top Width (m) 194.16 Top Width (m) 21.15 19.01 154.01 Vel Total (m/s) 1.08 Avg. Vel. (m/s) 0.86 2.28 0.73 Max Chl Dpth (m) 4.29 Hydr. Depth (m) 1.67 3.44 1.29 Conv. Total (m3/s) 9474.5 Conv. (m3/s) 884.6 4342.6 4247.2 Length Wtd. (m) 465.35 Wetted Per. (m) 22.00 20.16 156.22 Min Ch El (m) 173.63 Shear (N/m2) 18.58 37.43 14.68
58
Plan: Plan 04 arbia arbia RS: 2687.55 Profile: PF 1 (Continued) Alpha 2.28 Stream Power (N/m s) 15.91 85.26 10.76 Frctn Loss (m) 0.53 Cum Volume (1000 m3) 98.79 201.69 124.48 C & E Loss (m) 0.01 Cum SA (1000 m2) 63.27 62.32 80.45
Plan: Plan 04 arbia arbia RS: 2222.21 Profile: PF 1 E.G. Elev (m) 177.52 Element Left OB Channel Right OB Vel Head (m) 0.23 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 177.29 Reach Len. (m) 338.50 338.50 338.50 Crit W.S. (m) 175.79 Flow Area (m2) 23.15 133.44 10.02 E.G. Slope (m/m) 0.001099 Area (m2) 23.15 133.44 119.20 Q Total (m3/s) 325.00 Flow (m3/s) 20.98 297.44 6.57 Top Width (m) 119.57 Top Width (m) 11.83 39.20 68.54 Vel Total (m/s) 1.95 Avg. Vel. (m/s) 0.91 2.23 0.66 Max Chl Dpth (m) 4.44 Hydr. Depth (m) 1.96 3.40 1.21 Conv. Total (m3/s) 9801.7 Conv. (m3/s) 632.8 8970.7 198.3 Length Wtd. (m) 338.50 Wetted Per. (m) 12.56 40.39 8.83 Min Ch El (m) 172.85 Shear (N/m2) 19.87 35.62 12.24 Alpha 1.21 Stream Power (N/m s) 18.01 79.40 8.03 Frctn Loss (m) 0.57 Cum Volume (1000 m3) 85.17 155.42 50.50 C & E Loss (m) 0.03 Cum SA (1000 m2) 55.59 48.78 28.67
Plan: Plan 04 arbia arbia RS: 1883.71 Profile: PF 1 E.G. Elev (m) 176.94 Element Left OB Channel Right OB Vel Head (m) 0.56 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 176.39 Reach Len. (m) 440.77 440.77 440.77 Crit W.S. (m) 175.46 Flow Area (m2) 0.62 97.95 0.84 E.G. Slope (m/m) 0.003026 Area (m2) 0.62 97.95 0.84 Q Total (m3/s) 325.00 Flow (m3/s) 0.29 324.26 0.44 Top Width (m) 35.90 Top Width (m) 1.78 32.07 2.05 Vel Total (m/s) 3.27 Avg. Vel. (m/s) 0.47 3.31 0.53 Max Chl Dpth (m) 4.92 Hydr. Depth (m) 0.35 3.05 0.41 Conv. Total (m3/s) 5908.6 Conv. (m3/s) 5.3 5895.2 8.1 Length Wtd. (m) 440.77 Wetted Per. (m) 1.91 35.00 2.19 Min Ch El (m) 171.47 Shear (N/m2) 9.63 83.04 11.38 Alpha 1.02 Stream Power (N/m s) 4.55 274.90 6.01 Frctn Loss (m) 1.36 Cum Volume (1000 m3) 81.14 116.26 30.18 C & E Loss (m) 0.00 Cum SA (1000 m2) 53.29 36.72 16.73
Plan: Plan 04 arbia arbia RS: 1442.94 Profile: PF 1 E.G. Elev (m) 175.58 Element Left OB Channel Right OB Vel Head (m) 0.54 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 175.04 Reach Len. (m) 437.98 437.98 437.98 Crit W.S. (m) 174.33 Flow Area (m2) 66.26 50.94 9.83 E.G. Slope (m/m) 0.003140 Area (m2) 66.26 50.94 9.83 Q Total (m3/s) 325.00 Flow (m3/s) 111.94 200.72 12.35 Top Width (m) 48.89 Top Width (m) 30.02 13.07 5.80 Vel Total (m/s) 2.56 Avg. Vel. (m/s) 1.69 3.94 1.26 Max Chl Dpth (m) 4.27 Hydr. Depth (m) 2.21 3.90 1.69 Conv. Total (m3/s) 5799.9 Conv. (m3/s) 1997.6 3581.9 220.4 Length Wtd. (m) 437.98 Wetted Per. (m) 31.04 14.41 7.18 Min Ch El (m) 170.76 Shear (N/m2) 65.74 108.83 42.15 Alpha 1.62 Stream Power (N/m s) 111.05 428.77 52.93 Frctn Loss (m) 1.90 Cum Volume (1000 m3) 66.40 83.44 27.83 C & E Loss (m) 0.04 Cum SA (1000 m2) 46.28 26.77 15.00
59
Plan: Plan 04 arbia arbia RS: 1004.96 Profile: PF 1 E.G. Elev (m) 173.63 Element Left OB Channel Right OB Vel Head (m) 0.99 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 172.64 Reach Len. (m) 391.20 391.20 391.20 Crit W.S. (m) 172.57 Flow Area (m2) 9.31 67.12 5.89 E.G. Slope (m/m) 0.006387 Area (m2) 9.31 67.12 5.89 Q Total (m3/s) 325.00 Flow (m3/s) 13.61 304.61 6.79 Top Width (m) 41.98 Top Width (m) 8.91 24.95 8.13 Vel Total (m/s) 3.95 Avg. Vel. (m/s) 1.46 4.54 1.15 Max Chl Dpth (m) 3.40 Hydr. Depth (m) 1.05 2.69 0.72 Conv. Total (m3/s) 4066.5 Conv. (m3/s) 170.2 3811.3 84.9 Length Wtd. (m) 391.20 Wetted Per. (m) 9.24 26.17 8.33 Min Ch El (m) 169.24 Shear (N/m2) 63.13 160.67 44.26 Alpha 1.25 Stream Power (N/m s) 92.21 729.18 51.03 Frctn Loss (m) 0.71 Cum Volume (1000 m3) 49.85 57.59 24.39 C & E Loss (m) 0.26 Cum SA (1000 m2) 37.75 18.44 11.95
Plan: Plan 04 arbia arbia RS: 613.76 Profile: PF 1 E.G. Elev (m) 172.66 Element Left OB Channel Right OB Vel Head (m) 0.12 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 172.54 Reach Len. (m) 286.65 286.65 286.65 Crit W.S. (m) 171.52 Flow Area (m2) 141.07 88.04 67.91 E.G. Slope (m/m) 0.000849 Area (m2) 141.07 88.04 67.91 Q Total (m3/s) 325.00 Flow (m3/s) 90.64 172.90 61.46 Top Width (m) 158.87 Top Width (m) 104.80 24.95 29.12 Vel Total (m/s) 1.09 Avg. Vel. (m/s) 0.64 1.96 0.90 Max Chl Dpth (m) 3.86 Hydr. Depth (m) 1.35 3.53 2.33 Conv. Total (m3/s) 11155.2 Conv. (m3/s) 3111.1 5934.5 2109.5 Length Wtd. (m) 286.65 Wetted Per. (m) 105.61 26.53 30.42 Min Ch El (m) 168.68 Shear (N/m2) 11.12 27.62 18.59 Alpha 1.94 Stream Power (N/m s) 7.14 54.24 16.82 Frctn Loss (m) 0.41 Cum Volume (1000 m3) 20.44 27.24 9.95 C & E Loss (m) 0.04 Cum SA (1000 m2) 15.51 8.68 4.66
Plan: Plan 04 arbia arbia RS: 327.11 Profile: PF 1 E.G. Elev (m) 172.21 Element Left OB Channel Right OB Vel Head (m) 0.51 Wt. n-Val. 0.055 0.033 0.055 W.S. Elev (m) 171.70 Reach Len. (m) Crit W.S. (m) 170.84 Flow Area (m2) 1.52 102.01 1.54 E.G. Slope (m/m) 0.002845 Area (m2) 1.52 102.01 1.54 Q Total (m3/s) 325.00 Flow (m3/s) 0.84 323.31 0.86 Top Width (m) 42.45 Top Width (m) 3.42 35.64 3.40 Vel Total (m/s) 3.09 Avg. Vel. (m/s) 0.55 3.17 0.56 Max Chl Dpth (m) 3.84 Hydr. Depth (m) 0.44 2.86 0.45 Conv. Total (m3/s) 6093.1 Conv. (m3/s) 15.7 6061.3 16.1 Length Wtd. (m) Wetted Per. (m) 3.52 37.15 3.53 Min Ch El (m) 167.86 Shear (N/m2) 12.00 76.60 12.16 Alpha 1.04 Stream Power (N/m s) 6.63 242.79 6.78 Frctn Loss (m) Cum Volume (1000 m3) C & E Loss (m) Cum SA (1000 m2)
60
Plan: Plan 04 arbia arbia RS: 5821.81 Profile: PF 1Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power
(m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)1 LOB 93.85 46.93 34.35 41.75 14.44 0.83 1.37 59.12 80.792 Chan 93.85 123.55 277.02 65.11 31.00 85.24 2.19 4.25 150.96 642.303 ROB 123.55 1.05 1.44 4.52 0.32 0.32 0.73 22.93 16.66
Plan: Plan 04 arbia arbia RS: 5318.14 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 281.54 35.39 63.97 126.42 10.89 0.51 0.55 11.40 6.312 Chan 281.54 306.49 251.47 81.60 26.40 77.38 3.27 3.08 69.63 214.593 ROB 306.49 38.13 33.88 23.08 11.73 1.49 1.13 33.07 37.22
Plan: Plan 04 arbia arbia RS: 4310.02 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 346.88 26.49 25.68 32.19 8.15 0.80 1.03 34.04 35.122 Chan 346.88 367.07 241.01 61.60 22.50 74.16 3.05 3.91 116.84 457.123 ROB 367.07 57.50 53.06 61.78 17.69 0.87 1.08 36.65 39.72
Plan: Plan 04 arbia arbia RS: 3918.46 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 166.31 35.41 80.09 154.27 10.90 0.52 0.44 7.22 3.192 Chan 166.31 181.76 121.23 52.10 17.89 37.30 3.37 2.33 40.49 94.223 ROB 181.76 168.36 237.06 224.55 51.80 1.07 0.71 14.68 10.42
Plan: Plan 04 arbia arbia RS: 3584.67 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 311.24 23.70 28.63 34.35 7.29 0.84 0.83 21.60 17.882 Chan 311.24 331.44 248.85 71.43 21.35 76.57 3.54 3.48 86.67 301.963 ROB 331.44 52.45 38.15 21.38 16.14 1.83 1.37 46.23 63.55
Plan: Plan 04 arbia arbia RS: 2981.75 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 363.51 28.23 21.31 16.70 8.69 1.30 1.33 48.03 63.642 Chan 363.51 388.46 245.12 68.47 26.01 75.42 2.74 3.58 99.12 354.813 ROB 388.46 51.65 34.73 22.91 15.89 1.56 1.49 57.09 84.89
Plan: Plan 04 arbia arbia RS: 2687.55 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 361.13 30.35 35.42 22.00 9.34 1.67 0.86 18.58 15.912 Chan 361.13 380.14 148.96 65.40 20.16 45.83 3.44 2.28 37.43 85.263 ROB 380.14 145.69 198.74 156.22 44.83 1.29 0.73 14.68 10.76
Plan: Plan 04 arbia arbia RS: 2222.21 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 438.35 20.98 23.15 12.56 6.46 1.96 0.91 19.87 18.012 Chan 438.35 477.55 297.44 133.44 40.39 91.52 3.40 2.23 35.62 79.403 ROB 477.55 6.57 10.02 8.83 2.02 1.21 0.66 12.24 8.03
Plan: Plan 04 arbia arbia RS: 1883.71 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 42.77 0.29 0.62 1.91 0.09 0.35 0.47 9.63 4.552 Chan 42.77 74.84 324.26 97.95 35.00 99.77 3.05 3.31 83.04 274.903 ROB 74.84 0.44 0.84 2.19 0.14 0.41 0.53 11.38 6.01
Plan: Plan 04 arbia arbia RS: 1442.94 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 174.63 111.94 66.26 31.04 34.44 2.21 1.69 65.74 111.052 Chan 174.63 187.69 200.72 50.94 14.41 61.76 3.90 3.94 108.83 428.773 ROB 187.69 12.35 9.83 7.18 3.80 1.69 1.26 42.15 52.93
61
Plan: Plan 04 arbia arbia RS: 1004.96 Profile: PF 1Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power
(m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)1 LOB 177.00 13.61 9.31 9.24 4.19 1.05 1.46 63.13 92.212 Chan 177.00 201.95 304.61 67.12 26.17 93.72 2.69 4.54 160.67 729.183 ROB 201.95 6.79 5.89 8.33 2.09 0.72 1.15 44.26 51.03
Plan: Plan 04 arbia arbia RS: 613.76 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 191.26 90.64 141.07 105.61 27.89 1.35 0.64 11.12 7.142 Chan 191.26 216.21 172.90 88.04 26.53 53.20 3.53 1.96 27.62 54.243 ROB 216.21 61.46 67.91 30.42 18.91 2.33 0.90 18.59 16.82
Plan: Plan 04 arbia arbia RS: 327.11 Profile: PF 1
Pos Left Sta Right Sta Flow Area W.P. Percent Hydr Velocity Shear Power (m) (m) (m3/s) (m2) (m) Conv Depth(m) (m/s) (N/m2) (N/m s)
1 LOB 156.81 0.84 1.52 3.52 0.26 0.44 0.55 12.00 6.632 Chan 156.81 192.45 323.31 102.01 37.15 99.48 2.86 3.17 76.60 242.793 ROB 192.45 0.86 1.54 3.53 0.26 0.45 0.56 12.16 6.78
62
Perizia n. 081 – Relazione idrologica idraulica
"Verifica idrologica e idraulica del bacino del fiume Ombrone e ricostruzione degli eventi del
29/10/01 e 04/12/04" a cura del Prof. Ing. E. Paris.
ALLEGATO 3 – Sezioni interessate dall’intervento
63
Tr 30 anni
Tronco Sezione P[m] q[mc/s] s[mc/s] h[m] y[m] V [m/s] Fr Et[m] Ev[m] Sp[t] ym[m] b[m] bt[m] B[m] Pb[m] A[dmq] At[dmq] R[m] C2 beta alfa
Arbia Ar2033 -17289.32 318.48 0.00 181.80 4.90 2.21 0.50 181.97 0.25 294.74 2.32 92.01 92.01 94.36 1.46 17.39 17.39 2.23 76.68 1.00 1.00
Arbia Ar2034 -16899.59 313.38 0.00 181.23 5.13 1.78 0.41 181.28 0.16 469.64 2.29 207.29 207.29 210.54 1.40 34.12 34.12 2.21 76.53 1.00 1.00
Arbia AR2035_B -16873.81 313.45 0.00 180.65 4.55 2.91 0.63 181.07 0.43 277.25 2.45 48.00 48.00 62.27 1.71 10.84 10.84 1.85 72.06 1.00 1.00
Arbia AR2035_C -16863.81 313.47 0.00 180.40 4.30 3.29 0.73 180.93 0.55 263.06 2.43 48.00 48.00 60.70 1.65 9.65 9.65 1.84 71.92 1.00 1.00
Arbia Ar2036 -16851.00 313.55 0.00 180.58 5.18 1.49 0.31 180.64 0.11 482.06 2.60 136.53 136.53 138.49 1.73 28.52 28.52 2.53 80.01 1.00 1.00
Arbia AR2037_B -16529.00 314.72 0.00 179.54 4.48 2.29 0.54 179.81 0.27 281.72 2.06 66.90 66.90 86.05 1.51 13.80 13.80 1.60 68.69 1.00 1.00
Arbia AR2037_C -16519.00 314.71 0.00 179.43 4.37 2.41 0.57 179.73 0.30 270.93 2.06 66.42 66.42 84.65 1.48 13.07 13.07 1.57 68.20 1.00 1.00
Arbia AR1034 -16364.46 314.27 0.00 179.01 4.21 1.76 0.45 179.17 0.16 346.70 2.69 66.75 66.75 68.40 1.62 17.98 17.98 2.63 81.04 1.00 1.00
Arbia AR1035 -16092.46 313.93 0.00 178.51 5.24 1.88 0.42 178.68 0.18 312.67 2.27 81.64 88.85 91.56 1.48 17.13 17.13 2.19 76.19 1.00 1.00
Arbia AR1036 -15871.53 314.12 0.00 177.97 5.07 1.93 0.42 178.15 0.19 304.05 2.24 73.91 73.91 76.14 1.47 16.55 16.55 2.17 76.06 1.00 1.00
Arbia AR1037 -15505.53 313.96 0.00 177.40 5.08 1.57 0.42 177.48 0.13 364.07 2.12 120.04 120.04 122.43 1.33 24.17 24.17 2.07 74.86 1.00 1.00
Arbia AR1038 -15360.05 315.30 0.00 177.28 5.38 1.41 0.45 177.35 0.10 436.79 2.60 103.41 103.41 105.55 1.49 26.84 26.84 2.54 80.12 1.00 1.00
Arbia AR1039 -15112.99 317.94 0.00 177.06 5.81 1.41 0.43 177.15 0.10 441.89 2.84 82.05 82.05 83.95 1.72 23.29 23.29 2.77 82.49 1.00 1.00
Arbia AR1040 -15035.26 318.31 0.00 176.89 6.19 1.88 0.38 177.05 0.18 377.73 2.80 77.24 77.24 80.67 1.79 17.88 17.88 2.62 80.97 1.00 1.00
Arbia AR1041 -14666.54 315.85 0.00 176.10 5.85 2.77 0.51 176.28 0.39 350.34 3.10 78.80 91.52 95.53 1.87 17.05 17.05 2.75 82.23 1.00 1.00
Arbia AR1042 -14433.38 315.80 0.00 175.24 5.57 2.55 0.53 175.57 0.33 313.34 3.03 40.85 40.85 43.23 1.87 12.39 12.39 2.87 83.41 1.00 1.00
Arbia AR1043 -14100.72 389.57 0.00 174.44 6.34 2.49 0.56 174.63 0.32 388.84 2.28 95.83 95.83 99.24 1.76 19.47 19.47 2.16 75.84 1.00 1.00
Arbia AR1044 -14032.61 389.19 0.00 174.21 6.41 2.11 0.45 174.44 0.23 437.27 2.66 82.51 90.34 93.83 1.91 18.53 18.53 2.46 79.26 1.00 1.00
Arbia AR1045 -13887.92 389.50 0.00 173.69 5.39 2.39 0.57 173.97 0.29 358.00 2.26 72.76 94.63 97.77 1.62 16.48 16.48 2.08 74.92 1.00 1.00
Arbia AR1046 -13727.84 390.59 0.00 173.29 6.34 1.83 0.42 173.44 0.17 426.40 2.54 85.58 85.58 89.29 1.65 21.77 21.77 2.44 79.00 1.00 1.00
Arbia AR1047 -13492.72 391.40 0.00 172.97 6.27 1.70 0.32 173.10 0.15 540.55 3.31 70.15 70.15 74.15 2.06 23.24 23.24 3.13 80.92 1.00 1.00
Arbia AR1048 -13234.04 393.17 0.00 172.79 5.89 1.36 0.31 172.86 0.09 694.31 3.10 103.89 123.44 127.70 2.00 32.21 32.21 2.52 77.52 1.00 1.00
Arbia AR1049 -13165.89 418.78 0.00 172.75 6.00 1.35 0.28 172.84 0.09 636.03 2.61 123.20 123.20 126.53 1.85 31.34 31.34 2.48 79.41 1.00 1.00
Arbia AR1050 -13110.97 417.77 0.00 172.66 5.91 1.72 0.34 172.80 0.15 580.42 2.83 91.71 91.71 94.49 2.03 25.14 25.14 2.68 81.57 1.00 1.00
64
Tr 100 anni
Tronco Sezione P[m] q[mc/s] s[mc/s] h[m] y[m] V [m/s] Fr Et[m] Ev[m] Sp[t] ym[m] b[m] bt[m] B[m] Pb[m] A[dmq] At[dmq] R[m] C2 beta alfa
Arbia Ar2033 -17289.32 444.14 0.00 182.30 5.40 2.13 0.49 182.51 0.23 424.33 2.27 97.79 97.79 100.30 1.51 22.04 22.04 2.20 76.34 1.00 1.00
Arbia Ar2034 -16899.59 443.35 0.00 181.93 5.83 1.79 0.40 181.97 0.16 769.93 2.38 211.37 211.37 214.71 1.50 48.68 48.68 2.30 77.53 1.00 1.00
Arbia AR2035_B -16873.81 443.29 0.00 181.18 5.08 3.33 0.63 181.74 0.56 399.40 2.94 48.00 48.00 66.38 1.87 13.31 13.31 2.01 74.04 1.00 1.00
Arbia AR2035_C -16863.81 443.25 0.00 180.84 4.74 3.79 0.80 181.56 0.73 376.91 2.50 48.00 48.00 63.73 1.76 11.75 11.75 1.84 72.00 1.00 1.00
Arbia Ar2036 -16851.00 443.05 0.00 181.13 5.73 1.52 0.31 181.16 0.12 834.75 2.60 273.64 273.64 275.83 1.73 59.59 59.59 2.53 80.03 1.00 1.00
Arbia AR2037_B -16529.00 438.83 0.00 180.13 5.07 2.48 0.54 180.44 0.31 411.44 2.44 73.21 73.21 97.42 1.69 17.85 17.85 1.83 71.84 1.00 1.00
Arbia AR2037_C -16519.00 438.82 0.00 180.05 4.99 2.56 0.57 180.38 0.33 400.90 2.36 72.98 72.98 96.44 1.66 17.26 17.26 1.79 71.28 1.00 1.00
Arbia AR1034 -16364.46 439.81 0.00 179.60 4.80 1.90 0.45 179.77 0.18 495.31 2.90 92.36 105.60 107.40 1.75 23.87 23.87 2.83 83.06 1.00 1.00
Arbia AR1035 -16092.46 442.19 0.00 179.08 5.81 1.88 0.44 179.20 0.18 485.53 2.25 152.53 152.53 155.74 1.53 29.05 29.05 2.16 75.93 1.00 1.00
Arbia AR1036 -15871.53 443.86 0.00 178.47 5.57 2.21 0.45 178.70 0.25 429.54 2.55 80.57 80.57 83.04 1.64 20.53 20.53 2.47 79.39 1.00 1.00
Arbia AR1037 -15505.53 445.85 0.00 178.00 5.68 1.58 0.42 178.09 0.13 571.39 2.61 120.04 120.04 122.43 1.63 31.37 31.37 2.56 74.64 1.00 1.00
Arbia AR1038 -15360.05 448.98 0.00 177.91 6.01 1.39 0.44 177.97 0.10 677.90 2.84 129.53 129.53 131.88 1.71 36.75 36.75 2.79 82.10 1.00 1.00
Arbia AR1039 -15112.99 450.46 0.00 177.65 6.40 1.60 0.42 177.78 0.13 623.60 3.38 83.28 83.28 85.32 1.96 28.11 28.11 3.30 87.37 1.00 1.00
Arbia AR1040 -15035.26 450.04 0.00 177.43 6.73 2.01 0.42 177.64 0.21 521.70 2.84 95.00 95.00 98.46 1.92 22.41 22.41 2.66 81.32 1.00 1.00
Arbia AR1041 -14666.54 449.48 0.00 176.66 6.41 2.56 0.47 176.87 0.34 530.65 2.99 79.25 92.02 96.03 1.97 22.19 22.19 2.66 81.35 1.00 1.00
Arbia AR1042 -14433.38 448.62 0.00 175.76 6.09 3.05 0.55 176.23 0.47 441.20 3.16 46.57 46.57 49.18 2.05 14.73 14.73 3.00 84.63 1.00 1.00
Arbia AR1043 -14100.72 551.94 0.00 174.98 6.88 2.54 0.56 175.23 0.33 573.23 2.55 96.98 96.98 100.41 1.81 24.71 24.71 2.46 76.57 1.00 1.00
Arbia AR1044 -14032.61 552.35 0.00 174.77 6.97 2.41 0.49 175.03 0.30 607.15 2.65 91.23 91.23 94.83 2.03 23.70 23.70 2.50 79.56 1.00 1.00
Arbia AR1045 -13887.92 552.45 0.00 174.26 5.96 2.62 0.57 174.58 0.35 552.51 3.00 73.01 94.63 97.77 1.90 21.91 21.91 2.24 74.33 1.00 1.00
Arbia AR1046 -13727.84 554.91 0.00 173.88 6.93 2.10 0.42 174.08 0.23 612.94 3.09 86.74 86.74 90.59 1.87 26.83 26.83 2.96 84.29 1.00 1.00
Arbia AR1047 -13492.72 556.20 0.00 173.56 6.86 1.93 0.32 173.74 0.19 788.99 4.14 70.51 70.51 74.51 2.34 29.18 29.18 3.92 82.54 1.00 1.00
Arbia AR1048 -13234.04 555.87 0.00 173.39 6.49 1.42 0.32 173.49 0.10 991.13 3.81 104.13 123.44 127.70 2.30 39.68 39.68 3.11 78.19 1.00 1.00
Arbia AR1049 -13165.89 597.76 0.00 173.35 6.60 1.54 0.29 173.47 0.12 882.56 3.03 128.19 128.19 131.56 2.03 38.87 38.87 2.95 84.24 1.00 1.00
Arbia AR1050 -13110.97 595.74 0.00 173.30 6.55 1.72 0.34 173.42 0.15 901.47 3.01 127.68 127.68 130.90 2.10 38.46 38.46 2.94 81.68 1.00 1.00
65
Tr 200 anni
Tronco Sezione P[m] q[mc/s] s[mc/s] h[m] y[m] V [m/s] Fr Et[m] Ev[m] Sp[t] ym[m] b[m] bt[m] B[m] Pb[m] A[dmq] At[dmq] R[m] C2 beta alfa
Arbia Ar2033 -17289.32 517.75 0.00 182.57 5.67 2.11 0.49 182.79 0.23 516.28 2.52 97.80 97.80 100.32 1.64 24.67 24.67 2.46 77.10 1.00 1.00
Arbia Ar2034 -16899.59 518.00 0.00 182.31 6.21 1.80 0.40 182.35 0.17 976.96 2.62 216.69 216.69 220.12 1.63 56.83 56.83 2.58 80.54 1.00 1.00
Arbia AR2035_B -16873.81 517.78 0.00 181.44 5.34 3.57 0.63 182.09 0.65 474.55 3.31 48.00 48.00 68.61 1.97 14.51 14.51 2.11 75.36 1.00 1.00
Arbia AR2035_C -16863.81 517.77 0.00 181.07 4.97 4.10 0.81 181.88 0.86 445.79 2.79 48.00 48.00 65.51 1.83 12.84 12.84 1.96 73.47 1.00 1.00
Arbia Ar2036 -16851.00 517.62 0.00 181.40 6.00 1.51 0.31 181.43 0.12 1069.45 2.63 310.42 310.42 314.54 1.74 73.19 73.19 2.56 80.36 1.00 1.00
Arbia AR2037_B -16529.00 513.87 0.00 180.36 5.30 2.63 0.53 180.71 0.35 482.35 2.65 73.87 73.87 100.20 1.76 19.55 19.55 1.95 73.37 1.00 1.00
Arbia AR2037_C -16519.00 513.90 0.00 180.27 5.21 2.74 0.56 180.65 0.38 468.52 2.57 73.61 73.61 99.11 1.73 18.89 18.89 1.91 72.78 1.00 1.00
Arbia AR1034 -16364.46 514.54 0.00 179.79 4.99 1.99 0.45 179.99 0.20 565.35 2.81 105.61 107.12 108.95 1.78 25.96 25.96 2.74 82.14 1.00 1.00
Arbia AR1035 -16092.46 513.10 0.00 179.26 5.99 1.83 0.42 179.40 0.17 557.36 2.19 153.85 153.85 157.14 1.51 31.88 31.88 2.11 75.24 1.00 1.00
Arbia AR1036 -15871.53 515.48 0.00 178.71 5.80 2.33 0.45 178.97 0.28 505.42 2.75 81.58 81.58 84.15 1.73 22.43 22.43 2.67 81.40 1.00 1.00
Arbia AR1037 -15505.53 514.02 0.00 178.25 5.94 1.55 0.42 178.37 0.12 682.66 2.87 120.04 120.04 122.43 1.76 34.43 34.43 2.81 74.11 1.00 1.00
Arbia AR1038 -15360.05 517.61 0.00 178.15 6.25 1.40 0.45 178.24 0.10 797.44 3.08 129.53 129.53 131.88 1.83 39.96 39.96 3.03 81.76 1.00 1.00
Arbia AR1039 -15112.99 520.62 0.00 177.96 6.71 1.72 0.42 178.11 0.15 733.09 3.66 83.95 83.95 86.06 2.09 30.76 30.76 3.57 89.77 1.00 1.00
Arbia AR1040 -15035.26 520.70 0.00 177.77 7.07 2.08 0.41 177.98 0.22 642.01 2.85 95.00 95.00 98.46 2.08 25.66 25.66 2.67 81.44 1.00 1.00
Arbia AR1041 -14666.54 517.63 0.00 176.95 6.70 2.79 0.51 177.17 0.40 636.35 3.14 79.33 92.02 96.03 2.12 24.89 24.89 2.75 82.28 1.00 1.00
Arbia AR1042 -14433.38 516.06 0.00 175.95 6.28 3.42 0.61 176.50 0.60 503.61 3.30 47.40 47.40 50.09 2.12 15.65 15.65 3.12 85.81 1.00 1.00
Arbia AR1043 -14100.72 652.31 0.00 175.25 7.15 2.49 0.55 175.53 0.31 687.95 2.82 96.98 96.98 100.41 1.94 27.34 27.34 2.72 77.34 1.00 1.00
Arbia AR1044 -14032.61 652.72 0.00 175.02 7.22 2.47 0.48 175.33 0.31 732.27 2.89 91.30 91.30 94.90 2.15 26.37 26.37 2.78 79.56 1.00 1.00
Arbia AR1045 -13887.92 651.38 0.00 174.57 6.27 2.70 0.57 174.92 0.37 680.98 3.38 73.15 94.63 97.77 2.04 24.76 24.76 2.53 74.77 1.00 1.00
Arbia AR1046 -13727.84 650.72 0.00 174.24 7.29 2.26 0.42 174.48 0.26 748.21 3.43 87.45 87.45 91.39 2.02 29.98 29.98 3.28 87.22 1.00 1.00
Arbia AR1047 -13492.72 652.17 0.00 173.93 7.23 2.03 0.32 174.13 0.21 961.24 4.66 70.74 70.74 74.73 2.53 32.94 32.94 4.41 83.56 1.00 1.00
Arbia AR1048 -13234.04 651.79 0.00 173.76 6.86 1.51 0.31 173.87 0.12 1191.79 4.24 104.28 123.44 127.70 2.48 44.24 44.24 3.46 78.04 1.00 1.00
Arbia AR1049 -13165.89 704.10 0.00 173.67 6.92 1.67 0.30 173.80 0.14 1033.91 3.30 130.34 130.34 133.73 2.14 43.05 43.05 3.22 86.68 1.00 1.00
Arbia AR1050 -13110.97 704.72 0.00 173.58 6.83 1.72 0.33 173.72 0.15 1056.41 3.30 127.68 127.68 130.90 2.24 42.07 42.07 3.21 81.19 1.00 1.00
66